1 Potential Solutions Relative to Dust Control Las Cruces, New Mexico May 2009

2 Best Management Practices Water Track-out Control and Maintenance Surfactants Suppressants Phasing Wind Fencing Grading Landscaping Vegetation

3 Water Trucks

4

5 Cost / Dust Control Costs $55 / Hour $90 / Hour Annually $114,400 year $187,200 year Necessity on Active Sites Quick Fix / Short Term Solution Needed on Inactive Sites Daily if alternative stabilization methods have not been implemented

6 Additional Costs / Considerations Cost of Water Cost of Water Delivery System Soil Types and Size of Site Multiple Trucks Site Shut Downs when unavailable

7 Track-out Control Devices

8

9

10 Costs / Gravel Pads Costs $2,000 Initial Set Up $18 - $25 a ton rock Annually $35K $60K Required on all Sites at all exit points Helps Reduce reentrainment caused by paved road dust High Level of Maintenance Required

11 Costs / Shakers Costs $3,500 Initial Set Up $300 $500 month Rental Rate $12,000 Each Set - Purchase Annually $45K $70K Required on all Sites at all exit points Helps Reduce reentrainment caused by paved road dust Medium / Low Level of Maintenance Required Need three (3) sets to substitute for Gravel

12 Costs / Wheel Wash Costs $5,500 Initial Set Up $3,500 month Rental Rate $75, Purchase Annually $55K $85K Cost Required on all Sites at all exit points Helps Reduce reentrainment caused by paved road dust Medium / Low Level of Maintenance Required Need three (3) sets to substitute for Gravel

13 Additional Costs / Considerations Equipment Costs Rip, refresh and re-new devices Street Sweeping Costs $65 95 an hour $50K - $75K annually Generator Needed for Wheel Wash # of Exits (less is better)

14 Surfactants Surfactant is the word that combines the terms "surface active agent". Chemical species that acts as wetting agents to lower the surface tension of a liquid and allow for increased spreadability.

15 Costs / Surfactants Costs Varied Dependant an acreage Reduces the amount of water required Helps throughout all phases of construction.

16 Palliatives / Suppressants Water- Attracting Chemicals Chlorides, Salts, Brine Solutions Organic Chemicals Lignosulfonates, Tall Oil Pitch, Vegetable Oils Polymers Polyvinyl Acrylics

17 Water-Attracting Chemicals Not recommended in arid or semi-arid areas. Need humidity levels of about 30% for it to pull moisture out of air

18 Organic Chemicals

19 Lignin Derivatives Increases dry strength of soil Not humidity dependant Needs proper aggregate mix to enhance performance Best use on Roads

20 Tall Oil Pitch Imparts plasticity to road surfaces High bonding strength Requires proper weather and time to fully cure Limited re-application, if enough product installed Need to work into soil

21 Polymers

22 Snots Downgraded product of Originals Vinyl versus acrylic Solids Rate is important

23 Other Suppressants Tars, Resins Cementitious Based Binders Organic Nonpetroleum Oils Bio-Diesel By Products Glycerin

24 Cost / Dust Control Costs Applied $600 an acre $7,000 an acre Cost Product $ $7.00 a gallon Application Rates $600 an acre 100 gallons per acre or less Topical Only 3-6 months no traffic $7,000 an acre 1,000 gallons an acre Disc 6-12 months no traffic

25 Drivable Surface??? Costs Applied $15,000 an acre Cost Product $ $7.00 a gallon Application Rates $15,000 an acre GSA or DG Needed Disc 1,500 2,000 gallon per acre minimum

26 Phasing Work Acre limitations Prevents clearing of massive amounts of land Permit restrictions Site Planning Before Development

27 Wind Fencing

28 Wind Fencing Need minimum 3-5 foot high 50% or less porosity

29 Roads / Parking Lots

30

31

32 Signs

33 Opacity A condition of the atmosphere, or any part thereof, in which an air contaminant (particulate matter) partially or wholly obscures the view of an observer

34

35

36

37

38

39 Unpaved Roads & Parking Lots Test Methods for Stabilization Test Methods: Opacity Test Method Silt Content Test Method

