1 Permit Requirements for Landslide-Prone Areas in the City of Seattle

2 AGENDA Landslide-Prone Areas Rob McIntosh, P.E., Senior Geotechnical Engineer Department of Planning and Development (DPD) Trees and Vegetation Seth Amrhein, Senior Environmental Analyst Department of Planning and Development (DPD)

3 Definition of Landslide-Prone Areas in the Environmentally Critical Areas (ECA) Ordinance Known landslide areas Potential landslide areas Steep slopes (at least 10 feet high and 40% or greater average slope)

4 Development Regulations for Landslide-Prone Areas in Seattle No grading/disturbance of steep slope areas is allowed. Limited exemptions include: Proposed development is located where existing development is located Proposed development is located on steep slope areas created by previous legal grading Proposed development is in an isolated steep slope less than 20 feet in height Proposed development is the minimum necessary to stabilize the slope See Client Assistance Memo (CAM) 327A. Permit required for any grading over 25 cubic yards

5 Development Regulations for Landslide-Prone Property in Seattle Permit required for all retaining walls Permit required for installation of drainage

6 Development Regulations for Landslide-Prone Property in Seattle Getting a Building Permit Visit the Applicant Services Center on the 20 th Floor of th Ave, Seattle to get started Call to get more information or to schedule an intake appointment Pre-application site visit (PASV) Plan review and corrections Expedited permitting for some landslide repairs Special Inspections

7 Don t List Don t direct storm or other water onto a slope. Don t denude vegetation on slope without an approved revegetation plan. Don t cut into the toe (or bottom) of a slope. Don t remove tree stumps from slopes. Don t install a permanent irrigation system in landslideprone areas. Don t put fill or yard debris on a steep slope.

8 Tree and Vegetation Overview SMC Removing, clearing, or any action detrimental to habitat, vegetation or trees is prohibited within the following areas: landslide-prone critical areas, steep slope buffers, riparian corridors, shoreline habitat, shoreline habitat buffers, wetlands and wetland buffers, except for

9 Tree and Vegetation Overview (Tip 331) Normal and Routine Maintenance* Area of Work File Plan with DPD DPD Routed Plan Review SEPA review required Plan Type Less than 750 sq. ft. None 750 sq. ft. or greater YES Maintenance plan * Normal and routine maintenance includes practices that are necessary to maintain existing pathways and landscaping, ensure the health of existing vegetation, or achieve limited pruning to allow windowing, reduce tree mass or redirect tree growth. Removal of trees and vegetation is not considered normal and routine maintenance.

10 Tree and Vegetation Overview (Tip 331) Approved as Part of an Issued Building or Grading Permit Area of Work DPD Routed Plan Review Less than 1500 sq ft SEPA review required Plan Type YES NO Restoration plan as part of plan set 1500 to less than 9000 sq ft 9000 sq ft or greater for SFR YES NO Restoration plan as part of plan set YES YES Restoration plan and SEPA checklist as part of plan set

11 Tree and Vegetation Overview (Tip 331) Vegetation Restoration Project-removing invasive plants and noxious weeds by hand Area of Work* File Plan with DPD Less than 1500 sq. ft.** 1500 sq. ft. or greater YES DPD Routed Plan Review SEPA review required Plan Type Restoration plan, ECA Restoration plan application YES YES Restoration plan, SEPA checklist, ECA Restoration plan application * Area Slope measured Stability and cumulatively Vegetative over Soil three Stabilization years. in the Puget Sound Region ** In landslide-prone areas, when disturbance exceeds 750 square feet, the plan shall be approved by a licensed geotechnical engineer or geologist.

12 Tree and Vegetation Overview (Tip 331) Hazard Trees Area of Work File Plan with DPD DPD Routed Plan Review SEPA review required Plan Type All YES Hazard Tree Application (see Tip 331B* for information and submittal requirements. *Hazard Tree Removal Application, Tree Risk Assessment report by Tree Risk Assessment Qualified Arborist, photos, site plan

13 Vegetation Restoration (Tip 331A) Provides general information about creating a revegetation plan. Geared toward homeowners. Vegetation restoration projects need to be designed to: promote maintenance or creation of a naturally functioning condition that prevents erosion, protects water quality, or provides diverse habitat

