1 DEPLOYMENT OF CHEMICAL EXTRACTION SOIL TREATMENT ON URANIUM CONTAMINATED SOIL ABSTRACT Jeffrey P. Kulpa Earthline Technologies Ashtabula, Ohio (440) John E. Hughes Earthline Technologies Ashtabula, Ohio (440) One of the significant contributors to the cost of completing D&D activities at most Department of Energy (DOE) sites is the remediation of contaminated soil. The traditional approach of excavation, packaging, transportation, and burial at an approved disposal site can be the major contributor to overall project cost. At the Ashtabula Environmental Management Project (AEMP) in Ashtabula, Ohio, soil remediation in the approved project baseline accounted for over $45 Million of a total project cost of $150 Million. To reduce project costs and shorten the project schedule, Earthline Technologies has designed, built and is operating a chemical extraction soil washing facility. The facility has successfully processed over 14,000 tons of contaminated soil. The Earthline soil washing initiative has progressed from bench scale testing to establish the viability of the process, pilot plant operations to refine engineering approaches, through final design and construction of a first of its kind chemical extraction soil washing plant. The Earthline soil washing plant uses a 0.2M carbonate solution that is heated to approximately 115 o F and contacts the soil for approximately 90 minutes to leach the uranium from the soil. The process has operated as designed and has resulted in contaminant removal efficiencies of approximately 85% and volume reductions in excess of 90%. The chemical extraction technology provides a remediation approach for the 60,000 tons of uranium contaminated soil at the AEMP in Ashtabula, Ohio. The soil washing approach provides projected savings of approximately $300 per ton when compared to ship and bury costs. This paper describes the process flow for the carbonate extraction plant and provides a description of monitoring conducted to ensure that clean soil meets regulatory requirements to be used as clean back fill in restored areas. In addition, lessons learned from the first campaign of soil washing are discussed. Finally, plant improvements and activities to allow treatment of soil contaminated with Technetium-99 and Trichloroethylene (TCE) are briefly discussed.

2 INTRODUCTION Earthline Technologies has developed a remediation approach for the DOE s Ashtabula Environmental Management Project (AEMP) for removing uranium contamination from soil. The treatment approach was tested and proven effective in bench scale and pilot plant operations. Soil treatment using carbonate extraction reduces the volume of contaminated material requiring off-site disposal, which has the positive effect of lowering total project costs associated with soil remediation from $45 Million for ship and bury to $25 Million for treatment. This paper describes the operations of this first of a kind, 10 ton per hour, continuous flow, chemical extraction soil treatment production plant. Background The RMI Titanium Company operated the RMI Extrusion Site in Ashtabula, Ohio from 1962 through 1990 as part of the U.S. Department of Energy (DOE) weapons production program. Depleted, normal, and slightly enriched (up to 2.1% weight percent U-235) was extruded as part of the DOE production reactor fuels manufacturing process. RMI also extruded depleted and natural uranium under a Nuclear Regulatory Commission (NRC) license and extruded nonradioactive metals (primarily copper based) for the commercial sector. However, the majority of material processed at the facility was for DOE. All extrusion operations at the RMI Extrusion Site ceased on October 31, In 1990, the NRC identified the RMI Extrusion Site for accelerated cleanup under the Site Decommissioning Management Plan (SDMP). DOE accepted financial responsibility for the cleanup based on previous site operations, which supported the DOE mission. Since 1990, the site has performed equipment and legacy waste removal, selected building demolition, soil remediation, and planning/permitting in support of groundwater remediation. The remediation effort is governed by guidance and regulations promulgated by the NRC for site decommissioning and license termination. In addition, the presence of chemical constituents (TCE) in groundwater has led to involvement by the U.S. and Ohio Environmental Protection Agencies (EPA) in remediation decisions involving a Corrective Action Management Unit (CAMU). Earthline Technologies is the prime contractor to DOE for completion of site decommissioning. The DOE Ashtabula Environmental Management Project Office (AEMP) provides day to day oversight of the remediation effort. The DOE approved project baseline for the decommissioning project is approximately $150 Million and the project is scheduled to complete in Fiscal Year The site consists of 25 buildings on 7 acres of the 32 acre site and is located in Northeastern Ohio about 50 kilometers north of Cleveland and approximately 1.5 kilometers south of Lake Erie. The area immediately adjacent to the site is sparsely populated. The majority of the site and surrounding area is relatively flat with the maximum elevation variation being 4 feet. The site is on the Lake Erie Flood Plain geographical feature, which formed in the latter part of the Wisconsin Age.

3 Description of Site Soil Contamination The primary practice that contributed to soil contamination at the RMI Site was uranium extrusion manufacturing. Particulate uranium was generated in the extrusion building during operation of the main 3,850 ton extrusion press and during operation of other machining equipment. Hoods and fans were used to exhaust the fine uranium dusts and fumes outside the buildings. Particulate deposition from the exhaust system contaminated the surrounding soils with uranium. The soil at the site is predominantly clay (>80%) with a small sand fraction and some non-native gravel that was used for plant service roads. The uranium contamination at the site is generally stratified within shallow topsoils with highest activities found in the top 15 cm. of soil. Site characterization data indicates that in general, uranium activities fall below the treatment standard of 30 pci/gm at a depth of approximately 46 cm. Average uranium contamination levels in the AEMP soils are approximately 100 pci/gm. The total amount of soil contaminated with uranium at the AEMP is approximately 60,000 tons (1 ton = 907 kg). In addition to uranium contamination, the soil is also contaminated with Technetium-99 (Tc-99), a byproduct of uranium recycling. The cleanup levels established by the U.S. Nuclear regulatory commission are 30 pci/gm for total uranium and 65 pci/gm for Tc-99. The unity rule for contamination levels for free release of the soil also exists in that: (CU/30 pci/gm) + (CTc/65 pci/gm) must be <1 (Eq. 1) where CU is the concentration of total uranium in the soil in pci/gm CTc is the concentration of Tc-99 in the soil in pci/gm Tc-99 impacts approximately 10,000 tons of the total volume of soil. However, Tc-99 presents different technical challenges than uranium with respect to extraction chemistry. Earthline has developed a process modification, which allows for efficient extraction of the Tc-99 in the soil. This process will be used during the next campaign of soil washing. Project Overview In late 1996, Earthline conducted bench scale screening in order to assess the viability of soil washing as a treatment option for the remediation of the high clay content soils present in Ashtabula. This study found that the Ashtabula soils could be treated effectively using a 0.2 M sodium bicarbonate solution at a temperature of approximately 115 o F and a retention time of 1.5 hours. Treatability testing showed that chemical treatment using carbonate extraction achieved removal efficiencies of up to 90% and was effective in meeting the treatment standard of 30 pci/gm for most of the site soils. A cost estimate of soil washing using the chemical extraction approach indicated that significant cost savings could be realized for the AEMP by implementing soil washing as the soil remediation approach. Based on the results of the treatability study, a pilot plant was designed to process 2-ton batches of contaminated soil. The purpose of the pilot plant was to validate the results of the treatability

