State Energy Agency of the Government of the Kyrgyz Republic. Vertical unbundling. by Sadyraliev Rustam
|
|
- Gary Edwards
- 6 years ago
- Views:
Transcription
1 State Energy Agency of the Government of the Kyrgyz Republic «SEA» Vertical unbundling by Sadyraliev Rustam First Annual Meeting of CAREC Members Electricity Regulators Forum Beijing, 4-6 July 2005 The views expressed herein are those of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors or the governments they represent. ADB makes no representation concerning and does not guarantee the source, originality, accuracy, completeness or reliability of any statement, information, data, finding, interpretation, advice, opinion, or view presented.
2 The energy sector of Kyrgyztan has experienced a crisis, which started from the early years of the country s attainment of independence. The crisis is characterized by a continued decrease in industrial power consumption and increase in domestic daily consumption. Due to scarcity of resources and persistent delays in replacing equipment, system losses have reached more than 3.5 to 4.0 billion Kwh annually or approximately 42 to 44 of transmitted electricity. The fundamental reasons for this situation are the non-market approaches in promoting energy saving measures and inefficient use of electricity and investments. Essentially, the function of the energy sector was similar to that of the fire department s job. Where there is a burning installation, there is repair. In situations like this, drastic changes are necessary both in long-term development planning and management methods. The energy sector, through the years, has had great difficulties in financing capital investments. Thus, attracting private investments has become a burning issue in the agenda for the energy sector.
3 For the creation of an efficient electricity market and attraction of foreign investors, there is a need to introduce elements of competition in the power market. However, because of the distinct character of the energy sector natural monopoly may not be avoided. International experience has shown that through careful preparations there is a possibility of introducing some elements of competition in the different branches of the energy sector. Although according to the opinion of most experts in the power sector, it would be economically efficient to leave monopoly powers in the hands of one of the power system s main branches, i.e. transmission. The presence of competitors will increase total expenditure levels, which in the end, is not advantageous to the consumers. After gaining independence, the Kyrgyz Republic has embarked on building a market economy. This argument and the establishment of the State Energy Agency serve as the first step towards restructuring, knowing that a market economy has its own methods of regulation.
4 The creation of a power market requires the observance of the following principles: Efficiency and low expenditures Long-term planning Provision of safe and continuous supply Energy saving measures Attracting private investments Transparency
5 First, the power market must be economically efficient. Second, long-term planning must be undertaken. Third, ensure the stability and continuity of electricity supply for all consumers. Fourth, the power market should be able to stimulate energy saving measures and activities aimed at preserving the natural environment. To address issues concerning economic efficiency and sound regulation, the power market must be as transparent as possible. This way, there can be more confidence in making forecasts and system planning, and analyzing expenditures, resources, and ongoing expenses. The actual and final task of the power market in Kyrgyztan is to attract private investments. Power sector equipment, especially in the distribution system, is in extremely bad shape. Significant investments are needed to replace obsolete equipment and to install new and more accurate meters.
6 Structure of the Vertically Integrated Monopoly Kyrgyzenergo up to the middle of June 2001 Hydroelectric Power Plant PRODUCTION OF ELECTRICITY Thermal Power Plant Transmission of power through high voltage networks Export of electricity DISTRIBUTION OF ELECTRICITY TO END CONSUMERS
7 In fulfillment of the tasks mentioned above and having studied international experience, the government of the Kyrgyz Republic has adopted the following resolutions: In 1996 a resolution was adopted On the Transformation of the Ministry of Energy into the State Energy Agency, for the purpose of creating a power market and introducing elements of competition in said power market All issues related to regulatory activities will be handled by the Executive Council of the State Energy Agency. The EC of the SEA is composed of three members, one of which is the Director of the State Energy Agency Another resolution was adopted in the middle of 2001, which changed the structure of the power sector. The power sector was divided into functional branches: production, transmission, and distribution. The transformation of the energy sector from a vertically integrated monopoly into a re-structured sector was necessary to make the system more efficient, in accordance with the principles of a market economy. It is noteworthy that the positive effects of restructuring are to be expected in the long-term.