14 Vegetation Restoration (Tip 331A) WHAT IS VEGETATION RESTORATION? Vegetation restoration is the establishment of native vegetation, including the removal of non-native or invasive plants. Goal is to promote maintenance or creation of a naturally functioning condition that prevents erosion, protects water quality, or provide diverse habitat (SMC ). Restoration should result in a densely vegetated area with a significant diversity of native trees, shrubs and groundcover

15 Vegetation Restoration (Tip 331A) Examples of allowed restoration include: re-establishment of a native ecosystem in human impacted areas such as paved surfaces, lawns or landscaped areas replacing non-native, noxious and/or invasive species such as English ivy, Himalayan blackberry, or reed canary grass, with native plantings

16 Vegetation Restoration (Tip 331A) Examples of allowed restoration include (continued): replacing previously topped trees with healthy native trees replacing monocultural stands of deciduous trees like big leaf maples and red alder with native conifers

17 Vegetation Restoration (Tip 331A) Examples:

18 Vegetation Restoration (Tip 331A) Examples (before and after maintenance):

19 Vegetation Restoration (Tip 331A) Examples (established revegetation):

20 Vegetation Restoration (Tip 331A) Examples (established revegetation):

21 Hazard Trees (Tip 331B) Large holding roots on Bigleaf maple Hazard trees must have a target (infrastructure or people).

22 Selective Removal & Thinning For View Corridors Tree removal is not permitted for views. Pruning is OK when done using best practices to maintain tree health; topping is prohibited. Removal only permitted if tree is hazardous or if necessary to promote maintenance or creation of a naturally functioning condition that prevents erosion, protects water quality, or provide diverse habitat.

23 Question & Answer

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007 NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007 Peter L. Kallin, Ph.D., P.W.S. Phone: 732-499-3600 Ext. 237 E-mail: pkallin@aesop.rutgers.edu www.water.rutgers.edu

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664

CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664 CITY OF AIRWAY HEIGHTS SPOKANE COUNTY, WASHINGTON ORDINANCE C-664 AN ORDINANCE OF THE CITY OF AIRWAY HEIGHTS, WASHINGTON ADOPTING TITLE 19 OF THE AIRWAY HEIGHTS MUNICIPAL CODE ENTITLED CRITICAL AREAS AND

More information

Sections:

Sections: DIVISION 15: NATURAL RESOURCES REGULATIONS CHAPTER 9-1500 NATURAL RESOURCES REGULATIONS: INTENT AND ORGANIZATION 9-1500.1 Title and Intent. 9-1500.2 Organization. 9-1500.1 TFlZE AND INTENT. Division 15

More information

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION TOWN OF WAYLAND MASSACHUSETTS 01778 CONSERVATION COMMISSION TOWN BUILDING 41 C0CHITUATE ROAD TELEPHONE: (508) 358-3669 FAX: (508) 358-3606 Wayland s Wetlands and Water Resources Bylaw CHAPTER 194 (D-768)

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

BEFORE YOU BUILD GUIDE

BEFORE YOU BUILD GUIDE BEFORE YOU BUILD GUIDE A GUIDE FOR HOMEBUILDERS Permit Process Steps The following shows the steps in the permit process. included in the following pages. A description of each step is Gather information

More information

7/16/2012. Post Construction Best Management Practices (PCBMPs) Article VIII: Post Construction Best Management Practices

7/16/2012. Post Construction Best Management Practices (PCBMPs) Article VIII: Post Construction Best Management Practices Post Construction Best Management Practices (PCBMPs) Article VIII: Post Construction Best Management Practices Presented by Jennifer Boyer DuPage County DEC Includes BMPs intended to provide volume control

More information

channelizing; discharging pollutants except storm water; paving, construction, application of gravel; modifying for surface water management

channelizing; discharging pollutants except storm water; paving, construction, application of gravel; modifying for surface water management Chapter 14.10 CRITICAL AREAS Sections: 14.10.010 Legislative purpose. 14.10.020 Definitions. 14.10.040 General provisions. 14.10.050 Appeal from decisions. 14.10.060 Designation, classification, and protection.

