BUILDING CODE COMMISSION

Size: px
Start display at page:

Download "BUILDING CODE COMMISSION"

Transcription

1 Ruling No Application No BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Article of the Regulation 350/06, as amended, the Building Code. AND IN THE MATTER OF an application by Paul Mior, Abbotsford Group Inc., for the resolution of a dispute with Ann Borooah, Chief Building Official, City of Toronto, to determine whether the proposal to install an un-vented roof assembly, using 2 lb. medium density polyurethane spray foam to insulate the roof, provides sufficiency of compliance with Article of the Building Code at 39 Alma Drive, Toronto, Ontario. APPLICANT RESPONDENT PANEL Paul Mior Abbotsford Group Inc. Toronto, ON Ann Borooah Chief Building Official City of Toronto Prabhakar Mahant, Vice Chair Mina Tesseris Doug Clancey PLACE Toronto, Ontario DATE OF HEARING October 22, 2009 DATE OF RULING October 22, 2009 APPEARANCES Paul Mior Abbotsford Group Inc. Toronto, ON The Applicant Al Jasinevicius Chief Building Official City of Toronto The Respondent

2 -2- RULING 1. Particulars of Dispute The Applicant has received an Order to Comply under the Building Code Act, 1992, to remedy certain alleged code contraventions at 39 Alma Drive, Toronto, Ontario. The subject building is an existing two storey, residential dwelling, comprised of combustible construction with a new third storey addition. The construction in dispute is with respect to the installation of 2lb medium density closedcell polyurethane spray foam insulation in the void space between the roof joists and roof sheathing of the new third storey addition, which contains both flat and sloped portions. Except where it can be shown to be unnecessary, Sentence (1) of the Code requires a space to be provided between the insulation and the sheathing, where insulation is installed between a ceiling and the underside of the roof sheathing and requires vents to be installed to permit the movement of air from the space to the exterior. In this case, no air space has been provided between the roof sheathing and the insulation and no vents have been installed. The Applicant is of the position that the spray foam insulation proves that venting in this case, is unnecessary and therefore, sufficiently complies with Article of the Code. The Respondent s position is that adequate roof ventilation must be provided for the spaces between the roof sheathing and the proposed insulation in accordance with Sentence (1) of the Code. 2. Provisions of the Building Code in Dispute Required Venting (1) Except where it can be shown to be unnecessary, where insulation is installed between a ceiling and the underside of the roof sheathing, a space shall be provided between the insulation and the sheathing, and vents shall be installed to permit the movement of air from the space to the exterior. 3. Applicant s Position The Applicant submitted that the subject building is a single family residence that is being renovated and a new third storey has been added to the building. The third storey roof structure consists of both flat and sloped portions framed with cm deep wood joists. The Applicant advised that although the original permit drawings called for mineral wool batt type insulation to provide the necessary thermal resistance rating and venting above the insulation, the owners had since decided to install 2lb medium density closed-cell polyurethane spray foam to insulate the roof instead. The Applicant submitted that Morrison Hershfield Ltd, and independent consulting engineering firm, was retained to conduct a review of the installed closed-cell, mediumdensity, spray applied polyurethane foam insulation. The Applicant stated that Morrison Hershfield s report concluded that due to the unique nature of the polyurethane spray foam used in this application, venting is not required. The report indicated that since there are no gaps or empty spaces between the insulation and the

