1 Chapter 22: Environmental Justice 22.1 INTRODUCTION Federal agencies are required to identify disproportionately high and adverse effects of their actions on minority and low-income populations (environmental justice populations) and, where such effects are identified, to identify mitigation for those effects and conduct outreach to the affected populations to seek their input on the impacts and mitigation. This chapter provides an analysis of the Preferred Alternative s effects on environmental justice populations. This chapter contains the following sections: 22.1 Introduction 22.2 Analysis Methodology Regulatory Context Analysis Techniques 22.3 Identification of Environmental Justice Populations New Jersey New York 22.4 Impacts of No Action Alternative 22.5 Benefits and Impacts of the Preferred Alternative and Measures to Avoid, Minimize, and Mitigate Impacts New Jersey New York 22.6 Determination of Disproportionately High and Adverse Effects on Environmental Justice Populations Overview New Jersey New York 22.7 Environmental Justice Conclusion Further Mitigation Measures or Alternatives that Would Avoid or Reduce the Disproportionately High and Adverse Effect are Not Practicable A Substantial Need for the Action Exists and Lesser-Impact Alternatives are Not Available 22.8 Public Participation 22.2 ANALYSIS METHODOLOGY During development of this Environmental Impact Statement (EIS), the Federal Railroad Administration (FRA) and NJ TRANSIT developed methodologies for evaluating the potential effects of the Hudson Tunnel Project in coordination with the Project s Cooperating and Participating Agencies (i.e., agencies with a permitting or review role for the Project). The methodologies used for analysis of environmental justice are summarized in this chapter REGULATORY CONTEXT Executive Order (EO) 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations (February 11, 1994), requires Federal agencies to identify and address disproportionately high and adverse effects of their actions on minority and Draft EIS and Draft Section 4(f) Evaluation 22-1 June 2017

2 low-income populations. EO also requires federal agencies to work to ensure greater public participation in the decision-making process. The Council on Environmental Quality (CEQ), which has oversight of the Federal government s compliance with EO and the National Environmental Policy Act (NEPA), has developed guidance to assist Federal agencies with their NEPA procedures so that environmental justice concerns are effectively identified and addressed (Environmental Justice Guidance under the National Environmental Policy Act, December 1997, referred to in this chapter as CEQ guidance). Federal agencies may supplement this guidance with more specific procedures tailored to their particular programs or activities. The U.S. Department of Transportation (USDOT) issued additional guidance in its Updated Environmental Justice Order (a), Actions to Address Environmental Justice in Minority Populations and Low-Income Populations 1 (referred to in this chapter as the USDOT Order) and the Federal Transit Administration (FTA) issued guidance in its Environmental Justice Policy Guidance for Federal Transit Administration Recipients (FTA C4703.1, effective August 15, 2012, referred to in this chapter as the FTA Circular). These documents establish policies and procedures for the agencies to use in complying with EO At the state level, New Jersey s EO 131 commits to ensuring that communities of color and lowincome communities are afforded fair treatment and meaningful involvement in decision-making. The New Jersey Office of Environmental Justice within the New Jersey Department of Environmental Protection (NJDEP) supports environmental protection through public involvement. In New York State, projects seeking certain permits from the New York State Department of Environmental Conservation (NYSDEC) that may impact environmental justice areas must confer with and obtain input from the affected community. NYSDEC s guidance for incorporating environmental justice concerns into the agency s permit review process is provided in CP-29, Environmental Justice and Permitting (issued March 19, 2003). Identification of a disproportionately high and adverse effect on minority or low-income populations does not preclude a project from moving forward. The USDOT Order requires that projects that would disproportionately affect minority or low-income populations may proceed only if: (1) further mitigation measures or alternatives that would avoid or reduce the disproportionately high and adverse effects are not practicable; and (2) a substantial need for the action exists, and other alternatives that would have less adverse impacts on the subject population and still satisfy the need, would either have other adverse impacts that are more severe or involve increased costs of extraordinary magnitude. Additionally, as set forth in the USDOT Order (Section 8.b.), "In making determinations regarding disproportionately high and adverse effects on minority and low-income populations, mitigation and enhancement measures that will be implemented and all offsetting benefits to the affected minority and low-income populations may be taken into account, as well as the design, comparative impacts, and the relevant number of similar existing system elements in nonminority and non-low-income areas." ANALYSIS TECHNIQUES This environmental justice analysis was prepared to comply with the guidance and methodologies set forth in the USDOT Order, the FTA Circular, and the CEQ guidance. It also complies with New Jersey and New York State guidance (EO 131 and CP-29). 1 This Order updates USDOT s original Environmental Justice Order, which was published April 15, June Draft EIS and Draft Section 4(f) Evaluation

3 Chapter 22: Environmental Justice Consistent with those documents, this analysis involved five basic steps: 1. Identify the area where the Preferred Alternative may cause impacts (i.e., the study area); 2. Compile race and ethnicity and income data for the census block groups in the study area and identify minority and low-income populations; 3. Identify the Preferred Alternative s potential adverse impacts on minority and low-income populations; 4. Evaluate the Preferred Alternative s potential adverse effects on minority and low-income populations relative to its effects on non-minority and non-low-income populations to determine whether the Proposed Action would result in any disproportionately high and adverse effects on minority or low-income populations; and 5. For projects that would result in disproportionately high and adverse effects on minority or low-income populations, determine whether: (1) further mitigation measures or alternatives that would avoid or reduce the disproportionately high and adverse effects are not practicable; and (2) a substantial need for the action exists, and other alternatives that would have less adverse impacts on the protected population and still satisfy the need would either have other adverse impacts that are more severe or involve increased costs of extraordinary magnitude. In addition, where minority and low-income populations are present in the study area, conduct outreach targeted to those populations DELINEATION OF STUDY AREA The environmental justice analysis study area encompasses the area most likely to experience impacts during construction and operation of the Preferred Alternative. The study area therefore includes the census block groups that are within 500 feet of the Project site. FRA and NJ TRANSIT excluded the underground footprint of the North River Tunnel from the Project site used to define the environmental justice study area, since the analyses provided in other chapters of this EIS conclude that underground construction work would not result in adverse environmental impacts. Because of their physical separation and different statistical points of reference, FRA and NJ TRANSIT treat the New Jersey and New York portions of the study area separately in this analysis. As shown in Table 22-1 and Figure 22-1, the environmental justice study area includes 24 census block groups in New Jersey and 4 census block groups in New York. Draft EIS and Draft Section 4(f) Evaluation 22-3 June 2017

4 7th Ave 6/15/ th St State Rt 3 Route 3 East Service Rd Weehawken 32nd St 38th St H u d s o n R i v e r New York W 42nd St 148/4 148/2 170/3 182/1 Lincoln Pl 179/1 179/2 North River Tunnel 11th Ave 10th Ave 9th Ave 8Th Ave W 38th St Penn W 34th St Station New York 103/1!H 199/2 County Ave 199/3 21st St 171/1 171/2 171/3 171/4 148/3 172/1 172/2 174/1 174/2 173/1 182/4 W. 18th St Willow Ave 99/1 97/2 97/4 W 23rd St W 30th St W 29th St W 26th St Tonnelle Ave North Bergen 10th St 175/1 Palisade Ave 184/1 13th St 14th St /1 W 14th St 178/1 Secaucus Hoboken County Rd 69/1 Secaucus Junction Station!H New Jersey Project Site Census Tract Block Group Boundary EJ Poverty & Minority Block group Non-EJ Block Group 0 2,000 FEET Study Area (500-foot boundary) Tract/ Block Group Environmental Justice (EJ) Block Group in Study Area EJ Minority Block group EJ Poverty Block Group PROJECT Environmental Justice Communities in the Study Area Figure 22-1

