1 In-Service Forcemain Condition Assessment Tim Ross and Reid McDougall TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON

2 Agenda Project background & planning EM assessment of CPP C301 (PCCP) and C303 (BWP) Planning and execution Calibration exercise Project results Conclusions & recommendations

3 Project Background Flow reversal project in 2012 CH2M Hill and the City of Calgary 2 forcemains flowing north Southbound flow considered Project criteria Condition assessment of the forcemains Forcemains must remain in service during inspections AWWA C 301 and C 303 Pipe Project / Logistical Considerations Tool insertion Tool retrieval Pipeline details plans Maintaining sufficient flow Identification of inline valves Tool tracking during inspection

4 Project Planning Total inspection: 12,096 m 750 mm diameter FM Mostly PCCP and BWP twinned section of HDPE Constructed 1985 and 1993 Flow reversal in consideration of moving flow to Pine Creek WWTP

5 Concrete Pressure Pipe C 301(L) C 303 Signs of Deterioration Leaks Prestressing Wire Breaks Bar Breaks Internal Cracking Delamination Corroded Steel Cylinder

6 EM Primer Exciter Coil Current creates a magnetic field Prestressing Wires Magnetic field from the exciter induces a current in the prestressing wires Detector Coil The current in the prestressing wires creates a magnetic field which induces a current in the detector coil Amplitude: The strength of the detector signal Phase: The time that it takes for the signal to go from the Exciter to the Detector Signal is sensitive to pipeline properties (wire spacing, diameter, cylinder thickness, etc ) Signals are compared against a baseline signal for similar pipes. Simulated wire breaks and cylinder damage are used to create a calibration curve

7 PipeDiver Inspection Platform Free swimming tool Battery module Remote field transformer coupling module Tracking module Neutrally buoyant uses flexible fins Flexible body design Insertion under live or temporary depressurized conditions

8 Tool Insertion Anderson L/S Insertion at Anderson Lift Station Plug Valve Removed and PipeDiver Insertion

9 Tool Insertion Fish Creek WWTP Plug Valve to be Removed for PipeDiver Insertion

10 Inspection Tool Tracking A total of 12,096 m inspected 1,605 pipe segments Leap frog tracking teams ~1 hour from Anderson LS ~3 hours from Fish Creek

11 Tool Extraction Bonnybrook Forcemain Discharge Channel Tool Removed

12 Tool Extraction Bonnybrook Eager Anticipation! Despair Sets In!

13 Tool Extraction Bonnybrook Unknown interconnect chamber in the gravity main Tool Located on Private Property inside Interconnect Chamber Tool Extraction

14 Inspection Results Pipeline Diameter (mm) Pipe Type No. of Inspected Pipes Pipes with Wire or Bar Breaks Pipes with Cylinder Defect Anomalous Pipes # % # % # % Anderson Force Main 750 LCP 1, Fish Creek Force Main 762 BWP Total 1, km of PCCP C301 L pipe (Canron 1985) 5 km of BWP C303 pipe (Ameron 1993) Calibration Historical data used for 750 mm PCCP Custom pipe manufactured for 762mm BWP by Hanson Pipe & Precast Manufactured to nearly identical specifications Pipe Diameter Class Cylinder Thickness (mm) Wire Gauge (mm) Wire Spacing (mm) Calibration Pipe 762 mm N/A Fish Creek Force Main 762 mm

15 Calibration Data Progressive damage created to quantify EM data from the inspection Simulated up to 35 bar breaks at the middle window Simulated up to 40 bar breaks at the joint window Cylinder defects machined into cylinder

16 Calibration Data Simulation of 0 to 35 bar breaks at the middle window Simulation of 0 to 40 bar breaks at the joint window

17 Calibration Data Cylinder defects machined into the cylinder (30% to 35% cylinder loss) 5 X 10 at middle window 7 X 12 at joint window Third window simulated three coupon sizes 1X1 inch 3X3 inch 5X5 inch

