Optimization of a Groundwater Wellfield Subject to Regulatory Constraints

Size: px
Start display at page:

Download "Optimization of a Groundwater Wellfield Subject to Regulatory Constraints"

Transcription

1 Optimization of a Groundwater Wellfield Subject to Regulatory Constraints Andrew Hinnell, Ph.D., P.Geo. Senior Hydrogeologist, Advisian April 4,

2 Introduction Driver: Controls: Water supply Acts Regulations Guidelines Approach: Optimize water well production rates within the regulatory guidelines Advisian / 2

3 Groundwater Supply ~ 240,000 Water wells drilled in Alberta ~ 150,000 Water wells drilled since 1980 ~ 70,000 Active water wells within the Paskapoo Formation 330 million m 3 of groundwater 660,000 people rely on groundwater as their primary source of water (Alberta Environment 2010) Map credit: Advisian / 3

4 Regulatory Regime - Alberta Statute Water Act The purpose of this Act is to support and promote the conservation and management of water, including the wise allocation and use of water. Under the Water Act a licence is required to divert water for all purposes except household, traditional agriculture, or where use is exempt under the Water Regulation (e.g. fire fighting). Advisian / 4

5 Regulatory Regime - Alberta Implementation of the Water Act managed through Policy and Guidelines Groundwater Authorization Guideline (2011) Water Conservation and Allocation Policy/ Guideline for Oilfield Injection (2006) Groundwater Management Frameworks Advisian / 5

6 Groundwater Authorization Constraints: Sustainable Yield (Q 20 ) Q 20 = 0.7QH a s 20y T + s 100m O s 100m T Drawdown at the pumping well is limited to the top of the confined aquifer Impacts of the proposed water diversion on the Aquifer, the Environment, and Other Users needs to be assessed Advisian / 6

7 Synthetic Example Advisian / 7

8 Scenario Company A is evaluating their unconventional oil and gas asset and requires water to support the appraisal phase Having completed an Alternative Water Use Assessment groundwater was determined to be the preferred water source during appraisal with a switch to reuse/recycle of saline water should the asset move to operations Google Images Advisian / 8

9 Scenario Company A has drilled and tested multiple groundwater wells and is now interested in moving to licencing some groundwater wells to divert groundwater to support appraisal Questions: Which wells? How much? Advisian / 9

10 Setting Advisian / 10

11 Setting Well 4 Well 3 Well 2 Well 1 T=400m 2 /d S=1x10-4 Wells screened in a confined aquifer not connected to surface water Well Q20 rate Available Head Well Well Well Well Advisian / 11

12 Predicted Drawdown (Individual Q20) Well Rate Available Head Well Well Well Well Well A Well B Predicted Drawdown Total Q = 7,300m 3 /d Advisian / 12

13 Constraints Well interference within the well field reduces overall capacity of the well field H a 1 > s 1 1 +s 2 1 +s 3 1 +s 4 1 Drawdown at Wells A and B what interference is reasonable? s A > 0.1H a A s B > 0.1H a B 10% used as an example, actual values are subject to negotiation Advisian / 13

14 Predicted Drawdown (Well field) Well Rate Available Head Well Well Well Well Well A Well B Predicted Drawdown Total Q = 5,000m 3 /d Advisian / 14

15 Predicted Drawdown (Well field) Well Rate Available Head Well Well Well Well Well A Well B Predicted Drawdown Total Q = 1,200m 3 /d Advisian / 15

16 Optimization Multiple combinations of wells can meet constraints Which combination of pumping rates meets the constraints and results in the highest production rate for the well field? Advisian / 16

17 Optimization Multiple options based on complexity of problem and forward model DREAM - Efficient global MCMC even in high-dimensional spaces Advisian / 17

18 Optimized Production Rates Well Rate Available Head Well Well Well Well Well A 15 4 Well B Total Q = 5,500m 3 /d Predicted Drawdown Advisian / 18

19 Cost Considerations Well Rate Available Head Well Well Well Well Well A Well B Total Q = 4,900m 3 /d Predicted Drawdown Slight reduction in volume with significant reduction in cost (2 wells do not need to be tied in) Advisian / 19

20 Summary Objective: estimate the maximum volume of groundwater that could be produced from a wellfield given the regulatory constraints and thus identify a production rate that is defensible within the regulatory guidelines Approach: solve a constrained optimization problem for maximum production rate. Result: Maximum likelihood estimate of the production rate for each well that meets the specified constraints. From the groundwater licence applicant s perspective, this approach provides an estimate of total production rate for the well field and an estimate of proposed production rates from individual wells and a proposed well field operation scheme that meets regulatory constraints. Advisian / 20

21

22 DISCLAIMER This presentation has been prepared by a representative of Advisian. The presentation contains the professional and personal opinions of the presenter, which are given in good faith. As such, opinions presented herein may not always necessarily reflect the position of Advisian as a whole, its officers or executive. Any forward-looking statements included in this presentation will involve subjective judgment and analysis and are subject to uncertainties, risks and contingencies many of which are outside the control of, and may be unknown to, Advisian. Advisian and all associated entities and representatives make no representation or warranty as to the accuracy, reliability or completeness of information in this document and do not take responsibility for updating any information or correcting any error or omission that may become apparent after this document has been issued. To the extent permitted by law, Advisian and its officers, employees, related bodies and agents disclaim all liability direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Advisian and/or any of its agents) for any loss or damage suffered by a recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.