3 -3- underside of the roof sheathing, venting has been shown to be unnecessary in this case. Further, Morrison Hershfield s onsite observations included that polyethylene sheeting and gypsum sheathing had been installed to act as the vapour and air barriers. The Applicant advised that Morrison Hershfield s report indicated that daily test reports were conducted in accordance with Section of CAN/ULC-S , confirming test results for density, cohesion and adhesion surpassed the requirements of the Standard. The Applicant argued that Morrison Hershfield s report states that the practice of insulating the underside of the roof sheathing with polyurethane spray foam insulation without venting is widely and successfully practiced across Canada because the spray foam insulation performance provides the required resistance to vapour diffusion and air leakage where the venting requirement per Article (1) is shown to be unnecessary. The Applicant submitted Morrison Hershfield s opinion that the expanding and bonding nature of the product, the requirements by the manufacturers for skilled installers and the assurance that the material was installed as intended, the spray foam insulation will provide the level of performance required by the Code. Further, the Agent advised that in addition to Morrison Hershfield, an opinion from another independent engineering consulting firm had also been retained. The Applicant informed the Commission that Buchan, Lawton, Parent Ltd., reported the same findings as Morrison Hershfield and that it was their opinion that the installation of the polyurethane spray foam insulation and vapour barrier had been installed in accordance with the manufacturer s specification and the CAN/ULCS705.2 Standard and further, the installation was in conformance with the requirements of the Building Code. The Applicant also presented a Branch Opinion dated May 1997 regarding Section of the Ontario Building Code, issued by the Ministry of Municipal Affairs and Housing, which stated, It is the opinion of the Housing Development & Buildings Branch that, where a roof assembly is filled with rigid insulation (no gaps or empty spaces in between), Subsection 9.19 of the OBC need not apply. In response to questions, the Applicant maintained that airtight and insulated pot lights would be used in the flat portions of the roof installed with the appropriate clearance distance from the insulation. In conclusion, the Applicant maintained that in light of two independent engineering consultant s opinions, the subject foam spray installation would provide a continuous air and vapour barrier and further, provides sufficiency of compliance with Sentence (1) of the Building Code, as venting has been shown to be unnecessary in this circumstance. 4. Respondent s Position The Respondent stated that he was concerned with the products performance in this type of application. The Respondent submitted that the subject product identified as BASF walltite has been evaluated by the Canadian Construction Materials Centre (Evaluation Report No R) and had an approval for installation in open wall cavities only, not in ceiling spaces such as cathedral ceilings, as is in this case. The Respondent maintained that there was lack of technical information on the application and performance of this spray foam on roof assemblies. The Respondent also stated that the subject ceilings will contain pot light penetrations; and

4 -4- as such, the penetrations if not sealed properly could be a source of moisture penetration. Further, the Respondent submitted that as a result of the lack of ventilation, the building materials within the roof assembly (i.e. roof sheathing, roof shingles, and roof rafters) may not perform as intended and as a result, warranties may be voided. The Respondent stated that it was his opinion that adequate roof ventilation must be provided in the space between the roof sheathing and the proposed insulation to satisfy the roof ventilation requirement set out in Sentence (1) of the Building Code. 5. Commission Ruling It is the Decision of the Building Code Commission that the proposal to install an un-vented roof assembly, using 2 lb. medium density polyurethane spray foam to insulate the roof provides sufficiency of compliance with Article of the Building Code at 39 Alma Drive, Toronto, Ontario. 6. Reasons i) Sentence (1) of the Building Code states, Except where it can be shown to be unnecessary, where insulation is installed between a ceiling and the underside of the roof sheathing, a space shall be provided between the insulation and the sheathing, and vents shall be installed to permit the movement of air from the space to the exterior. ii) iii) iv) It is the Commission s opinion, based on the evidence and testimony presented, that the installation of the 2 lb. medium density polyurethane spray foam to insulate the roof provides an air seal that will minimize air leakage and reduce the potential for condensation. Therefore, venting in the subject roof assembly has been shown to be unnecessary. Sentence of Division B of the Building Code requires that spray-applied polyurethane insulation be installed in accordance with CAN/ULC-S The Commission heard that the closed-cell spray polyurethane foam has been installed and tested in accordance with CAN/ULC-S Standard for thermal insulation as referenced by the Code. The Commission was advised that a vapour barrier has been provided, as per Subsection of the Building Code. The Commission was advised that the pot lights that have been used are sealed units with a vapour barrier around them and are ULC listed. v) Considering the design of this roof and the climatic data for Toronto contained in Supplementary Standard SB-1 of the Ontario Building Code, it is the Commission s opinion that the potential for ice damming is minimal

5 -5- Dated at Toronto this 22 nd day in the month of October in the year 2009 for application number Prabhakar Mahant, Chair Designate Mina Tesseris Doug Clancey

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-24-1198 Application No. 2008-21 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Sentence 9.19.1.1.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-14-1226 Application No. B-2009-15 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Clause 9.25.2.2.(1)(g)

More information

Date of Authorization APRIL 29, 2004 BMEC Authorization BMEC # BMEC Application #A

Date of Authorization APRIL 29, 2004 BMEC Authorization BMEC # BMEC Application #A Building Materials Evaluation Commission 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 Tel: 416: 585. 4234 / Fax: 416. 585. 7531 www.obc.mah.gov.on.ca Date of Authorization APRIL 29, 2004 BMEC Authorization

