1 1993 Specifications CSJ SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations, portions of concrete bent columns and concrete tie beams at locations indicated on the plans or as directed by the Engineer. This item shall also govern repairing, sealing and bonding of cracks in concrete structures by pressure injection of epoxy adhesive into such cracks in accordance with the details shown on the plans and this specification. 2. Materials. All materials shall conform to the pertinent requirements of the following items: Item 440, Reinforcing Steel Item 575, Epoxy Item 421, Portland Cement Concrete Epoxy mortar or epoxy based bonding agents shall not be used when performing patch type repairs. The materials used for sealing the surface of cracks to be injected shall be an epoxy adhesive capable of bonding to wet or dry surfaces. The epoxy adhesive shall be gray in color. It shall have adequate strength and adhesion to confine the injection material in the cracks being injected until the injection material has cured. Where exceptionally wide cracks are encountered, the epoxy should be extended with an approved filler. All materials used shall be free of soluble chlorides or other ingredients capable of causing corrosion to steel reinforcement. The epoxy used for injection shall be a two component epoxy conforming to all requirements shown herein and in departmental material specification DMS6100. The viscosity of the epoxy shall be adjusted as necessary to obtain penetration and retention in the cracks. Where there is considerable variation in crack widths, it may be necessary to use more than one epoxy formulation. The epoxy shall contain no solvents and no solvents shall be added at any time. The mixing ratio of the components in terms of volume and weight shall be clearly stated. Specific requirements for the injection epoxy are shown in the departmental material specification DMS6100. Unless otherwise indicated, the test procedure used shall be as set forth in Epoxy Adhesive of the department DMS6100specifications. The pot life at 77 F, shall be a maximum of 30 minutes. Mortar specimens for wet strength test shall be soaked in tap water at 70 F to 80 F for 24 hours, then removed and free water wiped from the surface prior to bonding

2 A polymer-latex modified, mortar/concrete patching material containing microsilica shall be used for repairs. The selected material shall achieve a minimum compressive strength of 4,500 psi in seven days and 5,500 in 28 days. Proposed material and method of application including manufacturer s technical specifications and formulation of applicable, shall be submitted for approval by the Engineer prior to commencing work. Aggregates shall meet all requirements of Item Construction Methods. Epoxy crack injection (Ty IX) shall be used for sealing and bonding cracks. Cracks 1/16 inch wide or less shall be repaired by epoxy injection as directed by the Engineer. For cracks wider than 1/16 inch or for interconnected cracks networks, the full depth patch repair method should be used. Cracks narrower than 1/32 inch will not require repair work unless directed by the Engineer The Contractor shall provide a detailed work plan to the Engineer for the proposed repair work subject to the Engineer s approval, prior to beginning of any repair work. The Contractor shall work with the Engineer to identify and locate repair structural concrete (Item ) and repair structural concrete-seal cracks (Item ) locations that are to be designated and approved for repair. The Contractor shall provide the Engineer safe work access to the repair sites. All equipment, materials and labor required to provide inspection access to the Engineer will not be paid for directly, but will be considered incidental to the various bid items. The concrete repair areas shall be sounded using a hammer to locate repair area limits, with the exact limits of the repair being approved by the Engineer. (1) Repair Conrete Areas Existing concrete areas designated to be repaired shall be prepared by chipping or other methods to remove all loose or defective concrete. Feather edges shall be eliminated by saw cutting and/or chipping a perpendicular or back-tapered face, approved by the Engineer, along the periphery of the area to be repaired so that the minimum depth of repair is approximately one-half inch. The area being prepared shall be cleaned by sandblasting, or other means approved by the Engineer to remove all loose particles, dirt deteriorated concrete or other substance that would impair the bond between the old concrete and the repair material. Materials removed from the bridge shall become property of the Contractor and shall be removed to disposal sites out of the right of way arranged by the Contractor and approved by the Engineer or otherwise disposed of in a manner satisfactory to the Engineer. Surface preparation shall include the removal of all loose or delaminated concrete and an additional 1 behind the reinforcing within the spalled area. All reinforcing shall be maintained at original position and all exposed steel shall be sandblasted to a near white condition to meet SSPC-SP10 requirements prior to placement of patching material. Severely damaged reinforcing steel as established by the engineer shall be repaired by lap splicing as approved by the Engineer. Bonding agent shall be the term used to designate the bonding bridge material between the new polymer-latex modified Portland cement mortar/concrete with microsilica and the existing hardened Portland cement concrete