4 study and to optimize process design parameters. The pilot plant was operated on 38 batches in early 1998 to test various feed conditions. The results of pilot plant operations indicated that chemical extraction soil washing would result in contaminant removal efficiencies of approximately 82% and volume reductions of 95% (i.e., <5% residual waste requiring off-site disposal). A cost estimate of full production soil washing operations based on pilot plant results indicated that savings of over $300 per ton could be realized when compared to ship and bury. SOIL WASHING TECHNOLOGY DESCRIPTION This section will provide a brief overview of the 10 ton per hour carbonate extraction system which has been constructed by Earthline Technologies. A block diagram of the process is illustrated in Figure 1. In the chemical extraction process, uranium in the contaminated soil is converted into a watersoluble form and extracted from the soil. This process which uses a relatively mild concentration of sodium carbonate to form a carbonate complex with uranium, is approximately 85% to 95% effective depending on properties of the soil and source term of the uranium material contained in the soil. Processed soils however, do contain trace levels of water-soluble uranium. This is largely due to levels of water-soluble carbonate complexed uranium contained in the interstitial soil water and uranium sorbed on clay and silt soil particles due to ion exchange reactions. Earthline devoted substantial research, design, and modeling efforts to ensure that processed soil would not have a negative impact on the long term environmental quality. The results of these efforts are discussed in the uranium stabilization section of this paper. The Soil Washing Production Plant is designed to leach uranium from contaminated soil using a nominal 0.2 M sodium carbonate/sodium bicarbonate solution. Following extraction, the soil is dewatered and staged as clean soil. The clean, treated soil is returned to the site as clean backfill. As a result of this process, significant volume reduction is achieved which minimizes radioactive low level waste (LLW) material which has to be transported off-site and buried, and thus minimizes soil remediation costs. Soil from the Soil Staging Pad is processed through the Soil Washing Production Plant and after treatment it is conveyed outside to a covered Treated Soil Staging Pad. This pad is located on the south end of the Production Plant and functions as a staging area for the soil until it has been sampled, analyzed and field verified to meet the treatment standard. Following field verification of the treated soil, it is loaded using a front end loader onto a dumptruck and transported back to the excavated areas for staging, free release, and ultimately backfilling. The AEMP soil is planned to be processed in two campaigns. The first, Campaign 1, consists of soil from the outer site areas, which was excavated in 1998 through Campaign 1 consists of approximately 20,000 tons of soil. Campaign 2 consists of soil from areas close in and under the buildings. Campaign 2 will be completed as buildings are demolished and will consist of approximately 40,000 tons.

5 Untreated Soil Feed Hopper To Wet Screen Recycle Leachate Storage Tank Drum Scrubber Wet Screen <2mm Slurry Reactor Tanks (3) >2 inch Oversize 2 mm Oversize Clarifier Belt Filter Press Regeneration Tanks (3) Ion Exchange Columns (4) Barren Leachate Storage Tank Uranium Stabilization Evaporation Tanks Treated Soil Volume Reduction Evaporation Fig. 1: Soil Washing Process Simplified Flow Diagram Process Description Contaminated feed material is introduced into the plant using a front end loader to dump soil into the feed hopper. The feed hopper is equipped with the conveyor that passes the feed materials through a clod breaker to size reduce large chunks of soil. Soil falls through the clod breaker onto the primary Feed Conveyor which transports the feed material to the transfer conveyor. The transfer conveyor carries the feed material to the feed chute of the drum scrubber. At the drum scrubber water is introduced to the feed stream to the further reduce the size of the feed materials. The drum scrubber rotates on a slanted axis causing materials to travel toward the open end of the drum scrubber. A trommel screen in this portion of the drum scrubber allows materials that are less than 2 inches in size to drop onto the vibrating wet screen below. The fraction of the feed materials that is greater than 2 inches in size drops out the open end of the drum scrubber (this fraction usually consists of rocks, large organic matter, debris and balls of clay).

6 Material that falls to the wet screen is further segregated into greater and less than 2mm sizes. The fraction that is greater than 2mm is conveyed out of the plant for later processing, that which is 2mm or less in size is slurried and pumped to the Reactor Tanks. In Reactor Tank #1 the slurry is mixed with the sodium carbonate to produce a 0.2M solution. The solution is heated approximately 115 degrees F. The solution is gravity fed through the three reactor tanks and then into the Reactor Overflow Tank. From the Reactor Overflow Tank the leachate is pumped to the Lamella Clarifier. At the Lamella Clarifier, a polymer flocculant is added to the solution to allow the solids to settle out of solution. Solids are pumped to a belt filter press for de-watering, and liquids pump to the pregnant leachate tanks. Solids drop from the belt into the screw conveyor below. The screw conveyor transfers the processed soil into the mixing conveyor where stabilization and fertilization additives are mixed into the soil. The soil is then conveyed, via a radial stacker, to the clean soil pad. A pile on the clean soil pad consists of 80 to 100 tons, the amount processed in a usual day. The clean processed soil remains on the clean soil pad until analytical results confirm that the soil meets free release standards. Liquids from the Pregnant Leachate Tanks are pumped through a series of resin columns. The fluid passes through three of the four columns in a sequence designed to maximize resin efficiency and on line use. The first column that the fluid is introduced to will be the most heavily loaded with uranium. The second column will have the next highest loading value and the third the least uranium loading. When the resin in the first column is saturated with uranium it is taken off line and the fourth column is placed in service. The column that was second is now the first column in series and so on The column taken off line will be regenerated using a sodium chloride solution. Regeneration of each column requires approximately 24 hours. Leachate pumped from the resin columns enters the Barren Leachate Tank. The leachate is pumped to the Belt Filter Press spray nozzles, which clean the belts. The leachate is captured in sumps and is pumped to the Recycle Leachate Tank. From the Recycle Leachate Tank, the leachate is pumped to the Drum Scrubber and Wet Screen to assist in feed material size reduction and creating the initial slurry. EQUIPMENT DESCRIPTIONS Feed Hopper and Feed Ramp The Feed Hopper is a apron feeder designed to receive, hold, meter, and convey 10 tons per hour of soil into the Soil Washing Production Plant. The Feed Hopper is fabricated from carbon steel and has a nominal 60" wide variable speed, chain driven, pan feeder. Drum Scrubber A rotating, carbon steel, Drum Scrubber combines 10 tons per hour of soil from the Feed Hopper, and Recycle Leachate to create a 30 wt. % soil slurry. Undersize <2" material falls through the Drum Scrubber trommel screen, and oversize >2" material passes through the Drum

