1 SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS APPENDIX D: SLIP FORMED CONCRETE BARRIERS 1 GENERAL All slip formed concrete barrier shall be formed using the F-shape profile detailed in Specification M23 Appendix A. NOTE: This is a working draft release. Minor changes may be made before final release. 2 GEOMETRY Any comments or questions may be sent to julian.chisnall@nzta.govt.nz. 2.1 A minimum 3m long by 250mm deep reinforced concrete anchor footing shall be provided at all barrier terminations and at 60m maximum spacing between barrier terminations. Reinforcing shall be continuous through intermediate anchor footing (no air gap required). 2.2 Anchor footing arrangement as shown in Drawing B8-1 below (Extract from M23 Appendix B, in preparation) is an acceptable solution. Footing length may be increased to facilitate construction is desired. 2.3 Where the barrier height transitions up or down, this must occur over at a rate not exceeding 1V:15H. 2.4 To prevent random shrinkage cracking, contraction joints shall be provided at 3m maximum spacing by saw cutting to a minimum depth of 50mm and shall be cut while the concrete is in the plastic state. 3 SUBSTRATE 3.1 Substrate base material shall be compacted granular material, asphaltic concrete or similar to the Engineers specification. Level of base shall be 50mm minimum/100mm maximum below finished Pavement level on both sides, to allow for embedment of barrier as per Drawing B8-1 below. 4 CONCRETE CONSTRUCTION 4.1 Concrete construction shall comply with NZS 3109 and NZS 3104 except at as modified below: i) Concrete minimum cementitious content shall be 350kg/m 3. ii) Concrete maximum water cement ratio shall be 0.4. iii) A set retarding admixture may be used. iv) Concrete consistency shall be assessed by visual and tactile methods. Up to 12 litres of clean water may be added to each m3 of batched concrete before and during M SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS Page 1 of 5
2 placement. Slump and cylinder tests due to this additional water are not required unless requested by the Engineer. v) Test cylinder samples may be taken at the production plant. Tests for acceptance shall be in accordance with clause of NZS In addition one extra cylinder shall be taken and tested at 7 days. vi) Concrete shall be thoroughly compacted in the mould, such that the barrier extruding at the back of the mould is smooth and tight with no open areas at the surface indicating poor compaction apparent. vii) Barrier cross sectional tolerances shall comply with Figure D1: Slip Formed Concrete Barrier Dimensional Tolerances below. viii) Barrier position shall be within +/-30mm of set out position. ix) End of day joints and any barrier cut-outs shall be within +/-20mm of design position and verticality. 4.2 Surface finish shall be Class U3 in accordance with NZS Surface tolerances and irregularities shall meet the requirements for Class F4 in accordance with NZS The primary longitudinal reinforcement for slip formed barriers shall be 12.7mm low relaxation galvanised prestressing strand. Strand shall be suspended mechanically in the correct position within the mould while placing concrete. All cables/bars/strands shall be held taut during slip forming. 4.5 Longitudinal prestressing strand shall be joined by overlapping strand a minimum of 1m and clamping each lap with four ½ commercial rope grips, clamped tightly. 5 CONCRETE TESTING 5.1 Concrete testing shall be in accordance with NZS 3109 as detailed in Table 1 below. M SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS Page 2 of 5
3 TABLE 1: CONCRETE TESTING Test Test method Slump test NZS 3112: Part 1 Compression test NZS 3112: Part 2 Minimum frequency Comments Acceptance criteria One per batch of concrete and when compression test samples are taken. The greater of; a) One set of test specimens for each day of pouring b) One set of test specimens for every 25m 3 poured. In addition, one set of test specimens shall be taken; c) if water is added to the mix in accordance with clause of NZS3109 or, d) if the concrete mix or concrete manufacturer is changed. Tested in the casting yard prior to pouring A set of test specimens shall comprise three cylinders to be tested at 28 days and 1 cylinder to be tested at 7 days. Test specimens may be taken at the production plant unless water is added to the mix, in which case they shall be taken in the casting yard during pouring. Refer to clause of NZS Rejected concrete shall not be used in the works. Refer to clause of NZS3109. Works made from concrete not meeting the acceptance criteria shall be rejected. Cover Site measure Every bar within every pour Refer to clause of NZS3109. Reinforcement outside of cover tolerance requirements shall be rectified before pouring. Reinforcing steel Clause B6 and B7 of AS/NZS 4671 At commencement of construction and whenever reinforcing bar is sourced from a different manufacturer. * Australasian Certification Authority for Reinforcing and Structural Steels This test is to avoid counterfeit and substandard reinforcing bar. If reinforcing bar is not sourced from, and certified by, an ACRS* accredited supplier the local random verification testing requirements of NZTA TAN shall apply. Testing undertaken by the bar manufacturer is adequate proof for acceptance provided authentic verification of the test results are provided. M SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS Page 3 of 5
