Annex O To Loughborough University Estates Services Health and Safety Policy

Size: px
Start display at page:

Download "Annex O To Loughborough University Estates Services Health and Safety Policy"

Transcription

1 Annex O To Loughborough University Estates Services Health and Safety Policy Management Programme Of The Water Storage And Distribution Facilities Of Buildings And Cooling Towers On And Off Campus In Order To Effect Prevention And Control Of Legionnaires Disease Site Description And Technical Information 1. This Code of Practice covers the work undertaken by Loughborough University Estates Services, the Residential Organisation and contractors working on their behalf in order to effect compliance with the Health and Safety Commission document 'The Control of Legionella Bacteria in Water Systems, Approved Code of Practice and Guidance L8 (L8) and the Control of Substances Hazardous to Health (COSHH) Regulations. Water Storage Systems 2. One of the primary requirements from the Approved Code of Practice L8 document concerning the control of Legionella is the Identification and Assessment of the Risk. The University completed this Risk Assessment of its water storage systems during The following requirements are based on specialist contractors undertaking works on behalf of Loughborough University, based on the L8 document, with recommendations concerning inspection and cleaning of tanks following the original risk assessment. 3. The Mechanical Engineer maintenance shall be responsible for maintaining the cleaning, disinfection and conformity certification for water storage and distribution systems. 4. Currently, the Imago at Burleigh Court Short Course Centre is included in this Code of Practice. 5. This Management Programme for water storage and distribution systems includes regular pre-planned visits by specialised personnel to:- a. Annually Inspect or drain, inspect and clean domestic water storage tanks including disinfection of drained tanks on completion as itemised on the list of buildings given at Appendices 1, 2 and 3 as applicable. Any additional requirements found necessary on inspection are to be brought to the attention of the Contracts Engineer immediately for instructions. A photograph of all drained tanks is to be included as a record for the University. Draining calorifiers, and checking for debris, in the base of the vessel. The calorifier should then be cleaned if considered necessary (Approved Code of Practice L8, Items 182 paragraph C) August

2 Within the list of calorifiers given below and at Appendix 1, there are many sizes and types ranging from High Temperature Hot Water Pressure Vessels supplied on the primary side from central boiler houses, to domestic cylinders used in small houses. Many of the calorifiers do not have access ports in the base of the vessel for inspection purposes. Estates Services will continuously reassess the methodology by which inaccessible calorifiers are treated based on the following guidelines. The large pressure vessel calorifiers are inspected every four years for insurance purposes and at that time are completely drained, covers removed and inspected. The specialist water treatment contractor will be required to carry out inspections/cleaning and chlorinating on the systems affected by the insurance inspections at the same time, finally inspecting and spray chlorinating the internal surfaces of the calorifier at a maximum level of 50ppm for 1 hour. The calorifier will finally be boxed up by others. The list for these Pressure Vessel Domestic Hot Water Services Calorifiers for year one of the cycle is as follows:- Chemical Engineering HWS BA10 Electrical Engineering workshops HWS BA13 Mechanical Engineering (Wolfson Original) HWS BA8 Electrical Eng basement Toilets HWS BA15 Chemistry HWS B19 Brockington Extension HWS B29 Brockington Plant room HWS B24 Haslegrave HWS B34 Haslegrave Changing Rooms HWS B60 HWS B61 Whitworth HWS B50 HWS B51 The list for the Pressure Vessel Domestic Hot Water Services Calorifiers for year two of the cycle is as follows:- Herbert Manzoni LUSAD Fine Arts James France Towers Accommodation Hazlerigg Edward Herbert LUFS (Old Telford) Dance Studio Towers Refectory HWS B38 HWS BA13 HWS B21 HWS B23 HWS BDL8 HWS BDL9 HWS B36 HWS B10 HWS B11 HWS B50 HWS B51 HWS BDL10 HWS BDL11 August

3 The large pressure vessel calorifiers that are not being inspected for insurance purposes will annually have the secondary side (domestic hot water) drained, covers removed, inspected, cleaned as necessary, spray chlorinated and finally boxed up. The primary side of the calorifier, that does not require inspecting, will be isolated by Estates Services and a Permit to Work issued to the contractor. The non-statutory calorifiers are listed at Appendix 1 to this Annex and require secondary side (domestic hot water) draining, covers removing where fitted, inspecting, cleaning as necessary, spray chlorinating and finally boxing up. Where there are no inspection facilities, take TVC samples of calorifier drains or from the nearest domestic hot water sentinel outlet if no drain is available. The successful contractor is to compile a list of inspection covers and drain outlets that are not fitted for the University to consider a programme of installing these items where appropriate. It should be noted that anti-vacuum valves are incorporated in some of the hot water services systems. The Contractor shall be responsible for locating and opening these valves prior to draining down. At the same time as water tanks are being inspected, a Risk Assessment Review on tanks and plant rooms is to be carried out to highlight any hazards or potential hazards that may have developed since the last full Risk Assessment. b. Student Village The residential Village complex domestic hot and cold water is fed from the storage tanks in the Whitworth building. This system is continually dosed by an Envirox PWT chlorine dioxide generation unit and is monitored on a monthly basis by a specialist contractor, therefore the requirement for quarterly cleaning of shower heads is negated and an annual clean and sterilisation is undertaken. Buildings Number of Shower heads Whitworth 9 Cayley 135 Rutherford 118 Telford 108 Faraday 116 Royce 114 All the annual work is to take place over the summer vacation during July, August and September each year. c. Six Monthly All Academic and Residential domestic tanks temperature monitoring and recording as indicated in Appendices 2 and 3 to this Annex. August

