NRC Publications Archive Archives des publications du CNRC

Size: px
Start display at page:

Download "NRC Publications Archive Archives des publications du CNRC"

Transcription

1 NRC Publications Archive Archives des publications du CNRC Automation and Visualization in Modular and Prefab Construction Industry Neelamkavil, J. For the publisher s version, please access the DOI link below./ Pour consulter la version de l éditeur, utilisez le lien DOI ci-dessous. Publisher s version / Version de l'éditeur: Research Report (National Research Council Canada. Institute for Research in Construction), NRC Publications Record / Notice d'archives des publications de CNRC: Access and use of this website and the material on it are subject to the Terms and Conditions set forth at READ THESE TERMS AND CONDITIONS CAREFULLY BEFORE USING THIS WEBSITE. L accès à ce site Web et l utilisation de son contenu sont assujettis aux conditions présentées dans le site LISEZ CES CONDITIONS ATTENTIVEMENT AVANT D UTILISER CE SITE WEB. Questions? Contact the NRC Publications Archive team at PublicationsArchive-ArchivesPublications@nrc-cnrc.gc.ca. If you wish to the authors directly, please see the first page of the publication for their contact information. Vous avez des questions? Nous pouvons vous aider. Pour communiquer directement avec un auteur, consultez la première page de la revue dans laquelle son article a été publié afin de trouver ses coordonnées. Si vous n arrivez pas à les repérer, communiquez avec nous à PublicationsArchive-ArchivesPublications@nrc-cnrc.gc.ca.

2 Automation in Modular and Prefab Industry Report # RR-261 Neelamkavil, J September 2008 The material in this document is covered by the provisions of the Copyright Act, by Canadian laws, policies, regulations and international agreements. Such provisions serve to identify the information source and, in specific instances, to prohibit reproduction of materials without written permission. For more information visit Les renseignements dans ce document sont protégés par la Loi sur le droit d'auteur, par les lois, les politiques et les règlements du Canada et des accords internationaux. Ces dispositions permettent d'identifier la source de l'information et, dans certains cas, d'interdire la copie de documents sans permission écrite. Pour obtenir de plus amples renseignements :

3 Automation in Modular and Prefab Industry Joseph Neelamkavil Table of Contents Introduction...4 Automation Research in Prefab & Modular Construction...5 The FutureHome Project...5 The ManuBuild Project:...8 Making of the Construction Components Role of Robotics Automation...9 Precast automation...11 Automated Construction Site...12 Crane Selection and Movement Automation...16 Virtual Reality and Simulation in Modular Construction...17 Planning for Automated Building Assembly...19 Scheduling Automation and Sensor-based Control...20 Order Processing Automation...21 Conclusion & Future Directions for the Prefab Industry...22 Prefab Factory A Stage for Construction Productivity Enhancement...22 Prefab Building An Example of Quality and Functionality...24 References

4 List of Figures Figure 1. FutureHome Robotized Crate Source Balaguer et al [17]...5 Figure 2. Assembly Using Cones Connector Source: Diez et al [18]...7 Figure 3. AUTMOD3 Assembly Planner Source Padron et al [19]...7 Figure 4. NCC Apartment Building Source: [23] 9 Figure 5. Gantry-type Robots for Precast Panel Production Source: Bock [32].10 Figure 6. Robotized Manufacturing of Precast Panels - Source: Peñin et al [3]...11 Figure 7. Software Spec. System Architecture Source: Eastman et al [24]...12 Figure 8. Crane Handling Tool Source: Martinez et al [7]...13 Figure 9. SMART System Source: Reference [16]...14 Figure 10. Big Canopy Parallel Delivery System - Source: Hamada et al [37]...15 Figure 11. Modular Assembly Source: Olearczyk et al [26]...16 Figure 12. 3D AUTOCAD Model of Building - Source: Manrique [5] et al...17 Figure 13. Virtual Construction Environment Source: Murray et al [8]...18 Figure 14. ProModel Graphics Library Source: Nasereddin et al [6]...19 Figure 15. Bespoke Production Planner Source: Benjaoran & Dawood [34]...21 Figure 16. Option selection for Order Configuration Source: Shin et al [25]

5 Abstract The construction industry at-large is dominated by numerous small and specialized subcontractors who typically are not technologically advanced enough to embrace automation. The sector that represents factory built housing (the modular, panelized and prefabricated, precast, etc.) is perhaps an exception. Since these are built in factories, the principles of mass production that are the norm in manufacturing, applies. This will also make it easy to adapt to automation, integration and optimization. In this scenario, the constructability aspects can easily be verified prior to being built, and an optimum plan for construction (similar to a manufacturing process plan) can be chosen. Newer materials can be applied, and tight tolerances achieved, while the built products are not affected by outside climatic conditions, as is the case for site built housing. This report provides an overview and the type of automation that is prevalent in the factory-built and prefab industry. It will also provide some background information for the researchers to further their research on this important topic. Introduction Automation in the construction sector, inclusive of factory-built housing, mostly means the automation of the on-site construction process, and the automated component making operation [1]. Generally speaking, the construction process falls into one of three categories: 1) components making process, (parts, panels, precast, formwork, etc.) which deal primarily with the construction of the building blocks; 2) assembly process in which the construction components (from many different suppliers) are assembled/installed to form the buildings, houses, etc., by an array of sub-contractors, with sometimes conflicting workflows; 3) construction business processes most business and support processes (project management, workflow management, supply chain management, document management, change management, planning & scheduling, etc.) Traditionally, the bulk of the construction tasks are realized via manual methods. Hence, prior to deciding to automate the component making process, it is prudent to evaluate and decide on whether it is even worthwhile to launch modular or factory-built operations. Jongchul Song et al [11] has developed a tool that helps decide on the viability of prefabrication, preassembly, modularization, and off-site fabrication, etc. - collectively termed as pre-work (PPMOF). It facilitates the decision-making process for evaluating the use of PPMOF on any specific projects. Automating an operation that doesn t make any business sense is not at all advisable. Similarly, creating islands of automation does very little to the efficient functioning of the business. Sheer et al [12] has presented the key issues for improving integration of the automation systems pertaining to the whole construction process - from design to component making through the assembly of these components to the end product house, building, etc. A key catalyst for success in implementing automation is that the suppliers, designers and clients work collaboratively in fully integrated teams. As reported by Summers [13] on various aspects regarding the case of construction of terminal 5 at Heathrow airport, a high-level supervisory system needs to control what is in production at the factory, track delivery and storage inventory, and monitor quality at various levels. At a higher technology level, it is analogous to the requirements summarized by Alan M. Lytle et al [30] during a NIST workshop on construction automation, namely: a) Robotics and process integration in the fabrication shop, b) Materials tracking using radio frequency identification (RFID) tags, bar codes, etc., c) Design of connections for compliant 4

6 assembly, d) Pre-assembly to minimize field connections, e) Integrated project processes, databases and 4-D models, f) Positive control of members and sub-assemblies using manipulator arms, inverse Stewart platforms, etc., g) Automated welding, bolting, adhesion, etc., and h) Global positioning and locating systems. The NIST workshop focused on automation in steel construction, yet many of these technologies are also equally applicable in precast, pre-fabricated and/or modular type housings. Automation Research in Prefab & Modular Construction Europe has seen two mega research projects being undertaken in the prefab domain, with automation as the core. These are the FutureHome and ManuBuild projects. The FutureHome project [17, 18, 19, 20, 21] started in 1998 and was completed in The ManuBuild project [22, 23] started in 2005 and is due to be completed in The FutureHome Project The European segment of this project is known as FutureHome, and the Japanese segment is designated as IF7. The main objective of the FutureHome project is the development of integrated construction automation (ICA) concept and associated technologies for all stages of the house-building construction process, from the architect s desk to site robots. This includes: a) modular design of buildings with planned robotic erection, b) automatic planning and real-time re-planning of offsite prefabrication, transportation, and onsite assembly and c) onsite automatic and robotic transportation, manipulation, and assembly of the buildings prefabricated parts. Figure 1. FutureHome Robotized Crate Source Balaguer et al [17] The present-day prefabricated structures can only be taken apart with loss of functionality, either due to unavoidable damage or irreversible jointing. Whereas the FutureHome building system derives from a Kit-of-Parts approach, which is a specific implementation of prefabrication. The distinction is that such structures follow an assembly, disassembly, 5

