1 Our Goal is FOR ALL STAKEHOLDERS TO HAVE A SUCCESSFUL PROJECT with us and that together we keep people and structures safe and buildings economically viable to serve the needs of our community. We strive for: May 11th, 2016 EXCELLENT CUSTOMER SERVICE! and QUALITY INSPECTIONS! OUR NEXT MEETING IS JUNE 8th I. Customer Service Reminder, Mr. Rains
2 II. Consistency Questions 1)I have a neighborhood that Duke will not relocate lateral to the other side of the lot, assuming they no longer want to pay them to, where the garage is. EC has started running SER through the house from a main on one side to the panel in the garage. It is a main power feeder per (B)(7). This being said I was recently told by another inspector that they did not have to apply (B)(4) where in thermal insulation. I had been having another EC in another neighborhood derating the SER to 60 because 10' or 10% of it was in the insulation. Does this not apply to main power feeders? If so, why not? RAINS (B)(4) refers us to Part II of 334, excluding Then it further instructs us that in thermal insulation the ampacity shall be in accordance with the 60-degree C rating.
3 310.15(B)(7) of the NCEC allows a diversity demand for the feeder carrying the total load of the dwelling unit to use the table reducing the allowable conductor size by load diversity, not adjusting for thermal calculation. 2) When is it required to fill the nipple on a back to back service in a single family dwelling? HARTMAN Per of the code they should be sealed to prevent condensation issues due to thermal transfer. 3) Are liquidtight connectors that are approved for wet locations OK for direct burial? DELLINGER We would need to see the listing information from the manufacturer and UL. Generally, no per UL.
4 4)I have a service trough with meters and mains below. I added a meter and a main like all the existing equipment. The inspector turned me down and said I would have to change the service so that ALL mains were contiguous (even the existing mains)! Is this correct? SIMPSON We did have an interpretation that led us to that but as of 3/29/16 it s not. Per Mr. Starling at NCDOI: I lean towards the idea that grouping of disconnects is uniquely dependent of the structure it serves. The service disconnects for the structure should be arranged in a manner that allows someone to disconnect all the power from a building in one general location. I would agree that there should be no reason that other building components or systems should infringe on that area where the disconnects are located. Section (E)(2) helps the inspectors keep this area free from other equipment that do not belong in that special zone. However, meters, conduit, and other necessary electrical equipment should not necessarily be prohibited to be installed where they come between the handles of the disconnect.
5 5)I ran liquid tight flexible metallic conduit to join two sections of PVC raceway for service conductors to a building. I was turned down because there is no way to bond the flex. Does exception not apply? It seems like the intent is the same. KING NO, it only applies to a metal elbow. 6)What size breaker can I use to protect 12, fourteen gauge wires, ran in a conduit to feed 15A general use receptacles? WEST (B) (1) would prohibit this. You could divide the conductors in to multiple conduits to avoid this issue. 7)When performing Plan Review and Inspections on multi-occupancy dwellings, what is the responsibility of the reviewer concerning the individual units, and what is the responsibility of the inspector by CE policy. KALE
6 The review team is to only review to the unit panel as the rest takes too much time and is very subject to field change. We look at the units as individual residences that require no review. The inspector will cover all system elements for code compliance. 8)Is there any guidelines as to the location of a utility tap box used in conjunction with a utility transformer? BARNES The specs and location of the tap box would need to be identified for us to know if building/electrical protection is needed. 9)How do we resolve the conflict between CE Policy and Duke Energy s Policy on transformer location and clearances? RAINS We will require what is needed to protect the building. Duke Energy seems to be interested in other criteria. Their construction services book advises their customers to check with the local AHJ. The criteria we agreed to is still on our website.