18 Detailed Results Anderson Forcemain (PCCP) Rank Pure Ref # MK # STA Pipe length (m) Pipe Class Break Position (m) # WB by Region 1 41 STD STD STD STD STD Total #WB 5 pipes with wire breaks Pure Ref # MK # STA Pipe length (m) Pipe Class Signal Positional Range (m) 755 STD pipe with any cylinder defect

19 Detailed Results Fish Creek Forcemain (BWP) Item # Pure Ref # Piece # STA Pipe length (m) Pipe Class Break Position (m) # BB by Region Total #BB 2 pipes with bar breaks Pure Ref # Piece # STA Pipe length (m) Pipe Class Signal Positional Range (m) 18 18B pipe with measured cylinder defect

20 Results Summary Anderson FM (PCCP) 0.8% damage Fish Creek FM (BWP) 0.5% damage Pipeline Length (m) Pipes with 5 WB/BB Pipes with 10 to 15 WB/BB Pipes with >15 WB/BB # % # % # % Anderson Force Main 7, Fish Creek Force Main 4, Total 12, Both in excellent overall condition No pipes with >15 wire breaks / bar breaks No verifications or repairs were undertaken

21 Conclusions & Recommendations Both forcemains are in excellent overall condition Of the 1,022 pipes inspected in the Anderson FM, there are a total of 5 pipes with prestressing wire break damage and 1 pipe with cylinder defect Of the 583 pipes inspected in the Fish Creek FM, there are a total of 2 pipes with bar break damage, and 1 pipe with cylinder defect Structural evaluation was recommended to determine MAOP Periodic monitoring through re inspection or continuous monitoring would be appropriate to track deterioration

22 Further Technology Development Added functionality to the technology platform EM resolution on PipeDiver platform increased through the addition of detector petals Dependent on pipe diameter

23 Thank You For more information, please contact: Tim Ross: Reid McDougall: Or visit our website

Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials. Stewart Day, Pure Technologies

Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials. Stewart Day, Pure Technologies Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials Stewart Day, Pure Technologies 1 Presentation Outline PCCP Common failure modes Metallic pipe failure modes PCCP & metallic pipe

More information

Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study

Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study CERIU - INFRA - 2011 Stewart Day, PURE Technologies, Regional Manager- Canada Shelley McDonald, City of Ottawa,

More information

City of Phoenix Superior Pipeline PCCP Investigation and Assessment

City of Phoenix Superior Pipeline PCCP Investigation and Assessment City of Phoenix Superior Pipeline PCCP Investigation and Assessment Ronald Ablin, P.E. 1, Brandy Kelso, P.E. 2, Bethany Williams, P.E. 3, Myron Shenkiryk 4, The City of Phoenix is currently in a multi-year

More information

Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines

Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines Procrastinator s Workshop Thursday, December 12, 2013 Presented by: Michael J. Livermore Midwest Regional Manager Solutions for Sustainable

More information

Condition Assessment of Pipeline Systems Within Power Generating Plants

Condition Assessment of Pipeline Systems Within Power Generating Plants Condition Assessment of Pipeline Systems Within Power Generating Plants Condition Assessment of Pipeline Systems within Power Generating Plants Many cities depend on safe, reliable power delivered from

More information

Where Intelligence Meets Infrastructure PA AWWA Conference

Where Intelligence Meets Infrastructure PA AWWA Conference Where Intelligence Meets Infrastructure 2017 PA AWWA Conference Analysis and Verification of PCCP Stiffness Testing Using Non-Invasive Acoustic Testing Name: John Marciszewski jmarciszewski@echologics.com

More information

AGENDA ITEM C8. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II)

AGENDA ITEM C8. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II) AGENDA ITEM C8 DATE: February 6, 2017 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Phase III Condition Assessment Services with

More information

There are many technologies available for

There are many technologies available for Engineering Technologies for Pipeline Asset Management Bryon L. Livingston, Ahmad Habibian, and Dan Kugler There are many technologies available for managing the condition of underground infrastructure,

More information

VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES

VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES 1413 VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES Rasko P. Ojdrovic *, Peter D. Nardini, and Mehdi S. Zarghamee * Ph.D., P.E., M. ASCE, Principal, rpojdrovic@sgh.com, (781) 907-9231 P.E., A.M. ASCE,

