MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR:

Size: px
Start display at page:

Download "MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR:"

Transcription

1 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR: a. Description. This work consists of providing all labor, materials and equipment required to prepare pavement surfaces and apply a one coat high friction surface treatment (HFST). Preparation of pavement surfaces and application of materials must be in accordance with this special provision and the manufacturer s recommendations. Any discrepancies between the two must be brought to the attention of the Engineer. b. Materials. Use a two-part polymer resin binder system to overlay the pavement. Containers must be clearly distinguishable. The physical requirements of the properly proportioned and mixed polymer resin binder must meet the requirements in Table 1: Table 1: Physical Requirements of the Polymer Resin Binder Property Test Method Viscosity ASTM D 2556 Gel Time AASHTO M 235 Polymeric Resin Requirements Class C: 7-30 poises Class C: 10 minutes minimum Methyl Methacrylate Resin Requirements Class C: poises Class C: 10 minutes minimum Ultimate Tensile Strength AASHTO M psi psi Elongation at break point AASHTO M % 30 70% Durometer Hardness (shore D) ASTM D Compressive Strength AASHTO M psi minimum 1600 psi minimum 1,000 psi minimum at 1,000 psi minimum at Compressive Strength ASTM C hours 3 hours 5,000 psi minimum at 2000 psi minimum at 7 days 7 days Cure Rate (Dry through time) ASTM D hours maximum 3 hours maximum Water Absorption AASHTO M 235 1% maximum 1% maximum Adhesive Strength at 24 hours ASTM C psi minimum or 100% substrate failure 250 psi minimum or 100% substrate failure Tolerances for testing and curing temperatures will be ±2 degrees F. Run all resin binder tests at 73 degrees F. Run tests without delay if testing temperature does not match curing temperature.. Conduct the resin binder tests in accordance with the following: 1. Viscosity - ASTM D Prepare a one pint sample and mix for 2 to 3 minutes before testing. Use X1.1 for spindle selection.

2 OFS:CER 2 of Gel Time - AASHTO M 235. Prepare a 60 gram sample. 3. Ultimate Tensile Strength - AASHTO M 235. Prepare Type I specimens in accordance with ASTM D 638. Cure specimens for 7 days at 73 degrees F and 50 degrees F. 4. Elongation at Break Point - AASHTO M 235. Prepare Type I specimens in accordance with ASTM D 638. Cure specimens for 7 days at 73 degrees F and 50 degrees F. 5. Durometer Hardness - ASTM D Use the Type 1 Precision - Type D Durometer Method. Cure specimens for 7 days at 73 degrees F and 50 degrees F. 6. Compressive Strength - AASHTO M 325. No more than 10 minutes shall elapse between the start of mixing and the placement of the specimens in the curing chamber. Use of a 1 inch by 1 inch by 2 inch specimen is also acceptable. 7. Compressive Strength - ASTM C 579. Prepare specimen according to Method B, 2 inch cube, using 2.75 parts of sand to one part of mixed polymer resin binder by volume. Sand must meet ASTM C 778, sand. Cure specimens for 3 hours and 7 days at 73 degrees F and 50 degrees F. 8. Cure Rate (Dry Through Time) - ASTM D Prepare a specimen of wet mil thickness. Cure specimens for 3 hours maximum at 73 degrees F and 50 degrees F. 9. Water Absorption - AASHTO M 235. Cure specimens for 7 days at 73 degrees F and 50 degrees F. 10. Adhesive Strength at 24 Hours - ASTM C Cure specimens for 24 hours at 73 degrees F and 50 degrees F. Provide surface aggregate that is calcined bauxite (minimum of 87 percent aluminum oxide per Section 15 of ASTM C 25) which is clean, dry, and free from foreign matter. The aggregate must meet the gradation shown in Table 2. Table 2: Aggregate Gradation Sieve Size Minimum % Passing Maximum % Passing 3/ Pan 0 0 Minimum Maximum Fineness Modulus