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

ARBORIST REPORT. Report History: Report 1 New design

ARBORIST REPORT. Report History: Report 1 New design Community Development Department City of Saratoga 13777 Fruitvale Avenue Saratoga, California 95070 ARBORIST REPORT Application No. ARB15-0025 Prepared by Kate Bear, City Arborist Site: 21459 Saratoga

More information

Zoning Ordinance Chapter 7

Zoning Ordinance Chapter 7 CHAPTER 7 - HILLSIDE SECTION 7.0 GENERAL A. Purpose: To allow for the reasonable use and development of hillside areas while promoting the public health, safety, and general welfare of the citizens of

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

Goose Management through Habitat Restoration

Goose Management through Habitat Restoration Goose Management through Habitat Restoration presented at the Goose Management Workshop Bergen County Community College Paramus, New Jersey March 3, 2009 Christopher C. Obropta, Ph.D., P.E. Extension Specialist

More information

Mechanical Site Preparation

Mechanical Site Preparation Mechanical Site Preparation 1 Mechanical Site Preparation Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...5 Design Outcomes To Maintain Soil Productivity...6 Planning...7 Planning

More information

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL BMPs to Conserve Wooded Areas 31 BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL Audience This section is primarily directed toward: local units of government, landowners and developers, builders

More information

Environment & Conservation Introduction

Environment & Conservation Introduction Environment & Conservation Introduction Anacortes is blessed with an abundance of natural beauty. Residents identify marine shorelines, streams, lakes, forested areas, and other natural features as defining

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Green Real Estate. NSCC - RES 130 Online. Module 3 Sustainable Sites & Water Cate O dahl, Instructor. Learning Objectives

Green Real Estate. NSCC - RES 130 Online. Module 3 Sustainable Sites & Water Cate O dahl, Instructor. Learning Objectives Green Real Estate NSCC - RES 130 Online Module 3 Sustainable Sites & Water Cate O dahl, Instructor Sustainable Sites & Water Conservation Learning Objectives Relationship of the Building to Water Issues

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

Stream Corridor Protection and Adaptive Management Manual. Prepared for the City of Independence, Missouri

Stream Corridor Protection and Adaptive Management Manual. Prepared for the City of Independence, Missouri Stream Corridor Protection and Adaptive Management Manual Prepared for the City of Independence, Missouri Rock Creek Independence, Missouri By Patti Banks Associates and Applied Ecological Services, Inc.

More information

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES

Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES 1 Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES 2 Urban Forest: a Major policy emphasis Urban Forest Policy Element Open Space Habitat and Recreation Element Climate Action

More information

ORDINANCE NO. 08-O-72AA

ORDINANCE NO. 08-O-72AA ORDINANCE NO. 08-O-72AA AN ORDINANCE OF THE CITY OF TALLAHASSEE, FLORIDA AMENDING CHAPTER 9, ENVIRONMENT, OF THE CITY OF TALLAHASSEE CODE OF GENERAL ORDINANCES TO REGULATE THE USE OF FERTILIZER WITHIN

More information

TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST

TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST The TCP2 is required to follow an approved TCP1 and for any application that requires an FSD. At the Type 2 phase, final decisions are made

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

every year. It s not a matter of IF your

every year. It s not a matter of IF your WILDFIRE IS COMING. ARE YOU READY? DEFENSIBLE SPACE AND HARDENING YOUR HOME. Thousands of wildfires strike California every year. It s not a matter of IF your home is at risk, but when. ReadyForWildfire.org

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

RIPARIAN PROTECTION Questions & Answers

RIPARIAN PROTECTION Questions & Answers RIPARIAN PROTECTION Questions & Answers 1. What is a riparian corridor and why is it important? Answer: A riparian corridor is a space on both sides of a stream or around a lake or wetland. The corridor

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Agricultural/Rural Riparian Buffer Analysis

Agricultural/Rural Riparian Buffer Analysis Agricultural/Rural Riparian Buffer Analysis December 2014 Executive Summary The Agricultural/Rural Riparian Buffer Analysis was developed from a 2014 analysis of current requirements for the riparian areas

More information

APPENDIX D: COST ESTIMATES FOR STUDY REACHES

APPENDIX D: COST ESTIMATES FOR STUDY REACHES D-1 APPENDIX D: COST ESTIMATES FOR STUDY REACHES This appendix provides approximate quantity and cost information for the higher-priority improvement measures identified in the reach tables in Appendix

