Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines
|
|
- Vernon Gregory
- 5 years ago
- Views:
Transcription
1 Trenchless Crossing Evaluation on the Martha Lake Gateway Sewer An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines
2 Introduction Purpose Provide engineers and owners with one example of a trenchless crossing evaluation. Outline Trenchless Considerations Trenchless Methods HDD, microtunneling, pipe jacking, auger-boring, pipe ramming. Martha Lake Sewer Project Overview Martha Lake Trenchless Evaluation Conclusion of Evaluation Next Steps
3 Trenchless Considerations Ground Conditions Soil Type Groundwater Rock / Boulders Mixed Face Conditions Wood Man-made Debris (concrete, steel, VW Bugs, etc.) Crossing Length Pipe / Casing Diameter Alignment (Horizontal and Vertical) Depth (cover over excavation)
4 Trenchless Methods Horizontal Directional Drilling (HDD) Microtunneling Pipe Jacking Auger Boring Pipe Ramming
5 Horizontal Directional Drilling (HDD) Pilot hole Reaming pass(es) Spoils removed by recirculation of drilling mud Pipe insertion
6 Horizontal Directional Drilling (HDD) Strengths Performs well in groundwater Drilling mud mix can be altered for ground conditions Very long crossings Curved alignments Weaknesses Elevated risk of frac-out or settlement Smaller diameters (< 36 ) Difficult to control line and grade Requires a 2% minimum slope for gravity applications Large area for pullback layout
7 Microtunneling Jacking shaft Spoil Removal via slurry lines Slurry pressure provides excavation face support Hydraulic jacks advance pipe string and MTBM
8 Microtunneling Strengths Performs well above or below groundwater Slurry pressure can be varied based on support needed at excavation face Longer Drive Lengths Good line and grade control Weaknesses Has difficulties excavating obstructions larger than 1/3 the diameter Most do not allow face access to remove obstructions Rescue pit required if stopped by an obstruction Can be deflected by mixed-face conditions
9 Pipe Jacking Jacking Shaft Open face allows manned access Spoil Removal via mechanical or manned methods Hydraulic jacks provide advance pipe string and pipe jacking machine
10 Pipe Jacking Strengths Face access allows removal of obstructions Longer Drive Lengths Good line and Grade Control Weaknesses Difficult to control groundwater Difficult to control flowing soils Can be deflected by mixed-face conditions
11 Auger-boring Jacking Shaft Spoil Removal via auger flight though jacking pipe Hydraulic jacks advance pipe string and auger flight
12 Auger-boring Strengths Good in cohesive soils Minor line and grade control Weaknesses Difficult to control groundwater Max. drive length of around 300
13 Pipe Ramming Excavated pit Pneumatic tool advances pipe Minimal Spoil Removal Face support provided by soil plug
14 Pipe Ramming Strengths Minimal risk of ground settlement Excavation continuously supported Performs well above or below groundwater Weaknesses Difficult to control line and grade Short drive lengths (< 300 )
15 Martha Lake Project Overview Alderwood Water & Wastewater District Lynnwood, WA Site
16 Martha Lake Project Overview I-5 and 164 th St. SW 3,400 LF of 12 to 15 gravity sewer Residential Septic Commercial Pump Stations 1700 LF of 24 water main added Currently at 60%
17 Martha Lake Trenchless Crossing Ground Conditions Soil Dense Glacial Till overridden by fill Groundwater Perched groundwater on top of Till Pockets within Till Rock / Boulders Boulders: 1.5 to 7 Mixed Face Conditions None Known Wood None Known Man-made Debris None Known
18 Martha Lake Trenchless Crossing TILL
19 Martha Lake Trenchless Crossing Drive Length 535 Pipe Diameter(s) Casing 12 Ductile Iron Sewer 24 Ductile Iron Water Six 4 Conduits Alignment Vertical profile lies completely within Glacial Till Depth 14 minimum, 25 maximum
20 Martha Lake Trenchless Evaluation Trenchless Methods Soil Types (G Glacial Till) Gr round Water (Gr ravel Pockets) Ro ock / Boulders Set ttlement Risk Drive Length (535') Lin ne and Grade Control TOTAL HDD Microtunnel Pipe Jack Auger-bore Pipe Ramming
21 Conclusion Microtunneling or Pipe Jacking Two options increases number of eligible contractors Contractor can chose machine he believes will work best for ground conditions Three jacking pipe options give more flexibility HOBAS Reinforced Concrete Steel (PermaLok) GO BIG!!! = 60 Casing
22 WSDOT PUD
23 ulders!! Bou WSDOT
24 Next Steps Specifications Specify MTBM best suited for ground conditions Specify options for rescue shaft to free MTBM Require mitigation plan for encountering groundwater with a pipe jacking machine Require obstruction removal plan for pipe jacking GBR Must apply to both pipe jacking and microtunneling operations
25 Trenchless Tips Use in combination with other methods Pay a premium for short crossings Talk with machine manufacturers and local contractors!