5 Table 22-1 Environmental Justice Study Area Block Groups State / County Municipality Census Tract Block Group New Jersey / Hudson Jersey City 69 1 New Jersey / Hudson North Bergen 148 2, 3, 4 New Jersey / Hudson Union City New Jersey / Hudson Union City 171 1, 2, 3, 4 New Jersey / Hudson Union City 172 1, 2 New Jersey / Hudson Union City New Jersey / Hudson Union City 174 1, 2 New Jersey / Hudson Union City New Jersey / Hudson Union City New Jersey / Hudson Weehawken 179 1, 2 New Jersey / Hudson Weehawken 182 1, 4 New Jersey / Hudson Hoboken New Jersey / Hudson Hoboken New Jersey / Hudson Secaucus 199 2, 3 New York / New York Manhattan 97 2, 4 New York / New York Manhattan 99 1 New York / New York Manhattan IDENTIFICATION OF ENVIRONMENTAL JUSTICE POPULATIONS Within the environmental justice study area, this analysis identifies whether minority and/or lowincome populations (also referred to as environmental justice populations) are present that may be affected by the Preferred Alternative. FRA and NJ TRANSIT used the following definitions for this identification: Minority Populations: As defined in the FTA Circular, minority populations include persons who are American Indian and Alaska Native, Asian, Black or African American, Hispanic or Latino, and Native Hawaiian and other Pacific Islander. This environmental justice analysis also considers minority to include persons identified as being either some other race or two or more races in the census data. Following CEQ guidance, minority populations were identified where either: (1) the minority population of the affected area exceeds 50 percent; or (2) the minority population percentage of the affected area is meaningfully greater than the minority population percentage in the general population or other appropriate unit of geographic analysis. For this analysis, FRA and NJ TRANSIT used Hudson County as the primary statistical reference area for the New Jersey portion of the study area and New York County (Manhattan) as the primary statistical reference area for the New York portion of the study area. Approximately 70.6 percent of the population in Hudson County and 52.9 percent of the population in New York County is minority; to be conservative, the CEQ guidance threshold of 50 percent was used as an indicator of minority population for both portions of the study area. Low Income Populations: According to the FTA Circular, low income means a person whose median household income is at or below the Department of Health and Human Services (HHS) poverty guidelines. Low-income population means any readily identifiable group of low-income persons who live in geographic proximity, and, if circumstances warrant, geographically dispersed/transient persons (such as migrant workers or Native June Draft EIS and Draft Section 4(f) Evaluation

6 Chapter 22: Environmental Justice Americans) who will be similarly affected by a proposed USDOT program, policy or activity. The FTA Circular notes that FTA grant recipients are encouraged to use a locally developed threshold or a percentage of median income for the area, provided that the threshold is at least as inclusive as the HHS poverty guidelines. Therefore, in accordance with that guidance, the percentage of individuals below poverty level in each census block group was used to identify low-income residents. In Hudson County, approximately 17.5 percent of individuals live below the Federal poverty threshold; therefore, FRA and NJ TRANSIT considered any census block group with more than 17.5 percent of its individuals living below the poverty level to be a low-income area. In New York County, approximately 17.9 percent of individuals live below the Federal poverty threshold; as a conservative approach, FRA and NJ TRANSIT considered any census block group with more than 17.9 percent of its individuals living below the poverty level to be a low-income area. This methodology is more inclusive than the HHS poverty guidelines. Within the study area, FRA and NJ TRANSIT collected demographic data at the census block group level from the American Community Survey (ACS) Five-Year Estimates. The data were aggregated and mapped to illustrate the location of environmental justice populations within the study area. FRA and NJ TRANSIT also took into account additional environmental justice populations beyond those thresholds where appropriate in accordance with FTA guidance IDENTIFICATION OF POTENTIAL ADVERSE EFFECTS AND POTENTIAL DISPROPORTIONATE IMPACTS The next step in the analysis was to identify the adverse effects that would occur in the environmental justice study area as a result of the Preferred Alternative, based on the analyses presented in other chapters of this EIS, and then to determine whether those impacts would result in disproportionately high and adverse effects on environmental justice populations. To determine whether disproportionately high and adverse effects would occur to identified environmental justice populations, FRA and NJ TRANSIT examined the potential for adverse effects on human health and safety and environmental resources that would occur to environmental justice populations in comparison to those that would occur to non-environmental justice populations, taking into account any mitigation that would eliminate or reduce effects to environmental justice populations. The FTA Circular notes that even when the minority or lowincome population in an area is small, this does not eliminate the possibility of a disproportionately high and adverse effect of a proposed action. It is important to consider the comparative impact of an action among different population groups OUTREACH TO ENVIRONMENTAL JUSTICE POPULATIONS FTA s Environmental Justice Circular notes that a key component of environmental justice is engaging environmental justice populations as part of the transportation planning process. This allows project sponsors to understand the needs and priorities of environmental justice populations and to balance the benefits of a proposed project against its adverse effects. FRA and NJ TRANSIT have held public outreach meetings throughout development of the EIS documentation, including large meetings at key Project milestones and smaller, targeted meetings for specific stakeholders. Meetings have been held in parts of the study area where environmental justice communities live, and FRA and NJ TRANSIT have undertaken targeted outreach to affected property owners and stakeholders in these communities. Project materials have been provided in both English and Spanish to ensure participation by Limited English Proficient (LEP) communities. Future outreach in the design and construction phases will Draft EIS and Draft Section 4(f) Evaluation 22-5 June 2017

7 continue to involve environmental justice communities in the study area, including targeted outreach to LEP populations IDENTIFICATION OF ENVIRONMENTAL JUSTICE POPULATIONS This section presents an overview of demographic data (e.g., race/ethnicity and poverty status) in the New Jersey and New York portions of the study area to identify whether environmental justice populations are present. FRA and NJ TRANSIT used data from the ACS Five- Year Estimates for this study, which are presented in Table NEW JERSEY Based on ACS Five-Year Estimates, the New Jersey portion of the study area had a population of 35,593 in Approximately 55.5 percent of this population identified themselves as Hispanic or Latino, comprising the largest race/ethnicity cohort. Overall, approximately 69.1 percent of the study area residents are minority. This is similar to Hudson County as a whole (70.6 percent). Of the 24 individual block groups in the study area, 17 have more than 50 percent minority residents and therefore meet the definition of minority populations. Of the 24 block groups in the New Jersey portion of the study area, 12 have low-income percentages that are greater than 17.5 percent and are therefore considered to be low-income communities. Overall, approximately 15.2 percent of the study area population lives below the poverty level. In sum, most of the New Jersey portion of the study area can be considered environmental justice communities because of the high minority population and percentage of low-income individuals. Waterfront block groups in Hoboken and Weehawken, and certain areas in the Meadowlands west of Tonnelle Avenue, were not found to be environmental justice communities based on the established thresholds. Further study in these areas did not reveal any small or localized environmental justice populations. This was determined based on the lack of any community facilities, dedicated housing communities, or other features of the built environment that would indicate the presence of such communities. Therefore, these areas are not considered environmental justice communities. By the Project analysis year of 2030, some new development is planned in the New Jersey study area, including new residential development in Weehawken. Chapter 6A, Land Use, Zoning, and Public Policy, Section 6A.4.1.1, describes the anticipated development. These developments may include areas that are home to new environmental justice communities in the study area NEW YORK Based on ACS Five-Year Estimates, the New York portion of the study area had a population of 9,162. Approximately 54.3 percent of this population identified themselves as White (non-hispanic), comprising the largest race/ethnicity cohort. Approximately 45.7 percent of the study area residents are minority. This is less than New York County (the Borough of Manhattan), where approximately 52.9 percent of residents are minority. Only one of the four individual block groups in the study area has more than 50 percent minority residents and therefore meets the definition of a minority population. June Draft EIS and Draft Section 4(f) Evaluation

