1 Appendix Y-3 Environmental Impact Comparison Social Sciences Interdisciplinary Building

2 Appendix Y-3 Environmental Impact Comparison Social Sciences Interdisciplinary Building A. Introduction USC proposes to construct a new Social Sciences Interdisciplinary Building. This building would represent an initial development increment of the. This document provides a comparative analysis of the environmental impacts of the new Social Sciences Interdisciplinary Building with the environmental analysis set forth in the Environmental Impact Report (EIR) for the. The analysis provided herein demonstrates that this initial development increment was fully identified and evaluated within the Draft EIR prepared for the. The analysis provided herein also shows that no new or increased impacts beyond those identified in the Draft EIR would result from construction or operation of the new Social Sciences Interdisciplinary Building. Rather, the environmental impacts have been fully considered within the Draft EIR and the analysis herein. In addition, all of the relevant mitigation measures set forth in this Draft EIR for the USC Redevelopment Plan would be implemented as part of this initial development increment, unless such measures have already been completed in connection with another initial development. These mitigation measures are listed below. Thus, no further analysis or mitigation measures are required for construction or operation of the Social Sciences Interdisciplinary Building. B. Project Description As described in detail in Section II, Project Description, of the Draft EIR, the USC Development Plan would provide approximately 2,500,000 square feet of academic and University uses; up to 350,000 square feet of retail/commercial uses; and approximately 2,135,000 square feet of student and faculty comprised of providing up to 5,400 student beds in a variety of housing types and configurations and approximately 250 faculty housing units. The would also provide for an approximately 165,000-square foot hotel and conference center with up to 150 guest rooms, conference and banquet facility areas, sit down restaurant area, a swimming pool, and other related amenities. In addition, a new University-affiliated K-8 laboratory school and community educational academy comprised of up to approximately 80,000 square feet may also be Page 1

3 developed. Within Subarea 1, the proposes 1,570,000 square feet, including 1,500,000 square feet of Academic/University uses and 70,000 square feet for 200 student beds. As an initial development proposal that is within the scope of the USC Development Plan, USC proposes to construct a new Social Sciences Interdisciplinary Building located at the entrance to the campus at the intersection of Exposition Boulevard and Pardee Way, south of Lewis Hall and across Pardee Way from Popovich Hall. As shown in Figure 1 on page 3, the proposed building is located within Subarea 1 of the Project, which is referred to in the Draft EIR as the Academic Core Area. As shown in Figure II-9 of Section II, Project Description, of the Draft EIR, this location was specifically identified as a potential development site within the Draft EIR. Proposed development would consist of a single building with approximately 110,000 square feet of floor area as defined in the Planning and Zoning Code. To provide for the new Social Sciences Interdisciplinary Building, removal of the existing one-story Faculty Center building that includes approximately 10,500 square feet would be necessary. Thus, the net new building area resulting from implementation of this development increment would be approximately 99,500 square feet. This net new building area would represent a small fraction of the 1,5120,000 square feet of building area proposed within Subarea 1 of the and an even smaller fraction of the total 5,230,000 square feet proposed as part of buildout of the entire. The maximum height of the building would be approximately 100 feet measured from grade level to a tower element in the center of the building s south facade. As shown in the Conceptual Site Plan provided in Figure 2 on page 4, the proposed building would be designed with a U-shaped floor plan that would provide a central courtyard that links to and enlarges the existing courtyard south of Lewis Hall. The massing of the building would step back on the north side, allowing sunlight into the courtyard and providing terrace spaces on upper floors. Building design and finishes would include red brick, clay tile roofing, precast concrete, and mosaic tile accents, with façades that reflect the prevailing Romanesque architectural style of the campus and materials that are similar to adjacent buildings. The Social Sciences Building would be developed in accordance with specific urban design guidelines set forth on pages IV.A-48 through IV.A-58 of Section IV.A, Aesthetics of the Draft EIR. These design guidelines promote pedestrian activity, promote an open design, provide for the use of transparent building elements to sustain street level interest, require specific architectural features to create visual interest and compatibility with existing buildings, require screening of rooftop equipment, and provide for plant species and landscape designs that are compatible with the existing Campus. The Social Sciences Building would also be required to comply with the University Park Core Campus Planning and Design Guidelines that have been approved by the board at the University and incorporated into the Social Sciences Building as project design features. These guidelines Page 2

4 W JEFFERSON BLVD S VERMONT AVE. McCLINTOCK AVE. Proposed Social Sciences Interdiscliplinary Building Page 3 Page II-31 W 36TH STREET EXPOSITION BLVD Potential Development Sites N Figure 1 Location of Social Sciences Interdiscliplinary Building within Potential Development Sites for Subarea 1 Source: University of Southern California.

5 Page 4 Source: HKS, N NORTH Figure 2 Conceptual Site Plan Social Sciences Interdiscliplinary Building

6 address maximum building heights that are generally not to exceed five stories, specify that building entrances should be legible and located along public spaces, provide that the architectural vocabulary be compatible with and reflective of the Italian Romanesque style of the historic core of the Campus, encourage interior spaces to be extensions of the public space outside, provide for outdoor courts, provide for pedestrian amenities, and provide for plant materials and landscape design that is compatible with the Southern California Region and the Campus. Uses within the proposed Social Sciences Interdisciplinary Building would include an auditorium, offices, classrooms of multiple sizes, seminar rooms, conference rooms, media and computer labs, and indoor lounge areas, as well as access to outdoor terraces. Circulation would be provided by elevators and two grand spiral staircases, one linking the classroom levels together (Basement, Floor 1 and Floor 2), and one linking the faculty levels together (Floors 3 to 5). As shown in Figure 2, the building would connect to an existing covered arcade that runs along the west side of Pardee Way and connects to Lewis Hall. Development of the Social Sciences Interdisciplinary Building would not result in an increase in student enrollment levels for the Campus, and any increase in staffing would be nominal. In addition, the proposed use, building height, and massing would be consistent with the uses and building heights for Subarea 1 of the that are evaluated in the Draft EIR. With development of the Social Sciences Building, proposed new development within Subarea 1 would be reduced from 1,570,000 square feet to 1,470,500 square feet and the overall new allowable development within the project would be reduced from 5,230,000 square feet to 5,130,500 square feet. 1 In addition, when accounting for the other two initial development increments proposed (i.e., a new Annenberg Academic Building and a new Cinematic Arts Building), proposed new development within Subarea 1 would be reduced to 1,360,140 square feet and the total allowable development within the project site would be reduced to 5,020,140 square feet. C. Environmental Impact Comparison As indicated by the impact comparison below, based on the size, location, use, and massing of the proposed Social Sciences Interdisciplinary Building, the potential impacts of this initial development proposal would be well within the envelope of environmental 1 As discussed in Section II, Project Description of the Draft EIR, the proposed Project provides for transfer of floor area for Academic/University uses and Student Housing between Subareas 1 and 3A on a per square foot basis. With these transfers, Subarea 1 could include up to 2,041,000 square feet of floor area, However, in no case would the Project entitlement exceed the 5,230,000 square feet maximum total. With this initial development increment, the maximum square footage within Subarea 1 with the transfers would be reduced to 1,941,500 square feet. When accounting for all three initial development increments, the maximum square footage within Subarea 1 with the transfers would be 1,831,140 square feet. Page 5

