1 I DECISION DECISION MEMO Besson Special Use Permit Ottawa National Forest T49N R37W Section 19, 30 Houghton County; T49N R38W Sections 24,25 Ontonagon County Forest Roads 1157, 1157-G, and spur road in the NWSE Section 25. The Responsible Official for the Besson special use permit is Susanne Adams, Bergland and Ontonagon District Ranger. A. Description It is my decision to issue a FLPMA (Forest Land Policy Management Act) Forest Road (FR) Special Use permit to Glen Besson to access his private land across National Forest property. The selected action is to allow use of a total of approximately 2.38 miles or 3.46 acres of National Forest travelway for access to private property owned by the aforementioned party. This decision will be implemented through the issuance of Forest Road Special Use permit that meets the requirements of the decision, Forest Service regulations, and outlines the terms and conditions of use. Mr. Besson owns the 40 acre parcel in the NESE of section 25 along with Eugene Cogswell, and Besson owns the 40 acres in the SESE section 25 jointly with Dave Aho. With Mr. Besson acting as the agent, a Road Association has been formed (the Kakola Road Association) by these three private landowners under one permit. The actions of these individuals known under the Road Association are not connected in any way nor are they cummulative in nature. The permit project file will contain a signed copy of their association bylaws with the private party s names listed therein. The permittee(s) is responsible for maintenance of permitted roads as instructed in Exhibit B - Operation and Maintenance Plan of his permit, including any lead-off drainage, ditching, shaping, and gravel work as necessary to prevent erosion. The condition of the travelways were found to be deteriorated due to unstable surface conditions, and access should follow guidelines as perscribed by the Forest engineer in the Operation and Maintenance Plan Exhibit B for the Besson Special Use Permit. The permittee is also required to repair all damage to other National Forest roads caused by the exercise of the privileges granted by the permit (FR Special Use Permit clauses 8, 10, and Clause 17 A-F). The road location is displayed on the attached map. Forest Road 1157 is open to the general public via Off-Highway vehicles (OHVs) and highway vehicles for approximately ½ mile, with the remaining portion of FR 1157 and 1157-G open to the general public via OHV only, as part of the Ottawa s Motor Vehicle Use Map (MVUM). These roads are subject to an annual public closure period from March 15 th through May 14 th to all motorized uses to alleviate potential spring thaw road damage. All un-named spur roads listed above for permit inclusion are not open to any public motorized traffic. It is also my decision that a Special Use Fee will be charged for the permit as Forest Service regulations require the applicant to pay any necessary fees, post any necessary bonds, and secure any state or federal permits or authorizations required by law. The use of the travel route will be monitored and inspected pursuant to Forest Manual direction and the FLPMA not to exceed once every 5 years, and also upon any construction or rehabilitation work to permitted travelway, or any other time as deemed necessary by Forest Service personnel. 1

2 B. Purpose of Decision Authorization through a Special Use Permit is needed to cross National Forest System land to reach private property when the access is not part of the forest transportation system or is not open to the public. The location for such travel to private land is the one determined most suitable through the integrated resource management process. The purpose of this decision is to provide access to private property. Request by the proponent for issuance of a special use permit was accepted in September This decision responds to the 2006 Ottawa National Forest Plan s Standards and Guidelines for providing the written authorization required under the Forestwide standard to travel when access by the general public is restricted (Forest Plan, Chapter 2 pg.15). C. Alternative Actions Considered but Dismissed Alternative routes were reviewed but not carried forward due to National Forest lands surrounding the private lands. The aforementioned travelways were field reviewed along with various surrounding travelways that were also reviewed as part of the adjacent Pori Vegetative Mangement Environmental Assessment. Should the Pori analysis move to implementation, the Besson permit may be amended to incorporate a road which may be better suited for the Besson access which was improved under the Pori project. The Forest system roads and trails leading to the private parcel have been on the transportation system for over 20 years; the chosen route is the one currently best suited to sustain motorized vehicular traffic under permit. II REASONS FOR CATEGORICALLY EXCLUDING THE DECISION Decisions may be categorically excluded from documentation in an environmental impact statement or environmental assessment when they are within one of the categories identified by the U.S. Department of Agriculture in 7 CFR part 1b.3 or one of the categories identified by the Chief of the Forest Service in Forest Service Handbook (FSH) sections 31.11, 31.12, or 31.2 and there are no extraordinary circumstances related to the decision that may result in a significant individual or cumulative effect on the quality of the human environment. We have concluded that this decision is appropriately categorically excluded from documentation in an environmental impact statement or environmental assessment as it is a routine activity within a category of exclusion and there are no extraordinary circumstances related to the decision that may result in a significant individual or cumulative effect on the quality of the human environment. Our conclusion is based on information presented in this document and the entirety of the project record. A. Category of Exclusion The project is within the FSH (3) category of exclusion that includes the Approval, modification, or continuation of minor special uses of National Forest System lands that require less than five contiguous acres of land. B. Relationship to Extraordinary Circumstances 1. Federally listed threatened or endangered species or designated critical habitat, species proposed for Federal listing or proposed critical habitat, or Forest Service sensitive species This project was reviewed by the Forest botanist and wildlife biologist. No habitat change is likely from the current condition, and populations existing in these areas would not be subjected to additional impacts. No federally listed, threatened, endangered, or proposed plants, or Forest Service sensitive species are believed to occur within the project areas, and none were observed during field reviews. No Forest Service sensitive species or their habitat will be affected. No critical habitat for any federally listed wildlife species is present on the Ottawa National Forest (see Project 2