8 Restructuring of Kyrgyzenergo KYRGYZENERGO Production: KTES, PSGES, Аt-BashiGES KeminGES, BishketTETs, OshTETs Transmission and Distribution: BishkekPES, TsuyPES TalasPES, NarinPES Isik-KulPES, OshPES Zhalal-AbadPES, BPTS BTS (BPTS) Severelektro (BPES, TsuyPES) Vostokelektro (NPES, IPES) Oshelektro (OshPES) Zhalal-Abadelektro (ZhPES) Kyrgyzenergo (Powerstations, ВВС 110 kv up) ES NESK /06/
9 Structure of the Energy Sector of Kyrgyzstan Open JSC «Power Plants» Оsh CHPP Тоkтоgul coordinated system Atbashy hydro power Bishkek CHPP Export Large consumer of electricity Large consumer of electricity National Electricity Transmission Company Open JSC «NESK» JSC Bishkek Heating system company Large consumer of electricity JSC Tchakan hydro power Dis JSC АО «Жалал-Абадэлектрo» Dis JSC «Ошэлектрo» Dis JSC АО «Востокэлектрo» Dis JSC АО «Северэлектрo» Consumers Consumers Consumers Consumers
10 Existing Structure of the Country s s Power Sector Production Power Stations National Electricity Transmission Company Open JSC «NESK» State Energy Agency Distribution Severelektro Распределение Vostokelektro Distribution Oshelektro Distribution Zhalal-Abadelektro
11 The Distribution Sector has been divided into four companies The distribution companies obtain their basic income from selling electricity to end consumers. These companies get their access to electricity through bilateral contracts with power generation companies. Strict state control is being carried out on the volume and price of supply to prevent any market player from using non-market oriented methods or from obtaining a dominant position.
12 Indicators (Distribution Companies) Unit m mos 2005 TOTAL VOLUME OF ELECTRICITY ENTERING THE (Distribution Companies) NETWORK TOTAL ELECTRICITY LOSSES same percentage 36,4 38,0 45,2 Technical losses same percentage of electricity entering the network 16,9 16,6 19,5 Commercial losses same percentage of electricity entering the network 19,5 21,4 25,7 USEFUL AMOUNT OF ELECTRICITY DELIVERED TO END CONSUMERS TOTAL CONSUMPTION Industry As a percentage of total consumption Budget consumers As a percentage of total consumption Agricultural consumers As a percentage of total consumption Population As a percentage of total consumption Other consumers As a percentage of total consumption
13 INDICATORS of Distribution Companies unit mos 2005 Billing 1000 som Industry тыс.сом As percentage of total consumption Budget consumers тыс.сом As percentage of total consumption Agricultural consumers тыс.сом As percentage of total consumption Population тыс.сом As percentage of total consumption Other consumers тыс.сом As percentage of total consumption TOTAL COLLECTION тыс.сом , , COLLECTION LEVEL (Total volume of billing) Including: Industry Budget consumers Agricultural consumers Population Other consumers
14 Collection Chart of Distribution Companies for (in million US$) rrrggggg rrrr 2003 г г. 5 мес. 2005г Cash Money to money взаимозачет barter Рост дебиторской задолженности
15 Indebtedness of Distribution Companies to Production and Transmission Companies by (m illion $) Sever Vostok Zhalal- Abad Оsh Total Creditor Indebtedness of Distribution Companies Debitor Indebtedness of Distributon Companies
16 Creditor Indebtedness of Distribution Companies to Production and Transmission Companies (in millions $) г г г г г г г г г. Сев ер Восток Ж -Абад Ош
17 Present-day Problems: Constant increase in the population s s consumption, which in turn, leads to overloading in the distribution networks; Depreciation of equipment resulting to high level of technical losses; Accumulation of needed repair and rehabilitation works Frequent switching off and deteriorating quality of electricity supply; Absence of enough instruments to measure electricity, which is the main reason for rising commercial losses; Low collection level; Subsidy and export dependence.
18 Future Perspectives: Direction towards increasing energy self-sufficiency sufficiency; Attracting foreign investments; Search for and creation of new routes for power transmission; Implementation of market-oriented reforms in the energy sector; Improvement of international cooperation in the energy sector within the region.