7 impacts set forth in the Draft EIR prepared for the. No new or increased significant impacts would result and no new mitigation measures would be required. 1. Aesthetics Under the, up to 1,500,000 square feet of Academic/University uses and a net increase of up to 110,000 square feet of student housing would be developed within Subarea 1. Building heights within Subarea 1 would be limited to a maximum of 150 feet, with the exception of development within the northwest corner, which would be limited to 60 feet. As discussed on pages IV.A-60 through IV.A- 93 of Section IV.A, Aesthetics, of the Draft EIR, with the exception of impacts related to the potential removal of the Faculty Center and Registration Building, which are considered aesthetic resources, impacts to aesthetics/visual quality resulting from the USC Development Plan would be less than significant. In the event that the Faculty Center and Registration Building are removed, the loss of these resources would constitute a significant aesthetic impact. With regard to views, as discussed on pages IV.A-94 through IV.A-97 of Section IV.A, Aesthetics of the Draft EIR, proposed development, including development within Subarea 1, would not result in any significant view impacts. Similarly, as discussed on pages IV.A-97 through IV.A-100 of Section IV.A, Aesthetics of the Draft EIR, impacts associated with light and glare would be less than significant. Relative to shading, as discussed on pages IV.A-100 through IV.A-128 of Section IV.A, Aesthetics of the Draft EIR, the project would result in significant impacts associated with shading. However, with the reduction in building heights made in the Final EIR, shading impacts associated with development within Subareas 1 and 2 would be less than significant, while shading impacts associated with Subarea 3 would be reduced but would remain significant. As shown in Figure 1, the Social Sciences Interdisciplinary Building proposed within Subarea 1 would be located on a development site specified in the Draft EIR. In addition, the proposed maximum building height of 100 feet would be much lower than the 150-foot building height allowed within much of Subarea 1 and for this specific site and evaluated on page IV.A-63 of the Draft EIR. In addition, as described above, the Social Sciences Building would be developed in accordance with the design guidelines specified in Section IV.A, Aesthetics of the Draft EIR. Thus, as set forth on page IV.A-62 of the Draft EIR, the mass and proportion of the new building would adequately address pedestrian scale, the design would provide variation and visual interest, and the building would be designed in a style that would complement the Campus. Proposed lighting and new landscaped areas would be consistent with existing lighting and landscaping within Subarea 1 and consistent with that analyzed in the Draft EIR. Specifically, as set forth on page IV.A-98 of Section IV.A, Aesthetics of the Draft EIR, as required by the design guidelines, new illumination sources introduced as part of construction of the Social Sciences Building would be Page 6

8 shielded and directed onto associated walkways and lighting would comply with LAMC lighting standards. In addition, there are no off-site shade sensitive uses that are close enough to be affected by shading from the proposed Social Sciences Building. As set forth and evaluated in the Draft EIR, the existing Faculty Center Building, which has been identified as a historic resource, would be removed as part of this development increment. Thus, as described in the Draft EIR, potential aesthetic impacts associated with removal of this building would be significant and unavoidable. Due to the location, size and height of the Social Sciences Interdisciplinary Building, impacts associated with views, light and glare and shading would be less than significant. Furthermore, as listed below, all of the mitigation measures regarding aesthetics set forth in the Draft EIR would be implemented under this initial development increment. Thus, potential impacts would be within the impact envelope for aesthetics, views, light and glare, and shading set forth in the Draft EIR. No additional mitigation measures would be required. 2. Air Quality a. Construction A detailed analysis of construction air quality impacts is provided on pages IV.B-48 through IV.B-55 of Section IV.B, Air Quality of the Draft EIR. The Draft EIR concluded that with implementation of mitigation measures, construction of the would exceed the SCAQMD regional significance thresholds for NO X and VOC during the most intense construction period. In addition, even with incorporation of mitigation measures, construction the would remain in exceedance of the SCAQMD localized significance thresholds (LSTs) threshold for PM 10 and NO 2. No notable impacts related to toxic air contaminant (TAC) emissions during construction are anticipated to occur. As such, potential impacts associated with the TACs would be less than significant. With regard to odors, the is not anticipated to generate a substantial amount of objectionable odor emissions during construction due to mandatory compliance with SCAQMD Rules. As such, potential impacts associated with odors would be less than significant. Construction air quality impacts are generally determined based on the peak construction day where the maximum amount of construction equipment and maximum amount of area would be graded. The air quality analysis for construction activities assumed these conditions as well as some overlap of construction components within all three subareas of the project site. For Subarea 1, the construction air quality analysis specifically assumed that one-acre would be disturbed and 150,000 square feet of building area would be developed at a given time. As described above, the Social Sciences Interdisciplinary Building would be located within a potential development site within Subarea 1 that is identified in the EIR. Thus, peak construction activities for the 110,000-square foot building and associated grading would be within the Page 7

9 level of the peak-level construction activities evaluated in the Draft EIR. Furthermore, all of the relevant air quality mitigation measures related to construction set forth in the Draft EIR and included below would also be implemented under this initial development increment. Thus, impacts associated with construction of the Social Sciences Interdisciplinary Building would be within the level of impact identified in the Draft EIR. No additional mitigation measures would be required. b. Operation A detailed analysis of operational air quality impacts is provided on pages IV.B-55 through IV.B-72 of Section IV.B., Air Quality, of the Draft EIR. Although the USC Development Plan would incorporate numerous project design features to reduce operational emissions, the Draft EIR concluded that regional operational emissions would still exceed the SCAQMD daily emission threshold for regional NO X, VOC, and PM 10 after implementation of feasible mitigation measures. Therefore, operation of the USC Development Plan would have a significant and unavoidable impact on regional air quality. No significant impacts related to local CO concentrations, consistency with the AQMP, TAC emissions, or odors would occur. In addition, impacts with associated with climate change would be less than significant. Regional operational air quality impacts are generally based on the average daily trips (ADT) and energy use associated with a project. Thus, the operational air quality analysis within the Draft EIR is based on the number of daily trips and energy use associated with the 5,230,000 square feet proposed by the project. The proposed 110,000- square foot Social Sciences Interdisciplinary Building within Subarea 1 would represent a small portion of the 5,230,000 square feet of new uses evaluated in the Draft EIR. In addition, the Social Sciences Interdisciplinary Building would not result in an increase in student enrollment levels for the Campus, and any increase in staffing would be nominal. Therefore, the Social Sciences Interdisciplinary Building would not generate significant increases in ADT. Furthermore, all of the air quality mitigation measures related to operation of the set forth in the Draft EIR and listed below would be implemented under this initial development increment. As such, operational mobile air emissions associated with the Social Sciences Interdisciplinary Building would be well within the envelope of operational air quality impacts evaluated in the Draft EIR, and such emissions would be less than significant. No additional mitigation measures would be required. A detailed analysis of greenhouse gas (GHG) impacts is provided on pages IV.B-77 through IV.B-80 of the Draft EIR. GHG emissions resulting from an incremental increase in usage of on-road mobile vehicles, electricity, natural gas, and water were calculated in which the proposed Project with incorporation of project design features would result in an Page 8

10 increase of approximately 46,297 metric tons per year over the baseline condition and 29.8 percent reduction of GHG emissions in comparison to the business-as-usual (BAU) scenario. With incorporation of the project design features, the proposed Project would be considered consistent with the goals set forth in AB 32 and would result in an equivalent or larger break from business-as-usual than has been determined by CARB to be necessary to meet AB 32 s goals (approximately 28.4 percent for 2020). Therefore, the proposed Project will not have a significant impact on the environment due to its GHG emissions. The proposed 99,500 square foot Social Sciences Building within Subarea 1 would represent a small portion of the 5,230,000 square feet of new uses evaluated in the Draft EIR. Given that the proposed building would be designed and constructed to achieve the equivalent of LEED certification and would implement proposed project design features, GHG impacts associated with the Social Sciences Building would be well within the envelope of GHG impacts evaluated in the Draft EIR, and such impacts would be less than significant. No additional mitigation measures would be required. 3. Cultural Resources A detailed analysis of potential impacts to cultural resources is provided on pages IV.C-73 through IV.C-81 of Section IV.C, Cultural Resources of the Draft EIR. The Draft EIR determined that the would result in the removal of two individually eligible resources, the Registration Building and the Faculty Center, located within Subarea 1. If these buildings are not successfully relocated, impacts to historic resources would be significant and unavoidable. Implementation of the proposed mitigation measures would ensure that potential impacts to the historic district would be reduced to a less than significant level. In addition, implementation of mitigation measures would ensure that potential impacts associated with archeological and paleontological resources would be less than significant. Impacts associated with historic and archaeological resources are based on whether a substantial adverse change to a historic or archaeological resource would result. Impacts associated with paleontological resources are generally determined based on whether the project would have the potential to directly or indirectly destroy a paleontological resource. Such impacts typically are associated with the discovery of such resources during project excavation activities. To provide for the Social Sciences Interdisciplinary Building, the existing Faculty Center Building comprising a total of 10,500 square feet would be removed. As discussed Section IV.C, Cultural Resources of the Draft EIR, this structure has been determined to be an individually eligible resource. Thus, as discussed in the Draft EIR, removal of this building would result in a significant impact. With regard to Page 9