8 Chapter 22: Environmental Justice State / Census Tract / Block Group Total Population Table 22-2 Study Area Minority and Low-Income Characteristics White (Non - Hispanic) Black (Non- Hispanic) Race and Ethnicity Percentage (%) Asian (Non - Hispanic) Other (Non - Hispanic) Hispanic or Latino Total Minority Percent Individuals Below Poverty Level (%) NJ Tract 69 BG NJ Tract 148 BG 2 1, NJ Tract 148 BG 3 3, NJ Tract 148 BG 4 0 N/A N/A N/A N/A N/A N/A N/A NJ Tract 170 BG 3 1, NJ Tract 171 BG 1 1, NJ Tract 171 BG 2 1, NJ Tract 171 BG 3 1, NJ Tract 171 BG 4 1, NJ Tract 172 BG 1 1, NJ Tract 172 BG 2 1, NJ Tract 173 BG 1 2, NJ Tract 174 BG 1 1, NJ Tract 174 BG 2 1, NJ Tract 175 BG 1 2, NJ Tract 178 BG 1 1, NJ Tract 179 BG NJ Tract 179 BG 2 1, NJ Tract 182 BG NJ Tract 182 BG NJ Tract BG 1 3, NJ Tract 184 BG 1 1, NJ Tract 199 BG 2 3, NJ Tract 199 BG NJ Portion of Study Area 35, Hudson County 662, NY Tract 97 BG NY Tract 97 BG 4 1, NY Tract 99 BG 1 4, NY Tract 103 BG 1 1, NY Portion of Study Area 9, Borough of Manhattan 1,629, Notes: Source: Percentages in bold indicate minority or low-income areas. Total minority percentage consists of all population other than non-hispanic Whites. Totals may not add up to 100 percent due to rounding. U.S. Bureau of the Census, American Community Survey Five-Year Estimates. Of the four block groups in the New York portion of the study area, two have low-income percentages that are greater than 17.9 percent, and therefore are considered to be low-income communities. Overall, approximately 14.5 percent of the study area population lives below the poverty level. In sum, some parts of the New York portion of the study area can be considered environmental justice communities because of their high minority population and percentage of low-income Draft EIS and Draft Section 4(f) Evaluation 22-7 June 2017

9 individuals. Populations west of Tenth Avenue and north of West 30th Street were not found to be environmental justice communities based on the established thresholds. Further study in these areas did not reveal any small or localized environmental justice populations. This was determined based on the lack of any community facilities, dedicated housing communities, or other features of the built environment that would indicate the presence of such communities. Therefore, these areas are not considered environmental justice communities. The New York study area will see extensive redevelopment in the future, including a number of large-scale mixed use (commercial and residential) developments, commercial developments, as well as several public transportation infrastructure and open space improvement projects (see Chapter 6A, Land Use, Zoning, and Public Policy, Section 6A.4.3.1). The addition of a large amount of new commercial office space and retail space, new hotels, and thousands of new apartments will change the economic profile and residential characteristics of the New York study area by the analysis year of The new buildings will be completed over approximately the next decade, so that some new residents will be present in the New York study area when the approximately seven-year construction period for the Preferred Alternative in New York is under way. The characteristics of this future population are unknown, but the new development will include a mix of market-rate and affordable housing IMPACTS OF NO ACTION ALTERNATIVE The No Action Alternative assumes that the existing North River Tunnel remains in service, with continued maintenance as necessary to address ongoing deterioration to the extent possible. However, without a full rehabilitation of the North River Tunnel, damage to the tunnel caused by Superstorm Sandy will continue to degrade systems in the tunnel. This deterioration combined with the tunnel s age and intensity of use will likely lead to increasing instability of rail operations in the tunnel, and may lead to its eventual closure. Under the No Action Alternative, construction of the Preferred Alternative would not occur. As a result, there would be no Project-related impacts to environmental justice communities in the study area. However, the No Action Alternative would result in adverse effects on socioeconomic conditions in New Jersey, New York, and throughout the Northeast, which would directly and indirectly affect environmental justice communities in the study area (see Chapter 7, Socioeconomic Conditions, Section 7.5). Without proper maintenance of the transportation infrastructure, delays on Amtrak and NJ TRANSIT service for unplanned maintenance and repairs would continue to worsen. As trans-hudson travel demand continues to grow, access to work, home, and areas of commerce may become more difficult in New Jersey, New York, and throughout the NEC as public transportation service becomes more unreliable. Increasing travel time required for work commutes and the movement of goods and services in the region would increase the cost of doing business and ultimately make the region a less desirable location to live and work. However, these effects of the No Action Alternative would not fall disproportionately on environmental justice communities because sizeable non-environmental justice communities are also served by trans-hudson and other regional transportation infrastructure and would be equally affected. June Draft EIS and Draft Section 4(f) Evaluation

10 Chapter 22: Environmental Justice 22.5 BENEFITS AND IMPACTS OF THE PREFERRED ALTERNATIVE AND MEASURES TO AVOID, MINIMIZE, AND MITIGATE IMPACTS NEW JERSEY OVERALL PROJECT IMPACTS In New Jersey, construction of the Preferred Alternative would result in temporary, but long-term, adverse impacts on the communities near the construction sites at the Tonnelle Avenue staging areas and the Hoboken staging area. Construction activities would generally be disruptive to nearby land uses because of the appearance of the equipment and the traffic, noise, and dust associated with construction. Construction activities for the surface tracks through the Meadowlands would require partial acquisitions of abutting industrial properties. Temporary easements would be required to accommodate installation of below-grade drainage infrastructure and to allow construction access for workers installing the railroad embankment and structures. In most instances, access to commercial establishments adjacent to construction sites would be maintained at all times and temporary and permanent fee acquisition and easements would be limited to partial takings of vacant land. However, certain businesses would experience temporary disruptions to parking areas or loading docks, generally for six months to a year, and one business would be adversely affected for four years because part of its property would be used for a temporary construction access road. Construction activities at the Tonnelle Avenue construction site in North Bergen, New Jersey would occur over an 11-year period, including utility relocation and construction of a new roadway bridge over the railroad alignment, staging for the surface track construction, staging for the Palisades tunnel, and staging for rehabilitation of the North River Tunnel. During this time there would be heavy truck activity and the use of noisy construction equipment (see Chapter 12, Noise and Vibration, Sections and ). A Maintenance and Protection of Traffic (MPT) plan would be developed in consultation with the local municipality to minimize traffic disruptions. As with any construction project, construction activities would at times be disruptive to nearby activities. Adverse noise impacts would occur at residences on Paterson Plank Road and Grand Avenue above the staging area, at a religious facility (Hindu temple) close to the staging area on Tonnelle Avenue, and on Tonnelle Avenue near 10th Street and Secaucus Road from increased truck traffic. Construction activities at the Hoboken staging site would occur over a seven-year period, during which time there would be heavy truck activity and the use of noisy construction equipment (see Chapter 12, Noise and Vibration, Section ). Traffic on major north-south routes, such as Willow Avenue, Park Avenue, and JFK Boulevard East, would experience delays caused by the introduction of haul trucks or material delivery trucks. An MPT plan would be developed in consultation with the local municipality to minimize traffic disruptions. A temporary access road (i.e., haul route) to the Hoboken staging site would shift truck traffic away from the nearby residential neighborhood, but even with this haul route, truck traffic on the local streets would still affect access to the businesses along Willow Avenue and Park Avenue. Adverse noise impacts would occur for four years at residences along the truck routes i.e., residences along the Park Avenue service road and Willow Avenue service road and Willow Avenue between the Hudson- Bergen Light Rail (HBLR) right-of-way and 19th Street. Once the construction is complete and the Project is in operation, there would be few permanent adverse effects of the Preferred Alternative in New Jersey. Permanent infrastructure would be Draft EIS and Draft Section 4(f) Evaluation 22-9 June 2017