26 Questions?
Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.
Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods
More informationTrenchless Technology
TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology
More informationCS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS
TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationThere are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.
Applications for New Installations There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications. Note that some specifications
More information2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January
Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations
More informationTrenchless Pipeline Crossings
Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationCC1602 Microtunneling
CC1602 Microtunneling H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae rachel@ictd.ae Course Introduction: Significant technical advances and increases in the utilization
More informationShort Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON
Short Drive Microtunnelling (MTBM) TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Earth Boring Co. Limited Trenchless Since 1947 Founded in Streetsville
More informationWARNING DO NOT BID ON THIS PROJECT
WARNING DO NOT BID ON THIS PROJECT Nick H. Strater, P.G., Associate, Brierley Associates, Bedford, NH Brian C. Dorwart, P.E., P.G., Sr. Consultant, Brierley Associates, Bedford, NH For projects advertised
More informationSlurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.
Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Farmer, P.E. Hazen and Sawyer, P.C. Project Background City
More informationCutting-Edge Trenchless Technology Proposed for Challenging CSO Project
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TM1-T2-03 Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project
More informationNo-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.
No Dig Technology Introduction: No-Dig Technology is the art and science of installing, repairing or renewing underground pipes, ducts and cables using techniques that minimizes / eliminates the need for
More informationSPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006
Michigan Department Of Transportation 3703F (11/06) SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006 Page 1 of 5 1 Materials 1.1 Pipe (a) Pipe shall be specifically designed and certified for microtunneling
More informationAgenda for Today s Workshop
Agenda for Today s Workshop 10:00 to 10:45: Introduction Dr. Mo Najafi 10:45 to 11:15: Research and Testing Mr. Jwala Sharma 11:15 to 11:45: Cost Comparison Ms. Trupti Kulkarni 11:45 to 12:00: Lab Tour
More informationTrenchless Technology The Missing Recipe for Sustainable Infrastructure s Construction and Maintenance in the Arab Countries
Trenchless Technology The Missing Recipe for Sustainable Infrastructure s Construction and Maintenance in the Arab Countries Dr. Moustafa Kassab Systems Design Engineering / Civil Engineering Departments
More informationAnalysis of Design When You Should Consider Pipe Ram Over Traditional Auger/Jack & Bore
Analysis of Design When You Should Consider Pipe Ram Over Traditional Auger/Jack & Bore Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga,
More informationSioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons
WATER Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons Presented by Peter Merten, PE, HR Green, Inc. and David Reuter, PE, Underground Solutions UCT Underground Construction
More informationPUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY
PUMPING STATION CONSOLIDATION AND TRENCHLESS INSTALLATION CASE STUDY New River Street Pump Station - Bridgeport CT May 1, 2017 NEWEA Sustainability and Collection Systems Conference Tim McDonald, PE NEW
More information5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights.