More information

Using Condition Assessment to more Efficiently Manage your Pipelines

Using Condition Assessment to more Efficiently Manage your Pipelines Using Condition Assessment to more Efficiently Manage your Pipelines Traditional Management Approach Prioritize Pipelines Replace Pipelines Traditionally, prioritizations were based on age, material and

More information

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate AGENDA ITEM C2 DATE: April 4, 2016 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

Predictive Models Based on Force Main Condition Assessment

Predictive Models Based on Force Main Condition Assessment Overview Let s focus on some general concepts: TSX: PUR global innovative sustainable infrastructure management solutions Predictive Models Based on Force Main Condition Assessment Understand failure modes

More information

Force Main Condition Assessment. Water Environment School March 2017

Force Main Condition Assessment. Water Environment School March 2017 Force Main Condition Assessment Water Environment School March 2017 Safety Moment First Aid App Studies show that most workplace first aid training is forgotten over 90 days after certification Mobile

More information

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities 147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,

More information

Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process

Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process Tom Sangster. Principal, Jason Consultants Group, Geneva, Switzerland Synopsis Condition assessment is a critical

More information

Capabilities of MFL Inspection in DUPLEX Steel Pipelines

Capabilities of MFL Inspection in DUPLEX Steel Pipelines Capabilities of MFL Inspection in DUPLEX Steel Pipelines Hendrik Aue and Werner Thale ROSEN Technology and Research Center Germany Am Seitenkanal 8, 49811 Lingen, Germany Age E. Pedersen and Samuel Moe

More information

Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data

Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data 298 Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data Michael S. Higgins, P.E. 1 ; Allison Stroebele, P.Eng. 1 ; Sana Zahidi 1

More information

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR)

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) Contents 1 Canal 2 PCCP pipe 3 Tunnel 1 Canal The middle route runs from Danjiangkou Reservoir

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE

IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE IMPACT ECHO TESTING OF IN-SITU PRECAST CONCRETE CYLINDER PIPE Dennis A. Sack; Larry D. Olson, P.E. 1 Abstract This paper presents recent research and field work performed in the area of Nondestructive

More information

WRF Research Efforts on Large Diameter Pipes

WRF Research Efforts on Large Diameter Pipes WRF Research Efforts on Large Diameter Pipes Water Research Foundation Metropolitan Water District, Los Angeles, January 20, 2016 Overview A variety of large diameter pipes covered PCCP CI & DI Steel HDPE

More information

ASSET MANAGEMENT WATER MAINS OWWA - OMWA

ASSET MANAGEMENT WATER MAINS OWWA - OMWA ASSET MANAGEMENT WATER MAINS OWWA - OMWA Water department Drinking water branch City of Montreal Serge Martin Paul, P.Eng. M.Eng., Project manager Presentation plan ASSET MANAGEMENT WATER MAINS Overview

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

7. Allowable Fittings.

7. Allowable Fittings. 7. Allowable Fittings. a. General Requirements. 1) The fittings listed in this section are generally the allowable fittings for the design of DIP and PVC pipe. For steel pipe and fittings, see Part One,

More information

Exploring the Direct Relationship Between Transients and Wire Breaks. February 9 2pm EST

Exploring the Direct Relationship Between Transients and Wire Breaks. February 9 2pm EST Exploring the Direct Relationship Between Transients and Wire Breaks February 9 2pm EST Do you have PCCP lines? Poll Question Poll Question Do you have a budget to repair or replace or do condition assessment

More information

An Update on Acoustic Emission Testing of PCCP. Will Worthington, P.E. Member ASCE 1

An Update on Acoustic Emission Testing of PCCP. Will Worthington, P.E. Member ASCE 1 From the Proceedings of the 1998 Pipeline Division Conference, American Society of Civil Engineers, San Diego, CA, August 23-37, 1998 I. Abstract An Update on Acoustic Emission Testing of PCCP by Will,

More information

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE Caribbean Water & Wastewater Conference 2015 Topic: Water & Wastewater Pipeline Rehabilitation, Trenchless Technology Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and