3 Apply a bonding compound to entire spall area to be repaired prior to new concrete placement. Bonding compound shall also be applied to all exposed reinforcing steel within the repair area (including back of rebars). Bonding compound shall be a threecomponent epoxy resin/portland cement adhesive. Mixing, application and curing shall be performed as per manufacturer s specifications. Mixed material shall be uniform in appearance. No lumps or irregularities shall be allowed. Application time shall not exceed manufacturer s specified pot life. Removal of forms will be as approved by the Engineer. Care shall be taken to prevent freezing of the mortar or concrete during the curing period. Upon completion of curing, repairs shall be sounded by hammer to locate any defective areas. Any repaired areas found defective shall be removed and repaired at the complete expense of the Contractor. (2) Crack Injection The cracks to be injected shall be designated by the Engineer. Unless otherwise approved by the Engineer, injection will not be permitted unless the concrete temperature is above 50 F and the air temperature is above 50 F and rising. Equipment used in drilling injection port holes shall be equipped with a vacuum attached swivel drill chuck and hollow drill bits capable of removing the dust and debris when drilling. The equipment used will be tested and approved by the Engineer prior to drilling to insure satisfactory operation. There shall be no evidence of any dust or debris remaining in the drilled holes, which will be detrimental to the injection process. Injection ports may be placed in the epoxy or epoxy mortar, used to seal cracks to be epoxy injected. Care shall be used to prevent blockage of the ports when placed. Any injection ports that are blocked will be replaced with another port. The epoxy shall be injected with automatic two component proportioning and mixing equipment. The machine shall be equipped with positive displacement type pumps for each component provided with interlock to insure proper proportioning. The two components shall be mixed by the machine just prior to injection. The machine must be capable of proportioning the materials within ± 5% of the ratio stated by the epoxy supplier. The mixing head must be designed so that an intimate mix of the two components will be obtained. Dwell time in the mixing head shall not exceed ten seconds. The injection pressure shall not exceed the maximum psi as recommended by the epoxy manufacturer. The top surface of cracks designated for injection shall be cleaned free of dust, silt, laitance, oil and grease or any other material that would interfere with the bond of the surface sealer. Entry ports for epoxy shall be provided, spaced far enough apart to assure that when the adhesive material shows at the adjacent port, it has completely filled the crack to its full depth. Entry ports shall be spaced along cracks a maximum of 12 inches on centers and usually determined by the tightness of the crack and the depth of the concrete substrate. Spacing is generally between 4 and 10 inches with the port to be recessed a minimum of 1/2 inch. A small reservoir shall be provided below the bottom of the port to aid in resin flow. Care shall be exercised not to drill beyond a crack which may be running at an angle to the surface. A surface seal or epoxy patch meeting the requirements of these specifications shall first be applied to the exterior

4 crack to prevent the escape of the epoxy. The cracks shall be covered with a bead of patch and smoothed with a putty knife to insure sealing. Injection ports shall be inserted into the drilled holes to a depth of approximately 1/2 inch allowing for the small reservoir below the port. The ports are then bonded into position with the epoxy patch being careful not to seal the ports from resin flow. After allowing adequate curing time for the patch, generally overnight, it is recommended that water be injected through the entire crack area. Injection of the epoxy into a given crack unless otherwise permitted by the Engineer, shall begin first at the entry port of lowest elevation and continue until the epoxy begins to flow out of the adjacent port. Injection pressure shall be kept as low as practical and shall not exceed 30 psi. The connection between entry port and head of the injection gun must be sufficiently tight to prevent epoxy from running out onto the concrete surface. After injection at a given port is complete, this port shall be sealed and injection started at the next adjacent port. This procedure shall be repeated until the crack is completely filled. Where exceptionally wide cracks are encountered, the adhesive shall be modified by addition of an approved filler, provided it can be demonstrated that the modified adhesive will readily penetrate the full depth of the crack without void inclusions and will flow from the entry port adjacent to that in which the modified adhesive is injected. Before beginning injection at hourly intervals during injection work, a small sample of the mixed epoxy shall be taken from the injection gun. Should these samples show any evidence of improper proportioning or mixing, injection work shall be suspended until the equipment or procedures are corrected. The surface of the crack herein treated shall be finished flush with the adjacent concrete surfaces and show no indentations or evidence of port fittings. Sampling and Testing. Samples of the injection epoxy shall be taken by the Engineer and tested by the Department for compliance with specification requirements prior to use. Quality of Work. The overall quality of work will be judged by the Contractor s ability to achieve full penetration of the cracks. Experience of Workmen. This work shall only be performed by contractors who are authorized applicators of the process. The injection application shall be supervised by factory trained technicians who are certified by the epoxy injection resin manufacturer to be proficient in the art of injection repairs. The epoxy injection technicians shall have completed a minimum of two similar jobs. The contractor shall provide evidence of the experience and certifications of the technicians for approval by the Engineer. 4. Measurement. The Repair Structural Concrete item will be measured by the square foot, in place, as measured on the surface of the repair. When a repair involves multiple surfaces, such as a corner, measurement will be made of all surfaces repaired. The Repair Structural Concrete (Seal Cracks) item will be measured by the linear foot of epoxy injection complete in place

