DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

Size: px
Start display at page:

Download "DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN"

Transcription

1 The following Marmot Basin-specific BMPs, as identified in the Site Guidelines (Marmot Basin 2008a), have been developed by Ski Marmot Basin in consultation with Parks Canada representatives and have been included in the LRP and Supplemental Volume: racecourse management; reglading and tree removal; protocols for summer construction and maintenance activities to minimize effects on grizzly bears; and matters related to viewscapes, noise and lighting. 3.0 SCOPE OF PROJECT The LRP proposes the following projects: expanded snowmaking in the mid-mountain and upper areas; enhanced parking and transportation access; upgrade of the Caribou Chalet infrastructure; and reglading on the slopes west of the mid-mountain chalets. These four projects and associated activities comprise the scope of project for the DIA. In this section, each of these four projects is described, including the existing situation, the purpose and need for the project, and a description of the project itself. A short mention of alternatives is provided, which summarizes the alternatives discussion provided in the LRP. Construction methods are described, including general construction practices that will apply to all of the projects, followed by more detail about each individual project and the project scheduling as currently envisioned. Operations and maintenance activity associated with each project is described. This section concludes with discussions about accidents and malfunctions, and a description of how the project is expected to be affected by the environment. This section of the draft DIA has been prepared based on information provided by representatives of Ski Marmot Basin and its consultants (e.g., Nichols Environmental [Canada] Ltd.). Project details are preliminary and will require confirmation by Ski Marmot Basin when further project design information becomes available. 3.1 Expanded Snowmaking Existing Situation Marmot Basin relies primarily on natural snowfall to provide a base snowpack for skiing. This is supplemented by additional snow in some limited areas provided by an interim snowmaking system that was installed in Marmot Basin also builds a snow base of up to 30 cm on runs where snow naturally accumulates less quickly, and where there is heavy skier and rider traffic. Snowmaking currently occurs along portions of nine lower mountain ski runs between the Caribou Chalet and the top of the Eagle Express Quad Chair. The water for this system is supplied by water stored in Cell 1 and Cell 2, located on a small natural terrace situated below the ski area in the wastewater treatment area. It is estimated that the existing snowmaking system uses about 41,600 m 3 to 56,800 m 3 per year (11 to 15 million US gallons). Snowmaking begins, typically, after October 15 and prior Report No

2 to the ski area opening in early to mid-november. The Water Management Strategy, included in the Supplemental Volume, provides more details about the existing interim snowmaking system. Following initial operation of the snowmaking system in 2006/2007, ski hill visitation during the early season and the Christmas holidays increased significantly due to the certainty of good snow conditions on the lower mountain runs (Table 2). This has increased visitation to the Town of Jasper and provided a range of direct and indirect economic benefits to the supporting tourism-related businesses and the community. Prior to the installation of the interim snowmaking system the community of Jasper s winter economy was subject to the vagaries of early season winter storm patterns. Opening dates were typically in December and as late as December 22 in 2000 and December 23 in The 2002/2003 season was particularly difficult with a December 23 opening date and marginal early season conditions. By mid-january, total visitation had reached only 24,719 visits. This compares with the 2009/2010 season, when opening day was November 9, and by January 15 a total of 89,466 visits were recorded. Table 2: Actual Skier Visits Opening Day to January 15 Winter Season Total Visitation Opening Day to January 15 Opening Date 2000/ ,506 December / ,814 December / ,719 December / ,142 December / ,780 November / ,368 November / ,456 November / ,703 November / ,801 November / ,466 November / ,413 November / ,748 November Purpose and Need Expanded snowmaking is proposed in order to provide for reliable snow coverage on areas that receive heavy use by skiers and riders, and possess limitations due to icing conditions throughout the winter season. The expanded coverage would occur on a total plan area of 13.5 ha (14.4 ha slope area for the purpose of calculating water requirements for snowmaking). In addition, the interim snowmaking system, now operational on portions of the lower runs, would be made permanent with the burying, where feasible, of all water lines. As part of upgrading ski area infrastructure, existing waterlines will be replaced in the future. This replacement project will assist to alleviate the requirement to flow water through the system throughout the winter to prevent freezing. Most of this water flows into one of the cells and is used for snowmaking. The remainder is released to ground at the base of the ski area. The primary snowmaking period is late October through to January. The average width of run coverage would be 40 m, to a depth of 30 cm. Snowmaking coverage is proposed on Basin Run, Roll Out, Paradise and S-Turns runs (Figure 4). Report No

3 L:\2011\1332\ \6000\ A004_ProposedExpandedSnowmaking.dwg Layout: 4 PROPOSED EXPANDED SNOWMAKING Modified: BWheeler 11/27/2013 3:45 PM Plotted: BWheeler 11/27/ SCALE (APPROX.) PROJECT LEGEND P DINING / RESTAURANT CREEK EXISTING SNOWMAKING FIRST AID STATION EXISTING LIFT EXISTING EXTENDED SNOWMAKING PARKING LOT PROPOSED 6" PIPELINE PHASE 2 SNOWMAKING PROPOSED PUMPING STATION PROPOSED 8" PIPELINE PHASE 2 EXTENDED SNOWMAKING PROPOSED MID-MOUNTAIN RESERVOIR NOTES IMAGE OBTAINED FROM ECOSIGN MOUNTAIN RESORT PLANNERS LTD. JULY 9, PHOTOGRAPH DATE: JULY 22, COMPILED BY ORTHOSHOP_AUGUST 22, WO9203. NAD83 METRES DETAILED IMPACT ANALYSIS FOR THE SKI MARMOT BASIN LONG TITLE PROPOSED EXPANDED SNOWMAKING PROJECT No DESIGN AB CADD TV CHECK BB REVIEW CM FILE No. SCALE A004_Prop AS SHOWN FIGURE:4

