1 Purchasing manual Karolinska Institutet Latest web version: 16/12/2016 1

2 Table of Contents 1 Introduction Public procurement How does public procurement differ from purchasing in the private sector? The Public Procurement Act (LOU) in brief When is LOU to be applied? What are the contents of LOU? Fundamental principles The principle of non-discrimination The principle of equal treatment The principle of proportionality The principle of openness The principle of mutual recognition Threshold Procurement procedures Procurements in excess of the threshold Open procedure Restrictive procedure Negotiated procedure Competitive dialogue Procurements below the threshold Simplified procedure Selective procedure Direct award Estimation of the contract's value Grounds for award of contract Shall and should requirements Are there any exceptions to LOU? Agreement

3 4.9.1 Contract Framework agreement Governmental framework agreements Karolinska Institutet's framework agreements What happens if a mistake is made? Procurement review procedure Reviewing the effectiveness of an agreement Procurement fines Damages Bribery and impartiality Is it just about compliance with the law? Other negative effects of non-compliance Other positive effects of compliance Identifying the requirement in good time KI's purchasing organisation The Procurement Unit Purchasing Coordinators The Purchasing Group Purchasing at Karolinska Institutet Planning Defining the requirements of the business Needs analysis Life-Cycle Cost Analysis Involving the end user Consider the requirement from a KI perspective Observing sustainability issues Estimating the value Negotiations pursuant to the Swedish Co-Determination at the Workplace Act (MBL) Duty-free import of certain goods Market analysis Why is a market analysis necessary? Contact several different suppliers

4 Equal treatment Select the procurement procedure Is there a framework agreement? Draw up the contract documents Contract documents "What's done is done" General information regarding requirements and conditions in the contract documents Implementation Publication How does the supplier locate the procurement? Responding to questions and providing additional information Questions and answers Alterations to contract documents Submission of tenders The opening of tenders and confidentiality Correction of tenders The contracting authority decides what can be permitted Only certain corrections, clarifications and supplementations are permitted Reviewing and evaluating the tenders Qualification of suppliers Checking "shall" requirements Evaluation of "should" requirements and price Abnormally low tenders Negotiations within the procurement process What is the aim of negotiation? What can the negotiation cover? Only negotiate with suppliers who satisfy the requirements Neither can new requirements be introduced into the contract documents Points to keep in mind in negotiations Withdrawal of the invitation to tender Award of contract

5 Contract award decision Communication of the contract award decision The procurement ceases to be confidential Standstill period Signing of the procurement contract The content of the procurement contract The time for signing Completion and documentation Evaluation and monitoring Evaluation of the procurement Evaluation of the procurement can encompass: Monitoring of the contract and multiple purchase agreements The distribution of activities and responsibilities Invoice handling Purchasing from a procured supplier Purchasing from a non-procured supplier Some definitions Glossary English English-Swedish glossary of procurement terms Swedish-English glossary of procurement terms Legal acts Acts Ordinances EU directives EU regulations

6 1 Introduction This purchasing manual is intended to serve as a guide for employees at Karolinska Institute (KI) who are involved with the purchasing of goods or services. The latest version of the purchasing manual can be found on the KI intranet. If you want to ensure that you have the latest version, please visit The purchasing manual is a living document, the content of which will be continuously developed and updated by the Procurement Unit Certain sections of the document will be developed following consultation with the relevant users. KI is a public authority and complies as such with the Public Procurement Act (2007:1091) (LOU - hereinafter referred to as LOU). The main implication of this complicity is that KI is obliged to investigate and utilise the competition that exists in the relevant market when there is a purchasing requirement. This allows all interested parties the opportunity to offer KI that which it requires and, as a result of the competition that this creates, KI's financial resources come to be utilised in the best possible manner. Purchasing, acquisition, procurement, ordering or call-offs are some of the terms used when a product is bought from an external supplier. "Product" usually refers to goods or services - everything from advanced measurement instruments or light bulbs to IT consulting or cleaning services. A supplier can be anything from the local newsagent to a multinational IT company. The buying process can be conducted in various ways depending on the nature and value of that which is being bought and, as a result, different terms are used. The Procurement Unit is the unit within the University Administration and the Finance Office that is responsible for purchasing issues at KI. The unit provides all parts of the organisation with advice and support regarding all types of purchasing issues. Much of the unit's work involves the application of the relevant regulations, including LOU which plays a central role. LOU contains criteria for determining the regulations that apply to a particular purchase and for the processes that are to be conducted when purchasing. The text that follows provides the reader with a brief introduction into the context in which LOU arose and how it works. This is followed by a general overview of public procurement, in addition to the provisions of the Act and its areas of application. To conclude, a description is provided of how purchasing is conducted at KI. The purchasing manual is primarily intended to constitute a tool to enable the identification and management of purchasing issues at all levels throughout the organisation, rather than being a manual that the individual user can utilise when conducting of their own purchases. The manual provides a general description of the contexts and processes that characterise public procurement. In future editions, the author also hopes to be able to supplement the content with sections that offer more practical help, as is befitting a document that is intended to be a guide. However, the purchasing manual will always be a tool to complement the collaboration and dialogue that the Procurement Unit hopes to have with all parts of the KI organisation. 6

7 2 Public procurement Every year, the Swedish public sector purchases goods, services and contracts to an estimated value of SEK 500 billion. The State, the county councils and the municipalities purchase everything from office materials, sports arena and consulting services, to health and medical care. These activities have a major impact on the national economy. Public authorities have to follow certain regulations in their purchasing, in order to make the best use of public funds and to utilise the competition that exists in the market. This is regulated by the public procurement regulations. The public procurement regulations are based on EU directives and are largely similar throughout the entire EU. The basic principles that permeate the regulations are grounded on objectivity and openness. According to the regulations, public authorities are to be objective and choose their suppliers based only on that which they are purchasing. Other considerations, such as loyalty to certain or previous suppliers, are not to affect their decision. The choice of supplier is to be made for commercial reasons and will be determined by the supplier that offers the best goods or services on the best terms. The regulations are designed to provide all suppliers with the opportunity to compete on equal terms in each procurement. 3 How does public procurement differ from purchasing in the private sector? The public sector follows different regulations to those of the private sector, since their purchasing is financed by public funds. For example, when a purchase is to be made, a contracting authority cannot directly approach a previous supplier or one which has been recommended. A public procurement implies that all companies who satisfy basic requirements have the opportunity to sell their goods or services to the public authority concerned. The public authority shall at all times remain objective and neutral to the companies wishing to become suppliers and the whole procurement process is to be characterised by openness and proportionality. A public procurement sometimes takes longer to complete than a private sector purchase. In the majority of cases, the public authority will first advertise the goods or services that it wishes to procure and draw up detailed contract documents specifying what it requires and the demands that are to be met by the supplier. Companies submit tenders corresponding to the contract document in which they describe what they can offer and the relevant price. The public authority subsequently qualifies and evaluates the tenders in order to determine which supplier or suppliers will be awarded the contract. Following the decision, a time limit comes into force during which other potential suppliers can appeal the decision. This procurement process is governed, inter alia, by LOU. Minor procurements can be conducted relatively quickly, whilst major procurements can take longer to complete. 7