11 archaeological and paleontological resources, as described in the Draft EIR, Subarea 1 is not known to contain any archaeological or paleontological resources. As discussed on page IV.C-80 of the Draft EIR, the analysis of potential impacts associated with archeological and paleontological resources assumed excavation of depths of up to 40 feet below ground surface. As the Social Sciences Building proposed only one level below grade, the depth of excavation would be much less than the 40 foot depth evaluated in the Draft EIR. Furthermore, the mitigation measures related to cultural resources set forth in the Draft EIR and listed below would be implemented under this initial development increment. These mitigation measures would include preparation of Historical American Building Survey (HABS) documentation, the provision of up to $25,000 in relocation assistance for any interested party willing to relocate the Faculty Club, implementation of the development guidelines and procedures established in the Adaptive Mitigation Management Approach (AMMA), as well as measures to address the discovery of archaeological and paleontological resources during construction activities. Thus, potential impacts to historic, archaeological, and paleontological resources associated with development of the Social Sciences Interdisciplinary Building would be within the envelope of impacts set forth in the Draft EIR. No additional mitigation measures would be required. 4. Geology and Soils As discussed pages IV.D-15 through IV.D-20 of Section IV,D, Geology of the Draft EIR, geology and soils impacts associated with implementation of the USC Development Plan, including impacts associated with fault rupture, seismic groundshaking, liquefaction, inundation, soil conditions, sedimentation and erosion, and landform alteration would be less than significant with implementation of regulatory requirements. Mitigation measures are also proposed to ensure compliance with City requirements. The Social Sciences Interdisciplinary Building would be developed within Subarea 1 of the area on a development site that was evaluated in the Draft EIR (refer to Figure 1). The regulatory requirements and all of the mitigation measures set forth in Section IV.D, Geology of the Draft EIR would be implemented for the Social Sciences Interdisciplinary Building. A list of the mitigation measures is also provided below. Thus, potential impacts associated with this initial increment of development would be less than significant and within the envelope of impact set forth in the Draft EIR. No additional mitigation measures would be required. 5. Hazards and Hazardous Materials As discussed on pages IV.E-35 through IV.E-43 of Section IV.E, Hazards and Hazardous Materials of in the Draft EIR for the, with implementation of the proposed mitigation measures, impacts associated with hazards and Page 10

12 hazardous materials, including impacts associated with the use, storage, and disposal/ transport of hazardous materials; underground storage tanks; asbestos-containing materials; lead-based paint; methane; and emergency access and preparedness would be reduced to a level that is less than significant through compliance with regulatory requirements and implementation of mitigation measures. Potential hazards impacts are generally based on the potential to uncover hazards on a given site during construction to emit or handle hazardous materials during operation of a project. As discussed above, construction of the Social Sciences Building would be located on a potential development site that was evaluated in the Draft EIR. In addition as an academic use, the Social Sciences Interdisciplinary Building is consistent with the types of uses expected and evaluated in the Draft EIR. As discussed on page IV.E-38 the academic/university serving uses, including the new Social Sciences Building, may use and store hazardous materials. However, the regulatory requirements and mitigation measures regarding construction and operation set forth in Section IV.E. Hazards and Hazardous Materials of the Draft EIR would be implemented for the Social Sciences Interdisciplinary Building. These mitigation measures are also listed below. Thus, hazards and hazardous materials impacts associated with the Social Sciences Interdisciplinary Building would be less than significant and within the envelope of impacts evaluated in the Draft EIR. No additional mitigation measures would be required. 6. Surface Hydrology and Water Quality The analysis of impacts associated with surface water hydrology is provided on pages IV.F-19 through IV.F-21 of Section IV.F.1 Surface Water Hydrology of the Draft EIR and the analysis of impacts associated with surface water quality is provided on pages IV.F-46 through IV.F-50 of Section IV.F.2 Surface Water Quality of the Draft EIR. As discussed therein, with implementation of regulatory requirements including compliance with National Pollutant Discharge Elimination System (NPDES) requirements including implementation of Standard Urban Storm Water Mitigation Plan (SUSMP) requirements and preparation of a Storm Water Pollution Prevention Plan (SWPPP), impacts on surface water quality and hydrology would be less than significant. Thus, no mitigation measures would be required under the. Impacts associated with surface water hydrology and surface water quality are generally determined based on whether construction or operation of the project has the potential to cause flooding or an adverse change in the movement of flows or to result degrade water quality as a result of construction or operation of a project. The Social Sciences Interdisciplinary Building is located within a potential development site identified for development within Subarea 1 of the and evaluated in the Draft EIR (refer to Figure 1). In addition, the proposed Social Sciences Building is the specific type of use assumed in the Draft EIR to be operating within Subarea 1and the site is Page 11

13 currently covered with impervious surfaces. Furthermore, construction and operation of the Social Sciences Interdisciplinary Building would occur in accordance with the NPDES requirements described in Sections IV.F.1 Surface Water Hydrology and IV.F.2 Surface Water Quality of the Draft EIR. Thus, as described in the Draft EIR, Best Management Practices (BMPs) would be incorporated as part of both SUSMP requirements and a SWPPP that would ensure that impacts to water quality would be less than significant. As set forth in the Draft EIR, no mitigation measures would be required. Thus, hydrology and water quality impacts would be less than significant and within the envelope of impacts evaluated in the Draft EIR. 7. Land Use As discussed on pages IV.G-50 through IV.G-116 of Section IV.G, Land use of in the Draft EIR, with approval of the discretionary actions requested for the USC Development Plan, impacts with regard to land use consistency would be less than significant. In addition, land use impacts with regard to compatibility and urban decay would be less than significant. Therefore, no mitigation measures would be required for the. Impacts associated with land use are generally determined based on whether a project would result in substantial conflict with adopted land use plans, introduce a use or structure that would disrupt or divide a community, or substantially change land use relationships in the area. The Social Sciences Interdisciplinary Building is located within a potential development site identified for Subarea 1 of the as shown in Figure 1. The Social Sciences Building would be consistent with land use and zoning regulations and floor area ratios set forth for Subarea 1 and evaluated in the Draft EIR. The Social Sciences Interdisciplinary Building is permitted under the existing zoning, subject to a plan approval. The proposed use, height, and massing of the new building are consistent with the types of uses assumed for the particularly Subarea 1, and are consistent with adjacent uses. In addition, as described above, the Social Sciences Building would be developed in accordance with the design guidelines set forth in the Draft EIR. Thus, the proposed Social Sciences Interdisciplinary Building would be consistent with land use plans and compatible with surrounding uses. In addition, based on its location within an internal area of Subarea 1, the Social Sciences Building would not have the potential to disrupt or divide a community or substantially change land use relationships in the area. Impacts would be less than significant and within the envelope of land use impacts evaluated in the Draft EIR. No mitigation measures would be required. Page 12

14 8. Noise a. Construction As discussed pages IV.H-25 through IV.H-30 of Section IV.H, Noise of the Draft EIR, compliance with the recommended mitigation measures would reduce construction noise levels to the extent feasible. However, temporary construction noise impacts associated with on-site construction activities would remain significant and unavoidable. As discussed on pages IV.H-30 through IV.H-31 of Section IV,H, Noise of the Draft EIR, vibration impacts associated with construction would be less than significant. Construction noise impacts are generally determined based on the type and amount of construction equipment and the proximity of construction activities to noise sensitive uses. The type of construction equipment expected to be used for the Social Sciences Building would be similar to that set forth on page IV.H-26 of the Draft EIR. However, the amount of equipment to be used would likely be less than that assumed in the construction noise analysis for Subarea 1. As shown in Figure 1, the proposed Social Sciences Interdisciplinary Building would be located within a potential development site within Subarea 1 that was identified and evaluated within the Draft EIR. In addition, the noise mitigation measures set forth in the Draft EIR would be implemented as part of construction of the Social Sciences Interdisciplinary Building. Accordingly, construction noise and vibration impacts would be well within the envelope of impact evaluated in the Draft EIR. No additional mitigation measures would be required. b. Operation As discussed on pages IV.H-31 through IV.H-44 of Section IV,H, Noise of the Draft EIR, with implementation of project design features, operation of the uses proposed as part of the would not result in significant impacts at off-site receptors. In addition, traffic noise impacts under the would also be less than significant. No mitigation measures would be required. Operational noise impacts are generally determined based on the type and location of the use proposed, as well as the amount of traffic generated by a project. The academic use of the proposed Social Sciences Interdisciplinary Building was identified and evaluated as part of the EIR. In addition, as shown in Figure 1, the proposed Social Sciences Building would be located within a potential development site within Subarea 1 that was identified and evaluated within the EIR. Thus, noise sources from stationary equipment and daily operation of the Social Sciences Building have been accounted for in the Draft EIR. In addition, the Social Sciences Interdisciplinary Building would not result in an increase in student enrollment levels for the Campus, and any increase in staffing would be nominal. Therefore, the Social Sciences Interdisciplinary Building would not generate substantial increases in traffic as the traffic Page 13