Highlights. How to use a Jet Pump? Jet pump for HDD New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters Dr. Marc Peters, Herrenknecht AG Full-Face Hole opener & Downhole Jet
More informationPipe Ramming with HDD. Presentation Outline
EXAMINING PIPE RAMMING DESIGN- A FORENSIC ANALYSIS OF A HIGH RISK PROJECT Kimberlie Staheli, Ph.D., P.E. Staheli Trenchless Consultants Seattle, WA, USA Presentation Outline Pipe Ramming State of the Art
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationAPPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer
APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY
More informationHDD Training. Mitigation. Mark Miller, PE Jon Robison, PE
HDD Training Mitigation Mark Miller, PE Jon Robison, PE Mitigating HDD Risks HDD construction risks need to be evaluated during the design process to reduce the risk of schedule delays, damage to existing
More informationAustralasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking
Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking - 2 Minor changes JP JP JP JP 1 June 2015 1 General Revisions JC MI NH JP 03 Feb 2010 0 Issued for Use Client
More informationA Trenchless Approach to Lift Station Elimination
A Trenchless Approach to Lift Station Elimination PRESENTED BY: SCOTT MAUGHN, P.E. DANIEL HUFFINES, P.E. FSAWWA Fall Conference November 27, 2018 1 AGENDA Project Background Preliminary Investigations
More informationA number of abbreviations and technical terms have been used in this guideline:
Page No: i CONTENTS 1.0 BACKGROUND 2 2.0 DEFINITIONS 2 3.0 INTRODUCTION 2 4.0 HORIZONTIAL DIRECTIONAL DRILLING GUIDELINE 2 4.1 HDD Process 2 4.2 HDD Methods 2 4.2.1 Pilot Bore 2 4.2.2 Reaming 2 4.2.3 Pullback
More information2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995
2013 ASCE Agenda Introduction Difficult Ground Microtunneling in Difficult Ground Craig Camp July 31, 2013 Microtunneling Characteristics (NASTT) Earth pressure balancing Hydrostatic pressure balancing
More informationKathryn Wallin Bennett Trenchless. Bo Botteicher Underground Solutions. Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016
www.norcalpug.com Pipe Users Group Sharing Technologies Seminar Berkeley, CA February 18, 2016 Kathryn Wallin Bennett Trenchless Bo Botteicher Underground Solutions Project Area Existing Sewers 66-inch
More informationKing County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle
More informationUse of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii
Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii Reyn Hashiro 1, P.E., M. ASCE, Devin Nakayama 2, P.E. M. ASCE, and James Kwong 3, Ph.D., P.E., M. ASCE 1 Associate, Yogi Kwong
More informationHow to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study. Jessica M. W. Hou, P.E.
How to Apply the Virginia Underground Utility Damage Prevention Act to a Jack and Bore Operation: A Case Study Jessica M. W. Hou, P.E., BCEE Agenda What is a jack and bore? What is does the Underground
More informationWeighing the Risks of Installing a Lake Tap with Microtunneling
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-2-03 Weighing the Risks of Installing a Lake Tap with Microtunneling Christy Sanders-Meena
More informationDahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless
DAHLIA PONDS TUNNEL PROJECT CASE HISTORY Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Outline Owner s Approach Design & Engineering Construction
More informationPILOT TUBE & PIPE RAMMING METHOD INSTALL LARGE DIAMETER CASING UNDER RR
PILOT TUBE & PIPE RAMMING METHOD INSTALL LARGE DIAMETER CASING UNDER RR TOM LOYER, ENGINEERS CONSTRUCTION INC JOHN HRABOSKY, HAMMERHEAD TRENCHLESS NASTT s 2019 No-Dig Show What is pipe ramming? A pneumatic
More informationProblems Realized with Contractor-Proposed Pilot Tube Auger Boring
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 WM-T5-01 Problems Realized with Contractor-Proposed Pilot Tube Auger Boring Rebecca
More informationTechnology. Trenchless. Planning, Equipment, and Methods. Mohammad Najafi. Mc Gravu Hill
Trenchless Technology Planning, Equipment, and Methods Mohammad Najafi Mc Gravu Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore Sydney Toronto
More informationPipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2
Slide 1 PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe Jacking Association as an aid to engineers
More informationCHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD
North American Society for Trenchless Technology (NASTT) No-Dig Show 2012 Nashville, TN Paper A-2-04 CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD Christopher
More informationITEM 432 TUNNEL CONSTRUCTION
AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.
More informationMicrotunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.
Microtunnelling Building infrastructures and power supply systems underground, while life above continues unaffected. 2 Comprehensive Microtunnelling Solutions A reliably functioning infrastructure which
More informationSPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006
Michigan Department Of Transportation 3703B (11/06) 1 Materials SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006 Page 1 of 5 1.1 Pipe - Pipe used in this method includes an external steel
More informationTempleton Community Services District Eastside Force Main Improvements. Monthly Progress Report
Templeton Community Services District Eastside Force Main Improvements Monthly Progress Report Prepared By: Kim Lindbery, Resident Engineer MKN & Associates, Inc. July 31, 2018 1 2 Schedule and Budget
More informationExperts in tunneling with Tunnel Boring Machines
www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution
More informationThe City of Sergeant Bluff, IA Chooses Pilot Tube Microtunneling over Open Trench Construction
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 Paper MM-T4-02 The City of Sergeant Bluff, IA Chooses Pilot Tube Microtunneling
More informationB. All materials to be installed shall be purchased in accordance with all applicable provisions of the Buy American Act.
33 05 23 TRENCHLESS UTILITY INSTALLATION SECTION 1 GENERAL 1.1 SUMMARY A. This specification addresses systems of piping and general requirements for water distribution and sewer collection systems which
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2002 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING TABLE OF CONTENTS 450.01
More informationThe Pilot Pipe method is a very simple method for trenchless installation of supply lines. It is done in several steps:
Guided Auger Boring in South America Dr. Gregor Nieder, Director of Bohrtec Gesellschaft GmbH Juan Carlos Moreno Sales Manager Latin America Herrenknecht AG Introduction Bohrtec is a worldwide known manufacturer
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical
More informationSEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch
SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling
More informationQUANTIFYING THE EFFECTS OF LUBRICATION ON JACKING FORCES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-2-02 QUANTIFYING THE EFFECTS OF LUBRICATION ON JACKING FORCES Laura Wetter 1, Kimberlie
More informationPIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association
PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association Pipe Jacking Pipe Jacking Microtunnelling Pipe Jacking - General Arrangement Pipe Jacking is an integrated system linking:
More informationAmendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 416 September 2017 Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility
More informationTake Me to the Other Side:
Take Me to the Other Side: The Importance of Trenchless Crossings in Routing Water Supply Transmission Brooke Barry, E.I.T., Mark Havekost, P.E. 2014 HDR, all rights reserved. PURPOSE: Develop an additional
More informationTable of Contents TOC. Chapter 14 - Trenchless Construction. 14A General Information. 14B New Construction. 14C Rehabilitation
Design Manual Chapter 14 - Trenchless Construction Table of Contents TOC Table of Contents Chapter 14 - Trenchless Construction 14A General Information 14A-1---------------------------------General Information
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2O12 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING TABLE OF CONTENTS 450.01
More informationSECTION TRENCHLESS INSTALLATION
SECTION 02250 PART 1 GENERAL 1.01 Section Includes A. Trenchless installation of casing pipe. B. Trenchless installation of carrier pipe. C. Open cut installation of casing pipe. 1.02 Description of Work
More informationSometimes Big Problems Require Small Solutions Microtunneling in New York City Reduces CSO Events