8 4 The Public Procurement Act (LOU) in brief 4.1 When is LOU to be applied? The Public Procurement Act (2007:1091) (LOU) governs how public procurements are to be conducted. As a general rule, agreements incorporating financial conditions that are entered into by a contracting authority and a supplier must be preceded by procurement procedures. Government agencies, municipalities, county councils and certain bodies governed by public law are classed as contracting authorities. Several municipal and government-owned limited companies must also adhere to LOU. Organisations that comply with LOU are therefore known as "contracting authorities", regardless of whether or not they have authority status outside of procurement issues. 4.2 What are the contents of LOU? The Swedish Public Procurement Act (LOU) contains 240 paragraphs divided into 18 chapters that describe the various types of procurements, when they are to be conducted and the processes and regulations involved when conducting procurements. LOU also contains regulations regarding when a procurement can be reviewed, and when a procurement fine 1 and damages may be applicable. 4.3 Fundamental principles In addition to that stated in LOU, there are also a number of fundamental principles that are always to be observed with regards to procurement: The principle of non-discrimination The principle of non-discrimination implies that suppliers must not be discriminated against due to their nationality (i.e., their citizenship, the country in which they are based or their country of operation). The contracting authority may not specify requirements of which only Swedish companies are aware or which only Swedish companies are capable of satisfying; this applies even in cases when the contracting authority does not expect to receive tenders from overseas suppliers. Tenderers from another town, and those applying to tender shall be treated in the same manner as companies from the "home" municipality. An example of a transgression of the non-discrimination principle would be to require that the supplier has an office in Stockholm The principle of equal treatment The principle of equal treatment implies that all suppliers shall be subject to the same preconditions. For example, all suppliers must have simultaneous access to the same information, so that no particular 1 Procurement fines are a type of penalty that the contracting authority may be obligated to pay. 8

9 supplier has any advantage over the others. For example, the procurer may not accept a late tender, since the same regulations and time limits are to apply to everyone. An example of a transgression of the equal treatment principle would be when a specific supplier receives information, i.e. via a phone call, that is significant for the procurement, whilst the same information is not communicated to other suppliers The principle of proportionality The principle of proportionality implies that requirements and conditions for the conducting of a procurement shall in reasonable proportion to that which is to be procured. Measures undertaken by the contracting authority may not exceed that which is necessary for the procurement in question. An example of a transgression of the proportionality principle would be when the contracting authority makes functional demands of a product for which it has no requirement The principle of openness The principle of openness (or the transparency principle) implies that procurements shall be characterised by openness and predictability. Information that is relevant to the procurement may not be kept secret, the procurement is to be publicly advertised and the suppliers who have participated in the tender procedure are to be informed of the result. The procurements are to be public and the contract documents are to be predictable, i.e., they are to be clearly formulated and state all the requirements that are to be satisfied. An example of a transgression of the principle of openness would be when the contracting authority allows the evaluation of the tender to be affected by a particular circumstance that was not mentioned in the contract documents The principle of mutual recognition The principle of mutual recognition implies that certification issued by the competent authorities in one member state shall also apply in other EU/EEA countries. An example of a transgression of the principle of mutual recognition would be contracting authority's non-approval of a certificate issued by a foreign nation tax authority that is equivalent to the corresponding certificate issued by the Swedish Tax Agency. 4.4 Threshold When goods, a service or a construction contract are to be procured, various regulations apply depending on whether the value falls below or exceeds the "threshold". The threshold is established 9

10 centrally by the EU and is adjusted every other year, most recently on 1 January The total value of the procurement must therefore be calculated before you can see which regulations are to be applied. The threshold for goods and services for government agencies is just in excess of SEK 1.17 million. When calculating the value of procurement, the figure referred to is always exclusive of value-added tax. Whether or not the threshold is exceeded is important in two respects. Firstly, different procedures are applied for procurements above or below the threshold; secondly, procurements that exceed the threshold are advertised so that they are visible to suppliers throughout the entire EU. Procurements below the threshold only need to be advertised so that they are visible to suppliers within Sweden Procurement procedures Procurements in excess of the threshold When the estimated value of goods or services exceeds the threshold, the contracting authority may choose freely between conducting an open or a restrictive procedure. According to LOU, negotiated procedure and competitive dialogue may only be used in specified cases Open procedure In an open procedure, all suppliers may submit a tender. The contracting authority advertises the procurement and interested suppliers request contract documents. Negotiations with suppliers are not permitted. Open procedures occur frequently for procurements above the threshold Restrictive procedure If a contracting authority chooses a restrictive procedure, all suppliers may apply to participate, but only those selected by the contracting authority may submit a tender. Contract documents are then sent out to the selected parties simultaneously. Only tenders from the selected parties may be examined by the contracting authority. Negotiations with suppliers are not permitted. Restrictive procedure is therefore conducted in two stages and can be applied for procurements in a market where there are many players and where a reduced number of final tenders is required Negotiated procedure In a negotiated procedure, the contracting authority invites selected suppliers to tender and then negotiates contract conditions with one of more of them. As with restrictive procedure, there is first a qualification and then a restriction in the number of those applying to tender. The authority 2 Exceptions in this respect apply for the procurement of "Part B Services" which, regardless of their value, can be handled in the same way as if they did not exceed the threshold. 10

11 subsequently invites at least three qualified tender applicants to submit a tender or to negotiate. Negotiated procedures may only be applied in exceptional cases Competitive dialogue In particularly complicated procurements, competitive dialogue may be employed. This type of procurement procedure can be used above or below the threshold. This occurs under the proviso that it is not possible to allocate the contract via open or restrictive procedure, or through simplified or selective procedure. The competitive dialogue procedure implies than an authority that knows the results it wishes to achieve from a procurement, but that cannot decide how this result is to be obtained, can invite suppliers into a process of dialogue, through which they arrive at a solution regarding how the authority's requirements can best be met Procurements below the threshold If the estimated value of the procurement falls below the threshold, the authority can choose freely between conducting a simplified or a selective procedure. These regulations also apply to the procurement of Part B Services, regardless of their value. Part B Services are those that are considered to only be of interest to, or which can only be conducted by, national suppliers. Other services are known as Part A Services. If the value is less than the fixed monetary limit, SEK , a direct award can be made. Competitive dialogue may also be applied below the threshold Simplified procedure If a contracting authority selects a simplified procedure, all suppliers that the right to participate. The suppliers submit tenders and the contracting authority may negotiated with one or more of them. Please note that, despite its title, simplified procedure is restricted by certain regulations and should not be confused with "direct award". In principal, simplified procedure corresponds to the open procedure that applies to procurements above the threshold Selective procedure Within a selective procedure, all suppliers have the right to apply to submit tenders and the contracting authority then invites several suppliers to do so. The contracting authority may negotiate with one or more of them. In principal, selective procedure corresponds to the restrictive procedure that applies for procurements above the threshold, and it can be applied in the same manner if there are many players in the market or where a reduced number of final tenders is required. 3 This monetary limit applies from 1 January

12 Direct award In the case of smaller procurements where the estimated value is less than the fixed monetary limit, SEK (from 1 January 2018), the contracting authority may make a direct award, i.e. make a procurement without publication of a contract notice. This is done in cases where a normal tender procedure would incur excessive administrative costs in relation to the size of the procurement. If the value exceeds SEK 100,000 there is a documentation requirement on what is being procured, why and by whom. Several suppliers should compete for the contract even when procedure is used, at least three (3) if possible. Instructions and a form for documentation are available on the intranet. Direct award can also be used in certain specific situations that are stated in legislation, i.e. if there are "overriding reasons".4 With direct award, the contracting authority should also contact several potential suppliers in order to obtain the most beneficial tender. The importance of the contract's value for the choice of procurement procedure can be illustrated in the following manner: Contract value Form of procurement Open procedure Restrictive procedure Negotiated procedure Competitive dialogue SEK Simplified procedure 4 Overriding reasons refer primarily to unforeseen events over which the authority itself had no control. The fact that the contracting authority finds itself pressed for time as a result of a lack of planning does not constitute a right to conduct a direct award. 12