40 Equipment Required Sieve Kit Small whisk broom or paint brush Spatula w/out holes Small scale w/ ½ ounce increments Level surface required Shallow light weight container Basic calculator Cloth gloves Sealable plastic bags (if retaining samples) Silt Content test result form Maricopa County Air Quality Department Protecting our most vital natural resource - air

41 Soil Crust Determination (Drop Ball Test)

42 Threshold Friction Velocity

43 TFV Test Method

44 Dust Coordinators

45 Adopt Agriculture Practices

46

47

48

49

50 Comments or Questions??? Cameron Flower Senior Environmental Manager Kitchell Environmental Services (office)

Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders

Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION ASBESTOS AIRBORNE TOXIC CONTROL MEASURE FOR CONSTRUCTION, GRADING, QUARRYING AND SURFACE MINING OPERATIONS 93105, Title 17, California Code of Regulations Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE

More information

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION ASBESTOS AIRBORNE TOXIC CONTROL MEASURE FOR CONSTRUCTION, GRADING, QUARRYING AND SURFACE MINING OPERATIONS 93105, Title 17, California Code of Regulations Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE

More information

Appendix B Maricopa County Dust Abatement Rule 310

Appendix B Maricopa County Dust Abatement Rule 310 Wickenburg Interim Improvement Study Draft Environmental Assessment Appendix B Maricopa County Dust Abatement Rule 310 SECTION 100 - GENERAL MARICOPA COUNTY AIR POLLUTION CONTROL REGULATIONS REGULATION

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

Asbestos Dust Mitigation Plan (ADMP) Application

Asbestos Dust Mitigation Plan (ADMP) Application El Dorado County Air Quality Management District (AQMD) 330 Fair Lane, Placerville, CA 95667 Phone: 530-621-7501 / Fax: 530-295-2774 www.edcgov.us/airqualitymanagement Asbestos Dust Mitigation Plan (ADMP)

More information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan The Application for an Earth Moving Permit / Dust Control Plan Is At the End of This Guidance Section 1 Applicant

More information

Managing Fugitive Dust. Dave Barnes and Billy Connor Alaska University Transportation Center University of Alaska Fairbanks

Managing Fugitive Dust. Dave Barnes and Billy Connor Alaska University Transportation Center University of Alaska Fairbanks Managing Fugitive Dust Dave Barnes and Billy Connor Alaska University Transportation Center University of Alaska Fairbanks Road Map Understanding fugitive dust Methods to manage dust What we have learned

More information

Investigation of Methodologies to Control Dust On Township Roads. SDAT&T Larry Weiss Ken Skorseth

Investigation of Methodologies to Control Dust On Township Roads. SDAT&T Larry Weiss Ken Skorseth Investigation of Methodologies to Control Dust On Township Roads SDAT&T Larry Weiss Ken Skorseth The volume of traffic involved in the oil field in western North Dakota has surpassed the ability of counties

More information

APPENDIXG FUGITIVE DUST CONTROL PLAN

APPENDIXG FUGITIVE DUST CONTROL PLAN APPENDIXG FUGITIVE DUST CONTROL PLAN As required by 324.5524 a fugitive dust control plan has been prepared. Pertinent sections are as follows: (1) The provisions of this section, including subsection

More information

and Surfacing Alternatives

and Surfacing Alternatives Rural Roads Educational Webinar Series UC Cooperative Extension/ Society of American Foresters Roadway Materials, Dust Control, and Surfacing Alternatives Gordon R. Keller, PE, GE Geotechnical Engineer

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Clover Power Station Coal Combustion Residual Management Submitted To: Clover Power Station S.R. 92 Clover, VA 24534 Submitted By: Golder Associates

More information

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES SECTION 11 PART I STORMWATER QUALITY PROTECTION CONTENTS Page 11-1 Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES 11-2 Stormwater Pollution Prevention Plan (SWPPP) 11-3 11-3 Erosion and Sediment

More information

Clements Fluids Roadmaster Calcium Chloride for Dust Control & Road Stabilization. Clements Fluids Management, LLC

Clements Fluids Roadmaster Calcium Chloride for Dust Control & Road Stabilization. Clements Fluids Management, LLC Clements Fluids Roadmaster Calcium Chloride for Dust Control & Road Stabilization Clements Fluids Management, LLC Why Roadmaster Calcium Chloride? Provides dust control at lowest total cost. Improves road

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

GRAVEL ROAD DUST ABATEMENT STATE OF THE PRACTICE

GRAVEL ROAD DUST ABATEMENT STATE OF THE PRACTICE GRAVEL ROAD DUST ABATEMENT STATE OF THE PRACTICE David Jones University of California Pavement Research Center Annual Western Canada Pavement Workshop February 2013 Overview Overview Introduction Additive

More information

CAP.GB.DUS.7/03. Use this booklet to help assure that your business is meeting air quality laws, and to train your employees.