15 generated would represent only a fraction of the traffic generated by the 5,230,000 square feet of operational uses evaluated in the Draft EIR. Thus, the noise impacts associated with operation of this new building would be well within the envelope of operational noise impacts set forth in the Draft EIR and well below the maximum traffic noise impacts set forth in the Draft EIR and less than significant. No mitigation measures would be required. 9. Employment, Population and Housing As discussed in detail in the impact analyses contained within Sections IV.I.1 Employment, IV.I.2 Housing and IV.I.3 Population of the Draft EIR, the USC Development Plan would comprise a small percentage of the employment, housing, and population within the Subregion in 2030 as well as the forecasted growth within the Subregion between 2009 and Furthermore, the would be consistent with the adopted employment, housing, and population policies of the City of Los Angeles and SCAG. In addition, the would not displace a substantial number of housing units resulting in the replacement of housing elsewhere. Therefore, impacts with respect to employment, population, and housing would be less than significant. Impacts associated with employment, population and housing are generally determined based on whether a project is consistent with SCAG projections or whether the project would result in the displacement of housing. As described above, to provide for the Social Sciences Interdisciplinary Building, the existing Faculty Center Building comprising a total of 10,500 square feet would be removed. The new Social Sciences Interdisciplinary Building would not result in an increase in student enrollment levels for the Campus or an increase in housing or population. Any increase in staffing would be nominal and would be well below the increase in employees evaluated in the Draft EIR. Such impacts would not require any mitigation and would be well below the employment, housing, and population forecasts for the evaluated in the Draft EIR and substantially below the 2030 SCAG forecasts. 10. Public Services The Draft EIR provided a comprehensive analysis of potential impacts associated with police protection refer to pages IV.J-14 through IV.J-19), fire protection refer to pages IV.J.-40 through IV.J-47), schools (refer to pages IV.J-72 through IV.J-85), parks (refer to pages IV.J-109 through IV.J-114), and libraries (refer to pages IV.J-130 through IV.J-134). With the proposed s project design features, impacts to police, fire protection, and library services would be less than significant. Mitigation measures have been proposed to further reduce impacts to police and fire protection services. Implementation of the proposed mitigation measures regarding construction and Page 14

16 associated impacts to school traffic, pedestrian routes, and transportation safety issues would ensure that potentially significant school safety impacts associated with construction of the would be reduced to a less than significant level. In addition, with payment of requisite developer fees in accordance with SB 50, impacts on public schools would be less than significant, and thus no mitigation measures would be required. Finally, compliance with regulatory requirements and the provision of new on-site recreational amenities, impacts on parks and recreation would be less than significant. Thus, no mitigation measures regarding park and recreational facilities would be required for the. Impacts on public services are generally determined based on whether a project introduces a new residential or daytime population that could generate a demand for public services. As discussed above, the Social Sciences Interdisciplinary Building would not result in an increase in student population. In addition, the increase in University staff associated with operation of the Social Sciences Interdisciplinary Building would be nominal. Thus, this initial development increment would not result in a substantial increase in demand for police protection, fire protection, schools, parks and recreation, or library services. Furthermore, this initial increment of the would be implemented in accordance with the regulatory requirements, and would include all of the project design features related to fire protection, police protection, and schools set forth in the Draft EIR for the. In addition, the construction-related mitigation measures relative to school safety would be implemented as part of construction of the Social Sciences Interdisciplinary Building. Thus, impacts associated with police protection, fire protection, schools, parks, and libraries would be minimal and would be less than significant. Such impacts would also be well below the level of impact evaluated for the 5,230,000 square feet of uses proposed as part of the project and evaluated in the Draft EIR. No additional mitigation measures would be required. 11. Traffic, Access and Parking a. Construction As discussed on pages IV.K-53 through IV.K-58 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR, with implementation of the project design features, which include the preparation of a Construction Traffic Management Plan, a Construction Period Pedestrian Routing Plan, and a Construction Worker Parking Plan, construction-related traffic, access and parking impacts associated with the would be less than significant. Construction traffic impacts are determined based on the amount of constructionrelated traffic generated by the project during peak hours. As shown in Figure 1,the Social Page 15

17 Sciences Interdisciplinary Building is located on a development site that was evaluated throughout the Draft EIR. The amount of construction activity and associated construction traffic generated by construction of the Social Sciences Interdisciplinary Building would represent a fraction of the construction activity identified and evaluated in the Draft EIR. In addition, as part of the construction of the Social Sciences Interdisciplinary Building, the project design features identified in the Draft EIR, including a Construction Traffic Management Plan, a Construction Period Pedestrian Routing Plan, and a Construction Worker Parking Plan would be implemented. Thus, impacts would be less than significant and within the envelope of environmental impacts identified in the Draft EIR for the USC Development Plan. No additional mitigation measures would be required. b. Operation (1) Intersections As discussed on pages IV.K-53 through IV.K-73 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR, even with incorporation of mitigation measures that include both physical improvements and additional Transportation Demand Management (TDM) measures, traffic generated by the would result in significant impacts at up to seven intersections. The proposes academic/university serving uses, commercial uses, hotel uses, student and faculty housing and laboratory school uses. Traffic impacts associated with these uses were generally determined based on the amount of commercial square footage proposed, number of hotel rooms, cinema seats, the student population and staff and faculty growth, and the number of faculty and staff and faculty units proposed. As stated above, the Social Sciences Interdisciplinary Building would not result in an increase in student population, and the increase in University staff and faculty associated with operation of the Social Sciences Interdisciplinary Building would be nominal. Thus, the Social Sciences Interdisciplinary Building would result in a nominal increase in traffic. This nominal increase would represent a small fraction of the traffic associated with buildout of the proposed uses set forth in the that comprise 5,230,000 square feet. However, since the traffic analysis for the USC Development Plan did not specify the amount of development that would trigger the significant impact, it is conservatively recommended that traffic mitigation measures set forth in the Draft EIR be implemented as part of this initial development increment. These measures are set forth below. In the event that a mitigation measure has already been implemented by another development increment (i.e., the new Annenberg Building or the new Cinematic Arts Building), the mitigation measure would not be required as part of this development increment. Based on the above, traffic impacts associated with this initial development increment would be less than significant and within the envelope of impact set forth in the Draft EIR. No additional mitigation measures would be required. Page 16

18 (2) Regional Transportation System As discussed on pages IV.K-74 through IV.K-85 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR, implementation of the would result in less than significant impacts on freeway segments. As described above, the Social Sciences Interdisciplinary Building would generate limited traffic and such traffic would represent a small fraction of the traffic generated by buildout of the USC Development Plan. Thus, regional transportation system impacts associated with the Social Sciences Interdisciplinary Building would be less than significant and would be well within the impact envelope evaluated in the Draft EIR. No mitigation measures would be required. (3) Neighborhood Streets Impacts to neighborhood streets are evaluated on page IV.K-85 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR. As set forth in the analysis within the Draft EIR, to address potential traffic impacts on neighborhood streets, a Neighborhood Traffic Management Plan would be implemented as part of a mitigation measure for the USC Development Plan. The Neighborhood Traffic Management Plan would identify measures to make local routes less attractive to through traffic, such as traffic circles, speed humps, roadway narrowing effects, landscaping features, roadway striping changes, and stop sign patterns. Because implementation of neighborhood traffic controls on one street can cause intruding traffic to shift to other streets, an effective Neighborhood Traffic Management Plan can only be implemented on an area-wide basis with all affected parties, including neighborhood residents, involved in development of the plan. Since USC cannot unilaterally impose neighborhood traffic improvements/traffic calming measures, impacts at the neighborhood street segment would be considered significant and unavoidable. As described above, the Social Sciences Interdisciplinary Building would generate limited traffic and such traffic would represent a small fraction of the traffic generated by buildout of the. Thus, this initial increment of the USC Development Plan would not result in significant impacts to neighborhood streets and such impacts would be well within the impact envelope set forth in the Draft EIR. However, since the traffic analysis for the did not specify the amount of development that would trigger the potential significant impact, it is conservatively recommended that the Neighborhood Traffic Management Plan (set forth below) be implemented as part of this initial development increment in accordance with the measures established in the Draft EIR, unless such measures have already been implemented in connection with another initial development increment (i.e., the new Annenberg Building or the new Cinematic Arts Building). Page 17