Delivering Business Results Today by Using Tomorrow s Field Optimisation Engine

Delivering Business Results Today by Using Tomorrow s Field Optimisation Engine INSTR COVE 1. 2. 3. 4. 5. Delivering Business Results Today by Using Tomorrow s Field Optimisation Engine S t G C C L u INSTR IMAG 1. 2. 3. C G T o 4. T t Kai Eberspaecher / Antony Wauchope October 2017

More information

Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation

Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation Integrated Surface Water and Groundwater Modelling for Oil Sands Reclamation Ranjeet Nagare 1, Young-Jin Park 2, Jalpa Pal 1 1 WorleyParsons Canada Services Ltd. 2 Aquanty Inc. Shell, 2006 (AER, 2014)

More information

Technical and Economic Challenges of Biomass and Waste to Syngas

Technical and Economic Challenges of Biomass and Waste to Syngas Technical and Economic Challenges of Biomass and Waste to Syngas Feedstock, Process and Product Selection Armen Abazajian, Senior Consultant, Advisian Prepared for Presentation at the 2018 Global Syngas

More information

Gathering engineering and supplier data for oil and gas projects

Gathering engineering and supplier data for oil and gas projects Gathering engineering and supplier data for oil and gas projects Past, Present and Future Dave Kent Lead Data Coordinator Offshore Engineering Data Event Welcome Dave Kent Lead Data Coordinator WorleyParsons

More information

HISC Performance Validation of DSS Welds for Large-Strain, HP/HT Subsea Applications

HISC Performance Validation of DSS Welds for Large-Strain, HP/HT Subsea Applications HISC Performance Validation of DSS Welds for Large-Strain, HP/HT Subsea Applications Requirements for an Improved Assessment Approach Alexander Amadioha & Andrew Low AOG 2015 Conference, Perth, Australia,

More information

Phosphate in Australia

Phosphate in Australia Engineering Conferences International ECI Digital Archives Beneficiation of Phosphates VII Proceedings Spring 4-1-2015 Phosphate in Australia Ewan Wingate WorleyParsons John Dunster Rum Jungle Resources

More information

ESCRI-SA Energy Storage for Commercial Renewable Integration South Australia

ESCRI-SA Energy Storage for Commercial Renewable Integration South Australia Energy Storage for Commercial Renewable Integration South Australia Project Update - Phase 1 by Bruce Bennett, AGL Hugo Klingenberg, ElectraNet Paul Ebert, WorleyParsons Background to Project A study was

More information

ASX Release. CEDA 2009 Energy Overview. 2 October 2009 PETRATHERM LIMITED ABN

ASX Release. CEDA 2009 Energy Overview. 2 October 2009 PETRATHERM LIMITED ABN ASX Release PETRATHERM LIMITED ABN 17 106 806 884 CEDA 2009 Energy Overview Petratherm Managing Director, Mr Terry Kallis, will later this morning present an update on the Australian Geothermal Industry

More information

Share Fair November Garry Lewis, Business Development Director Roy Choudhury, Supply Chain Director

Share Fair November Garry Lewis, Business Development Director Roy Choudhury, Supply Chain Director Share Fair 2017 1 November 2017 Garry Lewis, Business Development Director Roy Choudhury, Supply Chain Director In case of emergency 2 Agenda Introduction to WorleyParsons UK opportunities Global Supplier

More information

PETRATHERM LIMITED ABN

PETRATHERM LIMITED ABN ASX Release PETRATHERM LIMITED ABN 17 106 806 884 Carbon pricing presentation by MD The attached presentation, by Petratherm s MD, Terry Kallis, summarizes the broad impacts of the recently legislated

More information

For personal use only

For personal use only Mobile solution for the hiring, scheduling and employment of contingent workforces Recently featured in: 23 rd June 2015 People Power Potential Disclaimer This presentation has been prepared by Reclaim

More information

SAREIC Petratherm Limited. Company & Projects Overview. Managing Director Terry Kallis. 1 May 2013

SAREIC Petratherm Limited. Company & Projects Overview. Managing Director Terry Kallis. 1 May 2013 SAREIC 2013 Petratherm Limited Company & Projects Overview Managing Director Terry Kallis 1 May 2013 Disclaimer and competent persons statement Disclaimer This presentation has been prepared by Petratherm