3 OFS:CER 3 of Provide a test data certification to the Engineer that the materials meet the requirements specified herein. c. Construction. Provide certification to the Engineer from the polymer resin binder manufacturer documenting the Contractor s qualifications to place HFST in a manner acceptable to the polymer resin binder manufacturer and in compliance with this special provision. Place HFST using automated mechanical equipment. At the Engineer s discretion, the HFST may be mixed and placed by hand for areas where mechanical forms of application are not conducive or economical. 1. Equipment. Ensure the mixing and application systems, for the polymer resin binder, are capable of thoroughly blending the polymer resin and hardening agent, and can uniformly and accurately apply the polymer resin binder materials at the specified rate to the pavement surface in such a manner as to cover 100 percent of the work area. Ensure the aggregate spreader is propelled in such a manner as to uniformly apply dry aggregate to excess onto the applied polymer resin binder material. Ensure the vacuum truck is self-propelled to remove excess debris and aggregate. For hand applications, equipment will consist of equipment suitable for mixing and applying the polymer resin binder and aggregate including, but not limited to: calibrated containers, a paddle type mixer, notched squeegees, and stiff bristle brooms. 2. Surface Preparation. Protect utilities, drainage structures, curbs and any other structure within or adjacent to the HFST location from surface preparation activities and application of the surface treatment materials. Cover and protect all existing pavement markings that are adjacent to the surface treatment location. Pavement markings that will be covered with the surface application must be removed prior to performing the required surface preparation. Cover bridge expansion joint devices. A. Concrete. Clean the entire concrete surface by shotblasting before placement of the overlay. The prepared concrete surface must meet the International Concrete Repair Institute Guideline No , Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays, concrete surface profile 7 (CSP 7). Mortar which is sound, and soundly bonded to the course aggregate, must have open pores due to cleaning to be considered adequate for bond. Use a vacuum truck or oil-free moisture-free air blast to remove all dust and other loose material. Do not use brooms. Control and minimize airborne dust and similar debris generated by surface preparation and cleanup to prevent a hazard to motor vehicle operation or nuisance to adjacent property. Meet the requirements of subsection A.1 of the Standard Specifications for Construction and other applicable contract documents regarding dust control. B. Asphalt. Clean asphalt pavement surfaces using mechanical sweepers and high pressure air wash. Remove pavement markings that will be covered with the HFST

4 OFS:CER 4 of application in accordance with subsection F of the Standard Specifications for Construction. Mechanically sweep all surfaces to remove dirt, loose aggregate, debris and deleterious material. Air wash all surfaces using a minimum of 180 cfm clean and dry compressed air. Maintain the air lance perpendicular to the surface and the tip of air lance within 12 inches of the surface. For applications on new asphalt pavement, ensure the surface has cured a minimum of 30 days prior to performing surface preparation and installation of the HFST. 3. Application. Handling and mixing of the polymer binder resin and hardening agent must be performed in a safe manner to achieve the desired results in accordance with the manufacturer s recommendations for a one-coat system. Apply the polymer binder resin at a rate of no less than 40 ft 2 /gal. Do not place polymer resin binder overlay materials when surface is less than 50 degrees F or ambient air temperature is forecast to fall below 50 degrees F within 8 hours after application. Do not place polymer resin binder overlay materials if weather or surface conditions are such that the material cannot be properly handled, placed, and cured within the manufacturer s requirements and specified requirements of traffic control. A. Mechanized Binder Application. Apply the polymer resin binder by a truck or trailer mounted application machine that is capable of continually mixing and delivering the binder components on demand within the temperature range specified in varying widths of up to 12 feet wide at a uniform application thickness. Ensure that the mechanically applied distributing equipment includes accurate measuring devices and/or calibrated containers and thermometers for measuring the binder temperature prior to placement should heating be required. Do not allow the binder material to separate in the mixing lines, cure, dry, or otherwise impair retention bonding of the high friction surfacing aggregate. Ensure the application machine is equipped with flushing systems such that blockages of lines will not occur, and installation operations are not delayed, stopped, or otherwise compromised. Ensure that mechanical applications are capable of applying binder uniformly at a minimum rate of 10 gallons per minute. Uniformly spread the mechanically applied binder with a notched squeegee. B. Hand Binder Application. Ensure that after the polymer resin binder mixture has been prepared for the overlay, it is immediately and uniformly applied to the pavement with a notched squeegee. C. Aggregate Application. Apply the dry aggregate in such a manner as to cover the polymer resin binder mixture completely within 5 minutes. No bleed through, or wet spots should be visible in the overlay. Minimize all foot traffic on the uncured polymer resin binder and ensure any foot traffic will only be done with steel spiked shoes approved by the Engineer. Remove and replace applications which do not receive enough aggregate. Cure the polymer resin binder until vacuuming or brooming can be performed without tearing or damaging the surface. Do not allow traffic or equipment on the overlay surface during the curing period. Remove all loose aggregate by vacuuming or brooming after the curing period. The minimum curing periods must be according to the manufacturer s recommendation or longer if directed by the Engineer. Remove and replace any areas damaged or marred by the Contractor s operations in accordance with this special provision at no additional cost to the Department.