19 (4) Public Transit As discussed on pages IV.K-85 through IV.K-88 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR impacts of the on public transit would be less than significant and no mitigation measures would be required. As the Social Sciences Interdisciplinary Building would not generate any increase in student population and any increase in staff would be limited, impacts to public transit associated with this initial development increment would be less than significant and well within the impact envelope set forth in the Draft EIR. No mitigation measures would be required. (5) Access As discussed on pages IV.K-88 through IV.K-91 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR, the could improve the Level of Service (LOS) at the intersection of Vermont Avenue and Jefferson Boulevard with implementation of a proposed mitigation measure. However, the intersection would continue to operate at an LOS E during both morning and evening peak hours after mitigation. In addition, even without traffic associated with the, the intersections of Vermont Avenue and Jefferson Boulevard and Exposition Boulevard and Figueroa Street would operate at a LOS E or F during peak hours in Nonetheless, based on the City s significance thresholds, the impacts at the three access points that are near these intersections have been conservatively concluded to remain significant and unavoidable. As described above, the Social Sciences Interdisciplinary Building would generate limited traffic and such traffic would represent a small fraction of the traffic generated by buildout of the. In addition, the relevant traffic mitigation measures for Subarea 1 set forth in the Draft EIR would be implemented as part of this initial development increment. Furthermore, the access points that were determined to be significantly impacted by the overall do not provide direct access to the development site on which the Social Sciences Interdisciplinary Building would be located. Thus, access impacts associated with this initial development increment would be within the envelope of impact set forth in the Draft EIR, and new mitigation measures would not be required. (6) Pedestrian/Bicycle Safety The analysis presented on pages IV.K-91 through IV.K-92 of Section IV.K.1 Traffic, Access and Parking of the Draft EIR. concluded that the University s near-term and longterm bicycle and pedestrian safety improvements, impacts of the on pedestrian/bicycle safety would be less than significant. Therefore, no mitigation measures would be required. Page 18

20 The Social Sciences Interdisciplinary Building is located within Subarea 1 of the. As part of this initial development increment, bicycle and pedestrian access would be provided within the vicinity of the building. As the Social Sciences Building would only represent a small fraction of the overall development under the, the Social Sciences Building would generate only a small fraction of the bicycle and pedestrian traffic that would be generated by the overall USC Development Plan. Therefore, impacts associated with bicycle and pedestrian safety would be less than significant and well within the envelope of impacts identified in the Draft EIR. No mitigation measures would be required. (7) Parking As set forth in the analysis presented on pages IV.K-142 through IV.K-148 of Section IV.K.2 Parking of the Draft EIR, to adequately satisfy the incremental parking demand associated with the, Mitigation Measure K.2-1 would be implemented to ensure that the University would implement an annual monitoring process to ensure that the demand for parking is met. With compliance with this Mitigation Measure, parking impacts would be less than significant. As the Social Sciences Interdisciplinary Building would not generate an increase in student population and any increase in staff would be limited, the demand for parking generated by this initial development increment would be nominal. In addition, the same mitigation measure (see below) would be implemented as part of this initial development increment. Thus, parking impacts would be less than significant and well within the envelope of impacts indentified in the Draft EIR. 12. Utilities a. Water and Wastewater As described on pages IV.L-42 through IV.L-51 and pages IV.L-71 and IV.L-84 of Sections IV.L.1, Water and IV.L.2, Wastewater, respectively of the Draft EIR, the USC Development Plan would not result in significant impacts associated with water or wastewater. No mitigation measures were required or proposed for these environmental topics. Within the Draft EIR, water and wastewater impacts have been determined based on the square footage of commercial uses proposed, the increase in student population of the University, the number of restaurant seats proposed, the number of cinema seats proposed, the number of hotel rooms proposed, and the number of student and faculty units proposed. The USC Social Sciences Interdisciplinary Building would result in an Page 19

21 increased demand for water and an increase in wastewater generation. As the 110,000- square foot building and associated minimal increase in employment represents only a fraction of the 5,230,000 square feet of new development and new employees evaluated in the Draft EIR, this initial development increment would result in a fraction of the water demand and wastewater generation evaluated in the Draft EIR. In addition, the water conservation features proposed in the Draft EIR would be implemented as part of this initial development increment. Thus, impacts would be less than significant and well within the envelope of impacts evaluated in the Draft EIR. No mitigation measures would be required. b. Solid Waste As discussed on pages IV.L-106 through IV.L-108 of Section IV.L.3, Utilities of the Draft EIR, construction-related impacts on solid waste facilities would be less than significant. With regard to operational impacts, as discussed in the impact analysis provided on pages IV.L-108 through IV.L-117 of Section IV.L.3, Utilities of the Draft EIR, the Los Angeles County Integrated Waste Management Plan (ColWMP) annual reports assesses future County landfill disposal needs over a 15-year planning horizon based, in part, on forecasted waste generation and available landfill capacity. While it is anticipated that future iterations of the CoIWMPs would provide for improvements beyond 2022 to serve future waste disposal needs, it is conservatively assumed that no new landfills or increases in capacity would occur to provide for full buildout of the in Thus, based on this worst-case assumption, the County may not be able to accommodate the disposal needs associated with the. Therefore, operational solid waste impacts were conservatively concluded to be significant and unavoidable. Solid waste impacts associated with construction are typically determined based on the square footage proposed by a project. Construction of the Social Sciences Interdisciplinary Building would represent a small fraction of the square footage of the USC Development Plan. Therefore, construction solid waste generated by the construction of the Social Sciences Building would represent only a small fraction of the solid waste estimated to be generated by the 5,230,000 square feet of new development evaluated for the. Thus, impacts associated with construction waste for the Social Sciences Building would be less than significant and well within the envelope of impacts set forth in the Draft EIR. Solid waste impacts associated with operation of a project are generally determined based on the square footage and number of employees proposed. Operation of the Social Sciences Interdisciplinary Building would generate an increase in solid waste. However, based on the limited number of employees that would be generated and the square footage of the building, this increase would represent a small fraction of the amount of solid waste Page 20

Appendix Y-2. Environmental Impact Comparison Annenberg Academic Building for the USC Annenberg School for Communication & Journalism

Appendix Y-2. Environmental Impact Comparison Annenberg Academic Building for the USC Annenberg School for Communication & Journalism Appendix Y-2 Environmental Impact Comparison Annenberg Academic Building for the USC Annenberg School for Appendix Y-2 Environmental Impact Comparison Annenberg Academic Building for the USC Annenberg

More information

Page EIR COVER I. Executive Summary I-1

Page EIR COVER I. Executive Summary I-1 TABLE OF CONTENTS EIR COVER I. Executive Summary I-1 A. Proposed Project I-1 B. Overview of the Planning Context I-1 C. Areas of Controversy/Issues to be Resolved I-1 D. Alternatives to Reduce or Avoid

More information

5.0 ALTERNATIVE VARIATIONS

5.0 ALTERNATIVE VARIATIONS 5.0 ALTERNATIVE VARIATIONS 5.1 INTRODUCTION The Draft EIR for the Beverly Hilton Revitalization Plan evaluated five alternatives to the project, pursuant to Section 15126.6 of the California Environmental

More information

6. Cumulative Impacts

6. Cumulative Impacts 6.1 OVERVIEW Section 15355 of the California Environmental Quality Act (CEQA) Guidelines defines cumulative impacts as: "...two or more individual effects which when considered together, are considerable

More information

SUPPLEMENTAL CEQA ANALYSIS OF REDUCED DENSITY PROPOSAL

SUPPLEMENTAL CEQA ANALYSIS OF REDUCED DENSITY PROPOSAL Environmental Review Section City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 SUPPLEMENTAL CEQA ANALYSIS OF REDUCED DENSITY PROPOSAL SOUTHEAST LOS ANGELES COMMUNITY PLAN AREA The Case No.