5 5. Payment. The work performed and the materials furnished in accordance with this Item and measured as provided under Measurement, will be paid for at the unit price bid for the pertinent concrete repair item. This shall include all transportation, labor, equipment, tools and incidentals necessary to complete the planned work as well as repair any damage to the structure and surroundings caused by this work. (1) Repair Structural Concrete This price shall be full compensation for furnishing and placing all materials, removing and disposal of all loose or defective concrete, sawcutting as required, surface preparation, cleaning reinforcing steel. (2) Repair Structural Concrete (Seal Cracks) This price shall be full compensation for furnishing and placing all materials, cleaning cracks, drilling, our surface preparation epoxy crack injection and finishing of surface

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-03 01 30.71 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-03930 (September 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING 1.0 GENERAL A. Description Construction of textured and colored formed concrete surfaces using simulated

More information

ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor

ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar SECTION 03 92 50 PART 1 - GENERAL 1.1 SUMMARY A. This section includes Portland cement-based, microsilica-modified,

More information

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

DIVISION 3 - CONCRETE Section Concrete Rehabilitation Spec Component: SC-101-03/10 Sikacem 133 DIVISION 3 - CONCRETE Section 03730 - Concrete Rehabilitation Part 1 General 1.01 Summary A. This specification describes the patching or overlay of interior and/or

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

1/16 Single Broadcast Polymer Flooring System

1/16 Single Broadcast Polymer Flooring System specification 1/16 Single Broadcast Polymer Flooring System Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions

More information

DIVISION 3 CONCRETE Section Concrete Rehabilitation

DIVISION 3 CONCRETE Section Concrete Rehabilitation Spec Component: SC-119-0907 SikaRepair 222 DIVISION 3 CONCRETE Section 03730 - Concrete Rehabilitation Part 1 General 1.01 Summary A. This specification describes the patching or overlay of interior and/or

More information

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS TABLE OF CONTENTS 932.04 SUBMISSION

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroCrete RT Rake/Trowel Urethane Mortar 3/16-1/4 (4.5-6.0 mm) Floor Resurfacing System Part 1: General 1.01 System Description A. System I Skid-Resistant Finish Resurfacing

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 1. Description. This Item shall govern for the furnishing and placing of colored concrete wave

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Part 1: General Architectural Specification FloroCrete SLX Self-Leveling Urethane Mortar w/broadcast nominal 3/16 Flooring System 1.01 System Description A. Squeegee/Troweled-applied, aggregate-rich polyurethane

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Tunnel Painting

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Tunnel Painting 1993 Specifications CSJ 8075-18-005 SPECIAL SPECIFICATION ITEM 4514 Tunnel Painting 1. Description. This Item shall govern for the painting of the walls and ceiling of a tunnel. The intent is to provide

More information

DIVISION 3 - CONCRETE Section Concrete Toppings Section Concrete Resurfacing Section Concrete Rehabilitation

DIVISION 3 - CONCRETE Section Concrete Toppings Section Concrete Resurfacing Section Concrete Rehabilitation Spec Component: SC-025-03/10 SikaTop 122 Plus DIVISION 3 - CONCRETE Section 03550 - Concrete Toppings Section 03720 - Concrete Resurfacing Section 03730 - Concrete Rehabilitation Part 1 General 1.01 Summary