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

STATE ENVIRONMENTAL POLICY ACT (SEPA) CHECKLIST INTAKE CHECKLIST

STATE ENVIRONMENTAL POLICY ACT (SEPA) CHECKLIST INTAKE CHECKLIST Skamania County Community Development Department Building/Fire Marshal Environmental Health Planning Skamania County Courthouse Annex Post Office Box 1009 Stevenson, Washington 98648 Phone: 509-427-3900

More information

When the land division tree preservation requirements apply

When the land division tree preservation requirements apply INFORMATION GUIDE Tree Preservation on Your Land Division Site The land division process provides the flexibility and opportunity to promote creative site design that considers multiple objectives, including

More information

Technical and Physical Feasibility Fact Sheet Alternative 28: Infill/Density

Technical and Physical Feasibility Fact Sheet Alternative 28: Infill/Density Technical and Physical Feasibility Fact Sheet Alternative 28: Infill/Density Acknowledgements: This fact sheet was written by Phyllis Taylor of Sites Southwest as part of the Evaluation of Alternative

More information

The Georgian Highlands Where Nature is your Amenity Guidelines to Property Owners Issue 1, July 22, 2003

The Georgian Highlands Where Nature is your Amenity Guidelines to Property Owners Issue 1, July 22, 2003 Guidelines to Property Owners Issue 1, July 22, 2003 The Georgian Highlands is an architecturally controlled community whose purpose is to ensure that the proposed homes are compatible with the theme of

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house): R-1A - ZONING REVIEW WORKSHEET Note: The items below must be reviewed and found in compliance prior to issuance of a zoning permit. Therefore, the appropriate data must be shown on the survey/lot development

More information

FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN. January 2005

FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN. January 2005 FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN January 2005 City of Santa Barbara Community Development Department Planning Division URS Corporation 130 Robin Hill Road, Suite 100 Santa

More information

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY

PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY PINELLAS COUNTY SURFACE WATER UTILITY ADJUSTMENTS AND MITIGATION CREDITS POLICY Department of Public Works Division of Environmental Management Updated October 2016 This page intentionally left blank.

More information

LAKE BELLAIRE SHORELINE SURVEY SUMMARY REPORT

LAKE BELLAIRE SHORELINE SURVEY SUMMARY REPORT 1 LAKE BELLAIRE SHORELINE SURVEY SUMMARY REPORT Three Lakes Association PO Box 689 Bellaire, MI 49615 by William Bohannon, Braden Ackerman, Wilhelmina Witt and TLA Volunteers August 30, 2008 3 Developed

More information

SECTION 100: GENERAL PROVISIONS AND ADMINISTRATION

SECTION 100: GENERAL PROVISIONS AND ADMINISTRATION 16.20.105 Purpose. City of Poulsbo SECTION 100: GENERAL PROVISIONS AND ADMINISTRATION It is the intent of the city of Poulsbo that the beneficial structure, value and functions (RCW 36.70A.172(1) and WAC

More information

Using Airborne Imagery, GIS & Remote Sensing for Ecological Monitoring and Mapping

Using Airborne Imagery, GIS & Remote Sensing for Ecological Monitoring and Mapping Using Airborne Imagery, GIS & Remote Sensing for Ecological Monitoring and Mapping Multi-spectral Aerial Photography Geo-referenced Oblique Aerial Photography Tools and Mapping Products AES Imaging Plane

More information

Habitat Management Workshop Report

Habitat Management Workshop Report Habitat Management Workshop Report 1 Environmental permitting commenced in Pinellas County in 1971 with the adoption of Ordinance 71-2 ( Tree Permitting). This was revised the following year with the adoption

More information

Mosaic Forest Management Ltd.

Mosaic Forest Management Ltd. June 24th, 2007 Protech Consultants Ltd., #200 1449 St. Paul St., Kelowna, B.C. V1Y 2E4 Attn: Grant Maddock Dear Grant: re: Wildfire Mitigation Assessment - Lower Peachland Area Structure Plan This letter

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections. Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE

More information

Chapter 30.63B LAND DISTURBING ACTIVITY

Chapter 30.63B LAND DISTURBING ACTIVITY Chapter 30.63B LAND DISTURBING ACTIVITY 30.63B.010 Purpose and objectives. (1) The purpose of this chapter is to regulate land disturbing activities as defined in SCC 30.91L.025. i (2) Specific objectives

More information

The total population of the township is 9,942 (2015 Five-Year American Community Survey [ACS]). The median household income is over $109,000.