More information

V. ALTERNATIVES A. INTRODUCTION

V. ALTERNATIVES A. INTRODUCTION V. ALTERNATIVES A. INTRODUCTION CEQA requires that an EIR describe a range of reasonable alternatives to the project or to the location of the project that could feasibly avoid or lessen significant environmental

More information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE EAST CAMPUS STUDENT HOUSING PHASE III DEVELOPMENT PROJECT UNIVERSITY OF CALIFORNIA, IRVINE I. ADOPTION OF THE MITIGATED

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact

More information

HERALD EXAMINER PROJECT

HERALD EXAMINER PROJECT D R A F T E N V I R O N M E N T A L I M P A C T R E P O R T HERALD EXAMINER PROJECT Volume I EIR Case File No: ENV-2005-4654-EIR SCH No. 2005081146 Prepared for: Los Angeles Department of City Planning

More information

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1 1.0 INTRODUCTION This Draft Environmental Impact Report (Draft EIR or EIR) has been prepared for the 1020 S. Figueroa Street Project (the Project). Jia Yuan USA Co., Inc., the Applicant, proposes to develop

More information

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4 Division of Land / Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 FINAL ENVIRONMENTAL IMPACT REPORT Volume 1 ENV-2007-0254-EIR STATE CLEARINGHOUSE NO. 2007071036 Council

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR INTRODUCTION Corrections and Additions to the Draft EIR are a function of the comments received on the Draft

More information

Appendix D1 Screening Analysis

Appendix D1 Screening Analysis Appendix D Screening Analysis of Additional Resource Areas for Consideration in the CS SEIR due to Assumed Incremental Increase in Terminal Throughput under the Revised Project Appendix D1 Screening Analysis

More information

PROJECT ALTERNATIVES 1.0 INTRODUCTION

PROJECT ALTERNATIVES 1.0 INTRODUCTION VI. PROJECT ALTERNATIVES 1.0 INTRODUCTION The California Environmental Quality Act (CEQA) Guidelines (Section 15126.6(a)) require an EIR to (1) describe a range of reasonable alternatives to the proposed

More information

Therefore, each of the alternatives to the Specific Plan addressed in this EIR were selected based on the following factors:

Therefore, each of the alternatives to the Specific Plan addressed in this EIR were selected based on the following factors: CHAPTER 5 Alternatives 5.1 Criteria for Selecting Alternatives CEQA requires that the EIR compare the effects of a reasonable range of alternatives to the effects of the project. The alternatives selected

More information

Table of Contents. City of Redlands - Redlands Crossing Center

Table of Contents. City of Redlands - Redlands Crossing Center City of Redlands - Redlands Crossing Center Executive Summary... ES-1 Section 1: Introduction...1-1 1.1 - Overview of the CEQA Process...1-1 1.2 - Scope of the EIR...1-5 1.3 - Organization of the EIR...1-8

More information

ANDORA AVENUE TTM PROJECT Subsequent Draft EIR

ANDORA AVENUE TTM PROJECT Subsequent Draft EIR City of Los Angeles ANDORA AVENUE TTM PROJECT ENV-1986-0062-EIR 9503 Andora Avenue/Tentative Tract Map 53426 APCNV-2004-7308-ZC SCH No. 86052110 Volume I Prepared for: City of Los Angeles Department of

More information

6 ALTERNATIVES 6.1 INTRODUCTION

6 ALTERNATIVES 6.1 INTRODUCTION 6 ALTERNATIVES 6.1 INTRODUCTION Environmental impact reports (EIRs) are required to consider alternatives to the project that are capable of reducing or avoiding significant environmental impacts. Section

More information

6 ALTERNATIVES 6.1 INTRODUCTION

6 ALTERNATIVES 6.1 INTRODUCTION 6 ALTERNATIVES 6.1 INTRODUCTION Section 15126.6 of the California Environmental Quality Act (CEQA) Guidelines states that an EIR is to describe a range of reasonable alternatives to the proposed project,

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

5.0 ALTERNATIVES 5.1 INTRODUCTION

5.0 ALTERNATIVES 5.1 INTRODUCTION 5.1 INTRODUCTION The California Environmental Quality Act (CEQA) Guidelines state that an EIR shall describe a range of reasonable alternatives to the Project, or to the location of the Project, which

More information

Appendix G Analysis of Project Impacts Compared to Existing Conditions

Appendix G Analysis of Project Impacts Compared to Existing Conditions Appendix G Analysis of Project Impacts Compared to Existing Conditions This page intentionally left blank. Analysis of Project Impacts Compared to Existing Conditions Introduction The analysis scenarios

More information

II. Corrections and Additions to the Draft EIR

II. Corrections and Additions to the Draft EIR II. Corrections and Additions to the Draft EIR II. Corrections and Additions to the Draft EIR This section of the Final EIR provides changes to the Draft EIR that have been made to clarify, correct, or

More information

Appendix A. Initial Study/NOP/NOP Comment Letters

Appendix A. Initial Study/NOP/NOP Comment Letters Appendix A Initial Study/NOP/NOP Comment Letters VERMONT AVE Source: Matrix Environmental, 2009; Rand McNally-Thomas Guide Digital California Edition. HOOVER ST N USC Specific Plan / NOP USC Project

More information

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW 1.0 INTRODUCTION This Environmental Impact Report (EIR) evaluates the potential for the San Joaquin Apartments and Precinct Improvements Project (the project or San Joaquin Apartments project to result

More information

V. ALTERNATIVES TO THE PROPOSED PROJECT

V. ALTERNATIVES TO THE PROPOSED PROJECT V. ALTERNATIVES TO THE PROPOSED PROJECT A. REASONS FOR ALTERNATIVES ANALYSIS The State CEQA Guidelines require the identification and evaluation of a reasonable range of alternatives (identified in Section

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

San Ramon City Center Draft Subsequent EIR

San Ramon City Center Draft Subsequent EIR San Ramon City Center State Clearinghouse Number 2007042022 Prepared for: City of San Ramon Planning/Community Development Department Planning Services Division 2222 Camino Ramon San Ramon, CA 94583 Prepared

More information

Los Coyotes Country Club Development Plan

Los Coyotes Country Club Development Plan Los Coyotes Country Club Development Plan Community Meeting October 13, 2014 Community Development Department 1. Welcome and Introductions Community Meeting October 13, 2014 Community Development Department

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

Guidance regarding the definition of project alternatives is provided in State CEQA Guidelines Section (a) as follows:

Guidance regarding the definition of project alternatives is provided in State CEQA Guidelines Section (a) as follows: 5.0 ALTERNATIVES A. INTRODUCTION Under CEQA, and as indicated in California Public Resources Code Section 21002.1(a), the identification and analysis of alternatives to a project is a fundamental aspect

More information

5 ALTERNATIVES TO THE PROPOSED PROJECT

5 ALTERNATIVES TO THE PROPOSED PROJECT 5 ALTERNATIVES TO THE PROPOSED PROJECT 5.1 INTRODUCTION In accordance with Section 15126.6(a) of the State California Environmental Quality Act (CEQA) Guidelines, an environmental impact report (EIR) must

More information

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as:

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as: ALTERNATIVES TO THE PROPOSED PROJECT 5.0 5.1 CEQA REQUIREMENTS CEQA requires that an EIR analyze a reasonable range of feasible alternatives that meet most or all project objectives while reducing or avoiding

More information

Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report

Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report Draft Environmental Impact Report SCH No. 2015101030 Prepared for: City of Culver City Planning Division 9770 Culver Boulevard Culver City, California 90232 Prepared by: Psomas 225 South Lake Avenue Suite

More information

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN Environmental Impact Report SCH No. 2008021004 Volume I: Draft EIR Prepared for City of Los Angeles Department of City Planning 200 N. Spring Street, Room 667

More information

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings Tuesday, October 24, 2017 6:30 to 8:00 PM El Rincon Elementary School 11177 Overland Avenue Monday, October

More information

APPENDIX II.2. Land Use Equivalency Program Technical Report Prepared by Christopher A. Joseph & Associates, May 2010