More information

Bid Opportunity Section CKP File No M May 2009 Page 1 of 9

Bid Opportunity Section CKP File No M May 2009 Page 1 of 9 Exterior May 2009 Page 1 of 9 1. GENERAL Select areas of the Tyndall Stone masonry cladding show signs of distress, including cracking and displacement, both in the stone and the mortar. This section details

More information

Special Specification 4038 Zinc Cathodic Protection System

Special Specification 4038 Zinc Cathodic Protection System Special Specification 4038 Zinc Cathodic Protection System 1. DESCRIPTION Furnish, install, and energize a sacrificial zinc anode cathodic protection system to bent caps, tie beams, concrete walls and

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

Section Fluid Applied Waterproofing

Section Fluid Applied Waterproofing Section 07920 - Fluid Applied Waterproofing Part 1 - General 1.01 Summary A. This specification describes the injection of a crack or joint with infiltrating water with a low viscosity hydrophobic polyurethane

More information

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

DIVISION 3 - CONCRETE Section Concrete Rehabilitation Spec Component: SC-102-03/10 SikaRepair 224 DIVISION 3 - CONCRETE Section 03730 - Concrete Rehabilitation Part 1 General 1.01 Summary A. This specification describes the patching or overlay of interior

More information

SECTION SHOTCRETE Cast-In-Place Concrete Precast Prestressed Concrete Joists and Beams.

SECTION SHOTCRETE Cast-In-Place Concrete Precast Prestressed Concrete Joists and Beams. SECTION 03361 SHOTCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03413 - Precast Prestressed Concrete Joists and Beams. 1.02 REFERENCES A. American Society

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

Section Shotcrete

Section Shotcrete Section 03 37 13 Shotcrete *** SIKA SPECIFICATION NOTE: This guide specification includes test methods, materials and installation procedures for, a one component, high performance repair mortar for dry/wet

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroBuild XT Extreme Impact & Abrasion Resistant Resurfacing System Part 1: General 1.01 System Description A. Roller applied 100% solids epoxy primer, followed by an extreme

More information

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT

JOB SPECIFIC BELLEVUE AVENUE NEWPORT, RHODE ISLAND PORTLAND CEMENT CONCRETE PAVEMENT PORTLAND CEMENT CONCRETE PAVEMENT This Specification consists of furnishing and placing full-panel replacement of Portland Cement Concrete Pavement on Bellevue Avenue. Portland Cement Concrete Pavement

More information

SECTION MORTAR

SECTION MORTAR PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work

More information

Supaflow HF Grout. Dual Expansion Class C Grout. Description. Areas of application. Features

Supaflow HF Grout. Dual Expansion Class C Grout. Description. Areas of application. Features Supaflow HF Grout Dual Expansion Class C Grout Description Supaflow HF is a free flowing cement based grout offering high performance and non-shrink characteristics. This product is suitable for pumping

More information

DIVISION 3 CONCRETE Section Grouts

DIVISION 3 CONCRETE Section Grouts Spec Component: SC-207-03/10 SikaGrout 328 DIVISION 3 CONCRETE Section 03600 - Grouts Part 1 General 1.01 Summary A. This specification describes grouting of machinery base plates, anchor bolts, pins and

More information

SPECIFICATIONS MODERRA MORTARLESS MASONRY VENEER

SPECIFICATIONS MODERRA MORTARLESS MASONRY VENEER SPECIFICATIONS MODERRA MORTARLESS MASONRY VENEER PART 1: GENERAL 1.01 Section Includes A. Product description and definitions. B. Constructing base ledge for concrete wall units. C. Installing modular

More information

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 2004 Specifications CSJ 0013-06-042, Etc. SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 1. Description. Furnish and apply a high friction surfacing system in accordance with this Specification

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE

More information

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings. SECTION 03 54 16 - HYDRAULIC CEMENT UNDERLAYMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork. DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management

More information

SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay 2004 Specifications CSJ 0055-01-025, etc & 0007-06-077 SPECIAL SPECIFICATION 4398 Multiple-Layer Polymer Concrete Overlay 1. Description. Prepare deck surfaces, furnish materials, and apply crack sealant

More information

Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal

Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal Features Benefits Versatile movement Profile design Ease of installation Material composition DESCRIPTION: Can accommodate

More information

EPOXY TERRAZZO 1 REV. 8/02

EPOXY TERRAZZO 1 REV. 8/02 PART 1 - GENERAL GUIDE SPECIFICATIONS section 9400 EPOXY THINSET TERRAZZO (Without A Crack Suppression Membrane) REVISED MAY 2003 1.1 RELATED DOCUMENTS A. Section includes thin-set epoxy terrazzo flooring