4 Once these primary runs are addressed, problematic pitches of a secondary group of runs would be addressed if sufficient water volumes remain following application to the primary runs. The secondary runs are (Figure 4): Highway 16; Punch Bowl; Gun Sight. Marmot Run; Sunset Boulevard; Fresh Tracks; and Description of Expanded Snowmaking Project An expanded snowmaking system is a key project proposed in the LRP. This entails construction of a new water reservoir to the northwest of the mid-mountain chalets, and associated installation of water distribution and pumping systems. The Site Guidelines (Parks Canada 2008b) allow consideration of the construction of a midmountain reservoir, subject to the results of a water management strategy. The reservoir at this location would reduce power demands associated with pumping water uphill from the cells located at the base of the ski hill in the wastewater treatment area. The proposed 34,000 m 3 mid-mountain reservoir will be situated at the south side of the Canadian Rockies Express liftline at tower 17 and the end of the Show-Off Cat Track (Figure 4). This reservoir will assist to address over-all water requirements for operation of the ski area. The location for the proposed new reservoir is on a relatively flat and forested area. The reservoir will be constructed as a partially excavated pond and earth embankment for above-ground containment of water. The impoundment will be lined with an impervious liner fabric. An earthen berm about 6 m in height will be constructed on the lower side of the reservoir, and a rock-faced cut of about 7 m will form the upper wall and embankment of the reservoir (Nichols Environmental Canada Ltd. May 2013 Rev 2). The uppermost 3 m of in-situ mixed material will serve as back-of-earthern dam fill material as well as backfill replacement for the parking lot expansions. The deeper stiff impermeable clay material will be used to construct the earthern dam berms being proposed for the water reservoir. The weathered sandstone bedrock will serve as the base for the proposed reservoir (Clark, John, pers. comm. May 3, 2013). The new snowmaking system will also require development of a new water intake structure, installation of mechanical and electrical equipment, such as a pump house, inlet and distribution piping, wet well, pumps, turbines, and electrical controls (Clark, John, pers. comm. May 3, 2013). A gravity fed intake and wet well sump will be positioned on the edge of the reservoir to provide calm water to the pumps. High pressure water will then be distributed into welded steel piping buried below the frost level. The pipes will be installed at a depth of at least 1.5 m below the surface. A main trench will be dug approximately 5 m from the treeline/ slope edge to facilitate easier digging and avoid tree root damage. From the main pipe, 5 cm lateral pipes will be used to deliver the water to frost free 0.91 m tall snowmaking hydrants situated at intervals along the ski runs. Approximately 1,435 m of 20.3 cm (8 inch) diameter pipe will be used, 1,990 m of 15.2 cm (6 inch) pipe, 500 m of 5 cm (2 inch) pipe and 59 hydrants will be used. The electrical supply and distribution system will require three new transformers and use or upgrading of two existing transformers. Ski Marmot Basin will acquire 15 portable Report No

5 Super PoleCat Manual snowmakers. The snowmakers will need to be moved after initial set up for snow production over the entire new coverage area. The reservoir will be situated within the existing Basin Creek channel, and a new channel will be developed to divert the creek around the reservoir. The reservoir will be filled by diverting water from Basin Creek during the high flow snowmelt periods. A water volume requirement of 37,850 m 3 (10 million U.S. gallons) has been identified on the basis of the slope area and snow depth calculations. However, site constraints have limited the reservoir to a maximum capacity of 34,086 m 3 (9.005 Million USG) (John Clark, pers. comm. May 3, 2013). Aging sewer and water lines from the Eagle and Paradise Chalets will be replaced. This project will include replacement of a 39.9 m 3 above-ground wooden stave tank which is situated at the base of the ski hill Alternative Means Snow fencing and snow farming techniques can be used, where feasible, to supplement, replace and manage snow cover loss on the ski area. These techniques cannot, however, serve as an alternative to expanded snowmaking. In addition to Basin Creek within the ski area, other water sources were considered for the expanded snowmaking system. Portal Creek and Whistler Creek are outside the leasehold boundaries and so withdrawing water from these sources would be contrary to Parks Canada policy on water withdrawal. Further, use of these water sources would necessitate significant infrastructure investment and high operational costs. Groundwater is the preferred source. Test drilling at Marmot Basin to determine the possibility of a groundwater source was conducted in The site was drilled to a depth of 60 m and no suitable water supply was found. This confirmed the results of previous test drillings, as well as opinions previously obtained that the feasibility of using groundwater wells is unlikely (Brown 2012). The development of any primary reservoir in the lower mountain area is not feasible due to size constraints associated with the proposed one-time fill-up and increased electrical power requirements necessary for pumping water from the lower mountain area to the upper mid-mountain area. The construction of a smaller new reservoir at the proposed mid-mountain site and expanding one of the existing lower mountain lagoons was investigated and deemed cost prohibitive both from a capital and operational perspective. As well, the alternative creates a range of operational complexities that adversely impacts the effectiveness of the existing arrangement for the treatment of wastewater. The possibility of a third cell, adjacent to the existing two cells, was not pursued due to space limitations associated with the lease boundary. No alternate site was identified that fulfills the requirements associated with a reservoir with sufficient capacity to support reservoir filling only during the high-flow spring and summer seasons: sufficient site size; suitable geotechnical conditions; reasonable proximity to a water source; operational considerations, including energy conservation; and proximity to the areas proposed for enhanced snow coverage. Report No

6 3.2 Enhanced parking and transportation access Existing Situation Marmot s Basin s existing parking capacity is approximately 1,000 vehicles, provided in four lots. Currently, shoulder parking on the roadways can accommodate 350 vehicles. Issues are apparent when skier/rider counts reach 3,000 and it becomes problematic at 4,000 counts. Guest safety and overall satisfaction levels are of concern when these use levels are reached. Skier/rider counts in excess of 3,000 and 4,000 daily visits for the past three winter seasons are provided in Table 3. Table 3: Skier/Rider Counts Winter Season Days Exceeding 3,000 Visits Days Exceeding 4,000 Visits Days Operational 2009/ / / Source: Marmot Basin. Additionally, two-way traffic flow problems occur at the end of the day when skier/rider counts exceed 3,000. On these busy days, two lanes of downhill traffic are set-up and controlled by parking attendants from the Vehicle Maintenance Compound access turn-off to the Caribou Chalet. This is done to expedite traffic flow leaving the ski area. Ski Marmot Basin has initiated a bus transit system that links 13 Jasper hotels, worked to maintain the Edmonton Snow Bus and actively encouraged access by buses for school groups and corporately sponsored events. Despite these services and active promotion efforts, transit use remains low Purpose and Need Ski Marmot Basin faces a parking shortfall and vehicle congestion on busy days. Congestion occurs on busy days at the Caribou Chalet drop-off, the four parking lots and, on the busiest days, along the Marmot Basin Road from 600 m below the Caribou Chalet to Lot 4. Expanded vehicle parking is required to address existing and future shortfalls and to provide a resort balance. At the same time, innovative and integrated approaches are needed to encourage increased transit use and ridesharing from the Town of Jasper and surrounding regional centres. A bus load/ unload facility is required to address congestion at the Caribou Chalet front parking area, and to assist in encouraging increased use of bus transportation. By widening sections of the access road between parking lot 4 and just above the Caribou Chalet, two lanes of downhill traffic can be maintained at the end-of-day, while maintaining an uphill lane for ambulances, a shuttle service and private vehicles. Because the parking lot expansion and road widening would use material excavated from the reservoir site, both projects would take place concurrently. Report No