7 Scrubber trommel screen and leaves the unit as oversize. The Drum Scrubber has a working volume of 775 gallons; and nominal dimensions of 6' diameter x 16' long drum, and a 4' 3" diameter x 4' 3" long trommel screen located on the discharge end of the unit Wet Screen A nominal 3' wide x 7' long vibrating Wet Screen is provided to perform additional size fractionation of the <2" material which falls through the Drum Scrubber trommel screen. The wet screen is fitted with a 2 mm screen and spray nozzles to wash the fines from the oversize material. A modification to the plant prior to Campaign 2 will install a rock crusher which will crush the oversize material. The crushed oversize material will be recycled into the process thus further reducing the amount of material requiring off site disposal. Recycle Leachate Tank Recycle Leachate solution originates as Belt Filter Press filtrate and is pumped into the 7500 gallon Recycle Leachate Tank. The tank functions as a process water surge and buffer tank. The Recycle Leachate is pumped to the Wet Screen to wash the oversize, and it is pumped to the Slurry Pump Tank to dilute the Lamella Clarifier feed from 30% solids to 10% solids. Reactor Tank System The Reactor Tank System consists of 3 gravity feed, steam jacketed (2 of the 3 tanks), insulated, nominal 4000 gallon, carbon steel, atmospheric tanks in series with agitators to maintain the solids in suspension. The Reactor Tanks function as reaction and retention vessels to enable the 0.2 M sodium carbonate/sodium bicarbonate solution (ph=10) to solubilize the uranium at a 115 o F process temperature. After approximately 1-1/2 hours of retention time of the slurry in the Reactor Tanks, the leaching of uranium from the soil is completed. Lamella Clarifier System The 10 wt.% slurry from the Reactor Tank System is transferred to the Lamella Clarifier which functions, with the addition of coagulating and flocculating agents, to perform the initial dewatering of the slurry via gravity settling the solids out of solution. The Lamella Clarifier also functions to permit rinsing of the uranium from the solids leaving as a 35 wt.% slurry from the underflow of the Lamella Clarifier using Barren Leachate solution (i.e., Ion Exchange System effluent process water with a nominal 2 ppm uranium concentration). The overflow from the Lamella Clarifier gravity drains to the Pregnant Leachate Tanks. Pregnant Leachate Tanks Two 7500 gallon Pregnant Leachate Tanks are provided to collect the overflow from the Lamella Clarifier. Two tanks are provided to act as surge and buffer volume in the event of a Lamella Clarifier upset. The Pregnant Leachate is pumped out of the tanks to provide dilution water to the Lamella Clarifier Flocculant Make-up Unit, and pumped through a filter to remove residual solids > 150 um particle size and then fed to the Ion Exchange System.

8 Belt Filter Press and Soil Stabilization System The final dewatering of the slurry occurs within the Belt Filter Press. The soil sludge cake created by the Filter Press discharges into a screw conveyor and is transported outside and transferred onto the Soil Mixing Conveyor. The treated soil is stabilized by mixing it with chemical amendments (e.g., sulfuric acid to neutralize the soil ph to 7-8, and phosphate treatment to stabilize the residual soluble uranium). Following stabilization, the treated soil is conveyed onto the Treated Soil Staging Pad using the Radial Stacker Conveyor and staged as clean soil. Ion Exchange System The uranium from the Pregnant Leachate solution is recovered using an upflow Ion Exchange System. The Ion Exchange System consists of four 3,500 gallon pressure vessels. The vessels are designed and built in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. At any one time, three of the vessels are in service, and the fourth is off-line being regenerated or in standby. The vessels contain a nominal 125 ft 3 strong base anionic resin, and are operated in series with the vessel with the highest uranium loading always operated as the lead vessel. Once the resin in the lead column is exhausted, the fourth regenerated column is brought on-line. The exhausted column is taken off-line, and it is regenerated to permit reuse. The regeneration process continues iteratively throughout the operation of the plant. Regeneration of the resin occurs in the Ion Exchange vessels using 2.0 M sodium chloride, and 0.1 M sodium bicarbonate solutions. Barren Leachate System One 7500 gallon Barren Leachate Tank is provided to collect the effluent of the Ion Exchange System and serve as a process water surge and buffer tank. Barren Leachate stored within this tank is fed to the Belt Filter Press to supply the belt spray wash water, fed to the Belt Filter Press Flocculant Make-up Unit to provide flocculant dliution water, and is fed to the Lamella Clarifier underflow in order to dilute the underflow from 35% to 10% solids. Boiler and Steam Distribution System A 150 boiler horsepower (BHP) or 5M btu/hr low pressure boiler is provided to supply low pressure <15 psig process steam to the Reactor Tank steam jackets, and intermittently to supply steam to the Caustic Wash Tank steam coil. Wastewater Evaporator System Process wastewater is minimized through recycling process water and regeneration solutions as much as possible. Wastewater which can not be recycled (i.e., 175 gallons per day) is sent to the Wastewater Treatment Plant (WWTP) and evaporated using a closed drum evaporator system. The system consists of 12 electrically heated Drum Dryers. The water vapor from the dryers is collected and condensed. Condensate from the condenser is collected within a sump and recycled back into the process. Residual solids from the drums are disposed of as LLW.

9 OPERATIONS The Earthline Soil Washing Facility is a 10 ton per hour continuous feed process. The plant is staffed by 8 operator technicians who perform the following operational tasks: Plant feed operations using a 2 cubic yard end loader. Feed operations include management of excavated soil staged for future operations. Operation of all required plant operating stations which include: plant feed; reactor tank systems, ion exchange and regeneration systems, clarifier and filter press systems, and stabilization systems. Chemical make-up operations. Minor plant operational maintenance and planned preventive maintenance. Clean soil product handling from the treated soil staging area to previously excavated areas for restoration of excavated areas. Plant operations are controlled by the plant operations supervisor who coordinates all operational activities. The plant is operated in single shift operations for five days a week. A typical week consisted of 10 hour operations for four days followed by one day for routine maintenance. This planned operating schedule allowed over 1,000 tons of soil to be processed in each month, which meets project requirements and DOE funding profiles. During the period from February through May 2000, an average production of 1,600 tons per month was achieved. The plant was very reliable. Despite being a first of its kind in the world, the plant achieved greater than 95% plant availability during Campaign 1 operations. CLEAN SOIL PRODUCT FREE RELEASE The RMI Decommissioning Project is governed by the Nuclear Regulatory Commission (NRC) through an approved Decommissioning Plan. Cleanup levels for soil are established at 30 pci/gm for total uranium and 65 pci/gm for Tc-99. Monitoring of activity levels in the soil is accomplished by several means. Real time monitoring during plant operations is accomplished through hourly X-Ray Fluorescence (XRF) sampling. XRF can provide total uranium results in less than 1 hour. During pilot plant operations, extensive statistical sampling was conducted to ensure accurate agreement between XRF and the regulatorily required Alpha Spectroscopy procedure. The samples taken for XRF are also used to provide a composite daily sample for all processed material. The composite sample is analyzed using alpha spectroscopy for uranium and gamma spectroscopy for Tc-99. All results are reviewed by the Radiation Safety Officer on a daily basis to ensure that license free release standards are satisfied. If the material does not meet standards, it is returned to the plant for processing. During Campaign 1, less than 1% of treated soil required re-processing. URANIUM STABILIZATION The clean free released soil product requires addition of several chemicals to ensure that there are no long term environmental impacts resulting from the use of the clean product which contain trace levels of water soluble uranium as backfill. The concern is that water soluble

10 carbonate complexed uranium contained in the interstitial soil will be released and impact surface water or groundwater. Earthline had extensive modeling performed by ARCADIS Geraghty & Miller (1), which led to the following conclusions: Surface erosion will not produce surface water uranium concentrations in local brooks that exceed the standard of 30 pci/l when the Kd value for the processed soil exceeds 800 L/Kg. Peak groundwater concentrations would not exceed 30 pci/l when the Kd value for processed soils exceeds 800 L/Kg. Kd is the Adsorptive Partitioning Coefficient and is defined as the ratio of soluble uranium in liquid phase over non-soluble uranium in the solids phase. Kd for untreated soil has a value of approximately 20 L/Kg. Earthline completed extensive laboratory testing to determine the correct formulations required to achieve the required Kd (2). The laboratory testing revealed that approximately 60 pounds of Triple Super Phosphate were required per ton soil processed to stabilize the uranium and remove its water soluble nature. In addition, 10 pounds of Sulfuric Acid were added to each ton of soil to restore the soil to neutral ph. These two additions had the impact of stabilizing the residual uranium in soil to protect the groundwater and of restoring the ability of the soil to support vegetation. Extensive re-vegetation experiments have been conducted to ensure that areas restored with clean soil product can be returned to vegetated conditions. The uranium stabilization efforts described above also have a positive effect on vegetation efforts resulting in a very acceptable growth medium. URANIUM REMOVAL EFFICIENCY Soil processing resulted in data regarding the initial uranium concentration and final treated uranium soil concentration. It was noted that the uranium removal efficiency was dependent on the initial feed concentration. Table I shows that removal efficiency increases with feed contamination levels. COST Table I: Uranium Removal Efficiency as a Function of Uranium Feed Concentration Average Feed Concentration Average Treated Concentration Observed Removal Efficiency 180 pci/gm 18 pci/gm 90% 100 pci/gm 18 pci/gm 82% 60pCi/gm 15 pci/gm 75% With the completion of processing 14,200 tons of contaminated soil, the cost of building and operating the soil washing plant is summarized to ensure that cost savings are resulting from operations as predicted.