7 10)When an elevator is required for a 5 story building to be used as a means of egress, how do we know in the plan review stage whether it requires Emergency Power (NEC 700) or Standby Power (NEC 701). What system is required is specified by the NCBC. If the electrical examiner is unsure of the appropriate call, I would suggest that the building examiner provide that information to the electrical examiner by . If there appears to be a conflict, then the Building CA could decide the issue. HARTMAN 11)When the water line is part of the GEC system, does the water line need to be connected at the street? If so, is this a CE SOP or is this per CMUD? DELLINGER NEC (A)(1) states we can use a metal underground water pipe for the grounding electrode. If it has no water in it is it a water pipe? It has long been Meck. County CE s interpretation that it has to be complete
8 to qualify. We have had two incidents of personnel injury when power was connected without the water system being complete. 12) I have 2 buildings located 10 feet apart, on the same property and same owner. Building A has the service and building B has a subpanel fed from building A. Can I install 2 ground rods between them and use them as the made electrodes for both? SIMPSON Per NEC the grounding electrode(s) shall be installed. This indicates that no duplicate use is allowed as posed in the question. 13) Does the low voltage data and voice cables installed underground in conduit have to be listed for a wet location? KING Cables generally have to be used in accordance with their listing (B) and GS 66. Underground conduits are wet location and the cables would need to be rated for wet locations. See communication circuits
9 which disagrees with GS. We don t see how either way will make a safety impact. 14) Can I install a NEMA 1 panel in a damp location (under a shelter outside)? WEST Well yes you can but the inspector will need to turn it down. NEMA I is for indoor locations and offers no protection from water penetration. If the location of the panel is well within the structure so as to avoid direct rain and dripping a NEMA 2 might could be used if inspector judged ok and the location as indoors. Generally, a NEMA 3 would be needed. 15)In the service panel, do I have to land my EGC 's directly on the neutral bar? KALE
10 In general terms no. There is no potential difference in the bars of grounded conductors and equipment grounding conductors at service if they are bonded together. Be sure to follow manufacturer s installations instructions. If not bonded and the can is the only common point, then EGCs are all that can land on the EGC bar. 16)We need to replace a 75 kva 480/208 transformer in our facility, do we need to have this replacement permitted? BARNES Yes. No exception is allotted for permitting this work in of the NC Admin. Code or NCGS. 17)Can a 50-amp receptacle be fed by a 30-amp circuit breaker? No (B)(1) and (B)(3) prohibits this. RAINS
11 18) Is there a limit on how many NM cables I can pull through a drilled hole in a wooden stud? HARTMAN No limit is prescribed by code. The key is what will fit without damaging the cable. Be aware of derating requirements as well. 19) Can EMT be installed under or in a slab? DELLINGER Yes. See Corrosion protection needs to be considered. Fittings need to be listed for the purpose. 20) We have some pre-wired office furniture that came with isolated ground receptacles. We did not provide an isolated ground with the branch circuit. Can we tie both of the grounds to our branch circuit ground? And do we have to change the isolated receptacles to nonisolated grounded receptacle? SIMPSON
12 The provision for isolated grounding is just that. You can t make a hybrid system out of it. You must either choose to follow the required grounding system as normal or choose the isolated system. 21)In the meter can shown in the picture below. I landed my GEC on the lug and the inspector turned me down. Was he correct? I do this all the time. KING
13 It appears the can is being used to connect the GEC to the grounded conductor. That is not allowed per NEC If it is a supplemental GEC it is allowed as shown.
14 22)We added some lighting in an existing open office area, all of our mc cable and lights were supported and secured per the NEC, the inspector turned my job down citing that existing defects were my responsibility because we added wiring. He said if you alter the ceiling its yours even though the defects had nothing to do with our scope of work. Is he correct? WEST If the contractor s scope of work meets the code, then an RQ needs to be created and the owner advised to get violations corrected. If an existing circuit or feeder is used it must be in compliance as well. 23)We changed out the 2x4 lay ins at an old office building, all we did was disconnect and reconnect wires which were Romex. All Romex was supported properly. Are we required to replace Romex with MC? NO! Like for like replacement is allowed if it met the code at the time. If other, then replacement to code occurs. KALE
15 24)I was turned down for disposal not being installed with a receptacle outlet installed under sink. We have been allowed in the past to leave a cord and plug connected disposal out, as long as we provide outlet. Has the policy changed? BARNES Our policy (6.2) for several years states the disposal must be set for final. 25)I installed an outlet with a metal box in a media panel, the metal box is attached to the media panel by machine threaded screws and the metal box is properly bonded, so why would the inspector turn me down for not bonding the media panel? RAINS In this case the grounding is fine unless the manufacturer s instructions state differently.
