1 = DECISION MEMO SUGAR CREEK STORM TREATMENT/ FORD REHAB U.S. FOREST SERVICE PAYETTE NATIONAL FOREST KRASSEL RANGER DISTRICT VALLEY COUNTY, IDAHO BACKGROUND The purpose of this project is to protect fish habitat from sedimentation originating from Forest Service Road and eliminate the direct vehicle impacts to ESA listed fish and their spawning redds at the Sugar Creek ford crossing. Sugar Creek is considered critical habitat for Endangered Species Act-listed Bull Trout, Steelhead trout and Chinook salmon and has been identified in the Forest Plan as a high priority area for restoration. Forest Service Road is located directly adjacent to Sugar Creek and includes a ford crossing. Sugar Creek has been inventoried using the Geomorphic Road Analysis and Inventory Package (GRAIP) designed to predict road sediment production and the amount delivered directly to the stream. FS Road is delivering 12 tons of sediment per year to Sugar Creek detrimentally effecting ESA (Chinook salmon, steelhead and bull trout) habitat (NPT-WD 2015). Monitoring of storm damage risk reduction road restoration treatments similar to those proposed in this project have shown to be effective at reducing sediment delivery by approximately 50% (Nelson et al. 2012). Restoration of the ford crossing and deterring motorized traffic on FS Road and at the ford crossing will further reduce sediment inputs and reduce direct impacts to Chinook salmon and bull trout spawning redds. The road is currently classified as a Level 2 closed road that allows for administrative and permitted use and this project would not change that classification. Traffic counter data collected from May 16th through July 16 1 h,2015 showed vehicle use at 49 vehicles a week or 7 a day with a daily maximum of 42 vehicles on July 4th. Implementation of this project would occur in the summer of 2016 when stream flow levels are at or near base flows and prior to the August 15 1 h instream work limitation. The project is located approximately seven air miles east of the community of Yellow Pine, Idaho in Valley County, within the Sugar Creek watershed, a tributary to the East Fork South Fork Salmon River at Township 19N, Range 9E, Section 34, 35, 36; Township 19N, Range loe, section 31; and Township 18N, Ranger loe, Section 1. See Locator Map. Page 1 of 9
2 -:::-= a LOCATOR U30A Foreet 5efvice, P~)'lltm Niltio~ Farell,MAP: SUGAR CREEK STmM TREATMENT/ FORD REHAB PROJECT M.nagement.was: 2 Legend - fs_ro.mfc._51883 H H Payette NF 1Boundary - - Road Highway - Slate of Idaho Lands. D USDA FOREST SERVICE D I.JSDI BUREAU OF LAND MANAG!Private Llnd Loallur Map._, De,at,ewtal map i Pa<Jl!l'.ie ~ Fae:;:t,.,. - N Miles w-..:.. c...,...,,_,> Page 2 of 9
3 -::-:::-::: DECISION I have decided to implement storm damage risk reduction (SDRR) road restoration treatments on approximately 4.5 miles of FS Road and restore the road ford crossing at Sugar Creek. Road restoration treatments and closure could include the following actions: Construction and maintenance of road drainage features (drivable water-bars and drainage dips) Clean and maintain ditches Clean and maintain culvert inlets and outlets where needed Removal of road cut bank slough material to accommodate equipment access (small excavator) Restore native vegetation on road cutbanks and fill slopes Disturbance would be restricted to the road prism, which includes the road surface, cut and fill slopes Borrow needed for bank reconstruction would use road material Road closure using boulders, earthen material or gate Road signage to inform public of road closures Implementation of Project Design Features and Mitigation Measures (see appendix A) Restoration of the ford crossing at Sugar Creek would reestablish the natural channel geometry by reducing the over-widened channel by reconstructing the eroded stream banks. Bank reconstruction would result in a narrower and slightly deeper channel which would be accomplished using natural materials on site. Dead or down trees and clusters of riparian vegetation (alder and willow) with root masses attached would be collected within the riparian conservation area and transplanted along the channel to rebuild the banks. The volume of riparian vegetation, root mass and soil that would be backfilled to re-construct channel banks would total approximately 8 cu/yds. Ground disturbance would be restricted to the road prism, including a 50 foot buffer from road center to gather vegetation clusters in the vicinity of Sugar Creek ford. Borrow needed for bank reconstruction would use road material found at the ford crossing. The road approaches to the ford would be