11 Table II: Soil Plant Operating Cost Breakdown Cost Element Operations Labor cost for plant manager, shift supervisor, 8 operators, 3 treatability laboratory chemists, plus front end loader rental, dump truck rental, maintenance parts and labor. Capital Investment Cost - $4.3 Million construction cost plus $700K startup and permitting cost amortized over 60,000 tons. Sampling all required in process and confirmatory laboratory analysis both on site and off site to support plant operations. Residuals Management evaporation of residual water from ion exchange resin regeneration and off site disposal of residues. Utilities natural gas, electricity, and water Consumables Plant operating chemicals, replacement resin, and other consumables such as PPE and other supplies. Cost $169 per ton $83 per ton $16 per ton $18 per ton $6 per ton $17 per ton The total life cycle cost per ton of soil processed sums to $309. This compares very favorably with the total cost for shipment and disposal of $600 per ton. The estimated cost savings at the AEMP if 60,000 tons of soil are processed in lieu of off site shipment for burial is $17.5 Million. LESSONS LEARNED Several important lessons were learned as a result of processing the initial 14,200 tons of soil by Earthline Technologies. These include: The buildup of organic material in the leachate solution resulted in difficulty in precipitating uranium yellow cake from ion exchange regeneration solution. As a result, the process was modified to directly remove regeneration solution from the process and evaporate this liquid. This change had minimal impact on the volume of material requiring disposal and caused only a slight increase in the overall processing cost. The oversize fraction from drum scrubber operations was a substantially higher percentage of processed soil volume than estimated prior to operations. (20% versus 10%). The difference was attributed to the large amount of aggregate material brought on site to improve haul roads during site excavations. The oversize material will be processed by a rock crusher circuit, which will be installed during 2001.

12 CONCLUSIONS Earthline Technologies has constructed and operated a 10 ton per hour chemical extraction soil washing facility at a capital cost of approximately $4.0 Million. A cost comparison of traditional soil remediation through transportation and burial and soil washing reveals that at the AEMP, soil washing will save the DOE approximately $290 per ton of soil processed. The Earthline Soil Washing process is currently being modified and improved to include capabilities to: (1)Air strip TCE from soil in the reactor tanks. When permitted, this addition will allow Earthline to treat soil from the site Corrective Action Management Unit which is contaminated with uranium, TCE, and Tc-99, and, (2)Modify the plant process chemistry to add an oxidizing agent which will allow treatment of soil contaminated to high levels of Tc-99 thus minimizing the amount of Tc-99 soil requiring direct disposal. REFERENCE (1) Uranium Stabilization Determination, ARCADIS Geraghty & Miller, January (2) Groundwater Flow and Constituent Transport Modeling for Soil Washing at Ashtabula, Ohio, ARCADIS Geraghty & Miller, March 1999.

CONSTRUCTION AND OPERATION OF A CHEMICAL EXTRACTION SOIL TREATMENT PLANT FOR THE REMEDIATION OF URANIUM CONTAMINATED SOIL AT A DOE FACILITY

CONSTRUCTION AND OPERATION OF A CHEMICAL EXTRACTION SOIL TREATMENT PLANT FOR THE REMEDIATION OF URANIUM CONTAMINATED SOIL AT A DOE FACILITY CONSTRUCTION AND OPERATION OF A CHEMICAL EXTRACTION SOIL TREATMENT PLANT FOR THE REMEDIATION OF URANIUM CONTAMINATED SOIL AT A DOE FACILITY ABSTRACT Jeffrey P. Kulpa RMI Environmental Services Ashtabula,

More information

DEPLOYMENT OF MULTIPLE TECHNOLOGIES FOR REMEDIATION OF NUMEROUS MIXED WASTE STREAMS

DEPLOYMENT OF MULTIPLE TECHNOLOGIES FOR REMEDIATION OF NUMEROUS MIXED WASTE STREAMS DEPLOYMENT OF MULTIPLE TECHNOLOGIES FOR REMEDIATION OF NUMEROUS MIXED WASTE STREAMS ABSTRACT Jeffrey P. Kulpa Earthline Technologies Ashtabula, Ohio (440) 993-2804 Scott A. Altmayer Earthline Technologies

More information

Closed Water Loop Dewatering. System Possible Coagulant Feed Points

Closed Water Loop Dewatering. System Possible Coagulant Feed Points Closed Water Loop Dewatering Sand Screw Feed (from sizing screens) - 400 mesh (38 micron) solids System Possible Coagulant Feed Points Water for Reuse Thickener Dilution Water Product Hydrocyclones Belt

More information

Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine

Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine Charles Murphy, Alpha Natural Resources, Logan County, West Virginia, USA Christopher Bennett,

More information

SOIL WASHING PLANT TRANSPORTABLE CONTAMINANTS FROM SOIL CONTAMINANTS OUT OF WASTE MATERIALS. / Coarse-grained soil / Coarse-grained waste materials

SOIL WASHING PLANT TRANSPORTABLE CONTAMINANTS FROM SOIL CONTAMINANTS OUT OF WASTE MATERIALS. / Coarse-grained soil / Coarse-grained waste materials TRANSPORTABLE SOIL WASHING PLANT REMOVING CONTAMINANTS FROM SOIL FLUSHING CONTAMINANTS OUT OF WASTE MATERIALS / Coarse-grained soil / Coarse-grained waste materials PROCESS FLOW DIAGRAM Soil feeding unit

More information

NATIONAL LEAD COMPANY, INC.

NATIONAL LEAD COMPANY, INC. f. I - i,.. ; ~ ~ ~ /fy~.,.,.l -~,- -~ _

More information

The waste water treatment plant will treat

The waste water treatment plant will treat Waste Water Treatment Plant The waste water treatment plant will treat groundwater and surface water pumped from the existing Port Granby Waste Management Facility during excavation of the waste and continue

More information

AUDIT REPORT SOIL WASHING AT THE ASHTABULA ENVIRONMENTAL MANAGEMENT PROJECT DOE/IG-0542 JANUARY 2002

AUDIT REPORT SOIL WASHING AT THE ASHTABULA ENVIRONMENTAL MANAGEMENT PROJECT DOE/IG-0542 JANUARY 2002 DOE/IG-0542 AUDIT REPORT SOIL WASHING AT THE ASHTABULA ENVIRONMENTAL MANAGEMENT PROJECT JANUARY 2002 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES U. S. DEPARTMENT OF ENERGY

More information

Lecture 23. Nitrophosphate Fertilizers Part 1

Lecture 23. Nitrophosphate Fertilizers Part 1 Lecture 23 Nitrophosphate Fertilizers Part 1 Introduction Nitrophosphate is the generally accepted term for any fertilizer that is produced by a process involving treatment of phosphate rock with nitric