North American Society for Trenchless Technology (NASTT) NASTT s 2017 No-Dig Show Washington, D.C. April 9-12, 2017 TM1-T5-03 Sometimes Big Problems Require Small Solutions Microtunneling in New York City
More information2 3 4 Jacking Shaft Ground Surface Reception Shaft Microtunneling Process Jacking Shaft Ground Surface Reception Shaft Microtunneling Process Jacking Shaft Ground Surface Reception Shaft Microtunneling
More informationTRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS
L L S! " # #! " # # $ % & ' (! & ) * + ', - )!!!. &! - * + ', - )!!!. &! - * " # # $ % & ' (! & ) " &! % - / 0 1 2 3 4 3 2 5 6 3 7 8 4 7 9 : 7 5 ; < 7 9 = > / 1 9 3 1 >? @ A A B C 9 1 8 2 D E 1 > > F 8
More informationØ1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati
Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins
More informationWEF Collection Systems Conference Noble Gulch Trunkline Relocation Project: Implementation of a Multifaceted Trenchless Technology Program
Noble Gulch Trunkline Relocation Project: Implementation of a Multifaceted Trenchless Technology Program Keith Corcoran, PE, Carollo Engineers Anne Prudhel, PE, Carollo Engineers ABSTRACT The Santa Cruz
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2007 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES
More informationSECTION BORING AND/OR JACKING PIPE
02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe
More informationMICRO-TUNNELING LARGE DIAMETER SEWER MAY BE THE BEST OPTION FOR YOU
ABSTRACT MICRO-TUNNELING LARGE DIAMETER SEWER MAY BE THE BEST OPTION FOR YOU Christopher L. Windley, PE (McKim & Creed, Inc.)* Joshua P. Farmer, PE and Stephen D. Leitch, PE (Hazen & Sawyer, PC) *McKim
More informationPipe Jacking. Japan Sewage Works Association
Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,
More informationA Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE
A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line Kourosh Iranpour, PE Presentation Outline Background information Selection of preferred alignment Primary project challenges Selection
More informationTRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.
TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS. Author: Frank B. Stevens Pr. Eng, BSc (Civil), HonFIMESA, FSAICE Technical Representative for Herrenknecht AG (Utility Tunnelling). stevens.frank@herrenknecht.de
More informationMoncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo
Moncton Watermain Relocation Moncton, New Brunswick TRS 2010 Dr Mark Knight University of Waterloo Presentation Outline Overview of the project Design and construction Issues Trenchless construction Lessons
More informationTHE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject
56 THE TRENCHLESS TREND Pipeline shore crossings are often one of the most Costs and risks involved will change with every site, and every complex and technically challenging elements of any project. subsea
More informationSPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006
Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable
More information8Re: Northern Access 2016 Project. Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation
8Re: Northern Access 2016 Project Ischua Creek Crossing (MP 62.4) Analysis of Feasibility and Risks of Direct Pipe Installation Dear Mr. Horey and Mr. Hoover, Mr. Bradden Horey Mr. Brent Hoover P.E. Project
More informationDiaphragm wall Construction
Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support
More informationDraft. Not yet Approved TABLE OF CONTENTS. Page
TABLE OF CONTENTS Page 5.0 1 5.1 1 5.2 1 5.3 1 5.4 1 5.5 1 5.6 1 5.7 1 5.8 MICROTUNNELING...1 5.8.1 SCOPE...1 5.8.2 PLANNING...1 5.8.2.1 Equipment Selection...2 5.8.2.2 Environmental Permitting...5 5.8.3
More informationWhat do you mean we can t do HDD?
Clark Public Utilities Salmon Creek Crossing What do you mean we can t do HDD? Presented by Matt Hickey, PE Murray, Smith & Associates, Inc. and Russ Knutson, PE Clark Public Utilities Project Team Clark
More informationSTANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.
STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water
More informationHORIZONTAL BORING HORIZONTAL BORING. Underground Electric Distribution Standards I. GENERAL
I. GENERAL I.1. I.2. I.3. Driven or bored casing pipe provides an effective housing for duct. Its use is required in situations where open cutting is not permitted such as crossings under railroads and
More informationREQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES)
SYSTEMS AND CAPABILITY TECHNICAL REQUIREMENT NO: MCE-SR-16 ISSUE: Initial DATE: 14-10-2009 PAGE: 1 of 19 REQUIREMENTS FOR SERVICES UNDER THE RAILWAY CORRIDOR (NON-QR SERVICES) ISSUE DATE DESCRIPTION /
More informationAlternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project
Alternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project Bernie Ashyk 1, Christopher Lucie, P.E. 2, Jeffrey LeBlanc, P.E. 3 1 Shook Walbridge JV, Project Manager;
More informationSECTION HORIZONTAL DIRECTIONAL DRILLING
SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using
More informationNorth End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No
Hauled Wastewater Receiving Facilities Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Materials and installation for sewage force mains. 1.2 RELATED SECTIONS.1 CW 2110 Watermains and all specifications referenced
More informationReinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines
Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines Maged Mekhael, Munro Ltd. TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara
More informationFinal Report FHWA/IN/JTRP-2002/7
Final Report FHWA/IN/JTRP-2002/7 DEVELOPMENT OF A DECISION SUPPORT SYSTEM FOR SELECTION OF TRENCHLESS TECHNOLOGIES TO MINIMIZE IMPACT OF UTILITY CONSTRUCTION ON ROADWAYS By Dulcy M. Abraham, Ph.D. Associate
More informationE-Power Pipe : A new trenchless method for underground cable installation
E-Power Pipe : A new trenchless method for underground cable installation Dr. Gerhard Lang Jan 31, 2018 - UCT 2018, Track XI High Voltage Power Grid in Germany. Intention to replace nuclear power plants
More informationAPPENDIX: C. Stormwater and Wastewater Construction Specification. Tauranga City Council
APPENDIX: C Stormwater and Wastewater Construction Specification Tauranga City Council General Where the word Contractor is used below, it shall mean either work undertaken by the Consent Holder s Representative
More informationMultiple Large Diameter Microtunnels with Limited Ground Cover
North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show Dallas, Texas March 20-24, 2016 Paper No. TM2-T5-04 Multiple Large Diameter Microtunnels with Limited Ground Cover Steve
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationS.No Description Unit Quantity Rate (Rs) Amount (Rs)
, S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation
More informationSPECIFICATION : BORING AND JACKING
SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in
More informationBRADSHAW CONSTRUCTION CORPORATION
BRADSHAW CONSTRUCTION CORPORATION TUNNELING SPECIALISTS From a Contractor s Perspective Bradshaw s Experience 54 years as a tunneling contractor 26 years as a microtunneling contractor 25 years using conventional
More informationSECTION UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD)
SECTION 33 05 07.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING (HDD) PART 1 GENERAL 1.1 SCOPE A. Scope: 1. Design, furnish and install the proposed piping alignment by horizontal directional drilling (HDD)
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationUSE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward
USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the
More informationThe new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump
The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump Simon Herrenknecht, Product Manager Pipeline, Herrenknecht AG Herrenknecht Introduction Herrenknecht AG, Germany Founded
More informationREDUCING RISK AND VISITOR IMPACTS
REDUCING RISK AND VISITOR IMPACTS Trenchless Solutions for Liberty Island Paul J. Mourt, PE Project Rules To Live By 1 Expect the Unexpected Do your homework 2 Risks need to be evaluated on every project
More informationGEOTECHNICAL BASELINE REPORTS APPLYING THE GUIDELINES TO MICROTUNNELING
The North American Society (NASTT) and the International Society for Trenchless Technology (ISTT) International No-Dig Show 2009 Toronto, Ontario Canada March 29 April 3, 2009 Paper A-2-04 GEOTECHNICAL
More information