5 OFS:CER 5 of Replace any damaged or missing transverse and longitudinal joint seals in accordance with subsection S of the Standard Specifications for Construction prior to applying the binder. Provide the Engineer with all records including, but not limited to, the following for each batch provided: batch numbers and sizes; location of batches as placed on pavement, referenced by stations; batch time; temperature of air, pavement surface, polymer resin binder components, and aggregates; loose aggregate removal time; and time open to traffic. d. Measurement and Payment. The completed work, as described, will be measured and paid for at contract unit price using the following pay item: Pay Item Pay Unit High Friction Surface Treatment... Square Yard High Friction Surface Treatment includes preparing, cleaning and applying a HFST to asphalt or concrete pavement including miscellaneous clean-up. The costs associated with the removal, preparation and replacement of transverse and longitudinal joint seals is included in the payment. The costs associated with removing and replacing existing pavement markings will be paid for separately.

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 2004 Specifications CSJ 0013-06-042, Etc. SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 1. Description. Furnish and apply a high friction surfacing system in accordance with this Specification

More information

SUPPLEMENTAL SPECIFICATION. High Friction Surface Treatment

SUPPLEMENTAL SPECIFICATION. High Friction Surface Treatment September, 1 2015 SUPPLEMENTAL SPECIFICATION High Friction Surface Treatment 1. Description This work consists of installing a High Friction Surface Treatment (HFST) in accordance with the plans and specifications.

More information

Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13

Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13 Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13 American Association of State Highway and Transportation Officials 444 North Capitol

More information

ALABAMA DEPARTMENT OF TRANSPORTATION

ALABAMA DEPARTMENT OF TRANSPORTATION ALABAMA DEPARTMENT OF TRANSPORTATION DATE: January 9, 2014 Special Provision No. 12-0817 SUBJECT: High Friction Surface Treatments for Asphalt Pavements, Project Number 99-303-690-000-302, Jefferson County

More information

Add as Section 37-6: 37-6 HIGH FRICTION SURFACE TREATMENT

Add as Section 37-6: 37-6 HIGH FRICTION SURFACE TREATMENT 37-6.01 General 37-6.01A Summary Add as Section 37-6: 37-6 HIGH FRICTION SURFACE TREATMENT Section 37-6 includes specifications for placing high friction surface treatment (HFST) on asphalt concrete pavement.