11 present along the NEC, at Tonnelle Avenue, and at the Hoboken fan plant. The fan plant would be similar in shape and character to the adjacent light industrial uses and would be designed to be compatible with the visual character of the surrounding area. The shape, size, and design treatment of the fan plant will be refined during preliminary and final engineering. The Project Sponsor for the Hudson Tunnel Project will coordinate with the local community and seek input in determining the appropriate design for the visible portions of the fan plant. The fans within the fan plant would operate intermittently, as needed to provide cool air to the tunnel below and exhaust hot air, to exhaust smoke in emergencies, and for testing. The fan plant would be equipped with silencers and dampers and this operation would not result in adverse noise or air quality impacts on the adjacent neighborhood. As detailed in previous chapters of this EIS, the benefits and adverse impacts of the Preferred Alternative on the New Jersey study areas evaluated in this EIS and the associated mitigation that the Project Sponsor will implement to address these impacts would include the following: Transportation services - Benefit: Would rehabilitate the existing North River Tunnel and provide new resiliency against severe weather and redundancy for operational flexibility - Benefit: NEC rail passenger service (Amtrak and NJ TRANSIT) would be maintained during rehabilitation of North River Tunnel Traffic - Impact: Construction traffic would result in disruptions to nearby intersections on Tonnelle Avenue in North Bergen during construction at the Tonnelle Avenue staging area in North Bergen (11 years) and on streets in Weehawken during construction at the Hoboken staging area (seven years) - Mitigation: Implementation of Maintenance and Protection of Traffic (MPT) plans; changes to traffic signal timing at affected intersections Land use and community character - Impact: Temporary but long-term disruption to nearby activities during construction because of construction activities, trucks, noise, dust; may affect religious facility and businesses on Tonnelle Avenue in North Bergen (11 years); residences on Paterson Plank Road, Grand Avenue, and along Tonnelle Avenue in North Bergen (11 years); and residents in Weehawken in the Shades neighborhood adjacent to the Hoboken construction staging area and truck routes (seven years) - Mitigation: Outreach program to local neighborhoods, mitigation for traffic, noise, dust - Mitigation: Creation of a special off-road haul route that would connect to the existing street network at Willow and/or Park Avenues in Hoboken to divert construction traffic headed to and from the Hoboken staging area away from the nearby Shades neighborhood of Weehawken Property acquisition - Impact: Temporary and permanent surface easements would need to be acquired in Secaucus and North Bergen. One fee acquisition of an industrial property in Hoboken may be required to accommodate a truck route, if that route is selected to avoid other adverse effects. - Mitigation: Agreements with private property owners regarding how access would occur to minimize adverse impacts on business activities - Mitigation: Property acquisition in accordance with Federal and state laws June Draft EIS and Draft Section 4(f) Evaluation

12 Chapter 22: Environmental Justice Socioeconomic conditions - Impact: Temporary, short-term disruption to businesses in the Meadowlands near the NEC because of the need to use portions of parking lots and storage yards for Project construction access (generally 6 to 12 months per property, duration of four years at the New York, Susquehanna & Western Railway lumber reload facility) - Mitigation: Coordination with business owners regarding timing of outages Parks and recreational resources - Impact: Disruption from construction noise at five neighborhood parks in Weehawken and Hoboken from construction activities and trucking - Mitigation: Measures to mitigate noise impacts Historic and archaeological resources - Impact: Adverse impact on historic North River Tunnel and NEC - Mitigation: North River Tunnel to be documented to the standards of Historic American Engineering Record prior to rehabilitation work; interpretive displays about the tunnel to be located in a station along the NEC in New Jersey and at the new Moynihan station in New York - Impact: Potential for accidental construction damage to historic structures near construction - Mitigation: Implementation of Construction Protection Plan to protect Substation No. 3 and Bergen Portal on Tonnelle Avenue in North Bergen - Impact: Potential for archaeological resources to be present in Hoboken construction zone that could be affected by construction - Mitigation: Archaeological testing or monitoring for potential historic sea wall in Hoboken Visual and aesthetic considerations - Impact: Large new fan plant in Hoboken adjacent to Shades neighborhood in Weehawken - Mitigation: To be designed to be compatible with neighborhood character; visible elements of design to be coordinated with local community Natural resources - Impact: Wetland impacts in the Meadowlands and Hoboken. Temporary impact to 4.3 acres of wetlands and open waters in the Meadowlands and 0.44 acres of wetlands in Hoboken. Permanent impacts to 7.85 acres of wetlands and open water in the Meadowlands - Mitigation: Measures to minimize impacts (erosion and sediment controls, best management practices, restoration of wetland areas after construction). Purchase of wetland credits from bank in same or nearby watershed - Impact: Construction disturbance to species inhabiting the Meadowlands (11 years) - Mitigation: Any required clearing will occur only between October 1 and March 14, outside of bird breeding season - Mitigation: Develop and implement transplantation plan for protected floating marshpennywort population in Penhorn Creek Noise and vibration - Impact: Overall construction noise at staging areas and along truck routes (11 years at Tonnelle Avenue staging site, 7 years at Hoboken staging site) Draft EIS and Draft Section 4(f) Evaluation June 2017

13 - Mitigation: Coordinate construction activities with affected municipalities; establish noise and vibration complaint procedure to address community concerns; meet with affected buildings to identify activities sensitive to noise and schedule construction activities around those where practicable - Mitigation: Limit blasting to daytime hours (i.e., not after 7 PM) in residential areas unless permission from the relevant regulatory agency (i.e., North Hudson Regional Fire and Rescue) is provided; provide community outreach related to anticipated times of blasting. - Mitigation: Use acoustical noise tents and mufflers for loud equipment as practicable; noise to comply with applicable standards; vehicles routed through sites to minimize use of backup alarms - Mitigation: Pre-construction inspection and vibration monitoring for buildings adjacent to construction sites - Mitigation: A noise barrier along the construction staging area boundary in Hoboken - Mitigation: Offer installation of improved windows for affected residents in North Bergen (along truck routes and above staging area) and Weehawken (along truck routes) - Mitigation: Use of haul route along HBLR to take trucks away from local streets Air quality - Impact: Construction air pollutant emissions (11 years at Tonnelle Avenue staging site, 7 years at Hoboken staging site) - Mitigation: Implement dust control plan and idling restrictions - Mitigation: Use of ultra-low sulfur diesel and Best Available Tailpipe Reduction Technologies for all diesel engines, and electrically powered equipment to the extent practicable. Use of newer equipment GHG emissions and resilience - Impact: GHG emissions associated with construction (4.5 years at surface tracks in the Meadowlands, 11 years at Tonnelle Avenue staging site, 7 years at Hoboken staging site) - Mitigation: Sustainability design guidelines; construction contracts to include provisions related to locally produced, recycled building materials and biodiesel - Impact: GHG emissions associated with Project operation - Mitigation: Sustainability design guidelines; construction contracts to require Energy Star and other high-efficiency building components; efficient lighting and energy systems. Use of Building Management Systems for fan plant - Impact: Potential vulnerability to severe storms during construction - Mitigation: Implement a storm risk management plan for construction - Impact: Potential vulnerability to severe storms for permanent Project elements - Mitigation: Use of Design Flood Elevation (DFE) established for the Project; all elements to be designed so additional protection can be included at a later date if necessary Contaminated materials - Impact: Potential for contaminated materials to be encountered during construction - Mitigation: Implement Health and Safety Plan and Project-wide Materials Management Plan - Mitigation: All disturbed areas will be restored using engineering controls to prevent direct human exposure to contaminated materials June Draft EIS and Draft Section 4(f) Evaluation

