EPA s 2015 Multi-Sector General Permit (MSGP)
|
|
- Eric Beasley
- 6 years ago
- Views:
Transcription
1 EPA s 2015 Multi-Sector General Permit (MSGP) August 13, 2015 Suzanne Warner U.S. EPA, Region warner.suzanne@epa.gov David Gray, P.E. U.S. EPA, Region gray.davidj@epa.gov
2
3 EPA s NPDES Permit Program Clean Water Act, 1972 Stormwater amendments, 1987 SW associated w/ industrial activity (3 - MSGP) Point Source Discharge of pollutants Waters of the United States (1) (2)
4 Does my facility need a permit? Is the primary activity at your facility described by one of the categories of industrial activity included in the 29 sectors of the MSGP AND Is this primary industrial activity exposed to stormwater that discharges to a Waters of the U.S. through a discrete conveyance
5 Regulated Sectors (SIC to NAICS Crosswalk) Standard Industrial Classification (SIC) System: North American Industry Classification System (NAICS):
6 What s My Primary Industrial Activity? Where a facility is engaged in activities described by multiple SIC/NAICS codes, determination is based on: the value of receipts or revenues for each operation, or if this information is not available, the operation that employs the most personnel If the vast majority of on-site activity falls within one SIC code, that activity may be the primary industrial activity)
7 How to Obtain Authorization Be an operator of a primary industrial activity in a sector covered by this permit (see Appendix D); Be located in a state, territory, or Indian country, or be a federal operator where EPA is the permitting authority; Meet the Part 1.1 eligibility requirements; Select, design, install, and implement control measures to meet numeric and non-numeric effluent limits; Develop a SWPPP or update your existing SWPPP; and Submit a complete and accurate NOI AC MA/NH
8 Limitations on Coverage (Can t use MSGP) The following stormwater discharges are ineligible: Mixed with unauthorized non-stormwater discharges Associated with construction disturbing >1-acre Authorized by a current or previous individual permit, unless EPA approves in writing Adversely affect endangered species or related habitat, or historic properties To a water designated as Tier 3 (Outstanding Natural Resource Water) by a State or Tribe
9 Allowable Non-Stormwater Discharges (Part ) Discharges from emergency/unplanned fire-fighting activities; Fire hydrant flushings; Potable water, including water line flushings; Uncontaminated condensate from air conditioners, coolers/chillers, and other compressors and from the outside storage of refrigerated gases or liquids; Irrigation drainage; Landscape watering provided all pesticides, herbicides, and fertilizers have been applied in accordance with the approved labeling;
10 Allowable Non-Stormwater Discharges (Part ), continued Pavement wash waters with exceptions Routine external building washdown waters with exceptions Uncontaminated ground water or spring water; Foundation or footing drains where flows are not contaminated with process materials; and Incidental windblown mist from cooling towers that collects on rooftops or adjacent portions of your facility, but not intentional discharges from the cooling tower (e.g., piped cooling tower blowdown; drains).
11 For All Other Non-Stormwater Discharges Prior to NOI submission, document in SWPPP that: Unauthorized discharges have been eliminated and the actions taken to do so; or A separate NPDES permit was obtained
12 Can I Avoid the Need for Permit Coverage?
13 No Exposure Certification for Exclusions from Stormwater Permitting A NPDES permit authorization is not required where an Operator certifies to a condition of no exposure, i.e.,: All industrial materials or activities are protected by a storm resistant shelter to prevent exposure to rain, snow, snowmelt, and/or runoff Available on a facility-wide basis only (not by individual discharges) New certification due every five years Must file an NOI if exposure conditions change
14 No Exposure Certification
15 Storm Resistant Shelter Not required for: Non-industrial areas (e.g., parking lot) Adequately maintained vehicles (e.g., fork lift) Sealed drums or tanks without taps or valves Certain above ground storage tanks (ASTs) Certain materials or activities that pose little threat of stormwater pollution Dumpsters with lids that cannot leak
16 Storm Resistant Shelter May be acceptable to use: Shelters with roofs only, but runon/runoff must be prevented Temporary covers (e.g., tarps) - may require case-by-case determination by EPA
17 Timeline for Filing an NOI
18 Operator Category NOI Submission Deadline Operators authorized under the 2008 MSGP NLT 9/2/2015, unless EPA notifies you that your deadline is extended Operators that commenced discharging between 9/30/2013 9/2/2015, and have been operating consistent with EPA s no action assurance memoranda ASAP, but NLT 9/2/2015, unless EPA notifies you that your deadline is extended Operators that commence discharging after 9/2/2015, or operators seeking coverage for dischargers previously covered under an individual permit or an alternative general permit. A minimum of 30 days prior to commencing discharge New operators of existing industrial activities with discharges previously authorized under the 2015 MSGP. A minimum of 30 days prior to the date of transfer of control to the new operator Operators of industrial activities that began discharging prior to 9/2/2015, but not covered under the 2008 MSGP or another NPDES permit and not operating consistent with EPA s no action assurance memoranda Immediately, to minimize the time discharges from the facility will continue to be unauthorized