More information

Lecture 35. NPK Fertilizers Nitrophosphate Route

Lecture 35. NPK Fertilizers Nitrophosphate Route Lecture 35 NPK Fertilizers Nitrophosphate Route Phosphate sources must be converted into a form which can be taken up by plants ( available ). This can be achieved by using the integrated Nitrophosphate

More information

Worldwide Pollution Control Association

Worldwide Pollution Control Association Worldwide Pollution Control Association WPCA-Duke Energy FGD Wastewater Treatment Seminar March 7, 2013 All presentations posted on this website are copyrighted by the Worldwide Pollution Control Association

More information

Radioactive Water Treatment at a United States. John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201

Radioactive Water Treatment at a United States. John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201 ABSTRACT Radioactive Water Treatment at a United States Environmental Protection Agency Superfund Site - 12322 John C Beckman, US Army Corps of Engineers, Baltimore District, Baltimore, MD 21201 A water

More information

Worldwide Pollution Control Association

Worldwide Pollution Control Association Worldwide Pollution Control Association WPCA-Southern Company Wastewater Treatment Seminar April 16 & 17, 2013 All presentations posted on this website are copyrighted by the Worldwide Pollution Control

More information

Treatment Technologies

Treatment Technologies Treatment Technologies Precipitation Softening INTRODUCTION CHEMISTRY OF PRECIPITATION SOFTENING COLD LIME SOFTENING WARM LIME SOFTENING HOT PROCESS SOFTENING SILICA REDUCTION REDUCTION OF OTHER CONTAMINANTS

More information

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT Michael Botz, Elbow Creek Engineering, Billings, MT Sevket Acar, Newmont Mining Corporation, Englewood, CO Introduction

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016 Introduction Flue Gas Desulfurization is a process of removing

More information

Abstract. 1 Introduction. Golder Associates Ltd, Canada

Abstract. 1 Introduction. Golder Associates Ltd, Canada https://papers.acg.uwa.edu.au/p/1752_05_gu/ Challenges associated with the design of a dewatering plant that will undergo a large increase in tailings throughput during the initial years of the project

More information

DEVELOPMENT OF WET-OXIDATION TREATMENT SYSTEM FOR FILTER BACKWASH SLUDGE AND ION EXCHANGE RESINS

DEVELOPMENT OF WET-OXIDATION TREATMENT SYSTEM FOR FILTER BACKWASH SLUDGE AND ION EXCHANGE RESINS DEVELOPMENT OF WET-OXIDATION TREATMENT SYSTEM FOR FILTER BACKWASH SLUDGE AND ION EXCHANGE RESINS T. Miyamoto, M. Motoyama, M. Shibuya JGC Corporation 2-3-1, Minato Mirai, Nishi-ku, Yokohama, 220-6001,

More information

BioGenesis Enterprises, Inc Alban Station Blvd. Suite B-208 Springfield, Virginia USA TEL (703) FAX (703)

BioGenesis Enterprises, Inc Alban Station Blvd. Suite B-208 Springfield, Virginia USA TEL (703) FAX (703) BENCH-SCALE TREATABILITY STUDY REPORT BIOGENESIS SM SEDIMENT WASHING TECHNOLOGY NamDong Retardation Basin Incheon City, South Korea October 15, 2008 BioGenesis Enterprises, Inc. Abstract BioGenesis Enterprises,

More information

Module: 8 Lecture: 36

Module: 8 Lecture: 36 Module: 8 Lecture: 36 TRIPLE SUPERPHOSPHATE INTRODUCTION Triple superphosphate (TSP) is the more concentrated fertilizer than ordinary superphosphate, containing from 44 to 51% of available P2O5 or nearly

More information

Phosphate Plant Yield Comparisons

Phosphate Plant Yield Comparisons Phosphate Plant Yield Comparisons Presented at the 33 rd Meeting of the Central Florida Chapter of the American Institute of Chemical Engineers By: Richard D. Harrison Senior Engineer PegasusTSI Tampa,

More information

Midwest Soil Remediation, Inc.

Midwest Soil Remediation, Inc. Thermal Desorption Unit (TDU) 23872 North Kelsey Road Lake Barrington IL 60010 USA (800) 870-0375 www.midwestsoil.com MSR Unit 945d Midwest Soil Remediation, Inc. An Introduction to MSR 945d Direct Fired

More information

Pilot Study Report. Z-92 Uranium Treatment Process

Pilot Study Report. Z-92 Uranium Treatment Process Pilot Study Report for Z-92 Uranium Treatment Process conducted at the Mountain Water & Sanitation District, Conifer, Colorado Revised November 11, 4 Page 2 Executive Summary Mountain Water & Sanitation

More information

Final pilot plant layout

Final pilot plant layout 7.2.27 Final pilot plant layout Summary INTRODUCTION... 7.2-813 PILOT PLANT LAYOUT BASED ON THE RESULTS FROM LAB-SCALE TREATMENT RUNS... 7.2-813 CHANGES IN PILOT PLANT LAYOUT ON ACCOUNT OF THE AVAILABILITY

More information

The Benefits of Removing Oil from Water

The Benefits of Removing Oil from Water The Benefits of Removing Oil from Water Table of Contents Why is Removing Oil from Water Important? 3 What is Oil Skimming? 6 Oil Removal Benefit #1: Reduces Costs 7 Oil Removal Benefit #2: Generates New

More information

INDIRECT THERMAL DESORPTION PLANT

INDIRECT THERMAL DESORPTION PLANT INDIRECT THERMAL DESORPTION PLANT CONVERTING HAZARDOUS WASTE TO NON-HAZARDOUS / INERT MATERIAL INDUSTRIAL WASTE TO VALUABLE MATERIAL / Contaminated soil / Sludge / Sediment / Hazardous waste PROCESS FLOW

More information

PELLETIZING AND RECYCLING OF DUST FROM AND TO A LEAD GLASS FURNACE

PELLETIZING AND RECYCLING OF DUST FROM AND TO A LEAD GLASS FURNACE PELLETIZING AND RECYCLING OF DUST FROM AND TO A LEAD GLASS FURNACE Robert G. Hinkle President MMC/Mars Mineral Mars, PA Jeffrey T. Lowery Manager, Environmental Control and Laboratory Larry Tock Environmental

More information

Introduction to flocculation

Introduction to flocculation Introduction to flocculation With upgrading we understand, the further processing of the final products from the enrichment stages in a process. This is valid both concerning the valuable minerals (the

More information

SOLID-LIQUID SEPARATION TECHNOLOGY FOR REMOVING CONTAMINANT FINES FROM WATER SCRUBBING, CLARIFIER EFFLUENTS AND GREY WATER PAPER NUMBER

SOLID-LIQUID SEPARATION TECHNOLOGY FOR REMOVING CONTAMINANT FINES FROM WATER SCRUBBING, CLARIFIER EFFLUENTS AND GREY WATER PAPER NUMBER SOLID-LIQUID SEPARATION TECHNOLOGY FOR REMOVING CONTAMINANT FINES FROM WATER SCRUBBING, CLARIFIER EFFLUENTS AND GREY WATER PAPER NUMBER 480801 Barry A. Perlmutter, President & Managing Director BHS-Sonthofen

More information

be recycled. This method is one which can be employed, now, in an effort toward waste minimization.