13 Selective procedure Competitive dialogue SEK Direct award Estimation of the contract's value When estimating the contract's value, attention should be paid to the maximum total amount that will be paid during the contract period. This means that the calculations should be made on the basis that any options and renewals of contracts will be exercised. When assessing whether the value is above or below the monetary limit for direct award, attention should not just be paid to the value of the current agreement but to all procurements of the same type that the contracting authority conducts in the course of a financial year. Attention must also be paid to the authority's future requirements and its needs in other areas. As was mentioned previously, both the threshold and the monetary limit are stated exclusive of VAT. 4.6 Grounds for award of contract The tenderer(s) who offer(s) either the lowest price or the tender that is the most economically advantageous will be awarded the contract. It is to be decided in advance which of these alternatives is to be applied as a basis for the award of contract. The most economically advantageous tender refers to the fact that a combination of several different criteria is taken into consideration. These could include price, quality and delivery time. Naturally, Lowest price refers to the supplier who offers the lowest price. Please note however that the winning tender must still satisfy the specified requirements. This means that it is possible to have very high specified requirements even in a lowest price procurement, which would mean that only those suppliers who satisfy the requirements would be eligible for award of the contract. But from these tenders, the lowest price wins. If the contracting authority has a very good level of knowledge of the relevant market, if it knows exactly what it wants and is not interested in any "extras", then it may be appropriate to have the lowest price as the grounds for award of contract. 13

14 4.7 Shall and should requirements A procurement's contract documents often contain both "shall" and "should" requirements. All "shall" requirements must be unconditionally satisfied by the tenderer; if not, the tender will not even be considered. The "shall" requirements normally refer to certain fundamental prerequisites, such as the tenderer's credit-worthiness, technical and professional capacity and the minimum levels that the tenderer is capable of providing. "Should" requirements refer to that which the contracting authority desired, but which do not have to be satisfied; a value is attached to them however in the evaluation of a tender. As an example of this, there might be a requirement that a car shall have an engine that produces at least 100 hp, whilst there may also be a requirement that the same car should produce 150 hp. In the evaluation process, all cars producing less than 100 hp are disqualified. The remaining cars are allocated points in relation to the amount by which their engines exceed 100 hp, where maximum points are allocated when 150 hp is reached. If price is also a factor in such procurements, a less powerful car can have a greater value attached to it than a more powerful one, if the tenderer compensates for this lack of power with a lower price. The contracting authority therefore decides what they "need to have and what would be "nice to have. A rule of thumb when deciding whether the requirements for a product or services should be expressed as "shall" or "should" requirements is that the contracting authority could potentially sign a contract with any of those suppliers who satisfy all the "shall" requirements. 4.8 Are there any exceptions to LOU? In certain situations, procurement does not need to be conducted in accordance with LOU regulations. The Act provides for a number of provisions that are described in more detail in preliminary work and case law. Provided that certain criteria are met, situations where exceptions are allowed might involve the following: certain research and development services certain goods used for research and development purposes technical reasons exclusive rights overriding urgency overriding reasons unforeseen additional services Decisions regarding exceptions from LOU shall always be made in consultation with the Procurement Unit. 14

15 4.9 Agreement Each procurement results in an agreement between the contracting authority and the supplier(s) who won the procurement. In accordance with LOU, the agreement shall be made in writing and it may either be a contract or a framework agreement Contract When the procurement that has been conducted is an object procurement, i.e. the procurement concerns a specific volume of goods or services, a contract is drawn up. The contract contains conditions for the purchasing of goods or services such as, for example, a description of the quality of the goods, delivery times and price. In other words, placing a regular order is not sufficient Framework agreement An agreement can also take the form of a framework agreement. A framework agreement is signed either with one or more suppliers and aims to establish the conditions for a subsequent award of contract within a stated time period that may not normally exceed four years. When a need arises for something that is covered by the framework agreement, a contract is signed with regards to what has now become a concrete requirement. This is known as a call-off from the framework agreement (and from the contract sometimes, in the case of multiple purchase agreements or delivery agreements). If the procurement is aimed at a framework agreement with several suppliers, it is decided in advance whether call-offs from the framework agreement are to be made using suborders or via renewed competitive tendering. For framework agreements using suborders, a ranking order of the suppliers who submitted the best tenders in the procurement procedure is created. The supplier who obtained the most points in the evaluation of tenders is ranked at the top, and so on. For call-offs from the framework agreements that are made using suborders, the contracting authority's inquiry always goes to the highest ranked supplier. If they cannot, or do not have the opportunity to respond to the inquiry, it passes on to the next supplier down the list, and so on. Framework agreements can also be designed so that call-offs are brought about via "renewed competitive tendering". With this type of call-off, the contracting authority directs its inquiry to all suppliers involved in the framework agreement. The suppliers may submit new tenders in respect of the "concrete order" and one supplier is awarded the contract, based on the content of their tender. This is, in other words, a type of "mini-procurement" where "the market" consists solely of the suppliers involved in the framework agreement Governmental framework agreements For goods and services frequently procured by public authorities in large amounts or that amount to large sums, Kammarkollegiet has, on behalf of the Government a central responsibility for providing framework agreements for this type of procurement (the coordination of governmental purchasing). KI and other public authorities can then make call-offs from these governmental framework agreements. 15

16 Procurement framework agreements are assembled in a database that can be found at Approximately 1,100 government framework agreements are assembled here involving 700 suppliers in over 60 product areas and around 90 underlying sub-areas. With the help of the database, public authorities can find out whether the goods or services that they need to purchase can be called-off from an existing governmental framework agreement Karolinska Institutet's framework agreements As a complement to the governmental framework agreements, KI also uses its own framework agreements for procurement. The details of KI's own framework agreements can be found in an agreement catalogue on the KI intranet under The agreements contain information regarding their scope and instructions on how to make a call-off. There are also supply agreements which are call-offs from government framework agreements and apply for the whole of KI. 5 What happens if a mistake is made? For a long time it has been possible to conduct public procurement incorrectly without any noticeable repercussions for the contracting authority in question. Since 15 July, LOU has however been supplemented with a number of regulations that increase the scope for the administrative courts and the Swedish Competition Authority 5 to take action when contracting authorities contravene the regulatory framework. 5.1 Procurement review procedure If the contracting authority has in the course of its procurement contravened any of the provisions of LOU, and this has resulted in a supplier suffering damages, the Administrative Court can decide that the result of the procurement is to be corrected or that the whole procurement process should be repeated. Only suppliers have the right to apply for the review of a procurement. A review procedure may be relevant if, for example, the contracting authority, in its evaluation of a tender, approved a supplier who did not satisfy the "shall" requirements; or if the authority took into consideration circumstances that were not described in the contract documents and which subsequently affected the results of their evaluation. 5.2 Reviewing the effectiveness of an agreement In certain cases, a supplier may also apply for a contract resulting from a procurement to be declared ineffective. Declaring a contract to be ineffective may be relevant if, for instance, the signing of the contract was not preceded by publication of the procurement in accordance with LOU, something that is known as "illegal direct award of contract". The consequences of an agreement being declared 5 The Swedish Competition Authority is the supervisory authority for public procurement. 16

17 ineffective are that the parties no longer have any obligation to complete that which is stated in the agreement, and that any work already undertaken shall be cancelled. 5.3 Procurement fines In certain situations, the contracting authority can be ordered to pay a procurement fine. Application for payment of a procurement fine is made by the Swedish Competition Authority to the Administrative Court and can be relevant if, for instance, a contracting authority has made an illegal direct award of contract. Procurement fines are a type of penalty fee that is paid to the government. Ki has been ordered to pay such a fine on one occasion. 5.4 Damages If a contracting authority has not followed the regulations of the Swedish Public Procurement Act (LOU), a supplier can, in certain circumstances, demand compensation for damages that have resulted from this. This option may be available to a supplier who has not been awarded a contract following a procurement process, but also for the supplier who entered into a contact with the contracting authority which was later declared invalid by the court. 5.1 Bribery and impartiality All business must be characterised by honesty. All forms of bribes are prohibited. This also applies to gifts and presents that may appear to have a low financial value. Warning signs Special caution should be observed in the event of any of the following: the benefit is not insignificant in value or is given frequently, the benefit has no clear connection with the recipient s work or assignment, the benefit is not a natural and useful part of the work or assignment, the benefit is offered or handed to the recipient (or a closely-related person) in close conjunction with a decision that affects the bribing party, the employee or supplier is invited to an event with a guest, relative or friend, the benefit (in the nature of an event or similar) is targeted at specially selected people, the benefit is not given openly, the benefit deviates from generally accepted forms of society between industry and public organisations, or the benefit is initiated by the recipient Everyone who takes part in a public procurement needs to remember not to have personal commitments that may be in conflict with Karolinska Institutet s interests. As an example, it could be a 17