More information

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT 505 HIGH FRICTION SURFACE TREATMENT 1 of 5 CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT DESCRIPTION. Construct a High Friction Surface Treatment (HFST) using Bauxite Aggregate and Polymer Resin

More information

NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION

NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION NJDOT HIGH FRICTION SURFACE TREATMENT (HFST) SPECIFICATION DESCRIPTION

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on

More information

SPECIAL SPECIFICATION 4190 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4190 Multiple-Layer Polymer Concrete Overlay 2004 Specifications CSJ 0902-20-072 SPECIAL SPECIFICATION 4190 Multiple-Layer Polymer Concrete Overlay 1. Description. Prepare deck surfaces, and furnish and apply multiple-layer polymer concrete overlay

More information

Section 506. SLURRY SEAL

Section 506. SLURRY SEAL 506.02 Section 506. SLURRY SEAL 506.01. Description. This work consists of providing traffic control, preparing the surface, and applying a slurry seal mixture. 506.02. Materials. Provide material in accordance

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR THIN EPOXY POLYMER BRIDGE DECK OVERLAY

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR THIN EPOXY POLYMER BRIDGE DECK OVERLAY MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR THIN EPOXY POLYMER BRIDGE DECK OVERLAY OPR:JD 1 of 5 APPR:JAB:EMB:06-27-17 FHWA:APPR:07-13-17 a. Description. This work consists of providing

More information

SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay 2004 Specifications CSJ 0055-01-025, etc & 0007-06-077 SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay 1. Description. Prepare deck surfaces, furnish materials, and apply crack sealant

More information

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.01 Section 506 SLURRY SEAL 506.01 Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.02 Materials. Furnish a slurry seal mixture consisting of a blend of asphalt

More information

HDX TECHNICAL SPECIFICATION

HDX TECHNICAL SPECIFICATION HDX TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 858 THIN POLYMER (EPOXY) OVERLAYS FOR STRUCTURAL SLABS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 858 THIN POLYMER (EPOXY) OVERLAYS FOR STRUCTURAL SLABS. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 858 THIN POLYMER (EPOXY) OVERLAYS FOR STRUCTURAL SLABS April 20, 2018 858.01 Description 858.02 Bridge Decks Repairs 858.03 Thin Polymer

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

Evaluation of High Friction and Thin Overlays for Bridges and Pavements

Evaluation of High Friction and Thin Overlays for Bridges and Pavements NTPEP Committee Work Plan for Evaluation of High Friction and Thin Overlays for Bridges and Pavements Date Issued: October 2016 National Transportation Product Evaluation Program 444 North Capitol Street

More information

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL May 21, 2008 HIGH PERFORMANCE CHIP SEAL 411 High Performance Chip Seal 411.1 Description High Performance Chip Seal is a high macro-texture surface treatment that is applied in a continuous operation.

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

Special Specification 4106 Polyester Polymer Concrete Bridge Deck Overlay

Special Specification 4106 Polyester Polymer Concrete Bridge Deck Overlay Special Specification Polyester Polymer Concrete Bridge Deck Overlay 1. DESCRIPTION 2. MATERIALS Furnish and place polyester polymer concrete (PPC) overlay system with a high molecular weight methacrylate

More information

PAVEMENT MARKING, METHYL METHACRYLATE

PAVEMENT MARKING, METHYL METHACRYLATE PAVEMENT MARKING, METHYL METHACRYLATE PART 1 GENERAL 1.1 SECTION INCLUDES A. Methods and materials for installing durable colored pavement marking materials, consisting of anti-slip treated methyl methacrylate.