National Agency of the Kyrgyz Republic for Anti-Monopoly Policy and Development of Competition. S. U. Sultanbekov State Secretary
National Agency of the Kyrgyz Republic for Anti-Monopoly Policy and Development of Competition S. U. Sultanbekov State Secretary Topic: Application of tariff structures in Kyrgyzstan. Questions and objectives
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked
More informationState Energy Agency under the Government of Kyrgyz Republic «SEA SEA» Price and tariff department - SEA Sadyraliev Rustam leading specialist
State Energy Agency under the Government of Kyrgyz Republic «SEA SEA» Price and tariff department - SEA Sadyraliev Rustam leading specialist Re-structuring of power sector in Kyrgyz Republic The main events
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Background, Performance, Problems, and Opportunities
Uch-Kurgan Hydropower Plant Modernization Project (RRP KGZ 49240-002) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Background, Performance, Problems, and Opportunities 1. The Kyrgyz Republic
More informationState Energy Agency under the Kyrgyz Government
State Energy Agency under the Kyrgyz Government «SEA SEA» Partnership Program;Bishkek, August 17-22, 2003 G. Kasymova, Technical Expertise and External Relations Department, Chief Specialist Technical
More informationThe Kyrgyz Republic Address of the Director of the State Energy Agency
The Kyrgyz Republic Address of the Director of the State Energy Agency Ladies and gentlemen: I would like to sincerely thank the Utilities and Transportation Commission of the State of Washington for affording
More informationEXPERIENCE OF KYRGYZ REPUBLIC: ENERGY SECTOR S SERVICES
MULTI-YEAR EXPERT MEETING ON SERVICES, DEVELOPMENT AND TRADE: THE REGULATORY AND INSTITUTIONAL DIMENSION Geneva, 17-19 March 2010 EXPERIENCE OF KYRGYZ REPUBLIC: ENERGY SECTOR S SERVICES By Ular MATEEV
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone
More informationAZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES
AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES 1. Analysis 1. Economy. The economy grew, on average, by 29.3% from 2005-2007 and in 2008, the gross domestic product (GDP) increased by
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Namangan 500-Kilovolt Power Transmission Project (RRP UZB 46007-002) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Uzbekistan is a Central Asian
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: PAK 32381 TECHNICAL ASSISTANCE TO THE ISLAMIC REPUBLIC OF PAKISTAN FOR CAPACITY BUILDING OF THE NATIONAL ELECTRIC POWER REGULATORY AUTHORITY March 2000 CURRENCY EQUIVALENTS
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Country Partnership Strategy: Armenia, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY A. Sector Performance, Problems, and Opportunities 1. Sector performance. Armenia has no proven reserves of oil or natural
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The
More informationSORBON KHOLMUHAMADZODA MINISTRY OF ENERGY AND WATER RESOURCES OF THE REPUBLIC OF TAJIKISTAN
7 th INTERNATIONAL FORUM ON ENERGY FOR SUSTAINABLE DEVELOPMENT 1 TAJIKISTAN S ENERGY PROFILE - POTENTIAL & PERSPECTIVES SORBON KHOLMUHAMADZODA MINISTRY OF ENERGY AND WATER RESOURCES OF THE REPUBLIC OF
More informationFurther electricity interconnection is needed to exploit the high generation capacity.
Romania Key Issues Correct and complete transposition of the Third Energy Package and its practical application needs to continue. Romania should complete the corporate governance reform of state-owned
More informationPower & Utilities in Russia. Industry overview and investment opportunities
Power & Utilities in Russia Industry overview and investment opportunities May 2016 Power market overview (1/2) Key statistics As of 2015, Russia is the fourth-largest electricity producer (1,104 TWh)
More informationPower Market Reforms in New Independent Countries
IREX visiting scholar (Azerbaijan) Power Market Reforms in New Independent Countries Executive Summary The energy sector of any society is the foundation on which other sectors depend. All activities rely
More informationDevelopment of renewable energy sector in the Kyrgyz Republic
Ministry of Energy of the Kyrgyz Republic Development of renewable energy sector in the Kyrgyz Republic Almaz Stomaliev Chief of the Power Generation and Transmission Department September 2013 Almaty 1
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Country Partnership Strategy: Philippines, 2011 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines
More informationSECTOR ASSESSMENT: BIHAR POWER SECTOR