CAP.GB.DUS.7/03. Use this booklet to help assure that your business is meeting air quality laws, and to train your employees. CAP.GB.DUS.7/03 Use this booklet to help assure that your business is meeting air quality laws, and to train your employees. Controlling Dust In Spokane County 1 Why Did SCAPCA Produce This Booklet? The

More information

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment

SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 2004 Specifications CSJ 0013-06-042, Etc. SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 1. Description. Furnish and apply a high friction surfacing system in accordance with this Specification

More information

ALABAMA DEPARTMENT OF TRANSPORTATION

ALABAMA DEPARTMENT OF TRANSPORTATION ALABAMA DEPARTMENT OF TRANSPORTATION DATE: January 9, 2014 Special Provision No. 12-0817 SUBJECT: High Friction Surface Treatments for Asphalt Pavements, Project Number 99-303-690-000-302, Jefferson County

More information

Rock Sock (RS) Rock Sock height.

Rock Sock (RS) Rock Sock height. Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as

More information

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE TABLE OF CONTENT About RESISTO 2 Asphalt Cleaner and Degreaser 3 Oil Spot Primer 3 Liquid Crack Filler 4 Rubberized Crack Filler 4 Levelling

More information

RULE FUGITIVE DUST - CONSTRUCTION, BULK MATERIAL HANDLING, BLASTING, OTHER EARTHMOVING ACTIVITIES AND CARRYOUT AND TRACKOUT PREVENTION

RULE FUGITIVE DUST - CONSTRUCTION, BULK MATERIAL HANDLING, BLASTING, OTHER EARTHMOVING ACTIVITIES AND CARRYOUT AND TRACKOUT PREVENTION EDCAQMD Page 1 of 18 RULE 223-1 FUGITIVE DUST - CONSTRUCTION, BULK MATERIAL HANDLING, BLASTING, OTHER EARTHMOVING ACTIVITIES AND CARRYOUT AND TRACKOUT PREVENTION (Adopted 7/19/2005, Amended 10/18/2005)

More information

Appendix D Regulation VIII Fugitive Dust Rules

Appendix D Regulation VIII Fugitive Dust Rules Regulation VIII Fugitive Dust Rules RULE 800 GENERAL REQUIREMENTS FOR CONTROL OF FINE PARTICULATE MATTER (PM-10) (Adopted 10/10/94; Revised 11/25/96; Revised 11/08/2005; Revised 10/16/2012) A. General

More information

REGULATION III CONTROL OF AIR CONTAMINANTS RULE 301 PRODUCT TRANSFER OPERATIONS INDEX SECTION 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 EXEMPTIONS

REGULATION III CONTROL OF AIR CONTAMINANTS RULE 301 PRODUCT TRANSFER OPERATIONS INDEX SECTION 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 EXEMPTIONS SECTION 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 EXEMPTIONS REGULATION III CONTROL OF AIR CONTAMINANTS RULE 301 PRODUCT TRANSFER OPERATIONS INDEX SECTION 200 DEFINITIONS 201 APPROVED EMISSION CONTROL

More information

Appendix D Regulation VIII Fugitive Dust Rules

Appendix D Regulation VIII Fugitive Dust Rules Regulation VIII Fugitive Dust Rules RULE 800 GENERAL REQUIREMENTS FOR CONTROL OF FINE PARTICULATE MATTER (PM-10) (Adopted 10/10/94; Revised 11/25/96; Revised 11/08/2005; Revised 10/16/2012) A. General

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Dust Control on Unpaved Roads

Dust Control on Unpaved Roads Dust Control on Unpaved Roads D on G. Sh u r ig, Research Associate Highway Extension and Research Project for Indiana Counties Purdue University IN T R O D U C T IO N Dust on unpaved roads creates a number