16 26)In looking at Duke Energy s new Requirements for Electrical Service and Meter Installation for NC and SC, what are Plan Reviews obligations for documenting these changes on approved drawings? Specifically, in regards to fig. 47A and 47D. Fig.47A indicates the meters and disconnects be mounted over the service trough. Fig. 47D indicates meters and disconnects mount below service trough when a C/L fuse cabinet is mounted ahead of trough. Does plan review need this documented on single line diagram prior to approval since this is a utility provider requirement? HARTMAN We have no obligation to Duke s standards. 27) I have a project in plan review that is a 4 story private school with class rooms and administrative offices. The NEC has changed has added an exception to Lighting Loads for Specified Occupancies.
17 The following exception to NEC reads: Exception: Where the building is designed and constructed to comply with an energy code adopted by the local authority, the lighting load shall be permitted to be calculated at the values specified in the energy code where the following conditions are met: (1) A power monitoring system is installed that will provide continuous information regarding the total general lighting load of the building. (2) The power monitoring system will be set with alarm values to alert the building owner or manager if the lighting load exceeds the values set by the energy code. (3) The demand factors specified in are not applied
18 to the general lighting load. We use the 2012 NC Energy Conservation Code as our required energy code of the NCECC addresses the Building area method and the space-by-space method to be calculated at 0.89 va. per sq.ft. NEC requires 3 va. Per sq. ft. This is around 1/3 of the required load of NEC (A) Other than checking that are not applied, what requirement will be needed at plan review to ensure the designer has a code compliant design? (B) Will this have any impact for the field inspector for verification of the monitoring system and required alarms for this design? DELLINGER
19 The designer needs to provide the calculation used if the exception is used. The monitor and alarm system need to be shown as required also. 28) The new Duke Energy manual requires the minimum trough size 14 X 14. The 2014 NEC (A)(3) will be a problem for contactors. How is this now being handled in the field by inspectors? Will our field inspector s approach this differently with Duke s new trough size? The contractor will have the responsibility to meet code appropriate clearances and continue to bond all service equipment as required by code. SIMPSON 29) Can the light over the kitchen sink be on the same circuit as the disposal? KING
20 (A)(2) allows it if the disposal does not exceed 50% of the circuit. 30) Can a ground rod be installed in a building? WEST Code does not prohibit this. 31) Can MC cable be used in brick work? KALE See &.12. MC is not to be embedded in mortar except in dry locations. Stubbing thru an exterior wall is not an issue. Otherwise the cable needs to be rated for the environment. 32) Can the GEC be spliced in panels on ground bars? BARNES Yes, per (D)
21 33) Is a detached building disconnect means to be service rated? RAINS Maybe. See and ) When using metallic flex between a 480V to 120/208V transformer to a 120/208V panel, is it necessary to bond the flex with bond bushings or bonding locknuts? No. See NCEC and the following.
22
23
24
25
26
27 Review of 2014 Residential Changes
2015 Code Rollout Meeting Q & A
1 SECTION QUESTION SaskPower Inspections Dept. ANSWER 2 3 4 5 6 7 8 9 10 11 12 15-02-024 15-02-200 15-02-200 15-02-200 15-02-314 Are existing single or double 'weather proof when not in use' covers allowed
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationEFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,
TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.
More informationTemporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska
Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing
More informationBasic Requirements for Residential Electrical Installations
Basic Requirements for Residential Electrical Installations Wayne County Building Department 428 West Liberty Street Wooster, Ohio 44691 Phone: 330-287-5525 Fax: 330-287-5649 This brochure is intended
More informationUNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL
UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details
More information2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationSt. Clair County Electrical Code Regulations
St. Clair County Electrical Code Regulations St. Clair County has adopted the 2011 National Electrical Code as amended with the following listed articles as the St. Clair County version of the National
More informationEFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,
TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2008 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.
More informationInspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)
TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More informationMETERING INSTALLATION
4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationSECTION OUTLET, PULL, AND JUNCTION BOXES
SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:
More informationTEMPORARY METER POLE INSTALLATION
TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is it illegal to install a wet-niche luminaire face-up
More information2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING
2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationWIRING METHODS CHAPTER 38
CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationPermitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics
Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationDesign Standard Conduit for Electrical Systems
Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More informationELECTRIC METERING GENERAL
1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More informationDESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7
DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification
More informationB. Provide a complete conduit system with associated couplings, connectors, and fittings.
SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED
More informationBuilding Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.
AGUA CALIENTE BAND OF CAHUILLA INDIANS A SOVEREIGN TRIBAL GOVERNMENT Planning & Development Department Building and Safety Division 5401 Dinah Shore Drive Palm Springs, CA 92264 (760) 669-6800 RESIDENTIAL
More informationTABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19
TABLE OF CONTENTS About This Textbook... xvii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More informationThe Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999
CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March
More informationElectric Service Requirements. Residential Overhead. Engineering Specification T002. February
Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL
More informationSERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.
SERVICE ENTRANCES 3.01 POINT OF ENTRANCE General Service The customer, or the customer s electrician, should provide OPPD with a site plan, load schedule, and voltage requirements when requesting service.
More informationPlease check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral
More informationAmendment: Accept Comment 7-14
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: NFPA Technical Correlating Committee
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationAbout This Textbook... xvii About the National Electrical Code...xxi About the Author... xxv About the Illustrator... xxvi About the Team...
About This Textbook... xvii About the National Electrical Code...xxi About the Author... xxv About the Illustrator... xxvi About the Team...xxvii Article 90 Introduction to the National Electrical Code...
More informationRevisions for the 2011 National Electrical Code - Part 2
PDHonline Course E356 (3 PDH) Revisions for the 2011 National Electrical Code - Part 2 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &
More informationWhy Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2
Swimming Pools Building Guide for Homeowners Why Do I Need a Permit? D ID Y OU K N OW? There are many important reasons to obtain building permits and to have inspections performed for your construction
More informationOPERATING PROCEDURE NO. 310
OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations
More informationOVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).
6.01 GENERAL OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE See Chapter 3, Section 3.01 for more information about point of entrance (POE). In all cases, the customer installs, owns, and maintains the
More informationCOUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES
COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT Mike Lara Building Official PHOTOVOLTAIC PERMITTING GUIDELINES PLANS AND PERMITS In order to minimize installation problems, plans must be provided that
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC
More informationORDINANCE NO. ORD
ORDINANCE NO. ORD-2012-9407 AN ORDINANCE AMENDING SECTION 8-11 OF ARTICLE II BUILDING CODES OF CHAPTER 8 IRVING BUILDING STANDARDS CODE OF THE IRVING LAND DEVELOPMENT CODE BY ADOPTING THE 2011 EDITION
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationNY State Unified Solar Permit
PERMIT APPLICATION Town of Warwick Building Department (845) 986-1127 NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal
More informationPRIMARY LINE EXTENSION
PRIMARY LINE EXTENSION Installation of new electric service to an empty parcel/lot or extending a transformer to within 150' of proposed meter location. This includes installing a permanent branch, addition,
More informationRevision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd
RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of
More information2011 National Electrical Code Update Training. Henrico County Department of Building Construction and Inspections
2011 National Electrical Code Update Training Henrico County Department of Building Construction and Inspections Questions Questions are Welcome!!! You are probably not the only person with the same question.