The total population of the township is 9,942 (2015 Five-Year American Community Survey [ACS]). The median household income is over $109,000. East Bradford Township, Pennsylvania Motivated by watershed impairment caused by suburban development over the past 30 years, a township with a full slate of water quality improvement programs looks outside

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Design With Nature: How to Create an Old Growth Forest. Chuck Pettis Earth Sanctuary

Design With Nature: How to Create an Old Growth Forest. Chuck Pettis Earth Sanctuary Design With Nature: How to Create an Old Growth Forest Chuck Pettis Earth Sanctuary 1385 Raden Pl. Freeland, WA 98249 (360) 331-6667 cpettis@earthsanctuary.org www.earthsanctuary.org 2006 Earth Sanctuary

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Bond release verification requirements for successful reclamation at Wyoming surface coal mines

Bond release verification requirements for successful reclamation at Wyoming surface coal mines Bond release verification requirements for successful reclamation at Wyoming surface coal mines Dr. Anna Krzyszowska Waitkus Coal bond release procedure in Wyoming Coal bond release verification criteria

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Coal Combustion Facility Assessment Report. October 20, 2010

Coal Combustion Facility Assessment Report. October 20, 2010 Coal Combustion Facility Assessment Report October 20, 2010 Introduction Stantec Consulting Services Inc. North American Consulting Firm 10,000 Engineers, Geologists, Architects, Scientists and Technicians

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

BOZEMAN YELLOWSTONE INTERNATIONAL AIRPORT GALLATIN AIRPORT AUTHORITY 850 GALLATIN FIELD ROAD, SUITE 6 BELGRADE, MT HANGAR INFORMATION

BOZEMAN YELLOWSTONE INTERNATIONAL AIRPORT GALLATIN AIRPORT AUTHORITY 850 GALLATIN FIELD ROAD, SUITE 6 BELGRADE, MT HANGAR INFORMATION BOZEMAN YELLOWSTONE INTERNATIONAL AIRPORT GALLATIN AIRPORT AUTHORITY 850 GALLATIN FIELD ROAD, SUITE 6 BELGRADE, MT 59714 HANGAR INFORMATION Thank you for inquiring about building a hangar at Bozeman Yellowstone

More information

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND 2010 Legislative Session

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND 2010 Legislative Session DR- COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND 00 Legislative Session Bill No. CB- -00 Chapter No. Proposed and Presented by Introduced by The Chairman (by request Planning Board) Council Members

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

A GUIDE TO STREAM RESTORATION

A GUIDE TO STREAM RESTORATION A GUIDE TO STREAM RESTORATION Restoration of stream resources occurs for many reasons. You might be interested in goals of: Reducing and preventing further bank erosion, Increasing your property value,

More information

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING INTRODUCTION Black Oak Wind Farm, LLC is proposing to develop a wind-powered electric generating facility (the

More information

NRI/FSD and FOREST CONSERVATION EXEMPTION SUBMISSION REQUIREMENTS

NRI/FSD and FOREST CONSERVATION EXEMPTION SUBMISSION REQUIREMENTS Detailed description of the submission requirements for the NRI/FSD and forest conservation exemption requests may be found in the MNCPPC Trees Technical Manual. The applicant, applicant s agent, or qualified

More information

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Revised August 2005 I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Before the applicant submits improvement plans and reports for Engineering plan checking, the applicant shall contact

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

FLOOD PLAIN STANDARDS AND REQUIREMENTS. Adopted by City Council on September 16, 2014 Effective January 1, 2015

FLOOD PLAIN STANDARDS AND REQUIREMENTS. Adopted by City Council on September 16, 2014 Effective January 1, 2015 City of Vancouver Land Use and Development Policies and Guidelines Planning and Development Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 tel 604.873.7000 fax 604.873.7060 planning@vancouver.ca FLOOD

More information

NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934

NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934 NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934 Adopted December 16, 1996 AS AMENDED BY By law No. 4811 September 22, 2014 (This Consolidation is prepared for convenience