More information

Fugitive Dust Control Plan Sherburne County Generating Plant

Fugitive Dust Control Plan Sherburne County Generating Plant Fugitive Dust Control Plan Sherburne County Generating Plant Original Publication: September 2015 Review No. 3: October 2018 Revision No: 0 Table of Contents Annual Review Log... 1 Revision Log... 2 Certification

More information

Plant Yates - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5

Plant Yates - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5 AMENDMENT SUMMARY Date Amendment # Comments I Notes Page 2 of 5 1.0 PURPOSE The purpose of this plan is to demonstrate compliance with the fugitive dust requirements in 40 CFR 257.80 (b)(1) through (7)

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT 505 HIGH FRICTION SURFACE TREATMENT 1 of 5 CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT DESCRIPTION. Construct a High Friction Surface Treatment (HFST) using Bauxite Aggregate and Polymer Resin

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE

More information

INSTRUCTIONS FOR AIR QUALITY COMPLIANCE PLAN APPLICATION

INSTRUCTIONS FOR AIR QUALITY COMPLIANCE PLAN APPLICATION INSTRUCTIONS FOR AIR QUALITY COMPLIANCE PLAN APPLICATION Rapid City Community Planning & Development Services Air Quality Division 300 Sixth Street Rapid City, SD 57701 (605) 394-4120 PLEASE PRINT OR TYPE

More information

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Yorktown Power Station Coal Combustion Residual Management Submitted To: Yorktown Power Station 1600 Waterview Road Yorktown, VA 23692 Submitted By:

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 12 16 ASPHALT CONCRETE PAVING PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for placing a hot laid plant mix asphalt surface course upon either an asphalt stabilized

More information

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows:

ADDENDUM NUMBER TWO. A. SECTION ADVERTISEMENT FOR BIDS 1. REVISE Sealed Bid Date/Time/Location paragraph to read as follows: DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION 00 91 11.02 ADDENDUM NUMBER TWO June 22, 2016 TO: PLANHOLDERS SUBJECT: PCT TRUCK STAGING PROJECT PROJECT NO. 091606 CONTRACT NO. 070287 This

More information

HARD COURT/RUNNING TRACK CONSTRUCTION. A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks.

HARD COURT/RUNNING TRACK CONSTRUCTION. A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks. PART 1 GENERAL 1.01 SUMMARY SECTION 02545 HARD COURT/RUNNING TRACK CONSTRUCTION A. Section Includes: Tennis courts, basketball/volleyball courts, and running tracks. B. Related Sections: 1. 02200 - Earthwork.

More information

Hygroscopic salt which absorbs moisture. Long-chain chemicals with soil binding properties

Hygroscopic salt which absorbs moisture. Long-chain chemicals with soil binding properties CHEMICAL DUST SUPPRESSANTS The U.S. EPA lists the use of chemical dust suppressants as one of the most effective Reasonably Available Control Measures (RACM) for long-term stabilization of fugitive dust

More information

DUST CONTROL MEASURES

DUST CONTROL MEASURES The City of Rancho Cucamonga exhibits an extreme concern for its citizens regarding dust control. Our city has several windy days each year. Air pollution remains a significant health concern in many parts

More information

SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES

SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES SEALING PAVEMENT CRACKS WITH HIGH MOLECULAR WEIGHT METHACRYLATES 1. SCOPE This specification covers the materials, techniques, and workmanship requirements for sealing portland cement concrete (PCC) pavement

More information

Editing notes to assist users are included within bordered boxes. Delete these notes prior to final printing.

Editing notes to assist users are included within bordered boxes. Delete these notes prior to final printing. 03050 BASIC CONCRETE MATERIALS AND METHODS This guide specification has been prepared by Dayton Superior Corporation to assist design professionals in the preparation of a specification section covering

More information

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760) NOTICE TO GRADING PERMIT APPLICANTS New Dust Control Ordinance Requirements On November 13, 2003, the City Council of the City of Palm Desert unanimously passed Ordinance 1056 which revised Title 24, Chapter

More information

Product Presentation

Product Presentation Product Presentation 2 Achieving Sustainability, Increased Productivity, Safety and Compliance with Effective Dust Control, Soil Stabilization & Erosion Control (SWPPPs and TSS control) 3 Key Figures 6

More information

SECTION UNIT PAVERS

SECTION UNIT PAVERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Concrete pavers. 2. Detectable warning pavers. 3. Warning stripe pavers. 1.2 SUBMITTALS A. Product Data: For the following: 1. Pavers.