3 Record). 2. Floodplains, Wetlands, or Municipal Watersheds This project was reviewed by the Forest soil scientist, engineering technician, botanist, and Forest hydrologist, including validation by field review, and by reviewing topography and Ecological Land Type Phase maps. This decision will not affect floodplains or wetlands (see Project Record). There are no municipal watersheds on the Ottawa National Forest. 3. Congressionally Designated Areas The project is not located in a Wilderness or in a Wild and Scenic River corridor. The wild segment of the East Branch of the Ontonagon River lies 1.5 miles to the west of the Besson property. The distance from the river and continued use of the travel ways to the permitted area do not present any concerns. There are no National Recreation Areas or Wilderness Study Areas on the Forest. No congressionally designated areas will be affected by this decision (see Project Record maps). 4. Inventoried Roadless Areas There are no inventoried roadless areas (RARE II or Forest Plan) in or near any of the decision areas. This decision will not affect inventoried roadless areas. 5. Research Natural Areas, Special Interest Areas There are no candidate or designated Research Natural Areas (RNA) or Special Interest Areas in or near the decision area. 6. American Indian and Alaska Native Religious or Cultural Sites This project is minor in scope and covers in total 3.46 acres of existing linear travelway. Meetings are conducted frequently with the Tribes to make them aware of upcoming special use projects across the Forest. No concerns have been voiced at these meetings. 7. Archaeological Sites, or Historic Properties or Areas This project was reviewed by an archaeological paraprofessional. One site, , was noted near but outside of the travel route; this site has not been evaluated by the State of Michigan for elegibility; as per guidelines established by the Forest archeologist and included under the Operation and Maintenance Plan for the Besson Special Use Permit, the site will be proteced with a 100 buffer to protect it from disturbance. Any work on the permitted travelways will stop immediately should any new sites or artifacts be discovered within the project area during permitted use until the area can be assessed and cleared for use by the Forest Archeologist (see Project Record). Therefore, no known religious, cultural, archeological, or historical sites will be affected by the use or maintenance of the roads included in this decision. No other extraordinary circumstances related to the project were identified. III PUBLIC INVOLVEMENT Scoping was conducted through interviews with Forest Service specialists (botanist, archeological paraprofessional and Forest archeologist, soil scientist, wildlife biologist, hydrologist, engineering technician, recreation mangement assistant, silviculturist, and realty specialist). The project was listed most recently in the January to March 2014 Schedule of Proposed Actions, which is posted on the Ottawa s Internet site and mailed to over 130 individuals and organizations that requested this publication, including Federal, State, and Local agencies and affected Indian Tribes. No additional persons that could be affected were identified. No issues with this decision were raised. 3

4 IV FINDINGS REQUIRED BY AND/OR RELATED TO OTHER LAWS AND REGULATIONS My decision will comply with all applicable laws and regulations. I have summarized some pertinent ones below. Alaska National Interest Lands Conservation Act, Sec This Act directs the Secretary of Agriculture to provide access to non-federally owned land within the boundaries of the National Forest System as the Secretary deems adequate to secure to the owner the reasonable use and enjoyment thereof: Provided, that such owner comply with rules and regulations applicable to ingress and egress to or from the National Forest System. The Besson privately owned parcels are surrounded on all sides by National Forest System lands. The landowners will be allowed reasonable access under the Act. Federal Land Policy and Management Act - This Act allows the granting of easements across National Forest System Lands. The regulations at 36 CFR 251 guide the issuance of permits, leases, and easements under this Act. Permits, leases, and easements are granted across National Forest System lands when the need for such is consistent with planned uses and Forest Service policy and regulations. This decision is consistent with this Act. Forest Plan Consistency (National Forest Management Act) - This Act requires the development of long-range land and resource management plans (Forest Plans). The Ottawa Forest Plan was approved in 2006 as required by this Act. It has since been amended one time to incorporate direction for Wild and Scenic Rivers based upon authorized Comprehensive River Management Plan. The Act requires all projects and activities are consistent with the Forest Plan. The Forest Plan has been reviewed in consideration of this project. This decision is responsive to guiding direction contained in the Plan, as summarized in Section IB of this document and as follows. This decision is consistent with the standards and guidelines contained in the Ottawa Forest Plan, specifically Cultural Resources p. 2-5; Water and Soil Resource Management pp. 2-7 to 2-8, 2-26 to 2-27; Wildlife, Fish, and Sensitive Plant Management pp. 2-4, 2-8 to 2-10, 2-27 to 2-34; Special Use Management p 2-34; and Transportation System p Endangered Species Act - As required by this act, an evaluation was completed that addressed the potential effects to threatened and endangered species utilizing the project area. It has been determined that the proposed authorization would not affect any currently listed federally threatened or endangered species (See BE, project file). On October 2, 2013, the USDI Fish and Wildlife Service proposed to list the northern long-eared bat (Myotis septentrionalis) as Endangered under the Endangered Species Act due to the primary threat of White- Nose Syndrome (WNS) (USDI Fish and Wildlife Service 2013). More information about this proposed listing is available at the Federal Register website ( October 2, 2013 edition, pp ). Because none of the proposed actions in this project would jeopardize this bat species or its habitat, conferencing with USDI Fish and Wildlife Service will not be initiated at this time. If the USDI Fish and Wildlife Service lists this bat species (decision expected during the fall 2014), the Ottawa would initiate informal consultation according to the ESA Section 7 Handbook (USDI FWS 1998). The project s biologist and botanist have determined that the project will not affect any federal listed species. See Section II-B1. Sensitive Species (Forest Service Manual 2670) Manual direction requires analysis of potential impacts to sensitive species, those species for which the Regional Forester has identified population viabilitiy is a concern. Potential effects of this decision on sensitive species has been analyzed by the project s biologist and botanist. It has been determined that this decision will have no impact on sensitive species. Therefore, implementation 4