7 parts replacement, re-assembly sequence as required during their life-cycle. In this project, standardization plays a major role in achieving economies from the many variations allowed in the parts set. The stakeholders of the FutureHome project chose light steel framing for the pre-fabrication; the rationale comes from transportation logistics and the requirement to use automation tools both in the factory and on site. This demands guaranteed dimensional precision and avoidance of problems like warping and shrinkage. The project custodians took the approach to erect a building complex that consisted of several buildings. Each building is erected using three-dimensional (3-D) modules and two-dimensional (2-D) panels (facades). These modules and panels are prefabricated offsite in a factory. Using beams, panels, installation elements, etc., the 3-D modules are assembled in a flexible production line. Frames, panels, windows, doors, etc., are used to build the 2-D facade panels. A noteworthy feature of the construction modules from this project is their ability to be automatically assembled. Several assembly connectors had been developed for the assembly of the modules, the structural connection, and electrical and service pipes connections. These connectors ensure automatic performance of complete assembly between modules. Another important element of the project is the development of a tool called AUTMOD3, which is an automatic modular construction software environment [18, 19, 20]. This system seamlessly integrates architectural design, planning and simulation tools in a commercial CAD program. Special purpose software modules, menus and libraries are linked to the CAD system, and a library of several types assists and guides the designer through the process. It contains structural 3D modules, 2D façade modules, 3D roof modules, and so on. The automatic modularization feature is invoked for deciding the number and types of modules, which depends on several criteria, like the minimum number of modules, module-size limitation due to pre-fabrication, transportation, etc. There are two methods of modular design in the AUTMOD3 tool. The first method is based on traditional architectural design. Architects design and draw architectural plans in a CAD system, and these drawings are processed using a modular division procedure to obtain the modules needed for the house. If there is any problem during the modular division due to the complexity of the design, the system requires the architect to make appropriate corrections. In the second method, the design is performed using a catalogue of 3D parametric modules. The library of modules is updated taking into account customer and architect requirements and also the development of new materials, accessories and fabrication techniques. All information is stored in a central database, which allows its access from other processes in the system. The planning segment of the AUTMOD3 tool features production planning and on-site modular assembly planning. Here, the assembly planning element generates the trajectories, which can be applied directly to a robotized crane developed as part of the project. The onsite assembly processes are expected to be performed by robots, autonomous cranes and/or other automated machines. The planning segment is considered four-dimensional (4-D), which takes into account not only the geometrical constraints of the assembly, but also the time constraints. That is, it determines the sequence in which different building components are assembled and plans the robot or crane trajectories to assemble them. A prime feature in arriving at a successful automated assembly system in this project is the integration of the planning process with the design and execution processes. For this to happen, pre-fabricated modules are vertically assembled using the cone connectors 6

8 system (as shown in figure above). This system allows auto-centering of the modules during the insertion, as well as a bigger tolerance in the precision of the crane movements. The assembly, by means of cones connectors, ensures that assembling motions occur essentially in a single direction, usually up-and-down. Figure 2. Assembly Using Cones Connector Source: Diez et al [18] As noted, the production sequence and the on-site modular assembly planning are the objectives of the AUTMOD3 planner (see the interface below). It defines the sequence, in which pre-fabricated modules should be produced, transported and finally assembled on the construction site. It generates programs for the automated devices involved in the onsite assembly. It also defines the assembly operations and their sequence, the fixture design, the tool selection and the workspace layout, to ensure satisfaction of a set of technical and economical requirements. Figure 3. AUTMOD3 Assembly Planner Source Padron et al [19] 7

9 In addition, as described by Wing and Atkin [21], visualization methods provide support on several levels in the FutureHome project. Virtual reality is employed to complement the Kit-of-Parts, providing a common virtual environment that can be shared by clients, architects, engineers, constructors, maintenance providers, etc. The clients can be led through the virtual design of their house, created on-line using prefabricated components. In addition, a simulation of the construction process is provided, allowing examination of cost, quality and time aspects. It is an environment within which the user creates a design from its constituent prefabricated components. A 3D window lists a library of available components. The user selects a component and views it in 3D; he/she then chooses to add the component to the design, using collision detection and constraintbased modeling techniques to ease the interaction process. As the design progresses, a window within the environment keeps the user updated with the total component cost of the design. The user then moves to the construction environment for a simulation of the construction process, which includes a tower crane and other virtual site equipment. The ManuBuild Project: The ManuBuild project [22, 23] is due to be completed in 2009, and has set its vision such that customers will be able to purchase high quality manufactured buildings that have a high degree of design flexibility at relatively low costs. Enabling business processes, ICT systems, new materials/technologies and smart components are the major features of this project. ManuBuild targets a shift from the traditional "craft and resource-based construction" to open building manufacturing. It combines efficient manufacturing in factories and on the sites with an open system for products and components that offers diversity of supply in the market. It has set its vision: Customers will be actively engaged in the design of their buildings, using state of the art interactive tools; it incorporates mass customization, and offers customers increased choice and design flexibility; the efficient, flexible and scalable manufacturing concept enables production efficiencies of production scale; an open system for products and components gives diversity of supply at competitive costs. Potential impacts include significant reductions in waste, costs, time to construct and the number of construction related accidents. Striving to achieve automation, one of ManuBuild s goals is to provide ICT support for distributed building manufacturing. Several decision support tools have been developed ranging from catalogues of products via information delivery, design, custom configuration, and assembly planning. Some of the highlights are: Market analysis method taking into account economic models, demography and cultural conditions; reactions to market changes can be set in motion in advance, and this enables to focus production according to customer demand. Intelligent component catalogues for parametric, intelligent building products here the term parametric refers to the customizability for the end-user needs, and intelligent refers to built-in design/logic and life cycle information of the objects. Design and configuration tools for customer driven design and configuration of buildings, based on intelligent catalogues and stored building templates. Assembly planning and monitoring tool to integrate production planning and component delivery scheduling having visual features of 3D assembly. The use of RFID is also being experimented with for efficient tracking of components. Open ManuBuild System Platform: the solutions are made available on a common portal, which permits access to all developed tools by the partner stakeholders. 8

10 As a visible outcome, ManuBuild is about to complete demonstration projects (see figure below) across several European cities, including two large residential buildings in Madrid (led by EMV3, the City Council of Madrid), a low-rise apartment building in Stockholm (led by NCC4) and a residential project and a healthcare or school building in the UK (led by Taylor Woodrow Construction, TWC5). Figure 4. NCC Apartment Building Source: [23] Making of the Construction Components Role of Robotics Automation Robots were first introduced in construction in the production of industrialized building components and modular housing. Later, mobile robots were developed for special on-site construction tasks. As reported by Bock [15], robots played a very active role at the production line of Sekisui Chemical Sekisui Heim in Japan, where more than 85 percent of the houses are prefabricated. The steel frames of the box unit are assembled from the roof, floor, and end wall frames which are welded together in a totally automated process using arc- and spot welders. The production process starts with cutting the prescribed length of highly rust resistant fused galvanized steel. Robots then weld connecting fittings to the columns. At the ceiling frame production line, 2" x 4" beams are attached to the ceiling frame and electric wiring is installed. In the floor-frame production line, insulation is laid on the floor-frame and an automatic nailer installs the floor boards. Another automated process assembles columns fitted with connecting lugs to form a column frame. The frames are spot welded together in a fully automated process. The frame supports also serve as jigs establishing the frame's dimensions. After the exterior wall panels that are manufactured on a different line are fitted to the structure, the interior items and partitioning panels are installed. Recently humanoid construction robots have been developed and tested. The evolution of robots in the construction industry is further elaborated by Bock [32]. For example, a robotic precast concrete panel factory uses a multipurpose unit which allows flexible production of unique concrete floor, wall and roof panels. Here, first the robotic cleaning unit cleans the production table and then sets regular spacers. Next the multi functional 9