14 Chapter 22: Environmental Justice PROJECT IMPACTS ON ENVIRONMENTAL JUSTICE COMMUNITIES As discussed above, most of the New Jersey study area is within environmental justice communities. The Project site including the surface tracks in the Meadowlands, the tunnel beneath the Palisades, the tunnel east of the Palisades, and the Hoboken staging area and fan plant site is set within environmental justice communities and therefore any adverse impacts resulting from the construction and operation of the Preferred Alternative in New Jersey would occur to one or more environmental justice communities. In New Jersey, these effects would occur to environmental justice communities and not to other communities; therefore, these impacts are borne entirely by environmental justice communities NEW YORK OVERALL PROJECT IMPACTS In New York, construction of the Preferred Alternative would result in temporary, but long-term adverse impacts on the areas near the construction site at Twelfth Avenue. Construction activities would generally be disruptive to nearby land uses because of the appearance of the equipment and the traffic, noise, and dust associated with construction. Construction activities for the Preferred Alternative would include staging and other work centered on the western third of the block between West 29th and West 30th Streets, Twelfth Avenue, and Eleventh Avenue (Manhattan Block 675, Lots 1 and 12), as well as related work within the streetbed of West 30th Street. This work would last approximately seven years, during which time there would be lane closures, traffic diversions, heavy truck activity, and the use of noisy construction equipment. As with any construction project, construction activities would at times be disruptive to nearby activities. Construction noise impacts would occur at the two new residential buildings planned at the east end of Block 675 once they are occupied but the construction for the Preferred Alternative is still underway; construction noise impacts would also occur at other residential buildings in the vicinity and along the portion of the High Line closest to the staging area. These impacts would last approximately two years. In addition, a potential adverse construction impact could occur at the new residential buildings on the east end of Block 675 during construction for the Preferred Alternative. Once the construction is complete and the Project is in operation, there would be few permanent adverse effects of the Preferred Alternative in New York. The only visible element of the Preferred Alternative in New York would be the Twelfth Avenue fan plant which would be designed to be compatible with the character of the surrounding area and any urban design goals that the City of New York has established for the area. The fans within the fan plant would operate intermittently, as needed to provide cool air to the tunnel below and exhaust hot air, to exhaust smoke in emergencies, and for testing. The fan plant would be equipped with silencers and dampers and this operation would not result in adverse noise or air quality impacts on the adjacent neighborhood. As detailed in previous chapters of this EIS, the benefits and adverse impacts of the Preferred Alternative on the New Jersey study areas evaluated in this EIS and the associated mitigation that the Project Sponsor will implement to address these impacts would include the following: Transportation services - Benefit: Would rehabilitate the existing North River Tunnel and provide new resiliency against severe weather and redundancy for operational flexibility - Benefit: NEC rail passenger service (Amtrak and NJ TRANSIT) would be maintained during rehabilitation of North River Tunnel Draft EIS and Draft Section 4(f) Evaluation June 2017

15 Traffic and pedestrians - Impact: Construction traffic would result in disruptions to traffic on streets used as truck routes during construction in Manhattan (seven years) - Mitigation: Implementation of Maintenance and Protection of Traffic (MPT) plans; changes to traffic signal timing at affected intersections - Impact: Temporary pedestrian detours on Tenth Avenue between West 31st and 33rd Streets would result in temporary impacts on sidewalks and crosswalks Land use and community character - Impact: Temporary but long-term disruption to nearby activities during construction because of construction activities, trucks, noise, dust; may affect residents, businesses, and park users in Manhattan (seven years) - Mitigation: Outreach program to local neighborhoods, mitigation for traffic, noise, dust Open space and recreational facilities - Impact: Temporary construction activities in Hudson River Park for tunnel segment beneath the park (total of 18 months) - Mitigation: No open cut excavation in Hudson River Park (ground freezing to avoid excavation); bikeway and a minimum 8-foot-wide segment of Hudson River Park walkway can be kept open Socioeconomic conditions - Temporary construction activities for tunneling affecting the West 30th Street Heliport, requiring relocation of helicopter fueling facilities and rendering one or more of the landing pads inaccessible for 18 months Historic and archaeological resources - Impact: Adverse impact on historic North River Tunnel and NEC - Mitigation: North River Tunnel to be documented to the standards of Historic American Engineering Record prior to rehabilitation work; interpretive displays about the tunnel to be located in a station along the NEC in NJ and at the new Moynihan station in NY - Impact: Adverse impact on historic Hudson River Bulkhead - Mitigation: Preparation of documentation related to bulkhead based on information gathered during design; implementation of construction monitoring plan - Impact: Potential for accidental construction damage to historic structures near construction - Mitigation: Implementation of Construction Protection Plan to protect High Line and Master Printers building - Impact: Potential for archaeological resources to be present in construction zone that could be affected by construction - Mitigation: Archaeological testing or monitoring for various resources in NY Visual and aesthetic considerations - Impact: Large new fan plant building in Manhattan - Mitigation: To be designed to be compatible with neighborhood character of nearby areas; visible aspects of design to be coordinated with the New York City Department of City Planning ( NYCDCP) Natural resources - Impact: Potential for impacts to aquatic species in Hudson River, including endangered species, during in-water work within cofferdam in Hudson River (15 months) June Draft EIS and Draft Section 4(f) Evaluation

16 Chapter 22: Environmental Justice - Mitigation: Installation and removal of sheet piles using vibratory hammer. No sheet pile installation between November 1 and April 30, to minimize impacts to fish species. Sequence cofferdam installation so that area closest to shoreline occurs first, with deeper water installation last Noise and vibration - Impact: Overall construction noise (seven years at Twelfth Avenue staging site) - Mitigation: Coordinate construction activities with City of New York; establish noise and vibration complaint procedure to address community concerns; meet with affected buildings to identify activities sensitive to noise and schedule construction activities around those where practicable - Mitigation: Limit blasting to daytime hours (i.e., not after 10 PM) in residential areas unless permission from appropriate regulatory agency (i.e., the Fire Department of New York) is provided; provide community outreach related to anticipated times of blasting - Mitigation: Use acoustical noise tents and mufflers for loud equipment as practicable; noise to comply with applicable standards; vehicles routed through sites to minimize use of backup alarms - Mitigation: Pre-construction inspection and vibration monitoring for buildings adjacent to construction sites - Mitigation: Noise barriers at Manhattan construction sites Air quality - Impact: Construction air pollutant emissions (seven years at Twelfth Avenue staging site) - Mitigation: Implement dust control plan and idling restrictions - Mitigation: Use of ultra-low sulfur diesel and Best Available Tailpipe Reduction Technologies for all diesel engines, and electrically powered equipment to the extent practicable. Use of newer equipment GHG emissions and resilience - Impact: GHG emissions associated with construction (seven years at Twelfth Avenue staging site) - Mitigation: Sustainability design guidelines; construction contracts to include provisions related to locally produced, recycled building materials and biodiesel - Impact: GHG emissions associated with Project operation - Mitigation: Sustainability design guidelines; construction contracts to require Energy Star and other high-efficiency building components; efficient lighting and energy systems. Use of Building Management Systems for fan plant - Impact: Potential vulnerability to severe storms during construction - Mitigation: Implement a storm risk management plan for construction - Impact: Potential vulnerability to severe storms for permanent Project elements - Mitigation: Use of Design Flood Elevation (DFE) established for the Project; all elements to be designed so additional protection can be included at a later date if necessary. Contaminated materials - Impact: Contaminated materials encountered during or after construction - Mitigation: Implement Health and Safety Plan and Project-wide Materials Management Plan Draft EIS and Draft Section 4(f) Evaluation June 2017