P P Central Bihar Power System Improvement Project (RRP IND 41626) SECTOR ASSESSMENT: BIHAR POWER SECTOR A. Introduction 1 1. The power sector in India has an installed capacity of 159,400 megawatt (MW),PF
More informationFuture Energy in Albania. Eighth International Forum on Energy for Sustainable Development
Future Energy in Albania Eighth International Forum on Energy for Sustainable Development Artan Leskoviku 11-14 June 2017, Astana, Kazakhstan 1 CONTENTS CURRENT CONDITIONS STRATEGIC VISION, POLICIES AND
More informationAnalysis of the Cost-effectiveness and Ways of Improving the Profits of Beijing Public Transit Corporation
Organisation for Economic Co-operation and Development Development Research Centre of the State Council of the PRC Asian Development Bank CORPORATE GOVERNANCE OF STATE- OWNED ENTERPRISES IN CHINA Analysis
More informationDEVELOPMENT COORDINATION MATRIX. Rehabilitation of existing hydropower plants (Toktogul HPP, Kambarata-2 HPP)
Country Partnership Strategy: Kyrgyz Republic, 2018-2022 DEVELOPMENT COORDINATION MATRIX A. PATHWAYS FOR ADB TO SUPPORT GROWTH AND ONOMIC DIVERSIFICATION IN CPS 2018 2022 Energy: Improved quality of energy
More informationON ENERGY RESOURCES UTILIZATION
THE LAW OF AZERBAIJAN REPUBLIC ON ENERGY RESOURCES UTILIZATION This Law determines legal, economic and social basis of the State policy in the field of energy resources utilization as well as main directions
More informationInternational Atomic Energy Agency
International Atomic Energy Agency Research Project Initial analysis of different indicators for sustainable energy development on the basis of existing economic, energy and environmental trends in Russia.
More informationREPUBLIC OF UZBEKISTAN
REPUBLIC OF UZBEKISTAN ENERGY POLICY Ministry of Economy of Uzbekistan Contents * Uzbekistan: General Information * Current energy policy. * Energy demand and supply (statistics) * Outlook of energy policy,
More informationGeneral Information AREA: Population: 143 thousand. km2 (93% of the territory is covered by mountains) 8,7 mln. people Capital: Dushanbe city Independ
TAJIKISTAN S ENERGY PROFILE, POTENTIAL & PERSPECTIVES DILOROM SHERALIEVA LEADING SPECIALIST OF INTERNATIONAL DEPARTMENT MINISTRY OF ENERGY AND WATER RESOURCES OF THE REPUBLIC OF TAJIKISTAN General Information
More informationAssessment of Wholesale Competition in the Nigerian Electricity Market
Assessment of Wholesale Competition in the Nigerian Electricity Market By U. D. Achinanya The Market Operator, PHCN, Nigeria 11/28/2007 WAPIC 2007, Abuja 1 Outline Wholesale Electricity Market:- Definition
More informationContent Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems
A COUNTRY REPORT OF NEPAL Presented by: Pralhad Prasad Sapkota Under Scretary Government of Nepal,Ministry of Energy, Kathmandu, Nepal Content Introduction Institutional Arrangement Energy Policy Documents
More informationREGIONAL ELECTRICITY EXPORT POTENTIAL STUDY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CENTRAL ASIA REGIONAL ELECTRICITY EXPORT POTENTIAL STUDY Appendix Volume EUROPE AND CENTRAL
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1916 Project Name. Business Environment Reform and Institutional Strengthening Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1916 Project Name Business Environment Reform and Institutional Strengthening Region EUROPE AND CENTRAL ASIA Sector General public administration
More informationREPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS
Official translation REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Article 1. Purpose of the Law This
More informationMarket Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission
Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission May 13, 2015 AGENDA 1. Review EU energy legislation 2. United States structural
More informationDeveloping Microgrid in Local Energy Systems in Russia: Barriers and Opportunities
Developing Microgrid in Local Energy Systems in Russia: Barriers and Opportunities Irina Volkova, Viktor Kolesnik National Research University Higher School of Economics iovolkova@hse.ru A Structural-innovative
More informationAutomakers and Auto Parts manufacturers
Last updated: July 13, 2011 Rating Methodology by Sector Automakers and Auto Parts manufacturers 1. Business base Susceptible as it is to business fluctuations, the demand for new automobiles is relatively
More informationKOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010
KOSOVO ENERGY CORPORATION J.S.C. TARIFF APPLICATION FOR 2010 February 2010 Page 1 08 February 2010 Table of Contents: 1. Introduction,... 3 2. Focus on Privatization... 5 3. Tariff Strategy,...... 5 4.