11 gantry type robotic unit with two vertical arms places magnetos on the steel production table according to the CAD supplied design data. In a third step the robotic unit attaches shutters on top of the magnetos and then places horizontal, vertical and triangular reinforcement bars, according to structural engineering data. Next, a CADCAM controlled concrete distributor spreads the right amount of concrete while controlled by a CAD layout plan, which takes into account installation, window or door openings. The whole system is very flexible and can create any layout, or be run by rush order or optimal panel layout on the steel production pallet (see figure 5). Figure 5. Gantry-type Robots for Precast Panel Production Source: Bock [32] Kye-Young Lee et al [9] has proposed the human-robot cooperative (HRC) system to cope with the construction environment via real-time interaction with a human and robot simultaneously. The physical power of a robot system helps a human to handle heavy materials with a relatively scaled-down load. The human can feel and respond to the force reflected from the robot end-effecter acting with the working environment. The humanrobot relation is modeled with a target dynamic system which describes physical behaviors with impedances. The HRC system feature is the power-assistance and forcereflection. The effect of force-reflection is realized by the feedback of force reflected from an external force-sensor. The study also presents the experiments and evaluations to verify the proposed human-robot cooperative system for robotic applications in construction giving the performance tests, like force assistance, force reflection, and position-tracking in a two axes manipulator. Engelbert Westkamper et al [14] have developed a robotic system for the automatic laying of tiles within certain tolerances on prefabricated modules. The pilot system consists of the following features: A tile laying system consisting of tile positioning equipment, centering and measuring system and laying unit; An adhesive application system consisting of adhesive preparation, adhesive transport and adhesive application; A tile supply system consisting of a store and a measuring unit; Systems for generating process parameters, and 10

12 Handling and positioning systems having industrial robot and process control. The supply system consists of two laser triangulation sensors moved by a linear motor to measure the tiles. The laying equipment is composed of vacuum grippers on pneumatic cylinders having limit switches and a mechanical centering unit with a linked electronic measuring system. The adhesive application tool consists of a reusable container with a plunger for the supply of the adhesive, a hose pump for transporting the adhesive, and a nozzle for applying the adhesive. Precast automation Peñin et al [3, 4] has developed a robotized cell for the manufacturing of pre-fabricated glass reinforced cement (GRC) panels for a Spanish construction company. The system is primarily developed for the automatic programming and control of facade panel manufacturing. A CAD based 3D-drawing of the building facade serves as the input, and from the CAD design, the optimum facade to the panel s partition is obtained. In order to manufacture each panel, automatic task and path planning are performed for the available equipment in the manufacturing cell, such as the spraying robot, PLCs, control computer, etc. Figure 6. Robotized Manufacturing of Precast Panels - Source: Peñin et al [3] Where concrete is used as a structural building material, the modular formwork systems aid in automating the formwork operation and also improves productivity. However, proper planning for the form reuse schemes in the design as well as the construction phases of a building, including resource allocations and the construction sequence, is vital for successful use of modular formwork systems. Rong-yau Huang [10] et al has employed computer process simulation to study different form reuse schemes and to use gang forming systems in construction. Five form reuse schemes are identified, and to develop computer models for each scenario, a technique known as CYCLONE modeling methodology is employed. Simulations and sensitivity analyses of the schemes, using different numbers of form sets, cranes, and crews, are then conducted for real cases to assess their impact on the productivity and the cost-effectiveness of the operation. 11

13 Eastman et al [24] has reported on the effort to integrate advanced design and engineering information technologies in the North American precast/pre-stressed concrete industry. The project was undertaken by a consortium of precast producer companies formed specifically for the task. The effort involves significant process modeling work. This has led to the development of a specification for an advanced precast concrete design and engineering application platform implemented by a major building modeling software company. The platform, developed on top of a general parametric modeling CAD platform, is meant to provide the geometric modeling capabilities to support the definition of a precast concrete structure, all of its pieces and connections, and the reinforcing and other components embedded in the pieces. It provides the required geometric modeling, parametric capabilities, and information handling capabilities of the system architecture. The platform supports the engineering design of precast building assemblies, including whole buildings, like parking garages or the precast components of an office building. It supports top-down parametric modeling, allowing the full building to be defined as sets of precast assemblies that could be updated and automatically revised. Each piece in the assembly is defined, based on its relationship to the overall assembly. The architecture for the software specification is shown in the figure below. Figure 7. Software Spec. System Architecture Source: Eastman et al [24] Automated Construction Site Automated construction sites use robotics for logistics and assembly. Four major reasons contribute to the use of robots at a construction site: 1) Health & safety risk reduction, 2) Improving the working environment, 3) Improvement of quality and productivity, and 4) Cost reduction. Yet, the development and use of robotic systems for on-site construction faces many barriers. These barriers can be technological barriers or economical barriers. The technological barriers are that a construction robot must cope with the complexity of the construction process involving an unstructured and continuously evolving site, together with the need for performing multiple tasks with differing characteristics. This is in addition to the replacement of human labor, which necessitates the system to have a 12

14 certain level of intelligence in the form of an advanced control system and sensory system. As detailed by Zied [31], robotics research in construction has moved to address the technological barriers via: Development of mobile platforms and manipulators Development of advanced control systems Sensory systems integration Re engineering of processes to suit robotic systems Software development to help in the above aspects of development The use of advanced IT systems to enhance the whole system performance. The driving force for the final implementation of the robotic system to perform construction tasks is economics. Economical barriers are: The direct cost or benefits The effect of the new system on the organization like the technology strategy to comply with factors such as health & safety regulations and labor organizations. Changes required for implementing the new system. Martinez et al [7] has described their research, carried out in the robotization and industrialization of the construction process, with the following objectives: a) Modular design of buildings, with robotic erection as a means for construction; b) automatic planning and real-time re-planning of the offsite prefabrication, transportation, and onsite assembly; c) onsite automatic and robotic transportation, manipulation, and assembly of the buildings prefabricated components. Figure 8. Crane Handling Tool Source: Martinez et al [7] They have developed tools for the assembly of building modules, which consist of three main parts: The used gantry crane is a low-cost commercially available system with some modifications. Its main characteristics are 4m of span and 500 kg of payload. 13

15 The control system consists of vector control drivers for all motors, and a PC with a multi-axis controller PMAC that allows handling complex motion trajectories, difficult servo filters, advanced computation algorithms, and sophisticated I/O logic simultaneously. A square shaped metallic platform was designed and built to lift and assemble the modules. The conical shape of the electromagnets facilitates the assembly, due to the auto-centre facility. SMART (Shimizu Manufacturing system by Advanced Robotics Technology) represents modern attempts at computer-integrated construction, which claims to reduce the personhours required to complete a multi-storey office building by as much as 30% (refer 16). System set-up takes a few weeks, after which the building's top floor and roof are erected on top of four jacking towers. The jacking towers are used to push up the several-ton heavy top floor assembly - the main work platform - as well as lifting their own bases from floor to floor in a cycle time of around two and a half hours. The heart of the system is composed of lifting mechanisms and automatic conveying equipment which are installed on the work platform (this may later become the roof of the building). Overhead gantry cranes are connected to the underside of the roof structure in a way that very much resembles a factory production facility. Trolley hoists are used to lift and position construction components which are introduced at ground level. The whole process is computer-controlled, though workers are still involved in overseeing operations. Simplified connections between construction components facilitate rapid erection times. Floors emerge from under the top floor, and the weather factor is excluded from the site by a mesh fabric hung around the work area. The SMART system automates a range of production processes including: erection and welding of steel frames placement of precast concrete floor planks exterior and interior wall panels installation of various prefabricated units. Figure 9. SMART System Source: Reference [16] 14

16 Koji Hamada et al and others [39, 40, and 41] have described a similar construction system for high-rise reinforced concrete buildings, which is often referred to as the Big Canopy. As shown in the figure below, the Big Canopy set up consists of a parallel delivery system with three automated overhead cranes and one large construction lift under an all-weather synchronously climbing temporary roof frame. A modern material management system becomes a major part of it with linkage to databases and seamless communication with a CAD system, which draw resources based on prefabricated construction materials, and uses versatile workers. Figure 10. Big Canopy Parallel Delivery System - Source: Hamada et al [37] Essentially, the Big Canopy construction system can be divided into the following subsystems: a roof supported by four tower crane posts, which are situated outside the building; a complex hoist system with three cranes mounted against the roof; a jib crane on the roof to mount and to dismantle the tower crane posts; a high-speed constructions lift to all floors; use of prefabricated components with easy identification (RFID, bar-coded etc.); a material management and delivery system to manage the flow of materials and components. The work sequence itself follows something like this: Assemble the temporary roof frame and proceed with basement work under the roof. Raise the temporary roof two floors at a time, and skeleton work is performed using an efficient delivery system under the roof, and complete finishing and equipment work. After the skeleton work is completed, the temporary roof is lowered onto the roof of the actual building in order to dismantle it. Separate the perimeter of the temporary roof frame and lower it in the reverse sequence to the ground so as to dismantle it. The temporary roof is transported to the next project, or may be left as, for instance, a heliport. 15