APPENDIX II.2. Land Use Equivalency Program Technical Report Prepared by Christopher A. Joseph & Associates, May 2010 APPENDIX II.2 Land Use Equivalency Program Technical Report Prepared by Christopher A. Joseph & Associates, May 2010 LAND USE EQUIVALENCY PROGRAM TECHNICAL REPORT Prepared for: Wilshire Grand Redevelopment

More information

Facebook Campus Project. City Council Study Session January 31, 2012

Facebook Campus Project. City Council Study Session January 31, 2012 Facebook Campus Project City Council Study Session January 31, 2012 Meeting Purpose Opportunity for the City Council to become familiar with project and reports released to date Opportunity for the City

More information

LOWE S HOME IMPROVEMENT WAREHOUSE

LOWE S HOME IMPROVEMENT WAREHOUSE LOWE S HOME IMPROVEMENT WAREHOUSE DRAFT ENVIRONMENTAL IMPACT REPORT V. PROJECT ALTERNATIVES A. Introduction Section III of this document provides a detailed analysis of potential impacts associated with

More information

City of Malibu. Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I. Prepared For: Prepared by:

City of Malibu. Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I. Prepared For: Prepared by: City of Malibu Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I Prepared For: Prepared by: I M PA C T S C I E N C E S, I N C. 638 East Colorado Blvd, Suite 301 Pasadena,

More information

1.0 INTRODUCTION 1.1 CEQA REQUIREMENTS 1.2 PUBLIC REVIEW PROCESS

1.0 INTRODUCTION 1.1 CEQA REQUIREMENTS 1.2 PUBLIC REVIEW PROCESS 1.1 CEQA REQUIREMENTS 1.0 INTRODUCTION Before approving a project that may cause a significant environmental impact, the California Environmental Quality Act (CEQA) requires the Lead Agency to prepare

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001

101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001 COMMITTEE ON 101 B B. CERTIFICATION OF ENVIRONMENTAL IMPACT REPORT AND APPROVAL OF DESIGN, SOUTHWEST CAMPUS HOUSING AND PARKING PHASE 1, LOS ANGELES CAMPUS The President recommends that upon review and

More information

V. MITIGATION MONITORING PLAN

V. MITIGATION MONITORING PLAN V. MITIGATION MONITORING PLAN A. INTRODUCTION The mitigation monitoring plan (MMP) contained herein satisfies the requirements of CEQA pursuant to Section 15097(a) of the State CEQA Guidelines as they

More information

TABLE OF CONTENTS. GENERAL DESCRIPTION OF THE ENVIRONMENTAL SETTING...II-1 A. Overview of Environmental Setting...II-1 B. Related Projects...

TABLE OF CONTENTS. GENERAL DESCRIPTION OF THE ENVIRONMENTAL SETTING...II-1 A. Overview of Environmental Setting...II-1 B. Related Projects... TABLE OF CONTENTS Section I. SUMMARY... I-1 A. Location and Setting... I-1 B. Project Background... I-2 C. Summary of Proposed Project... I-2 D. EIR Process... I-2 E. Environmental Impacts... I-3 F. Alternatives

More information

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510) Environmental and Development Services Department Planning Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 - FAX: (510) 233-5401 N O T I C E O F P R E P A R A T I O N DATE: April 4,

More information

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR 5.0 ALTERNATIVES California Environmental Quality Act (CEQA) requires that an EIR describe a range of reasonable alternatives to the project or to the location of the project that could feasibly avoid

More information

5.0 ALTERNATIVES ANALYSIS

5.0 ALTERNATIVES ANALYSIS 5.0 ALTERNATIVES ANALYSIS In accordance with the California Environmental Quality Act (CEQA), an Environmental Impact Report (EIR) must include the evaluation of comparative effects of a range of reasonable

More information

County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by:

County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by: County of El Dorado El Dorado Hills Apartments Project Draft Environmental Impact Report SCH No. 2017042017 Prepared by: 505 14th Street, Suite 1230 Oakland, California 94612 Prepared For: County of El

More information

6. Significant Unavoidable Adverse Impacts

6. Significant Unavoidable Adverse Impacts Chapter 1, Executive Summary, contains Table 1-1, which summarizes the impacts; Programs, Plans and Policies (PPP); Project Design Features (PDF); mitigation measures; and levels of significance before

More information

B. ALL RESIDENTIAL ALTERNATIVE

B. ALL RESIDENTIAL ALTERNATIVE The All Residential Alternative would include the development of residential units across the Project Site and Add Area. The All Residential Alternative would include replacement of existing uses at the

More information

3.1 Existing Setting Regulatory Framework Changes in Population, Employment, and Housing

3.1 Existing Setting Regulatory Framework Changes in Population, Employment, and Housing EXECUTIVE SUMMARY ES.1 Purpose and Scope of the EIR... ES-1 ES.2 Project Characteristics... ES-1 ES.3 Project Alternatives Summary... ES-2 ES.4 Areas of Controversy... ES-2 ES.5 Summary of Environmental

More information

TABLE OF CONTENTS ES EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 PROJECT DESCRIPTION 3.0 ENVIRONMENTAL ANALYSIS

TABLE OF CONTENTS ES EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 PROJECT DESCRIPTION 3.0 ENVIRONMENTAL ANALYSIS ES EXECUTIVE SUMMARY ES1 ES2 ES3 ES4 ES5 Purpose and Scope of the Environmental Impact Report... ES-1 Project Summary... ES-1 Project Alternatives Summary... ES-1 Areas of Controversy/Issues to be Resolved...

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

The following presents a brief summary of Proposed Project effects found not to be significant, including reasons why they would not be significant.

The following presents a brief summary of Proposed Project effects found not to be significant, including reasons why they would not be significant. VII. EFFECTS FOUND NOT TO BE SIGNIFICANT 1. INTRODUCTION This section of the EIR provides information regarding impacts of the Proposed Project that were determined to be less than significant by the City

More information

The alternatives addressed in this EIR were selected based on the following factors:

The alternatives addressed in this EIR were selected based on the following factors: CHAPTER V Alternatives A. Criteria for Selecting Alternatives The California Environmental Quality Act (CEQA) requires that the EIR compare the effects of a reasonable range of alternatives to the effects

More information

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015

FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 FIFTH ADDENDUM TO THE CIVIC CENTER SPECIFIC PLAN EIR APRIL 2015 CITY OF SANTA MONICA PLANNING AND COMMUNITY DEVELOPMENT 1685 MAIN STREET SANTA MONICA, CA 90401 INTRODUCTION This document is the Fifth Addendum

More information

6.1 SIGNIFICANT IMPACTS OF THE PROJECT

6.1 SIGNIFICANT IMPACTS OF THE PROJECT SECTION 6.0 ALTERNATIVES CEQA requires that an EIR identify alternatives to a project as it is proposed. The CEQA Guidelines specify that the EIR should identify alternatives which would feasibly attain

More information

ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM

ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM CITY OF PASADENA 175 NORTH GARFIELD AVENUE PASADENA, CA 91109 PROPOSED MITIGATED NEGATIVE DECLARATION PROJECT

More information

I. CERTIFICATION OF THE FINAL EIR

I. CERTIFICATION OF THE FINAL EIR CERTIFICATION OF THE FINAL ENVIRONMENTAL IMPACT REPORT, FINDINGS AND APPROVALS OF THE AMENDMENT OF THE LRDP AND DESIGN OF TWO UNDERHILL AREA PROJECTS: CENTRAL DINING AND OFFICE FACILITY AND, BERKELEY CAMPUS

More information

2 Executive Summary 2.1 Project Location

2 Executive Summary 2.1 Project Location 2 Executive Summary 2.1 Project Location Draft Supplemental Environmental Impact Report page 11 2. Executive Summary 2.1 Project Location The proposed Project, known as the Outlets at San Clemente Sign

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

ATTACHMENT B. Findings for Approval and Statement of Overriding Considerations Eastern Goleta Valley Community Plan

ATTACHMENT B. Findings for Approval and Statement of Overriding Considerations Eastern Goleta Valley Community Plan ATTACHMENT B Findings for Approval and Statement of Overriding Considerations Eastern Goleta Valley Community Plan Case Nos. 14GPA-00000-00018, 14GPA-00000-00019, 11ORD-00000-00015, 13ORD-00000-00011,