More information

For personal use only. Company Update

For personal use only. Company Update Company Update May 2016 Company Highlights Vmoto is a global electric scooter manufacturer and distribution group Growing sales and underlying profits over FY2013 to FY2015 Wide China sales channels with

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Campbell River Power Enterprises Project April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Ditni Yoh Green Energy April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION OF LIABILITY

More information

PETRATHERM LIMITED ABN

PETRATHERM LIMITED ABN ASX Release PETRATHERM LIMITED ABN 17 106 806 884 Company Update Australian Geothermal Energy Conference Petratherm s Managing Director, Mr. Terry Kallis and Exploration Manager, Mr. Peter Reid, will present

More information

For personal use only

For personal use only Vmoto Presentation May 2018 Electric Vehicle - Think Future Disclaimer IMPORTANT NOTICE The information contained in this presentation is current as at 22 May 2018 and is provided by Vmoto Limited (ABN

More information

System Impact Study for. 1 January January 2016

System Impact Study for. 1 January January 2016 System Impact Study for OASIS 72401305 Long-term Point to Point Transmission Service Request On the LM BPAT Path 1 January 2011 1 January 2016 Report No: SPPA2009-113 May 2009 System Planning & Performance

More information

An overview of the global LPG market and its impact in Latin America

An overview of the global LPG market and its impact in Latin America An overview of the global LPG market and its impact in Latin America Rio de Janeiro, 33 rd AIGLP Conference Vanessa Viola SVP Latin America, Argus March 218 London Houston Moscow Singapore Dubai New York

More information

XXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan

XXXXX. Bremner Trio Small Hydro Project. Interconnection Facilities Study and Project Plan XXXXX Bremner Trio Small Hydro Project Interconnection Facilities Study and Project Plan June 25, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights

More information

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview Green Evaluation D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds Transaction Overview In January 2017, the District of Columbia Water & Sewer Authority issued $100 million in series

More information

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT. March 2018 ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT March 2018 Transaction Highlights 2 High Grade Vanadium in Drilling Significant Whole Rock Results include1: 9m at 1.34% V2O5 + 10.5% TiO2 from 9m (SFR019)

More information

Interconnection Feasibility Study

Interconnection Feasibility Study XXXXX Campbell River Power Enterprises Project April 5, 2011 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2011. All rights reserved. DISCLAIMER OF WARRANTY, LIMITATION

More information

SPE Workshop: The Montney Play Drilling Data Trends

SPE Workshop: The Montney Play Drilling Data Trends SPE Workshop: The Montney Play Drilling Data Trends Mark Lenko, M.Ec., P.Eng., Managing Director (Interim) and Engineering Director Mark Kowaluk, B.Sc., EIT, Engineer October 17-18, 2016 Disclaimer Disclaimers

More information

3 May 2016 FILE: Twin Lakes: Water Management Guidance for Phase 1 of TLGR DVP

3 May 2016 FILE: Twin Lakes: Water Management Guidance for Phase 1 of TLGR DVP FILE: 15-048-01 Regional District Okanagan Similkameen 101 Martin Street Penticton, B.C. V2A 5J9 Attn.: Mr. Stephen Juch, AScT, Subdivision Supervisor Via email: sjuch@rdos.bc.ca Re: Twin Lakes: Water

More information

IAG House, 388 George Street, Sydney. Retrofitting for Energy Efficiency 2 February 2012

IAG House, 388 George Street, Sydney. Retrofitting for Energy Efficiency 2 February 2012 IAG House, 388 George Street, Sydney Retrofitting for Energy Efficiency 2 February 2012 Important Notice Whilst every effort is made to provide accurate and complete information, this presentation has

More information

Investor Update. January 2014 ASX : ENR

Investor Update. January 2014 ASX : ENR Investor Update January 2014 ASX : ENR INVESTMENT SUMMARY Greenfields Copper Discovery - BM7 Large scale Cu system >14km long and growing $20m farm-in with Antofagasta plc (2 tenements) Key ground position

More information

Air Cooled Condensers

Air Cooled Condensers Air Cooled Condensers Key Elements for a Successful Specification Gary Pratt Jose Oikawa Advisian / WorleyParsons www.advisian.com Introduction Preparing an ACC specification: How hard can it be? All you

More information

HOW LONG WILL THE RUBBER OVERSUPPLY LAST?