17 Crane Selection and Movement Automation Olearczyk et al [26] have elaborated on a construction case based on field experience. Modules are fabricated in factories and transported for the assembly on site. These modules incorporate utilities, furniture and even painted walls, and are stacked together in the required configuration to create a multi-storey building. Presented also is the use of 3D modeling to solve problems of equipment interference, as an approach to the development of mathematical algorithms for crane position optimization, and to optimize sequential lifting patterns. Algorithms are also used to optimize different construction assembly scenarios, with the most efficient option being selected based on an evaluation of the kinematics movements for each module lift, via a series of simulation sequences. The 3D/4D models are utilized for the training of the operating crew, and for constructability verification and improvement. To implement the operation schedule, task duration to the minute scale is assigned, which is rarely the case in construction, but is the norm in the automotive industry. Figure 11. Modular Assembly Source: Olearczyk et al [26] Manrique [5] et al. have presented a concept involving the construction of a somewhat complex residential tilt-up-panel structure utilizing 3D modeling and animations. The residence is comprised of 108 precast concrete panels of varying rectangular shapes with dog legs and window and door cutouts, resembling an assembled jigsaw puzzle. 3D animations were used primarily to experiment with the construction process on the computer screen prior to construction to avoid potential conflicts and on-site errors, as well as a training tool for the contractors. The authors describe a methodology to integrate the crane selection algorithm and optimization model with 3D modeling and animation for the selection, utilization, and location of cranes on construction sites. Over 50 different types of cranes were tested in order to select the equipment with enough capacity to lift the 108 concrete panels, while considering the lowest rental cost and the space constraints and clearances between the lifted panel and the ongoing construction. 16

18 Figure 12. 3D AUTOCAD Model of Building - Source: Manrique [5] et al Virtual Reality and Simulation in Modular Construction The use of virtual prototyping technology (VP) in the construction industry is somewhat recent. Virtual reality (VR) enables real-time viewing of, and interaction with, spatial information. Virtual prototyping technology can assist planners to verify their plans so that construction risks can be eliminated before the commencement of the actual project. It enables contractors to construct the building many times in the computer, and reuse the model at different stages of the construction process. Different scenarios can be previewed and potential problems identified in advance in visualization process. The visualization can perform such tasks as production, transportation, handling and assembly of different construction components, including all the associated operational processes. Li et al [27] described an integrated framework and process for general contractors to apply the VP technology. In this framework, an expert (process modeler) accepts the BIM model from the designer, and decomposes it into formats required by the main contractor, subcontractors and consultants. At the same time, the process modeler integrates information provided by the construction team into the BIM model to create a virtual prototyping of the construction processes. Through an iterative process, the process modeler enables the construction team to conduct what-if analyses of different construction methods in the virtual prototyping environment, until a satisfactory method is obtained. Typically, the construction companies use virtual models only on large and complex buildings and infrastructure projects. The lead users are concerned with reducing risk, increasing technological innovation and improving business processes; that is, the visualization is seen as a means rather than an end. Some VR applications in the construction domain include [2]: Recognition of design errors and clashes early in the process, Improve design and reduce waste in the construction process, Constructability analysis and demonstrating with clients before the project starts, Helps in bidding for the construction of a facility, Design review with clients and end users, and make alternate choices, 17

19 Customer interface offer the customer a greater understanding of the product, Reusing the modules across many different construction projects and with the advantage of being able to sell from a virtual plan as it reduces the development risks. Murray et al [8] described a virtual environment that supports the design as well as the construction process of buildings assembled from prefabricated components and simulates the construction sequence according to a schedule. The design environment imports a library of 3-D models of prefabricated modules that can be used to interactively design a building. The construction schedule of the designed building can be altered, and the information may be fed back to the construction simulation environment. Within this environment the order of construction can be visualized using virtual machines. It provides a single 3-D environment where the user can construct their design through automatic constraint recognition and view the real-time simulation of the construction process within the environment. A visualization tool such as the one just described could assist the site manager in obtaining a better perception of the project which could be achieved by integrating the schedule management of the project with an animated virtual environment display. Figure 13. Virtual Construction Environment Source: Murray et al [8] In this environment, the model creation requires very minimal user interaction as it supports automatic constraint recognition between the components so that when the user constructs the model, the system automatically detects whether the components that being manipulated can be linked. An object database holds the types of modules that are used in the building and any relevant information applicable to the component, such as price, size, construction methods, etc. It also holds information relevant to the construction site, such as stock, resources and delivery information. As the user creates the building, the construction information is stored within the object database along with the order of construction and any dependencies between the tasks. One may review the building being constructed from within the virtual environment; the construction order of the 3-D model can be replayed to provide an animated 4-D model, combined with virtual machines (a crane, for instance) to simulate the construction process. Using a project plan, the 18

20 construction schedule can be altered and fed back into the virtual construction environment to explore alternative schedules. Nasereddin et al [6] described an automated approach for developing discrete event simulation models, very much applicable to the prefab industry. The paper describes elements commonly found in modular manufacturing, and summarizes an approach for automating the model development process using ProModel and Visual Basic. A case study is presented to verify advantages that included a reduction in model development time and improved modeling consistency. In ProModel, work locations must be defined and presented on the simulation canvas. The animation data which was done manually includes the graphics library that they created for the modular home manufacturing industry (see figure below). The library is used to show animation changes to the module as it is processed through the production line (example: after the wall set process is done, the simulation model will show the graphic with the walls installed). The simulation analysis is reported to have helped the clients to choose a factory layout that increased the overall production capacity by as much as 50%. Figure 14. ProModel Graphics Library Source: Nasereddin et al [6] Planning for Automated Building Assembly Automatic planning of construction process is an important premise of construction automation. In this context, construction of a prefabricated building can be considered analogous to the assembly of a manufactured product where the assembly is the reverse of disassembly in most cases. And in manufacturing, through the disassembly of a product, the disassembling process can be planned and based on which assembly process plan can be inferred. Drawing on a similar parallel, components are basic units of a building, and a building is comprised of a number of components assembled according to certain rules and constraints. The assembly of building components is dependent not only on geometric properties of components, but also on the assembly relationship of the 19

21 components. Accordingly, a computer model of construction in a prefabricated building will consist of relationship information of components and spatial restriction information. With these in mind, Hu [33] has presented a method for the automatic determination of a construction sequence from a connection graph representing a pre-fabricated building through the extraction of components. The extraction is based on the recursive extraction of components by a simultaneous verification of disassemblability. Components that are tightly connected together geometrically and physically, but loosely connected to the rest of the assembly, are selected as a preferred super-component. The process of extracting components not only makes it possible to reduce the problem space by early pruning of infeasible construction sequences, but also explicitly defines temporal and spatial parallelism in construction. Scheduling Automation and Sensor-based Control An efficient production schedule can drive the automation process in the making of prefab components. Several scheduling prototypes are reported to be developed addressing this issue. For example, a decision support system for coordinated prefabrication production scheduling has been described by Weng-Tat Chan [28]. The system supports key elements of production (re)scheduling, namely, conflict detection, determination of the priority for conflict resolution, generation and evaluation of alternatives for conflict resolution, and ranking of outcomes for negotiation. It combines the use of an explicit constraints-based scheduling model, genetic algorithms for the determination of scheduling parameters and conflict resolution priorities, as well as constraint programming to facilitate the rapid determination of several alternative schedules with minimum disruption of existing plans. Note that genetic algorithms (GA) have been popularly used in many areas: constrained or unconstrained optimization, sequencing, transportation, reliability optimization, artificial intelligence, and many others. A (GA) based searching technique is adopted in a mixed precast flow-shop scheduling system proposed by Leu and Hwang [35] to provide the optimal or near-optimal combination of production sequences, resource utilization, and minimum make-span while complying with resource constraints and mixed production. To help automate the planning segment of bespoke precast production, Benjaoran and Dawood [34] have developed an innovative planning system called Artificial Intelligence Planner (AIP). It has two major functionalities. The first is a data integration system that encourages automation in the planning process. The second is a decision support system for planners to improve the efficiency of the production plans. These functionalities complement each other to deliver optimum benefits to precast manufacturers. The AIP system adopts artificial intelligence technologies (neural network and genetic algorithm) to assist the process of production planning. The figure below shows the major elements of the system, which are: information inputs, main production processes, and information outputs. Primary information inputs for the system are fetched from external sources (project designers and contractors of construction projects). These can be project drawings, product specifications, and construction schedules. The production process includes product design, productivity estimation, production planning, and component manufacturing. Three major AIP components have been developed, which are: Graphic data Extractor to assist the product design; Processing-Time Estimator for the productivity estimation; and Production Scheduler for the production scheduling. The AIP system implements data integration technology through the central database to manage historical and current project data. The outputs of the system can be a quality production 20