5 of this project will not cause a trend to federal listing or loss of viability for any species on the RFSS list for the Ottawa National Forest. See Section II-B1. Clean Water Act - This Act is to restore and maintain the integrity of waters. The Forest Service complies with this Act through the use of Best Management Practices. This decision incorporates Best Management Practices to ensure protection of soil and water resources (see Project Record). Wetlands (Executive Order 11990) - Wetlands are defined by this order as... areas inundated by surface or ground water with a frequency sufficient to support and under normal circumstances does or would support a prevalence of vegetative or aquatic life that requires saturated or seasonally saturated soil conditions for growth and reproduction. Wetlands generally include swamps, marshes, bogs, and similar areas such as sloughs, potholes, wet meadows, river overflows, mud flats, and natural ponds. This decision incorporates permit clauses to ensure protection of wetlands when travel ways are maintained or improved through a permit s Maintenance Agreements Exhibit B. This decision will not affect wetlands. See Section II-B2 of this document. Floodplains (Executive Order 11988) - Floodplains are defined by this order as... the lowland and relatively flat area adjoining inland and coastal waters, including flood prone areas of offshore islands, including at a minimum, that area subject to a one percent [100-year recurrence] or greater chance of flooding in any one year. This decision will not affect floodplains. See Section II-B2 of this document. National Historic Preservation Act - Section 106 of the National Historic Preservation Act requires federal agencies to take into account the effect of a project on any district, site, building, structure, or object that is included in, or eligible for inclusion in the National Register of Historic Places. Section 106 of the National Historic Preservation Act also requires federal agencies to afford the Advisory Council on Historic Preservation a reasonable opportunity to comment on agency undertakings. This decision complies with this Act. Surveys were conducted for Native American religious or cultural sites, archaeological sites, and historic properties or areas that may be affected by this decision. A no historic properties affected determination was made. Any unknown sites found within the project area would be avoided and protected following the standards set forth under the guidelines of the Memorandum of Agreement between the USDA Forest Service and the local Tribal Historic Preservation Officers and Michigan State Historic Preservation Officer. No tribal concerns were identified during the scoping process. This decision complies with this Act. See Section II-B7 of this document. Archaeological Resources Protection Act - This Act covers the discovery and protection of historic properties (prehistoric and historic) that are excavated or discovered on federal lands. It affords protection of archaeological resources and sites that are on public and Indian lands. This decision complies with this Act. See Section II-B7 of this document. Native American Graves Protection and Repatriation Act - This Act covers the discovery and protection of Native American human remains and objects that are excavated or discovered in federal lands. It encourages avoidance of archaeological sites that contain burials or portions of sites that contain graves through in situ preservation, but may encompass other actions to preserve these remains and items. This decision complies with this Act. See Section II-B6 of this document. Wild and Scenic Rivers Act This act designates selected rivers and their immediate environments, possessing outstandingly remarkable scenic, recreational, geologic, fish and wildlife, historic, cultural, or other similar values; to be preserved in free-flowing condition and protected for the benefit and enjoyment of present and future generations. There are no wild, scenic, or recreational rivers within the project area. See Section II-B3 of this document. Environmental Justice (Executive Order 12898) - This Order requires consideration of whether projects would disproportionately impact minority or low-income populations. This decision complies with this Act. Public involvement occurred for this project, the results of which I have considered in this decision-making. Public 5

6 involvement did not identify any adversely impacted local minority or low-income populations. This decision is not expected to adversely impact minority or low-income populations. National Environmental Policy Act - This Act requires public involvement and consideration of potential environmental effects. The entirety of documentation for this decision supports compliance with this Act. V IMPLEMENTATION DATE Implementation of this decision may be implemented immediately. VI CONTACT PERSON Further information about this decision can be obtained from Dawn Buss-Glodowski at the Ontonagon Ranger District, 1209 Rockland Road, Ontonagon, MI 49953; Phone (906) extension 15, fax (906) , 8:00 a.m. to 4:30 p.m. weekdays; dbussglodowski@fs.fed.us. Additional information about this decision can be found on the Internet at /s/ SUSANNE M. ADAMS Ontonagon District Ranger Date The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, sex, religion, age, disability, sexual orientation, marital status, family status, status as a parent (in education and training programs and activities), because all or part of an individual s income is derived from any public assistance program, or retaliation. (Not all prohibited bases apply to all programs or activities.) If you require this information in alternative format (Braille, large print, audiotape, etc.), contact the USDA s TARGET Center at (202) (Voice or TDD). If you require information about this program, activity, or facility in a language other than English, contact the agency office responsible for the program or activity, or any USDA office. To file a complaint alleging discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C , or call Toll free, (866) (Voice). TDD users can contact USDA through local relay or the Federal relay at (800) (TDD) or (866) (relay voice users). USDA is an equal opportunity provider and employer. 6

7 7

8 BESSON SPECIAL USE PERMIT T49N R37W Section 19, 30 Houghton Co. T49N R38W Section 24, 25 Ontonagon Co. Forest Road 1157, 1157-G, and spur road in NWSE Section 25 Proposed Route 8

DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS

DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin/White Cloud Ranger District Newaygo County, Michigan

More information

DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT

DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin Ranger District Newaygo County, Michigan I. DECISION A. Background

More information

I. Decision to be Implemented. II. Reasons for Categorically Excluding the Decision. A. Description of Decision - 1 -

I. Decision to be Implemented. II. Reasons for Categorically Excluding the Decision. A. Description of Decision - 1 - Decision Memo Guitonville Penelec Power Line Right-of-Way Special Use Permit USDA Forest Service, Eastern Region 9 Allegheny National Forest Marienville Ranger District Warrant 5133, Green Township Forest

More information

Decision Memo Starkey Elk Handling Facility Water System Improvements

Decision Memo Starkey Elk Handling Facility Water System Improvements Decision Memo Starkey Elk Handling Facility Water System Improvements USDA Forest Service Wallowa-Whitman National Forest La Grande Ranger District Union County, Oregon I. DECISION TO BE IMPLEMENTED A.