More informationUzbekistan Energy Strategy
Uzbekistan Energy Strategy T.P. Salikhov Abstract - Analysis of Uzbekistan energy policy on the base of system approach has been performed. It has been shown that the energy policy can be presented in
More informationCooperation in the Energy Sector
MINISTRY OF ENERGY AND INDUSTRY OF THE KYRGYZ REPUBLIC Cooperation in the Energy Sector Ministry of Energy and Industry of the Kyrgyz Republic Speaker: Aibek R. Kaliev, Deputy Minister Bishkek, 2014 Following
More informationSUMMARY SECTOR ASSESSMENT: ENERGY 1
Access to Clean Energy Investment Program (RRP PAK 49056) SUMMARY SECTOR ASSESSMENT: ENERGY 1 A. Sector Performance, Problems, and Opportunities 1. A reliable and sustainable energy sector is essential
More informationCost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC
Cost of Service and Public Policy Ted Kury Director of Energy Studies, PURC ted.kury@warrington.ufl.edu Session Overview Improving Utility Sector Performance Costs to Provide Service Uniform System of
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT
Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance and problems. The transport
More informationOPTIMIZING PRASA S METERING SYSTEM AND CUSTOMER EXPERIENCE April 20, 2017
OPTIMIZING PRASA S METERING SYSTEM AND CUSTOMER EXPERIENCE April 20, 2017 DISCLOSURE The materials contained in this presentation are for informational purposes only. This document does not constitute
More informationSECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities
Water Sector Improvement Program (RRP PAL 44031) SECTOR ASSESSMENT: WATER AND SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Anticipated water supply shortfall by 2010.
More informationSCADA/EMS for Unified Power System of Russia
1 SCADA/EMS for Unified Power System of Russia Oxana Yakovleva Head of SCADA/EMS PIU, System Operator for UES of Russia Vladimir Calovic KEMA Consulting EPCC - les Diablerets, Switzerland, June 8, 2005
More informationImportance of Data transparency to the Petroleum Industry and the International Oil Market
Bilateral JODI Training Workshop 10-11 December 2009, South Africa Importance of Data transparency to the Petroleum Industry and the International Oil Market Rachid Boularas Senior Energy Analyst International
More informationRegulatory Reform in the Electricity Sector: The Experience of the APEC Economies
Third Workshop and High level Conference of the APEC-OECD Co-operative Initiative on Regulatory Reform Regulatory Reform in the Electricity Sector: The Experience of the APEC Economies Armando Cáceres
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities
Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems and Opportunities 1. The Ministry of
More informationThe Third Energy Package and Electricity Market Reform
Policy Briefing Series [PB/01/2012] The Third Energy Package and Electricity Market Reform Jörg Radeke & Georg Zachmann Berlin/Chişinău, June 2012 Motivation 1. Background: As a member of the Energy Community
More informationMEMO 27 June District heating and combined heat and power in China
MEMO 27 June 2013 File no. Ref. Ole Odgaard Page 1 District heating and combined heat and power in China District heating has expanded rapidly in Northern China since the beginning of the 1990 s. Residential
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Indonesia is striving hard to increase
More informationSTATUTORY AUTHORITY: ACT no. 50 of 29 June 1990, section 7-6
NOTE: Unofficial translation - for information only REG. no. 959 of 7 December 1990: Regulations concerning the generation, conversion, transmission, trading, distribution and use of energy etc. (The Energy
More informationEstimating imperfect competition impact on producer prices in Russia in
Estimating imperfect competition impact on producer prices in Russia in 2003-2010 Topic: Examinations of Input-Output Price Model Author: Artem Denisov Co-author: Vadim Gilmundinov Monetary instruments
More informationCharacteristics of Deregulation Process with Respect to the Electric Power Market in Croatia
Characteristics of Deregulation Process with Respect to the Electric Power Market in Croatia ERALDO BANOVAC *, IGOR KUZLE, SEJID TEŠNJAK * Licensing/Monitoring Department Department of Power Systems Croatian
More informationInvestors Meeting for FY2010 Financial Results