19 Extended Timelines based on New Eligibility Criteria Endangered Species Protection Must submit a Criterion Selection Worksheet to EPA at least 30 days prior to filing your NOI if Federally listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your facility s action area, and your industrial activity s discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat (Criterion C)
20 Extended Timelines based on New Eligibility Criteria Historic Properties Protection If historic properties potentially exist and may be impacted by your construction or installation of control measures, you must contact the State Historic Preservation Office at least 30 days prior to filing your NOI
21 Extended Timelines based on New Eligibility Criteria New Dischargers to Water-Quality Impaired Waters (See Part ) If you are a new discharger (See Appendix A), must provide information to Regional Office, at least 30 days prior to submitting your NOI, documentation supporting conclusion that discharge is expected to meet applicable water quality standards
22 Review your 2008 NOI Existing enoi System will remain available as a legacy system to search 2008 MSGP NOIs, NOEs, etc. No longer need permit coverage?: file an NOT using the enoi System or mail a paper NOT Form
23 NPDES ereporting Tool (NeT) NeT replaces the original enoi System used for the 2008 MSGP enoi-system-for-epas-multisector-general- Permit.cfm#NetDMR
24 Changes to Notice of Intent (NOI) Provides EPA with more complete information to determine eligibility Enables EPA to inform the operator of its specific monitoring requirements Operators now need to include in their NOI: Latitude/longitude of each stormwater outfall If facility dischargers to saltwater
25 Signatories for NOI (and SWPPP, DMRs, Reports, etc ) NOIs, NOTs, and NOEs Certified by a responsible corporate officer; either a general partner or the proprietor; or either a principal executive officer or ranking elected official SWPPPs, Annual Report, DMRs, inspection reports, and corrective action reports Certified by a person noted above, or a or duly authorized representative of that person All other changes to your SWPPP, and other compliance documentation Person preparing the change or documentation
26 Non-Numeric Technology- Based Effluent Limits and Control Measures
27 Non-Numeric Technology-Based Effluent Limits Minimize Exposure Good Housekeeping Maintenance Spill Prevention & Response Erosion & Sediment Control Management of Runoff Salt Storage Piles Employee Training Non-Stormwater Discharges Dust Generation and Vehicle Tracking of Industrial Materials
28 Non-Numeric Technology-Based Effluent Limits (TBELs) 2015 MSGP includes greater level of clarity and specificity for several TBELs: Minimizing Exposure Instead of pay particular attention to certain control measures, now must implement these control measures unless infeasible Good Housekeeping More specific measures, e.g.: Keep all dumpster lids closed when not in use Maintenance - More specific measures, and uses the timeframes from the permit s corrective action provisions, e.g.: Cleaning catch basins when the depth of debris reaches twothirds (2/3) of the sump depth and keeping the debris surface at least six inches below the lowest outlet pipe.
29 Non-Numeric Technology-Based Effluent Limits (TBELs) 2015 MSGP includes greater level of clarity and specificity for several TBELs (continued) Spill Prevention & Response Clarified and added more specific measures, e.g.: Keep spill kits on-site, located near areas where spills may occur or where a rapid response can be made Employee Training Refined specific personnel that require training if related to the scope of their job duties e.g.,: Only personnel responsible for conducting inspections need to understand how to conduct inspections
30 Stormwater Pollution Prevention Plan (SWPPP)
31 SWPPP Purpose & Updating a tool to assist both the operator and inspectors in ensuring and documenting that effluent limits are met Living document that must be kept up-to-date when control measures are modified or replaced Permit violation if you fail to develop and maintain an up-to-date SWPPP
32 SWPPP Preparation Prepared in accordance with good engineering practices and to industry standards May be developed by either a person on your staff or a third party, but it must be developed and certified by a qualified person
33 SWPPP Preparation A qualified person is a person knowledgeable in the principles and practices of industrial stormwater controls and pollution prevention, and possesses the education and ability to assess conditions at the industrial facility that could impact stormwater quality, and the education and ability to assess the effectiveness of stormwater controls selected and installed to meet the requirements of the permit.
34 SWPPP - Documentation Minor changes to documentation requirements to ease operator burden Can now comply with a few straightforward control measures (*) by including the effluent limits verbatim in your SWPPP without need for additional detail, e.g.: Plainly label containers (e.g., Used Oil, Spent Solvents, Fertilizers and Pesticides ) that could be susceptible to spillage or leakage to encourage proper handling and facilitate rapid response if spills or leaks occur;*
35 SWPPP - Availability Change provides two options for making SWPPP publically available: 1. Provide a web URL for SWPPP on your NOI; or 2. Provide select SWPPP information on your NOI Agency priority to enhance transparency and accessibility of NPDES documentation Difficulty of obtaining facility and discharge information often made it more difficult for public to protect their local resources Vital for protecting water quality and provides a powerful incentive to improve compliance and performance
36 Inspection, Monitoring & Corrective Actions