17 - Mitigation: All disturbed areas will be restored using engineering controls to prevent direct human exposure to contaminated materials PROJECT IMPACT ON ENVIRONMENTAL JUSTICE COMMUNITIES As discussed above, the New York study area includes block groups that are environmental justice communities. These are located east of Tenth Avenue and south of West 30th Street, several blocks from the major construction activities for the Preferred Alternative, which would be focused on the Twelfth Avenue staging site. Construction disruption closest to the identified environmental justice communities would be related to cut-and-cover construction in Tenth Avenue between West 31st and West 33rd Streets to accommodate the tunnel alignment as it crosses the avenue, construction within the building at 450 West 33rd Street between West 31st and West 33rd Streets on the east side of Tenth Avenue (the Lerner Building), and traffic impacts on neighborhood streets from construction vehicles. Most of the adverse construction and operational impacts in the New York study area would not fall on environmental justice communities. The permanent, visible features of the Preferred Alternative in New York would consist of the new Twelfth Avenue fan plant and modifications to the street-level façade of the west side of the Lerner Building. Neither would adversely affect environmental justice communities DETERMINATION OF DISPROPORTIONATELY HIGH AND ADVERSE EFFECTS ON ENVIRONMENTAL JUSTICE POPULATIONS OVERVIEW The methodology presented in the FTA Circular involves identifying any adverse effects and benefits that may occur to minority and/or low-income populations as a result of a proposed action and then determining whether adverse effects would be disproportionately high and adverse on the environmental justice population. According to the Environmental Justice Circular, if after consideration of the adverse effects and potential benefits of a proposed project, it is determined that the proposed action would have disproportionately high and adverse effects on an environmental justice population, the project sponsor must determine whether further mitigation measures or alternatives are practicable, and any practicable measures must be implemented before moving forward with the proposal. As defined in the FTA Circular, based on the USDOT Order, a disproportionately high and adverse effect on an environmental justice population is an adverse effect that is predominantly borne by a minority population and/or low-income population, or will be suffered by the minority population and/or low-income population and is appreciably more severe or greater in magnitude than the adverse effect that will be suffered by the non-minority population and/or non-lowincome population. Offsetting benefits and mitigation measures are taken into consideration when determining whether a project has disproportionately high and adverse effects on minority and low-income populations NEW JERSEY Because the Preferred Alternative s alignment would be located predominantly in environmental justice communities in New Jersey, the adverse construction effects associated with the Preferred Alternative would fall disproportionately on environmental justice communities. Even considering the mitigation measures described above in Section , Project-related impacts would result in disproportionately high and adverse effects to environmental justice communities. June Draft EIS and Draft Section 4(f) Evaluation

Project Purpose. Federal Railroad Administration

Project Purpose. Federal Railroad Administration Project Purpose To preserve the current functionality of Amtrak s Northeast Corridor service and NJ TRANSIT s commuter rail service between New Jersey and Penn Station New York by repairing the deteriorating

More information

Chapter 4: Analysis Framework 4.1 INTRODUCTION

Chapter 4: Analysis Framework 4.1 INTRODUCTION Chapter 4: Analysis Framework 4.1 INTRODUCTION Construction of the Hudson Tunnel Project (the Project) is expected to involve the use of Federal funding administered through the U.S. Department of Transportation

More information

Executive Summary S.1 INTRODUCTION

Executive Summary S.1 INTRODUCTION Executive Summary S.1 INTRODUCTION The Federal Railroad Administration (FRA) and New Jersey Transit Corporation (NJ TRANSIT) as joint lead agencies are preparing an Environmental Impact Statement (EIS)

More information

Environmental Setting

Environmental Setting Section 5.2 Environmental Justice This section describes the potential of the proposed changes to the approved project to result in disproportionately high and adverse health or environmental effects on

More information

HUDSON TUNNEL PROJECT

HUDSON TUNNEL PROJECT HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen

More information

Spire STL Pipeline Project

Spire STL Pipeline Project Spire STL Pipeline Project Draft Resource Report 5 Socioeconomics FERC Docket No. PF16-9-000 Pre-filing draft October 2016 Public RESOURCE REPORT 5 SOCIOECONOMICS SUMMARY OF FILING INFORMATION Information

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES Chapter 15: Construction Impacts A. INTRODUCTION This chapter describes activities required for construction of Alternative A (the no action alternative) and the three build alternatives: Alternatives

More information

11 Joint Development Regulatory Context and Methodology

11 Joint Development Regulatory Context and Methodology 11 Joint Development This chapter describes the long-term direct and potential indirect impacts, and short-term direct and potential indirect impacts, of the proposed METRO Blue Line Light Rail Transit

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

E. Other Federal Requirements and CEQA Considerations

E. Other Federal Requirements and CEQA Considerations E. Other Federal Requirements and CEQA Considerations Section E.1 includes discussions of various topics required by NEPA and/or CEQA, including a description of the long-term implications of the Project,

More information

PUBLIC HEARING April 24, 2017

PUBLIC HEARING April 24, 2017 PUBLIC HEARING April 24, 2017 1 Agenda SDEIS Public Review Environmental Process Overview Project Highlights Comments to Stenographer 2 3 SDEIS Public Review Public Hearing Schedule Monday, April 24, 2017

More information

Cumulative and Secondary Impacts

Cumulative and Secondary Impacts Chapter 14: Cumulative and Secondary Impacts A. INTRODUCTION SEQRA regulations require the consideration of the Proposed Project s potential to result in cumulative impacts (6 NYCRR 617.9(b)(5)(a)) and

More information

U.S. DEPARTMENT OF TRANSPORTATI ON FEDERAL TRANSIT ADMINISTRATION FINDING OF NO SIGNIFICANT IMPACT

U.S. DEPARTMENT OF TRANSPORTATI ON FEDERAL TRANSIT ADMINISTRATION FINDING OF NO SIGNIFICANT IMPACT U.S. DEPARTMENT OF TRANSPORTATI ON FEDERAL TRANSIT ADMINISTRATION FINDING OF NO SIGNIFICANT IMPACT Project: Applicant: Project Location: Long Slip Fill and Rail Enhancement Project (aka "NJ TRANSIT Hoboken

More information

3.12 NOISE Regulatory Setting Environmental Setting EXISTING NOISE SOURCES AND SENSITIVE LAND USES

3.12 NOISE Regulatory Setting Environmental Setting EXISTING NOISE SOURCES AND SENSITIVE LAND USES 3.12 NOISE This section assesses the potential for implementation of the West Village Expansion component to result in impacts related to short-term construction, long-term operational noise sources, and

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 Table 4.17-3. Summary of Adverse Environmental Justice Impacts Topic No Build TSM At-Grade Emphasis LRT Underground Emphasis LRT Locally Preferred Alternative Transit

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses

Lynnwood Link Extension 2013 Draft EIS Comments and Responses Page 157 C-001-001 Sound Transit acknowledges your opposition to Alternative C1 due to its residential impacts and impacts to Scriber Creek Park and wetlands. Page 158 C-002-001 Following the Draft EIS,

More information

Evaluation of Alternatives

Evaluation of Alternatives Chapter 9.0 Evaluation of Alternatives Chapter 9.0 provides a summary evaluation of the No Build Alternative and the Preferred Alternative. The evaluation contained within this chapter is an assessment

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

ATTACHMENT C MEASURES TO MINIMIZE HARM

ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM ATTACHMENT C MEASURES TO MINIMIZE HARM The mitigation measures and other features of the Project that reduce adverse impacts, to which Federal Transit Administration

More information

3.10 Socioeconomics and Environmental Justice

3.10 Socioeconomics and Environmental Justice 3.10 Socioeconomics and Environmental Justice This section of the Draft Environmental Impact Statement/Environmental Impact Report (EIS/R) characterizes the existing socioeconomic and environmental justice

More information

19. Hazardous Materials

19. Hazardous Materials Northern Branch Corridor SDEIS March 207 9. Materials 9.. Chapter Overview 9... Introduction The following analysis was conducted to determine whether the new or relocated SDEIS elements that were proposed

More information

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT

LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT LONG ISLAND RAIL ROAD EXPANSION PROJECT FROM FLORAL PARK TO HICKSVILLE DRAFT ENVIRONMENTAL IMPACT STATEMENT Project Name: Project Location: Lead Agency & Contact Person: SEQRA Classification: Project Sponsors:

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX H Environmental Justice Technical Memorandum

Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations. APPENDIX H Environmental Justice Technical Memorandum Anacostia Streetcar Phase 2 Environmental Assessment and Section 106 and 4(f) Evaluations APPENDIX H Environmental Justice Technical Memorandum September 2013 Table of Contents Contents 1.0 Introduction...