More information

The location of the valve site is displayed on a map in the project file.

The location of the valve site is displayed on a map in the project file. DECISION MEMO Special Use Permit # RAR401201 Amendment #7 Hiawatha National Forest Rapid River Ranger District Delta County, Michigan I DECISION A. Description My decision is to issue an amendment to the

More information

DECISION MEMO 4-H Tree Farm LLC Driveway Permit

DECISION MEMO 4-H Tree Farm LLC Driveway Permit DECISION MEMO 4-H Tree Farm LLC Driveway Permit I. DECISION USDA Forest Service, Eastern Region, Hoosier National Forest Tell City Ranger District Perry County, Indiana T73S, R2W, SESE Section 36 A. Description

More information

Michigan Wing-Civil Air Patrol

Michigan Wing-Civil Air Patrol DECISION MEMO Michigan Wing-Civil Air Patrol (CAP) Navigational Equipment Special Use Permit #MUN250 Hiawatha National Forest Munising Ranger District Alger County, Michigan I DECISION A. Description My

More information

DECISION MEMO For ASL (Allegheny Snowmobile Loop) Marshburg Connector Project

DECISION MEMO For ASL (Allegheny Snowmobile Loop) Marshburg Connector Project DECISION MEMO For ASL (Allegheny Snowmobile Loop) Marshburg Connector Project I. DECISION TO BE IMPLEMENTED A. Description of Decision USDA Forest Service, Eastern Region 9 Allegheny National Forest Bradford

More information

DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH

DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH BACKGROUND The Rock Creek drainage is a very popular recreation

More information

KENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION TOWER REPLACEMENT DECISION MEMO

KENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION TOWER REPLACEMENT DECISION MEMO UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE SOUTHERN REGION DANIEL BOONE NATIONAL FOREST KENTUCKY MARCH 2016 KENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION

More information

Wetland Creation Project. Decision Memo

Wetland Creation Project. Decision Memo Wetland Creation Project UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE Eastern REGION Monongahela NATIONAL FOREST West Virginia Decision Memo USDA Forest Service, Eastern Region, Monongahela National

More information

I. DECISION. A. Description of Decision

I. DECISION. A. Description of Decision DECISION MEMO Southern Indiana Power Oriental Road USDA Forest Service, Eastern Region Hoosier National Forest Tell City Ranger District Perry County, Indiana I. DECISION A. Description of Decision My

More information

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T.13 S., R.7 E., Section 14,

More information

Pinecrest Amphitheater Movies Special Use Permit (40431) Decision Memo

Pinecrest Amphitheater Movies Special Use Permit (40431) Decision Memo Decision Memo Stanislaus National Forest Summit Ranger District Tuolumne County, CA This decision memo provides documentation, pursuant to the National Environmental Policy Act (NEPA), related to the Pinecrest

More information

DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho

DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho I. Decision II. I have decided to authorize issuance of

More information

DECISION MEMO. Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit

DECISION MEMO. Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit DECISION MEMO Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit United States Department of Agriculture Forest Service (FS) Eastern Region

More information

Draft Decision Memo OHV Trails 22 and 42 Reroute Project

Draft Decision Memo OHV Trails 22 and 42 Reroute Project Draft Decision Memo OHV Trails 22 and 42 Reroute Project USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T13S, R7E, Sections 25 and 34 Willamette Meridian

More information

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project USDA Forest Service Decision Memo Mattie V Creek Minesite Rehabilitation Project Ninemile Ranger District Lolo National Forest Mineral County, Montana I. DECISION TO BE IMPLEMENTED A. Decision Description:

More information

Preliminary Decision Memo Recreation Residence Septic Repairs

Preliminary Decision Memo Recreation Residence Septic Repairs Preliminary Decision Memo 2014 Recreation Residence Septic Repairs USDA Forest Service McKenzie River Ranger District Willamette National Forest Lane County, Oregon T. 16 S., R. 5 E, Section 16 Willamette

More information

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon

More information

Suss ATV Access Special Use Authorization

Suss ATV Access Special Use Authorization United States Department of Agriculture Forest Service December 2010 Suss ATV Access Special Use Authorization Decision Memo USDA Forest Service, Eastern Region Green Mountain National Forest Manchester

More information

Decision Memo. Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines. United States Department of Agriculture

Decision Memo. Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines. United States Department of Agriculture United States Department of Agriculture Forest Service Decision Memo Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines Coconino National Forest Coconino, Gila,

More information

FINAL DECISION MEMO. Wizard Falls Fish Hatchery Rearing Pond Replacement

FINAL DECISION MEMO. Wizard Falls Fish Hatchery Rearing Pond Replacement USDA Forest Service Deschutes National Forest Sisters Ranger District FINAL DECISION MEMO Wizard Falls Fish Hatchery Rearing Pond Replacement Jefferson County, Oregon SW1/4SW1/4, Sec 14; NE1/4NE1/4, Sec

More information

Decision Memo. Cabin #5 Electric, Water, Septic Improvements

Decision Memo. Cabin #5 Electric, Water, Septic Improvements Decision Memo Cabin #5 Electric, Water, Septic Improvements USDA Forest Service Ocoee/ Hiwassee Ranger District, Cherokee National Forest Polk County, Tennessee Section 18, Township 2, Range 3 East; Lot