More information

SECTION CONCRETE REPAIR AND PATCHING

SECTION CONCRETE REPAIR AND PATCHING SECTION 03937 CONCRETE REPAIR AND PATCHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, General Specifications, and Division

More information

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) GENERAL PROVISIONS PART 1 - GENERAL A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections

More information

B. Samples: Cured samples of materials as required by Architect/Engineer.

B. Samples: Cured samples of materials as required by Architect/Engineer. SECTION 03305-1 PART 1 - GENERAL 1.01 SUMMARY A. Provide all labor, equipment and materials required to repair spalled, deteriorated or structurally damaged concrete surfaces. Depth of repairs shall be

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT OFS:CER 1 of 5 APPR:GM:TEH:04-04-13 FHWA:APPR: 04-21-14 a. Description. This work consists of providing all labor,

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 PART 1 GENERAL Product Guide Specification SECTION 03935 SPRAYABLE MICROSILICA

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS REPAIR SPALLING INSTALLATION INSTRUCTIONS A CSW Industrials Company BCSW Wall Compression Seals IMPORTANT The following instructions are very important. Read them carefully, and be sure you understand

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification -- FloroCryl Shop MMA (Methyl Methacrylate) - Silica Sand Single Broadcast 1/16 (1.59 mm) Flooring System Part 1: General 1.01 System Description A. Roller-applied penetrating

More information

City of Toronto-St. Clair Reservoir Waterproofing and Building Envelope Rehabilitation 15ECS-MI-01WA / TCN Page 1 of 13

City of Toronto-St. Clair Reservoir Waterproofing and Building Envelope Rehabilitation 15ECS-MI-01WA / TCN Page 1 of 13 15ECS-MI-01WA / TCN 324-2015 Page 1 of 13 1 General 1.1 DESCRIPTION.1 This section refers to concrete repair work inside or outside of existing tanks and other area related to concrete repair including

More information

DIVISION 3 CONCRETE Section Concrete Rehabilitation

DIVISION 3 CONCRETE Section Concrete Rehabilitation Spec Component: SC-010-03/10 Sika Pronto 19 TF DIVISION 3 CONCRETE Section 03930 Concrete Rehabilitation Part 1 General 1.01 Summary A. This specification describes the grouting of cracks / sealing of

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle

More information

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements. TECHNICAL SPECIFICATIONS SEWER MANHOLE REHABILITATION SYSTEM WITH A PROTECTIVE CEMENT LINER AND HIGH BUILD EPOXY COATING (As Provided by Standard Cement Materials) FOREWORD The following specification

More information

2. Exterior Concrete Exposed to Freeze/Thaw: 4500 psi minimum. i. Water Cement Ratio < 0.45 for exterior concrete exposed to freeze/thaw

2. Exterior Concrete Exposed to Freeze/Thaw: 4500 psi minimum. i. Water Cement Ratio < 0.45 for exterior concrete exposed to freeze/thaw 03 30 00 PART 1 - GENERAL 1.01 SCOPE A. Specific details of vehicular pavements, exterior slabs, sidewalks, and curbs constructed of Portland Cement Concrete (PCC) are also addressed in WSU Design Standard

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroBuild PT/ HT Epoxy Mortar ¼ Power Trowel or Hand Trowel Flooring System Part 1: General 1.01 System Description A. Roller-applied 100% solids, penetrating epoxy primer

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING OFS:BDB 1 of 5 APPR:JAB:CER:02-10-17 FHWA:APPR:02-28-17 a. Description. This work consists of furnishing

More information

NTPEP Evaluation of Rapid Set Concrete Patching Materials for Portland Cement Concrete

NTPEP Evaluation of Rapid Set Concrete Patching Materials for Portland Cement Concrete Standard Practice for NTPEP Evaluation of Rapid Set Concrete Patching Materials for Portland Cement Concrete AASHTO Designation: [RSCP-14] American Association of State Highway and Transportation Officials

More information

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on

More information

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

SECTION GROUT. A. American Society for Testing and Materials (ASTM): SECTION 03600 GROUT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03600 - Grout. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C109-95

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

SIKA EGYPT. Injection Systems. Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system