Investors Meeting for Financial Results The Chugoku Electric Power Co., Inc. May 11,2010 In this presentation, the term Fiscal Year 2010 describes the period which ended March, 2010. Contents Ⅰ.Shimane
More informationEnergy Efficiency in Central Asia: regional aspects and gaps
Energy Efficiency in Central Asia: regional aspects and gaps Atabek Umirbekov Regional Environmental Centre for Central Asia Climate Change and Sustainable Energy program Second International Energy Efficiency
More informationINOGATE Technical Secretariat Country Work Plan: Tajikistan
FINAL INOGATE Technical Secretariat Country Work Plan: Tajikistan INOGATE Technical Secretariat and Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives
More informationELECTRICITY POLICY STATEMENT
1. INTRODUCTION ELECTRICITY POLICY STATEMENT 1. Today, the electricity systems in the Federation of Bosnia and Herzegovina ("FBiH") and Republica Srpska ("RS"), which function in Bosnia and Herzegovina
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities
Interim Country Partnership Strategy: Mongolia, 2014 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 1. Sector Performance, Problems, and Opportunities 1. Low energy efficiency and urban air pollution. Presently,
More informationINTEGRATED RIVER BASIN MANAGEMENT IN UZBEKISTAN: DEVELOPMENT PRIORITIES
INTEGRATED RIVER BASIN MANAGEMENT IN UZBEKISTAN: DEVELOPMENT PRIORITIES Sherzod ASADOV, First Secretary Water-Energy-Environment Issues Task Force Ministry of Foreign Affairs Republic of Uzbekistan 1 Istanbul,
More informationDEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST
DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST Power Regulatory Webinar Series Deanna E. King Stephen J. Hug September 28, 2016 CURRENT DEVELOPMENTS IN WESTERN
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID6033
More information)(ewura. Energy and Water Utilities Regulatory Authority. In the matter of Application by the TANZANIA ELECTRIC SUPPLY COMPANY LTD
)(ewura Energy and Water Utilities Regulatory Authority In the matter of Application by the TANZANIA ELECTRIC SUPPLY COMPANY LTD For Tariff Review Application Background Tariff Review Justification Stakeholders'
More information14. Vietnam: Study on Past Investments
14. Vietnam: Study on Past Investments I. Background In 1986, Vietnam s Sixth Party Congress committed to the policy of doi moi (or renovation). Economic reform pressed ahead throughout the late 1980 s
More informationEnergy Advocacy: Skills for Leaders
Energy Advocacy: Skills for Leaders Weatherization Leveraged Partnerships Project The project offers training and assistance for all WAP subgrantees in designing private partnerships and programs that
More informationInfrastructure Connectivity in Afghanistan
Infrastructure Connectivity in Afghanistan Issyk Kul Kyrgyzstan,6-7 September, 2017 M. Azim Wardak, Acting Deputy Director General Economic Cooperation Department, Ministry of Foreign Affairs of Afghanistan
More informationThe Eastern Vector of Russian Energy Strategy: Prospects of Russian Energy Resources Supply to the Markets of Asia Pacific Region
Asian Pacific Energy Forum 2013 BUSINESS FORUM The Eastern Vector Russian Energy Strategy: Prospects Russian Energy Resources Supply to Markets Asia Pacific Region Boris Saneev Deputy Director ESI SB RAS
More informationCentral Asia Think Tank Development Forum
Central Asia Think Tank Development Forum CAREC Program: Improving infrastructure connectivity to promote construction of economic corridors and economic cooperation and integration Astana, Kazakhstan
More informationINTRODUCTION. Latitude ' N ' N Longitude ' E ' E Area 147,181 km 2
INTRODUCTION Country Location Between China and India Latitude 26 0 22' N - 30 0 27' N Longitude 80 0 04' E - 88 0 12' E Area 147,181 km 2 Population 28.8 millions Access to Electricity 67% Per capita
More informationAFGHANISTAN. Speaking Points. Eng. Aman Ghalib Dy. Mini Energy Minister of Energy and Water Islamic Republic of Afghanistan
AFGHANISTAN Speaking Points of Eng. Aman Ghalib Dy. Mini Energy Minister of Energy and Water Islamic Republic of Afghanistan At High-Level Seminar: Accelerating Sustainable Energy for All in Landlocked
More informationPrepared by: Diana Castillo, Lisa Marie Izquierdo, Gloria Jimenez, Mari Stangerhaugen, Robert Nixon. Advisor: Ambassador Rafat Mahdi