37 Inspections Three Two types of inspections required: Routine facility inspections (at least quarterly) Quarterly visual assessments (quarterly) Comprehensive site inspections (annually) Performed by qualified personnel with at least one member of SWPPP Team * Permit retains exception to routine inspections and visual assessments for inactive and unstaffed sites where industrial materials are not exposed to stormwater
38 Routine Facility Inspections Must look for: Industrial materials, residue or trash that may have or could come into contact with stormwater Leaks or spills from industrial equipment, drums, tanks and other containers Offsite tracking of industrial or waste materials, or sediment where vehicles enter or exit the site Tracking or blowing of raw, final or waste materials from areas of no exposure to exposed areas Control measures needing replacement, maintenance or repair
39 Routine Facility Inspections Performed when facility is in operation At least one inspection per year must be done while a stormwater discharge is occurring Discharge points must also be observed during. (If inaccessible, nearby downstream locations must be inspected) Must observe control measures to ensure they are functioning correctly
40 Routine Facility Inspection Documentation Inspection date, time, weather Name and signature of inspector All observations relating to control measures: Description of any active discharges Previously unidentified site discharges or pollutants Evidence or potential of/for pollutants entering the drainage system Physical condition of and around all outfalls Control measures needing maintenance, repairs, or replacement Incidences of noncompliance Additional control measures needed *Not required to submit unless requested by EPA
41 What to look for during an inspection Poor Housekeeping Exposure of potential pollutants (e.g., core batteries) Spills or leaks Unauthorized non-stormwater discharges
42 Quarterly Visual Assessments Collect a grab sample from each outfall within first 30 minutes of measurable storm event (or as soon as practicable thereafter) Modified requirements for situations involving adverse weather, snow melt, climates with irregular stormwater runoff For outfalls that are substantially identical, only one sample is required, with outfalls assessed on a rotating basis
43 Quarterly Visual Assessments Visually inspect sample for the following: Color Odor Clarity (diminished) Floating solids Settled solids Suspended solids Foam Oil Sheen, and Other obvious indicators of stormwater pollution
44 Quarterly Visual Assessment Documentation Must certify in SWPPP: Sample location(s) Date/Time of sample collection and assessment Person collecting sample and performing assessment Nature of discharge (runoff or snowmelt) Results of observations Probable sources of any observed contamination If applicable, why not possible to sample in 1st 30 min. *Not required to submit unless requested by EPA
45 Discharge Monitoring Potential Monitoring Benchmark Monitoring Effluent Limitation Guidelines Monitoring Impaired Waters Monitoring State or Tribal-Specific Monitoring Other Monitoring Required by EPA
46 EPA monitoring guidance available at: pubs/msgp_monitori ng_guide.pdf
47 Requirements For All Monitoring Monitor each outfall (unless designated as substantially identical outfall) Sample storm events with actual discharges ( measurable storm event ) that follows preceding event by at least 3 days Use grab samples from discharge within first 30 minutes of measurable storm event (or as soon as practicable thereafter) Use EPA-approved analytical methods Report all sample results using NetDMR
48 Benchmark Monitoring Quarterly monitoring required during a minimum of four consecutive quarters of permit coverage beginning with Oct 1, 2015 Dec 31, 2015 May be modified where documented in SWPPP. Not required for inactive and unstaffed sites where industrial materials are not exposed to stormwater. No sector-specific benchmark monitoring for Sector AC
49 Impaired Waters Monitoring If approved TMDL does not exist for the pollutant: Monitor annually at each outfall beginning Oct 1, 2015 (or first full quarter after permit authorization if authorized after Sep 2, 2015) Monitor for all pollutants causing an in-stream impairment and for which a Part 136 analytical method exists Discontinue monitoring after 1 year if pollutant: Not detected above natural background levels Not detected and not expected to be present in discharge Is present solely due to natural background sources (same natural background exception as for Benchmark Monitoring)
50 Impaired Waters Monitoring If approved TMDL does exist for the pollutant: No monitoring for the pollutant(s) of concern is required until EPA notifies you that you are subject to monitoring consistent with the assumptions and requirements of the applicable TMDL and its wasteload allocation EPA s notice will include specifications on monitoring parameters and frequency Permittees must consult the appropriate EPA Regional Office for guidance regarding required monitoring under this Part
51 Impaired Waters Monitoring You discharge to an impaired water if: The first water of the U.S. to which you discharge is identified by a state, tribe or EPA as not meeting an applicable water quality standard, and: Requires development of a TMDL (pursuant to section CWA 303(d)); Is addressed by an EPA-approved or established TMDL; or Is not in either of the above categories but the waterbody is covered by a pollution control program that meets the requirements of 40 CFR 130.7(b)(1). Note: For discharges that enter a separate storm sewer system prior to discharge, the first water of the U.S. to which you discharge is the waterbody that receives the water from the storm sewer system.