More information2011 National Electrical Code Update Training
2011 National Electrical Code Update Training Henrico County Department of Building Construction and Inspections 1 Questions Questions are Welcome!!! You are probably not the only person with the same
More information4. GENERAL REQUIREMENTS
4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall
More informationST. VINCENT COLLEGE SIS AND HERMAN DUPRÉ SCIENCE PAVILLION SECTION LABORATORY ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS
SECTION 26 11 20 - LABORATORY ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.01 RELATED DOCUMENTS A. The general conditions, Division 1, and Division 26 are part of this section and the contract
More informationAbout Matt Piantedosi
2017 NFPA Conference & Expo Solar PV System Inspections Best Practices and Commonly Found Violations Presented by: Matt Piantedosi Manager of Solar Field Operations The Cadmus Group About Matt Piantedosi
More informationPanel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398
Panel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398 The National Electrical Code Technical Correlating Committee Identified concerns with
More informationPROJECT INSTRUCTIONS For Electrical Installers
PROJECT INSTRUCTIONS For Electrical Installers This handout is intended to be a general overview of residential electrical requirements as noted in the 2017 National Electrical Code. This handout is not
More information1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.
ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationEffective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.
Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground
More informationElectric Service Standards
V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are
More informationSolar PV System Code Compliance Best Practices, 2017 NEC Updates, and Opportunities for Improvement
Solar PV System Code Compliance Best Practices, 2017 NEC Updates, and Opportunities for Improvement MassCEC Webinar April 2017 Presented by: Matt Piantedosi Manager of Solar Field Operations The Cadmus
More information1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:
SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,
More informationOVERHEAD SERVICE. Table of Contents - Section 400
OVERHEAD SERVICE Table of Contents - Section 400 PARAGRAPH 400.0 OVERHEAD SERVICES (0-600 VOLTS)... 1 400.1 GENERAL 1 400.2 IDENTIFICATION OF CONDUCTORS. 1 400.3 MAXIMUM SERVICE ENTRANCE CONDUCTOR SIZE
More informationCode Change Alert: Permitting of Solar Photovoltaic Systems in Washington State
Code Change Alert: Permitting of Solar Photovoltaic Systems in Washington State Emergency Rule Regarding Rooftop Solar Photovoltaic Installations On June 13, 2014 the Washington State Building Code Council
More informationBULLETIN LICENSED ELECTRICAL CONTRACTORS. SaskPower Electrical Inspections. June 13, Item #1 Arc-Fault Receptacles, CEC Rule (f)
SaskPower Electrical Inspections BULLETIN 01-2014 June 13, 2014 TO: LICENSED ELECTRICAL CONTRACTORS SUBJECT: GENERAL BULLETIN Item #1 Arc-Fault Receptacles, CEC Rule 26-722(f) For the purposes of this
More informationSpecifications for Residential Underground Electric Service Installation
Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must
More informationService Entrance Cable Fittings
Suggested Specifications for Service Entrance Fittings All service fittings shall be approved for the purpose by a nationally recognized testing laboratory, inspection agency or product evaluation organization.