More information

Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines

Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines Maged Mekhael, Munro Ltd. TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara

More information

Public Hearing December 12, 2013

Public Hearing December 12, 2013 Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin

More information

Pulsed Eddy Current Testing (PECT) Inspection Technique

Pulsed Eddy Current Testing (PECT) Inspection Technique Introduction Pulsed Eddy Current Testing (PECT) is an inspection technique used for corrosion under insulation (CUI) screening on carbon steel structures as pipes, vessels, tanks and spherical tank legs

More information

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline

More information

Beyond the Wires. A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management

Beyond the Wires. A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management 1214 Beyond the Wires A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management Nathan D. Faber, P.E. 1, Martin R. Coghill CEng MICE 2, and John J. Galleher, P.E. 3 1 San Diego County Water

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment

Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment Nada M. Elbouri and Saleh M. Amaitik Operation and Maintenance Department, Building Maintenance Section, Man Made River

More information

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH Inland Pipe Rehabilitation August 17 OAWWA Canton, OH Presentation Agenda Introduction to IPR IPR Products & Services RS Technik by HammerHead Advanced CIPP Process Spartanburg, SC project review IPR Overview

More information

No Dig renovation and installation of systems using polyolefin pipes

No Dig renovation and installation of systems using polyolefin pipes No Dig renovation and installation of systems using polyolefin pipes MEMBER OF Why use No Dig technology with polyolefin pipes? In many of the major cities of the world, the underground pipeline systems

More information

PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main

PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main Wayne Gresh, P.E. Project Manager, Black & Veatch greshhw@bv.com / 503-699-2218 May 6, 2009 Outline

More information

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps: Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid

More information

PRESSURE PIPES PRODUCTION PLANTS FOR YOUR SUCCESS BFS THE TECHNOLOGY PRESSURE PIPES

PRESSURE PIPES PRODUCTION PLANTS FOR YOUR SUCCESS BFS THE TECHNOLOGY PRESSURE PIPES TECHNOLOGY PRESSURE PIPES PRODUCTION PLANTS FOR YOUR SUCCESS BFS THE TECHNOLOGY PRESSURE PIPES LEADER Concrete Pressure Pipes BFS has been designing and producing Quality High Pressure Concrete Pipe equipment

More information

CONCRETE PRESSURE PIPE REPAIR GUIDE

CONCRETE PRESSURE PIPE REPAIR GUIDE CONCRETE PRESSURE PIPE REPAIR GUIDE TABLE OF CONTENTS CONCRETE PRESSURE PIPE REPAIR GUIDE Introduction...1 Emergency Phone Numbers...1 Emergency Repair Questionnaire... 2 Making a Durable Repair... 4 Types

More information

QuakeWrap, Inc. Pipe Repair October 2012

QuakeWrap, Inc. Pipe Repair October 2012 History Innovative Applications of Carbon FRP in Pipelines Mo Ehsani, Ph.D., P.E., S.E. President, PipeMedic, LLC and Professor Emeritus of Civil Engineering, Univ. of Arizona QuakeWrap, Inc. was founded

More information

Pipe Pressure Test Certificate Template

Pipe Pressure Test Certificate Template Pressure Test Certificate Template Free PDF ebook Download: Pressure Test Certificate Template Download or Read Online ebook pipe pressure test certificate template in PDF Format From The Best User Guide

More information

WALL THICKNESS MEASUREMENT OF LARGE TUBE DIAMETERS USING PHASED ARRAY TECHNOLOGY

WALL THICKNESS MEASUREMENT OF LARGE TUBE DIAMETERS USING PHASED ARRAY TECHNOLOGY WALL THICKNESS MEASUREMENT OF LARGE TUBE DIAMETERS USING PHASED ARRAY TECHNOLOGY H. Lompe 1, O.Dillies 2, S. Nitsche 3, Ch. Delhaes 3 and G. Kauth 1 1 GE Inspection Technologies, Huerth, Germany 2 Vallourec