More information

DECISION MEMO. Griz Thin (Stand )

DECISION MEMO. Griz Thin (Stand ) Background DECISION MEMO Griz Thin (Stand 507089) USDA Forest Service Siuslaw National Forest Central Coast Ranger District Lane County, Oregon Township 16 South, Range 10 West, Sections 6 and 7 The Cummins-Tenmile

More information

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT HIGH WEST ENERGY, INC. For A Single-Phase (2-Wire), Overhead Power Line US FOREST SERVICE Arapaho & Roosevelt National Forests and Pawnee

More information

DECISION MEMO. East Fork Blacktail Trail Reroute

DECISION MEMO. East Fork Blacktail Trail Reroute Page 1 of 6 DECISION MEMO USDA Forest Service Madison Ranger District Madison County Background The East Fork Blacktail Trail #6069 is a mainline trail in the Snowcrest Mountains. The Two Meadows Trail

More information

DECISION MEMO LODA LAKE WILDFLOWER SANCTUARY IMPROVEMENT PROJECT

DECISION MEMO LODA LAKE WILDFLOWER SANCTUARY IMPROVEMENT PROJECT DECISION MEMO LODA LAKE WILDFLOWER SANCTUARY IMPROVEMENT PROJECT USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin Ranger District Newaygo County, Michigan I. DECISION A. Location,

More information

Clear Addition Project Decision Memo January 2013 DECISION MEMO. Clear Addition Fuels Reduction and Aspen Enhancement Project

Clear Addition Project Decision Memo January 2013 DECISION MEMO. Clear Addition Fuels Reduction and Aspen Enhancement Project DECISION MEMO Clear Addition Fuels Reduction and Aspen Enhancement Project USDA Forest Service Humboldt-Toiyabe National Forest, Carson Ranger District Douglas County and Carson City, Nevada I. PROJECT

More information

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO Background and Project Description In order to improve forest health and reduce hazardous

More information

Appalachian Trail/Long Trail Cold River Road Relocation Project

Appalachian Trail/Long Trail Cold River Road Relocation Project United States Department of Agriculture Forest Service Eastern Region Appalachian Trail/Long Trail Cold River Road Relocation Project Decision Memo August 2012 Green Mountain National Forest Manchester

More information

Decision Memo Sawtooth Trail #3634 Reroute

Decision Memo Sawtooth Trail #3634 Reroute Decision Memo Sawtooth Trail #3634 Reroute USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane County, OR T.25S, R.5.5E, Section 22, Willamette Meridian Purpose and Need The

More information

DECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline

DECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline DECISION MEMO Bull Bear 1H-18 Oil and Gas Pipeline USDA, Forest Service Cibola National Forest, Black Kettle National Grasslands Roger Mills County, Oklahoma BACKGROUND: Laredo Petroleum, Inc., in order

More information

SHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL

SHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL DRAFT DECISION MEMO SHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL U.S. FOREST SERVICE TOWNSHIP 40, 41, 42 AND 43 NORTH, RANGE 1, 2, 3 WEST,

More information

Decision Memo for the City of Detroit Root Rot Timber Sale Project

Decision Memo for the City of Detroit Root Rot Timber Sale Project Decision Memo for the City of Detroit Root Rot Timber Sale Project USDA Forest Service Detroit Ranger District Willamette National Forest Marion and Linn Counties, OR T.10S., R.5 E., Section 2, Willamette

More information

DECISION MEMO Eureka Fire Whitebark Pine Planting

DECISION MEMO Eureka Fire Whitebark Pine Planting Page 1 of 6 DECISION MEMO Eureka Fire Whitebark Pine Planting USDA Forest Service Madison Ranger District Madison County T11S, R2W, Sections16, 17, 18, 19, 20, 29, 30, 31 & 32 T11S, R3W, Sections 25 &

More information

Decision Memo Raptor 1 and 9 Prescribed Burns Project

Decision Memo Raptor 1 and 9 Prescribed Burns Project Decision Memo Raptor 1 and 9 Prescribed Burns Project USDA Forest Service Chemult Ranger District, Fremont-Winema National Forests Klamath County, OR Township (T) 29 South (S), Range (R) 6 East (E), Section

More information

DECISION MEMO Divide Creek Barrier Enhancement

DECISION MEMO Divide Creek Barrier Enhancement Page 1 of 7 Background DECISION MEMO USDA Forest Service Butte Ranger District Silver Bow County, Montana T. 2 N., R. 9 W., Section 32 The North Fork of Divide Creek is approximately 4 miles west of the

More information

Decision Memo. North Fork Calispell Creek Restoration Project

Decision Memo. North Fork Calispell Creek Restoration Project Project Description Decision Memo North Fork Calispell Creek Restoration Project USDA Forest Service Newport-Sullivan Lake Ranger Districts Colville National Forest Pend Oreille County, Washington Surveys

More information

Final Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District

Final Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District Final Decision Memo Murphy Meadow Restoration Project USDA Forest Service Willamette National Forest McKenzie River Ranger District T19S, R5E, Sec. 23, 24. Lane County Oregon BACKGROUND The Murphy Meadow

More information

Project. Memo. Decision. Green. Middlebury. Agriculture. Forest Service. Eastern Region. August Rochester and.