22 schedule that satisfies short customer lead-time, effective factory resource utilization, and satisfaction of delivery requirements. Figure 15. Bespoke Production Planner Source: Benjaoran & Dawood [34] Geetha Gajamani and Koshy Varghese [29] have presented a system on the use of RFID for automated schedule and inventory monitoring in real time, in the context of construction that involved precast/ prefabricated components. Note that in the fabrication phase of these components, details of the material composition need to be documented. Data of where they are stored are documented to identify and transport them with minimum time loss. In the construction phase, the components delivered to the site have to be inspected and stored, and then located and tracked prior to installation. Similarly, details related to installation have to be recorded. During all these activities, the real time data regarding the component identification, its location in the structure, and details of the installation are required. And this necessitates automated data collection, not only for the control but also for the field material management. Addressing these issues, RFID technology is employed to indentify and track building components used in the site, and the data collected in real time is converted using software technology for any future use. Order Processing Automation Shin et al [25] described an order configuration system for the construction industry, which is targeted for the automated selection of pre-fabricated housing modules. The order management program (OMP) reported in this project runs on a PC, and offers the customer important information in real time about finishing materials, unit prices, specification of materials, an installation diagram, final price, etc. In contrast to common practice, which support only limited information through pamphlets and/or visits to the model house, customers can select proposed options directly, and look at the combination of selected options and their pictures in one place. When all the selections have been made, customers are provided with information on the total cost of the chosen finishing materials and the overall contract price in real time as well as the contract itself. The order is sent to the site-office server via intranet or anywhere the customer can access it. The OMP program provides customers with a user interface (see below) to place orders on 21

23 finishing materials. The customer can make selections on various combinations of finishing materials in a virtual reality environment. Figure 16. Option selection for Order Configuration Source: Shin et al [25] Conclusion & Future Directions for the Prefab Industry The type of automation technologies reviewed in this study revolves around actual projects and research activities related to constructing a real product: that is, construction components, fabricated modules, panels, houses etc. And, it appears that three areas of automations are becoming dominant in the prefab domain automating the business processes (includes planning and scheduling), the design, and the material handling (robots, etc.). It is reasonable to conclude that the use of some form of automation will be the norm in all factory-built housings of the future. Based on this study, and on our understanding of the type of automation that already exists in other domains like manufacturing, a roadmap of the future for the prefab industry is outlined. The vision on future direction details primarily productivity issues of a factory setting (where the prefab components are built), and the quality and functionality of the products being made (the components, assembly of the buildings etc.). The technological and infrastructure issues related to transporting the components to the construction site, and/or technologies related to foundations of the house/building, etc. are not considered. Prefab Factory A Stage for Construction Productivity Enhancement The ultimate objective of automation is to improve on productivity and quality, which will also contribute to substantial cost reduction. A detailed vision for the prefab industry is carved out based on the ideas given in Mullens [36], the technology roadmap given in manufactured housing research alliance [40], and the findings of the Altus Clayton consultant report [41] as the following: Embracing those technologies that revolutionized manufacturing industry, prefab builders can radically improve the efficiency with which it produces homes and commercial buildings. The prefab builders of the future will evaluate ways to improve productivity through the application of lean production, information and automation technologies. It will develop efficient methods for warehousing, inventorying and accessing products in the plant. It will develop strategies to reduce construction waste, and adopt techniques for 22

NRC Publications Archive Archives des publications du CNRC

NRC Publications Archive Archives des publications du CNRC NRC Publications Archive Archives des publications du CNRC Thermoset biocomposites for industrial applications Ton-That, Minh Tan; Legros, Nathalie; James, Byron; Slaski, Jan; Duckett, Mike; Graham, Lori-Jo

More information

Fibre-reinforced polymers: tests show that building structural members wrapped with fibre reinforced polymer and insulation will hold out in a fire

Fibre-reinforced polymers: tests show that building structural members wrapped with fibre reinforced polymer and insulation will hold out in a fire http://irc.nrc-cnrc.gc.ca Fibre-reinforced polymers: tests show that building structural members wrapped with fibre reinforced polymer and insulation will hold out in a fire NRCC-49495 Bénichou, N. A version

More information

NRC Publications Archive Archives des publications du CNRC

NRC Publications Archive Archives des publications du CNRC NRC Publications Archive Archives des publications du CNRC Acoustics: sound insulation in mid-rise wood buildings (Report to Research Consortium for wood and wood-hybrid mid-rise buildings) Schoenwald,

More information

TABLE OF CONTENT. Equipment kit Description of the technology Installation of equipment Start of construction...

TABLE OF CONTENT. Equipment kit Description of the technology Installation of equipment Start of construction... TABLE OF CONTENT Equipment kit.... 6 Description of the technology.... 8 Installation of equipment.... 10 Start of construction.... 14 Erection of walls and partitions.... 17 Second floor printing....

More information

NRC Publications Archive Archives des publications du CNRC

NRC Publications Archive Archives des publications du CNRC NRC Publications Archive Archives des publications du CNRC Admixtures in portland cement concrete Swenson, E. G. Publisher s version / Version de l'éditeur: Canadian Building Digest, 1968-07 NRC Publications

More information

CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES

CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES H. Randolph Thomas The Pennsylvania State University Research Building B University Park,

More information

HYBRID CONSTRUCTION AUTOMATION AND ROBOTICS

HYBRID CONSTRUCTION AUTOMATION AND ROBOTICS 24th International Symposium on Automation & Robotics in Construction (ISARC 2007) Construction Automation Group, I.I.T. Madras HYBRID CONSTRUCTION AUTOMATION AND ROBOTICS President of IAARC Chair for

More information

MOBILE ROBOTS - A NEW GENERATION OF PRODUCTION TASKS FOR ROBOTS. Emil - Figge - Stral 3e 75 D-4600 Dortmund 50 West Germany ABSTRACT

MOBILE ROBOTS - A NEW GENERATION OF PRODUCTION TASKS FOR ROBOTS. Emil - Figge - Stral 3e 75 D-4600 Dortmund 50 West Germany ABSTRACT MOBILE ROBOTS - A NEW GENERATION OF PRODUCTION TASKS FOR ROBOTS Detlef Spee, Head of Department of Handling Systems Fraunhofer Institute for Transport Engineering and Physical Distribution Emil - Figge

More information

Locrete Building System: the Technology Handbook

Locrete Building System: the Technology Handbook Locrete Building System: the Technology Handbook 1 3... Introduction 4... Characteristics 6... Locrete Production 8... Locrete Testing 12... Building with Locrete 16... Shuttering System 13... External

More information

NRC Publications Archive Archives des publications du CNRC

NRC Publications Archive Archives des publications du CNRC NRC Publications Archive Archives des publications du CNRC The Return on Investment from BIM-driven Projects in Construction Neelamkavil, J.; Ahamed, S. S. For the publisher s version, please access the

More information

Experiencing Interoperability of BIM in a Stadium Project in China

Experiencing Interoperability of BIM in a Stadium Project in China Experiencing Interoperability of BIM in a Stadium Project in China Cheng Zhang 1, Bo Liu 2, Guobin Gong 3 1) Lecturer, Department of Civil Engineering, Xi an Jiaotong-Liverpool University, Suzhou, Jiangsu,

More information

Manufacturing: new trends in production systems design and operation. Fulvio RUSINA (Comau), Yves COZE (Dassault Systemes)

Manufacturing: new trends in production systems design and operation. Fulvio RUSINA (Comau), Yves COZE (Dassault Systemes) Manufacturing: new trends in production systems design and operation Fulvio RUSINA (Comau), Yves COZE (Dassault Systemes) Table of Contents Industrial key trends and main drivers The actual design and

More information

Application of Building Information Modelling (BIM) in the Hong Kong Housing Authority s Public Housing Developments

Application of Building Information Modelling (BIM) in the Hong Kong Housing Authority s Public Housing Developments Application of Building Information Modelling (BIM) in the Hong Kong Housing Authority s Public Housing Developments Ms Ada Fung, JP Deputy Director of Housing (Development & Construction) Hong Kong Housing