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

Best Management Practice (BMP) Guidance Manual

Best Management Practice (BMP) Guidance Manual Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these

More information

FUGITIVE DUST CONTROL PLAN

FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN FUGITIVE DUST CONTROL PLAN Yorktown Power Station Coal Combustion Residual Management Submitted To: Yorktown Power Station 1600 Waterview Road Yorktown, VA 23692 Submitted By:

More information

Air Quality Conservation Management Practices Program for San Joaquin Valley

Air Quality Conservation Management Practices Program for San Joaquin Valley Air Quality Conservation Management Practices Program for San Joaquin Valley Minimizing Agricultural PM10 from Animal Feeding Operations (AFOs) Poultry Operations May 2004 1 For more information, contact:

More information

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.01 Section 506 SLURRY SEAL 506.01 Description. Prepare the surface and apply a properly proportioned slurry seal mixture. 506.02 Materials. Furnish a slurry seal mixture consisting of a blend of asphalt

More information

Section 506. SLURRY SEAL

Section 506. SLURRY SEAL 506.02 Section 506. SLURRY SEAL 506.01. Description. This work consists of providing traffic control, preparing the surface, and applying a slurry seal mixture. 506.02. Materials. Provide material in accordance

More information

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL 37-2.01 DESCRIPTION This work shall consist of mixing asphaltic emulsion, aggregate, set-control additives and water and spreading

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Stormwater Program Department of Public Works City of Rancho Santa Margarita 22112 El Paseo Rancho Santa Margarita, CA

More information

Evaluation of High Friction and Thin Overlays for Bridges and Pavements

Evaluation of High Friction and Thin Overlays for Bridges and Pavements NTPEP Committee Work Plan for Evaluation of High Friction and Thin Overlays for Bridges and Pavements Date Issued: October 2016 National Transportation Product Evaluation Program 444 North Capitol Street

More information

Liquids are a Tool. What We Will Cover 4/26/2010. Performance issues for Liquids. Environment issues for Liquids. Economics issues for Liquids

Liquids are a Tool. What We Will Cover 4/26/2010. Performance issues for Liquids. Environment issues for Liquids. Economics issues for Liquids Liquids are a Tool Liquids are not a replacement for solid de-icers The Science behind anti-icing, icing de-icing and pre-wetting. Ken Ossian Ossian Inc. Use Liquid and Dry in Combination Liquids melt

More information

Use of Chemical Dust Palliatives as a Best Available Control Measure for Controlling PM-10 Emissions from Paved Roads during Windstorms

Use of Chemical Dust Palliatives as a Best Available Control Measure for Controlling PM-10 Emissions from Paved Roads during Windstorms Use of Chemical Dust Palliatives as a Best Available Control Measure for Controlling PM-10 Emissions from Paved Roads during Windstorms Environmental Quality Program Environmental Services Division Department

More information

CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA

CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA 57701-2724 PLANNING DEPARTMENT 300 Sixth Street Jeff Gies, Transportation Planning Coordinator Transportation Planning Division Phone: 605-394-4120 Fax: 605-394-6636

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT. OFS:CER 1 of 5 APPR:GM:TEH: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR HIGH FRICTION SURFACE TREATMENT OFS:CER 1 of 5 APPR:GM:TEH:04-04-13 FHWA:APPR: 04-21-14 a. Description. This work consists of providing all labor,

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION 326-1(a-j) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION These Special Provisions revise, amend and where in conflict, supersede applicable sections of the 1999

More information

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON Prepared For: Greenwood Aggregates Company Limited 205467 County Road 109 Amaranth,

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities Development Services 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 issaquahwa.gov Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction

More information

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF PERMITTING, ENVIRONMENT, AND REGULATORY

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF PERMITTING, ENVIRONMENT, AND REGULATORY MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF PERMITTING, ENVIRONMENT, AND REGULATORY AFFAIRS (PERA) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

ROAD MAINTENANCE METHODS. By B. C. Tiney, Maintenance Engineer, Michigan State Highway Department.