4 d. Quarterly All Academic and Residential as indicated in Appendices 2 and 3 to this Annex (apart from Village Envirox chlorine dioxide systems) dismantle, de-scale and flush showerheads. A review meeting between the University Estates Services and the Contractor. e. Monthly Calorifiers flow and return temperatures. Sentinel tap hot water outlet temperatures after approx 1 minute. Sentinel tap cold water outlet temperatures after approx 2 minutes. Monitor and record above in the files supplied to the University. Residential Organisation operatives will run showers and taps as prescribed in the planned maintenance system initiated by Estates Services. f. Weekly Out Of Term Time Residential Organisation operatives will run showers and taps within any empty buildings as prescribed by the Estates Services planned maintenance system. Records of such work shall be maintained by Estates Services. 6. General Requirements The chosen specialist contractor is to supply and maintain works and test records throughout the contract period, up-dating monthly. The contractor must provide a clearly defined management Structure with contact telephone numbers both for routine and Emergency situations. The contractor must appoint a qualified and responsible person to manage their staff working on the campus and must be available on site personally. This duty may be undertaken, by a working supervisor. The contract for specialist services shall be reviewed every 3 years and shall consist of annual, 6 monthly, quarterly and monthly visits by specialised personnel who are competent and trained to the requirements of the above mentioned documents. The Maintenance Contracts Engineer shall maintain the schematic drawings of all water storage tanks and systems and shall ensure their availability at all times for use by direct labour and contractors as necessary. Any of the above listed buildings may in the future have their water storage tanks and systems altered or modernised and at that time a pro rata price adjustment is to be agreed. August

5 The Contractor is to supply all labour, tools, equipment (including access equipment) and transport to carry out the work. All labour must be competent and trained in matters of safety and procedures both for themselves and members of the public as per the 'Health and Safety at Work etc Act 1974'. Data sheets for all chemicals intended for use are to be issued prior to work and suitable and sufficient Control of Substances Hazardous to Health assessments are to be carried out in compliance with Control of Substances Hazardous to Health Regulations. Protective clothing and respiratory protection equipment with conforms to the appropriate statutory requirements are to be used where necessary. The Contractor is to be fully responsible for the disposal of effluent, which is to be fully in accordance with the requirements of the Water Act. 7. Extent Of Work At every visit the Contractor is to report to the Maintenance Contracts Engineer (or his representative) for instruction, to sign in the register and to obtain any necessary keys. The keys have to be signed for in the key register and returned each day. The hours of reporting and key availability are 0830 hours to 1230 hours and 1330 hours to 1700 hours Monday to Thursday and 0830 hours to 1230 hours and 1330 hours to 1630 hours on Friday. The visits will take place within these times. Any request for attendance outside these times, for whatever reason, will have to be specially arranged. All contractors staff shall undergo an Estates Services specific Health and Safety Induction before commencement of any work on site. This is an absolute requirement and under no circumstances shall any non-inducted staff be allowed to work on any system. The annual drain, inspect, clean and chlorination to tanks as per the itemised list to comply with Health and Safety document L8 shall be as follows:- a. Any water treatment equipment is to be disconnected from the system. b. The ph of the system is to tested and should fall between 5.5 and 9.0. If below 5.5 the system is to be drained, flushed and refilled with mains water. If the ph of the mains water falls outside the range of 5.5 and 9.0, the disinfection is Not to Proceed and both the University and Severn Trent Water Authority, (via the Maintenance Contracts Engineer), are to be notified. c. If the water ph is within the limits, the water storage tanks are to be isolated including inlets and outlets. The water is to be discharged in accordance with Severn Trent Water regulations. Attach suitable hazard warning notices to ALL inlets and outlets, e.g.; 'DANGER - Do Not Use'. Please note:- The positions of the outlet valves are to be recorded before isolation to enable the identical water flow rates to be achieved when the tanks are returned to service. August

6 d. The water storage tank and associated fittings shall be cleaned using high pressure water jetting or manual methods. The ball float is to be thoroughly cleaned and the tank rinsed down. Suitable personal protective equipment (PPE) shall be worn by all personnel, during the cleaning and sterilisation processes. e. Residue is to be removed by the use of wet and dry vacuum cleaning and disposal down a foul drain. The tank is then to be rinsed with fresh water. f. The tank is to be refilled with fresh make up water and isolated from the mains supply. The tank is then to be chlorinated to a level of 50ppm for 1 hour topping up the tank as necessary. g. The chlorine will then be neutralised using Sodium Thiosulphate to ensure the chlorine level in the tank is no higher than that of the incoming mains supply. h. The tank will then be flushed and refilled, and then further PH of the tank water taken to ensure it falls between 5.5 and 9.0. The tank is to be de-isolated from the system, with valves being returned to their as found position. i. Where internal conditions of the tank is such that painting or other refurbishment is required, or the tank does not comply in any way with Water Regulations 1999, the contractor is to report this to the Maintenance Contracts Engineer on a written report. Any remedial work instructed by the Maintenance Contracts Engineer would be subject to an additional order. j. Residential Organisation operatives will run showers and taps within any empty buildings as prescribed by the Estates Services planned maintenance system. Records of such work shall be maintained by Estates Services. 8. Cooling Towers This section covers the approach adopted by Estates Services for the total management of the Pilkington Library Cooling Tower. Works Instruction H050, which was re-assessed following the audit in October 2003, is reproduced hereunder in order to effect compliance with L8. The Cooling Tower is stripped and cleaned twice a year either by specialist contractors or utilising suitably trained and competent in house labour, with weekly tasks undertaken by in house staff supplemented by specialist chemical contractor s monthly visits. The routine tasks are incorporated in the Estates Services planned maintenance system. The Cooling Tower system Log Book is maintained by the Mechanical Services Supervisor and routinely audited by Estates Services Health and Safety Officer. August