More information

CONSTRUCTION MANAGEMENT TOOLS USING 3D-CAD, VIRTUAL REALITY, RFID, AND PHOTOGRAPHY TECHNOLOGIES

CONSTRUCTION MANAGEMENT TOOLS USING 3D-CAD, VIRTUAL REALITY, RFID, AND PHOTOGRAPHY TECHNOLOGIES CONSTRUCTION MANAGEMENT TOOLS USING 3D-CAD, VIRTUAL REALITY, RFID, AND PHOTOGRAPHY TECHNOLOGIES Naruo Kano, Dr.Eng Professor, Department of Architecture Waseda University 3-4-1 Okubo,Shinjuku, Tokyo, JAPAN

More information

AMERICAS Tel or Tel CHINA, SHENZHEN Tel

AMERICAS Tel or Tel CHINA, SHENZHEN Tel www.uic.com email: universal@uic.com AMERICAS Tel. 1-800-432-2607 or Tel. +1-607-779-7522 CHINA, SHENZHEN Tel. +86-755-2685-9108 CHINA, SHANGHAI Tel. +86-21-6495-2100 EUROPE Tel. +36-23-445-500 2010 Universal

More information

Four Factors to Consider When Building Complex Production Systems

Four Factors to Consider When Building Complex Production Systems Four Factors to Consider When Building Complex Production Systems When machine builders partner with subsystem specialists to simplify and streamline their equipment design, engineering, production, and

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice

More information

Component-based 3D Simulation Platform for Production Planning and Process Control

Component-based 3D Simulation Platform for Production Planning and Process Control Advances in Simulation for Production and Logistics Applications Markus Rabe (ed.) Stuttgart, Fraunhofer IRB Verlag 2008 Component-based 3D Simulation Platform for Production Planning and Process Control

More information

BIM FOR SURVEYORS. Survey Economics State of recovery. Tracking Wildlife With a total station. Measuring a Meridian Time in 1700s Philadelphia

BIM FOR SURVEYORS. Survey Economics State of recovery. Tracking Wildlife With a total station. Measuring a Meridian Time in 1700s Philadelphia JUNE 2017 BIM FOR SURVEYORS Survey Economics State of recovery Tracking Wildlife With a total station Measuring a Meridian Time in 1700s Philadelphia A NEW MODEL FOR SURVEYORS As BIM moves into more projects

More information

VIRTUAL REALITY TECHNOLOGY TO REPRESENT CONSTRUCTION ACTIVITIES

VIRTUAL REALITY TECHNOLOGY TO REPRESENT CONSTRUCTION ACTIVITIES 17 th International Conference on the Applications of Computer Science and Mathematics in Architecture and Civil Engineering K. Gürlebeck and C. Könke (eds.) Weimar, Germany, 12 14 July 2006 VIRTUAL REALITY

More information

NRC Publications Archive Archives des publications du CNRC

NRC Publications Archive Archives des publications du CNRC NRC Publications Archive Archives des publications du CNRC Guide to calculating airborne sound transmission in buildings Zeitler, Berndt; Quirt, David; Hoeller, Christoph; Mahn, Jeffrey; Schoenwald, Stefan;

More information

Construction Planning and Scheduling

Construction Planning and Scheduling Instructor s Manual to accompany Construction Planning and Scheduling Fourth Edition Jimmie W. Hinze Updated by Paresh Shettigar Upper Saddle River, New Jersey Columbus, Ohio Copyright 2012, 2008, 2004,

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS Modcrete OVERVIEW Modcrete COMPONENTS 7 > Modcrete is a fast, versatile and cost effective permanent formwork system for the construction of reinforced concrete filled structural walls for single and multi-storey

More information

DEVELOPMENT OF AUTOMATIC CONVEYOR SYSTEM AT CONSTRUCTION SITES

DEVELOPMENT OF AUTOMATIC CONVEYOR SYSTEM AT CONSTRUCTION SITES 355 DEVELOPMENT OF AUTOMATIC CONVEYOR SYSTEM AT CONSTRUCTION SITES Hiroshi Nojima, Yoshimi Nakata, Masakazu Kakuyama, Seiichi Shibayama, Wataru Isomura, Taro Okamoto Technical Research Institute Fujita

More information

Building the Future With Innovation DfMA- DESIGN for MANUFACTURING AND ASSEMBLY

Building the Future With Innovation DfMA- DESIGN for MANUFACTURING AND ASSEMBLY SEMBCORP EOSM PTE LTD Building the Future With Innovation DfMA- DESIGN for MANUFACTURING AND ASSEMBLY 2 February 2015 SEMBCORP EOSM a SUBSIDARY OF SEMBCORP INDUSTRIES Temasek Holdings Sembcorp Industries

More information

VERTICAL SHIPYARD: TECHNOLOGY TRANSFER FOR AUTOMATED CON- AND DECONSTRUCTION

VERTICAL SHIPYARD: TECHNOLOGY TRANSFER FOR AUTOMATED CON- AND DECONSTRUCTION VERTICAL SHIPYARD: TECHNOLOGY TRANSFER FOR AUTOMATED CON- AND DECONSTRUCTION Thomas Bock *, Thomas Linner, and Nora Eibisch Chair for Building Realization and Robotics, Technische Universität München,

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

Lattice Plate Flooring

Lattice Plate Flooring Lattice Plate Flooring Introduction Pekso Precast manufacturers and supplies a range of precast concrete structural building products ranging from foundations and flooring systems that includes Lattice

More information

BIM Checklist. Introduction

BIM Checklist. Introduction Introduction This Building Information Modeling (BIM) Checklist is intended to be used as a guide for project stakeholders who are looking to implement BIM/VDC in a design-build project. Since integration

More information

AutoCAD or Factory Design Suite for layout design: A productivity study

AutoCAD or Factory Design Suite for layout design: A productivity study or Suite for layout design: A productivity study Autodesk Suite software saves countless hours of design and rework by automating and simplifying many common tasks in layout design. This study details

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

TECHNOLOGY SOLUTIONS

TECHNOLOGY SOLUTIONS TECHNOLOGY SOLUTIONS DRIVE CONTROL AUTOMATION As a leading Global Drive, Control and Automation System Integrator, we use a considered portfolio of products to deliver robust, reliable and flexible solutions

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

WEB BASED BIM FOR MODULAR HOUSE DEVELOPMENT. Query Approach in Consumer Participatory Design

WEB BASED BIM FOR MODULAR HOUSE DEVELOPMENT. Query Approach in Consumer Participatory Design WEB BASED BIM FOR MODULAR HOUSE DEVELOPMENT Query Approach in Consumer Participatory Design CHUEN-HUEI (JOSEPH) HUANG AND ROBERT J. KRAWCZYK Illinois Institute of Technology, College of Architecture, USA

More information

Light Steel Framing ~ From Concept to Completion

Light Steel Framing ~ From Concept to Completion Light Steel Framing ~ From Concept to Completion Panelization made simple for the 21st century Automated Construction Equipment Automated Construction Equipment (ACE) is a leader in the design, development

More information

The Merits of Structural Steelwork

The Merits of Structural Steelwork B309 12pp Final 11/12/02 11:14 AM The Merits of Structural Steelwork Page 2 The Purpose of this Reference Manual The guide, which has been prepared by BCSA, should be used in discussions with clients and

More information

Material Handling. Chapter 5

Material Handling. Chapter 5 Material Handling Chapter 5 Designing material handling systems Overview of material handling equipment Unit load design Material handling equipment selection Material Handling Definitions Material handling

More information

Gerber M Series Site Requirements

Gerber M Series Site Requirements Gerber M Series Site Requirements Preparing for the arrival of your new machine. P rior to the arrival of your Gerber M Series Cutting System there are certain things you can prepare to facilitate a quick

More information

ROBOTIZED LEAN ASSEMBLY IN THE BUILDING INDUSTRY

ROBOTIZED LEAN ASSEMBLY IN THE BUILDING INDUSTRY ROBOTIZED LEAN ASSEMBLY IN THE BUILDING INDUSTRY S. Martinez A. Jardon A. Gimenez C. Balaguer J.M. Navarro Dragados, Spain navarros@dragados.com C. Barcena Dragados, Spain navarros@dragados.com ABSTRACT