7 3.2.3 Description of Enhanced Parking and Transportation Access Project The LRP proposes to implement a phased approach to address existing parking, traffic circulation and congestion issues, and to enhance transportation access and convenience in the future. The phases are summarised below: The first phase involves putting in place operational measures to better manage traffic circulation and parking. A variety of approaches are being tested, including the use of parking attendants, prescriptive use of lots by vehicle type, and reorientation of flow patterns within the lots. Ski Marmot Basin currently uses parking attendants in Lots 3 and 4 on busy days to optimize the effective use of the parking areas. The second phase involves pursuing an increased reliance on mass transit. An assessment of this approach is part of the LRP and is a pre-condition for any consideration, by Parks Canada, of physically expanding the parking space. Opportunities to enhance traveller information and encourage increased transit use and ride sharing, in the short-term, would be advanced through messaging on the Ski Marmot Basin website and promotional materials. The third phase is the physical expansion of the existing four parking lots. As proposed, the parking lots would be extended onto Home Run, with only minor expansion within the existing developed footprint (Figure 5). The option of solely expanding the parking lots within the existing parking lot footprint has been assessed and is not being advanced because it would require substantial terrain modification with potential drainage and slope stability issues. In addition, sections of the Marmot Road would be widened from just below the Caribou Chalet area up to Lot 4. Road widening would not be continuous, but would be proposed where terrain and safety considerations permit. The roadwork would entail widening the road to provide an opportunity for roadside parking while permitting safe two-way traffic flow at the end of the ski day. The fourth phase entails developing an on-hill shuttle to transport visitors between the Caribou Chalet and the parking areas. The shuttle service would assist to address congestion and improve the safety of operations along the Marmot road. The fifth phase, which will be a component in the second long-range plan, entails developing an integrated approach for advancing mass transit from the Town of Jasper, further consolidation of maintenance/ staff/ storage facilities in Lot 2, as well as development of the existing maintenance area for bus loading/ unloading and parking. Once Lot 2 is used for the consolidation of lower mountain maintenance facilities, 100 existing parking stalls would be lost. Alternative parking scenarios for use of the existing Vehicle Maintenance Compound have yet to be finalised but will be contained in the second long-range plan. Activities necessary for the physical expansion of the lots include construction of expanded parking space with modest terrain modification, and stabilization of all disturbed slopes and revegetation. To the extent feasible, a balanced cut and fill approach will be used. Some tree removal between the School House and Home runs would be required to facilitate skier access to and from the parking lots via the School House Run. The existing roadway, in the region of the Caribou Chalet, will be widened to accommodate two-way traffic at the end of the day, as well as to provide access for a parking lot shuttle service to and from the Caribou Chalet. Report No

8 L:\2011\1332\ \6000\ A005_ProposedEnhancedParking.dwg Layout: 5 PROPOSED PARKING LOT EXPANSION AND TRANSPORTATION ACCESS Modified: TVu 11/27/2013 3:28 PM Plotted: BWheeler 11/27/ SCALE METRES LEGEND P DINING / RESTAURANT FIRST AID STATION PARKING LOT P CREEK EXISTING LIFT PARKING LOT AREA PROJECT TITLE DETAILED IMPACT ANALYSIS FOR THE SKI MARMOT BASIN LONG PROPOSED PARKING LOT EXTENSION PROPOSED ROAD WIDENING PROPOSED PARKING LOT EXPANSION AND TRANSPORTATION ACCESS NOTES IMAGE OBTAINED FROM ECOSIGN MOUNTAIN RESORT PLANNERS LTD. JULY 9, PHOTOGRAPH DATE: JULY 22, COMPILED BY ORTHOSHOP_AUGUST 22, WO9203. NAD83 PROJECT No. DESIGN CADD CHECK REVIEW FILE No A005 AB SCALE AS SHOWN TV BB CM FIGURE:5

9 Work associated with the roadway will entail widening the roadway up to 5m during construction, and leaving approximately 2 m in additional driving surface. This would involve excavating the existing ditch to a depth of approximately one m, adding culverts and backfilling. Once the backfill is compacted, the surface would be top-dressed with 2 cm crush Project Alternative Means The option of not proceeding with parking lot expansion would prolong existing issues of reduced quality of visitor experiences because of congestion and road safety on busy days. The option of expanding the parking lots within the existing parking lot footprint is not being advanced because it would require substantial terrain modification with potential drainage and slope stability issues. In association with the proposed road widening, the proposal for the extension of the north end of the Caribou Chalet will assist to address current parking congestion and traffic circulation problems associated with that chalet s public dropoff area. The alternative of addressing the parking shortfall through expanding mass transit was assessed and is discussed in the Long Range Plan. It was concluded that a mass transit system operated by Ski Marmot Basin would be neither economically feasible nor sustainable. An integrated and year-round transit system will be pursued as part of the second long-range plan and as a result of commitments by Parks Canada and the Town of Jasper to similarly pursue mass transit services in Jasper National Park in conjunction with tourism operators. A parkade structure would be prohibitively expensive at present, but consideration may be given in a future longrange plan. 3.3 Caribou Chalet Infrastructure Upgrade Existing Situation The Caribou Chalet is located at the base of the ski area. It provides a range of services for visitors, including food services and washrooms. Ski Marmot Basin administrative offices are also at this location. An existing trailer which houses administrative services, and a refrigerated trailer for food storage are located adjacent to the Caribou Chalet Purpose and Need There is an existing shortage of heated seating space and washroom facilities at Marmot Basin on days in excess of 3,000 visitors. The inability to provide adequate seating capacity adversely affects the overall guest experience. During these busy periods, line-ups for the washrooms extend through the public eating area. Some of Ski Marmot Basin s administrative offices are located in unsightly trailers facing the public drop-off area. There is a long-standing need to upgrade and consolidate these workspace areas. A shortage of food storage space resulted in the use of a refrigeration reefer being placed at the north end of the chalet over a decade ago. The trailer is inefficient to use and unsightly. Report No