More information

Sprayed Polyurethane Foam in Construction. Presented by: Andrew B. Cole, CUFCA, Executive Director

Sprayed Polyurethane Foam in Construction. Presented by: Andrew B. Cole, CUFCA, Executive Director Sprayed Polyurethane Foam in Construction Presented by: Andrew B. Cole, CUFCA, Executive Director Sprayed Polyurethane Foam (SPF) Types of Foams Comparison between open-cell and closed cell SPF physical

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-04-859 Application No. 2001-81 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.2.3.7.(7)

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing OBC Excerpt: SB 12 Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing November

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling # 01-12-805 Application # 2000-83 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Articles 9.26.5.1. and 9.26.5.2. of Regulation

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-54-952 Application No. 2003-64 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 6.2.3.2. of

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-11-866 Application No. 2002-06 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.1.5.5.(1),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-08-1022 Application No. 2005-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF in Articles 9.10.14.1.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 04-27-982 Application No. 2004-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 9.8.8.8.(2)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-22-877 Application No. 2002-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.2.(3),

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 09-06-1218 Application No. B-2009-04 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Article 3.1.9.1.

More information

WALLTITE ECO Air Barrier System. Welcome

WALLTITE ECO Air Barrier System. Welcome WALLTITE ECO Air Barrier System Welcome Program WALLTITE ECO air barrier system Assembly and installation Evaluation and compliance Program and support 2 Design System components sealant WALLTITE ECO spray

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-37-1273 Application No. B-2010-33 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clauses 9.7.2.1.(1)(a)

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing January 1, 2012 update

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-13-868 Application No. 2002-11 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.2.2.9. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-35-890 Application No. 2002-22 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 3.4.3.6. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-12-1186 Application No. 2008-03 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.6.3.1.(2)

More information

Master Specification WALLTITE Eco v.3 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

Master Specification WALLTITE Eco v.3 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1 Page 1 WALLTITE ECO v.3 by BASF Canada Inc, is a thermal insulation intended for building enclosures, located in appropriate assembly locations in buildings during enclosure construction. This section

More information

Date of Authorization April 28, 2005 BMEC Authorization BMEC Application # A Date of Amendment February 28, 2013

Date of Authorization April 28, 2005 BMEC Authorization BMEC Application # A Date of Amendment February 28, 2013 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 T: 416 585 4234 F: 416 585 7531 W: www.ontario.ca/buildingcode/ 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: 416 585 4234 TC: 416 585 7531 W:

More information

Evaluation Report CCMC R WALLTITE v.2 - Air Barrier System

Evaluation Report CCMC R WALLTITE v.2 - Air Barrier System CONSTRUCTION Evaluation Report CCMC 13467-R WALLTITE v.2 - Air Barrier System MASTERFORMAT: 07 27 09.01 Evaluation issued: 2009-08-19 Revised: 2011-12-01 Re-evaluation due: 2012-08-19 Re-evaluation in

More information

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED Ministry of Municipal Affairs PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED CHANGE NUMBER: SOURCE: B-05-10-03 Ontario-mNBC CODE REFERENCE: Division B / 5.10.3. DESCRIPTION OF THE

More information

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1 Page 1 WALLTITE ECO v.2 by BASF Canada Inc, is a thermal insulation intended for building enclosures, located in appropriate assembly locations in buildings during enclosure construction. This section

More information

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION/AIR BARRIER SYSTEM Page 1

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION/AIR BARRIER SYSTEM Page 1 Page 1 WALLTITE ECO v.2 by BASF Canada Inc, is an Air Barrier assembly intended to provide an air and moisture barrier assembly for building enclosures, located in appropriate assembly locations in buildings

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 4073 Issued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00 00

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-06-1180 Application No. B- 2007-49 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 7.4.8.2.,

More information

Energy Efficiency For Housing

Energy Efficiency For Housing Ministry of Municipal Affairs and Housing Building and Development Branch MMAH Supplementary Standard SB-12 MMAH Supplementary Standard SB-12 Energy Efficiency For Housing 2016 update Draft for stakeholder

More information

Sloped Roofs vs Walls. Problems. Review Roof Components. University of Waterloo and Balanced Solutions