4 M SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS Page 4 of 5
5 Figure D1: Slip Formed Concrete Barrier Dimensional Tolerances M SPECIFICATION FOR ROAD SAFETY HARDWARE SYSTEMS Page 5 of 5
5 Concrete Placement
5 Concrete Placement Testing Entrained Air Slump Strength Water/Cementitious Ratio Mixing Placing Concrete Compressive Test Specimens Curing De-Tensioning Multiple Strand Release Single Strand Release
More informationMATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 APRIL 2004 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES
More informationBridge Beams. Product brochure
Bridge Beams Product brochure Bridge Beams Stahlton offers economic bridge systems to suit a variety of spans, loadings and site conditions. Our Super Tee and Single or Double Hollowcore elements are manufactured
More informationMATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 NOVEMBER 2015 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES 1821.03 DEFINITIONS
More informationSection CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.
PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3
CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS
More informationCONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS
Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS
More information1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:
Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationSECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES
GUIDE SPECIFICATION SECTION CAST IN PLACE CONCRETE FOR FLOOR SLABS ON GRADE THAT WILL RECEIVE SEMI-PERMEABLE OR IMPERMEABLE FLOOR FINISHES PART 1 - SCOPE 1.01 WORK INCLUDED: 1.1.1 This guide covers the
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More information1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement
SECTION 03 31 00 - CAST-IN-PLACE STRUCTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Cast-in place structural concrete including footers, foundations, and other non-slab applications.
More informationSECTION RIGID PAVEMENT
SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.
More informationAPPENDIX I NASP TEST PROTOCOLS
APPENDIX I NASP TEST PROTOCOLS I-1 I-2 I-3 I-4 NASP STRAND BOND TEST (DRAFT) Standard Test Method to Assess the Bond of 0.5 in. (12.7 mm) and 0.6 in. (15.24 mm) Seven Wire Strand with Cementitious Materials
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA April 15, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
More informationMATERIAL SPECIFICATION FOR SPUN CONCRETE POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 2421 NOVEMBER 2017 (Formerly OPSS 2421, November 2012) Note: The MUNI implemented in November 2017 replaces OPSS 2421 COMMON, November 2012 with no technical
More informationTILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationSECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary
SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for
More informationJoint Free Slabs On Grade Website:
Joint Free Slabs On Grade Website: www.jointfreeslabs.com Specification Revised March 2014 Warwick Colefax Robert Colefax Phone (02) 9999 6688 Phone (07) 4051 9466 Fax (02) 9999 6680 Fax (07) 4051 9477
More informationDIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018
DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 1 CONCRETE MATERIALS, CONSTRUCTION METHODS AND TESTING PROCEDURES A. MATERIALS... 3 1. CONCRETE FOR SIDEWALK AND CURBS
More informationDesign Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres
Design Guidance for TAB-Deck Composite Slabs using SMD Metal Decking reinforced with ArcelorMittal Steel Fibres Version 2 Revised October 2008 Design Guidance for TAB-Deck Composite Slabs using SMD Metal
More informationSPECIAL SPECIFICATION 4491 Type CAC Concrete
2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.
More informationSECTION 941 PRECAST REINFORCED CONCRETE BARRIERS
941.01 Scope - This Section covers the quality and manufacture of precast reinforced concrete roadside and median barriers for highway and other off-highway traffic confinement use. The concrete traffic
More informationQUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS
SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS 1902.1 DESCRIPTION This specification covers precast concrete pipe, end sections, inlets, manholes, boxes, and related concrete accessories.
More informationSECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationSECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION
ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00
More informationKrystol Internal Membrane (KIM ) Guidelines and Procedures - NZ
Krystol Internal Membrane (KIM ) Guidelines and Procedures - NZ The use of Krystol Internal Membrane in Concrete Structures within New Zealand Product: The Krystol Waterproofing System consists of products
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationINSTITUTE OF CONCRETE TECHNOLOGY CONCRETE TECHNOLOGY & CONSTRUCTION Stage 2: GENERAL PRINCIPLES Learning objectives
INSTITUTE OF CONCRETE TECHNOLOGY CONCRETE TECHNOLOGY & CONSTRUCTION Stage 2: GENERAL PRINCIPLES Learning objectives 2.00 Introduction to the course 2.00.01 Outline the aims, objectives and content of the
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1098 PROCEDURE FOR ESTIMATING CONCRETE STRENGTH BY THE MATURITY METHOD.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1098 PROCEDURE FOR ESTIMATING CONCRETE STRENGTH BY THE MATURITY METHOD April 18, 2008 1098.01 Scope 1098.02 Acceptable Applications for using the Maturity
More informationSPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit
2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,
More informationAdmixtures-Section 924
Admixtures-Section 924 - Qualified Products List - Types include: - Air Entraining - Water-Reducing (Type A) - Accelerating (Type C) - Water-Reducing & Retarding (Type D) - Water-Reducer & Accelerating
More informationSECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.
SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721
More informationSpecial Provision No. 999S28 June 2010 CONSTRUCTION SPECIFICATION FOR PRECAST PANELS FOR USE AS STAY-IN-PLACE DECK FORMS
PRECAST PANEL STAY-IN-PLACE DECK FORMS FABRICATION Item No. PRECAST PANEL STAY-IN-PLACE DECK FORMS DELIVERY Item No. PRECAST PANEL STAY-IN-PLACE DECK PANELS ERECTION Item No. Special Provision No. 999S28
More informationPublic Works Manual. Revised September Concrete & Asphalt
Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01
More informationSECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:
SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing
More informationConstruction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
More informationPervious Pavement Placement
Pervious Pavement Placement Test Panel - Prior to Placement Prior to construction, test panel(s) shall be placed and approved by the Architect/Engineer. 1. The contractor shall place a test panel of at
More informationHISTORIC PRESERVATION COMMISSION AGENDA REGULAR MEETING. October 11, :30 p.m. LEMONT VILLAGE HALL 418 MAIN STREET
418 Main Street Lemont, IL 60439 I. CALL TO ORDER HISTORIC PRESERVATION COMMISSION AGENDA REGULAR MEETING October 11, 2018 6:30 p.m. LEMONT VILLAGE HALL 418 MAIN STREET II. III. IV. ROLL CALL APPROVAL
More informationSTANDARD SPECIFICATIONS FEBRUARY 2015 S-9 CONCRETE TABLE OF CONTENTS
TABLE OF CONTENTS 9.01 SCOPE OF WORK... 1 9.02 REFERENCES... 1 9.03 MATERIALS... 2 9.04 PERFORMANCE REQUIREMENTS OF... 2 9.05 TESTING... 4 9.06 PRODUCTION... 4 9.07 DELIVERY... 4 9.08 PLACING... 5 9.09
More informationSECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.
SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with
More informationSECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
SECTION 32 05 23 PART 1 - GENERAL 1.1 DESCRIPTION A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections
More informationMATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1350 NOVEMBER 2014 MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION TABLE OF CONTENTS 1350.01 SCOPE 1350.02 REFERENCES 1350.03 DEFINITIONS
More informationCW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS
December 2012 CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990
KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationREINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026
(Page 1 of 8) REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE FIELD SECTION 1026 1026.1 SCOPE. To establish procedures for the inspection of reinforced concrete pipe and the approval of modified
More informationCONSTRUCTION SPECIFICATION FOR FULL DEPTH REPAIR OF CONCRETE PAVEMENT OR CONCRETE BASE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 360 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR FULL DEPTH REPAIR OF CONCRETE PAVEMENT OR CONCRETE BASE TABLE OF CONTENTS 360.01 SCOPE 360.02 REFERENCES
More informationSECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE
SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous
More informationDesco Granite Flooring Specifications
Desco Granite Flooring Specifications PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Sections, apply
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 403 and replace with the following: SECTION 403 ON GRADE CONCRETE 403.1 DESCRIPTION
More informationPre-Construction Conference for Concrete Construction
Pre-Construction Conference for Concrete Construction Alabama Concrete Industries Association www.alconcrete.org Johnny Canfield, Technical Director 1 National Ready Mixed Concrete Association CLP 32 Concrete
More informationCONSTRUCTION SPECIFICATION FOR PERVIOUS CONCRETE PAVEMENT FOR LOW-VOLUME TRAFFIC APPLICATIONS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 356 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR PERVIOUS CONCRETE PAVEMENT FOR LOW-VOLUME TRAFFIC APPLICATIONS TABLE OF CONTENTS 356.01 SCOPE 356.02
More informationA. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).