Water Crisis in Central Asia Key Challenges and Opportunities Prepared by: Diana Castillo, Lisa Marie Izquierdo, Gloria Jimenez, Mari Stangerhaugen, Robert Nixon Advisor: Ambassador Rafat Mahdi Introduction
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: NEP 32241 TECHNICAL ASSISTANCE (Financed from the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR MANAGEMENT REFORMS AND EFFICIENCY IMPROVEMENTS FOR THE NEPAL ELECTRICITY AUTHORITY
More informationDefining PSD Goals, Identifying Bottlenecks to Growth, and Developing PSD Strategies. Presentation by
Defining PSD Goals, Identifying Bottlenecks to Growth, and Developing PSD Strategies Presentation by Scott Jacobs Managing Director, Jacobs and Associates Under contract to the ADB 18 April 2005 The views
More informationGeorgia s Energy Policy
Georgia s Energy Policy Overview of Main Directions 17 December 2007 Introduction On June 7, 2007, the Parliament of Georgia adopted the Resolution on Main Directions of Georgia s State Energy Policy,
More informationExporting, Importing and Countertrade
Lecture 9 Exporting, Importing and Countertrade Introduction Large and small firms export Exporting is on the rise thanks to the decline in trade barriers under the WTO and regional economic agreements
More informationLights Out? The Outlook for Energy in Eastern Europe and Central Asia. The World Bank
Lights Out? The Outlook for Energy in Eastern Europe and Central Asia Sustainable Development Department Europe and Central Asia Region MAJOR FINDINGS The countries of Eastern Europe and Central Asia region
More informationFourteenth Meeting of the IMF Committee on Balance of Payments Statistics Tokyo, Japan, October 24 26, 2001
BOPCOM-01-7 Fourteenth Meeting of the IMF Committee on Balance of Payments Statistics Tokyo, Japan, October 24 26, 2001 Data Quality Assessment Framework Prepared by the Bank of Japan For the IMF Committee
More informationEconomic Aspects of the Energy Sector in CIS Countries
EC Delegation in Russia/Moscow 27 June 2008 Economic Aspects of the Energy Sector in CIS Countries Sixth Session: Strategies and Policy Options for the Energy Sector Development in the CIS Region Energy
More informationSUMMARY OF STRATEGIC PLAN FOR THE
INTEREUROPA GROUP Intereuropa Global Logistics Service, Ltd. Co. SUMMARY OF STRATEGIC PLAN FOR THE INTEREUROPA GROUP 2015-2019 Koper, November 2014 Contents 1. Introduction... 3 2. Vision, Mission, Values...
More informationSUMMARY OF CONCLUSIONS AND RECOMMENDATIONS
SUMMARY OF CONCLUSIONS AND RECOMMENDATIONS 2 Turkey has made impressive progress since the last IEA in-depth review in 2001. The government has made considerable efforts to address the 3 Es, namely energy
More informationLucintel. Publisher Sample
Lucintel http://www.marketresearch.com/lucintel-v2747/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST Fridays: 5:30am
More informationRole of Sustainable Mega Projects on the Future of Iraq Economy & Human Capital
Role of Sustainable Mega Projects on the Future of Iraq Economy & Human Capital Iraq Energy Forum 2018 Dr Husain Al-Chalabi [ IEI Fellow] Role of Sustainable Mega Projects on the Future of Iraq Economy
More informationTRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO
TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO Address: Dërvish Rozhaja Str., No. 12, 10000 Prishtina, Kosovo Tel: 038 247 615 ext. 101, Fax: 038 247 620, E-mail: info@ero-ks.org,
More informationJAPAN ELECTRICITY MARKET AND THE ROLE OF RENEWABLES
JAPAN ELECTRICITY MARKET AND THE ROLE OF RENEWABLES ENERGY TRANSPARENCY 2013 ALI IZADI 20 JUNE 2013 /// Energy / / Transparency, Tokyo, / / 20 / June / / 2013 / / / 1 JAPAN ELECTRICITY CONSUMPTION INTENSITY
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities
Energy Supply Improvement Investment Program (RRP AFG 47282-001) SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector overview. Afghanistan
More informationRussian Gas Industry today and tomorrow. O.Buchnev, T.Shtilkind, NIIgazekonomika Institute
Russian Gas Industry today and tomorrow O.Buchnev, T.Shtilkind, Content 1. Russian Gas Industry and JSC «Gazprom» 2. Gazprom perspectives: - new projects - ways and goals of reforms 3. Internal gas market
More informationThe Evolution of the PJM Market in the United States: Looking Back to Look Forward