ROAD MAINTENANCE METHODS. By B. C. Tiney, Maintenance Engineer, Michigan State Highway Department. 70 PURDUE ENGINEERING EXTENSION DEPARTMENT ROAD MAINTENANCE METHODS By B. C. Tiney, Maintenance Engineer, Michigan State Highway Department. Michigan is maintaining a 6900-mile system of state highways,

More information

Prologis Oakland Global Logistics Center. Diesel Emissions Reduction and Air Quality Plan for Construction of

Prologis Oakland Global Logistics Center. Diesel Emissions Reduction and Air Quality Plan for Construction of Prologis Oakland Global Logistics Center Prepared For: City of Oakland Planning & Building Dept. 250 Frank Ogawa Plaza Oakland, CA 94612 Diesel Emissions Reduction and Air Quality Plan for Construction

More information

Plant Bowen - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5

Plant Bowen - Operations Procedures Fugitive Dust Control Plan AMENDMENT SUMMARY. Date Amendment # Comments I Notes. Page 2 of 5 AMENDMENT SUMMARY Date Amendment # Comments I Notes Page 2 of 5 1.0 PURPOSE The purpose of this plan is to demonstrate compliance with the fugitive dust requirements in 40 CFR 257.80 (b)(1) through (7)

More information

Construction Stormwater Best Management Practices

Construction Stormwater Best Management Practices Marin County Stormwater Pollution Prevention Program San Rafael, California November 12, 2015 Construction Stormwater Best Management Practices The mention or image of any product or service is for illustrative

More information

Flowfast Terrosso (2mm)

Flowfast Terrosso (2mm) Technical Profile Flowfast Terrosso (2mm) A seamless, rapid curing, decorative, durable MMA floor finish that transforms commercial and industrial environments. Typically used in public areas including

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

GENERAL REQUIREMENTS (Adopted November 15, 2001; Amended August 19, 2004)

GENERAL REQUIREMENTS (Adopted November 15, 2001; Amended August 19, 2004) RULE 8011 GENERAL REQUIREMENTS (Adopted November 15, 2001; Amended August 19, 2004) 1.0 Purpose The purpose of Regulation VIII (Fugitive PM10 Prohibitions) is to reduce ambient concentrations of fine particulate

More information

1. CMP SPECIALTY PRODUCTS 210 calcium aluminate/portland cement based self-leveling underlayment and topping

1. CMP SPECIALTY PRODUCTS 210 calcium aluminate/portland cement based self-leveling underlayment and topping SECTION 09699 RECOMMENDED SPECIFICATION FOR CMP SPECIALTY PRODUCTS LOCKDOWN 100% SOLIDS, TWO COMPONENT, RESIN BASED, MEMBRANE FORMING, MOISTURE MITIGATION SYSTEM PART 1- GENERAL 1.01 RELATED DOCUMENTS

More information

Submittal Information

Submittal Information Adhesive Fast Dispensing, Fast Curing The acrylic resin and hardening agent are completely mixed as they are simultaneously dispensed from the dual cartridge through a static mixing nozzle, directly into

More information

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on

More information

DUST EMISSIONS FROM UNPAVED GROUND SURFACES

DUST EMISSIONS FROM UNPAVED GROUND SURFACES DUST EMISSIONS FROM UNPAVED GROUND SURFACES D. C. Wijeyesekera 1,2, I. Bakar 1,2, S. M. Lim 1 and N. A. Zainal Abidin 1 1 Faculty of Civil and Environmental Engineering, University Tun Hussein Onn Malaysia,

More information

LAND DISTURBANCE PERMIT

LAND DISTURBANCE PERMIT SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone

More information

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.

A. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork. DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management

More information

Recommended Application Procedures

Recommended Application Procedures Recommended Application Procedures www.streetbond.com Updated: OCT 2011 Introduction StreetBond CemBase is an high-performance cementitious, epoxy modified, acrylic based, waterborne surfacing product

More information

NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION

NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION NJDOT HIGH FRICTION SURFACE TREATMENT SPECIFICATION ROBERT BLIGHT SUPERVISING ENGINEER NJDOT PAVEMENT DESIGN & TECHNOLOGY SECTION NJDOT HIGH FRICTION SURFACE TREATMENT (HFST) SPECIFICATION DESCRIPTION

More information

Current Hunters Point Projects and Dust Mitigation Practices. Hunters Point Shipyard Community Meeting April 14, 2009

Current Hunters Point Projects and Dust Mitigation Practices. Hunters Point Shipyard Community Meeting April 14, 2009 Current Hunters Point Projects and Dust Mitigation Practices Hunters Point Shipyard Community Meeting April 14, 2009 Overview Navy Introductions Project Update Site Walk Dust Best Management Practices

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

RITIVEX R LIQUID 1102

RITIVEX R LIQUID 1102 RITIVEX R LIQUID 1102 EDITION: SEPTEMBER 2013 ADHESIVE, ACRYLIC RESIN FOR MULTIPLE USES GENERAL CHARACTERISTICS Acrylic, adhesive, joining resin, water - diluted. It is combined with all cementitious mortars

More information

Revegetation Temperate Climates Short-term Non Vegetation Wet Tropics Long-term Weed Control Semi-Arid Zones Permanent

Revegetation Temperate Climates Short-term Non Vegetation Wet Tropics Long-term Weed Control Semi-Arid Zones Permanent Soil Binders EROSION CONTROL TECHNIQUE Revegetation Temperate Climates Short-term Non Vegetation Wet Tropics Long-term Weed Control Semi-Arid Zones Permanent Symbol Key Principles 1. The application and

More information

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 9/30/2009 AC 150/5370-10E ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 631-1.1 GENERAL. This item shall consist of a mixture of refined coal tar emulsion, mineral

More information

The specified emulsion for chip seal shall conform to the following applicable requirements:

The specified emulsion for chip seal shall conform to the following applicable requirements: ASPHALT EMULSION SEAL COAT Asphalt emulsion seal coat consist of applying asphaltic emulsion and screenings on the pavement where shown on the plans, as specified in these specifications and the special

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA

CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA 57701-2724 PLANNING DEPARTMENT 300 Sixth Street Jeff Gies, Transportation Planning Coordinator Transportation Planning Division Phone: 605-394-4120 Fax: 605-394-6636

More information

Road Conditioning Asphalt Crushing Soil Stabilization CLAUSSEN

Road Conditioning Asphalt Crushing Soil Stabilization CLAUSSEN Road Conditioning Asphalt Crushing Soil Stabilization CLAUSSEN. Wirtgen WS 2500 Tractor towed Soil Stabilizer 360hp Fendt or Claas IVT transmission Width 2.5 m = 8.5 ft Depth 0.50 m = 20 inch Compact and

More information

n o r s t o n e r o c k p a n e l s ROCK PANEL SPECIFICATION SHEET

n o r s t o n e r o c k p a n e l s ROCK PANEL SPECIFICATION SHEET n o r s t o n e r o c k p a n e l s ROCK PANEL SPECIFICATION SHEET STONE SPECIFICATIONS: Stone shall be Norstone Rock Panels as produced by Norstone of Sydney, Australia. For more information, please contact

More information

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 7. Published by

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 7. Published by AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 7 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205

More information

A. Submittal Procedures: See Article 13 of the General Conditions.

A. Submittal Procedures: See Article 13 of the General Conditions. SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,

More information

Storm Water Pollution and Spill Prevention Plan

Storm Water Pollution and Spill Prevention Plan Storm Water Pollution and Spill Prevention Plan for Deerfield Township, Ohio Prepared by: Deerfield Regional Storm Water District February, 2006 Table of Contents Introduction... 3 Part I: Site Assessment...

More information

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel

More information

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION]

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION] SECTION 31 32 13.26 - LIME-FLY ASH OR FLY ASH STABILIZATION PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for treating and stabilizing existing subgrade material or select

More information

Q: How often should the PaveDrain System be completely cleaned or maintained?

Q: How often should the PaveDrain System be completely cleaned or maintained? MAINTENANCE MANUAL The PaveDrain System is a one of a kind paving surface that takes all of the positive attributes of traditional paving surfaces and puts them together into one single permeable paving