7 9. Planned preventative maintenance instructions for evaporative cooling towers (H050). Safety in all its aspects concerns everyone and Safety Rules and Regulations must be observed. It is essential that all Plant and Equipment is rendered and kept safe whilst it is being worked on. Also, that suitable protective clothing and other safeguards are worn and used at all times. Only suitably trained and authorised personnel shall carry out work on the cooling tower or any of its component parts. Reference is to be made to the individual chemical product data sheets that are located at each water treatment/injection point before any work whatsoever takes place or treatment chemicals are handled. Before work or checks are carried out on any item of plant or machinery which is of the moving type, whether automatically controlled or not, such plant is to be isolated, both electrically and hydraulically from ALL sources of supply, and caution notices are to be fitted at points of isolation. 10. Pre-Cleaning Operations Thursday a. Water treatment dosage equipment turned off / isolated, and tower manual bleed valve opened up to the maximum sustainable rate to reduce the ph value in the system and to minimise chlorine demand. Friday b. Post warning notices around Cooling Tower indicating that chlorination is in progress. c. Add bio-dispersant 2504 to achieve a concentration of 10ppm direct to tower sump and disinfectant to achieve a free chlorine reserve of 5ppm. This chlorinated water shall be circulated throughout the whole of the system for five hours, with the fans off. During circulation, hourly tests are to be carried out to determine the levels of free available chlorine and ph. If necessary more chemical will be added to maintain the required 5ppm of free chlorine. If ph levels increase above a value of 8.0 then a level of 15-20ppm of free chlorine should be achieved. d. The system should then be de-chlorinated using sodium thiosulphate (if system capacity is greater than 5000 litres). e. Isolate plant and commence slowly draining the tower in order to ensure acceptable dilution rates for Water Authority. August

8 Cleaning Saturday and Sunday f. Drain out any residual water, and dry tower pond. g. Strip the tower and its components including louvres, baffles, drift eliminators and the filling sections. h. Clean and de-scale all items in 8 above. Report any damaged items. i. Clean all debris and scale from the pond, including build up on immersion heaters, ball valves etc. j. Inspect pond and re-treat metallic areas as necessary with approved sealer or cold galvanising compound as applicable. k. Remove and clean screens/strainers, including sheet surfaces, both sides. Retreat with cold galvanising compound, as required. Report condition on job card. l. Check, clean and treat any associated holding tanks. m. Reassemble cooling tower and all associated equipment once all treated surfaces are dry/cured. Post cleaning disinfection Monday n. Refill system with fresh water and repeat steps 3 to 6. o. Refill with fresh water via the automatic make up and dosing system to achieve ppm residual bromine. p. Bring system back onto line and check residual values of bromine and record. q. Notify department that maintenance is completed and that tower is running normally. r. Remove warning signs and notices. 11. Notes a. Normal protective clothing is suitable for all inspections and cleaning operations. Care should be taken to ensure adequate ventilation when applying surface coatings, even on external surfaces. August

9 b. Where balance tanks require total repainting, specific risk assessments are to be carried out. c. In order to prevent exposure to atomised water sprays that may contain biocides, high-pressure cleaning jetters are not to be used unless positive displacement facemasks are worn with suitable filters. d. All recordings and findings are to be entered in the relevant Cooling Tower logbook together with the competent supervisors name and signature. e. Where the above tasks are modified to suit departmental or other requirements, such modifications to procedure are to be entered on the written report. 12. Review The managerial approach to the prevention of Legionella shall be reviewed by an agency or department external to Estates Services Maintenance following the discovery of legionella bacteria within any system or at a maximum of every three years. August

The Control of Legionella Bacteria in Water Systems: Policy and Procedures. Estates Operations

The Control of Legionella Bacteria in Water Systems: Policy and Procedures. Estates Operations The Control of Legionella Bacteria in Water Systems: Policy and Procedures Estates Operations April 2018 Page 1 of 12 Imperial College Policy Statement Sections 2 and 3 of the Health and safety at Work

More information

Water Hygiene Chlorination Water Treatment Legionella Control

Water Hygiene Chlorination Water Treatment Legionella Control www.whs-ltd.com Water Hygiene Chlorination Water Treatment Legionella Control DOWNSERVICES DISINFECTION Cleaning and Chlorination Procedure A clean and chlorination has recently been carried out on your

More information

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes Document Control Revision No. Date Document Reviewed Publication on Web Site Date of next Review Summary of main changes Draft May 2017 New version of document 1 May 2017 May 2017 May 2018 Update of document

More information

WATER SAFETY POLICY. Deputy Director of Estates & Facilities & Tetra Consulting. This Policy applies to the Estates and Facilities Department.