10 3.3.3 Description of Caribou Chalet Upgrade The LRP is intended to identify projects that Ski Marmot Basin wishes to consider within the next 15 years. At some time during this period, Ski Marmot Basin expects to upgrade the Caribou Chalet to improve the visitor experience. Elements of that upgrade identified in the LRP are: enclosing the west-facing deck to be used for public food services and added washroom facilities, The deck enclosure entails covering 198 square metres (m 2 ) for public eating space and adding 72.7 m 2 that would be used for operational purposes (human resources and accounting). The net increase is 72.7 m 2. extending the north-end of the chalet. The north-end extension of the chalet would occur on two floor levels. The proposed new addition would add approximately m 2 of floor area. The lower extension would be m 2 with 20 m 2 of storage space. The upper level extension would result in an addition of m 2 of floor space. The extension would match the architectural elements of the existing chalet structure. The trailers and refrigeration reefer would be removed from the leasehold area and national park. At this time, the Caribou Chalet upgrade is at a preliminary design stage. Further details will be provided as part of the development review process Project Alternative Means There is no feasible alternative to the proposed expansion of commercial floor area other than deferment, which would fail to meet the objective of improving the quality of the visitor experience. Consideration had been given to developing a façade on the trailers, as an interim measure. This is no longer being advanced because it does not contribute to enhancing the image of the ski area and the structures would exacerbate the level of congestion at the public drop-off area. 3.4 Reglading Existing Situation Glading is the thinning of the forest to create a safe and interesting skiing experience. Gladed ski terrain simulates skiing in a mature, open forest or a recently burned forest. The Ski Area Management Guidelines (Parks Canada Agency 2006) permit new glading as part of a run/vegetation plan strategy in a LRP. In the mid-1980s, glading was used to improve skiing opportunities above and to the west of the Paradise and Eagle Chalets on runs accessed by the Canadian Rockies Express or Paradise chairlifts. Since then, the glading has not been maintained and trees have grown on the lower elevations of the affected runs to the point where tree and shrub growth no longer permits enjoyable and safe skiing Purpose and Need Trees in areas of Milk Run, Elevator Chutes and Little Chicago runs which were previously gladed approximately 30 years ago have regrown to the point where reglading is now required to permit safe and enjoyable skiing by advanced and higher-level skiers. The purpose of the reglading would be to restore this area to previous open gladed ski runs. Report No

11 3.4.3 Description of Reglading Reglading is proposed in three areas above and to the west of the Paradise and Eagle Chalets, and accessed from the Canadian Rockies Express or Paradise chairlift (Figure 6). No ski industry prescribed standards exists for glading because of the great variability associated with forest species composition, as well as terrain and slope features (Pers. Comm.: D. Murray, Ecosign Mountain Resort Planners Limited). Tree and shrub removal would occur in the three areas identified in Table 4. These three runs are all at similar elevations and egress to existing runs at 2,020 m on an east-facing aspect. The lower elevation portions of each run would require more intensive reglading, as a response to recent growth rates and densities. Reglading would occur in an area totaling 6.64 ha. Table 4: Proposed Limited Reglading Name of Run Total Run Area [ha] Milk Run (left area) 2.53 Elevator Chutes (middle area) 2.78 (includes part of the Paradise chairlift) Little Chicago (right area) 1.33 Total Area 6.64 Although the existing stand densities vary considerably, on average a thinning factor of 20% to 25% would be required over the three areas. Ski Marmot Basin proposes removing up to 30% of the emergent trees to achieve the desired effect of skiing in an open forest. Trees will not be removed from the top edge or sides of the runs to contain the regladed area. This will slow skiers as they enter and exit a regladed run while, at the same time, providing a safer ski experience. No whitebark pine will be removed, if found during the thinning process. Tree removal requirements can be reduced, significantly, if proposed limbing is permitted. If limbing is permitted, it would occur sensitively and in a manner that maintains a natural forest appearance. The tree species composition on these runs is a mix of Engelmann spruce and subalpine fir with the occasional lodgepole pine. Whitebark pine is present on the mountain at this elevation but has not been observed in the proposed reglading area. Ground surveys were undertaken for each run and provide the basis for measures of tree species composition and proposed reglading treatments. Milk Run contains 50% spruce, 49% subalpine fir and 1% lodgepole pine. Most of the proposed reglading on this run would be in the mid-section, and where limbing would be an effective option. Elevator Chutes contains 45% spruce, 55% subalpine fir and less than 1% lodgepole pine. The top section of this run is sufficiently open and no tree removal is proposed. Tree removal would be concentrated in the middle to lower sections of the run and is mostly mature spruce. Limbing would be an effective option in place of tree removal. The Little Chicago Run contains 40% spruce, 60% subalpine fir and <1% lodgepole pine. Limbing is not proposed on this run. Report No

12 L:\2011\1332\ \6000\ A007_ProposedRegladingAreas.dwg Layout: 6 PROPOSED REGLADING AREAS Modified: BEMcdonald 11/27/2013 3:28 PM Plotted: BWheeler 11/27/ SCALE (APPROX.) METRES LEGEND DINING / RESTAURANT FIRST AID STATION PROPOSED PUMPING STATION BASIN CREEK EXISTING LIFT PROPOSED REGLADED AREA PROPOSED MID-MOUNTAIN RESERVOIR PROJECT TITLE DETAILED IMPACT ANALYSIS FOR THE SKI MARMOT BASIN LONG REGLADED AREAS: MILK RUN Ha ELEVATOR CHUTES Ha LITTLE CHICAGO Ha NOTES IMAGE OBTAINED FROM ECOSIGN MOUNTAIN RESORT PLANNERS LTD. JULY 9, PHOTOGRAPH DATE: JULY 22, COMPILED BY ORTHOSHOP_AUGUST 22, WO9203. NAD83 PROPOSED REGLADING AREAS PROJECT No FILE No A007_Prop DESIGN AB SCALE AS SHOWN CADD TV CHECK BB REVIEW CM FIGURE:6