SECTION 32 13 14 CONCRETE PAVEMENT FOR VEHICULAR AREAS PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for forming and placing reinforced concrete curbs and vehicular pavement
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationSPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer
More informationSECTION STRUCTURAL PRECAST HOLLOW CORE SLABS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationREINFORCED CONCRETE MASONRY SECTION
SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007 (Revision 2) Page 1 of 21 CONCRETE CONSTRUCTION
January 2007 (Revision 2) Page 1 of 21 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 STANDARDS 1.05 QUALITY ASSURANCE The General Conditions of the Contract,
More informationSection 708. PRESTRESSED CONCRETE
708.02 Section 708. PRESTRESSED CONCRETE 708.01. Description. This work consists of manufacturing and erecting prestressed concrete. 708.02. Materials. Provide materials in accordance with the following:
More informationCAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01
More informationConstruction Specification for Unshrinkable Fill
Engineering and Construction Services Division Standard Specifications for Road Works TS 13.10 April 2014 for Table of Contents TS 13.10.01 SCOPE... 2 TS 13.10.02 REFERENCES... 2 TS 13.10.03 DEFINITIONS...
More informationSection 708. PRESTRESSED CONCRETE BEAMS Description. Manufacture and erect prestressed concrete beams.
708.0 Section 708. PRESTRESSED CONCRETE BEAMS 708.0 Description. Manufacture and erect prestressed concrete beams. 708.02 Materials. Use materials meeting the following. Mortar and Grout... 702 Cement...
More informationMANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:
MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF STRUCTURAL PRECAST CONCRETE
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF STRUCTURAL PRECAST CONCRETE STR:MJF 1 of 8 APPR:JFS:POJ:01-04-19 FHWA:APPR:01-10-19 a. Description. The Contractor
More informationGENERAL DESCRIPTION OF WORK CONSTRUCTION WITH EXTRUDING EQUIPMENT OPENINGS AND ALTERATIONS 6
06010_Jan31_2017.pdf ` Page 1 of 30 INDEX Page 06010-1 GENERAL DESCRIPTION OF WORK 3 06010-2 CONSTRUCTION WITH EXTRUDING EQUIPMENT 3 06010-3 OPENINGS AND ALTERATIONS 6 06010-4 METHOD OF REMOVING SIDEWALK
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS 2007 EDITION
Sheet 1 of 6 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS 2007 EDITION Add a new SECTION to DIVISION 400: LOW-CRACKING HIGH-PERFORMANCE CONCRETE 1.0 DESCRIPTION
More informationMATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 1350 NOVEMBER 2017 MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION TABLE OF CONTENTS 1350.01 SCOPE 1350.02 REFERENCES 1350.03 DEFINITIONS
More informationHERCULITE REPLACEABLE CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE
HERCULITE REPLACEABLE CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions
More informationPHILIPP Power Box Installation Instruction
07/07 - EN PHILIPP Power Box Installation Instruction Z 21.8-1840 1 www.philipp-group.de Committed. Competent. Your reliable partner. Transport and Mounting Systems for Precast Units Technical department
More informationLITHOCRETE ARCHITECTURAL CONCRETE PAVING
LITHOCRETE ARCHITECTURAL CONCRETE PAVING PART 1 GENERAL 1.1 GENERAL CONDITIONS A. Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing
More informationSpecial Provision No. 109S17 June 2017
AMENDMENT TO OPSS 905, NOVEMBER 2014 Special Provision No. 109S17 June 2017 OPSS 905, November 2014 Construction Specification for Steel Reinforcement for Concrete is deleted in its entirety and replaced
More informationRETAINING WALL LEVEL BACKFILL
City of Poway Development Services Department Building Division (858) 668-4645 (858) 668-4646 (Inspection Line) building@poway.org RETAINING WALL LEVEL BACKFILL Construction of retaining walls, except
More informationSECTION CONCRETE PAVING
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials
More informationPROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES
GENERAL NOTES TYPICAL DETAILS REQUIRED VERIFICATION & INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION 1. Inspection of reinforcing steel, including prestressing tendons and placement. 2.