HOW LONG WILL THE RUBBER OVERSUPPLY LAST? 1 HOW LONG WILL THE RUBBER OVERSUPPLY LAST? PAUL BRISSON VICE PRESIDENT C4 OLEFINS & DERIVATIVES ARGUS MEDIA, HOUSTON How Long Will the Rubber Oversupply Last APIC, Kuala Lumpur, Malaysia Paul Brisson

More information

For personal use only

For personal use only Go to View / Master / Slide Master. Insert, position and crop pictures on this Master Slide behind Vision Graphic element. MASTERMYNE GROUP AGM OPERATIONS UPDATE NOVEMBER 2017 www.mastermyne.com.au Overview

More information

Australian Agricultural Company. Financial Results Full Year ended 31 March 2017

Australian Agricultural Company. Financial Results Full Year ended 31 March 2017 Australian Agricultural Company Financial Results Full Year ended 31 March 2017 FY17 snapshot path of continued growth AACo s strategy is delivering returns Operational performance delivering financial

More information

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES

COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED TRANSMISSION SERVICES COST ALLOCATION POLICY FOR VICTORIAN TERMINAL STATIONS NEGOTIATED PREPARED BY: Network Development VERSION: 2.0 RELEASE DATE: 30 May 2012 Version Release History Version Date By Changes 1.0 6 Oct 11 Transmission

More information

E1/91. Brookfield Power New York Finance LP s $305 Million Senior Secured Notes. Green Evaluation. Transaction Overview. Green Evaluation Overview

E1/91. Brookfield Power New York Finance LP s $305 Million Senior Secured Notes. Green Evaluation. Transaction Overview. Green Evaluation Overview Green Evaluation Brookfield Power New York Finance LP s $305 Million Senior Secured Notes Transaction Overview Brookfield Power New York Finance LP (BPNY), indirectly owned by Brookfield Renewable Partners

More information

CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5)

CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5) CLARIFICATION OF GENERATOR TECHNICAL PERFORMANCE REQUIREMENTS (S5.2.5) 1. PURPOSE AEMO has prepared this document to clarify AEMO s interpretation of particular clauses in Schedule 5.2 of the National

More information

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.)

HPS vs. LED Indoor Cannabis Cultivation. Lasse Schulze (Ph.D.) HPS vs. LED Indoor Cannabis Cultivation Lasse Schulze (Ph.D.) Disclaimers & Cautionary Statements The information found herein, and any other materials provided by Cronos Group (the Company ), are intended

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

E2/67. Green Evaluation City of Gothenburg. Transaction Overview. Green Evaluation Overview. Overall Score. Transaction Transparency.

E2/67. Green Evaluation City of Gothenburg. Transaction Overview. Green Evaluation Overview. Overall Score. Transaction Transparency. Green Evaluation City of Gothenburg Transaction Overview On June 15, 2016 the City of Gothenburg, Sweden issued Swedish krona (SEK) 1 billion of green bonds due June 15, 2022 to fund a number of eligible

More information

For personal use only. Annual General Meeting 23 August 2016

For personal use only. Annual General Meeting 23 August 2016 Annual General Meeting 23 August 2016 Shaping the future 2 Overview Group revenue up 3.5% and underlying EBIT up 3.9% Strong growth in Business Finance demonstrates diversification strategy Group receivables

More information

MNSP DISPATCH ISSUE - MNSP NPL MODEL BUSINESS SPECIFICATION

MNSP DISPATCH ISSUE - MNSP NPL MODEL BUSINESS SPECIFICATION MNSP DISPATCH ISSUE - MNSP NPL MODEL BUSINESS SPECIFICATION PREPARED BY: DOCUMENT NO: 140-0069 VERSION NO: 1.01 EFFECTIVE DATE: 01/07/2010 ENTER STATUS: Market Operations Performance Final Au nollan fmrgy

More information

2017 Geo Business Seminar

2017 Geo Business Seminar 2017 Geo Business Seminar WELCOME Paradigm Change in the Automotive Industry How spatial data can help us predict the future of mobility and car sales Tanja Linken, Global Director Advisory Services, IHS

More information

Productivity and Recovery: Type Curves and EURs in the Northern Williston Basin

Productivity and Recovery: Type Curves and EURs in the Northern Williston Basin : Type Curves and EURs in the Northern Williston Basin Mark Lenko, B.Sc., B.A., M.Ec., P.Eng. Managing Director and Engineering Director Williston Basin Petroleum Conference 2017 May 2-4, 2017, Regina,

More information

Division of Drinking and Ground Waters. Division: Number: Category: Status: Issued:

Division of Drinking and Ground Waters. Division: Number: Category: Status: Issued: Division of Drinking and Ground Waters Policy on When The Constant Rate Pumping Test Should Exceed 24 Hours I. Purpose: Division: Number: Category: Status: Issued: DDAGW WELL-xx-001 Well Policy Draft 05/01/14

More information

Groundwater modelling study for sustainable water management in Town of High River. Han Sang-Yoon WaterTech, April 12, 2013

Groundwater modelling study for sustainable water management in Town of High River. Han Sang-Yoon WaterTech, April 12, 2013 Groundwater modelling study for sustainable water management in Town of High River Han Sang-Yoon WaterTech, April 12, 2013 Acknowledgements Town of High River: Reiley McKerracher Jasen Craigie Project

More information

PETRATHERM LIMITED ABN

PETRATHERM LIMITED ABN ASX Release PETRATHERM LIMITED ABN 17 106 806 884 China Update Several new prospective geothermal sites have been identified by Petratherm in China. The sites were identified in a recently completed Engineered

More information

What s next for the oil industry?