WATER SAFETY POLICY. Deputy Director of Estates & Facilities & Tetra Consulting. This Policy applies to the Estates and Facilities Department. A member of: Association of UK University Hospitals WATER SAFETY POLICY POLICY NUMBER TPRHS170 POLICY VERSION V.2 RATIFYING COMMITTEE Estates & Facilities Executive Group DATE RATIFIED 24 October 2016

More information

WATER SAFETY POLICY. Version Water Policy V2. Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group

WATER SAFETY POLICY. Version Water Policy V2. Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group East Cheshire NHS Trust WATER SAFETY POLICY Version 2.0 File ref 150820 Water Policy V2 Date approved draftcomments[1] June 2016 Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group

More information

UNIVERSITY OF SHEFFIELD

UNIVERSITY OF SHEFFIELD UNIVERSITY OF SHEFFIELD CONTROL OF LEGIONELLA BACTERIA WITHIN WATER SYSTEMS POLICY & PROCEDURES Contents: 1 Background 2 Commitment statement 3 Risk Assessment 3.1 Risk assessment policy 3.2 Persons at

More information

CONTROL OF LEGIONELLA

CONTROL OF LEGIONELLA CONTROL OF LEGIONELLA Safety Code No 38 Rev. 1.7, Issued October 2018 Note - This document may have been superseded by a more recent version. Contents 1. Purpose... 4 2. Scope... 5 3. Definitions... 5

More information

Edinburgh Napier University

Edinburgh Napier University Edinburgh Napier University Water Management Policy - Control of Legionella bacteria within water systems Policy Reference: WMP: 4.0 2015 Date of Issue: May 2015 Prepared by: Property & Facilities Date

More information

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT The management of Draks Interior Door Systems Ltd looks upon the promotion of Health and Safety measures as a mutual objective for themselves and their

More information

Legionella Compliance For The Social Housing Sector. 7 th November 2018 Ian Childs Client Relationship Director

Legionella Compliance For The Social Housing Sector. 7 th November 2018 Ian Childs Client Relationship Director Legionella Compliance For The Social Housing Sector 7 th November 2018 Ian Childs Client Relationship Director Services Provided.. Risk Assessment Remedial Works Disinfection Dosing Monitoring Water Hygiene

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY 1. Policy Statement CONTENTS 1. Policy Statement 2. Responsibilities 3. In Practice 3.1 Risk Assessments 3.2 COSHH 3.3 PPE 3.4 Safety Training 3.5 Accident Procedure 3.6 Emergency Procedure 3.7 Site Audits

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Organisation June 2014 Organisation Management Structure Aaron Klatt Managing Director Director Responsible for Health & Safety Site Supervisors Sub-Contractors Specialist Contractors

More information

Certificate of Registration

Certificate of Registration Legionella Control Association A Recommended Code of Conduct for Service Providers This is to certify that the following company has submitted a registration under the Conditions of Compliance as laid

More information

DIT HEALTH AND SAFETY OFFICE

DIT HEALTH AND SAFETY OFFICE DIT HEALTH AND SAFETY OFFICE POLICY TITLE: Policy on Health and Safety Training for Staff REVISION NO.: 4 NUMBER OF PAGES: 14 DATE OF ISSUE: Adopted by DIT Health & Safety Committee 22 nd November 2011

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety

More information

CONTROLLING CONTRACTORS (Completely Rewritten)

CONTROLLING CONTRACTORS (Completely Rewritten) CONTROLLING CONTRACTORS (Completely Rewritten) 1.0 Purpose To ensure that the Health, Safety and Environmental risks associated with the employment of contractors are controlled through compliance with

More information

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions.

Annex CC To Facilities Management Department. Routine Audit and Monitoring of Health and Safety management functions. Annex CC To Facilities Management Department Routine Audit and Monitoring of Health and Safety management functions. The responsibilities and monitoring approaches contained within this guide are to be

More information

LEGIONELLA IN THE REAL WORLD. May 2017

LEGIONELLA IN THE REAL WORLD. May 2017 1 LEGIONELLA IN THE REAL WORLD May 2017 LEGIONELLA IN THE REAL WORLD Better L8 than Never 2 3 LEGIONELLA IN THE REAL WORLD Legionnaires Disease Bellevue - Stratford Hotel, Philadelphia 21-24 July 1976

More information

Safe System of Work Policy

Safe System of Work Policy Reviews and Revisions Safe System of Work Policy Action Date Reason Reviewer Safe System of Work Policy 1 1. Introduction Campus Services manage and deliver a wide range of activities, accommodation, catering,

More information

HVAC WATER TREATMENT 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. D. Section Plumbing (Potable) Water Treatment

HVAC WATER TREATMENT 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. D. Section Plumbing (Potable) Water Treatment 232500 HVAC WATER TREATMENT PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230510 Chilled Water Systems B. Section 230520 Heat Generation C. Section 230530 Clean Steam

More information

LCA STANDARD FOR THE DELIVERY OF LEGIONELLA RISK ASSESSMENT SERVICES

LCA STANDARD FOR THE DELIVERY OF LEGIONELLA RISK ASSESSMENT SERVICES LCA STANDARD FOR THE DELIVERY OF LEGIONELLA RISK ASSESSMENT SERVICES A) WHAT DOES THIS STANDARD COVER? 1 This service standard is for those involved in identifying, assessing and reporting on the risk

More information

Integrated System Procedures Legionella Control Association Statement of Compliance

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No : 14 Rev Date : 20/07/2016 Page 1 of 7 The services offered by HBE (Healthy Built Environment) under the scope of this code of conduct are limited to: 1. Risk Assessment Services

More information

Corporate. Emergency Standby Generator SOP. Document Control Summary

Corporate. Emergency Standby Generator SOP. Document Control Summary Corporate Emergency Standby Generator SOP Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims Implementation Date: Review