More informationULTRA-HIGH STRENGTH SHEAR KEY GROUT
ULTRA-HIGH STRENGTH SHEAR KEY GROUT 187 April 30, 2015 SPECIFICATION FOR ULTRA-HIGH STRENGTH SHEAR KEY GROUT SCOPE This specification consists of the proper material selection and production of Ultra-High-
More informationCONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES GENERAL C220 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C220 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...
More informationADDENDUM January 2018 Updates for the 13 th Edition NPCA QC Manual QCM-001, Rev. 0,
ADDENDUM January 2018 Updates for the 13 th Edition NPCA QC Manual QCM-001, Rev. 0, 1-1-18 The NPCA Quality Assurance Committee has again raised the bar on quality for NPCA Plant Certification. The format
More informationQUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS
SECTION 1902 QUALITY CONTROL PROGRAM FOR PRECAST CONCRETE PRODUCTS 1902.1 DESCRIPTION This specification covers precast concrete pipe, end sections, inlets, manholes, boxes, and related concrete accessories.
More informationB. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.
SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.
More informationSECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):
SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -
More informationSECTION TESTING LABORATORY SERVICES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 45 29 1. Use this section only for NCA projects. 2. Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION 415 REINFORCING FOR CONCRETE
SECTION 415 REINFORCING FOR CONCRETE Module 5 August 2018 Release 10, Module 5 1 Release 10, August 2018 5-1 415 1 Description Furnish and place steel and fiber reinforced polymer (FRP) reinforcing of
More informationG. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.
DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in
More informationPERFORMANCE-RELATED SPECIAL PROVISION FOR HIGH PERFORMANCE CONCRETE MIX DESIGNS FOR CONCRETE SUPERSTRUCTURE (Tollway)
PERFORMANCE-RELATED SPECIAL PROVISION FOR HIGH PERFORMANCE CONCRETE MIX DESIGNS FOR CONCRETE SUPERSTRUCTURE (Tollway) Effective: October 12, 2012 Revised: June 14, 2013 DESCRIPTION This work consists of
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990
Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 NOTE: This special provision is generally written in the imperative mood. The subject,
More informationSTRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide
STRUCTURAL MASONRY SPECIAL INSPECTOR Study Guide May 2017 Examination: The Structural Masonry Inspector Examination is based on the references cited in this document. It is 3 hours in length, is an open-book
More informationPROTECTOWALL DPM MEMBRANE. Product. Scope. Building Regulations. Appraisal No. 517 [2013]
PROTECTOWALL DPM This Appraisal replaces BRANZ Appraisal No. 517 (2006) dated 3 July 2006. Amended 21 December 2015. BRANZ Appraisals Technical Assessments of products for building and construction. Marshall
More informationSECTION CAST-IN-PLACE CONCRETE
McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor
More informationNEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE
NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)
More informationDIVISION 7 STRUCTURES
DIVISION 7 STRUCTURES Section 701. PORTLAND CEMENT CONCRETE FOR STRUCTURES 701.01 Description. Proportion structural concrete according to this section for the various grades of concrete required on the
More informationCONSTRUCTION SPECIFICATION
CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES BOUNDARY FENCING C265 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C265 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS PAGE
More information2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT
2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT 501.01 GENERAL. This item consists of constructing a concrete pavement (with or without reinforcement)
More informationMATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1350 APRIL 2010 MATERIAL SPECIFICATION FOR CONCRETE - MATERIALS AND PRODUCTION TABLE OF CONTENTS 1350.01 SCOPE 1350.02 REFERENCES 1350.03 DEFINITIONS
More information