52 Impaired Waters Monitoring EPA s NeT includes a feature to locate receiving waters near your facility/outfalls based on latitude and longitude you provide NeT will provide impairment status You must confirm these receiving waters and impairment status as necessary using state resources or contacting Regional Office
53 Massachusetts 2012 Integrated List of Waters integrated-list-of-waters.html
54 Massachusetts Interactive Mapping of the 2012 Integrated List of Waters integrated-list-of-waters.html
55 Impairment & TMDL Status of Waterbodies Available from NHDES Watershed Report Cards or 303(d) List
56 NHDES Watershed Report Cards and Assessment Data Interactive Mapping
57
58 Corrective Actions Actions required in response to triggering conditions : Investigate the problem Document the problem (include with Annual Report) Modify control measures to prevent recurrence Some require modifications, others only require review to see if modifications are necessary
59 Corrective Actions Must review and revise control measures if: An unauthorized release or discharge occurs A discharge violates a numeric effluent limitation Control measures are not stringent enough to meet applicable WQS or non-numeric effluent limits Visual assessments show your control measures were never installed, not installed correctly, or are not properly operated and maintained. Visual assessment shows evidence of stormwater pollution (e.g., color, odor, floating solids, settled solids, suspended solids, foam)
60 Corrective Actions Must review the selection, design, installation, and implementation of your control measures if: Changes in facility design, operation, or maintenance significantly changes the nature or quantity of pollutants discharged Average of four (4) benchmark monitoring samples exceeds benchmark concentration (or mathematically certain if less than four samples)
61 Corrective Actions New concepts included for the type of actions required and requisite deadlines: Immediate Actions Subsequent Actions Revised documentation requirements
62 Immediate Actions Corrective Actions You must immediately take all reasonable steps necessary to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational Includes cleaning up any contaminated surfaces so that the material will not discharge in subsequent storm events
63 Immediate Actions Corrective Actions Immediately requires you to, on the same day a condition requiring corrective action is found, take all reasonable steps to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational If a problem is identified at a time in the work day when it is too late to initiate corrective action, initiation of corrective action must begin no later than the following work day
64 Immediate Actions Corrective Actions All reasonable steps means that the you have undertaken initial actions to assess and address the condition causing the corrective action, including, for example: sweeping up any exposed materials that may be discharged in a storm event or scheduling a new BMP to be installed at a later date
65 Subsequent Actions Corrective Actions Additional actions necessary beyond immediate actions (e.g., install a new or modified control and make it operational, complete the repair) Complete before the next storm event if possible, and within 14 calendar days from the time of discovery If it is infeasible to complete within 14 calendar days, you must document why Identify schedule for completing the work, which must be done as soon as practicable and 45 days after discovery
66 Corrective Actions Effect on Compliance Status If triggering condition is a permit violation, correction of the problem does not remove the underlying violation Failure to take necessary corrective action is an additional violation Enforcement response will take into consideration the appropriateness and promptness of correction action
67 Reporting & Recordkeeping
68 Discharge Monitoring Reports All monitoring data must be reported using EPA s electronic NetDMR tool at unless waiver granted by Regional Office NetDMR Training for the MSGP will be held on: Thursday, August 13 1:00 4:00 Eastern Tuesday, Aug. 18 9:00 12:00 Eastern For registration information visit:
69 Annual Report Due by January 30 th each year of permit coverage and summarizes your documentation from the past year: Facility inspections Quarterly visual assessments Corrective actions (including status of any not yet complete) incidents of noncompliance in the past year or currently ongoing, or if none, a statement that you are in compliance with the permit Must be submitted using NeT unless waiver granted by Regional Office
70 Recordkeeping Retain records for at least 3 years from the date that your permit coverage expires or is terminated: Copies of your SWPPP (including any modifications made during the term of this permit) Additional inspection, monitoring, and certification records pursuant to Part 5.5 All reports and certifications required by this permit All monitoring data All data used to complete your NOI
71 2015 MSGP Maintains State- Massachusetts Specific Requirements New and redeveloped sites must comply with applicable State stormwater performance standards
72 2015 MSGP Maintains State- New Hampshire Specific Requirements Must consider opportunities for onsite infiltration If No Exposure Certification can no longer be made for any of the stormwater to be infiltrated, then the infiltration BMP must cease for that portion of the runoff or the discharge must be permitted or registered with the State Notify the NHDES immediately of any plans to discharge any new non-stormwater discharges may require individual dischargers to meet additional conditions to obtain or continue coverage under the MSGP necessary to protect water quality
Industrial Stormwater
Industrial Stormwater 2017 Multi-Sector General Permit OKR05 for Stormwater Discharges from Industrial Activity Ismat Esrar, P.E. Municipal Discharge & Stormwater Permitting Water Quality Division Department
More informationClean Water Act Industrial Stormwater Applicability Flowchart. July 2009
Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,
More informationAppendix O Example Industrial SWPPP Template
Appendix O Example Industrial SWPPP Template Arizona Department of Environmental Quality Multi-Sector General Permit Stormwater Pollution Prevention Plan (SWPPP) Template Introduction To help you develop
More informationIndustrial Storm Water Permits. Summit County Safety Council Meeting Nov 15, 2018
Industrial Storm Water Permits Summit County Safety Council Meeting Nov 15, 2018 Why regulate storm water runoff? It can wash pollutants off your site! Storm sewers drain to surface waters How Ohio EPA
More informationStormwater Pollution Prevention Training
Stormwater Pollution Prevention Training Arkansas General Stormwater Permit For Industrial Activities (ARR00000) Presented by Jeremy Stehle ECCI Senior Environmental Scientist Background and Development
More informationNon-Storm Water Discharges
06/30/2009. This fact sheet was developed for the Port sector but can be used by any sector. The following information was extracted from the 2008 Multi Sector General Permit (MSGP) for industrial storm
More informationTexas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions
Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance
More informationPart 2.0 Non-Numeric Effluent Limitations
2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf
More informationGeneral Permit No.: OHR Page 2 of 141
General Permit No.: OHR000005 Page 2 of 141 NPDES MULTI-SECTOR GENERAL PERMITS FOR STORM WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY TABLE OF CONTENTS 1. Coverage under this Permit....6 1.1 Eligibility....
More informationLOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum
LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.
More informationMaryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity
Maryland Department of the Environment 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity Stormwater Permit Background The Clean Water Act (CWA or the Act) establishes a
More informationAppendix L Multi-sector General Permit
Appendix L Multi-sector General Permit AZPDES MULTI-SECTOR GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM NON-MINING FACILITIES TABLE OF CONTENTS 1.0 Coverage under
More informationCHAPTER 6 - How to Prepare a SWPPP
All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be
More informationOHIO ENVIRONMENTAL PROTECTION AGENCY
Page 1 of 171 OHIO ENVIRONMENTAL PROTECTION AGENCY AUTHORIZATION TO DISCHARGE STORM WATER ASSOCIATED WITH INDUSTRIAL ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM MULTI-SECTOR GENERAL
More informationFACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES
FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth
More informationCity of Waukegan, Illinois
City of Waukegan, Illinois NPDES Phase II Stormwater Program Stormwater Pollution Prevention Plan Public Works Facility July 2011 City of Waukegan, Illinois Stormwater Pollution Prevention Plan for the
More informationState of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012
State of Georgia Department of Natural Resources Environmental Protection Division For official use only NOTICE OF INTENT NOI - Version 2012 For Coverage Under NPDES General Permit GAR050000 (2012 IGP)
More informationU.S. EPA 2012 Construction General Permit (CGP) Suzanna Perea
U.S. EPA 2012 Construction General Permit (CGP) Suzanna Perea Topics Background Overview of EPA s Final 2012 Construction General Permit How to Obtain Permit Coverage Erosion and Sediment Control Requirements
More informationStormwater Outreach for Regional Municipalities (STORM) Overview. Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples
Stormwater Outreach for Regional Municipalities (STORM) Kevin Boesch, CPESC Overview Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples Inspection Frequencies Inspection
More information11/1/2011. Annual Employee Training
MS4 Address activities at WWTP in SWMP 1987 CWA Amendments Storm Water NPDES Industrial WWTP Design Flow 1 MGD WWTP Required to have approved Pretreatment Program Lynette Hablitzel, PE Ohio EPA Division
More informationSTORM WATER PLAN (SWP) GUIDANCE TEMPLATE
STORM WATER PLAN (SWP) GUIDANCE TEMPLATE Name of Facility: Address: Phone Number: Date: INTRODUCTION This Storm Water Plan (SWP) is written in accordance with the State of Delaware Regulations Governing
More informationIndustrial Storm Water Inspections Implementation
Industrial Storm Water Inspections Implementation Martin Miller, Industrial Compliance Supervisor Texas Storm Water Conference September 24, 2018 September 24, 2018 Page 2 Four Major Key Elements to a
More informationAnnual Stormwater Pollution Prevention Training
Annual Stormwater Pollution Prevention Training Columbus Airport August 2018 Agenda 1. Regulatory Background 2. Regulated Activities 3. Roles and Responsibilities 4. Best Management Practices 5. Spill
More informationStormwater CGP. CGP Regulatory Overview. CGP Regulatory Overview
Stormwater CGP Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Pima Association of Governments 2013 Seminar on Stormwater Prepared by Chris Henninger Stormwater
More informationSTORMWATER MANAGEMENT PROGRAM. Table of Contents
STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public
More information17 th Annual USEPA Region 6 Stormwater/MS4 Conference Hot Springs, AR Oct 20, 2015 Kerri McCabe, Inspector Supervisor, ADEQ Water Division Field
17 th Annual USEPA Region 6 Stormwater/MS4 Conference Hot Springs, AR Oct 20, 2015 Kerri McCabe, Inspector Supervisor, ADEQ Water Division Field Services/Inspection Branch Before We Get Started: Please
More informationMaryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD
Maryland Department of Environment Water Management Administration Program 1800 Washington Blvd, Baltimore, MD 21230 410-537-3510 AI ID: 23178 Inspector: Brian Connoley Eastside Auto Recycling, Inc. County:
More informationGeneral Permit No.: OHR Page 53 of 146
Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated
More informationReissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma
Oklahoma Department of Environmental Quality Water Quality Division Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State
More informationUNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN
UNDERSTANDING YOUR FACILITY S STORMWATER POLLUTION PREVENTION PLAN This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description
More informationWhat To Do When the Rain Comes Down Meeting the Requirements of Washington States New Industrial General Stormwater Permit
What To Do When the Rain Comes Down Meeting the Requirements of Washington States New Industrial General Stormwater Permit Dave Meyer Senior Consultant June 5, 2014 Webinar Logistics Session Format All
More informationSTORM WATER POLLUTION PREVENTION PLAN (SWPPP)
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) Name of Tenant and Facility Date: Emergency Contact: Title: Phone: INSTRUCTIONS FOR MERRILL FIELD TENANTS TO OBTAIN COVERAGE UNDER THE NPDES STORM WATER DISCHARGE
More informationInspection Requirements of the CGP 2013
Inspection Requirements of the CGP 2013 Stormwater Outreach for Regional Municipalities (STORM) Dennis L. Turner Surface Water Programs Consultant Arizona Department of Environmental Quality (ADEQ) dt1@azdeq.gov
More informationAppendix A: SWPPP Template Instructions
Appendix A: SWPPP Template Instructions To help you develop the narrative section of your construction site SWPPP, EPA has created this electronic SWPPP template. The template is designed to help guide
More informationStormwater Construction General Permit CGP-2013
Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Stormwater Outreach for Regional Municipalities MS4 Statewide Summit June 18, 2013 Prepared by Chris Henninger
More informationALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG360000
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG360000 Instructions: This form should be used to submit a Notice of Intent for coverage under NPDES
More information15-MM & 16-MA NOI and SWPPP Overview