More information

Part 2 - Servicing Specification

Part 2 - Servicing Specification Part 2 - Servicing Specification Contract Reference PSG 147 Contract Title Catering Equipment Servicing Page 2 of 10 Overall Scope and Nature of the Requirement Applicants are invited from suitably experienced

More information

Management of sources of ionising radiation

Management of sources of ionising radiation Health and Safety Services WELLBEING, SAFETY AND HEALTH Management of sources of ionising radiation Guidance Doc control no: PRSG13.2 WELLBEING, SAFETY AND HEALTH MANAGEMENT SYSTEM Author: HSS Approved

More information

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE Version 04.04.2017 Issue 1.2 (updated 17.01.2018) Approved by USG 10.10.17 1 CONTENTS 1 POLICY STATEMENT...1

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: 78 Fox Street Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET

More information

Estates and Campus Services (ECS) (including water assets directly under its control) WATER SAFETY PLAN Processes, Procedures and Permits

Estates and Campus Services (ECS) (including water assets directly under its control) WATER SAFETY PLAN Processes, Procedures and Permits Estates and Campus Services (ECS) (including water assets directly under its control) WATER SAFETY PLAN Processes, Procedures and Permits This Water Safety Plan 'Processes, Procedures and Permits Document'

More information

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE INTRODUCTION The Company was founded in 1973, as a designer, manufacturer and installer of glass reinforced plastic water cooling towers. Services offered include the design and manufacture of cooling

More information

Estates & Works Department

Estates & Works Department Estates & Works Department Statutory Compliance Strategic Plan 2014 1 INDEX 1. INTRODUCTION 2. SUMMARY 3. CONTROL OF CONTRACTORS 4. ELECTRICAL 5. GAS SAFETY 6. VENTILLATION 7. LEGIONELLA 8. MEDICAL GAS

More information

UNCONTROLLED WHEN PRINTED

UNCONTROLLED WHEN PRINTED Estates and Campus Services (ECS) (including water assets directly under its control) WATER SAFETY PLAN This Water Safety Plan 'Book' was formally approved by the Director of ECS on: Date: Name: Signed:.........

More information

Scottish Health Technical Memorandum 04-01: Water safety for healthcare premises: Part C: TVC Testing Protocol

Scottish Health Technical Memorandum 04-01: Water safety for healthcare premises: Part C: TVC Testing Protocol Scottish Health Technical Memorandum 04-01: Water safety for healthcare premises: Part C: TVC Testing Protocol February 2014 Contents Page Acknowledgements... 3 Preface... 4 About Scottish Health Technical

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: ABSA Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES

More information

Legionella policy plan. Document information

Legionella policy plan. Document information 2006-0037425 Field of application RWE Generation NL Valid until 01-12-2020 Document information Version Version date Authorisation V2.0 01-12-2017 Health, Safety and Security Manager - R. Kamst Changes

More information

GUIDE TO LEGIONELLOSIS - Operation & Maintenance

GUIDE TO LEGIONELLOSIS - Operation & Maintenance Application Guide AG 19/2000 GUIDE TO LEGIONELLOSIS - Operation & Maintenance R G Brown M A Roper Application Guide AG 19/2000 GUIDE TO LEGIONELLOSIS - Operation & Maintenance R G Brown M A Roper Old Bracknell

More information

During the design of SCART representatives from the Health & Safety Executive were very supportive of its development and its national application.

During the design of SCART representatives from the Health & Safety Executive were very supportive of its development and its national application. LANARKSHIRE NHS BOARD QUARTERLY PERFORMANCE REPORT PERIOD TO JUNE 2009 ANNEX 5 SUBJECT: LEAD: ESTATES, PROPERTY & ENVIRONMENT I ROSS STATUTORY COMPLIANCE AUDIT AND RISK TOOL (SCART) 1. Background SCART

More information

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No: 18 Rev Date : 02/07/2018 Page 1 of 7

Integrated System Procedures Legionella Control Association Statement of Compliance Procedure No: IP-028 Rev No: 18 Rev Date : 02/07/2018 Page 1 of 7 Procedure No: IP-028 Rev No: 18 Rev Date : 02/07/2018 Page 1 of 7 The services offered by HBE under the scope of this code of conduct are limited to: 1. Risk Assessment Services 3. Hot and Cold-Water Monitoring

More information

HEALTH & SAFETY POLICY OF:

HEALTH & SAFETY POLICY OF: HEALTH & SAFETY POLICY OF: SMITH & SONS (BLETCHINGTON) LTD including: HARDWICK FARMS LIMITED SMITHS CONSTRUCTION (BLETCHINGTON) LIMITED LINEAR FISHERIES (OXFORD) LTD STATEMENT OF POLICY Our policy is to

More information

WHS-08 Legionella Health Risk Management

WHS-08 Legionella Health Risk Management Table of Contents 1 Purpose... 3 2 Scope... 3 3 Roles and responsibilities... 3 4 Definitions... 4 5 References... 5 6 Records... 5 7 Legionella bacteria health risk precautionary measures... 5 8 Legionella

More information

London School of Economics & Political Science. Policy for the Control of Legionella Bacteria in Water Systems

London School of Economics & Political Science. Policy for the Control of Legionella Bacteria in Water Systems London School of Economics & Political Science Policy for the Control of Legionella Bacteria in Water Systems Approved by Estates Strategy Committee 09.10.2012 Next Review Date 15.03.2017 London School

More information

Cooling Water System Inspection Process. Presented by Craig Nicks, City of Onkaparinga