Sloped Roofs vs Walls. Problems. Review Roof Components. University of Waterloo and Balanced Solutions Roofs, Cathedral Ceilings, Venting, Non-Vented Dr June, 2005 This presentation Scope: Pitched, Wood, Roofs Performance Problems Vented, cathedral, unvented etc What solutions www.balancedsolutions.com

More information

Master Specification ENERTITE by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

Master Specification ENERTITE by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1 Page 1 ENERTITE 1-2-1 by BASF Canada Inc, is a thermal insulation intended for building enclosures, located in appropriate assembly locations in buildings during enclosure construction. This section includes

More information

BASF HP+ Wall XR Series Ontario TER No

BASF HP+ Wall XR Series Ontario TER No TER No. 1706-02 BASF, Inc. 100 Park Ave Florham Park, NJ 07932-1089 973-245-6000 basf.com Issue Date: July 13, 2017 Updated: March 6, 2019 Subject to Renewal: January 1, 2020 DIVISION: 06 00 00 WOOD, PLASTICS,

More information

Air Barrier Requirements for Low-Slope Roof Assemblies Myths vs. Facts

Air Barrier Requirements for Low-Slope Roof Assemblies Myths vs. Facts Air Barrier Requirements for Low-Slope Roof Assemblies Myths vs. Facts Peter Kalinger Canadian Roofing Contractors Association Dr. B. Baskaran National Research Council of Canada 1 Air Leakage Controlling

More information

BASIC VENTILATION REQUIREMENTS

BASIC VENTILATION REQUIREMENTS ATTIC VENTILATION BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

Evaluation Report CCMC R Icynene ProSeal Air Barrier System

Evaluation Report CCMC R Icynene ProSeal Air Barrier System Evaluation Report CCMC 14052-R Icynene ProSeal Air Barrier System MasterFormat: 07 27 09.01 Evaluation issued: 2016-12-23 Re-evaluation due: 2019-12-23 1. Opinion It is the opinion of the Canadian Construction

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-21-876 Application No. 2002-17 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.2.2.24. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-40-938 Application No. 2003-40 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 3.1.5.1. of

More information

Table Air Barrier and Insulation Inspection Component Criteria

Table Air Barrier and Insulation Inspection Component Criteria Table 40.4. Air Barrier and Insulation Inspection Component Criteria NUMBER COMPONENT CRITERIA Air barrier and thermal barrier Exterior thermal envelope insulation for framed walls is installed in substantial

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-32-930 Application No. 2003-31 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 5.1.4.2. and

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-18-1032 Application No. 2005-11 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF in Article 9.10.14.11.

More information

ESR-2847 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

ESR-2847 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-2847 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. A Subsidiary of the International Code Council

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-38-893 Application No. 2002-33 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clause 3.3.4.4.(1)(a)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 03-27-925 Application No. 2003-14 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 9.14.2.1.,

More information

Spray Polyurethane Foam in Unvented Cathedral Ceilings and Cathedralized Attics

Spray Polyurethane Foam in Unvented Cathedral Ceilings and Cathedralized Attics Spray Polyurethane Foam in Unvented Cathedral Ceilings and Cathedralized Attics RECOMMENDED DESIGN CONSIDERATIONS Spray Polyurethane Foam Alliance Copyright 2003 Re-Issued December 2008 To order copies

More information

Energy Efficiency For Housing

Energy Efficiency For Housing Ministry of Municipal Affairs Building and Development Branch MMA Supplementary Standard SB-12 MMA Supplementary Standard SB-12 Energy Efficiency For Housing July 7, 2016 update Effective Date: July 7,

More information

2009 IECC Chapter 1 Additions, alterations, renovations or repairs.

2009 IECC Chapter 1 Additions, alterations, renovations or repairs. 2009 IECC Chapter 1 Additions, alterations, renovations or repairs. Additions, alterations, renovations or repairs to an existing building, building system or portion thereof shall conform to the provisions

More information

Thermal Characteristics of Exterior Building Wall (Above Heritage Building

Thermal Characteristics of Exterior Building Wall (Above Heritage Building Minimum Required R Value for Wall (Above Ground) RSI 2.78 (R 15.8) Thermal Characteristics of Exterior Building Wall (Above Ground) @ Heritage Building W1 W2 Exterior Wall - Stucco Cladding @ 1st Floor

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION - 1 - Ruling No. 07-31-1160 Application No. 2007-15 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 8.7.3.2.