Maryland Department of the Environment 15-MM & 16-MA NOI and SWPPP Overview General Permit for Mineral Mines, Concrete and Asphalt Plants (15MM / NPDES MDG49) and General Permit for Marinas (16MA / NPDES
More informationFederal and State Regulation of Stormwater Discharges From Construction Sites
Federal and State Regulation of Stormwater Discharges From Construction Sites Andrew W. Lord 860.240.6180 alord@murthalaw.com Gregory A. Sharp 860.240.6046 gsharp@murthalaw.com February 4, 2010 Home Builders
More informationEPA s NPDES Stormwater Permitting Program
EPA s NPDES Stormwater Permitting Program C O N N I E B O S M A C H I E F, M U N I C I PA L B R A N C H U. S. E N V I R O N M E N TA L P R OT E C T I O N A G E N C Y / WAT E R P E R M I T S D I V I S I
More informationCITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE
CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE PREPARED BY Public Works Department CITY OF BLACK DIAMOND PO BOX 599 BLACK DIAMOND, WA 98010 (360) 886-5700 City of Black
More informationXerium Technologies, Inc. Concord, New Hampshire
STORMWATER POLLUTION PREVENTION PLAN Xerium Technologies, Inc. Concord, New Hampshire August 2015 Prepared for Xerium Technologies, Inc. 60 Old Turnpike Road Concord, New Hampshire 03301. Loureiro Engineering
More informationStorm Water Pollution Prevention Plan
NPDES MSGP for Storm Water Discharge Associated with Industrial Activities Sector N: Scrap Recycling and Waste Recycling Facilities Storm Water Pollution Prevention Plan Transfer Station Seabrook, New
More informationIndustrial Storm Water Permitting in Ohio. The New Multi-sector General Permit (MSGP) September 2011
Industrial Storm Water Permitting in Ohio The New Multi-sector General Permit (MSGP) September 2011 Background Storm water discharges associated with industrial activity and larger construction sites are
More informationDEQ Form Oct 18, Part A: Operator Information and Certification. DEQ Authorization Number: OKR10
DEQ Form 606-005 Oct 18, 2017 Oklahoma Department of Environmental Quality Annual Comprehensive Site Compliance Evaluation Report (ACSCER) for Stormwater Discharges Associated with Construction Activity
More information12-SW General Permit
Maryland Department of the Environment 12-SW General Permit for Stormwater Discharges Associated With Industrial Activity (Tentative Determination) Overview for Solid Waste Association of North America
More informationCITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY
CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY Activities Information: Project Site Name: Location & Address: City, State,
More informationSUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/15/2018 Topic: General Permit No. 2 updates Manual: Design Manual Location: Sections 7A-1 and 7B-1 Requested Revision: Section 7A-1 (General Information),
More informationRegulatory Requirements
7B-1 Design Manual Chapter 7 - Erosion and Sediment Control 7B - Regulatory Requirements Regulatory Requirements A. National Pollutant Discharge Elimination System (NPDES) The Clean Water Act established
More informationArizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager
Arizona Department of Environmental Quality Industrial Stormwater Program (Multi-Sector General Permit) Spencer J. York, Project Manager Arizona Department of Environmental Quality Stormwater and General
More informationOklahoma Department of Environmental Quality Water Quality Division
Oklahoma Department of Environmental Quality Water Quality Division Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State
More informationNPDES General Permit for Storm Water Discharges From Construction Activities
NPDES General Permit for Storm Water Discharges From Construction Activities Table of Contents COVER PAGE...1 PART 1: COVERAGE UNDER THIS PERMIT...2 1.1 Introduction... 2 1.2 Permit Area... 2 1.3 Eligibility...
More informationATTACHMENT C RISK LEVEL 1 REQUIREMENTS
ATTACHMENT C RISK LEVEL 1 REQUIREMENTS A. Effluent Standards [These requirements are the same as those in the General Permit order.] 1. Narrative Risk Level 1 dischargers shall comply with the narrative
More informationVillage of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities
Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works
More informationPermitting Applicability and Renewal of the Phase II MS4 and Construction General Stormwater Permits
Permitting Applicability and Renewal of the Phase II MS4 and Construction General Stormwater Permits STEP Meeting October 27, 2017 Danielle Cochran Texas Commission on Environmental Quality Compliance
More informationStorm Water Pollution Prevention Plan (SWPPP) Approved By: Eric St Pierre, GM
Page 1 of 41 STORM WATER POLLUTION PREVENTION PLAN Idaho Concrete Company (ICCO) Location (By Mapping Software): Heron River Pit 43.6967, -116.4672 S Seneca Springs Way T4N R1W S17 Boise Meridian Star,
More informationSTORM WATER POLLUTION PREVENTION PLAN TEMPLATE
STORM WATER POLLUTION PREVENTION PLAN TEMPLATE Cover Page Certifications Project, Owner, Operator, SWPPP Preparer, Date, Project Dates Signed by RIDOT (Owner) and CONTRACTOR (as Operator) of Contents Introduction
More informationNational Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities
National Pollutant Discharge Elimination System General Permit for Discharges from Construction Activities In compliance with the provisions of the Clean Water Act, 33 U.S.C. 1251 et. seq., (hereafter
More informationGuidance Manual for Conditional Exclusion from MDE s Stormwater Permitting (12SW) Based On No Exposure of Industrial Activities to Stormwater
Guidance Manual for Conditional Exclusion from MDE s Stormwater Permitting (12SW) Based On No Exposure of Industrial Activities to Stormwater Maryland Department of the Environment 1800 Washington Blvd.,
More informationManaging Industrial Stormwater In Minnesota
Managing Industrial Stormwater In Minnesota Sector S: Air Transportation Zach Chamberlain wq-strm3-20d Overview History General requirements SWPPP BMPs Monitoring benchmarks No Exposure Exclusion 2 What
More informationStormwater Management Program
Stormwater Management Program Revised March 2012 For Use In NPDES Phase II Implementation for Secondary Permittees. Stormwater Management Program Table of Contents Introduction... 3 CDID #1 Background...