13 Prior to removing trees and limbing, Ski Marmot Basin will flag the trees that will be affected for review with Parks Canada Project Alternative Means The only alternative is to allow the area to continue to become overgrown and close the area in the near future to public use. As this area has been gladed in the past, this would represent a net loss of skiable terrain at Marmot Basin. 3.5 Construction The construction phase of a project requires careful planning and implementation to mitigate potential environmental effects. Best Management Practices (BMP) (Parks Canada 2008c) have been developed by the ski area operators in Banff and Jasper national parks, and Parks Canada. These BMPs cover a number of routine activities which occur during construction projects. In addition to discussing the BMPs, details of specific construction practices associated with the projects proposed in the LRP are presented in this section General Construction Practices Best Management Practices for Development at Ski Areas in Banff and Jasper National Parks of Canada (Parks Canada Agency 2008) provides details about environmental protection measures to be applied during the construction phase of activities occurring at Marmot Basin. In addition, BMPs specific to Marmot Basin Ski Area have been developed as part of the Long Range Plan (Ski Marmot Basin 2014, see Supplemental Volume). Table 5 lists those BMPs which address concerns that may apply to the projects proposed in the LRP. Table 5: Best Management Practices Which May Apply to Long Range Plan Proposals From Best Management Practices for Development at Ski Areas in Banff and Jasper National Parks of Canada Construction timing Viewscapes Excavation, soil handling and backfilling Cultural, historical and archaeological resources Erosion control General construction Culvert installation Vegetation management Tree removal Non-native weed control Glading and clumping Working in or near water Reclamation and re-vegetation of disturbed sites Bridge installation Buildings and structures Off-road access Utilities Storage areas Snowmaking design and installation Hazardous materials management Terrain modification Waste management Rock removal From Best Management Practices Specific to the Marmot Basin Ski Area Noise Viewscapes Glading/Tree Removal and Run Brushing Source: Parks Canada Agency (2008c); Ski Marmot Basin (2014) Outdoor Lighting Summer construction & Maintenance to Bear and Ungulate Disturbance As part of contract tender preparation, Ski Marmot Basin will review the BMPs and include the relevant BMPs as part of the contract requirements of each contractor. Report No

14 In addition to applying the BMPs, additional techniques will be used to manage the effects of construction: Awareness of Requirements: Ski Marmot Basin will designate a Project Management team to monitor compliance with environmental protection measures and liaise with the Parks Canada Environmental Surveillance Officer (ESO). The Project Manager and Parks Canada ESO and/or Parks Canada designate will meet with the management, staff and contractors to review the construction permits and protocols for the Project. Prior to initiating construction, orientation sessions will be held for all construction personnel to review relevant BMPs and other environmental protection procedures, including bear avoidance procedures. During construction, all equipment needs will be specified to the Project Manager. If at any time during the Project deviations from the approved plans are required, the Environmental Monitor and the Parks Canada ESO and/or Parks Canada designate will be notified immediately. Site Disturbance and Reclamation: At every construction site, the disturbed area will be kept as small as possible. Disturbance on ski runs will be controlled by demarcating approved movement areas with flagging or temporary snow fencing. Equipment movement outside of the flagged areas will not be allowed. Where significant ground disturbance will occur, existing topsoil and vegetative material will be salvaged and retained for reclamation purposes. Where present, sods will be salvaged prior to topsoil stripping. Reclamation and revegetation will follow approved practices and procedures as outlined in BMPs. A reclamation plan will be prepared specifically for each Project. The plan will include reclamation goals, identify disturbed sites to be reclaimed and revegetated, describe procedures during and immediately following construction activities, and identify detailed reclamation methods and techniques. In addition, the plan will establish the frequency of monitoring reports (e.g., annually until restoration targets are achieved). The monitoring reports will summarize the progress made towards the reclamation goals. Regular progress reports will be submitted during the period of reclamation work with a final report provided to Parks Canada upon completion. Reclamation work will commence immediately following construction. Sod that cannot be reasonably replaced following construction activity will be covered and stored in a manner consistent with the BMPs and used as soon as feasible the following season. Topsoil within each disturbed site will be removed before further digging occurs. Topsoil will be stored and covered with a tarpaulin to prevent wind or water loss to the surrounding area. Following construction, the salvaged topsoil will be used to reclaim all disturbed sites. Construction access will be via existing maintenance roads. Efforts will be made to limit equipment and materials marshalling to existing access roads and parking lots. If additional marshalling and work areas are required, these will be included in a site plan provided to Parks Canada as part of the development permit application. Equipment used will depend on site specific soil conditions. Details concerning equipment use will be included as part of the development permit application. Report No

15 Contractor Performance: Fire: All contractors and sub-contractors will obtain the requisite business licence from Parks Canada and, preferably, have experience operating in a national park. Penalties for non-compliance of the environmental protection measures will be outlined in the contractor s work specifications. These might include financial penalties under the contract, removal of offending personnel, and termination of contracts. In the event of severe weather conditions that compromise the effectiveness of environmental mitigations, all affected construction activities could be halted at the discretion of the Environmental Monitor, the Parks Canada ESO and/or Parks Canada designate, and the construction supervisor or Ski Marmot Basin s Project Manager. Construction staff will be briefed on Parks Canada s fire regulations and shall practice fire protection in all aspects of construction. All field crews working during snow-free periods will be equipped with adequate equipment (i.e., minimum of two Gieke Cans, two Pulaskis, and two shovels) for responding to accidental fires. Field crews will be trained on the safe and effective use of the equipment. Activities may be restricted or suspended at the request of Parks Canada during periods of high or extreme fire danger periods, and additional preventative precautions will be implemented as required. A Permit to Burn must be obtained from Parks Canada for burning for disposal of slash. In event of a fire caused by construction activity or slash burning, the contractor will call Jasper dispatch immediately, attempt to extinguish (if possible to be done safely by trained personnel), account for all personnel and evacuate to a safe location or by instruction of Warden/Emergency Service(s) personnel. Materials Management: Construction waste will be source-separated and containerized to maximize recycling opportunities. Construction waste will be transported to an approved industrial garbage site outside of Jasper National Park. Recyclable material will be taken to an approved recycling facility. Fuel and lubricants for equipment (e.g., excavators) will be transported to staging areas by trucks equipped with tidy tanks or by small tanker trucks. Excavators working in areas remote from fuelling sites will return for re-fueling. All re-fueling will occur at least 100 m away from watercourses using Canadian Standards Association (CSA) approved containers. Daily lubrication will be done at staging areas or at Vehicle Maintenance. Splash containment trays shall be used during fuelling and lubrication. Fuel nozzles will have automatic shut-off and break-away couplings. Spill kits will be located at each major work site and work crews will be trained in their use. All food-related refuse and waste will be kept inside vehicles or placed in on-site animal proof containers. This waste will be removed daily from the site, and taken off the leasehold or stored overnight in a lockable enclosed building. Report No