What s next for the oil industry? What s next for the oil industry? Andy Milnes, CEO Integrated Supply & Trading Eastern Hemisphere Singapore, 6 September 2016 Disclaimer This document is intended to be read by the addressee only and must

More information

Global Lessons on Water Reuse for Industrial Applications in Alberta. Dr. Stephen Stanley, Ph.D., P.Eng., Senior Vice President, EPCOR Water Services

Global Lessons on Water Reuse for Industrial Applications in Alberta. Dr. Stephen Stanley, Ph.D., P.Eng., Senior Vice President, EPCOR Water Services Global Lessons on Water Reuse for Industrial Applications in Alberta Dr. Stephen Stanley, Ph.D., P.Eng., Senior Vice President, EPCOR Water Services An Evolving Global Water Market Demand for water is

More information

Investor Presentation

Investor Presentation Tony Toohey CEO & Managing Director Investor Presentation August, 2013 1 Disclaimer This document and any oral presentation accompanying it has been prepared in good faith. However, no express or implied

More information

CHAPTER 2. Objectives of Groundwater Modelling

CHAPTER 2. Objectives of Groundwater Modelling CHAPTER 2 Objectives of Groundwater Modelling In the last two decades mathematical modelling techniques have increasingly proved their value in furthering the understanding of groundwater systems and,

More information

METIS SETTLEMENTS STRATEGIC TRAINING INITIATIVES SOCIETY Request for Proposals

METIS SETTLEMENTS STRATEGIC TRAINING INITIATIVES SOCIETY Request for Proposals METIS SETTLEMENTS STRATEGIC TRAINING INITIATIVES SOCIETY Request for Proposals Invitation to Proponents This Request for Proposals ( RFP ) is an invitation to prospective contractors to submit proposals

More information

Pemex Farmout Day Ogarrio. Attractive investment opportunities in partnership with Pemex July Public bidding process administered by CNH

Pemex Farmout Day Ogarrio. Attractive investment opportunities in partnership with Pemex July Public bidding process administered by CNH 1 Pemex Farmout Day 2017 Ogarrio Attractive investment opportunities in partnership with Pemex July 2017 Public bidding process administered by CNH 2 OGARRIO Agenda Introduction Reserves Wells drilled

More information

Fortescue Metals Group Ltd. Peer review and model appraisal. Hydrogeological Assessment for the. Cloudbreak Water Management Scheme

Fortescue Metals Group Ltd. Peer review and model appraisal. Hydrogeological Assessment for the. Cloudbreak Water Management Scheme Fortescue Metals Group Ltd Peer review and model appraisal Hydrogeological Assessment for the Cloudbreak Water Management Scheme 14 th October 2010 HydroConcept Pty Ltd ABN: 42 143 302 201 PO Box 4231,

More information

Audit and Review Guidelines: Electricity and Gas Licences

Audit and Review Guidelines: Electricity and Gas Licences Audit and Review Guidelines: Electricity and Gas Licences April 2014 This document is available from the Economic Regulation Authority s website at www.erawa.com.au. For further information, contact: Economic

More information

Unconventional Marketing Techniques

Unconventional Marketing Techniques Unconventional Marketing Techniques Dr. Doug Ross The opinions of the contributors expressed herein do not necessarily state or reflect those of the International Carwash Association, its directors or

More information

STRATEGIC UPDATE 20 DECEMBER 2017

STRATEGIC UPDATE 20 DECEMBER 2017 STRATEGIC UPDATE 20 DECEMBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited ( Synlait ). It should be read in conjunction with,

More information

E1/83. ACS Servicios Comunicaciones y Energía S.L. Green Notes. Green Evaluation. Transaction Overview. Green Evaluation Overview.

E1/83. ACS Servicios Comunicaciones y Energía S.L. Green Notes. Green Evaluation. Transaction Overview. Green Evaluation Overview. Green Evaluation ACS Servicios Comunicaciones y Energía S.L. Green Notes Transaction Overview ACS Servicios Comunicaciones y Energía S.L. (ACS SCE) plans to issue 750 million of direct, general, unconditional,

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

31/10/2017. Australian vs Global investing in context. Investment Return. MSCI World SMSF ASSOCIATION INVESTING OVERSEAS WITHOUT LEAVING HOME

31/10/2017. Australian vs Global investing in context. Investment Return. MSCI World SMSF ASSOCIATION INVESTING OVERSEAS WITHOUT LEAVING HOME OVERSEAS WITHOUT STEFAN MARCIONETTI PORTFOLIO MANAGER MAGELLAN ASSET MANAGEMENT Australian vs Global investing in context Investment Return MSCI world S&P/ASX 200 MSCI World Australia 2.6% Rest of the