Project. Memo. Decision. Green. Middlebury. Agriculture. Forest Service. Eastern Region. August Rochester and. United States Department of Agriculture Forest Service Eastern Region August 2012 Catamount Trail Relocations Project Decision Memo Green Mountainn National Forest Rochester and Middlebury y Ranger Districts

More information

Cow Mountain Pond Snowmobile Trail Relocation Project

Cow Mountain Pond Snowmobile Trail Relocation Project United States Department of Agriculture Forest Service Eastern Region August 2011 Cow Mountain Pond Snowmobile Trail Relocation Project Decision Memo Northeastern States Forest Legacy Program Green Mountain

More information

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118)

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) DECISION MEMO Missoula Electric Cooperative Point 118 MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) USDA Forest Service - Lolo National Forest Missoula Ranger District

More information

PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project

PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project The USDA Forest Service is proposing to release and prune living apple trees in the Manchester Ranger District,

More information

The project location is displayed on the attached map.

The project location is displayed on the attached map. Decision Memo for Sheffield Land and Timber Company Road Special Use Permit USDA Forest Service, Eastern Region Allegheny National Forest Marienville Ranger District Warrant 2993, Howe Township Forest

More information

DECISION MEMO. NORTH FORK of NORTH CREEK FISH BARRIER PROJECT

DECISION MEMO. NORTH FORK of NORTH CREEK FISH BARRIER PROJECT DECISION MEMO NORTH FORK of NORTH CREEK FISH BARRIER PROJECT USDA Forest Service Fishlake National Forest, Beaver Ranger District Beaver County, Utah I. DECISION I have decided to allow the Utah Division

More information

DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008

DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 USDA Forest Service, Mt. Hood National Forest Hood River Ranger District Hood River County, Oregon Flooding in the fall of 2006 caused significant

More information

DECISION MEMO. Crow Creek Hardened Crossing

DECISION MEMO. Crow Creek Hardened Crossing Page 1 of 5 DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W in Section 35 Background A perennial cattle crossing on Crow Creek in in the Gravelly Landscape in the Centennial

More information

The project will be conducted in partnership with the Nez Perce Tribe.

The project will be conducted in partnership with the Nez Perce Tribe. DECISION MEMO Tributary to Brushy Fork Culvert Replacements Private Land USDA Forest Service, Northern Region Powell Ranger District Nez Perce Clearwater National Forests Idaho County, Idaho I. Decision

More information

Decision Memo North Boundary Salvage

Decision Memo North Boundary Salvage Map # Proposal and Need for the Proposal Decision Memo North Boundary Salvage USDA Forest Service Chequamegon-Nicolet National Forest Medford-Park Falls Ranger District The U.S. Forest Service (USFS) is

More information

DECISION MEMO. Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY

DECISION MEMO. Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY DECISION MEMO Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY 2007-2013 USDA Forest Service Bankhead National Forest - National Forests in Alabama Winston

More information

DECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA

DECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA DECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA Forest Service, Northern Region North Fork Ranger District, Clearwater National Forest Clearwater County, Idaho I. Decision I have decided to authorize

More information

DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT

DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT Page 1 of 7 DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT Background USDA Forest Service Pintler Ranger District Granite County, Montana T8N, R13W, sections 5, 6 and 7 The Kennecott Exploration

More information

Manchester Ranger District. Apple Tree Release and Maintenance Project

Manchester Ranger District. Apple Tree Release and Maintenance Project United States Department of Agriculture Forest Service February 2009 Manchester Ranger District Apple Tree Release and Maintenance Project Decision Memo USDA Forest Service, Eastern Region Green Mountain

More information

Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada

Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Background The Ann Exploration Project is located on the

More information

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36 Page 1 of 5 Background DECISION MEMO USDA Forest Service Butte District Silver Bow County T4N, R8W, Section 36 Northwestern Energy operates utility systems and facilities on federal lands under a Master

More information

Scoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting

Scoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting United States Department of Agriculture Forest Service Monongahela National Forest Greenbrier Ranger District Box 67 Bartow, WV 24920 Phone (304) 456-3335 File Code: 2020/2070/1950 Date: November 15, 2012

More information

DECISION MEMO. Vipond Water Development

DECISION MEMO. Vipond Water Development Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management

More information

BACKGROUND DECISION. June 2016 Page 1 of 6

BACKGROUND DECISION. June 2016 Page 1 of 6 BACKGROUND DECISION MEMO HOUSE ROCK WILDLIFE AREA PASTURE FENCE USDA FOREST SERVICE, SOUTHWEST REGION (R3) KAIBAB NATIONAL FOREST - NORTH KAIBAB RANGER DISTRICT COCONINO COUNTY, ARIZONA The Kaibab National

More information

I. DECISION A. Project Description B. Purpose

I. DECISION A. Project Description B. Purpose DECISION MEMO North Country Trail Bridge Project USDA Forest Service, Eastern Region, Ottawa National Forest Bergland and Ontonagon Districts Houghton and Ontonagon Counties, Michigan I. DECISION A. Project

More information

DECISION MEMO. Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238)

DECISION MEMO. Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238) Decision DECISION MEMO Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238) USDA Forest Service Ocala National Forest Lake, Marion, and Putnam County, Florida Based on the analysis

More information

Decision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project

Decision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project Decision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project USDA Forest Service Mount Hough and Beckwourth Ranger Districts Plumas County, CA Background We, (the USDA Forest

More information

U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine Ranger District Jasper County, Texas

U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine Ranger District Jasper County, Texas DECISION MEMO WESTWOOD WATER SUPPLY CORPORATION SPECIAL USE PERMIT REISSUANCE AND MODIFICATION PROJECT U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

DECISION MEMO Lazyman Repeater Shelter and Tower Replacement

DECISION MEMO Lazyman Repeater Shelter and Tower Replacement Page 1 of 5 Background DECISION MEMO Lazyman Repeater Shelter and Tower Replacement USDA Forest Service Madison Ranger District Madison County The Lazyman Repeater was installed in 1988 and serves parts