Cooling Water System Inspection Process. Presented by Craig Nicks, City of Onkaparinga Cooling Water System Inspection Process Presented by Craig Nicks, City of Onkaparinga What is the cooling water system used for? Air handling i.e. Commercial A/C Industrial / Commercial i.e. Plastics moulding

More information

Document B Specification

Document B Specification Tender for The Provision of a Communal Cleaning & Window Cleaning Service Reference: PDT 18-035 Document B Specification Dated: February 2019 General Scope This specification defines the quality and standards

More information

Water Efficiency for Small Businesses

Water Efficiency for Small Businesses Water Efficiency for Small Businesses Water Efficiency Audit for Small Businesses Most companies and organisations know how much water they use but do not always use this information to help reduce the

More information

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

Guideline for In-Service Assessment of Ammonia Refrigeration Plants Guideline for In-Service Assessment of Ammonia Refrigeration Plants This communication is intended to be used by plant owners and operators to provide guidance in preparation for an assessment of the plant

More information

SITE MASTER FILE For MHRA

SITE MASTER FILE For MHRA ABC CO., LTD. For MHRA Prepared by Date Approved by Date Verified by Date Document No.: SMF, Version No: 01, Effective Date: 09/05/06 Document No.: SMF Version No.: 01 Effective Date: 09/05/06 Page 2 of

More information

CONTINGENCY MEASURES

CONTINGENCY MEASURES "WATER SAFETY PLAN" Incorporating Legionella safe hot water, cold water, drinking water and ventilation systems Management and Control BOOK 4 CONTINGENCY MEASURES This document was formally approved by

More information

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015 1.0 Summary of Changes 1.1 This is a new joint procedure/sop for Essex Police and Kent Police. 2.0 What this Procedure is about 2.1 This document identifies how Essex Police and Kent Police shall manage

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

Legionella Control & Management. by Rami E. Kremesti M.Sc., CSci, CEnv

Legionella Control & Management. by Rami E. Kremesti M.Sc., CSci, CEnv Legionella Control & Management by Rami E. Kremesti M.Sc., CSci, CEnv History the organism was first identified in 1976 during an outbreak at an American Legion Convention in Philadelphia. 34 attendees

More information

North West Facilities Ltd

North West Facilities Ltd Project/Contract North West Facilities Ltd 17-18 Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891 557 581 Full bathroom refit Principle Contractor

More information

CONTROL OF LEGIONELLA FOR THE CAR WASH INDUSTRY

CONTROL OF LEGIONELLA FOR THE CAR WASH INDUSTRY CONTROL OF LEGIONELLA FOR THE CAR WASH INDUSTRY Legionella has become a focus for the car wash industry since the outbreak of Legionnaires disease at a car wash in Hoppers Crossing, Victoria. Legionnaires

More information

ATOC Guidance Note Provision of Drinking Water for On-Train Use

ATOC Guidance Note Provision of Drinking Water for On-Train Use ATOC Guidance Note Provision of Drinking Water Synopsis This Guidance Note provides advice on the management of drinking water supply, storage, use and chlorination at depots, stations and on-train, to

More information

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES TABLE OF CONTENTS INTRODUCTION Page 1 STATEMENT OF INTENT Page 2 Employer's Responsibilities Management Regulations Page 3 Employee's Responsibilities Page 4 Information for Employees Joint Consultation

More information

Wellhouse - The Place To Be

Wellhouse - The Place To Be POLICY ASBESTOS (MAINTENANCE) Wellhouse - The Place To Be Policy Created: February 2016 Date of Review: May 2017 Date of Next Review May 2020 1 Section Content Pages 1. Vision and values 2. Governance

More information

Contractor safety for schools and services. Guidance

Contractor safety for schools and services. Guidance Health and safety services Health and safety services Contractor safety for schools and services Guidance Updated September 2008 and amended March/May 2009 Contents 1.0 Planning the work 1.1 Minor alterations

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading

More information

PICS Health and Safety Policy and Arrangements

PICS Health and Safety Policy and Arrangements PICS Health and Safety Policy and Arrangements H&S Manual 2016 page 1 of 16 Date issued: November 2016 Contents Policy Statement & Organisation Details... 3 Health and Safety Policy Statement... 4 Health

More information

Cooling Tower Treatment Chemicals

Cooling Tower Treatment Chemicals Cooling Tower Treatment 1) Scale & Corrosion Inhibitors 1. Cooling Tower Treatment Code Product Name 2048 Combined Scale Control / Anti-Foulant-cooling Systems 2202 Scale & Corrosion Inhibitor (Hard Water)

More information

Gelovit 200 en English

Gelovit 200 en English Gelovit 200 en English Translation of the original instructions BA 85 981 / 02 334.00001... en Gelovit 200 This unit documentation is part of the unit and must be enclosed when selling or passing on the

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

Management and Control of Legionella Procedure

Management and Control of Legionella Procedure Management and Control of Legionella Procedure Version Number 3.0 Effective from 24 April 2017 Author: Head of Operations Estates and Facilities Document Control Information Revision History incl. Authorisation:

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION Section 13207 GROUND STORAGE PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and installation of surface water inlet piping, appurtenances, cleaning and disinfection of existing ground

More information

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9

ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9 ESTATES DEPARTMENT Management of Asbestos Policy and Procedures Document Rev 9 Contents SECTION 1: Estates Management of Asbestos Policy 1.1 Introduction 1.2 Policy Statement 1.3 Legal Requirements 1.4