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 05-26-1040 Application No. 2005-17 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 4.1.1.3.(1)

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 07-39-1168 Application No. 2007-35 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Articles 9.10.12.3.

More information

SECTION THERMAL INSULATION

SECTION THERMAL INSULATION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 21 13 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

DIVISION: THERMAL AND MOISTURE SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

DIVISION: THERMAL AND MOISTURE SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-2668 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF)

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF) SECTION 07200 INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF) Specifier Note: This specification is provided as guidelines for your use. Please review before publishing. PART 1.00 - GENERAL 1.01 DESCRIPTION:

More information

THERMAL BATT INSULATION COMFORTBATT. Thermal Batt Insulation for Residential & Commercial Construction.

THERMAL BATT INSULATION COMFORTBATT. Thermal Batt Insulation for Residential & Commercial Construction. THERMAL BATT INSULATION COMFORTBATT Thermal Batt Insulation for Residential & Commercial Construction. Superior building envelope performance by ROCKWOOL Insulation. ROCKWOOL COMFORTBATT is a semi-rigid

More information

RETROFIT INSULATION in WOOD ROOFS

RETROFIT INSULATION in WOOD ROOFS NBI: A525.403 RETROFIT INSULATION in WOOD ROOFS ALASKA BUILDING RESEARCH SERIES HCM-01552 Introduction This publication is one of nine that has been translated from Norwegian. They are taken from a series

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: CERTAINTEED CORPORATION 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2668 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) LLC

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) LLC 0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted ESR 3210 Valid: 03/15 to 03/16 DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 21

More information

Date of Authorization September 27, 2007 BMEC Authorization Number BMEC Application A

Date of Authorization September 27, 2007 BMEC Authorization Number BMEC Application A 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 Tel: 416 585 4234 Fax: 416 585 7531 Web: www.ontario.ca/buildingcode/ Date of Authorization September 27, 2007 BMEC Authorization Number 07-04-334 BMEC

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: AIR BARRIERS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: AIR BARRIERS REPORT HOLDER: 0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted ESR 2717 Reissued 07/2015 This report is subject to renewal 07/2017. DIVISION: 07 00 00 THERMAL

More information

Date of Authorization September 25, 2003 BMEC Authorization BMEC #

Date of Authorization September 25, 2003 BMEC Authorization BMEC # Building Materials Evaluation Commission 777 Bay Street, 16 nd Floor Toronto, Ontario, M5G2E5 Tel: 416: 585. 4234 / Fax: 416. 585. 7455 www.ontario.ca/buildingcode Date of Authorization September 25, 2003

More information

Evaluation Report CCMC R Insulspan Structural Insulated Panel (SIP) System

Evaluation Report CCMC R Insulspan Structural Insulated Panel (SIP) System Evaluation Report CCMC 13016-R Insulspan Structural Insulated Panel (SIP) System MasterFormat: 06 12 16.01 Evaluation issued: 2001-10-29 Re-evaluated: 2018-09-26 1. Opinion It is the opinion of the Canadian

More information

Building with Ducts in Conditioned Spaces Conditioned Attics

Building with Ducts in Conditioned Spaces Conditioned Attics Building with Ducts in Conditioned Spaces Conditioned Attics Application: This approach is most useful in single-story homes, because it allows easy access to every room. It could also be used for the

More information

Product Information Bulletin

Product Information Bulletin Product Information Bulletin BULLETIN NO. ISSUED: REPLACES: 292 March 30, 2017 August 7, 2015 PlastiSpan Insulation use as Continous Insulating Sheathing 2012 Ontario Building Code Page 1 of 5 PlastiSpan

More information

Product Information Bulletin

Product Information Bulletin Product Information Bulletin DuroSpan GPS insulation is a rigid, closed-cell expanded polystyrene (EPS) insulation with a silver-gray colour that meets or exceeds requirements as per CAN/ULC-S701.1 1,

More information

Evaluation Report CCMC R Demilec Air Barrier System

Evaluation Report CCMC R Demilec Air Barrier System Evaluation Report CCMC 14068-R Demilec Air Barrier System MasterFormat: 07 27 09.01 Evaluation issued: 2017-08-30 Re-evaluation due: 2020-08-30 1. Opinion It is the opinion of the Canadian Construction