More information

DECISION MEMO WEST RIVER COOPERATIVE TELEPHONE COMPANY BURIED FIBER OPTIC CABLE PROJECT

DECISION MEMO WEST RIVER COOPERATIVE TELEPHONE COMPANY BURIED FIBER OPTIC CABLE PROJECT DECISION MEMO WEST RIVER COOPERATIVE TELEPHONE COMPANY BURIED FIBER OPTIC CABLE PROJECT USDA, FOREST SERVICE GRAND RIVER NATIONAL GRASSLAND GRAND RIVER RANGER DISTRICT INTRODUCTION: West River Cooperative

More information

DECISION MEMO USDA FOREST SERVICE (USFS)

DECISION MEMO USDA FOREST SERVICE (USFS) DECISION MEMO USDA FOREST SERVICE (USFS) Lakewood-Laona Ranger District Chequamegon-Nicolet National Forest Oconto County, Wisconsin DECISION I have decided to implement Project, as identified below, and

More information

PROJECT INFORMATION Warren Falls Parking Lot Expansion Project

PROJECT INFORMATION Warren Falls Parking Lot Expansion Project PROJECT INFORMATION Warren Falls Parking Lot Expansion Project The USDA Forest Service (USFS) has initiated an environmental analysis process for the proposed Warren Falls Parking Lot Expansion Project

More information

Proposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply:

Proposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply: DECISION MEMO USDA Forest Service Inyan Kara Riders Motorcycle Enduro Event Rocky Mountain Region Thunder Basin National Grassland Medicine Bow-Routt National Forests Douglas Ranger District April 2011

More information

Bromley Havoc Trail Widening

Bromley Havoc Trail Widening United States Department of Agriculture Forest Service July 2011 Bromley Havoc Trail Widening Decision Memo USDA Forest Service, Eastern Region Green Mountain National Forest Manchester Ranger District

More information

Environmental Assessment

Environmental Assessment United States Department of Agriculture Forest Service May 2009 Environmental Assessment Powder River Campground Decommissioning Powder River Ranger District, Bighorn National Forest Johnson and Washakie

More information

Decision Memo for Pax Ponderosa Pine Planting Project

Decision Memo for Pax Ponderosa Pine Planting Project Decision Memo for Pax Ponderosa Pine Planting Project USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Lakeview Ranger District Lake County, Oregon Introduction The Lakeview

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Gold Lake Bog Research Natural Area Boundary Adjustment and Nonsignificant Forest Plan Amendment #53 USDA Forest Service Middle Fork Ranger District,

More information

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL USDA FOREST SERVICE, CHEQUAMEGON-NICOLET NATIONAL FOREST LAKEWOOD-LAONA RANGER DISTRICT FOREST COUNTY, WISCONSIN T35N, R15E,

More information

Decision Memo Tongass National Forest. Wrangell Ranger District. Pre-Commercial Thinning CE 2010

Decision Memo Tongass National Forest. Wrangell Ranger District. Pre-Commercial Thinning CE 2010 Decision Memo Tongass National Forest Pre-Commercial Thinning CE 2010 Decision It is my decision to authorize pre-commercial thinning (PCT) on approximately 7,500 acres of overstocked young-growth forest

More information

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon The Crescent Ranger

More information

Decision Memo. Delta A Septic Repair (#33)

Decision Memo. Delta A Septic Repair (#33) Decision Memo Delta A Septic Repair (#33) USDA Forest Service Willamette National Forest McKenzie River Ranger District T16S, R5E, Section 16 Lane County, OR Proposed Action The McKenzie River Ranger District

More information

Wildlife Habitat Restoration and Improvements FY 2007 Project

Wildlife Habitat Restoration and Improvements FY 2007 Project United States Department of Agriculture Forest Service Pacific Northwest Region Wildlife Habitat Restoration and Improvements FY 2007 Project Umpqua National Forest Diamond Lake Ranger District April 2008

More information

DECISION MEMO. Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106

DECISION MEMO. Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106 DECISION MEMO Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106 USDA FOREST SERVICE REGION 8 NATIONAL FORESTS AND GRASSLANDS IN TEXAS SABINE NATIONAL FOREST ANGELINA/SABINE

More information

Tenmile and Priest Pass Restoration Project Scoping Notice

Tenmile and Priest Pass Restoration Project Scoping Notice Introduction Tenmile and Priest Pass Restoration Project Scoping Notice USDA Forest Service Helena National Forest Helena Ranger District Lewis and Clark County, Montana The Helena Ranger District of the

More information

DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S.

DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. FOREST SERVICE CHATTAHOOCHEE-OCONEE NATIONAL FORESTS CONASAUGA RANGER DISTRICT FANNIN,

More information

Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA

Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA Background Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA USDA Forest Service Black Range, Quemado, and Reserve Ranger Districts

More information

DECISION MEMO WILLOW CREEK RECREATION AREA FACILITY RESTORATION U.S. FOREST SERVICE WILLOW CREEK RESERVE RANGER DISTRICT CATRON COUNTY, NEW MEXICO

DECISION MEMO WILLOW CREEK RECREATION AREA FACILITY RESTORATION U.S. FOREST SERVICE WILLOW CREEK RESERVE RANGER DISTRICT CATRON COUNTY, NEW MEXICO DECISION MEMO WILLOW CREEK RECREATION AREA FACILITY RESTORATION U.S. FOREST SERVICE WILLOW CREEK RESERVE RANGER DISTRICT CATRON COUNTY, NEW MEXICO BACKGROUND The Willow Creek recreational area is located

More information

Decision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho

Decision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho Decision Memo BOGUS CREEK OUTFITTERS SPECIAL USE PERMIT RENEWAL USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho August 2014 DECISION It is my decision to renew

More information

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake 2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation

More information

Red Mountain OHV Restoration

Red Mountain OHV Restoration United States Department of Agriculture Forest Service Red Mountain OHV Restoration Environmental Assessment High Sierra Ranger District, Sierra National Forest, Fresno County, California T8S, R26E, Sections

More information

DECISION MEMO Pony Whitebark Pine Planting

DECISION MEMO Pony Whitebark Pine Planting Page 1 of 5 DECISION MEMO Pony Whitebark Pine Planting USDA Forest Service Jefferson Ranger District Madison County T2S, R3W, Sections 4 & 9 Background The Pony Fire of 2012 burned 5,157 acres on the (BDNF).