More information

RISK ASSESSMENT OF SYSTEMS IN RESIDENTIAL LOG BOOK

RISK ASSESSMENT OF SYSTEMS IN RESIDENTIAL LOG BOOK OF C O L D A N D H O T WAT E R SYSTEMS IN RESIDENTIAL A C C O M M O D AT I O N LOG BOOK LOG BOOK Water System Hygiene - Cold and Hot Water Systems Risk Assessment Survey and Log Book Record Name of premises

More information

Health & Safety Policy & Management Systems. Guidance Note 13

Health & Safety Policy & Management Systems. Guidance Note 13 Health & Safety Policy & Management Systems Guidance Note 13 1 Health & Safety Policy & Management Systems Introduction This Guidance Note gives practical information regarding basic health and safety

More information

Genetic Modification. University Health and Safety Policy. Version 1: September 2015 Author: Health & Safety Services 1

Genetic Modification. University Health and Safety Policy. Version 1: September 2015 Author: Health & Safety Services 1 Genetic Modification University Health and Safety Policy Author: Health & Safety Services 1 Genetic Modification Procedure to support University Health and Safety Policy CONTENT Section Page 1 Introduction

More information

Policy for the Control of Legionella Bacteria in Water Systems

Policy for the Control of Legionella Bacteria in Water Systems Operational Policy for the Control of Legionella Bacteria in Water Systems London School of Economics Policy Statement The objective of the London School of Economics policy is to control, prevent and

More information

Health, Safety and Environmental Policy

Health, Safety and Environmental Policy Health, Safety and Environmental Policy REVISION HISTORY Description of Change Author Effective Date First Revision MB Health & Safety Ltd August2011 Second Revision MBHS November 2012 Purpose The purpose

More information

Wastewater Management Procedure Environment

Wastewater Management Procedure Environment 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to the management of wastewater and the operation and maintenance of Roy Hill wastewater treatment plants

More information

Health, Safety & Environment Committee

Health, Safety & Environment Committee SAF16-P12 10 February 2016 Health, Safety & Environment Committee Paper Title: Policy for Using Local Exhaust Ventilation Systems (LEV) Author: Catherine Moore/Alan Love 1. Specific Decision Required by

More information

SECTION 6: HYDRAULICS CONTENTS

SECTION 6: HYDRAULICS CONTENTS SECTION 6: HYDRAULICS CONTENTS 6.1 INTRODUCTION 2 6.2 HYDRAULIC SERVICES 2 6.2.1 Standards and Regulations 2 6.2.2 Sanitary Plumbing Drainage and Fixtures 3 6.2.3 Roof and Paved Surface Drainage System

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Policy Statement What is Comms-care s commitment to H&S Comms-care Group Ltd places the highest priority on protecting the health, safety and wellbeing of its employees and others,

More information

Risk Assessment Policy

Risk Assessment Policy Risk Assessment Policy 1. Introduction Risk assessment is a pivotal concept in health and safety risk management. However, it is often seen as a bureaucratic or a complex process. Neither is true. Risk

More information

Method Statement Risk Assessment

Method Statement Risk Assessment 1 SCOPE OF WORKS Flushing, cleansing,, Pipework and Heating Coils, Under Floor Circuit of any installation via the 1 ½ Flushing points provided or removal of pump. Use our 600/1000 litre Flushing system

More information

Material Safety Data Sheet

Material Safety Data Sheet Material Safety Data Sheet 1. Identification of the material and supplier Trade name of product ADG Emergency telephone number Material uses GUARDIAN SAFE PLUS GUARDIAN SAFE PLUS Not regulated. Supplier

More information

Quality Control Manual DOCUMENT NUMBER 15

Quality Control Manual DOCUMENT NUMBER 15 Quality Control Manual DOCUMENT NUMBER 15 Table of Contents 1. Distribution... 2 2. Scope... 2 3. Definitions... 2 4. Principal Characteristics of the Quality Management System... 3 5. Quality Policy...

More information

LEAD HAZARD CONTROL PROGRAM

LEAD HAZARD CONTROL PROGRAM LEAD HAZARD CONTROL PROGRAM Supervisor s Manual Prepared by Environmental Health and Safety Services Occupational Safety Programs GLOSSARY Abatement or Deleading CFR Control Measure Encapsulation EPA HEPA

More information

IAEA Specification, Dismantle & installation of cooling system. Dated 2017/07/19

IAEA Specification, Dismantle & installation of cooling system. Dated 2017/07/19 Dismantle & installation of 1. Introduction This Statement of work (SOW) describes the requirements for the services needed to refurbish the ( The System ) of the nuclear research reactor at the Instituto

More information

State of Alaska Department of Corrections Policies and Procedures Chapter: Subject:

State of Alaska Department of Corrections Policies and Procedures Chapter: Subject: State of Alaska Department of Corrections Policies and Procedures Chapter: Subject: Sanitation Hygiene Institutional Sanitation Index #: 806.01 Page 1 of 6 Effective: 6/17/2013 Reviewed: Distribution:

More information

Seeing is Believing - Convincing System Owners to Take Action. Kelly Galloway, P.Eng. Stratford, PE Canada

Seeing is Believing - Convincing System Owners to Take Action. Kelly Galloway, P.Eng. Stratford, PE Canada Seeing is Believing - Convincing System Owners to Take Action Kelly Galloway, P.Eng. Stratford, PE Canada kelly@dynamicmonitors.com Case Study: Nursing & Assisted Living Facility Prince Edward Island,

More information

UKES. UK Environmental Services. creating a better environment

UKES. UK Environmental Services. creating a better environment creating a better environment Welcome to Limited Helping you protect your business, clients and staff Are you confident that your organisation or institution is meeting its environmental obligations under

More information

Staying Alive CIBSE. Legionella Risk Management Are you aware of your duty of care?