16 Cultural Resources: If cultural /archaeological artefacts are found, project activities will stop immediately at that location and the Environmental Surveillance Officer, the Cultural Resource Specialist or Jasper Dispatch will be notified. Work shall stop immediately in the location where cultural resource materials are uncovered at any time and shall only recommence upon the instruction of a cultural resource specialist. Work Camp: Contractors, subcontractors, and construction personnel who do not live in the area may need to be housed in a work camp if alternate arrangements are not feasible. The location of the work camp will be addressed with Parks Canada as part of the development permit application. Operating procedures for the work camp will be prepared, based on the knowledge gained about mitigating the effects of work camps located previously in Jasper National Park. Visitor Conflicts: Notification of construction activities and potential effects to visitor use (e.g., increased traffic on Marmot Basin access road, expectations for construction noise and activity in publically accessible areas) will be posted in visitor information locations Project Components Expanded snowmaking in the mid-mountain and upper areas Detailed plans for construction of the expanded snowmaking system will be provided to Parks Canada as part of the development permit application. Construction of the snowmaking system is expected to be completed within one summer season, with some follow-up reclamation completed in the following year. Prior to initiating any ground disturbance, the perimeter of all work areas will be delineated. Site details for the diversion and protection of Basin Creek for the duration of the construction period will be determined prior to the development permit application. Depending on the results of the review, flows in Basin Creek may be placed in culverts for the duration of the construction, with the new creek channel being developed after the major construction work on the reservoir is completed. A detailed stream restoration plan will be developed following reservoir construction when the final site contours are evident. The general objective of the stream restoration plan will be to design and construct a new creek section around the reservoir that is similar to the existing creek in terms of slope, dimensions and substrate material. Successful restoration following this approach would provide a sustainable creek system that has similar flow (depth and velocity) and sediment transport characteristics as the natural system. Trees will be cleared from within the defined work area, and logs trucked to a staging area in one of Ski Marmot Basin s parking lots. Slash will be stockpiled and burned when weather conditions allow. Surface water run off will be diverted around the reservoir and topsoil stockpile site and released into Basin Creek after water quality monitoring determines that sediment loads are not greater than Basin Creek water Report No

17 quality upstream of the work area. During the construction period, runoff from the site will be controlled by means of silt fencing placed around the downhill side of all construction activity. Water pumped from the excavation will be treated to control suspended sediment and released when sediment loads are acceptable. Surface soil layers suitable for reclamation will be stripped and stockpiled in an existing cleared area adjacent to the reservoir site. Erosion control measures will be applied to reduce erosion from the stockpile until the material is respread onto reservoir berms at the completion of construction. The reservoir will be excavated, and excavated material will be used to construct berms around the lower slopes of the reservoir. The reservoir s earthen berms will be contoured in swales and natural-looking terraces to provide a natural looking terrain feature as well as provide microhabitats with better reclamation opportunities. The reservoir will be set into the slope, requiring a cut into the slope which will be stabilized with a rock liner. Until additional information is available about the nature of the material to be excavated, it is not known if the rock material required to construct this backslope will be available on-site, or must be sourced from other locations and hauled up the hill to the site. Material not required for berm construction will be trucked down the ski hill on the existing access road to the parking lots where it will be used for parking lot expansion. Once hauling requirements are identified, the access road will be reviewed for its capacity to handle the amount and weight of construction traffic. If upgrades are required, details of the upgrades will be included in Ski Marmot Basin s development permit application. Equipment to be used will be identified by the contractor, following consultation with Parks Canada. Following the reservoir excavation and berm construction, the salvaged topsoil material will be placed onto the backside of berm slopes and revegetated with grass and shrub species suitable to the habitat conditions. The reservoir will be emptied early in the ski season; Regardless, a permanent fence will be constructed around the reservoir to prevent wildlife and public access during the winter. The location of all components of the snowmaking system will be marked, and work areas defined. Pipeline installation will follow procedures used by Ski Marmot Basin for previous pipeline repair and replacement projects Enhanced parking and transportation access The initial phase of parking lot construction will delineate all work areas and develop a water management plan to control water into the work area from both surface water runoff and groundwater seepage. Some limited tree clearing will be required. These removed trees will be stockpiled in an area in the parking lot, and prepared for disposal. Slash will be burned when weather conditions are suitable. Organic surface materials will be stripped from the footprint of the parking lot expansion and placed in a stockpile within one of the parking areas. Suitable material excavated from the reservoir will be placed, compacted and surfaced with suitable material. Stockpiled organic material will be returned to the Home Run area and used for reclamation of the parking lot slopes. Report No

18 Upgrade of the Caribou Chalet infrastructure The upgrades of the Caribou Chalet are not expected to be initiated in the near-term, so detailed construction planning has not been initiated. The proposed extension would occur within existing disturbed footprint of the chalet. An engineering assessment and subsequent maintenance of the existing gabion wall, as identified in section 1.6 of this document, is required in advance of any building expansion. In the future, Ski Marmot Basin will submit a detailed project description during the development permitting process Reglading Ski Marmot Basin has prepared a specific Reglading Plan for the proposed reglading of Milk Run, Elevator Chutes and Little Chicago. The following description outlines how the work will be conducted. Proposed reglading areas will be delineated on-site for tree and shrub removal, using bio-degradable flagging tape. As part of the requisite activity permitting, a Parks Canada representative will be asked to review the delineated areas and provide field-specific suggestions and direction. The areas proposed for reglading will be delineated by Ski Marmot Basin, in accordance with the following principles from the Vegetation Management Strategy and the BMPs specific to Marmot Basin Ski Area for glading/tree removal and brush cutting (See Supplemental Volume). These include: Trees removed reglading will be selected to maintain the species and size class structure of the original forest stand. Spacing for glades will average 5 m. Natural clearings and limbing will be used to reduce tree removal requirements. Gaps between successive clumps of trees will minimize extended straight lines. Uneven thinning patterns will be selected to maintain naturally occurring vegetation patterns. Krumholz clumps will be left intact. Whitebark pine and trees/snags of obvious wildlife value will be identified and left intact. In addition to the Marmot Basin-specific BMP related to glading/tree removal and brush cutting, tree and brush removal and disposal will also apply tree removal BMPs developed for all the Rocky Mountain ski areas (Parks Canada 2008c) Construction Equipment A variety of mechanical equipment may be used during the staging, construction and reclamation phases of this Project. The type of equipment to be used will be dependent on the choice of the contractor which is chosen to undertake the work Construction Access and Staging Equipment and construction materials will be staged at one of the existing parking lots. Existing access roads at the ski area will be used to move equipment and materials between the reservoir site and other snowmaking equipment installation activities. Depending on an assessment of the access road prior to initiating construction, upgrades to the access road may be required. Report No