More information

Styrene Free Structural Liner for Sewers and Culverts

Styrene Free Structural Liner for Sewers and Culverts Styrene Free Structural Liner for Sewers and Culverts INTRODUCING NOVAFORM PVC LINER FOR SEWER AND CULVERT REHABILITATION 6 to 30 diameters (150mm to 750mm) Factory-made, quality-controlled and tested

More information

Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL)

Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL) Detecting metal loss and pipeline wall thinning with a combination of Ultrasonic Testing (UT) and Magnetic Flux Leakage (MFL) Wolfgang Krieg ROSEN Swiss AG Abstract In-line inspections with Ultrasonic

More information

Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program

Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program Jeff Schramuk NACE CP Specialist #7695 630-235-1559 www.cpsolutionsinc.net Danny J. Klopfer, P.E. Infrastructure

More information

8-5. Engineering and Operations Committee. Board of Directors. 1/13/2015 Board Meeting. Subject. Executive Summary

8-5. Engineering and Operations Committee. Board of Directors. 1/13/2015 Board Meeting. Subject. Executive Summary Board of Directors Engineering and Operations Committee 1/13/2015 Board Meeting Subject Appropriate $34.3 million; and authorize: (1) final design to rehabilitate prestressed concrete cylinder pipe (PCCP)

More information

USE OF GPR TO ESTIMATE DETERIORATION IN CONCRETE BRIDGE DECKS

USE OF GPR TO ESTIMATE DETERIORATION IN CONCRETE BRIDGE DECKS USE OF GPR TO ESTIMATE DETERIORATION IN CONCRETE BRIDGE DECKS Dr. Lesley Sneed, P.E. Assistant Professor of Civil Engineering Dr. Neil Anderson, Dr. Evgeniy Torgashov Department of Geological Engineering

More information

What s Next Establishing Reassessment Intervals

What s Next Establishing Reassessment Intervals What s Next Establishing Reassessment Intervals NACE ECDA Seminar Houston January 26- January 28 2009 Kevin C. Garrity, P.E. DNV Topics Covered Focus is ECDA - Reassessment Methodology, - Corrosion Growth

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

NOTE ON PERFORMANCE TESTING

NOTE ON PERFORMANCE TESTING NOTE ON PERFORMANCE TESTING Performance Profile Sheet(s) are included in a format that can be easily photo cop ied for each trainee. Performance tests are designed to mea sure competency in the tasks taught

More information

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing WEKO-SEAL Internal Joint Sealing internal pipe-joint sealing We know seals inside and out. Retaining Band Test Valve WEKO-SEAL WEKO-SEAL is the leading trenchless system for internally and economically

More information

Material Specification for. Large Diameter Watermains

Material Specification for. Large Diameter Watermains Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.80 November 2016 Large Diameter Watermains Table of Contents TS 7.80.01 SCOPE... 2 TS 7.80.01.01 Application...

More information

Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources

Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources Technowrap composite repairs for the maintenance of piping, pipelines, vessel or structural integrity Simon R. Frost, Walker Technical Resources 1 Introduction This presentation will answer the following

More information

CONDITION ASSESSMENT PLAN. Prepared for Hampton Roads Sanitation District February 2009 Revised September 2009

CONDITION ASSESSMENT PLAN. Prepared for Hampton Roads Sanitation District February 2009 Revised September 2009 APPENDX 4 CONDTON ASSESSMENT PLAN Prepared for Hampton Roads Sanitation District February 2009 Revised September 2009 Table of Contents Hampton Roads Sanitation District Condition Assessment Plan TABLE

More information

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72 January 2015, Issue 72 PipeLine Contents 1 I Increasing Sewer Capacity 4 I HOBAS Pipe Chosen for Large Diameter Force Main 6 I 26 Year Old Force Main Still Performing Well 8 I HOBAS Pipe Expands Field

More information

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23 The following presentation discusses

More information

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report Page 1 / 7 Reported By: Owner: Name: FRED OCASIO with KCI TECHNOLOGIES Name:, Wastewater Department Location of Overflow: 17301 BRUCE B DOWNS BLVD Address: 306 E. Jackson Street Phone Number: 813 495-2460