18 person who is a co-owner of a company and has bid for a service in procurement to become one of KI s suppliers. Various forms of family ties are included here. Read more at: 6 Is it just about compliance with the law? As was described under point 5, both suppliers and the Swedish Competition Authority have, with the assistance of various legal remedies, the opportunity to object to a procurement that has been conducted incorrectly. These options are aimed at the particular procurement or contract in question and should be treated as very real risks associated with conducting a procurement that contravenes the regulations of LOU. 6.1 Other negative effects of non-compliance In the longer perspective, there are however other disadvantages associated with a failure to apply the regulations. Through its failure to apply the structured procedures that public procurement entails, KI could potentially lose a tool which it could otherwise use to continuously control and improve both its contract documents and its agreements. The organisation as a whole, as well as the department in question, could therefore forego the opportunity to improve its agreements. By not taking an inventory of requirements, or due to a lack of communication with other parts of the operation, the opportunity to coordinate business goes to waste, resulting in double the work and higher prices. Another effect of disregarding the working methods that KI is obliged to apply in its procurements is the attitude that such actions may generate in KI's external suppliers. Repeated violations mean that KI risks losing credibility as a contracting authority and as a contracting party. This could have the effect that certain suppliers regularly call on well-known purchasers within the organisation in the hope that a formalistic procurement will not be conducted, or that procurements already agreed upon can be relinquished. Suppliers who have been procured in the correct manner may lose their incentive to submit tenders in subsequent procurements; they may even feel compelled to search for other routes into the organisation. 6.2 Other positive effects of compliance The response sometimes given to the question of why LOU must be applied within a procurement unit is that it is not desirable for the unit to become the subject of a review, or that the procedure that preceded the purchasing should not be open to criticism in any other way. It is of course true that a procurement can become the subject of a review, and there is therefore a risk of the economic and time losses associated with a new procurement having to be conducted. In order to avoid this risk, it is therefore important to conduct procurements in accordance with the regulations and the fundamental principles mentioned in this document. 18

19 However, to avoid reviews can never be the main reason for applying the relevant regulations. The primary objective must be to bring about good business. LOU is not just a system of regulations but also a description of a procedure which, correctly applied, constitutes a quality assurance that the procurer "gets everything right" - from correctly stated tender requirements to correct contract terms and conditions. Through application of the regulations and internal directives, the procurer can ensure that the requirement is well thought-out and correctly formulated. By notifying the market of the requirement, there is a greater chance of obtaining higher quality at a lower price. By deciding on the content of the agreement, it is possible to avoid being subjected to unfavourable terms and conditions. As is mentioned in the paragraph above, public authorities that have a good level of supervision and control of their purchasing also have a greater capacity to continually control and improve their organisation's agreements. 6.3 Identifying the requirement in good time Within every organisation there is often a core business activity. For KI, this core activity is, naturally, research and education. Other activities are aimed at providing the preconditions for us to be able to operate our core activities. Regardless of the activity concerned, whether it be a core activity or otherwise, there is an on-going requirement for goods, services and contracts that need to be purchased from external suppliers. In the majority of cases, these external purchasing requirements are governed by the public procurement regulations. The various projects and activities into which the business is divided generally have a set goal, a deadline for when this goal is to be achieved and, consequently, a time by which the project should have started. In order to ensure that the activity can commence and be operated as planned, it is important that those responsible for the project, both for its preparatory work and when the project is up and running, identify at an early stage those requirements that involve external purchasing, and that they communicate these so that any potential procurements can be initiated. It should be emphasised that the time that a public procurement requires does not just comprise the statutory time limit that the supplier has for the submission of their tender following the publication of the procurement, but also, especially, the preparatory work to identify requirements and draw up the contract documents and the subsequent work to evaluate the tenders submitted. The following diagram provides an example of the time schedule for a procurement that is conducted using open procedure: January February March April May Week Create contract documents Create agreement 19

20 Publication of contract documents Final date for submission of tenders Evaluation Contract award decision Standstill period Agreement 7 KI's purchasing organisation 7.1 The Procurement Unit At KI, the Procurement Unit has the central responsibility for purchasing matters. The unit is part of the Finance Office and the University Administration and its areas of responsibility include: the procurement of goods and services the coordination of KI's purchasing KI's framework agreements expert support in purchasing and procurement issues administration of support tools such as e-commerce tool Agresso providing training and information in purchasing and procurement issues global surveillance of the market for goods and services that are important to KI sustainability issues connected with purchasing the monitoring of agreements that have been entered into supervision of the business's procurement needs central invoice management incl. addition by suppliers in Agresso 7.2 Purchasing Coordinators Each department has its own Purchasing Coordinator. The Purchasing Coordinator is the department's contact point for the handling of internal purchasing issues and for communication with the Procurement Unit. The Purchasing Coordinator's areas of responsibility include: fundamental knowledge of regulations and processes support and information with regards to call-offs from framework agreements information concerning other purchasing issues communication with the Procurement Unit 20

21 representing their department at inter-departmental meetings First Line Support for their own department control of terms of payment and suppliers' tax clearance certificates, etc. acting as an intermediary in the contact between the departmental purchaser and the Procurement Unit helping the department with e-commerce issues regarding placing orders. 7.3 The Purchasing Group The Purchasing Group consists of the various departmental Purchasing Managers and representatives from the Procurement Unit. The Purchasing Group holds regular meetings that constitute a forum for, inter alia: information regarding on-going procurements (of mutual interest) identifying mutual acquisition needs information regarding new framework agreements training E-commerce other purchasing and procurement issues 8 Purchasing at Karolinska Institutet The following section describes how procurement and other purchasing is conducted at KI. The section is divided under the headings Planning, Implementation and Monitoring. The processes found under each heading are described in the order in which they normally occur within a procurement. However, certain processes do not necessarily occur in all procurements. At the end of the section there is a matrix that specifies the people within the organisation who are responsible for each process. 8.1 Planning Defining the requirements of the business Needs analysis The planning stage starts with definition of the business's requirements, in order to identify potential acquisitions, and when and during which period the requirement will arise. Procurement is never an end in itself but rather a means of satisfying existing requirements. If the procurement replaces a previous agreement, the needs analysis should include an evaluation of the pros and cons of the previous agreement. Such an evaluation can examine, for example, whether the new agreement should be more comprehensive, or whether, quite simply, it maybe covers something 21

22 that is not required. It is also possible to look in closer detail at price models that have worked well and whether deliveries have been made in accordance with the wishes of the purchaser. By ensuring that the users have a real, established need for that which is to be procured, the probability of a successful procurement with good contract compliance is increased Life-Cycle Cost Analysis A Life-Cycle Cost Analysis is a tool for environmental requirements. In a needs analysis, the contracting authority can use Life-Cycle Cost Analyses as a method for implementing different requirements. The method can be used for clarifying the total cost for a product for the period it is in use, including wind-up costs. One of the primary applications for conducting a Life-Cycle Cost Analysis is when procuring energy-consuming goods such as vehicles and electronic products Involving the end user The end user must be involved in the procurement at an early stage. If this does not occur, there is a risk that the procured items do not correspond to the requirements of the business. There is also a major risk that the procurement will need to be followed by further procurements. However, the fact that the end user is aware of the requirement does not always mean that he/she also knows the best way to satisfy this requirement. The focus of the needs analysis should therefore be on clarifying the requirement and not trying to find the solution to it Consider the requirement from a KI perspective When the need has been identified, you should ask whether this need may also exist elsewhere within the department and, in the future, maybe even elsewhere within KI. A procurement can then be coordinated to satisfy the requirements of several parties simultaneously. A coordinated procurement can, but need not, require more time. If it is likely that the volume to be purchased will increase as a result of a coordinated procurement, this is an incentive to the suppliers to lower their prices. KI could also be coordinating procurements with other universities or, occasionally with Karolinska University Hospital Observing sustainability issues According to the Swedish Public Procurement Act (LOU), contracting authorities should take environmental and social considerations into account within the public procurement process, if the nature of the procurement justifies this. Examples of social considerations could be the requirement on respecting basic human rights in the production of goods, a requirement on social integration or ethical trading principles. Examples of environmental considerations might be requirements on energy efficiency, choice of materials or preventing the use of environmentally hazardous or dangerous chemicals in a product. A well-formulated environmental requirement is generally a requirement that 22