More information

Development of an Efficient Tapered Slip-Form System Applying BIM Technology

Development of an Efficient Tapered Slip-Form System Applying BIM Technology Engineering, 2013, 5, 693-699 http://dx.doi.org/10.4236/eng.2013.59082 Published Online September 2013 (http://www.scirp.org/journal/eng) Development of an Efficient Tapered Slip-Form System Applying BIM

More information

PRODUCT BROCHURE GLOBAL COORDINATE MEASURING MACHINES

PRODUCT BROCHURE GLOBAL COORDINATE MEASURING MACHINES PRODUCT BROCHURE GLOBAL COORDINATE MEASURING MACHINES 2 GLOBAL Coordinate Measuring Machines TAILORED FOR MAXIMUM PRODUCTIVITY Scalability and scope are the hallmarks of the GLOBAL coordinate measuring

More information

TUBE INSPECTION SYSTEM

TUBE INSPECTION SYSTEM PRODUCT BROCHURE TUBE INSPECTION SYSTEM Tube measurement and production with the ROMER Absolute Arm 2 TUBE INSPECTION SYSTEM HIGHLIGHTS TUBE MEASUREMENT HAS A NEW SHAPE Hexagon Metrology s Tube Inspection

More information

Yale Lift Trucks Driven by Balyo

Yale Lift Trucks Driven by Balyo Yale Lift Trucks Driven by Balyo Transform into an efficiency machine with robotic lift trucks. You experience the pain every day, increasing demand and the desire for faster delivery times. As these issues

More information

E³.series Electrical Wiring, Control Systems and Fluid Engineering Software

E³.series Electrical Wiring, Control Systems and Fluid Engineering Software P R O D U C T O V E R V I E W Z u k e n T h e P a r t n e r f o r S u c c e s s E³.series Electrical Wiring, Control Systems and Fluid Engineering Software z u k e n. c o m / E 3 s e r i e s Z u k e n

More information

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format Basic Construction of the CANADACAR System The CANADACAR System is a prefabricated, engineered and constructed freestanding parking garage structure that utilizes superior technology combining pre-cast

More information

An Introduction To BIM INTEGRATED Architectural Specifications

An Introduction To BIM INTEGRATED Architectural Specifications An Introduction To BIM INTEGRATED Architectural Specifications WHAT ARE SPECIFICATIONS? Specifications are documents that accompany and govern the construction of a building. The guiding library of master

More information

Small Assembly Robots: Evaluating Controllers

Small Assembly Robots: Evaluating Controllers Small Assembly Robots: Evaluating Controllers A Guide for Manufacturers, Machine Builders and System Integrators Knowing how to evaluate key controller features can lead to making a wiser buying decision.

More information

Shigeru Sakamoto Construction Technology Development Department Taisei Corporation

Shigeru Sakamoto Construction Technology Development Department Taisei Corporation At present the Japanese construction industry and related areas in Japan are suffering from a number of problems. The problem of stagnant productivity and ever-increasing accidents are reflected in the

More information

Palletizing robots for the consumer goods industry

Palletizing robots for the consumer goods industry Palletizing robots for the consumer goods industry FlexPalletizer IRB 640 is the name of a new palletizing robot developed by ABB that meets the special needs of the consumer goods industry, and particularly

More information

The. universal 3D Inspection reference. advanced 3D measurement software & solutions

The. universal 3D Inspection reference.  advanced 3D measurement software & solutions The universal 3D Inspection reference www.metrologicgroup.com advanced 3D measurement software & solutions About the company Optimize your quality processes, measure more efficiently, maximize your investments

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

A White Paper February System for piping global management

A White Paper February System for piping global management A White Paper February 2004 System for piping global management Page blank Table of contents Summary... 4 Modules... 5 Piping Classes... 6 Data Dictionaries 6 Tables 6 Piping Classes 7 Branch Tables 7

More information

The Development of a Low Cost approach to the Prototyping of Construction Plant

The Development of a Low Cost approach to the Prototyping of Construction Plant The Development of a Low Cost approach to the Prototyping of Construction Plant D A Bradleyt, F Margravet, M B Widden$, G Melling" & H. McKee' t School of Electronic Engineering & Computer Systems, University

More information

Modular Wood Framing Goes Vertical

Modular Wood Framing Goes Vertical Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported

More information

SHELVING, RACKING AND STORAGE CONCEPTS

SHELVING, RACKING AND STORAGE CONCEPTS SHELVING, RACKING AND STORAGE CONCEPTS 1 JULY 2017 FREE GUIDE ABOUT SUPERMARKET SHELVING Supermarket Shelving has been in the second hand shelving and racking Industry for over 30 years and we are able

More information

In order to achieve major productivity and cost-efficient breakthroughs, a solution is

In order to achieve major productivity and cost-efficient breakthroughs, a solution is Igor Juricic, Intergraph, Italy, examines the advances made in vessel design software. In order to achieve major productivity and cost-efficient breakthroughs, a solution is required that can manage today

More information

A-ONE Insulated Forms Installation Manual

A-ONE Insulated Forms Installation Manual A-ONE Insulated Forms Installation Manual Rockford, MN www.aoneform.com www.diversifoam.com info@diversifoam.com A-ONE Manual 180426.docx Disclaimer Notice The information in the A-ONE Insulated Forms

More information

PZ H-BEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE

PZ H-BEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE PZ HBEAM FORMWORK PAVLOS ZENONOS & SONS LTD CATALOGUE PZ HBEAM FORMWORK PZ HBEAM FORMWORK SOLUTIONS PZ HBEAM FORMWORK SYSTEMS & APPLICATIONS PZ HBEAM COLUMN FORMWORK PZ HBEAM RETAINING WALL FORMWORK PZ

More information

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) AC191 Approved May 2008 Effective June 1, 2008 Previously approved February 2008, October 2007,

More information

Activplant essentials

Activplant essentials DATASHEET Activplant essentials The toolkit to build your custom MES solution. ActivEssentials the manufacturing operations platform. ActivEssentials lies at the heart of the Activplant solution, where

More information

Computer Aided Process Planning(CAPP) By: Dhiman Johns M.E.(PIE), Thapar University, Patiala

Computer Aided Process Planning(CAPP) By: Dhiman Johns M.E.(PIE), Thapar University, Patiala Computer Aided Process Planning(CAPP) By: Dhiman Johns M.E.(PIE), Thapar University, Patiala To understand CAPP, We must briefly discuss about Process Planning Products and their components are designed

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM Introduction AIA 2009 BIM AWARDS Category B: Design/Delivery Process Innovation Using BIM Project: UNIVERSITY OF COLORADO - DENVER HEALTH SCIENCE CENTER RESEARCH COMPLEX II Owner s Statement Architect

More information

DRY CONSTRUCTION SYSTEMS

DRY CONSTRUCTION SYSTEMS DRY CONSTRUCTION SYSTEMS Adrienn LEPEL BUTE Dry construction systems Prefabricated elements assembly on site Minimal use of water dry construction systems Assembled partitions Suspended ceilings Raised

More information

Course Description EMME 1

Course Description EMME 1 Course Description 01211211 Introduction to CAD/CAM 3(2 3 6) CAD/CAM systems for production engineering, hardwares and softwares for CAD/CAM systems, wireframe, surface and solid design, three dimension

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

Overview and Frequently Asked Questions

Overview and Frequently Asked Questions Overview and Frequently Asked Questions Overview Oracle Buys Demantra: Setting the New Standard in Today s Demand-Driven Planning Solutions On June 1, 2006, Oracle announced our agreement to buy Demantra,

More information

DAC / Fanuc Robotic Screw Insertion Work Cell

DAC / Fanuc Robotic Screw Insertion Work Cell 10949 Crystal Falls Parkway Leander, TX 78641 Phone: (512) 528-9501 Fax: (512) 528-9429 DAC / Fanuc Robotic Screw Insertion Work Cell Project Overview: This machine is designed for any customer that requires

More information

Virtual Prototyping for Engineering Design

Virtual Prototyping for Engineering Design Virtual Prototyping for Engineering Design Walid Tizani University of Nottingham England walid.tizani@ nottingham.ac.uk Robert A Smith University of Nottingham England robert.smith@ nottingham.ac.uk Darshan

More information

Reading. Between. the Lines

Reading. Between. the Lines Reading Between the Lines by Annie Vodenicharska, Derek Barnes and Stephen Capone A new library in East Boston is the focal point of a park that sits between a residential neighborhood and the waterfront,

More information

Digital Twin Plan, Optimize and Visualize Your Factory. Dr. Ulrich Rossgoderer, Oct 24 th 2017

Digital Twin Plan, Optimize and Visualize Your Factory. Dr. Ulrich Rossgoderer, Oct 24 th 2017 Digital Twin Plan, Optimize and Visualize Your Factory Dr. Ulrich Rossgoderer, Oct 24 th 2017 Realize innovation. Challenges More products/variants on the same line Growing number of projects (mainly brownfield)

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. MACHINE CONTROL LEVEL SIMULATION OF AN AS/RS IN THE AUTOMOTIVE INDUSTRY Min

More information

The complete process...