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Sandy Raises the Yards Permitting Raises the NEPA Bar MTA-NYCT 207th St Yard Flood Mitigation / Resiliency Project Environmental Railroad Conference November 1-2, 2016

More information

4.17 Environmental Justice

4.17 Environmental Justice 4.17 4.17.1 Regulatory Framework and Methodology 4.17.1.1 Regulatory Framework The applicable federal, state, and local regulations that are relevant to an analysis of the proposed project s environmental

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Indirect and Cumulative Effects 19.1 INTRODUCTION This chapter discusses potential indirect and cumulative effects of the Modified Design, in comparison to the 2004 FEIS Design. The White House Council

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

CHAPTER 21: COMMITMENT OF RESOURCES

CHAPTER 21: COMMITMENT OF RESOURCES CHAPTER 21: COMMITMENT OF RESOURCES 21.1 INTRODUCTION In accordance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality s implementing procedures under Title 40,

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

NYU CORE Construction Presentation

NYU CORE Construction Presentation NYU CORE Construction Presentation Prepared for Community Board 2 January 18, 2012 1 Construction Impacts Chapter 20 of the DEIS Transportation o Traffic o Transit o Pedestrians o Parking Air Quality Noise

More information

NYU CORE Construction Presentation

NYU CORE Construction Presentation NYU CORE Construction Presentation Prepared for Community Board 2 January 18, 2012 1 Construction Impacts Chapter 20 of the DEIS Transportation o Traffic o Transit o Pedestrians o Parking Air Quality Noise

More information

EXECUTIVE SUMMARY Environmental Justice Analysis for Bayview- Hunters Point: Biosolids Digester Facilities Project and Community Benefits Program

EXECUTIVE SUMMARY Environmental Justice Analysis for Bayview- Hunters Point: Biosolids Digester Facilities Project and Community Benefits Program EXECUTIVE SUMMARY Environmental Justice Analysis for Bayview- Hunters Point: Biosolids Digester Facilities Project and Community Benefits Program The U.S. Environmental Protection Agency s (USEPA) Office

More information

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY

KALIA-FORT DERUSSY WASTEWATER SYSTEM IMPROVEMENTS FINAL ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY EXECUTIVE SUMMARY This Environmental Assessment (EA) addresses the environmental impacts of the Proposed Action to construct certain improvements to the City and County of Honolulu (City) wastewater collection

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE Chapter 17: Construction A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter discusses the various activities that would be involved in constructing Hamilton Green. The potential for significant adverse

More information

C. ENVIRONMENTAL RESOURCES OF INTEREST

C. ENVIRONMENTAL RESOURCES OF INTEREST Chapter 18: Indirect and Cumulative Effects A. INTRODUCTION The Council on Environmental Quality (CEQ) s regulations implementing the procedural provisions of the National Environmental Policy Act (NEPA),

More information

Tech Memo #1: Station Area Analysis

Tech Memo #1: Station Area Analysis MILWAUKEE COUNTY EAST-WEST BUS RAPID TRANSIT Tech Memo #1: Station Area Analysis DATE June 28, 2016 Prepared for: Milwaukee County 10320 W. Watertown Plank Rd. Wauwatosa, WI 53226 Prepared by: AECOM Station

More information

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 275 C-034-001 Thank you for your comments describing the cultural importance of the Latvian Evangelical Lutheran Church. See Section 2.5.1 for a description of the refined Segment A alternatives that avoid

More information

16.1 Significant and Unavoidable Impacts

16.1 Significant and Unavoidable Impacts Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT 7. Affected Environment, Environmental Consequences, and Mitigation Strategies Table of Contents Chapter 7 7 Affected Environment, Environmental Consequences,

More information

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors

6/8/2016. Development Factors. Part 58 Review. Environmental Assessment Development Factors Development Factors Part 58 Review Environmental Assessment Development Factors 1 Environmental Assessment Development Factors Impact Codes Make a Determination of Impact for each factor by choosing the

More information

Section 7 Environmental Constraints

Section 7 Environmental Constraints Section 7 Environmental Constraints i Yakima Valley Metropolitan and Regional Transportation Plan Public Comment DRAFT 1/27/2016 Environmental Constraints Analysis A programmatic-level review of potential

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014 New Stadium Project Construction Activity Mitigation Program January 22, 2014 Construction Mitigation Plan Introduction It is the primary goal of HHRM, JV to minimize negative effects on traffic and the

More information

Walk Bridge Replacement Project

Walk Bridge Replacement Project Walk Bridge Replacement Project Public Hearing Environmental Assessment/Section 4(f) Evaluation & Environmental Impact Evaluation (EA/EIE) November 17, 2016 Meeting Agenda 1. Welcome & Introductions Robert

More information

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures 7.2 Natural Environment/Environmental Planning Executive Summary/Key Points The Environmental Consultation and Mitigation Plan establishes: o A process for consultation with environmental resource agencies

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal

More information

Mitigation Monitoring Program Campus Master Plan 2015

Mitigation Monitoring Program Campus Master Plan 2015 Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015 Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental

More information

EVALUATION OF ALTERNATIVES CARRIED FORWARD

EVALUATION OF ALTERNATIVES CARRIED FORWARD 1 EVALUATION OF ALTERNATIVES CARRIED FORWARD This chapter presents a comparative evaluation of the alternatives carried forward in this Final Environmental Impact Statement (EIS). The intent of this evaluation

More information

A. INTRODUCTION B. LAND USE, ZONING, AND PUBLIC POLICY C. SOCIAL CONDITIONS

A. INTRODUCTION B. LAND USE, ZONING, AND PUBLIC POLICY C. SOCIAL CONDITIONS Chapter 18: Mitigation Measures A. INTRODUCTION Chapters 3 through 17 of this document examine the potential for significant adverse impacts from the project alternatives. For any such impacts identified,

More information

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time. NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS TO WHOM IT MAY CONCERN: NEW JERSEY TRANSIT CORPORATION This is notice that the regularly scheduled meetings of the Board of Directors of the New Jersey Transit

More information

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director DATE: April 26, 2016 TO: FROM: Ron Davis, Interim City Manager Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director SUBJECT: Modification of two

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis

Port Jervis Line Service Strategy Report. Appendix C: Port Jervis Line Capacity Improvements Analysis Port Jervis Line Service Strategy Report Appendix C: Port Jervis Line Capacity Improvements Analysis January 2018 TABLE OF CONTENTS Introduction... 1 1. Future PJL Service... 1 2. Project Alternatives...