23 reaches beyond applicable law. Whether requirements are to be set with regard to environmental considerations such as these should be decided on a case to case basis via a prioritisation model where purchase volumes are weighed against environmental impact. Social consideration is determined via an analysis of the risks for human rights violations in the supplier chain, or shortcomings in the working conditions in combination with purchased volumes. In the work involved with considerations such as these, attention should be paid to the following points: requirements set must be consistent with the fundamental principles requirements must be deemed reasonable and have a natural connection with that which is to be procured requirements must be quantifiable and the contracting authority must be able to control monitoring of them The procuring body is responsible for assessing the procurement from a sustainability perspective (a specific method exists for this) and decides when the sustainability requirements should be imposed. The procuring body shall also, in consultation with the purchaser, decide which sustainability requirements should be included in the procurement. Guidance is available at the Environmental unit at the Facilities Office Estimating the value The needs analysis should also include an estimation of the value of that which is to be purchased. The aim of this is primarily to be able to decide the most appropriate procurement procedure. As was previously mentioned in point 4.4, attention should be paid to the maximum total amount that will be paid during the contract period. If the contract is to include an option, i.e., the opportunity for KI to purchase something extra, which can be decided upon at a later stage, the value of this should also be estimated and incorporated into the calculation. If it is a framework agreement that is to be procured, the calculation may be based on an estimation of future orders. If the framework agreement replaces a previous agreement, the estimation can be based on previous details. All estimations refer to amounts exclusive of VAT. It is not permissible to "subdivide" a procurement so that it ends up below the threshold Negotiations pursuant to the Swedish Co-Determination at the Workplace Act (MBL) The right to hold negotiations in the Swedish labour market is based on the co-determination regulations in MBL. The right of trade union organisations to have insight into and influence an operation is clearly regulated in the law and jusdicial practice. This can affect public procurements mainly in turnkey contract procurements and also when procuring consulting services and procurements where a change of employer is possible. The rules for this are outlined below. Right of negotiation 23

Directions for purchases at SLU

Directions for purchases at SLU 1(12) Reg. No: SLU ua 2018.2.4.4-261 Dispatched GOVERNING DOCUMENT Subject area: Financial administration, procurement, foundations and companies Document type: Directions Decision-maker: Head of Financial

More information

Procurement Rules for Karolinska Institutet Reg. no 1-73/ 2016

Procurement Rules for Karolinska Institutet Reg. no 1-73/ 2016 Procurement Rules for Karolinska Institutet Reg. no 1-73/ 2016 Apply with effect from 08/02/2016 Replace Procurement Rules Reg. no 1-522/2014 Translation of the rules Decision Reg. no: 1-73/2016 01/02/2016

More information

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions Title Procurement Policy Associated Policies Charging and Remissions REVIEWED: NEXT REVIEW: 1. Policy statement 1.1 This policy (Policy) sets out the rules by which The Brooke Weston Trust (the Trust)

More information

SECTION 17 CONTRACT PROCEDURE RULES

SECTION 17 CONTRACT PROCEDURE RULES Glossary of terms:- 17.1.1 "Tender" means a sealed bid or proposal to supply or receive goods, materials or services or for the execution of works. 17.1.2 "Contract" means any contract including a Purchase

More information

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes Welsh Government Rural Communities Rural Development Programme 2014-2020 European Maritime and Fisheries Fund 2014-2020 Competitive Tendering and Public Procurement Technical Guidance Notes Crown Copyright

More information

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING 1 PROCUREMENT POLICY 1 Purpose and Compliance 1.1 The purpose of this Procurement Policy and Scheme of Tendering is to set clear rules for the procurement

More information

Public Procurement Guidelines for LEADER Funding Applicants

Public Procurement Guidelines for LEADER Funding Applicants Public Procurement Guidelines for LEADER Funding Applicants Disclaimer: This Guidance Note is issued without liability and is for general information purposes only. County Wicklow Partnership accept no

More information

Wilo Group Code of Conduct. "Responsible Behaviour

Wilo Group Code of Conduct. Responsible Behaviour Wilo Group Code of Conduct "Responsible Behaviour January 2011 CONTENT FOREWORD 2 SCOPE 3 WILO PRINCIPLES 4 BASIC SOCIAL PRINCIPLES 4 COMPLIANCE OF LAWS 4 CONFLICTS OF INTEREST 4 ENVIRONMENTAL PROTECTION

More information

A DECREE ON PROCLAMATION OF THE LAW ON CONCESSIONS AND PUBLIC PRIVATE PARTNERSHIP

A DECREE ON PROCLAMATION OF THE LAW ON CONCESSIONS AND PUBLIC PRIVATE PARTNERSHIP 20120060164 ASSEMBLY OF THE REPUBLIC OF MACEDONIA On the basis of Article 75 paragraph 1 and 2 of the Constitution of the Republic of Macedonia, the President of the Republic of Macedonia and the President

More information

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Approved by: Audit & Ethics Committee Date: 23 February 2018 Next Review: vember 2019 1 Contents 1. Introduction...

More information

Auditing of Swedish Enterprises and Organisations

Auditing of Swedish Enterprises and Organisations Auditing of Swedish Enterprises and Organisations March 1st 2018 version 2018:1 1 General Application 1.1 These General Terms govern the relationship between the auditor ( the Auditor ) and the client

More information

- Details of the item to be procured and whether it is for works, services or goods;

- Details of the item to be procured and whether it is for works, services or goods; Procurement Policy 1. INTRODUCTION The policy is designed to ensure we comply with the relevant legislation, regulations and guidance which regulate our procurement activities. We will ensure our procurement

More information

Tendering and Procurement

Tendering and Procurement The Handy Guide to Tendering and Procurement Updated March 2012 Project Development & Support Ltd The Handy Guide to Tendering and Procurement Updated March 2012 Contents Guidance on the principles which

More information

Contract Management arrangements - Procurement Policy update

Contract Management arrangements - Procurement Policy update Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,

More information

LEGAL ASPECTS REGARDING PUBLIC PROCUREMENT IN ROMANIA

LEGAL ASPECTS REGARDING PUBLIC PROCUREMENT IN ROMANIA 121 LEGAL ASPECTS REGARDING PUBLIC PROCUREMENT IN ROMANIA Lecturer Ph.D. Isabela STANCEA "Constantin Brâncoveanu" University of Piteşti, Romania Email: stanceaiza "@ yahoo.com Abstract: For the holders

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

Roundtable on. Competition Policy and Public Procurement

Roundtable on. Competition Policy and Public Procurement Intergovernmental Group of Experts on Competition Law and Policy Geneva, 9 11 July 2012 Roundtable on Competition Policy and Public Procurement Written contribution by Lithuania The views expressed are

More information

Competitive Tendering and Procurement Policy

Competitive Tendering and Procurement Policy Competitive Tendering and Procurement Policy STATUS: Required by Academies Financial Handbook DATE ISSUED: February 2018 REVIEW DATE: February 2020 APPROVED BY: APPROVAL DATE: Board of Trustees 21 February

More information

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it.

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it. Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...