More information

DECISION MEMO USDA FOREST SERVICE

DECISION MEMO USDA FOREST SERVICE DECISION MEMO USDA FOREST SERVICE Eagle River-Florence and Lakewood-Laona Ranger Districts Chequamegon-Nicolet National Forest Florence, Forest, Langlade, Oconto, Oneida, and Vilas Counties, Wisconsin

More information

SCOPING STATEMENT OF THE PROPOSED ACTION FOR THE

SCOPING STATEMENT OF THE PROPOSED ACTION FOR THE SCOPING STATEMENT OF THE PROPOSED ACTION FOR THE PANGUITCH LAKE COURTESY DOCK INSTALLATION PROJECT U.S. FOREST SERVICE DIXIE NATIONAL FOREST CEDAR CITY RANGER DISTRICT GARFIELD COUNTY, UTAH PROJECT BACKGROUND

More information

DECISION MEMO WELDON MEADOW MINE RECLAMATION PROJECT U.S. FOREST SERVICE, SEQUOIA NATIONAL FOREST KERN RIVER RANGER DISTRICT KERN COUNTY, CA

DECISION MEMO WELDON MEADOW MINE RECLAMATION PROJECT U.S. FOREST SERVICE, SEQUOIA NATIONAL FOREST KERN RIVER RANGER DISTRICT KERN COUNTY, CA ,,-:=e - a BACKGROUND DECISION MEMO WELDON MEADOW MINE RECLAMATION PROJECT U.S. FOREST SERVICE, SEQUOIA NATIONAL FOREST KERN RIVER RANGER DISTRICT KERN COUNTY, CA The Kern River Ranger District of the

More information

DECISION MEMO. Newfield Exploration Company Mineral Proposal PDU ASH #K1MB Compartment 16

DECISION MEMO. Newfield Exploration Company Mineral Proposal PDU ASH #K1MB Compartment 16 DECISION MEMO Newfield Exploration Company Mineral Proposal PDU ASH #K1MB Compartment 16 USDA Forest Service Region 8 National Forests & Grasslands in Texas Sabine National Forest Angelina/Sabine Ranger

More information

T 43 N, R 18 W, Sections 32, 33 and T 42 N, R 18 W, Sections 3, 4, 5 State of Michigan

T 43 N, R 18 W, Sections 32, 33 and T 42 N, R 18 W, Sections 3, 4, 5 State of Michigan DECISION MEMO Hiawatha Telephone Company Cable Installation USDA Forest Service, Eastern Region, Hiawatha National Forest Rapid River and Manistique Ranger District Delta County, Michigan T 43 N, R 18

More information

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30 DECISION MEMO Walker Ridge Gold Exploration Project Plan of Operations #06-12-05 Mountain City Ranger District, Humboldt-Toiyabe National Forest Elko County, Nevada BACKGROUND On February 21, 2012, Columbia

More information

DECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois

DECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois DECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Background

More information

Decision Memo El Paso CGP Company, LLC Special Use Authorization

Decision Memo El Paso CGP Company, LLC Special Use Authorization Decision Memo El Paso CGP Company, LLC Special Use Authorization Background USDA Forest Service Jicarilla Ranger District, Carson National Forest Rio Arriba County, New Mexico PALS Project Number 47726

More information

DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO

DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO ,:::-:;;;;;;; a DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO BACKGROUND The purpose of this project is

More information

DECISION MEMO Clay Butte Radio Repeater Relocation Project

DECISION MEMO Clay Butte Radio Repeater Relocation Project Background DECISION MEMO Clay Butte Radio Repeater Relocation Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Park County, Wyoming The Shoshone National Forest, Clarks Fork

More information

On/Off periods Improvements Grazing System. 2 fence segments. 1 water development, 2 cattle guards

On/Off periods Improvements Grazing System. 2 fence segments. 1 water development, 2 cattle guards DECISION NOTICE HENRY CREEK AND SWAMP CREEK RANGE ALLOTMENT MANAGEMENT PLANS REVISION U.S. FOREST SERVICE PLAINS/THOMPSON FALLS RANGER DISTRICT LOLO NATIONAL FOREST SANDERS COUNTY, MONTANA DECISION Based

More information

Hungry Creek Watershed Road Maintenance and Stony Quarry Development

Hungry Creek Watershed Road Maintenance and Stony Quarry Development Notice of Proposed Action Opportunity to Provide Scoping Comments Hungry Creek Watershed Road Maintenance and Stony Quarry Development Mt. Hough Ranger District Plumas National Forest Plumas County, California

More information

Decision Memo. USDA Forest Service, Eastern Region. Green Mountain National Forest

Decision Memo. USDA Forest Service, Eastern Region. Green Mountain National Forest United States Department of Agriculture Forest Service May 2010 OTTER CREEK HEADWATERS LARGE WOODY DEBRIS PROJECT Decision Memo USDA Forest Service, Eastern Region Green Mountain National Forest Manchester

More information