More information

A STRAIN GAUGE TECHNIQUE FOR THE DYNAMIC MEASUREMENT OF ICE*

A STRAIN GAUGE TECHNIQUE FOR THE DYNAMIC MEASUREMENT OF ICE* A STRAIN GAUGE TECHNIQUE FOR THE DYNAMIC MEASUREMENT OF ICE* Don B. Clark? Introduction N THE study of ice properties exists a need for a measuring technique I that will provide automatic recording of

More information

Agilent InfinityLab Preparative Flow Cells for MWD & DAD

Agilent InfinityLab Preparative Flow Cells for MWD & DAD Agilent InfinityLab Preparative Flow Cells for MWD & DAD Technical Note This technical note describes the preparative flow cells for the Agilent 1260 Infinity II DAD WR (G7115A) and Agilent 1260 Infinity

More information

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region Rulemaking Process Topics Safety of Hazardous Liquid Pipelines (PHMSA- 2010-0229) Safety of Gas Transmission Pipelines (PHMSA- 2011-0023)

More information

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E' North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper MA-T4-02 Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control

More information

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following: PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement

More information

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Authors: Rogelio de las Casas, Ron Turner, Kristi Roe; EN Engineering This paper discusses two sections of pipeline

More information

ET-NDE of the Thickness Reduction of A Reinforced Concrete Embedded Steel Cylinder Pipe

ET-NDE of the Thickness Reduction of A Reinforced Concrete Embedded Steel Cylinder Pipe ECNDT 2006 - We.2.6.2 ET-NDE of the Thickness Reduction of A Reinforced Concrete Embedded Steel Cylinder Pipe Christophe BENTO, EDF - R&D, Chatou, FRANCE Thierry SOLLIER, CEA Saclay, Gif-sur-Yvette, FRANCE

More information

PCTB PC-LAB. Power Cycling Testbench for Power Electronic Modules. Power Cycling Test Laboratory

PCTB PC-LAB. Power Cycling Testbench for Power Electronic Modules. Power Cycling Test Laboratory PCTB Power Cycling Testbench for Power Electronic Modules PC-LAB Power Cycling Test Laboratory Technical Information PCTB power cycling test bench alpitronic has many years of experience in developing

More information

Protecting Existing PCCP Subject to External Transient Loads. 200, Fort Worth, Texas 76109; phone (817) ;

Protecting Existing PCCP Subject to External Transient Loads. 200, Fort Worth, Texas 76109; phone (817) ; 203 Protecting Existing PCCP Subject to External Transient Loads James K. Johnson, P.E. 1, Alan C. Hutson, P.E. 2, Russell L. Gibson, P.E. 3 and Louie Verreault, P.E. 4 1 Engineer, Water Resources, Freese

More information

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT.

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. www.lumi-o.com INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. STANDARD & L.E.D. Lumi-O Industries Inc. 370 Lajeunesse O. St-Jerome QC J7Y 4E5 tel (450)565-5544 * 1-866-99LUMI-O (450)565-5958

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development

More information

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling 1 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust

More information

Advanced High Precision of Bar Inspection and Conditioning

Advanced High Precision of Bar Inspection and Conditioning UDC 669. 14-426 : 658. 562 Advanced High Precision of Bar Inspection and Conditioning Taira ONO* 1 Osamu OOYAMA* 2 Abstract Special steel bars are worked secondly and thirdly by customers, and used in

More information

Pipelines 2013 ASCE Development History and Characteristics of the Bar-Wrapped Concrete Cylinder Pipe

Pipelines 2013 ASCE Development History and Characteristics of the Bar-Wrapped Concrete Cylinder Pipe 340 Development History and Characteristics of the Bar-Wrapped Concrete Cylinder Pipe By: Henry Bardakjian 1, P.E. and Mike Murphy 2, P.E. 1 Consulting Engineer, 1331 N. Maryland Ave, Glendale, CA 91207

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

REVIEW OF PERFORMANCE OF GASKETED JOINTS OF BURIED CONCRETE AND STEEL PIPELINES IN CALIFORNIA AFTER RECENT SEISMIC EVENTS