More informationSECTION BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies
More informationField Inspection Guideline for PV Systems
Field Inspection Guideline for PV Systems Prepared for: Interstate Renewable Energy Council (available at www.irecusa.org) Brooks Engineering 873 Kells Circle Vacaville, CA 95688 www.brooksolar.com Prepared
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge
More informationUNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES
7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,
More informationInstallation of CSST Gas Piping Systems
(What Inspectors Need To Know) May 2016 Conventional Arc-Resistant CSST Product Standard National Standard ANSI LC-1 Performance-based standard Listed system installed in accordance with manufacturer s
More informationPLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationMARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations
TOWN OF MARBLEHEAD FIRE DEPARTMENT Marblehead Fire Department Installation Guidelines for Photovoltaic/Solar installations July 1, 2015 Updated December 2015 MARBLEHEAD FIRE DEPARTMENT Standard Operating
More informationSECTION CONDUI T
PART1 GENERA L 1.01 SECTION INCLUDE S SECTION 26 0534 CONDUI T A. Galvanized steel rigid metal conduit (RMC). B. Intermediate metal conduit (IMC). C. Flexible metal conduit (FMC). D. Liquidtight flexible
More informationSpecifications for Residential Overhead Electric Service Installation
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
More informationHomeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments
Homeowner electrical wiring guide Including the 2015 Canadian Electrical Code amendments Table of Contents Homeowner electrical wiring guide... 1 Required inspections... 2 Rough inspections (prior to any
More informationREQUEST FOR QUOTATION (RFQ)
Engineering Support Program (ESP) USAID Contract No. AID-306-C-16-00010 REQUEST FOR QUOTATION (RFQ) To: From: Offerors Tetra Tech ESP Issuance Date: November 22, 2017 Closing Date: Subject: Reference:
More informationDIVISION 26 ELECTRICAL Electrical Power Conductors and Cables
PART 1 - GENERAL 1.01 DESIGN REQUIREMENTS A. Scope: Power Conductors and Cables in this section are defined as system voltages above 120V and less than 600V. B. System Voltages Three Phase and Single Phase:
More informationWESTERN CONNECTICUT STATE UNIVERSITY ELECTRICAL SAFETY PROCEDURE S-109
WESTERN CONNECTICUT STATE UNIVERSITY ELECTRICAL SAFETY PROCEDURE S-109 Draft Issued 12/10/97 Revised 2/98, 7/09, 10/14 Please direct any questions or comments about the applicability of this document to
More informationPhotovoltaic System Inspector Job Task Analysis Guide April 2017
Photovoltaic System Inspector Job Task Analysis Guide April 2017 V. 04.17 www.nabcep.org Raising Standards. Promoting Confidence. NABCEP mission is to establish and operate high quality Credentialing programs
More informationWIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION
WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION The following rules and information are issued to make it possible for anyone engaged in electrical wiring or installation of electrical
More informationELECTRICAL INSTALLATIONS
PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT ELECTRICAL INSTALLATIONS A homeowner guide to the Winnipeg Electrical By-law requirements for a Single Family Dwelling, Detached Garage or Shed January 2018
More informationNEC 2017 Code Changes Chapter 1 - General
NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers
More informationUnderground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11
Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available
More informationPORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code
2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical
More informationRevision History. Corrected issue with spacing at top of overhead temporary drawings Corrected errors in numbered bullets in all drawings
Revision History Version 1 Spring 2016 Original Document Release Version 1.1 Summer 2016 Corrected issue with spacing at top of overhead temporary drawings Corrected errors in numbered bullets in all drawings
More informationA WORK PROCESS SCHEDULE
Appendix A WORK PROCESS SCHEDULE AND RELATED INSTRUCTION OUTLINE Appendix A WORK PROCESS SCHEDULE OCCUPATION TITLE: ELECTRICIAN O*NET-SOC CODE: 47-2111.00 RAPIDS CODE: 0159 This schedule is attached to
More informationLarge Basic Service. This Section applies to members requiring new. Introduction. Service Types
Large Basic Service Introduction This Section applies to members requiring new Large Basic electric service installations, greater than 400 amps single phase and greater than 50kW three phase. This Section
More informationManufactured Buildings And The Electrical Code
2017 NCDOI Code College Electrical Series Manufactured Buildings And The Electrical Code October 31, 2017 1 Mike Hamm, PE Chief Building Code Consultant NC Department of Insurance Office of State Fire
More informationSPARTANBURG COUNTY BUILDING CODES DEPARTMENT
SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,
More informationSummary of the Changes 2017 National Electrical Code
what impact they will have on your work. Article 90----Introduction to the National Electrical Code 90.2 Scope of the NEC. Changes to this section include the removal of conductors, equipment and raceways,
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationB. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More informationCommercial Plans Application Checklist
Botetourt County, Virginia Development Services Construction Compliance 5 West Main Street, Suite 100 Fincastle, Virginia 24090 Phone: (540) 473-8248 Fax: (540) 473-2018 www.botetourtva.gov Commercial
More information