More information

Pemex Farmout Day Ayín-Batsil. Attractive Investment Opportunities in Partnership with Pemex July 2017

Pemex Farmout Day Ayín-Batsil. Attractive Investment Opportunities in Partnership with Pemex July 2017 Pemex Farmout Day 2017 Ayín-Batsil Attractive Investment Opportunities in Partnership with Pemex July 2017 Public Bidding Process Administered by CNH AYÍN-BATSIL Agenda Introduction Exploration wells drilled

More information

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017

TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 TasNetworks Distribution Connection Pricing Policy Final AER approved Commencing 1 July 2017 Page 1 of 54 Copyright This document is protected by copyright vested in Tasmanian Networks Pty Ltd. No part

More information

For personal use only

For personal use only 23 November 2016 Dear Shareholders, Our Journey from Pastoral Company to a Luxury Brand Business You would notice a lot of change if you first invested in AACo 5 years ago. We are still the leading beef

More information

Ring Fencing Guideline

Ring Fencing Guideline Ring Fencing Guideline Issue number 1 Status Final Date of approval 20/12/2017 Disclaimer This template is for generating internal and external document belonging to AusNet Services and may or may not

More information

Determining the Salinity of Groundwater for Regulatory Purposes in Alberta

Determining the Salinity of Groundwater for Regulatory Purposes in Alberta Determining the Salinity of Groundwater for Regulatory Purposes in Alberta Brent Welsh, P.Eng. District Hydrogeologist Alberta Environment and Water Operations, Northern Region Banff, Alberta April 12,

More information

FY18 RESULTS PRESENTATION

FY18 RESULTS PRESENTATION FY18 RESULTS PRESENTATION DISCLAIMER This presentation has been prepared by rhipe Limited ACN 112 452 436 (RHP). Each Recipient of this presentation is deemed to have agreed to accept the qualifications,

More information

MarkitSERV Membership Documents Instruction Sheet for New Clients. May 10, 2012

MarkitSERV Membership Documents Instruction Sheet for New Clients. May 10, 2012 MarkitSERV Membership Documents Instruction Sheet for New Clients May 10, 2012 Overview Purpose This document will provide a standard list of forms that are required for new account activation. Additional

More information

TG 16 SOUTH AUSTRALIAN WATER CORPORATION

TG 16 SOUTH AUSTRALIAN WATER CORPORATION TG 16 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Detail Design of Major Wastewater Collection Infrastructure Issued by: Principle Engineer Water & Wastewater s Issue Date: 10 January

More information

Future Matters US Disclosure

Future Matters US Disclosure Disclaimer This presentation has been prepared by Samsung Electronics Co., Ltd. (the "Company"). It does not purport to contain all the information that a prospective investor may require in connection

More information

I N V E S T M E N T AN AL Y S T Schematic Code ( )

I N V E S T M E N T AN AL Y S T Schematic Code ( ) I. DESCRIPTION OF WORK I N V E S T M E N T AN AL Y S T Schematic Code 10735 (31000046) Positions in this banded class analyze financial or credit information to forecast business industry and economic

More information

Water - policy and government regulation for heavy oil and oilsands development

Water - policy and government regulation for heavy oil and oilsands development Water - policy and government regulation for heavy oil and oilsands development Robert George, Alberta Environment and Sustainable Resource Development, Edmonton, Alberta Summary This presentation outlines

More information

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011

Gum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011 Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director Port Lincoln Council 17 January 2011 Disclaimer & Competent Person s Statement This presentation has

More information

SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS

SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS SECTION 7.0 WATER SOURCE MANAGEMENT TABLE OF CONTENTS PAGE 7.0 WATER SOURCE MANAGEMENT... 7-1 7.1 Introduction... 7-1 7.2 Dewatering... 7-1 7.3 Domestic Water Supply... 7-2 7.4 Process Water Supply...

More information

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison

Sunrise Communications AG. Sunrise ONE versus Swisscom inone - High level comparison unrise Communications AG unrise ONE versus wisscom inone - High level comparison unrise ONE - Everything unlimited aunch andline & obile in ONE package New fully convergent high-end product, complementing

More information

HCCA AUDIT & COMPLIANCE COMMITTEE CONFERENCE

HCCA AUDIT & COMPLIANCE COMMITTEE CONFERENCE HCCA AUDIT & COMPLIANCE COMMITTEE CONFERENCE EXTERNAL AUDIT AND THE AUDIT COMMITTEE CHRIS IDEKER, CPA CHRISIDEKER@ALVAREZANDMARSAL.COM February 25 th, 2013 QUESTIONS TO BE ADDRESSED The involvement and