be recycled. This method is one which can be employed, now, in an effort toward waste minimization. The Use of Electrolytic Recovery in Conjunction with Chemical Precipitation: A Case Study of Total Metal Recovery at a Jewelry Production Company Dr. George Hradil, Covocfinish Co., Inc. and Edward Hradil,

More information

U. S. Army Corps of Engineers Metals Precipitation Checklist

U. S. Army Corps of Engineers Metals Precipitation Checklist U. S. Army Corps of Engineers Metals Precipitation Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is designed to facilitate the performance evaluation of a

More information

Extracting uranium from its ores

Extracting uranium from its ores Nuclear fuel cycle' Extracting uranium from its ores g by D.C. Seidel* The development of the uranium mining and ore processing industry is unique. In the space of a little less than 10 years it grew from

More information

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead

Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead Groundwater Treatment Facility Operations Martin State Airport August 2018 Chuck Trione, Project Lead 1 Martin State Airport Groundwater Treatment Plant The recently completed 10,200 square foot building

More information

Paste Thickeners. Advanced Thickening Technology

Paste Thickeners. Advanced Thickening Technology Paste Thickeners Advanced Thickening Technology Paste Thickening What is Paste? Paste thickening technology is a long-term solution for many challenges facing the minerals industry. Thickening a stream

More information

PECO FLUORINE REMOVAL PROCESS PILOT PLANT. By Jack M. Nagy, P. Eng. Process Engineer & Stephen W. Hilakos Manager of Technical Services

PECO FLUORINE REMOVAL PROCESS PILOT PLANT. By Jack M. Nagy, P. Eng. Process Engineer & Stephen W. Hilakos Manager of Technical Services PECO FLUORINE REMOVAL PROCESS PILOT PLANT By Jack M. Nagy, P. Eng. Process Engineer & Stephen W. Hilakos Manager of Technical Services SF Phosphates Limited Company 515 South Highway 430 Rock Springs,

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Extraction Process Design Basis

Extraction Process Design Basis AI Project Update Joslyn North Mine Project 5 Process 5.1 Introduction This section describes the project bitumen extraction process and includes: process description material balance energy balance technology

More information

Where does drinking water come from?

Where does drinking water come from? Water Quality Where does drinking water come from? When you think about where your drinking water comes from, it's important to consider not just the part of the river or lake that you can see, but the

More information

WM 00 Conference, February 27 March 2, 2000, Tucson, AZ THE EXCAVATION AND REMEDIATION OF THE SANDIA NATIONAL LABORATORY CHEMICAL WASTE LANDFILL

WM 00 Conference, February 27 March 2, 2000, Tucson, AZ THE EXCAVATION AND REMEDIATION OF THE SANDIA NATIONAL LABORATORY CHEMICAL WASTE LANDFILL THE EXCAVATION AND REMEDIATION OF THE SANDIA NATIONAL LABORATORY CHEMICAL WASTE LANDFILL Sharissa Young, Don Schofield, Sandia National Laboratories Daniel Kwiecinski, Radian International, LLC Rhonda

More information

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project Prepared By: Curt Czarnecki, P.E. Kenosha Water Utility Presented By: Joseph Hughes, P.E. Centrisys Corporation MIWEA June

More information

ROTOFORM-----PASTILLATION FOR----SULPHUR BENTONITE

ROTOFORM-----PASTILLATION FOR----SULPHUR BENTONITE We design, engineer and install specialized fertilizer solidification and handling systems. Our systems are end-to-end, benefitting from our long experience of working in partnership with the chemical

More information

PRESENTATION OF NUCLEAR APPLICATIONS OF CONDENSATE TREATMENT

PRESENTATION OF NUCLEAR APPLICATIONS OF CONDENSATE TREATMENT Via Pietro Nenni, 15-27058 VOGHERA ITALY Tel. +39 0383 3371 Fax +39 0383 369052 E-mail: info@idreco.com PRESENTATION OF NUCLEAR APPLICATIONS OF CONDENSATE TREATMENT 0. MAIN CONDENSATE TREATMENT 1. REACTOR

More information

SEDIMENT CHOREOGRAPHY

SEDIMENT CHOREOGRAPHY Global Reach. Local Benefit. SEDIMENT CHOREOGRAPHY 4/15/2016 Maritime and the Regional Economy The Port of Cleveland spurs job creation and helps our region compete globally by connecting local businesses

More information

Magnesium Hydroxide Conversion Project From Quicklime Alone to Mixed Mode Treatment with FloMag H Magnesium Hydroxide Slurry and Quicklime

Magnesium Hydroxide Conversion Project From Quicklime Alone to Mixed Mode Treatment with FloMag H Magnesium Hydroxide Slurry and Quicklime EXECUTIVE SUMMARY Magnesium Hydroxide Conversion Project From Quicklime Alone to Mixed Mode Treatment with FloMag H Magnesium Hydroxide Slurry and Quicklime A major United States metal processing company

More information

System-50 Material Flow

System-50 Material Flow System-50 Material Flow 1) Run of Mine material (-600mm) is dumped onto the VF-50 Grizzly positioned above the HPC-50 Trommel Feed Chute. (*) HPC-50 Screen sizes are selected to suit each operation. Typical

More information

Utilizing ScaleBlaster to Reduce Lime Scale Build-up in an Industrial Wastewater Treatment Plant

Utilizing ScaleBlaster to Reduce Lime Scale Build-up in an Industrial Wastewater Treatment Plant Utilizing ScaleBlaster to Reduce Lime Scale Build-up in an Industrial Wastewater Treatment Plant Documented by The Village of Sauget Physical/Chemical Plant May, 2015 Purpose Case Study: Utilizing ScaleBlaster

More information

Agricultural Demand for Sulphur

Agricultural Demand for Sulphur Rotoform-----astillation-------for----sulphur---bentonite-------- We design, engineer and install specialized fertilizer solidification and handling systems. Our systems are end-to-end, benefitting from

More information

Fugitive Dust Control Plan Sherburne County Generating Plant

Fugitive Dust Control Plan Sherburne County Generating Plant Fugitive Dust Control Plan Sherburne County Generating Plant Original Publication: September 2015 Review No. 3: October 2018 Revision No: 0 Table of Contents Annual Review Log... 1 Revision Log... 2 Certification

More information

COMBINATION FILTRATION OF PRESSURE, VACUUM AND CLARIFICATION TECHNOLOGIES FOR OPTIMUM PROCESS SOLUTIONS (INCLUDING DATA IN APPENDIX A)

COMBINATION FILTRATION OF PRESSURE, VACUUM AND CLARIFICATION TECHNOLOGIES FOR OPTIMUM PROCESS SOLUTIONS (INCLUDING DATA IN APPENDIX A) COMBINATION FILTRATION OF PRESSURE, VACUUM AND CLARIFICATION TECHNOLOGIES FOR OPTIMUM PROCESS SOLUTIONS (INCLUDING DATA IN APPENDIX A) Barry A. Perlmutter, President & Managing Director BHS-Filtration

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

Page 1 of 8

More information

ASHTABULA SUCCESSES MACRO NOW OR FOREVER HOLD YOUR PIECES!