More information

2006 Building Science Press All rights of reproduction in any form reserved.

2006 Building Science Press All rights of reproduction in any form reserved. building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Building Science Digest 102 Understanding Attic Ventilation 2006-10-26 by Joseph Lstiburek Abstract: Attics

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2600 Reissued 02/2017 This report is subject to renewal 02/2018. DIVISION: 07 00

More information

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ]. National Master Specification (NMS) Section 07 21 16 BLANKET INSULATION Publisher: Spex.ca Page 1 Approved: 2014-12-31 Part 1 General 1.1 RELATED REQUIREMENTS.1 Section [ ]. 1.2 REFERENCES.1 CSA Group.1

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-38-831 Application # 2001-47 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Sentence 3.3.1.17.(1) of Regulation 403, as amended

More information

Standard practice for installing cellulose building insulation

Standard practice for installing cellulose building insulation TECHNICAL BULLETIN Standard practice for installing cellulose building insulation Cellulose insulation can be installed in attics, walls, ceilings, floors, and other building assemblies using a variety

More information

Evaluation Report CCMC R Insulspan Structural Insulated Panel (SIP) System

Evaluation Report CCMC R Insulspan Structural Insulated Panel (SIP) System Evaluation Report CCMC 13016-R Insulspan Structural Insulated Panel (SIP) System MASTERFORMAT: 06 12 16.01 Issued: 2001-10-29 Re-evaluated: 2013-03-05 Revised: 2015-08-14 Re-evaluation due: 2016-10-29

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-35-1271 Application No. B-2010-26 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 4.3.4.3.

More information

Insulating Attics & Crawlspaces. Roger Morrison, PE, RRC NCFI Polyurethanes

Insulating Attics & Crawlspaces. Roger Morrison, PE, RRC NCFI Polyurethanes Insulating Attics & Crawlspaces Roger Morrison, PE, RRC NCFI Polyurethanes Unvented vs. Vented Vented Space is vented to the outside Space is unconditioned Unvented Space does not communicate with outside

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-28-883 Application No. 2002-25 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Clauses 3.2.2.67.(2)(c)

More information

ONTARIO ENERGY CODES COMMERCIAL & RESIDENTIAL

ONTARIO ENERGY CODES COMMERCIAL & RESIDENTIAL The province of Ontario has adopted its own set of energy efficiency requirements for residential and commercial buildings. Building permits applied for after December 31, 2011, are required meet the new

More information

TER No Use of Icynene Classic Plus Spray Polyurethane Foam (SPF) in Unvented Attics & Crawlspaces

TER No Use of Icynene Classic Plus Spray Polyurethane Foam (SPF) in Unvented Attics & Crawlspaces Use of Icynene Classic Plus Spray Polyurethane Foam (SPF) Icynene, Inc. 6747 Campobello Road Mississauga, Ontario, Canada L5N 2L7 jevans@icynene.com Icynene.com TER No. 1703-15 Issue Date: July 8, 2014

More information

Evaluation Listing CCMC L Icynene ProSeal (MD-C-200v3)

Evaluation Listing CCMC L Icynene ProSeal (MD-C-200v3) CONSTRUCTION Evaluation Listing CCMC 13683-L Icynene ProSeal (MD-C-200v3) Evaluation Issued: 2014-04-16 Re-evaluation due: 2017-04-16 Preface: Masterformat 07 21 19.02, Spray-Applied Rigid Polyurethane

More information

Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4)

Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4) Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4) A. QUALITY (QII) PREPARATION FOR INSULATION 01 Air barrier installation and preparation for insulation was done and verified

More information

Building Enclosure Detailing for Walls and Low-Sloped Roofs

Building Enclosure Detailing for Walls and Low-Sloped Roofs Building Enclosure Detailing for Walls and Low-Sloped Roofs COLIN SHANE M.ENG., P.ENG., P.E. ASSOCIATE, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. AUGUST 2016 Disclaimer: This presentation was developed

More information

SB-12, Chapter 3. Applicable to all building permit applications submitted after December 23, 2016

SB-12, Chapter 3. Applicable to all building permit applications submitted after December 23, 2016 Updated: July 7, 2016 Effective: January 1, 2017 Applicable to all building permit applications submitted after December 23, 2016 Building permit applications submitted before December 24, 2016 are regulated

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: SPRAY FOAM POLYMERS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: SPRAY FOAM POLYMERS 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3225 Reissued 08/2017 This report is subject to renewal 07/2018. DIVISION: 07 00

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: AIR BARRIERS REPORT HOLDER: DAP FOAM, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: AIR BARRIERS REPORT HOLDER: DAP FOAM, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3052 Reissued 11/2016 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: BASF CORPORATION (RIGID PU SYSTEMS)

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: BASF CORPORATION (RIGID PU SYSTEMS) 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3662 Reissued 05/2017 This report is subject to renewal 02/2019. DIVISION: 07 00

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 10-21-1257 Application No. B-2010-13 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF with Articles 9.8.8.3.