The Evolution of the PJM Market in the United States: Looking Back to Look Forward Feasibility Study for ASEAN Multilateral Power Trade September 5-6, 2018 Jakarta, Indonesia Craig Glazer Vice President
More informationEx post evaluation Armenia
Ex post evaluation Armenia Sector: Electric power transmission and distribution (CRS code: 23630) Project: Safeguarding energy transmission in the South Caucasus (Gyumri substation) (BMZ No.: 2007 66 253)
More informationG20 Leaders Conclusions on Fuels,
G20 Leaders Conclusions on Fuels, 2008-2010 Zaria Shaw and Sarah Jane Vassallo G20 Research Group, July 21, 2011 Summary of Conclusions on Fuels in G20 Leaders Documents # of % of Total # of % of Total
More informationSupporting Documentation A Changing Industry and Marketplace 0
Supporting Documentation A Changing Industry and Marketplace 0 Ergon Energy s Regulatory Proposal is presented in a number of documents to make it easier for our different stakeholders to access the information
More informationTHEME Country profile Current state of energy sector Outlook of energy demand and supply The energy policy Documents and its implementation. Short ter
IEEJ : June 2012 NATIONAL DISPATCHING CENTER OF POWER SYSTEMS,MONGOLIA TRAINING AND DIALOGUE PROGRAMS OF JICA www.energy.mn COUNTRY PRESENTATION: MONGOLIA ENERGY POLICY (B) THEME Country profile Current
More informationINSTRUCTIONS: Read each statement carefully and ENCIRCLE the LETTER of the correct answer.
TEST I MULTIPLE CHOICE INSTRUCTIONS: Read each statement carefully and ENCIRCLE the LETTER of the correct answer. 1. Among the following, what is not considered as land in economics? a. Sea grasses on
More informationPublic Policy to Attract Private Sector Investments; Case study on Development of Small-Scale Generators in Power Industry
Review of History and Political Science June 2017, Vol. 5, No. 1, pp. 54-60 ISSN: 2333-5718 (Print), 2333-5726 (Online) Copyright The Author(s). All Rights Reserved. Published by American Research Institute
More informationECONOMIC AND FINANCIAL ANALYSIS
Irrigation Management Improvement Project (RRP BAN 45207) A. Approach and Methodology 1. Approach ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of the Irrigation Management Improvement
More informationWhat we know (and don t know) about economic growth in New Zealand. Strategic Policy Branch
What we know (and don t know) about economic growth in New Zealand July 2016 Strategic Policy Branch Document purpose What we know (and don t know) about economic growth in New Zealand : Brings together
More informationInvestment Climate and Energy Sector of Georgia
Investment Climate and Energy Sector of Georgia Regional Energy Hub Reliable transit country and regional energy hub Attractive cross border trading opportunities with well developed infrastructure and
More informationMEMORANDUM OF UNDERSTANDING CO-OPERATION IN THE FIELD OF CLIMATE CHANGE VULNERABILITY, RISK ASSESSMENT, ADAPTATION AND MITIGATION.
MEMORANDUM OF UNDERSTANDING on CO-OPERATION IN THE FIELD OF CLIMATE CHANGE VULNERABILITY, RISK ASSESSMENT, ADAPTATION AND MITIGATION Between THE MINISTRY FOR THE ENVIRONMENT, LAND AND SEA OF THE ITALIAN
More informationThe Fluctuations in World oil price and its impact on sustainable development and the role of SAIs
The Fluctuations in World oil price and its impact on sustainable development and the role of SAIs 1 A working paper to participate in the 3rd meeting of the Working Group on the INTOSAI Auditing Extractive
More informationA Paper Prepared for ABRACE by Ashley C. Brown, June 10, Advice on the Brazilian Natural Gas Market
A Paper Prepared for ABRACE by Ashley C. Brown, June 10, 2014 Advice on the Brazilian Natural Gas Market The natural gas market in Brazil is largely dysfunctional and constitutes a major barrier to the
More informationIntegrated Resource Plan. Appendix 7B. Technical Advisory Committee - Terms of Reference
Integrated Resource Plan Appendix 7B Technical Advisory Committee - INTRODUCTION BC Hydro is committed to engaging stakeholders, First Nations and the public in the development of the Integrated Resource
More informationSustainable Power Sector Development in the GMS
Sustainable Power Sector Development in the GMS - Update on RETA 9003-20 June 2018 Hyunjung Lee, ADB & Nikolay Nikolov, Ricardo, TA team leader Project Overview TA background: GMS economic growth has been
More information