More information

SIMPLIFY ENTERPRISE HYBRID CLOUD COST MANAGEMENT WITH HPE ONESPHERE CONSOLIDATED VISIBILITY & CONTROL OF COSTS ACROSS CLOUD ENVIRONMENTS

SIMPLIFY ENTERPRISE HYBRID CLOUD COST MANAGEMENT WITH HPE ONESPHERE CONSOLIDATED VISIBILITY & CONTROL OF COSTS ACROSS CLOUD ENVIRONMENTS SIMPLIFY ENTERPRISE HYBRID CLOUD COST MANAGEMENT WITH HPE ONESPHERE CONSOLIDATED VISIBILITY & CONTROL OF COSTS ACROSS CLOUD ENVIRONMENTS ENTERPRISE HYBRID CLOUD MANAGEMENT CHALLENGES As enterprise cloud

More information

Strengthening the experience and embracing the shift

Strengthening the experience and embracing the shift Strengthening the experience and embracing the shift THIS PRESENTATION IS NOT AN OFFER OR SOLICITATION OF AN OFFER TO BUY OR SELL SECURITIES. IT IS SOLELY FOR USE AT A CAPITAL MARKETS EVENT AND IS PROVIDED

More information

Renewable energy survey launch. Juerg Trueb, Head Environmental and Commodity Markets London, 29 November 2011

Renewable energy survey launch. Juerg Trueb, Head Environmental and Commodity Markets London, 29 November 2011 Renewable energy survey launch Juerg Trueb, Head Environmental and Commodity Markets London, 29 November 2011 Investments in renewable energy have increased rapidly Global new investment in renewable energy,

More information

Becoming a Next Generation Stem Cell Company

Becoming a Next Generation Stem Cell Company Becoming a Next Generation Stem Cell Company Dr Ross Macdonald, CEO, Eco Quest AGM, 29 October 2013 Important information This presentation has been prepared by Eco Quest Limited. ( Eco Quest or the Company

More information

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018 OZ Minerals Update Geoff Deans, Group Manager Social Performance 29 AUGUST 2018 A modern mining company Disclaimer This presentation has been prepared by OZ Minerals Limited (OZ Minerals) and consists

More information

For personal use only. Managing Director s Presentation GM March 2011

For personal use only. Managing Director s Presentation GM March 2011 PAPYRUS AUSTRALIA Managing Director s Presentation GM March 2011 PAPYRUS MISSION Papyrus objective is to license its technology to suitable entities in locations where banana is grown. This long-term goal

More information

Managing Director s Presentation GM March 2011

Managing Director s Presentation GM March 2011 PAPYRUS AUSTRALIA Managing Director s Presentation GM March 2011 PAPYRUS MISSION Papyrus objective is to license its technology to suitable entities in locations where banana is grown. This long-term goal

More information

Draft approval framework for the use of non-drinking water in Western Australia

Draft approval framework for the use of non-drinking water in Western Australia Draft approval framework for the use of non-drinking water in Western Australia Urban developments Looking after all our water needs SCT_Online Print_Final_A4.indd 1 31/05/10 11:08 AM Draft approval framework

More information

Augmented Reality, IoT and the Connected Product Experience

Augmented Reality, IoT and the Connected Product Experience Augmented Reality, IoT and the Connected Product Experience Slavko Snjegota, Development Architect, SAP 3D Visual Enterprise Auckland, March 7, 2017 Art of The Possible 2017 2017 SAP SE or an SAP affiliate

More information

Singapore and Hong Kong Investor Presentation

Singapore and Hong Kong Investor Presentation ASX Announcement 22 September 2014 Level 9, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3156 7777 fax + 61 (0) 7 3156 7776 www.carbonenergy.com.au

More information

Fitbit: Ionic Gains Highest Interest But Samsung Gear Sport Has Better Sentiment

Fitbit: Ionic Gains Highest Interest But Samsung Gear Sport Has Better Sentiment Sept 7th, 217 Fitbit: Ionic Gains Highest Interest But Samsung Gear Sport Has Better Sentiment Sector: Sub-Sector: Consumer Discretionary Consumer Electronics Key Takeaways The launch of Fitbit s first

More information

DTI GROUP LTD DTI GROUP LTD Interim Results Presentation 26 February Interim Results Presentation [_] February 2017

DTI GROUP LTD DTI GROUP LTD Interim Results Presentation 26 February Interim Results Presentation [_] February 2017 DTI GROUP LTD 2019 Interim Results Presentation 26 February 2019 DTI GROUP LTD 2017 Interim Results Presentation [_] February 2017 PETER TAZEWELL Chief Executive Officer 1 Overview H1 FY19 Financial Operating

More information

For personal use only

For personal use only Presentation 5 July 2016 NZX: SPY ASX: SMP SHARE INFORMATION Issued Shares: 171,752,278 Please see attached Smartpay presentation presented by Bradley Gerdis, Managing Director, to Micro Equities Rising