SIKA EGYPT. Injection Systems. Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system Method Statement for Application of Sika Injection 20 SIKA EGYPT Injection Systems Scope: Highly expansion solvent free water-reactive two part Polyurethane foam injection system INTRODUCTION: The water

More information

DMS EPOXIES AND ADHESIVES

DMS EPOXIES AND ADHESIVES DMS - 6100 EFFECTIVE DATES: OCTOBER 2007 MAY 2014. 6100.1. Description. This Specification details requirements for various types of epoxy and adhesive materials suitable for highway use. These materials

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 1 of 12 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE V/O CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3

More information

INSTALLATION INSTRUCTIONS FOR BALCO, INC. DURAFLEX TM "BCS" SERIES - BALCO COMPRESSION SEAL TYPE BCSF-SL SERIES FLOOR SYSTEMS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. DURAFLEX TM BCS SERIES - BALCO COMPRESSION SEAL TYPE BCSF-SL SERIES FLOOR SYSTEMS 2626 South Sheridan PO Box 17249 Wichita, Kansas 67217 Phone: (316) 945-9328 Fax: (316) 945-0789 INSTALLATION INSTRUCTIONS FOR BALCO, INC. DURAFLEX TM "BCS" SERIES - BALCO COMPRESSION SEAL TYPE BCSF-SL

More information

Desco Granite Flooring Specifications

Desco Granite Flooring Specifications Desco Granite Flooring Specifications PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Sections, apply

More information

Conditions of the Contract and Division 1 General Requirements are a part of this section.

Conditions of the Contract and Division 1 General Requirements are a part of this section. NOTES TO SPECIFIER General notes about the specifications and the reasons for them are listed here in general statements. Use this as a guide when choosing the correct selection of statements that apply

More information

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX ARDIFLO Pump System Underlayments SECTION 07 26 19 TOPICAL MOISTURE VAPOR EMISSION SYSTEM WITH ARDEX

More information

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE

CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 932 NOVEMBER 2009 CONSTRUCTION SPECIFICATION FOR CRACK REPAIR - CONCRETE TABLE OF CONTENTS 932.01 SCOPE 932.02 REFERENCES 932.03 DEFINITIONS 932.04

More information

SECTION SURFACE-APPLIED CRYSTALLINE WATERPROOFING AND CONCRETE REPAIR

SECTION SURFACE-APPLIED CRYSTALLINE WATERPROOFING AND CONCRETE REPAIR SECTION PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface-applied crystalline waterproofing treatment. B. Crystalline compounds for the repair of leaking cracks, holes and joints found in concrete. 1.2 RELATED

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

CVO/169897A OCTOBER 29, VERTICAL AND OVERHEAD CONCRETE SURFACE REPAIR SYSTEMS

CVO/169897A OCTOBER 29, VERTICAL AND OVERHEAD CONCRETE SURFACE REPAIR SYSTEMS SECTION 03720 VERTICAL AND OVERHEAD PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Association of State Highway and Transportation

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. Product Specification for: Rapid Set DOT Repair Mix SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS SECTION 03 05 00 COMMON WORK RESULTS FOR CONCRETE 09 97 00 SSPECIALTY COATINGS Weld Crete ************************************************************************************************************************

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.   (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 15 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant Spec Component: SC-073-03/11 Sikadur Combiflex SG Part 1 - General DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07900 Joint Sealers Elastomeric and non-elastomeric sealant 1.01 Summary A. This

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for

More information

RESINOUS FLOORING

RESINOUS FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Bid #2017-17 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 Product Guide Specification SECTION 03935 RESTORATION MORTAR AND EPOXY

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Part 1: General Florock Seamless Flooring Systems Architectural Specification FloroQuartz BC Epoxy - Colored Quartz 1/8 (0.125 mm) Double Broadcast Flooring System 1.01 System Description A. Roller-applied

More information

DECOCOLOR FLOORING SYSTEM

DECOCOLOR FLOORING SYSTEM AIA Specification DECOCOLOR FLOORING SYSTEM Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions of the

More information

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements... SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...

More information

SECTION DETECTABLE GUIDE TACTILES

SECTION DETECTABLE GUIDE TACTILES SECTION 09655 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for surface applied and recessed detectable guide or directional tactiles (tactiles) for use on the station platforms

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician? Copyright Material This presentation is protected by US and International copyright laws. Reproduction, distribution, display and use of the presentation without permission of the speaker is prohibited.

More information