More information

INDOT High Friction Surface Treatment Special Provision

INDOT High Friction Surface Treatment Special Provision INDOT High Friction Surface Treatment Special Provision Joe Bruno, P.E. Traffic Administration, INDOT March 8, 2016 Presentation Overview Background on High Friction Surface Treatments Special Provision

More information

Section 504. MICRO-SURFACING

Section 504. MICRO-SURFACING 504.01 Section 504. MICRO-SURFACING 504.01. Description. This work consists of preparing existing pavement and providing and placing a micro-surfacing mixture. 504.02. Materials. Provide materials in accordance

More information

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 9/30/2009 AC 150/5370-10E ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 631-1.1 GENERAL. This item shall consist of a mixture of refined coal tar emulsion, mineral

More information

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION Sample Project Special Provision: 409cas 08-11-2016 (Re-issued 07-03-17 with City of Montrose Edits) 1 Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL S312DM2-1112 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL September 28, 2012 I. DESCRIPTION This work shall consist of furnishing and applying an emulsified

More information

Section 502. HMA CRACK TREATMENT

Section 502. HMA CRACK TREATMENT 502.01 Section 502. HMA CRACK TREATMENT 502.01. Description. This work consists of treating cracks in Hot Mix Asphalt (HMA) surfaces using either a saw or rout and seal process or an overband process.

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PROTECTIVE OVERLAY FOR PAVEMENT AT SNOWMOBILE TRAIL CROSSINGS

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PROTECTIVE OVERLAY FOR PAVEMENT AT SNOWMOBILE TRAIL CROSSINGS MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PROTECTIVE OVERLAY FOR PAVEMENT AT SNOWMOBILE TRAIL CROSSINGS OFS:JD 1 of 5 APPR:TES:KPK:07-13-16 FHWA:APPR:07-13-16 a. Description. This work

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 337 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR SLURRY SEAL TABLE OF CONTENTS 337.01 SCOPE 337.02 REFERENCES 337.03 DEFINITIONS 337.04 DESIGN AND SUBMISSION

More information

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 ITEM 25 CHIP SEAL 25.1 DESCRIPTION 2 25.2 MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 25.3 AGGREGATES 3 25.4 MIX DESIGN 4 25.5 EQUIPMENT

More information

Special Specification 3005 Scrub Seal Treatment

Special Specification 3005 Scrub Seal Treatment Special Specification 3005 Scrub Seal Treatment 1. DESCRIPTION 2. MATERIALS 3. EQUIPMENT Construct a surface treatment consisting of 1 or more applications of a single layer of asphalt emulsion that is

More information

The specified emulsion for chip seal shall conform to the following applicable requirements:

The specified emulsion for chip seal shall conform to the following applicable requirements: ASPHALT EMULSION SEAL COAT Asphalt emulsion seal coat consist of applying asphaltic emulsion and screenings on the pavement where shown on the plans, as specified in these specifications and the special

More information

The GREENBOOK 2015 Standard Specifications for Public Works Construction

The GREENBOOK 2015 Standard Specifications for Public Works Construction 203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon

More information

1/16 Single Broadcast Polymer Flooring System

1/16 Single Broadcast Polymer Flooring System specification 1/16 Single Broadcast Polymer Flooring System Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321723 - PAVEMENT MARKINGS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DIVISION 9 - FINISHES Section Coatings

DIVISION 9 - FINISHES Section Coatings Spec Component: SC-031-0907 Sikagard 62 DIVISION 9 - FINISHES Section 09900 Coatings Part 1 - General 1.01 Summary A. This specification describes the overlay of interior horizontal surfaces with an epoxy

More information

SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES

SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES 1. SCOPE This specification covers the materials, techniques, and workmanship requirements for sealing portland cement concrete (PCC) pavement

More information

SECTION UNIT PAVERS

SECTION UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Concrete pavers. 2. Detectable warning pavers. 3. Warning stripe pavers. 1.2 SUBMITTALS A. Product Data: For the following: 1. Pavers.