More information

GSMP: General Specifications Change Notification (GSCN)

GSMP: General Specifications Change Notification (GSCN) GSMP: General Specifications Change Notification (GSCN) GSCN # GSCN Name Issue Date Status WR13-082 Non Reuse Rules GS1 Keys in Healthcare May-2016 Ratified Associated Work Request (WR) Number: 13-082

More information

EXECUTIVE STRATEGIES FOR RISK MANAGEMENT BY STATE DEPARTMENTS OF TRANSPORTATION EXECUTIVE SUMMARY

EXECUTIVE STRATEGIES FOR RISK MANAGEMENT BY STATE DEPARTMENTS OF TRANSPORTATION EXECUTIVE SUMMARY EXECUTIVE STRATEGIES FOR RISK MANAGEMENT BY STATE DEPARTMENTS OF TRANSPORTATION EXECUTIVE SUMMARY Prepared for: NCHRP 20-24 Administration of Highway and Transportation Agencies Prepared by: Janet D Ignazio

More information

S A S K A T C H E W A N

S A S K A T C H E W A N RavensCross Energy Ltd. Property Offering S A S K A T C H E W A N l Lloydminster Saskatoon Lucky Hills T30 R23 W3M Swift Current Regina Disclaimer The Data Book and the information contained herein (the

More information

Early mover Indian unconventional energy

Early mover Indian unconventional energy ABN 50 078 652 632 Early mover Indian unconventional energy Oilex Annual General Meeting 14 November 2012 Important information Disclaimer The presentation in this projected form and as verbally presented

More information

Lakes Oil NL Annual General Meeting

Lakes Oil NL Annual General Meeting Lakes Oil NL Annual General Meeting 13 November 2017 Disclaimer This document is not a recommendation, offer or invitation by any person to any person to sell or apply for securities in the Company and

More information

Electricity Market Design Principles

Electricity Market Design Principles Electricity Market Design Principles Identifying long-term market design principles to support a sustainable energy future for Australia Executive Summary 19 April 2018 KPMG.com.au Important Notice If

More information

DOING BUSINESS IN CHINA 27 OCTOBER 2017

DOING BUSINESS IN CHINA 27 OCTOBER 2017 DOING BUSINESS IN CHINA 27 OCTOBER 2017 DISCLAIMER - This presentation is intended to constitute a summary of certain information about Synlait Milk Limited (Synlait). It should be read in conjunction

More information

PROForms. Specifications SECTION FIBERGLASS REINFORCED POLYMER (FRP) PULTRUDED PRODUCTS

PROForms. Specifications SECTION FIBERGLASS REINFORCED POLYMER (FRP) PULTRUDED PRODUCTS PROForms Specifications SECTION 06600 FIBERGLASS REINFORCED POLYMER (FRP) PULTRUDED PRODUCTS Disclaimer BEDFORD REINFORCED PLASTICS INC. disclaims liability for any personal injury, property or other damages

More information

Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants

Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants Extending the CCS Retrofit Market by Refurbishing Coal Fired Power Plants DOE/NETL-2009/1374 Simulations with the National Energy Modeling System July 31, 2009 Disclaimer This report was prepared as an

More information

Optimization of infill drilling locations

Optimization of infill drilling locations Digital Technologies INVESTMENT OPPORTUNITY: Optimization of infill drilling locations Executive summary Today, decisions on drilling locations are made by using reservoir models and simulations, but with

More information

Pit to Port Infrastructure in SA

Pit to Port Infrastructure in SA Pit to Port Infrastructure in SA An Explorer s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011 Disclaimer & Competent Person s Statement

More information

New Line Introduction for Manufacturers GS1. Best Practice. Getting it Right first time

New Line Introduction for Manufacturers GS1. Best Practice. Getting it Right first time New Line Introduction for Manufacturers GS1 Best Practice Getting it Right first time Release 1.0, Approved, Oct 2015 Document Summary Document Item Document Name Current Value New Line Introduction for

More information

Practical guide to corporate governance

Practical guide to corporate governance www.pwc.co.uk Practical guide to corporate governance 2013 reporting changes implementation and disclosure June 2013 2013 reporting changes implementation and disclosure What s the issue? There are two

More information

Figure 1 Input power cable (left) and output power cable (right)

Figure 1 Input power cable (left) and output power cable (right) TIDA-00282 Cable Assemblies These cable assemblies are intended for use with the C2000-based Automotive Digitally-controlled Boost Power Supply board described in TI Designs TIDA-00282. Figure 1 Input

More information

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018

LITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018 LITHIUM & BATTERY METALS Perth, Western Australia 21-22 March 2018 KORAB RESOURCES LIMITED Andrej K. Karpinski Executive Chairman Tel: (08) 9474 6166 How Green is Green? 1 21 Why all the Fuss? 2 21 Why

More information