More informationWhitewater River Region SWMP Appendix L
Whitewater River Region SWMP Appendix L BMPs for Firefighting Agency Activities January 2015 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies
More informationSection 4: Managing the Construction Site
Section 4: Managing the Construction Site 4.1 Mobilization 33 4.1.1 Posting the SWPPP 33 4.1.2 Initial installation of BMP s 33 4.1.3 Mobilization Checklist for Initial Installation 34 4.2 Maintaining
More informationCity of Evanston STORMWATER MANAGEMENT PLAN February 2018
City of Evanston STORMWATER MANAGEMENT PLAN February 2018 1 1.0 Table of Contents 2.0 INTRODUCTION...3 2.1 SMP STRUCTURE... 3 2.2 AREA SUBJECT TO THE PLAN... 3 2.3 SMP DEVELOPMENT... 3 2.4 ANNUAL REPORTING...
More informationNo Exposure Certification
No Exposure Certification Amanda Sappington asappington@trcsolutions.com September 13, 2018 www.trcsolutions.com No Exposure Certification that replaces permit No inspection requirements No monitoring
More informationLOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE
TITLE: NUMBER: ISSUER: Storm Water Discharges Associated with Construction and Land Disturbance Activities REF-6286.0 John Sterritt, Director Enrique G. Boull t, Chief Operating Officer Office of the Chief
More informationOverview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit
Overview of the 2016 Small Municipal Separate Storm Sewer System (MS4) Permit Outline Regulatory Context and MS4 Permit Status 2016 MS4 Permit Requirements NOI, SWMP, Annual Reports Minimum Control Measures
More informationWashington State University Pullman Stormwater Management Program Plan 2017
Washington State University Pullman Stormwater Management Program Plan 2017 The Washington State University (WSU) Pullman Stormwater Management Program (SWMP) Plan has six elements derived from the Eastern
More informationAPPENDIX G Fire BMPs
APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of
More informationNebraska Department of Environmental Quality
Reuel Anderson and Travis Porter Reuel Anderson and Travis Porter Nebraska Department of Environmental Quality Federal Water Pollution Control Act Amendments(1972) Established the core of the program
More informationSECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY
1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations
More informationSINGLE FAMILY RESIDENCE COMMON PLAN of DEVELOPMENT or SALE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) For Construction Activities At:
SINGLE FAMILY RESIDENCE COMMON PLAN of DEVELOPMENT or SALE (SWPPP) For Construction Activities At: Project/Site Name Project/Site Location & Address City, State, Zip Code Latitude:. N (decimal degrees)
More informationCompletion Instructions for the Industrial SWP3 Template
Introduction Completion Instructions for the Industrial SWP3 Template The Oklahoma Department of Environmental Quality (DEQ) has created a template to help you develop your Stormwater Pollution Prevention
More informationSTATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater
More informationConstruction Storm Water 2013 Update for NPDES Permit #OHC000004
Construction Storm Water 2013 Update for NPDES Permit #OHC000004 Molly Drinkuth Ohio EPA Division of Surface Water Northeast District Office June 20, 2013 Why Regulate Construction Storm Water? Spilled
More informationSTORM WATER POLLUTION PREVENTION PLAN PALMER PAVING CORPORATION 25 BLANCHARD STREET PALMER, MASSACHUSETTS
STORM WATER POLLUTION PREVENTION PLAN PALMER PAVING CORPORATION 25 BLANCHARD STREET PALMER, MASSACHUSETTS Prepared by Berkshire Environmental Consultants, Inc. 1450 East Street, Suite 6 H Pittsfield, Massachusetts
More informationALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG110000
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG110000 Instructions: This form should be used to submit a Notice of Intent for coverage under NPDES
More informationStorm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping
DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping August 20, 2015 APWA Mid-Atlantic Lunch-n-Learn Agenda
More informationDIVISION of WATER QUALITY NDPDES PROGRAM
DIVISION of WATER QUALITY NDPDES PROGRAM THIS PAGE IS NOT PART OF ANY SWPPP CONSTRUCTION Storm Water Pollution Prevention Plan * SWPPP Template (2016-01) A SWPPP must be prepared and implemented for all
More informationStormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan
PDHonline Course C314 (6 PDH) Stormwater Preparing an Effective Industrial Stormwater Pollution Prevention Plan Instructor: Jeffrey R. Sotek, PE, CSP, CIH 2012 PDH Online PDH Center 5272 Meadow Estates
More informationAPPENDIX A BLANK RECORDKEEPING FORMS AVI-CPL-001
APPENDIX A BLANK RECORDKEEPING FORMS Checklist 1 Quarterly SWP3 Inspection Business Name: Date: Weather: Inspector(s): Inspector Affiliation: Inspector familiar with industrial activities performed at
More informationNPDES Industrial Storm Water Permitting. Jason Fyffe Ohio EPA, Division of Surface Water
NPDES Industrial Storm Water Permitting Jason Fyffe Ohio EPA, Division of Surface Water Why Regulate Storm Water It can wash pollutants off your facility! How Urbanized Areas Affect WQ How Ohio EPA Regulates