REVIEW OF PERFORMANCE OF GASKETED JOINTS OF BURIED CONCRETE AND STEEL PIPELINES IN CALIFORNIA AFTER RECENT SEISMIC EVENTS REVIEW OF PERFORMANCE OF GASKETED JOINTS OF BURIED CONCRETE AND STEEL PIPELINES IN CALIFORNIA AFTER RECENT SEISMIC EVENTS By: Henry H. Bardakjian, P.E. 1, Michael McReynolds, S.E, P.E. 2, and Mehdi Zarghamee,

More information

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships

Transmission Pipeline Opportunities. Advancing Project Development in India through Public Private Partnerships Transmission Pipeline Opportunities Advancing Project Development in India through Public Private Partnerships 22 23 February, 2007 Pipeline Maintenance and Repair: Agenda Methane Losses from Pipeline

More information

TAMDID PIPES GRP MANHOLE BROCHURE

TAMDID PIPES GRP MANHOLE BROCHURE TAMDID PIPES GRP MANHOLE BROCHURE 1) Types & Description of Manholes: Tamdid Pipes offer two types of Manholes; Structural and Liner Manholes: a. Structural Manholes Tamdid Pipes offers concentric and

More information

Available online at ScienceDirect. Procedia Engineering 86 (2014 )

Available online at  ScienceDirect. Procedia Engineering 86 (2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 86 (2014 ) 539 545 1st International Conference on Structural Integrity, ICONS-2014 Optimization of Integrity Testing of Piping

More information

INTERNAL PRESSURE AND BACKFILL LOAD RESISTANCE CHARACTERISTICS OF POPIT LIFT HOLE PLUGS

INTERNAL PRESSURE AND BACKFILL LOAD RESISTANCE CHARACTERISTICS OF POPIT LIFT HOLE PLUGS INTERNAL PRESSURE AND BACKFILL LOAD RESISTANCE CHARACTERISTICS OF POPIT LIFT HOLE PLUGS CONCRETE PIPES WITH A MECHNICAL OR ROUGH LIFT HOLE (Note : This report is prepared of information to readers only)

More information

Recent Developments in Stay Cable Systems

Recent Developments in Stay Cable Systems Recent Developments in Stay Cable Systems PTI Technical Conference, Reno- 2006 Khaled Shawwaf, Technical Director (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED Page 1 of 45 * Cable Stayed

More information

Development of Integrity Management Strategies for Pipelines. Presenter: Cheryl Argent

Development of Integrity Management Strategies for Pipelines. Presenter: Cheryl Argent Development of Integrity Management Strategies for Pipelines Ivan Cvitanovic [1], Uwe Thuenemann [2], Cheryl Argent [3], Chris Lyons [3], Andrew Wilde [3], [1].JADRANSKI NAFTOVOD (JANAF) Plc, Croatia.

More information

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-3-05 PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

FLUXUS F/G601 and F/G608

FLUXUS F/G601 and F/G608 Portable, quick and reliable FLUXUS F/G01 and F/G0 Portable ultrasonic clamp-on gas and liquid flow meters Accurate Flexible Quick Rugged Ergonomic When measuring matters FLUXUS F/G0X Mobile flow measurement

More information

HEGER DRY DOCK, INC Structural/Marine Engineers 531 Concord Street Holliston, MA Tel Fax

HEGER DRY DOCK, INC Structural/Marine Engineers 531 Concord Street Holliston, MA Tel Fax HEGER DRY DOCK, INC Structural/Marine Engineers 531 Concord Street Holliston, MA 01746 Tel 508-429-1800 Fax 508-429-1811 16 87L December 7, 2016 Attention: Eddie Goldman, Senior Dockmaster (eddie.goldman@baesystems.com)

More information

Roadmap to a succesfull risk assessment with Bowstar

Roadmap to a succesfull risk assessment with Bowstar Roadmap to a succesfull risk assessment with Bowstar Bowtie analyses PIMS International 1 Validation Risk Policy (Benchmark risk matrix) 1. Used by key players in the industry, 2. Lots of templates from