More information

SUBMITTED TO: PRODUCT INFORMATION: SUBMITTED BY: FOR ARCHITECT/ENGINEER USE:

SUBMITTED TO: PRODUCT INFORMATION: SUBMITTED BY: FOR ARCHITECT/ENGINEER USE: SUBMITTED TO: TO: SUBMITTAL DATE: COMPANY NAME: PROJECT: PRODUCT INFORMATION: SUBMITTED PRODUCT: CRACKBOND HEALER/SEALER SPECIFIED PRODUCT: SECTION: PAGE: PARAGRAPH: DETAIL/SHEET NO.: DESCRIPTION OF APPLICATION:

More information

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates. SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR OPEN-GRADED DRAINAGE COURSE, MODIFIED FOR JOB NUMBER 110616 (PORTLAND CEMENT-TREATED PERMEABLE BASE USING CRUSHED CONCRETE) CFS:JFS 1 of 5 APPR:ARB:TES:11-06-14

More information

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER STRESS ABSORBING MEMBRANE - SAM STRESS ABSORBING MEMBRANE INTERLAYER - SAMI 0395 This specification covers requirements for materials,

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR CONCRETE SURFACE REPAIR BY SEALING

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR CONCRETE SURFACE REPAIR BY SEALING 523-1(a-f) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR CONCRETE SURFACE REPAIR BY SEALING These Special Provisions revise, amend, and where in conflict, supersede applicable sections

More information

DIVISION 3 - CONCRETE Section Concrete Toppings Concrete Resurfacing Concrete Rehabilitation

DIVISION 3 - CONCRETE Section Concrete Toppings Concrete Resurfacing Concrete Rehabilitation Spec Component: SC-012-03/10 Sikadur 35, Hi-Mod LV DIVISION 3 - CONCRETE Section - 03550 Concrete Toppings 03920 Concrete Resurfacing 03930 Concrete Rehabilitation Part 1 General 1.01 Summary A.. This

More information

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING SECTION 09 67 23 RESINOUS FLOORING or SECTION 09 67 26 QUARTZ FLOORING PART 1 - GENERAL 1.1 SUMMARY (Specification writer shall add, delete or amend, as deemed necessary) A. Provide all labor, materials,

More information

The Wonderful World of Epoxy. Presented By: Justin Morris, P.E. Khalil Hanifa, P.E.

The Wonderful World of Epoxy. Presented By: Justin Morris, P.E. Khalil Hanifa, P.E. The Wonderful World of Epoxy Presented By: Justin Morris, P.E. Khalil Hanifa, P.E. Outline Recent History of Epoxy Use in Louisiana Louisiana DOTD s Current State of Practice NTPEP ASTM C881 High Friction

More information

DIVISION 9 FINISHES Section Floor Finishes

DIVISION 9 FINISHES Section Floor Finishes Spec Component: SC-032-0807 Supersedes: SS-032-0601 DIVISION 9 FINISHES Section 09600 Floor Finishes Part 1 - General 1.01 Summary A. This specification describes the application of a waterproofing, slip

More information

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings SECTION 07 26 19 TOPICAL MOISTURE VAPOR MITIGTION SYSTEM PART 1 - GENERAL

More information

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments SECTION 07 26 19 TOPICAL MOISTURE VAPOR EMISSION SYSTEM WITH ARDEX

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING OFS:BDB 1 of 5 APPR:JAB:CER:02-10-17 FHWA:APPR:02-28-17 a. Description. This work consists of furnishing

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

SECTION 213 ENGINEERING FABRICS

SECTION 213 ENGINEERING FABRICS SECTION 213 ENGINEERING FABRICS 213-1 PAVEMENT FABRIC MATERIAL. 213-1.1 General. Pavement fabric shall be treated by heat or other processes approved by the Engineer causing the fibers on one side only

More information

2004 Specifications CSJ SPECIAL SPECIFICATION 3250 Emulsified Asphalt Slurry Seal Surface Treatment

2004 Specifications CSJ SPECIAL SPECIFICATION 3250 Emulsified Asphalt Slurry Seal Surface Treatment 2004 Specifications CSJ 6240-39-001 SPECIAL SPECIFICATION 3250 Emulsified Asphalt Slurry Seal Surface Treatment 1. Description. Furnish and place an emulsified asphalt slurry seal surface treatment consisting