Staying Alive CIBSE. Legionella Risk Management Are you aware of your duty of care? CIBSE Staying Alive Legionella Risk Management Are you aware of your duty of care? Prepared by Tony Burns Senior Environmental Health Officer - PHU Wagga, & Legionella Consultant - NSW Health July,2016

More information

Local Rule: Engaging External Service Providers

Local Rule: Engaging External Service Providers Local Rule: Engaging External Service Providers 1. Significant Hazards Engaging incompetent Service Providers, failing to exchange appropriate health and safety information with them failing to adequately

More information

LEGIONELLA MANAGEMENT GUIDELINES

LEGIONELLA MANAGEMENT GUIDELINES LEGIONELLA MANAGEMENT GUIDELINES HYDROP E.C.S. PREPARED BY Samuel Rollins BSc (Hons) Wrens Court, 55 Lower Queen Street, Sutton Coldfield, West Midlands, B72 1RT Tel: 0121 354 2030 Fax: 0121 354 8030 info@hydrop.com

More information

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES Contents Policy on Health and Safety COSHH Policy Working with VDU's Policy Management of Health and Safety at Work Policy The Workplace

More information

Palmerston North City Council. Water Supply Mains Disinfection Code of Practice

Palmerston North City Council. Water Supply Mains Disinfection Code of Practice Palmerston North City Council Water Supply Mains Disinfection Code of Practice Palmerston North City Council Water Supply Mains Disinfection Code of Practice Environmental Training Centre 33 The Esplanade,

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3666.1:2011 AS/NZS 3666.1:2011 Australian/New Zealand Standard Air-handling and water systems of buildings Microbial control Part 1: Design, installation and commissioning AS/NZS 3666.1:2011 This

More information

Policy, Responsibilities & Procedures

Policy, Responsibilities & Procedures Health and Safety Services Policy, Responsibilities & Procedures for the management of Asbestos Containing Materials 1 Contents 1 Introduction... 3 2 Asbestos Policy... 4 2.1. Statement of Intent... 4

More information

A Short Presentation on Legionnaires' Disease. By Tom Toumazou Private Rented Sector Consultant

A Short Presentation on Legionnaires' Disease. By Tom Toumazou Private Rented Sector Consultant A Short Presentation on Legionnaires' Disease By Tom Toumazou Private Rented Sector Consultant What is Legionnaires' Disease Legionnaires disease is a potentially fatal form of pneumonia caused by the

More information

Contractors Safety Code of Practice

Contractors Safety Code of Practice Document Control Revision No. Date Document Reviewed 8 October 2017 Publication on Web Site November 2017 Date of next Review October 2019 or following any changes Summary of main changes Change in format

More information

Water Efficiency Management Plan (WEMP)

Water Efficiency Management Plan (WEMP) Water Efficiency Management Plan (WEMP) Please note: This plan is an example only, any reference to business/staff names, water use figures and actions are coincidental and fictional. This example is designed

More information

EcoCooler Evaporative Cooler. Legionella Risk Assessment

EcoCooler Evaporative Cooler. Legionella Risk Assessment EcoCooler Evaporative Cooler Legionella Risk Assessment Dr. Tom Makin BA, PhD, FIBMS, Chartered Scientist. Directorate Manager of the Department of Medical Microbiology at the Royal Liverpool University

More information

University of Portsmouth Safe System of Work Policy

University of Portsmouth Safe System of Work Policy University of Portsmouth Safe System of Work Policy Document title University of Portsmouth Safe System of Work Policy Document author and department Jonathan Latter Health & Safety Compliance Manager

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

JOB DESCRIPTION. 1. Job Title Sterile Services Technician 2. Base Sterile Services Department, Queensway, Telford Shropshire TF1 6AL

JOB DESCRIPTION. 1. Job Title Sterile Services Technician 2. Base Sterile Services Department, Queensway, Telford Shropshire TF1 6AL JOB DESCRIPTION 1. Job Title Sterile Services Technician 2. Base Sterile Services Department, Queensway, Telford Shropshire TF1 6AL 3. Band 3 4. Responsible To: Sterile Services Manager 5. Role summary:

More information

Efficient Operation of Swimming Pools and Hydrotherapy Pools

Efficient Operation of Swimming Pools and Hydrotherapy Pools Efficient Operation of Swimming Pools and Hydrotherapy Pools June 2012 Introduction Swimming and hydrotherapy pools located in schools are typically smaller (and may well be much older), than those found

More information

Biological Safety Policy

Biological Safety Policy Biological Safety Policy CONTENTS 1. University Policy 1.1 Purpose of the policy 1.2 Scope of the policy 2. Responsibilities of duty holders 2.1 Heads of Departments 2.2 Biological Safety Officer 2.3 Biological

More information

hebrochemie GmbH Premium coolants from hebro. Product group overview. Stimuli for people and the environment A member of the Chemetall Group

hebrochemie GmbH Premium coolants from hebro. Product group overview. Stimuli for people and the environment A member of the Chemetall Group hebrochemie GmbH Stimuli for people and the environment Premium coolants from hebro. Product group overview. A member of the Chemetall Group 1 Coolants. The basics. Facts worth knowing about hebro lub.

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information