More information

SEWER FORCE MAIN HDPE PIPE

SEWER FORCE MAIN HDPE PIPE SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene

More information

Extreme Loading for Structures Version 3.1

Extreme Loading for Structures Version 3.1 Extreme Loading for Structures Version 3.1 Corrosion Effects Option April 2010 1. Introduction Corrosion of gusset plates was identified as one of the main causes for failure in the catastrophic collapse

More information

PIPE USERS GROUP (PUG) July 11, Michelle Beason, PE Regional Manager National Plant Services, Inc., a Carylon Company

PIPE USERS GROUP (PUG) July 11, Michelle Beason, PE Regional Manager National Plant Services, Inc., a Carylon Company PIPE USERS GROUP (PUG) July 11, 2017 Michelle Beason, PE Regional Manager National Plant Services, Inc., a Carylon Company NATIONAL PLANT SERVICES, INC. New Service yard in Hayward, CA. Headquarters in

More information

Concrete and H2S Gas in Wet Wells and Tanks. James Orr - Project Manager NACE Inspector - Dixon Engineering

Concrete and H2S Gas in Wet Wells and Tanks. James Orr - Project Manager NACE Inspector - Dixon Engineering Concrete and H2S Gas in Wet Wells and Tanks James Orr - Project Manager NACE Inspector - Dixon Engineering What can H2S Gas do to Concrete????????? Ho Chunk WWTP Influent Wet Well Recoating Project Influent

More information

SPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer

More information

Press Release. Rehabilitation of oil pipelines with flexible high pressure pipes

Press Release. Rehabilitation of oil pipelines with flexible high pressure pipes Press Release July 31, 2013 Rehabilitation of oil pipelines with flexible high pressure pipes Network operators all over the world are confronted with increasingly aging pipeline infrastructure. Since

More information

Sclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE

Sclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE Sclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE Sclairpipe Sclairpipe high density polyethylene (HDPE) pipe represents the latest advances in both material and manufacturing techniques. Since 1968,

More information

Advantages of high quality PE pipe materials. Turkey Seminar - April 3, 2003

Advantages of high quality PE pipe materials. Turkey Seminar - April 3, 2003 d o n t c r a c k u n d e r p r e s s u r e Advantages of high quality PE pipe materials Turkey Seminar - April 3, 2003 by Robin Bresser / PE100+ Association 4/2003 1 Creating value in Pipe - basic human

More information

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE Amended November 2014 PIPELINE PERFORMANCE MEASURES - OVERVIEW Introduction The National Energy Board (Board) took action in March

More information

Material Properties Measurement

Material Properties Measurement Material Properties Measurement Nondestructive Characterization of Neutron Induced Embrittlement in Nuclear Pressure Vessel Steel Microstructure by Using Electromagnetic Testing I. Altpeter, G. Dobmann,

More information

Design Considerations for Selection of Pipe Material for Large Diameter CSO Force Main

Design Considerations for Selection of Pipe Material for Large Diameter CSO Force Main Design Considerations for Selection of Pipe Material for Large Diameter CSO Force Main Pacific Northwest Clean Water Association 2010 Conference Presented By M. Patty Nelson, City of Portland Phil Roppo,,

More information

New Advances using Handheld XRF Technology for the Prevention of Flow-Accelerated Corrosion (FAC)

New Advances using Handheld XRF Technology for the Prevention of Flow-Accelerated Corrosion (FAC) New Advances using Handheld XRF Technology for the Prevention of Flow-Accelerated Corrosion (FAC) Joey Cheverie, Vice President Elemental Controls Ltd www.elementalcontrols.com 1 Agenda Flow-accelerated

More information

3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE

3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE 3. CLASSIFICATION AND IMPLICATIONS OF DAMAGE 3.1 Summary of Earthquake Damage There are no modifications to the Guidelines or Commentary of Section 3.1 at this time. 3.2 Damage Types There are no modifications

More information

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont. E M I R A T E S Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation i) Introduction Dubia, UAE 14 March 2017 Trenchless Middle East Faiz Alelweet & Eng. Hamza Ali Maintenance Manager

More information