More information

SECTION EPOXY TERRAZZO

SECTION EPOXY TERRAZZO SECTION 09402 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION 609-1.1 This item shall consist of an aggregate filled polymerized seal coat composed of a single or two coat application placed on the

More information

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following: S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP2005-136 Mn/DOT 2356 is deleted and replaced by the following: S-1.1 DESCRIPTION Construct a seal coat on a prepared surface. A seal coat is the application

More information

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI) 1993 Specifications CSJ 0451-02-023, etc. SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI) 1. Description. This Item shall govern for the materials and construction requirements for

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

Special Provision for Hot-Mix Asphalt Prime Coat

Special Provision for Hot-Mix Asphalt Prime Coat All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Prime Coat July 25, 2014 This special provision was developed by the Bureau of Materials and Physical Research to improve

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08 SPECIAL PROVISIONS - SP2005BOOK Page 237 computerized printouts from the Contractor's plant as verified by cement cutoffs with the consideration of any waste as determined by the Engineer. (5) The Contractor

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

2016 Midwest Bridge Preservation Partnership

2016 Midwest Bridge Preservation Partnership Thin Epoxy Overlay Treatments on Bridge Decks Michigan DOT Best Practices 2016 Midwest Bridge Preservation Partnership MDOT Organization Outline Jason DeRuyver, P.E. (517) 242-2988 History of Thin Overlays

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 321216 ASPHALT PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Hot-mix asphalt paving. 1.2 PRE-INSTALLATION MEETINGS A. Pre-installation Conference: Conduct conference at Project site.

More information

Installation Instructions

Installation Instructions Installation Instructions I. GENERAL INFORMATION KEY CHIP-100 FLOORING is a decorative resin flooring system consisting of clear, 100% solids epoxy resin and colored vinyl chips. KEY CHIP-100 FLOORING

More information

Pacific Polymers Elasto-Deck 5000MR Guide Specification

Pacific Polymers Elasto-Deck 5000MR Guide Specification 1 071813-1 July 2018 Pacific Polymers Elasto-Deck 5000MR Guide Specification SECTION 071813 TRAFFIC COATINGS ELASTO-DECK 5000MR OVER CONCRETE 2 071813-2 July 2018 Pacific Polymers Elasto-Deck 5000MR Guide

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

MRXL4 CR6 Surface Requirements: XNS, NS, M, S; Special Requirements: NO PART 1 : GENERAL

MRXL4 CR6 Surface Requirements: XNS, NS, M, S; Special Requirements: NO PART 1 : GENERAL PART 1 : GENERAL 1.01 DESCRIPTION A. WORK INCLUDED: All labor, materials, appliances, tools, equipment, facilities, transportation and services necessary for and incidental to performing all operations

More information

SUPPLEMENTAL SPECIFICATION MICRO SURFACING

SUPPLEMENTAL SPECIFICATION MICRO SURFACING January 11, 2007 MICRO SURFACING 410 Micro Surfacing 410.1 Description This section covers the materials, equipment, construction and application procedures for placing Micro Surfacing material for filling

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 01 30.71 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-03930 (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. Product Specification for: Rapid Set TRU Self-Leveling SECTION 03 45 16 HYDRAULIC CEMENT UNDERLAYMENT SECTION 03 35 00 CONCRETE TOPPING SECTION 03 01 30.61 RESURFACING OF CAST-PLACE-CONCRETE SECTION 03

More information

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar SECTION 03 92 50 PART 1 - GENERAL 1.1 SUMMARY A. This section includes Portland cement-based, microsilica-modified,

More information

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL 37-2.01 DESCRIPTION This work shall consist of mixing asphaltic emulsion, aggregate, set-control additives and water and spreading