More informationEmployee Training Log
Appendix C G C- Training Log D- Spill Reports E- Corrective Action Log F- Weekly Visual Insp. Log G- Quarterly Insp. Form H- Post-Construction Facility Inspection Form I- Discharge Monitoring Form Employee
More informationGeneral NPDES Permit No. ILR40 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Illinois Environmental Protection Agency Division of Water Pollution Control 1021 North Grand East P.O. Box 19276 Springfield, Illinois 62794-9276 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM General
More informationFACT SHEET AND SUPPLEMENTARY INFORMATION FOR GENERAL PERMIT ARR STORMWATER RUNOFF ASSOCIATED WITH CONSTRUCTION SITES IN ARKANSAS
FACT SHEET AND SUPPLEMENTARY INFORMATION FOR GENERAL PERMIT ARR150000 STORMWATER RUNOFF ASSOCIATED WITH CONSTRUCTION SITES IN ARKANSAS Information in this part is organized as follows: Page 1 of 5, Fact
More informationConstruction Phasing Bad
Construction Entrances Construction Phasing Remove mud and dirt from the tires of construction vehicles before they enter a paved roadway. Propoerly size entrance BMP's for all anticipated vehicles. Make
More informationKANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM
KANSAS CITY, MO INDUSTRIAL FACILITY INSPECTION FOR MS4 PROGRAM Storm Water Pollution Prevention, Control, Reduction and Minimization In Compliance with Kansas City, MO Municipal Separate Storm Sewer System
More informationMn/DOT Outstate District SWPPP
SWPPP Table of Contents Introduction......4 PUBLIC EDUCATION AND OUTREACH...5 Distribute Educational Materials...5 Implement an Education Program...6 Education Program: Public Education and Outreach...7
More informationThree copies (one original and two copies) of your completed NOI should be submitted to:
To: Prospective Applicants for a Stormwater General Permit Associated with Construction Activity Greater than 5 Acres Attached is a Stormwater General Permit Associated with Construction Activity Greater
More informationState of Oregon Department of Environmental Quality
State of Oregon Department of Environmental Quality Memorandum To: Permit Registrants, Water Quality Staff and Date: October 24, 2006 Administrative File NPDES General Permit Nos. 1200-Z and 1200-COLS
More informationSTORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY
STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction
More informationCITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN
CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN May, 2017 CITY OF MERCER ISLAND 2017 S T O R M W A T E R M A N A G E M E N T P R O G R A M ( S W M P ) P L A N May 2017 City of Mercer
More informationStorm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015
Storm Water and SPCC Plan Best Management Practices Presented To: 2015 IMAA Winter Workshops February 2, 3 & 4, 2015 Mack Overton, VP Industrial Services KERAMIDA, Inc. Stormwater Rule Purpose is to limit
More informationTexas Pollutant Discharge Elimination System (TPDES) Stormwater Permitting Updates
Texas Pollutant Discharge Elimination System (TPDES) Stormwater Permitting Updates Southwest IECA Texas Stormwater Conference Rebecca L. Villalba September 26, 2018 Stormwater Team Water Quality Division
More informationTPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza. Stormwater and Pretreatment Team Water Quality Division
TPDES INDUSTRIAL STORMWATER MULTI-SECTOR GENERAL PERMIT (TXR050000) Lindsay Garza Stormwater and Pretreatment Team Water Quality Division INDUSTRIAL STORMWATER PERMIT APPLICABILITY If a facility discharges
More informationRisk Level 1 Annual Report Questions GENERAL INFO
GENERAL INFO A. Site Owner Information Owner Name: Owner Address: City: State: Owner Contact: E-Mail: Phone: Zip: B. Site Information Site Business Name: Site WDID No: Physical Address: City: Site Contact:
More informationAPPENDIX A EXCERPTS FROM THE PERMIT
APPENDIX A EXCERPTS FROM THE PERMIT NPDES CAS004001-45 - Order No. 01-182 F. PUBLIC AGENCY ACTIVITIES PROGRAM Each Permittee shall implement a Public Agency program to minimize storm water pollution impacts
More informationS5.C.1 Public Education and Outreach
City of Ferndale 2018 Stormwater Management Program This document is formatted as a response to specific special conditions within the Western Washington Phase II Municipal Stormwater Permit (Permit) that
More informationStorm Water Permitting
Storm Water Permitting July 12, 2018 N E S g l o b a l. n e t Your Participation Join audio: You have joined using computer speakers by default Choose Telephone and dial using the information provided
More informationThe Solution to Pollution is Dilution
The Solution to Pollution is Dilution The cornerstone of surface water quality protection in the United States gave EPA the authority to implement pollution control programs and... established the basic
More informationProject Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)
Compliance Assistance Program Checklist 1 Start of Construction Stormwater Self-Certification Checklist Note: This checklist must be completed and submitted to the DEM no later than 30 days after initiating
More information