The complete process... Alphacam Router is an easy-to-use CAD/CAM solution for manufacturers wanting fast, efficient toolpaths and the generation of reliable, machine ready CNC code. The complete process... Alphacam is the total

More information

INTERNSHIP REPORT GOUTHAM.J

INTERNSHIP REPORT GOUTHAM.J INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.

More information

Robcad. Tecnomatix. Digital manufacturing environment for robotic workcells verification and off-line programming

Robcad. Tecnomatix. Digital manufacturing environment for robotic workcells verification and off-line programming Robcad Digital manufacturing environment for robotic workcells verification and off-line programming Benefits Increase manufacturing quality, accuracy and profitability Reduce labor hours and process engineering

More information

Automated Access Planning On Construction Sites: An Expert GIS Approach

Automated Access Planning On Construction Sites: An Expert GIS Approach Automation and Rohohcs un onstructlon A G.H. Watson, R.L. Tucker and J.K. Walters (Editors) 1993 Elsevier Science Publishers B.V. All rights reserved. 325 Automated Access Planning On Construction Sites:

More information

Brochure. Equator gauging systems

Brochure. Equator gauging systems Brochure Equator gauging systems The role of Equator gauging systems on the shop floor To control manufacturing processes, gauges, for example sets of callipers, go / no-go gauges or bore gauges, have

More information

Supply Chain MICROSOFT BUSINESS SOLUTIONS DEMAND PLANNER

Supply Chain MICROSOFT BUSINESS SOLUTIONS DEMAND PLANNER Supply Chain MICROSOFT BUSINESS SOLUTIONS DEMAND PLANNER DEMAND PLANNING FOR BUSINESSES Demand planning is the first step towards business planning. As businesses are moving towards a demand-centric environment

More information

Building & Ductwork Airtightness Standards

Building & Ductwork Airtightness Standards Building & Ductwork Airtightness Standards Version 1.02, August 2013 Standard Reference Technical Body Title ICS (International Classification for Standards) Scope Door and Windows EN 12207:1999 Windows

More information

Oracle Production Scheduling. Maximize shop floor throughput and optimize resource utilization

Oracle Production Scheduling. Maximize shop floor throughput and optimize resource utilization Oracle Production Scheduling Maximize shop floor throughput and optimize resource utilization Typical Scheduling Challenges How can you: Sequence orders to best use your production resources? Offload production

More information

MRSI-175Ag Epoxy Dispenser

MRSI-175Ag Epoxy Dispenser MRSI-175Ag Epoxy Dispenser Applications: Microwave & RF Modules MEMS Semiconductor Packaging Multi-Chip Modules Hybrid Circuits Optical Modules Overview The MRSI-175Ag Conductive Epoxy Dispenser handles

More information

Robotics, CNC and FMS

Robotics, CNC and FMS Robotics, CNC and FMS! Extensive range of integrated training equipment! Robots - SCARA and Articulated types! Automatic materials handling equipment! Modular manufacturing systems! CNC Mill and Lathe!

More information

CATHEXIS. CathexisVision Solutions Beyond Surveillance. Beyond Surveillance. Increase return on investment

CATHEXIS. CathexisVision Solutions Beyond Surveillance. Beyond Surveillance. Increase return on investment CATHEXIS Solutions Beyond Surveillance Increase return on investment The IP Video Management Software suite provides an extensive range of sophisticated solutions to satisfy all security and infrastructure

More information

Achieve business excellence with smart, future-ready logistics innovation. Material Handling Automation. schneider-electric.us/materialhandling

Achieve business excellence with smart, future-ready logistics innovation. Material Handling Automation. schneider-electric.us/materialhandling Achieve business excellence with smart, future-ready logistics innovation Material Handling Automation schneider-electric.us/materialhandling SMARTER MACHINES Build even smarter material handling equipment

More information

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers

More information

proalpha ERP CAD Integration ERP for SMEs

proalpha ERP CAD Integration ERP for SMEs proalpha ERP CAD Integration ERP for SMEs proalpha CA-Link creates a consistent data and information flow between engineering and proalpha ERP. The highlights of proalpha CA-Link: Your CAD software and

More information

What s New with the PlantPAx Distributed Control System

What s New with the PlantPAx Distributed Control System What s New with the PlantPAx Distributed Control System Copyright 2016 Rockwell Automation, Inc. All Rights Reserved. 1 PLANT-WIDE Control and Optimization SCALABLE and Modular SECURE Open and Information-enabled

More information

Would you like to know why one of the best airlines in the world is using our AS/RS solutions?

Would you like to know why one of the best airlines in the world is using our AS/RS solutions? Would you like to know why one of the best airlines in the world is using our AS/RS solutions? Call us and find out why our clients consider us not only as suppliers, but also as team-mates and let us

More information

CONCRETE & MASONRY SAFETY

CONCRETE & MASONRY SAFETY CONCRETE & MASONRY SAFETY Safety and Quality Relationship REINFORCING MISS-PLACED IN CONCRETE RESULTS IN WEAKEN STRUCTURE IMPROPER PLACEMENT OF LINTEL BEAMS INCORRECT MASONRY CEMENT OR GROUT MIX DESIGN

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

SoftWall Enclosures. Flexible In-plant Enclosure Systems An Excellent Alternative to Rigid Wall Systems

SoftWall Enclosures. Flexible In-plant Enclosure Systems An Excellent Alternative to Rigid Wall Systems SoftWall Enclosures Flexible In-plant Enclosure Systems An Excellent Alternative to Rigid Wall Systems An Excellent Alternative Soper s Softwall Enclosures are easy to install, dismantle and relocate.

More information

763.389.9475 www.erdmanautomation.com The Erdman 3M VHB Structural Glazing Tape Applicator, Frame Assembly & Glass Lay-in System Erdman 3M VHB Structural Glazing Tape Applicator, Frame Assembly and Glass

More information

TELECOMMUNICATION TOWERS & CAMOUFLAGE SOLUTIONS CATALOGUE

TELECOMMUNICATION TOWERS & CAMOUFLAGE SOLUTIONS CATALOGUE IN CONTACT WITH THE FUTURE TELECOMMUNICATION TOWERS & CAMOUFLAGE SOLUTIONS CATALOGUE KONSING GROUP LTD BELGRADE KONSING GROUP LTD BELGRADE, Address: Surcinski put 1a, 11070 Belgrade, Serbia, T.: + 381

More information

SILO L, THE VERTICAL SINGLE-COLUMN STORAGE SYSTEM MULTI-PURPOSE NEW DESIGN NEW TECHNOLOGY NEW FEATURES

SILO L, THE VERTICAL SINGLE-COLUMN STORAGE SYSTEM MULTI-PURPOSE NEW DESIGN NEW TECHNOLOGY NEW FEATURES NEW DESIGN NEW TECHNOLOGY NEW FEATURES SILO L, THE VERTICAL SINGLE-COLUMN STORAGE SYSTEM MULTI-PURPOSE SILO L is an automatic storage system with shifting trays, designed for the intensive storage of a

More information

Construction OS&H Project planning and control for safe OS&H

Construction OS&H Project planning and control for safe OS&H Construction OS&H Project planning and control for safe OS&H Summary General principles of project planning and control OS&H by design as a key element of project planning and control OS&H performance

More information

Flawless painted surfaces thanks to fullyautomated

Flawless painted surfaces thanks to fullyautomated In-line image processing systems recognize and document even the tiniest paint defects Flawless painted surfaces thanks to fullyautomated 100% inspection ISRA VISION SYSTEMS, Darmstadt. In all sectors

More information

INUDSTRY 4.0 SMART FACTORY

INUDSTRY 4.0 SMART FACTORY INUDSTRY 4.0 SMART FACTORY How can we categorize Smart Factory with regard to industry 4.0 and other technologies Industry 4.0 Marketing R&D Production Logistics/SCM Data Analytics Real-time product data

More information