More information

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS TABLE OF CONTENTS 3.20 SLURRY SEAL... 1 3.20.1 GENERAL... 1 3.20.2 MATERIALS... 1 3.20.2.1 Aggregate... 1 3.20.2.2 Additives... 1 3.20.2.3 Asphalt... 1 3.20.2.4 Water... 1 3.20.3 TESTING... 1 3.20.3.1

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

Pacific Polymers Elasto-Deck 5000X2 Guide Specification

Pacific Polymers Elasto-Deck 5000X2 Guide Specification 1 071813-1 July 2018 Pacific Polymers Elasto-Deck 5000X2 Guide Specification SECTION 071813 TRAFFIC COATINGS ELASTO-DECK 5000X2 OVER CONCRETE 2 071813-2 July 2018 Pacific Polymers Elasto-Deck 5000X2 Guide

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 32 12 16 ASPHALT PAVING SPEC WRITER NOTE: Delete or add information between // ---- // and any other items applicable to project. Any item added to the text shall

More information

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified)

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified) 1995 Metric SPECIAL SPECIFICATION Item 3004 Micro-Surfacing (Polymer Modified) 1. Description. This Item shall consist of a micro-surfacing system which shall be a mixture of cationic polymer modified

More information

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE ASPHALT LEVELING COURSE PART 1 DESCRIPTION OF WORK The work to be done under these Specifications and the accompanying plans consist of furnishing all labor, material, accessories, and plant necessary

More information

1825 W. Adams, Phoenix, AZ Phone (602) / Fax (602)

1825 W. Adams, Phoenix, AZ Phone (602) / Fax (602) 1825 W. Adams, Phoenix, AZ 85007 Phone (602) 252-3926 / Fax (602) 252-5870 Forward The Arizona AGC Pavement Preservation guides are collections of best practices and recommendations for the state of Arizona.

More information

SECTION A. American Society for Testing and Materials (ASTM):

SECTION A. American Society for Testing and Materials (ASTM): hp.seal-krete.com 306 Gandy Rd., Auburndale, FL 33823-2723 863.967.1535 800.323.7357 fax: 863-965.2326 Seal-Krete High Performance Poly-Shell 7000 Single Quartz Broadcast System GUIDE SPECIFICATION SECTION

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant Spec Component: SC-073-03/11 Sikadur Combiflex SG Part 1 - General DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07900 Joint Sealers Elastomeric and non-elastomeric sealant 1.01 Summary A. This

More information

CAPE SEAL SPECIFICATIONS

CAPE SEAL SPECIFICATIONS CAPE SEAL SPECIFICATIONS DESCRIPTION The Contractor shall furnish all labor, equipment, material, supplies, signage, traffic control, and other incidentals necessary to provide an application of polymerized

More information

SECTION A. American Society for Testing and Materials (ASTM):

SECTION A. American Society for Testing and Materials (ASTM): hp.seal-krete.com 306 Gandy Rd., Auburndale, FL 33823-2723 863.967.1535 800.323.7357 fax: 863-965.2326 Seal-Krete High Performance Poly-Shell 7000 Color System GUIDE SPECIFICATION SECTION 09725 PART 1

More information

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 CITY OF SAN ANGELO ITEM 275 275.1 DESCRIPTION. This Item shall govern for treating subgrade, new and/or existing base (with or without asphaltic concrete pavement (ACP)), or combinations as shown

More information

AASHTO/Polymer Concrete Overlays Technical Committee

AASHTO/Polymer Concrete Overlays Technical Committee -01-008 Laboratory Data Manufacturers Data Replicate 1 Replicate 2 Replicate 3 Replicate 4 Replicate 5 Average Uncured Binder NO MATERIAL RECEIVED FOR COMPLETION OF TESTING Density ASTM D1475 Component

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) 1.0 DESCRIPTION. RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) This specification shall govern the process known as Full-Depth Rehabilitation (FDR). FDR consists

More information

SPECIAL SPECIFICATION 4897 Repair Structural Concrete

SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information