More information

The Act on Public Contracts, EU state aid rules, and funding granted by Innovation Funding Agency Business Finland

The Act on Public Contracts, EU state aid rules, and funding granted by Innovation Funding Agency Business Finland Guide 1 (5) The Act on Public Contracts, EU state aid rules, and funding granted by Innovation Funding Agency Business Finland Contents 1 Scope of application of the guide 1 2 The Act on Public Contracts

More information

Procurement Policy & Procedures

Procurement Policy & Procedures Procurement Policy & Procedures 1 Introduction 2 Objectives 3 Organisation 4 Authority 5 Procurement Procedures 6 EU Procurement Regulations 7 General Principles of Procurement 8 Reporting & Information

More information

ARCADIS GENERAL BUSINESS PRINCIPLES. July 2016

ARCADIS GENERAL BUSINESS PRINCIPLES. July 2016 ARCADIS GENERAL BUSINESS PRINCIPLES July 2016 ARCADIS GENERAL BUSINESS PRINCIPLES 1. INTRODUCTION At Arcadis we define our mission as: Our mission is to create exceptional and sustainable outcomes for

More information

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee Procurement Policy Department Owner Section Owner Approver Finance & Resources (National) Procurement E-ACT Audit & Risk Committee Date Approved July 2015 Review Date July 2017 E-ACT Procurement Guidelines

More information

ANTI-CORRUPTION AND BRIBERY POLICY

ANTI-CORRUPTION AND BRIBERY POLICY ANTI-CORRUPTION AND BRIBERY POLICY Policy statement It is our policy to conduct all of our business in an honest and ethical manner. We take a zero-tolerance approach to bribery and corruption and are

More information

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES

UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES UNIVERSITY OF SUNDERLAND STANDING ORDERS TENDERING AND CONTRACT PROCEDURES Finance and Development Committee Revised February 2010 UNIVERSITY OF SUNDERLAND STANDING ORDERS ON TENDERING AND CONTRACT PROCEDURES

More information

Legal Topic Note PROCUREMENT LTN 87. January Introduction

Legal Topic Note PROCUREMENT LTN 87. January Introduction Legal Topic Note LTN 87 January 2016 PROCUREMENT Introduction 1. This LTN applies to local councils in England and Wales except for paragraphs 10 to 15 below which apply only to local councils in England.

More information

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016 Procurement Policy Prepared By Nick Ronan, Development Director Date of Last Review November 2012 Date of Current Review March 2016 Date of Next Review March 2019 Reviewed By Board 1. INTRODUCTION 1.1

More information

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE Tender Number: PW #2-18 Sealed Tenders will be clearly marked and received by: Corporation of the Township of Ryerson 28 Midlothian Road Burk s Falls, Ontario P0A 1C0 (705) 382-3232 Closing Date: THURSDAY

More information

UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW (UNCITRAL)

UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW (UNCITRAL) UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW (UNCITRAL) UNCITRAL Model Law on Procurement of Goods, Construction and Services with Guide to Enactment CONTENTS PREAMBLE CHAPTER I. GENERAL PROVISIONS

More information

Competitive Tendering Policy

Competitive Tendering Policy Competitive Tendering Policy Contents Page 1. Key Principles... 3 2. Purpose... 3 3. Key requirements of process... 3 4. Quotations and tendering... 4 5. Procedures... 4 6. Acceptance of Tender... 5 7.

More information

briefing The new EU Remedies Directive: prudent procurement is of the essence Key points the voice of the NHS in Europe JANUARY 2010 ISSUE 5

briefing The new EU Remedies Directive: prudent procurement is of the essence Key points the voice of the NHS in Europe JANUARY 2010 ISSUE 5 the voice of the NHS in Europe briefing JANUARY 2010 ISSUE 5 The new EU Remedies Directive: prudent procurement is of the essence Revised EU rules will improve access suppliers have to a review when it

More information

Anti-Bribery Policy. At First Recruitment Group we are proud of our culture and we try to ensure that integrity underpins everything we do.

Anti-Bribery Policy. At First Recruitment Group we are proud of our culture and we try to ensure that integrity underpins everything we do. Policy Statement At First Recruitment Group we are proud of our culture and we try to ensure that integrity underpins everything we do. The Bribery Act 2010 and other prevailing anti-bribery laws in countries

More information

Hastings Academies Trust Standard Procurement Procedures

Hastings Academies Trust Standard Procurement Procedures 1. Overview The Standard Procurement Procedures support the Trust s Financial Regulations and reflect the requirements of the EFA as set out in the Academies Handbook. The requirements of the Academies

More information

POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED. Policy on Offers of Gifts and Hospitality Received 1

POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED. Policy on Offers of Gifts and Hospitality Received 1 POLICY ON OFFERS OF GIFTS AND HOSPITALITY RECEIVED Policy on Offers of Gifts and Hospitality Received 1 TABLE OF CONTENTS 1 INTRODUCTION... 4 2 GENERAL RULES... 4 3 RULES FOR SPECIFIC GROUPS OF PERSONS...

More information

OPEN CALL FOR CONSULTING SERVICES

OPEN CALL FOR CONSULTING SERVICES OPEN CALL FOR CONSULTING SERVICES Terms of Reference: International Lawyer Contracting Authority: Regional Cooperation Council Secretariat Starting Date: 7 November 2018 Reporting to: Duration: RCC Secretariat

More information

PostNL group procedure

PostNL group procedure 1 January 2017 PostNL Holding B.V. Audit & Security PostNL group procedure on fraud prevention guidance on bribery and corruption Author Director Audit & Security Title PostNL group procedure on Fraud

More information

INTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA

INTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA INTERREG IVA Programme Introduction Guidance Note on Procurement and Tendering G4/IIVA This guidance note sets out the procurement processes and thresholds in relation to projects funded in the INTERREG

More information

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement 6.5.2014 L 133/1 I (Legislative acts) DIRECTIVES DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement (Text with EEA relevance)

More information

Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support

Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support 1. Introduction This guidance is a tripartite document informed and agreed by Scottish Government, COSLA,

More information

PUBLIC-PRIVATE PARTNERSHIP

PUBLIC-PRIVATE PARTNERSHIP PUBLIC-PRIVATE PARTNERSHIP Law firm Sajic GP Banja Luka Bulevar vojvode Zivojina Misica 49B, Banja Luka Bosnia and Herzegovina Tel: +387 51 227 620 Fax: +387 51 227 623 e-mail: info@afsajic.com www.advokatskafirmasajic.com

More information

Humber Education Trust. Procurement Policy

Humber Education Trust. Procurement Policy Humber Education Trust Created By: Approved By: Adnan Bashir Bramhope Associates Limited Version: 1.1 Created on: 31 January 2017 Amended on: Next review date: Contents Policy Statement Page 3 Policy Scope

More information

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders An evaluation of the Irish Remote Interpreting Service (IRIS) 2018. Request for Tenders The latest date for receipt of tenders is Thursday 30 th August 2018 at 4 pm July 2018 Sign Language Interpreting

More information

PROCUREMENT PROCEDURES

PROCUREMENT PROCEDURES PROCUREMENT PROCEDURES DECEMBER 2016 1.0 Introduction. 1.1 Bangor University buys a wide range of works, services, goods and utilities, with expenditure ranging from large construction and refurbishment

More information

Guideline for Auditors

Guideline for Auditors Public Procurement Working Group Guideline for Auditors Constant De Koninck (Belgian Court of audit) Public Procurement Audit Seminar 14 and 15 October 2010 Lisboa - Portugal 1. Introduction Public procurement

More information

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018 Section: Finance and Administration Number: 12.20.PP.v7 Subject: Goods and Services Procurement (including consulting services) Policy and Procedure Associated Document Form Number: 12.20.F Effective Date:

More information

GREATER SHEPPARTON CITY COUNCIL and GOULBURN VALLEY REGIONAL COLLABORATIVE ALLIANCE

GREATER SHEPPARTON CITY COUNCIL and GOULBURN VALLEY REGIONAL COLLABORATIVE ALLIANCE GREATER SHEPPARTON CITY COUNCIL and GOULBURN VALLEY REGIONAL COLLABORATIVE ALLIANCE Policy Number 13.POL1 Version 3.0 Adopted February 2013 Last Reviewed July 2016 Business Unit: Responsible Officer: Approved