ASHTABULA SUCCESSES MACRO NOW OR FOREVER HOLD YOUR PIECES! ABSTRACT ASHTABULA SUCCESSES NOW OR FOREVER HOLD YOUR PIECES! S.A. Altmayer, J.A. Forschner, J. P. Kulpa RMI Environmental Services, 1800 E. 21 st St. Ashtabula, OH 44004 M. T. Spoerner Sandia National

More information

WASTEWATER FROM CARBON CAPTURE SPECIAL CONSIDERATIONS FOR WASTEWATER TREATMENT

WASTEWATER FROM CARBON CAPTURE SPECIAL CONSIDERATIONS FOR WASTEWATER TREATMENT WASTEWATER FROM CARBON CAPTURE SPECIAL CONSIDERATIONS FOR WASTEWATER TREATMENT Coauthor Kevin C. Lauzze Senior Engineer Sargent & Lundy, L.L.C. Presenting Author Matthew K. Heermann Senior Water Treatment

More information

DESIGN AND OPERATION OF POROUS METAL CROSSFLOW MICROFILTERS

DESIGN AND OPERATION OF POROUS METAL CROSSFLOW MICROFILTERS DESIGN AND OPERATION OF POROUS METAL CROSSFLOW MICROFILTERS Dr. Klaus J. Julkowski Presented at the American Filtration and Separation Society Conference Nashville, TN April 23-26, 1995 1 DESIGN AND OPERATION

More information

Pump & Treat Remediation

Pump & Treat Remediation Pump & Treat Remediation Selection and Planning Pump & Treat Extraction of contaminated water Extraction of free product in the form of a NAPL Removal or destruction of the contaminant from the extracted

More information

Treatability of Organic and Radioactive Emerging Contaminants in Stormwater Runoff

Treatability of Organic and Radioactive Emerging Contaminants in Stormwater Runoff Treatability of Organic and Radioactive Emerging Contaminants in Stormwater Runoff Robert Pitt, Ph.D., P.E., D.WRE, BCEE, University of Alabama Shirley Clark, Ph.D., P.E., D.WRE, Penn State - Harrisburg

More information

Dredging and Processing Arsenic Contaminated Sediment. Menominee River Marinette, Wisconsin

Dredging and Processing Arsenic Contaminated Sediment. Menominee River Marinette, Wisconsin Dredging and Processing Arsenic Contaminated Sediment Menominee River Marinette, Wisconsin Site Overview Menominee River in northern Marinette, Wisconsin Located next to an active manufacturing facility

More information

Pesticide Mixing-Loading Facility 1

Pesticide Mixing-Loading Facility 1 SS-AGE-20 October 1992 Pesticide Mixing-Loading Facility 1 Ray A. Bucklin and William J. Becker 2 There are numerous rules, regulations and recommendations on the safe use of pesticides. These include

More information

POREX Tubular Membrane Filter (TMF) Applied in a Copper Wastewater Reclaim System for a Printed Circuit Board Facility

POREX Tubular Membrane Filter (TMF) Applied in a Copper Wastewater Reclaim System for a Printed Circuit Board Facility O R E X F I LT R AT I O N CASE STUDY COER RECLAIM OREX Tubular Membrane Filter (TMF) Applied in a Copper Wastewater Reclaim System for a rinted Circuit Board Facility Abstract Introduction A rinted Circuit

More information

Site-Specific PM 10 Ambient Air Monitoring Plan

Site-Specific PM 10 Ambient Air Monitoring Plan Site-Specific PM 10 Ambient Air Monitoring Plan Great Plains Sand Processing Facility Wenck File #2771-01 Prepared for: GREAT PLAINS SAND, LLC 15870 Johnson Memorial Drive Jordan, MN 55352 February 2012

More information

Feasibility study for ISL mine

Feasibility study for ISL mine Feasibility study for ISL mine IAEA Technical Meeting Swakopmund, Namibia 1. 5. 10. 2007 Vladimir Benes, DIAMO, s.e., Czech Republic Introduction (1) It is the first step of designing ISL facilities. The

More information

Value engineering study for bauxite reject disposal

Value engineering study for bauxite reject disposal Value engineering study for bauxite reject disposal Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Waste Management Idaho Lessons Learned

Waste Management Idaho Lessons Learned Waste Management Idaho Lessons Learned Elizabeth D. Sellers, Manager U.S. Department of Energy - Idaho Operations Office February 2007 Strategic Vision of the Idaho Cleanup Project Clearly define end-states

More information

Industrial Process & Pilot Plant

Industrial Process & Pilot Plant Industrial Process & Pilot Plant Vienna, June 2008 3 Process Steps in 3 Sections Cooling Pelleting Mixing Sludge Ash Residues Thermal Treatment Energy Recycling Flue Gas Cleaning P-Half- Product Fertilizer

More information

Jay B. Dwyer. Senior Systems Engineer

Jay B. Dwyer. Senior Systems Engineer CAUSTIC ETCH REGENERATION U.S. FILTER, INC. - WARRENDALE, PENNSYLVANIA Edward P. Klein Manager, Aerospace / Anodizing Systems Jay B. Dwyer Senior Systems Engineer SUMMARY.') Interest in caustic Etch Regeneration

More information

Screw Press Dewatering Optimization. Kelly Brown, BDP Industries, Inc.

Screw Press Dewatering Optimization. Kelly Brown, BDP Industries, Inc. Screw Press Dewatering Optimization By Kelly Brown, BDP Industries, Inc. Where should your focus be??? What is the objective of your optimization? Maximize Capacity: Solids Loading, Flow Rate Maximize

More information

Valve Nest Filter with Time Clock Control Installation and Operation Manual

Valve Nest Filter with Time Clock Control Installation and Operation Manual Valve Nest Filter with Time Clock Control Installation and Operation Manual Effective 5/24/12 Effective 5/24/12 Table of Contents Operating Data. 1 Pre-Installation Data... 2 Filter Parameters Installation

More information

HPC-30 Specifications

HPC-30 Specifications HPC-30 Specifications For additional information please email us at info@extrac-tec.com Applications Capacity Drive System Electrical Supply Requirements Water Supply Requirements Feed material Trommel

More information

CHAPTER EIGHT : POLLUTION PREVENTION

CHAPTER EIGHT : POLLUTION PREVENTION CHAPTER EIGHT : POLLUTION PREVENTION 8.1 The Problem This chapter is different than the others. It is about ideas and not calculations. The goal is to demonstrate how knowing the material balance will

More information

Hanford Site Outlook

Hanford Site Outlook Hanford Site Outlook 2018 Tri-Cities Regional Economic Outlook Presented by: Brian Vance, Manager, U.S. Department of Energy Office of River Protection 1 Hanford Cleanup Overview Three components Tank

More information

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN: LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO. 0303-S3N AFIN: 47-00461 OCTOBER 14, 2016 LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO.

More information

Manasota Plating. Greg Powell, Environmental Scientist, US EPA / Environmental Response

Manasota Plating. Greg Powell, Environmental Scientist, US EPA / Environmental Response Manasota Plating Greg Powell, Environmental Scientist, US EPA / Environmental Response Team: We're at the Manasota Plating site in Sarasota, Florida supporting EPA Region IV during emergency removal of

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information

Nuclear Metals, Inc. (NMI) purchased undeveloped property in 1957 and the original laboratory facility was built the following year.