19 3.5.5 Site Security During the construction period, the access road to the ski area will be closed to the public, although there may be occasional hiker presence. Signs describing the nature of the Project activities will be posted at the Caribou Chalet and access road gate. Ski area staff will provide site security. All open excavations will be fenced to protect wildlife Hazardous Materials and Fuel Disposal Handling procedures for fuels will involve re-fuelling equipment from a licensed fuelling service. Appropriatesized spill kits will be available on-site for use, if necessary. When details of excavation requirements are available, the need for explosives will be determined Off-site Land Use During construction, off-site land use will be required. Highway 93 and 93A, and the Marmot Basin Ski Area access road will be used to transport materials and labour to and from Marmot Basin. Construction workers may be housed in a work camp. The location and operational practices of this work camp, if required, will be discussed with Parks Canada prior to the development permit application. Bussing, multiple passenger vehicles and ride-sharing will be used to reduce the number of commuting trips between Jasper and Marmot Basin Project Scheduling Scheduling of the Project construction is contingent on a number of factors include approval of the LRP from the Minister responsible for Parks Canada, and Ski Marmot Basin s internal business processes. The construction schedule will be described in Ski Marmot Basin s development permit application to Parks Canada. Some preliminary work will be completed in the first year when the site is snow-free, so that work can be planned in detail and contract tender documents prepared. Depending on work scheduling, project construction may take one or two summer seasons. 3.6 Operation and Maintenance Project Components Expanded snowmaking in the mid-mountain and upper areas Ski Marmot Basin will continue to withdraw water at its existing water intake gallery for domestic purposes and to fill the existing lagoons (Cell 1 and Cell 2) for snowmaking on the lower slopes. (Details are provided in the Water Management Strategy which is included in the Supplemental Volume, and in Section ). Water for the new mid-mountain reservoir will be collected at a new intake structure, which will divert water from Basin Creek only during the high flow period in late spring and summer. During this high flow period, about 34,000 m 3 of water will be diverted from Basin Creek. Once the reservoir is filled, no further water will be diverted at this intake structure in that year. Snowmaking will be initiated in the fall as soon as weather conditions are suitable, and will continue throughout the winter season where snow coverage is required or until the water supply in the mid-mountain reservoir is exhausted Enhanced parking and transportation access The operation of the expanded parking lots will be the same as the current operations. Report No

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN 2.0 JURISDICTION Parks Canada s decisions about the acceptability of proposals presented in the LRP are guided by a number of regulatory instruments and policies, the most relevant of which are described

More information

Alberta Transportation The City of Edmonton The City of Calgary

Alberta Transportation The City of Edmonton The City of Calgary Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Impacts of Harvesting and Road Construction to Malakwa Creek

Impacts of Harvesting and Road Construction to Malakwa Creek Impacts of Harvesting and Road Construction to Malakwa Creek Complaint Investigation #16081 FPB/IRC/207 August 2017 Table of Contents Introduction... 1 The Complaint... 1 Background... 2 Investigation

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Introduction/Background The Kobe Pumping Plant and Pipeline (the Project ) is located in Mesa and Garfield Counties near DeBeque, Colorado.

More information

STATE OF VERMONT PUBLIC SERVICE BOARD PREFILED TESTIMONY AND EXHIBITS OF IAN A. JEWKES

STATE OF VERMONT PUBLIC SERVICE BOARD PREFILED TESTIMONY AND EXHIBITS OF IAN A. JEWKES STATE OF VERMONT PUBLIC SERVICE BOARD Docket No. Petition of Dairy Air Wind, LLC for a certificate of public good, pursuant to 0 V.S.A., for the installation of a single turbine,. MW wind-powered electric

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Larimer County Land Use Code Section 5.8: Rural Land Use Process

Larimer County Land Use Code Section 5.8: Rural Land Use Process Larimer County Land Use Code Section 5.8: Rural Land Use Process 5.8.6 PRINCIPLES D. Development Standards 3. Engineering Standards and Guidelines for Roads and Drainage The following Standards and Guidelines

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

4 GENERAL PLANNING REQUIREMENTS

4 GENERAL PLANNING REQUIREMENTS 4 GENERAL PLANNING REQUIREMENTS The 2008 Site Guidelines contain a number of general planning requirements that Ski Marmot Basin and Parks Canada have agreed will form part of any long range plan, regardless

More information

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT I. BACKGROUND FOR MANURE STORAGE AND HANDLING SYSTEMS Supplementary Information Form on sizing and safety

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

Chapter 2: Selecting Best Management Practices (BMPs)

Chapter 2: Selecting Best Management Practices (BMPs) Chapter 2: Selecting Best Management Practices (BMPs) 2.1 - Temporary versus Permanent BMPs The same level of care should be taken to select both temporary BMPs and permanent BMPs. The same level of care

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 March 2002 Conservation and Reclamation INFORMATION LETTER C&R/IL/02-1 Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 CHANGES TO THE INFORMATION LETTER This Information

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

APRIL 2015 CONTINGENCY PLANS

APRIL 2015 CONTINGENCY PLANS APRIL 2015 CONTINGENCY PLANS Prepared by: TERRATEST (PTY) LTD PO Box 794 HILTON Postal code 3245 Telephone:0333436789 Email:terratest@terratest.co.za Project director: Simon Johnson TABLE OF CONTENTS 1

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

Construction of Dariali HEPP. Reinstatement Plan

Construction of Dariali HEPP. Reinstatement Plan Construction of Dariali HEPP Reinstatement Plan 2016 Table of Content 1. Introduction... 3 2. Site Clean-up... 4 3. Headwork Site Reinstatement... 4 4. Reinstatement Of The Pipeline Corridor.9 5. Cable