More information

EMPLOYMENT CONTRACT GUIDE FOR PROFESSORS

EMPLOYMENT CONTRACT GUIDE FOR PROFESSORS EMPLOYMENT CONTRACT GUIDE FOR PROFESSORS An employment relationship is based on an employment contract, which states that one party (the employee) will work for a salary or other compensation for and under

More information

POLICY FOR THE REMUNERATIONS OF THE EMPLOYEES WORKING FOR INVESTMENT INTERMEDIARY TRADING 212 LTD

POLICY FOR THE REMUNERATIONS OF THE EMPLOYEES WORKING FOR INVESTMENT INTERMEDIARY TRADING 212 LTD POLICY FOR THE REMUNERATIONS OF THE EMPLOYEES WORKING FOR INVESTMENT INTERMEDIARY TRADING 212 LTD (Title amended with resolutions of the sole owner of the capital from 10.07.2017 and from 16.10.2017) GENERAL

More information

Pay Policy for Support Staff

Pay Policy for Support Staff Pay Policy for Support Staff 2017-18 Applicable to: Committee Responsible: Person Responsible: Date for Next Review: All Support Staff Staff & Student Development Headteacher July 2018 Pay Policy for Support

More information

Municipality of the District of Lunenburg POLICY

Municipality of the District of Lunenburg POLICY Municipality of the District of Lunenburg Title: Purchasing and Tendering Policy Policy No. MDL-33 Effective Date: January 1, 2014 1. Purpose and Objectives POLICY Amended Date: January 12, 2016 The Municipality

More information

SKL International Code of Conduct

SKL International Code of Conduct SKL International Code of Conduct I. Introduction SKL International s Code of Conduct provides a framework to guide ethical conduct in a way that upholds the integrity and reputation of SKL International

More information

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government

More information

Handbuch Code of Conduct url:consense://produktiv/d Our success is based on satisfied customers

Handbuch Code of Conduct url:consense://produktiv/d Our success is based on satisfied customers This defines the principles and requirements of GEMÜ Group incl. all subsidiaries around the world regarding their responsibility for people and the environment. Our success is based on satisfied customers

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

Roma Integration 2020

Roma Integration 2020 European Union Roma Integration 2020 is co-funded by: Roma Integration 2020 OPEN CALL FOR CONSULTING SERVICES :: REFERENCE NUMBER: 045-018 :: Terms of Reference: Contracting Authority: RCC Department:

More information

Public Procurement Procedures

Public Procurement Procedures Brief 10 September 2016 Public Procurement Public Procurement Procedures CONTENTS Introduction Main types of competitive procedures available When can each of the main competitive procedures be used? Innovation

More information

Kyte Broking Ltd. Conflicts of Interest Policy Summary Statement. Page 1 of 9

Kyte Broking Ltd. Conflicts of Interest Policy Summary Statement. Page 1 of 9 Kyte Broking Ltd Conflicts of Interest Policy Summary Statement Page 1 of 9 Table of Contents Page 1. Introduction... 3 2. Purpose and Summary of Policy... 3 3. Clients and counterparties... 4 4. What

More information

ANTI-CORRUPTION POLICY

ANTI-CORRUPTION POLICY ANTI-CORRUPTION POLICY CONTENTS 1. PREFACE... 3 1.1. ASTM s Commitment to Fighting Corruption... 3 1.2. Legislative Framework... 3 1.3. Recipients and Scope of Application... 3 2. INTRODUCTION... 4 2.1.

More information

8.1. GENERAL RULES OF CAPACITY BOOKING

8.1. GENERAL RULES OF CAPACITY BOOKING 8.1. GENERAL RULES OF CAPACITY BOOKING (a) Pursuant to the provisions of the Gas Supply Act and the Implementation Decree the free capacities of the natural gas network may and shall be offered to network

More information

ARN Procurement Regulations Utility Sectors 2016

ARN Procurement Regulations Utility Sectors 2016 ARN 2016 Procurement Regulations Utility Sectors 2016 Preamble - Special sector companies are obliged to award assignments in accordance with the provisions of the Aanbestedingswet 2012 (Netherlands Procurement

More information

ARTICLE 29 Data Protection Working Party

ARTICLE 29 Data Protection Working Party ARTICLE 29 Data Protection Working Party 05/EN WP108 Working Document Establishing a Model Checklist Application for Approval of Binding Corporate Rules Adopted on April 14 th, 2005 This Working Party

More information

GN 490 of 26 April 2007: Guidelines on allocation of additional powers and functions to municipalities

GN 490 of 26 April 2007: Guidelines on allocation of additional powers and functions to municipalities GN 490 of 26 April 2007: Guidelines on allocation of additional powers and functions to municipalities MINISTRY FOR PROVINCIAL AND LOCAL GOVERNMENT I, Fholisani Sydney Mufamadi, Minister for Provincial

More information

New rules on public procurement have come into force on January 2018

New rules on public procurement have come into force on January 2018 May 2018 New rules on public procurement have come into force on January 2018 What changed for contracting authorities and economic players with the entry into force of the last review of the Portuguese

More information

Invitation to Tender. Development Legal Services. August 2015

Invitation to Tender. Development Legal Services. August 2015 Development Legal Services August Contents 1. Important notices... 3 1.1. Confidentiality... 3 1.2. Accuracy of information and liability of SLH... 3 1.3. Canvassing... 4 1.4. Non-collusion... 5 1.5. Copyright...

More information

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0 ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT Version 3.0 II Copyright notice 2016 ISCC System GmbH This ISCC document is protected by copyright. It is freely available from the ISCC website or upon

More information

Groupe PSA Responsible Purchasing Policy

Groupe PSA Responsible Purchasing Policy Groupe PSA Responsible Purchasing Policy The Groupe PSA is committed to growth founded on socially-responsible actions and behaviors in all countries in which it operates and in all fields in which it

More information

Qualified Persons in the Pharmaceutical Industry. Code of Practice. March 2008

Qualified Persons in the Pharmaceutical Industry. Code of Practice. March 2008 Qualified Persons in the Pharmaceutical Industry Code of Practice March 2008 Updated October 2009 Code of Practice for Qualified Persons 1. INTRODUCTION... 1 2. REGULATORY BASIS FOR THE QUALIFIED PERSON...

More information

MALTA DEVELOPMENT BANK Internal Audit Services

MALTA DEVELOPMENT BANK Internal Audit Services MALTA DEVELOPMENT BANK Internal Audit Services 1. INTRODUCTION 1.1. The Malta Development Bank ( the Bank ) was established on 24 November 2017 when the Malta Development Bank Act, 2017 came into force

More information

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement

More information

Factsheet N 12. Focus on public procurement

Factsheet N 12. Focus on public procurement Version N 7 of 13 July 2017 Table of contents I. WHAT IS PUBLIC PROCUREMENT?... 3 II. HOW TO COMPLY WITH PUBLIC PROCUREMENT RULES?... 4 III. POINTS OF ATTENTION... 5 13/07/2017 2/6 I. What is public procurement?

More information

Purchasing and Procurement Policy

Purchasing and Procurement Policy Purchasing and Procurement Policy Purpose The purpose of this document is to implement the requirements of state law with regard to procurement and bidding on public contracts for public works, goods,

More information

1. What is Bribery? 2. Safeguards A. Risk Assessment. B. Accurate Books and Record Keeping

1. What is Bribery? 2. Safeguards A. Risk Assessment. B. Accurate Books and Record Keeping Anti Bribery Policy Protocol is committed to the highest possible standards of openness, probity and accountability. This Anti Bribery policy applies to those who work for or on behalf of Protocol National

More information

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained.