More information

The Homeowner s Building Application Checklist for Constructing a Residential Addition

The Homeowner s Building Application Checklist for Constructing a Residential Addition The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential

More information

Airport Vicinity Acoustic Insulation

Airport Vicinity Acoustic Insulation PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Airport Vicinity Acoustic Insulation By-law No. 6419/94 of the City of Winnipeg to establish minimum acoustic insulation requirements for buildings within

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-19-874 Application No. 2002-16 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 11.3.1.1. of

More information

SECTION Blown Insulation THERMAL INSULATION

SECTION Blown Insulation THERMAL INSULATION SECTION 07 21 26 - Blown Insulation THERMAL INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Spray-in-place rigid closed-cell polyurethane foam insulation in assemblies indicated on the Drawings, to provide

More information

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition Spray Polyurethane Foam Design Guidance Insulation and Air Barrier Requirements of the 2012 I-Codes Spray Foam Coalition about the collaboration the center for the polyurathanes industry (CPI) of the

More information

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. A Subsidiary of the International Code Council

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION DIVISION: AIR BARRIERS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION DIVISION: AIR BARRIERS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-2717 Reissued 07/2017 This report is subject to renewal 07/2019. DIVISION: 07 00

More information

Evaluation Report CCMC R FOAMULAR CodeBord Air Barrier System (CABS)

Evaluation Report CCMC R FOAMULAR CodeBord Air Barrier System (CABS) Evaluation Report CCMC 12935-R FOAMULAR CodeBord Air Barrier System (CABS) MASTERFORMAT: 07 27 09.01 Evaluation issued: 2000-01-24 Re-evaluated: 2016-01-07 Re-evaluation due: 2018-01-24 1. Opinion It is

More information

Evaluation Report CCMC R Sto Guard - Air Barrier Material

Evaluation Report CCMC R Sto Guard - Air Barrier Material CONSTRUCTION Evaluation Report CCMC 13120-R Sto Guard - Air Barrier Material MASTERFORMAT: 07 27 09.02 Evaluation issued: 2003-05-26 Re-evaluated: 2012-11-26 Revised: 2013-08-13 1. Opinion It is the opinion

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 08-05-1179 Application No. B-2007-48 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Article 6.2.1.4.

More information

CANADA COMMERCIAL + RESIDENTIAL Building Insulation Guide

CANADA COMMERCIAL + RESIDENTIAL Building Insulation Guide CANADA COMMERCIAL + RESIDENTIAL Building Insulation Guide TABLE OF CONTENTS Here at Johns Manville, we are more than your supplier; we are your channel partner. When you do business with JM, you can count

More information

3.0 DESCRIPTION. Division: Thermal and Moisture Protection Section: Thermal Insulation

3.0 DESCRIPTION. Division: Thermal and Moisture Protection Section: Thermal Insulation Division: 07 00 00 Thermal and Moisture Protection Section: 07 21 00 Thermal Insulation Report Holder: Icynene Inc. 6747 Campobello Rd. Mississauga, Ontario L5N 2L7 CANADA (905)363-4040 www.icynene.com

More information

Improving the Energy Performance of the Gemini House. E.S. Tzekova K.D. Pressnail M.F. Touchie R.C. Richman M.E. Rumeo A.M.

Improving the Energy Performance of the Gemini House. E.S. Tzekova K.D. Pressnail M.F. Touchie R.C. Richman M.E. Rumeo A.M. Improving the Energy Performance of the Gemini House E.S. Tzekova K.D. Pressnail M.F. Touchie R.C. Richman M.E. Rumeo A.M. DiPlacido Overview Historic Building Context The Gemini NTED Project Overview

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 07-42-1171 Application No. B-2007-37 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentence 3.4.6.5.(8)

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3470 Reissued 03/2018 This report is subject to renewal 03/2019. DIVISION: 07 00

More information