Nuclear Metals, Inc. (NMI) purchased undeveloped property in 1957 and the original laboratory facility was built the following year. Joint Efforts By: Nuclear Metals, Inc. (NMI) purchased undeveloped property in 1957 and the original laboratory facility was built the following year. Owners/Operators 1958 1972: two industrial entities

More information

PRESENTATION OF CONDENSATE TREATMENT

PRESENTATION OF CONDENSATE TREATMENT Via Pietro Nenni, 15-27058 VOGHERA ITALY Tel. +39 0383 3371 Fax +39 0383 369052 E-mail: info@idreco.com PRESENTATION OF CONDENSATE TREATMENT THE CONDENSATE TREATMENT The absence of impurities in feed water

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Coke Manufacturing Industry Description and Practices Coke and coke by-products (including coke oven gas) are produced by the pyrolysis

More information

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018

Georgia Power Plant McManus NPDES Permit No. GA Ash Pond Dewatering Plan. Revised April 2018 Georgia Power Plant McManus NPDES Permit No. GA0003794 Revised April 2018 Purpose This (Plan) describes the procedures, safeguards and enhanced wastewater treatment measures that Georgia Power Company

More information

Andrew J. Lombardo, CHP Vice President Safety & Ecology Corp. April 2011

Andrew J. Lombardo, CHP Vice President Safety & Ecology Corp. April 2011 Andrew J. Lombardo, CHP Vice President Safety & Ecology Corp. April 2011 Completed Project 1 Overview 14 acre impacted soil area 6 million ft 3 of thorium contaminated soil Traditional approach DCGL =

More information

Senior Design Project Description

Senior Design Project Description Senior Design Project Description Company Name Orano Federal Services Date Submitted 11/16/2018 Project Title Optimization and Partial Demonstration of a Mercury Treatment Process (ORANO_HG) Planned Starting

More information

903 Pad and Lip Area IHSS Briefing Summary Prepared by Rik Getty

903 Pad and Lip Area IHSS Briefing Summary Prepared by Rik Getty 903 Pad and Lip Area IHSS Briefing Summary Prepared by Rik Getty Briefing Summary Revision Number Rev 1 (4/06) IHSS Group Number 900-11 IHSS/PAC Number IHSS 900-112, 903 Pad (903 Drum Storage Area) IHSS

More information

mott corporation Process Systems Safe, reliable, fully automated catalyst recovery. The Mott solution.

mott corporation Process Systems Safe, reliable, fully automated catalyst recovery. The Mott solution. mott corporation Process Systems Safe, reliable, fully automated catalyst recovery. The Mott solution. Maximizing catalyst retention. Introduction. Process operations involving catalysts have traditionally

More information

Minto Mine. Mill Operations Plan

Minto Mine. Mill Operations Plan Minto Mine Mill Operations Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Explorations Ltd. Minto Mine 2018 Mill Operations Plan Table of Contents 1 Introduction...1 1.1

More information

Environment. A Typical Electrolytic Silver Recovery Cell. DC Source - + Current. Anode. Cathode

Environment. A Typical Electrolytic Silver Recovery Cell. DC Source - + Current. Anode. Cathode Environment I N F O R M A T I O N F R O M K O D A K The Technology of Silver Recovery for Photographic Processing Facilities A number of techniques are available to remove silver from silver-rich photographic.

More information

Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project U.A. Kumthekar, J.D. Chiou Fluor Fernald, Inc. 7400 Willey Road, Hamilton, Ohio 45013 USA ABSTRACT The On-Site Disposal Facility

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO S3N AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO S3N AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT PLUM POINT ENERGY STATION CLASS 3N LANDFILL PERMIT NO. 0303-S3N AFIN: 47-00461 JANUARY 15, 2016 PLUM POINT ENERGY STATION CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Treatment or Process Filtration

Treatment or Process Filtration Reaction Tanks Advanced Membrane Filtration Memtek EFC-Series Microfiltration System A Major Advantage for Reliable Wastewater Treatment or Process Filtration Systems That Give You Greater Flexibility

More information

Treatability Study and Reverse Osmosis Pilot Study of Industrial Wastewater at a Wood Products Mill

Treatability Study and Reverse Osmosis Pilot Study of Industrial Wastewater at a Wood Products Mill Treatability Study and Reverse Osmosis Pilot Study of Industrial Wastewater at a Wood Products Mill NC AWWA-WEA 2017 Annual Conference Randall Foulke, PE, BCEE, LEED AP Tracey Daniels, EI November 14,

More information

Unit 1. Workshop - BHWP. Experts Teaching from Practical Experience

Unit 1. Workshop - BHWP. Experts Teaching from Practical Experience Unit 1 Workshop - BHWP Experts Teaching from Practical Experience Bruce Heavy Water Plant (BHWP) Owned & operated by Ontario Power Generation, located on the Bruce Nuclear site near the shore of Lake Huron

More information

high efficiency ~ simple package ~ proven reliability ChromaPur Chromic Acid Purification Unit

high efficiency ~ simple package ~ proven reliability ChromaPur Chromic Acid Purification Unit high efficiency ~ simple package ~ proven reliability ChromaPur Chromic Acid Purification Unit Achieve maximum recovery, maximum cost reduction, and maximum quality consistency with Eco-Tec s chromic acid

More information

REACTION TANKS ADVANCED MEMBRANE FILTRATION

REACTION TANKS ADVANCED MEMBRANE FILTRATION REACTION TANKS ADVANCED MEMBRANE FILTRATION Memtek EFC-Series Microfiltration System A MAJOR ADVANTAGE FOR RELIABLE WASTEWATER TREATMENT OR PROCESS FILTRATION SYSTEMS THAT GIVE YOU GREATER FLEXIBILITY

More information

A Review of Sulfide Smelting Process Gas Handling Systems

A Review of Sulfide Smelting Process Gas Handling Systems A Review of Sulfide Smelting Process Gas Handling Systems Paykan Safe Gas Cleaning Technologies 4950 North O Connor Road Suite 250 Irving, Texas, U.S.A. 75062 1.0 SMELTER PROCESS GAS CHARACTERISTICS Off-gas

More information

Carbon Dioxide Pretreatment of AMD for Limestone Diversion Wells

Carbon Dioxide Pretreatment of AMD for Limestone Diversion Wells Carbon Dioxide Pretreatment of AMD for Limestone Diversion Wells ABSTRACT Barnaby J. Watten NBS Research and Development Laboratory Wellsboro, Pennsylvania Michael F. Schwartz Freshwater Institute Sheperdstown,

More information

Crushing. Comminution

Crushing. Comminution Comminution In order to separate the minerals from gangue (the waste minerals), it is necessary to crush and grind the rock to unlock, or liberate, valuable minerals so that they are partially or fully

More information

Report on Piloting of the Volute Dewatering Press at the Boonsboro WWTP in Boonsboro, MD July 25 th - July 29 th, 2016

Report on Piloting of the Volute Dewatering Press at the Boonsboro WWTP in Boonsboro, MD July 25 th - July 29 th, 2016 Report on Piloting of the Volute Dewatering Press at the Boonsboro WWTP in Boonsboro, MD July 25 th - July 29 th, 2016 Process Wastewater Technologies, LLC. 9004 Yellow Brick Road, Suite D, Rosedale, MD21237

More information

Metal and Particulate Emissions from Incinerators Burning Sewage Sludge and Mixed Refuse

Metal and Particulate Emissions from Incinerators Burning Sewage Sludge and Mixed Refuse Metal and Particulate Emissions from Incinerators Burning Sewage Sludge and Mixed Refuse F. l. CROSS, JR. R. J. DRAGO H. E. FRANCIS Roy F. Weston West Chester, Pennsylvania National Air Pollution Control

More information

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment Design Supply Integration Installation Maintenance The Challenge for Businesses that Use Water PUBLIC HEALTH EPA state

More information