More information

CHAPTER 2 DESIGN REFINEMENTS

CHAPTER 2 DESIGN REFINEMENTS CHAPTER 2 DESIGN REFINEMENTS 2.1 INTRODUCTION Since publication of the Draft 2 nd Supplemental Environmental Impact Report (SEIR-2), additional design refinements have been identified. Some of these refinements

More information

RESOLUTION NO:

RESOLUTION NO: RESOLUTION NO: 11-031 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PASO ROBLES CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE 2011 CIRCULATION ELEMENT OF THE GENERAL PLAN AND ADOPTING FINDINGS,

More information

March Step ONE: Determine whether the action is located in a 100-year floodplain (or a 500-year floodplain for critical actions) or wetland

March Step ONE: Determine whether the action is located in a 100-year floodplain (or a 500-year floodplain for critical actions) or wetland Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management New Jersey Economic Development Authority Neighborhood and Community Revitalization (NCR) Program Borough of Carlstadt

More information

Carpinteria Valley Water District Carpinteria Advanced Purification Project

Carpinteria Valley Water District Carpinteria Advanced Purification Project NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:

More information

All Aboard Florida. DRAFT Environmental Impact Statement. Martin Metropolitan Planning Organization (MPO) Staff Review. Photo courtesy Carla McMahon

All Aboard Florida. DRAFT Environmental Impact Statement. Martin Metropolitan Planning Organization (MPO) Staff Review. Photo courtesy Carla McMahon All Aboard Florida DRAFT Environmental Impact Statement Martin Metropolitan Planning Organization (MPO) Staff Review Photo courtesy Carla McMahon Environmental Process An environmental assessment (EA)

More information

Description of Phase 2 Modified Design

Description of Phase 2 Modified Design Description of Phase Modified Design. INTRODUCTION This chapter provides an overview of the preliminary engineering design for Phase of the Second Avenue Subway that was evaluated in the Final Environmental

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES ST. LOUIS

More information

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation Introduction The Indiana Department of Transportation (INDOT) and the

More information

Chapter 5B: Transportation Services 5B.1 INTRODUCTION

Chapter 5B: Transportation Services 5B.1 INTRODUCTION Chapter 5B: Transportation Services 5B.1 INTRODUCTION Chapter 5 of this Environmental Impact Statement (EIS) evaluates the impacts of construction and operation of the Hudson Tunnel Project on transportation

More information

Second Avenue Subway Phase 2. NEPA Supplemental Environmental Assessment. Public Meeting. July 31, 2018

Second Avenue Subway Phase 2. NEPA Supplemental Environmental Assessment. Public Meeting. July 31, 2018 Second Avenue Subway Phase 2 NEPA Supplemental Environmental Assessment Public Meeting July 31, 2018 Purpose of Meeting Supplemental Environmental Assessment (EA) for Phase 2 Opportunity for public comments

More information

Environmental Assessment of Rail Infrastructure in Illinois

Environmental Assessment of Rail Infrastructure in Illinois Environmental Assessment of Rail Infrastructure in Illinois Presentation at the 16 th Railroad Environmental Conference, October 28, 2014. Ning Ai, Marcella Bondie, Anthony Grande, Shuo Ma & Shi Yin Outline

More information

Denise Duffy & Associates, Inc.

Denise Duffy & Associates, Inc. Denise Duffy & Associates, Inc. PLANNING AND ENVIRONMENTAL CONSULTING MEMORANDUM Date: August 24, 2017 To: Lisa Rheinheimer, Director of Planning and Marketing, Monterey-Salinas Transit From: Erin Harwayne,

More information

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018 - Archive Version: Summer 2018 These frequently asked questions (FAQ) have been developed to help residents, businesses and area stakeholders develop a better understanding of the proposed King of Prussia

More information

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address. Application 06-12-005 et al. Exhibit Date: August, 2008 PREPARED TESTIMONY OF LEE LISECKI Q. Please state your name, professional position, and business address. A. My name is Lee Lisecki. I am a principal

More information

3.8 SOCIOECONOMICS AND ENVIRONMENTAL JUSTICE

3.8 SOCIOECONOMICS AND ENVIRONMENTAL JUSTICE 3.8 SOCIOECONOMICS AND ENVIRONMENTAL JUSTICE 3.8.1 INTRODUCTION This section evaluates effects related to socioeconomics and environmental justice (as required under Executive Order [EO] 12898, Federal

More information

Appendix H Mitigation Monitoring Plan

Appendix H Mitigation Monitoring Plan Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared

More information

DRAFT Coastal Resiliency Technical Bulletin Page 1

DRAFT Coastal Resiliency Technical Bulletin Page 1 DRAFT Coastal Resiliency Technical Bulletin This guidance is intended to clarify how the Coastal Resiliency Goal and Objectives of the Regional Policy Plan (RPP) are to be applied and interpreted in Cape

More information

SECTION 7.0 Other CEQA Considerations

SECTION 7.0 Other CEQA Considerations SECTION 7.0 Other CEQA Considerations 7.0 OTHER CEQA CONSIDERATIONS 7.1 LONG-TERM IMPLICATIONS OF THE PROPOSED PROJECT If the proposed Perris DTSP is approved and constructed, a variety of short-term and

More information

3.15 Environmental Justice

3.15 Environmental Justice 3.15 Environmental Justice 3.15.1 Introduction and Summary This section describes environmental justice concepts and issues related to federal actions in three of the four geographic subregions: LCR, IID

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

OPTIONAL STATIONAVIATION/MANCHESTER

OPTIONAL STATIONAVIATION/MANCHESTER CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR OPTIONAL STATIONAVIATION/MANCHESTER Aviation and Manchester, Looking East Aviation/Manchester Station (Optional) The Optional Aviation/Manchester Station

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT Summary: Building a new bridge is necessary to replace the aging and obsolete Tappan Zee which serves as a critical Hudson

More information

13.1 INTRODUCTION 13.2 ANALYSIS METHODOLOGY

13.1 INTRODUCTION 13.2 ANALYSIS METHODOLOGY Chapter 13: Air Quality 13.1 INTRODUCTION In this chapter, the Federal Railroad Administration (FRA) and NJ TRANSIT have analyzed the potential impacts of the Hudson Tunnel Project (the Project) on air

More information

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) NOISE TECHNICAL MEMORANDUM Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) Attention: Kevin Hovey, Environmental Branch Chief, Caltrans District

More information

Sound Transit University Link Title VI Service and Fare Equity Analysis. March 14, 2016

Sound Transit University Link Title VI Service and Fare Equity Analysis. March 14, 2016 Sound Transit University Link Title VI Service and Fare Equity Analysis March 14, 2016 Table of Contents 1 Introduction... 1 1.1 The central Puget Sound transit environment... 1 1.2 Link light rail and

More information

Business Advisory Committee. July 12, 2016

Business Advisory Committee. July 12, 2016 Business Advisory Committee July 12, 2016 1 Today s Topics Approval of Meeting Minutes Cost Participation Adjusted Project Scope and Cost Estimate Recommendation Environmental Update 2 3 Cost Participation

More information

Standard Performance Attributes for Transportation Projects

Standard Performance Attributes for Transportation Projects Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on

More information

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017 Palo Alto Rail Committee Meeting November 29, 2017 Slide 1 Project Area Millbrae Station City Limits Existing Railroad Crossing at Broadway Caltrain Operational Constraint Major Constraints Millbrae Station

More information

Frequently Asked Questions Connecting Palo Alto

Frequently Asked Questions Connecting Palo Alto Frequently Asked Questions Connecting Palo Alto www.cityofpaloalto.org/connectingpaloalto General Project Questions Q1: What is Connecting Palo Alto? A1: Connecting Palo Alto (formerly the Palo Alto Rail

More information

Work Breakdown Structure Element Dictionary Preliminary Engineering

Work Breakdown Structure Element Dictionary Preliminary Engineering Element Name Initiation PE 3.1 Initiation includes the implementation of the project s funding and notification of the consultant or in-house design staff to commence work, the Kickoff Meeting with the

More information

Chapter 5 Regulatory Coordination and Compliance

Chapter 5 Regulatory Coordination and Compliance Chapter 5 Regulatory Coordination and Compliance This chapter provides an update on the federal, state, and local laws and regulations that required the City to coordinate with regulatory agencies to obtain

More information

U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs

U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs St. Louis River Area of Concern U. S. Steel Duluth Works - Spirit Lake Cleanup Plan FAQs Spirit Lake is a large, open area in the St. Louis River that has cultural, historical, and recreational significance

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative Open Houses Monday, June 24 6 7 PM: Open House 7 8 PM: Presentation & Q/A City of Atlanta Old Council Chambers Atlanta City Hall 55 Trinity Avenue Atlanta, GA 30303 Tuesday,

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information