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained. PROCUREMENT POLICY Document Summary To ensure the Trust s approach to Purchasing, Supply and Distribution provides the maximum benefit in both cost and service to the Trust. DOCUMENT NUMBER POL/002/043

More information

Code of business conduct

Code of business conduct CODE OF BUSINESS CONDUCT OUR PRINCIPLES OF ACTION OUR PRINCIPLES OF ORGANIZATION OUR POLICIES Code of business conduct Code of business conduct Contents 01 Introduction 02 Compliance with laws and regulations

More information

Manager, Sourcing Supply and Contracts, Grid Projects Approved By:

Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute

More information

Hellenic Court of Audit, Greece

Hellenic Court of Audit, Greece EU CC PUBLIC PROCUREMENT AUDIT 2018 SAIs PUBLIC PROCUREMENT AUDIT REPORTS (additional information) Typical irregularities identified in public procurement audit Hellenic Court of Audit, Greece Main observations

More information

Guide to the New Public Contracts Regulations 2015

Guide to the New Public Contracts Regulations 2015 Guide to the New Public Contracts Regulations 2015 1. Introduction Public procurement has been undergoing a process of reform. The final version of the Public Contracts Regulations 2015 (Regulations) was

More information

Contract Management Policy

Contract Management Policy Contract Management Policy December 2010 (modified June, 2011) Table of contents SECTION 1: Objectives, Definitions and Field of Application...3 1.1 Objectives...3 1.2 Ethics...3 1.3 Scope...4 1.4 Targeted

More information

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) CHANGES TO STAGE 2b, STAGE 3 & STAGE 4 ARISING FROM AMENDMENTS TO THE PUBLIC WORKS CONTRACTS 1. Introduction 1.1 Changes to Public Works Contracts (a)

More information

Translation from Norwegian. 1 Summary

Translation from Norwegian. 1 Summary 1 Summary Chapter 2 contains an overview of the questions discussed in the report, including how free the municipalities are in choosing forms of collaboration in the ICT area. This report must be seen

More information

Ratos AB Adopted by Ratos s Board on February 2018 (replaces previous version adopted 16 February 2017)

Ratos AB Adopted by Ratos s Board on February 2018 (replaces previous version adopted 16 February 2017) Code of Conduct Ratos is an investment company that acquires, develops and divests mainly unlisted Nordic companies. Over time, Ratos is to generate the highest possible return by actively exercising its

More information

Trethowans LLP. Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender

Trethowans LLP. Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender Trethowans LLP Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender 1. Tender Process 1.1. Trethowans LLP ( Firm ) is providing this Invitation to Tender ( ITT ) to various interested

More information

Roma Integration 2020

Roma Integration 2020 European Union Roma Integration 2020 is co-funded by: Roma Integration 2020 OPEN CALL FOR CONSULTING SERVICES :: REFERENCE NUMBER: 044-018 :: Terms of Reference: Expert Services to Support Regional Conference:

More information

Conditions of Award. Royal Society Newton International Fellowships funded under the Newton Fund

Conditions of Award. Royal Society Newton International Fellowships funded under the Newton Fund Conditions of Award Royal Society Newton International Fellowships funded under the Newton Fund These Conditions of Award set out the standard terms and conditions for all Royal Society Newton International

More information

Procurement. Equalities in Procurement Policy. Policy Review Period/Expiry. November 2014

Procurement. Equalities in Procurement Policy. Policy Review Period/Expiry. November 2014 Procurement Equalities in Procurement Policy Policy Manager Andy Hay Policy Group Procurement Policy Established November 2013 Policy Review Period/Expiry November 2014 Last Updated November 2013 Aims

More information

Brief Guide to Public Sector EU Procurement Legislation. Services for professional procurement. Be better informed, make better decisions.

Brief Guide to Public Sector EU Procurement Legislation. Services for professional procurement. Be better informed, make better decisions. Services for professional procurement. Be better informed, make better decisions. Brief Guide to Public Sector EU Procurement Legislation www.achilles.com Public procurement in the European Union (EU)

More information

Central Bank of Ireland

Central Bank of Ireland Central Bank of Ireland Corporate Procurement Policy 13 February 2017 Page 1 of 10 Change Log Policy Owner and Review Process This owner of the Procurement Policy is the Central Bank Commission. Responsibility

More information

Tender specifications for advertising Satellite image analyses for agricultural control 2018

Tender specifications for advertising Satellite image analyses for agricultural control 2018 Tender specifications for advertising of Satellite image analyses for agricultural control 2018 1 February 2018 1 1.1 Introduction... 3 1.2 The contracting authority... 3 1.3 Description of the project...

More information

239 Purchasing V4 Current

239 Purchasing V4 Current 239 Purchasing V4 Current 1 PURPOSE This policy provides a best practice approach to purchasing for the City of Busselton (the City ). It also ensures compliance with the Local Government Act 1995 ( the

More information

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE Section A Prequalification Questionnaire for Property Related Professional Services PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE CONTENTS Section A Section B Section C Appendix 1 Appendix

More information

ARN2016 Procurement Regulations Utility Sectors 2016

ARN2016 Procurement Regulations Utility Sectors 2016 ARN2016 Procurement Regulations Utility Sectors 2016 Preamble - Special sector companies are obliged to award assignments in accordance with the provisions of the Aanbestedingswet 2012 (Netherlands Procurement

More information

Procurement Under the New Requirements 1

Procurement Under the New Requirements 1 Requirements 1 Procurement under the New Requirements 1 Why This Session Is Needed New provisions in Uniform Guidance Changes to conflict of interest requirements in Uniform Guidance Distinctions between

More information

OFT issues guidance on competition law and its application to public bodies

OFT issues guidance on competition law and its application to public bodies Briefing 12/10 March 2012 OFT issues guidance on competition law and its application to public bodies To: All contacts in England, Wales, Scotland and Northern Ireland Key issues Guidance on competition

More information

CODE OF ETHICS POLICY AND PROCEDURE

CODE OF ETHICS POLICY AND PROCEDURE CODE OF ETHICS POLICY AND PROCEDURE Code of Ethics INDEX Page No. Index... 2 Introduction... 3 Policy Statement... 4 Responsibilities of the Trust...4-5 Responsibilities of the Individual...5-6 Transaction

More information

(2) I. SCOPE OF TENDER

(2) I. SCOPE OF TENDER (1) TENDER NOTICE Contract title: Consultancy Architectural / Engineering Consultant for Onsite Planning in Urban Poor Settlements in Phnom Penh, Cambodia for the Human Rights Based Spatial Planning II

More information

Memorandum of understanding between the Competition and Markets Authority and NHS Improvement

Memorandum of understanding between the Competition and Markets Authority and NHS Improvement 1 April 2016 Memorandum of understanding between the Competition and Markets Authority and NHS Improvement Contents Page Foreword... 2 Summary points of the MoU... 3 Memorandum of understanding between

More information

Structural Assistance Act

Structural Assistance Act Issuer: Riigikogu Type: act In force from: 01.09.2015 In force until: 04.12.2015 Translation published: 10.08.2015 Amended by the following acts Passed 04.06.2014 RT I, 21.06.2014, 1 Entry into force 01.07.2014

More information

1.1 This document details Edinburgh College s Procurement Policy and will support the values adopted by the College by:

1.1 This document details Edinburgh College s Procurement Policy and will support the values adopted by the College by: Policy Finance 1 Issue No 1 Issue Date 01/01/13 Review Date 01/01/16 EIA Prepared by L Dunlop PROCUREMENT POLICY 1. INTRODUCTION 1.1 This document details Edinburgh College s Procurement Policy and will

More information

CORPORATE GOVERNANCE PRINCIPLES

CORPORATE GOVERNANCE PRINCIPLES CORPORATE GOVERNANCE PRINCIPLES 1 GOVERNANCE PRINCIPLES Crayon considers good corporate governance to be a prerequisite for value creation and trustworthiness, and for access to capital. In order to secure

More information