More information

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.) 2.1 PURPOSE OF THE ENVIRONMENTAL IMPACT REPORT The California Environmental Quality Act requires that all State and local governmental agencies consider the environmental consequences of projects over

More information

H. LAND USE City of Los Angeles L.A. CEQA Thresholds Guide 2006

H. LAND USE City of Los Angeles L.A. CEQA Thresholds Guide 2006 H. LAND USE 2006 H.1. LAND USE CONSISTENCY 1. INITIAL STUDY SCREENING PROCESS A. Initial Study Checklist Questions IX.b): IX.c): Would the project conflict with any applicable land use plan, policy, or

More information

New Transportation Performance Measures for Transportation Analysis and Thresholds for CEQA

New Transportation Performance Measures for Transportation Analysis and Thresholds for CEQA New Transportation Performance Measures for Transportation Analysis and Thresholds for CEQA Transportation Advisory Commission September 11, 2014 Transportation Performance Measures Overview of OPR s Draft

More information

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

DRAFT ENVIRONMENTAL IMPACT REPORT

DRAFT ENVIRONMENTAL IMPACT REPORT City of Los Angeles Department of City Planning Environmental Analysis Section City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 DRAFT ENVIRONMENTAL IMPACT REPORT HOLLYWOOD COMMUNITY PLAN

More information

BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT DESCRIPTION

BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT DESCRIPTION EXHIBIT A-1 BOB HOPE AIRPORT REPLACEMENT TERMINAL PROJECT LOCATION The Burbank-Glendale-Pasadena Airport Authority (Authority) seeks to develop a 14-gate replacement passenger terminal building and related

More information

4 Project Alternatives

4 Project Alternatives CHAPTER 4 PROJECT ALTERNATIVES 4.1 Introduction This section summarizes The Villages Escondido Country Club Project (Project) to allow for an evaluation of its comparative merit with a range of reasonable

More information

PUBLIC HEARINGS June 6 & 7, 2018

PUBLIC HEARINGS June 6 & 7, 2018 PUBLIC HEARINGS June 6 & 7, 2018 STUDENT HOUSING WEST AGENDA & OUTLINE FOR THIS EVENING Agenda Present Student Housing West Project information. Present information specific to the Student Housing West

More information

Vista Canyon Transit Center - Air Quality Technical Memorandum

Vista Canyon Transit Center - Air Quality Technical Memorandum 803 Camarillo Springs Road, Suite C Camarillo, California 93012 (805) 437-1900 FAX (805) 437 1901 www.impactsciences.com MEMORANDUM To: Kris Markarian, City of Santa Clarita Job No. 1046.003 From: Susan

More information

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers Appendix H Millennium Hollywood Project Trip Cap and Mitigation Triggers MILLENNIUM HOLLYWOOD PROJECT TRIP CAP AND MITIGATION TRIGGERS Crain and Associates Introduction The Millennium Hollywood Project

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states: ADDENDUM TO THE EIR Section 15160 of the CEQA Guidelines explains that there are several mechanisms, and variations in environmental documents, that can be tailored to different situations and intended

More information

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors Development Factors Part 58 Review Environmental Assessment Development Factors 1 Environmental Assessment Development Factors Impact Codes Make a Determination of Impact for each factor by choosing the

More information

SECTION 7.0 Other CEQA Considerations

SECTION 7.0 Other CEQA Considerations SECTION 7.0 Other CEQA Considerations 7.0 OTHER CEQA CONSIDERATIONS 7.1 LONG-TERM IMPLICATIONS OF THE PROPOSED PROJECT If the proposed Perris DTSP is approved and constructed, a variety of short-term and

More information

I. Executive Summary

I. Executive Summary I. Executive Summary In accordance with California Environmental Quality Act (CEQA) Guidelines Section 15123, this section of this Draft Environmental Impact Report (EIR) contains a brief summary of the

More information

SUMMARY University of California San Francisco Institute for Regeneration Medicine

SUMMARY University of California San Francisco Institute for Regeneration Medicine SUMMARY University of California San Francisco Institute for Regeneration Medicine Final Initial Study and Mitigated Negative Declaration (State Clearinghouse No. 2008022027) March 2008 INSTITUTE FOR REGENERATION

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE APPROVAL OF THE DESIGN OF THE SEGUNDO INFILL HOUSING PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION In accordance

More information

PROJECT DESCRIPTION...

PROJECT DESCRIPTION... TABLE OF CONTENTS Volume I Chapter Page 1. INTRODUCTION... 1-1 1.1 Introduction... 1-1 1.2 Project Description... 1-1 1.3 Purpose of the EIR... 1-2 1.4 EIR Process... 1-3 1.5 Scope of the Draft EIR...

More information

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV

Schwan Self-Storage. Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No DP RV Schwan Self-Storage Addendum to Schwan Self-Storage Project Mitigated Negative Declaration Case No. 17-055-DP RV Prepared by: City of Goleta 130 Cremona Drive, Suite B Goleta, CA 93117 September 2017 Addendum

More information

The Village at Corte Madera Expansion Project

The Village at Corte Madera Expansion Project The Village at Corte Madera Expansion Environmental Report Addendum State Clearinghouse Number: 2016102061 Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94925 April 2018 The Village at Corte

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

Amador County General Plan Final Environmental Impact Report

Amador County General Plan Final Environmental Impact Report ENVIRONMENTAL IMPACT REPORT FINAL JULY 2016 Amador County General Plan Final Environmental Impact Report Prepared for: Amador County 810 Court Street Jackson, CA 95642 Contact: Susan Grijalva Planning

More information

7.1 Introduction. 7.2 Criteria for Alternatives Analysis

7.1 Introduction. 7.2 Criteria for Alternatives Analysis SECTION 7.0 Alternatives Analysis 7.1 Introduction The identification and analysis of alternatives is a fundamental concept under California Environmental Quality Act (CEQA). The role of alternatives in

More information

Findings of Fact and Statement of Overriding Considerations

Findings of Fact and Statement of Overriding Considerations Findings of Fact and Statement of Overriding Considerations Pursuant to Sections 21081 and 21081.6 of the Public Resources Code and Sections 15091 and 15093 of the CEQA Guidelines Creative Arts & Holloway

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

Hamilton Green. Draft Environmental Impact Statement (DEIS)

Hamilton Green. Draft Environmental Impact Statement (DEIS) Hamilton Green Draft Environmental Impact Statement (DEIS) June 2017 HAMILTON GREEN DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS) June 14, 2017 Lead Agency: SEQRA Classification: City of White Plains Common

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

Case No. CPC DA F-1. As amended by PLUM on June 19, 2018 FINDINGS

Case No. CPC DA F-1. As amended by PLUM on June 19, 2018 FINDINGS Case No. CPC-2013-4051-DA F-1 As amended by PLUM on June 19, 2018 FINDINGS 1. 2. 3. 4. Pursuant to State Government Code Section 65868, a development agreement be entered into by mutual consent of the

More information

7.0 ALTERNATIVES PURPOSE SELECTION OF ALTERNATIVES FOR ANALYSIS

7.0 ALTERNATIVES PURPOSE SELECTION OF ALTERNATIVES FOR ANALYSIS 7.0 ALTERNATIVES PURPOSE This section of the EIR provides a comparative analysis of the merits of alternatives to the proposed project pursuant to Section 15126.6 of the California Environmental Quality

More information

CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report

CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report City of Tehachapi CITY OF TEHACHAPI GENERAL PLAN Draft Environmental Impact Report SCH No. 2009101084 Prepared for: City of Tehachapi Community Development Department 115 South Robinson Street Tehachapi,

More information

Draft Environmental Impact City of Daly City General Plan Update. Sacramento, California, May

Draft Environmental Impact City of Daly City General Plan Update. Sacramento, California, May The EIR must examine the potential growth-inducing impacts of the proposed General Plan. More specifically, CEQA Guidelines require that the EIR discuss the ways in which the proposed project could foster

More information

Regulatory Requirements for Identifying and Analyzing Project Alternatives

Regulatory Requirements for Identifying and Analyzing Project Alternatives Regulatory Requirements for Identifying and Analyzing Project Alternatives The identification and analysis of alternatives is a fundamental concept of the environmental review process under CEQA. CEQA

More information