More information

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

Lesson 2-2: Riparian Zones

Lesson 2-2: Riparian Zones 2-14 Lesson 2-2: Riparian Zones Time of Lesson: 1 hour Rationale: The purpose of this lesson is to define what a riparian zone is and link its importance for fish and other animals, and humans, and the

More information

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM Note: This list should be used as a guide and not considered all inclusive. The offeror should use due diligence for any items

More information

DRAFT TECHNICAL SPECIFICATIONS FOR

DRAFT TECHNICAL SPECIFICATIONS FOR DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT

More information

GWINNETT COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT

GWINNETT COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT LAND DEVELOPMENT FEE SUMMARY Permit or Plat Review Land Disturbance Permit Clearing Permit Clearing & Grubbing Permit Grading Permit Timber Harvesting Permit Land Disturbance Renewal Land Disturbance Extension

More information

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers 4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of

More information

HOMEOWNER S MANUAL. FireSmart Begins at Home

HOMEOWNER S MANUAL. FireSmart Begins at Home HOMEOWNER S MANUAL FireSmart Begins at Home To order this manual, contact: FireSmart and Wildfire Prevention Co-ordinator Manitoba Wildfire Program Manitoba Sustainable Development Box 10 200 Saulteaux

More information

A MODEL RIPARIAN BUFFER IMPLEMENTATION PLAN

A MODEL RIPARIAN BUFFER IMPLEMENTATION PLAN A MODEL RIPARIAN BUFFER IMPLEMENTATION PLAN Developed for local units of government in the Upper Peninsula of Michigan with an emphasis on protecting water quality and quality of life A SIMPLE, LOW-COST

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

Trees on farms Growing trees for timber

Trees on farms Growing trees for timber Trees on farms Growing trees for timber Trees on farms, whatever their primary purpose, have the potential to deliver multiple benefits throughout their rotation. There are many examples where small woodlots,

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Clallam County Shoreline Master Program (SMP) Update

Clallam County Shoreline Master Program (SMP) Update Title Level 1 Title Level 2 Clallam County Shoreline Master Program (SMP) Update Port Angeles Public Forum November 8, 2017 Clallam County Shoreline Master Program: In effect for Over 40 years, with nine

More information

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES ANNUAL SUBMITTAL FORM DEADLINE: 5:00 PM ON FEBRUARY 15, 2017

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Dredge and Fill Standards on the Highland Lakes

Dredge and Fill Standards on the Highland Lakes www.lcra.org Dredge and Fill Standards on the Highland Lakes Lake Buchanan Inks Lake Lake LBJ Lake Marble Falls Lake Travis Introduction The Lower Colorado River Authority (LCRA) no longer requires that

More information

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page

More information

Post-Fire BAER Assessment Burned Area Emergency Response (BAER)

Post-Fire BAER Assessment Burned Area Emergency Response (BAER) November 2017 Post-Fire BAER Assessment Burned Area Emergency Response (BAER) Information Brief Diamond Creek Fire Values at Risk Matrix and Treatments CentralWashingtonFireRecovery.info EMERGENCY DETERMINATION

More information

Marbella Isles Homeowners Association, Inc.

Marbella Isles Homeowners Association, Inc. REQUEST FOR ARCHITECTURAL REVIEW Please Note: There is a $25.00 non-refundable processing fee for all requests. The application will not be processed if it is not included with application. Make check

More information

I-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP

I-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP I-405 Congestion Relief and Bus Rapid Transit Projects: Renton Nickel Improvement Project (Renton Stage 1) Mitigation Site USACE NWP 2006-00097 Northwest Region 2016 MONITORING REPORT Wetlands Program

More information

BIG SKY OWNERS ASSOCIATION

BIG SKY OWNERS ASSOCIATION BIG SKY OWNERS ASSOCIATION Landscape Alteration Application Property Description and Contact Information ------------------------------ Page 2 Landscape Alteration Submittal Requirements ------------------------------

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE14-00XXX Applicant: Job Description:

More information

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016

Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project. East Fork Ninemile Creek, Idaho May 3, 2016 Interstate-Callahan Upper and Lower Rock Dumps RA Construction Project East Fork Ninemile Creek, Idaho May 3, 2016 Tony Wesche, P.E. Pioneer Technical Services, Inc. and North Wind Group Presentation Topics

More information