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017 Applicant s Proposed Mitigation Statements Seward Highway -, POA 2013-448, Turnagain Arm Phase 1 May 2017 Avoidance The project is geographically constrained by Turnagain Arm tidal mudflats on one side

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Environmental Assessment Registration Destination RV Resort

Environmental Assessment Registration Destination RV Resort Environmental Assessment Registration Destination RV Resort Nine Island Pond South,Newfoundland and Labrador Prepared for: Department of Environment and Conservation Environmental Assessment Division Prepared

More information

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT Nonmetallic Mining Reclamation & Operation Plan Amendment No. 1 (Includes modifications for Wash Plant construction) Mondovi Mine Town of Mondovi, Wisconsin Prepared for: Buffalo White Sand, LLC PO Box

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

B.C. MINIST RY OF TRANSPORTATION. Maintenance Specification Chapter FLOOD CONTROL AND WASHOUT RESPONSE

B.C. MINIST RY OF TRANSPORTATION. Maintenance Specification Chapter FLOOD CONTROL AND WASHOUT RESPONSE B.C. MINIST RY OF TRANSPORTATION Maintenance Specification Chapter 7-760 FLOOD CONTROL AND WASHOUT RESPONSE 1. OBJECTIVE To safeguard Highway Users and adjacent properties; to prevent damage to Highways

More information

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices 1 Important Terms Accelerated erosion Conservation tillage Cover crops Diversion ditches Geologic

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

RECLAMATION REGULATIONS

RECLAMATION REGULATIONS RECLAMATION REGULATIONS 1001. INTRODUCTION a. General. The rules and regulations of this series establish the proper reclamation of the land and soil affected by oil and gas operations and ensure the protection

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

5.0 SURFACE WATER CONTROL MEASURES

5.0 SURFACE WATER CONTROL MEASURES 5.0 SURFACE WATER CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell civil engineers, construction personnel, and environmental personnel walked both Newgate/Phelps Road

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA-2004-1223 Introduction This mitigation statement was prepared as an attachment

More information

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by:

DRAFT SEDIMENT and EROSION CONTROL PLAN. BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION. Prepared by: DRAFT SEDIMENT and EROSION CONTROL PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC No. 2230) EXPANSION Prepared by: Electric Department 1.0 INTRODUCTION The Electric Department ( City ) is in the process of

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS

More information

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

SILT FENCE FLOW CHECK

SILT FENCE FLOW CHECK SILT FENCE FLOW CHECK Drawing No.: 1 SILT FENCE BARRIER Drawing No.: 2 STRAW BALE BARRIER Drawing No.: 3 1. Install diversion berm and cross ditch in conjunction with final clean-up and reclamation on

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

DEMOLITION TRADE SPECIFICATION

DEMOLITION TRADE SPECIFICATION DEMOLITION TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Condition The Contractor is to examine

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

City of Glendale Stormwater Management Plan Checklist

City of Glendale Stormwater Management Plan Checklist City of Glendale Stormwater Management Plan Checklist Project: Title of Plan: Date: Date of Plan: Reviewer: Most Recent Revision: Criteria Yes No Identify a SWMP Administrator and an alternate - The SWMP

More information

Flow Diversion Banks: General

Flow Diversion Banks: General Flow Diversion Banks: General DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Flow diversion

More information

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm

DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket part3-1Nsm DRAFT CH 10 & CH 11 October 7, 2015 From: SLDCProposedAmendmentsBCCPacket10-13-2015part3-1Nsm 10.19. SMALL SCALE SAND AND GRAVEL EXTRACTION. 10.19.1. Applicability. This section applies to any mineral

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made

More information

Manure Storage for Environmental Management Systems

Manure Storage for Environmental Management Systems WiMStor01 MStor Manure Storage for Environmental Management Systems Key: 1)Low Risk 2)Low-Moderate Risk 3)Moderate-High Risk 4)High Risk Location of Manure Storage Are the manure storage facilities in

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

To establish the Panama Canal Authority (ACP) occupational safety requirements for excavations.

To establish the Panama Canal Authority (ACP) occupational safety requirements for excavations. 1.0 PURPOSE To establish the Panama Canal Authority (ACP) occupational safety requirements for excavations. 2.0 BACKGROUND Excavation activities are highly dangerous and thus require adequate planning

More information

AM-PR-003 Construction Environmental Management Plan (C-EMP)

AM-PR-003 Construction Environmental Management Plan (C-EMP) OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Mitigating Flood Damage to Vermont Local Roads Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Vermont Emergency Management Vermont Local

More information

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1

More information

Appendix 4. Soil Management Plan

Appendix 4. Soil Management Plan Appendix 4 Soil Management Plan Soil Management Plan This Soil Management Plan (SMP) has been developed for the Giscome Quarry and Lime Plant Project. The SMP is a living document and will be updated as

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

VISUAL SITE INSPECTION REPORT 2018

VISUAL SITE INSPECTION REPORT 2018 VISUAL SITE INSPECTION REPORT 2018 SOUTHERN INDIANA GAS AND ELECTRIC A. B. BROWN GENERATING STATION TYPE III RESTRICTED WASTE LANDFILL WEST FRANKLIN, IN ATC PROJECT NO. 170LF00614 January 9, 2019 PREPARED

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE. January 10, 2014

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE. January 10, 2014 1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE January 10, 2014 Canadian Natural Resources Limited Primrose/Wolf Lake Oil Sands Project is a thermal in situ operation located primarily

More information

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE ARTICLE IV: DEVELOPMENT STANDARDS IV-63 410 GRADING AND DRAINAGE 410-1 General Provisions 410-1.1 All grading and drainage activities are to occur pursuant to the provisions of Chapter 14.12 of the Washington

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

Public Works Role in Mitigating Construction Impacts of Private Development

Public Works Role in Mitigating Construction Impacts of Private Development Public Works Role in Mitigating Construction Impacts of Private Development Trish Aragon, P.E. City Engineer City of Aspen 130 S. Galena Street Aspen, Colorado Abstract A large portion of the development

More information

Washington County Landfill Reconstruction Project: Progress Updates

Washington County Landfill Reconstruction Project: Progress Updates Home Site Index Glossary What's New Ask MPCA Visitor Center MPCA Home > Clean Up > Perfluorochemicals > Perfluorochemical (PFC) Waste Sites > Washington County Site Progress Updates Washington County Landfill

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information