scarified, planted and/or seeded with native vegetation and logs would be added to increase floodplain roughness. Additional barriers to prohibit motorized crossing of the rehabilitated ford may be constructed just outside the floodplain of Sugar Creek. This action is categorically excluded from documentation in an environmental impact statement (EIS) or an environmental assessment (EA). The applicable category of actions is identified in agency procedures as 36 CFR 220.6(e)(18): Restoring wetlands, streams, riparian areas or other water bodies by removing, replacing, or modifying water control structures such as, but not limited to, dams, levees, dikes, ditches, culverts, pipes, drainage tiles, valves, gates, andfencing, to allow waters to flow into natural channels and floodplains and restore natural flow regimes to the extent practicable where valid existing rights or special use authorizations are not unilaterally altered or canceled. This category of action(s) is applicable because the work proposed is to restore the streambank at the ford and to address water drainage of the road surface. Access to the private land at Cinnabar from the north access road is unchanged by this project and no special use authorizations for road access on Sugar Creek road have been requested in many years. Page 3 of 9
4 ,,,.-=: a I find that there are no extraordinary circumstances that would warrant further analysis and documentation in an EA or EIS. I took into account resource conditions identified in agency procedures that should be considered in determining whether extraordinary circumstances might exist: Federally listed threatened or endangered species or designated critical habitat, species proposed for Federal listing or proposed critical habitat, or Forest Service sensitive species - For fisheries, road maintenance is addressed in the Biological Assessment for ongoing and new actions, dated May 8, 2007 with a determination of not likely to adversely affect listed species (see USFWS BO 2009-F-0064 and NMFS concurrence 2008/06614); ford rehabilitation covered by Restoration Activities at Stream Crossings BA, Nov 5th, 2011 (see NMFS and USFWS OIEIFW F-0015). For wildlife, road maintenance covered by Ongoing Action BA 2008 and Ford rehabilitation covered by Idaho Stream Crossing Restoration consultation. Flood plains, wetlands, or municipal watersheds - The project is located in wetlands and floodplains but there is no effect if project design features and mitigation measures are implemented. Congressionally designated areas such as wilderness, wilderness study areas, or national recreation areas - The project is not located in a wilderness, wilderness study area, or national recreation area. Inventoried roadless areas or potential wilderness areas - The project is not located in an inventoried roadless area or potential wilderness area. Research natural areas - The project is not located in or near a Research Natural Area. American Indians and Alaska Native religious or cultural sites - Consultations were conducted with the Shoshone-Paiute Tribes, Shoshone-Bannock Tribes, and Nez Perce Tribe. No specific concerns regarding American Indian religious or cultural sites were identified. Archaeological sites, or historic properties or areas - No effect as there are no historic properties in the project area, concurred by the Idaho State Historic Preservation Office on April 8, The current status of FS Road (Sugar Creek road) as a classified Level 2 closed road that allows for administrative and permitted use will not change under this decision. During public scoping, several comments were received that opposed the status of the road as closed to public access (see response to comments matrix in the project record). The road was closed to public in the 1990s with the publication of the 2000 backroads map and the 2008 forest-plan Travel Plan EIS and 2010 Big Creek Yellow Pine Travel Plan did not change the road to open. While there are some members of the public that dislike the status of the road as closed to motorized public access, this project only restores the stream channel at the road ford and installs a barrier or gates to physically deter public motorized access. Therefore, the status of the road, while controversial, is not an extraordinary circumstance as the road status is not under decision with this project. Page 4 of 9
5 -::-=: PUBLIC INVOLVEMENT This action was originally listed as a proposal on the April 2016 Payette National Forest Schedule of Proposed Actions and updated periodically during the analysis. Individual scoping packages were also forwarded to the Nez Perce Tribe's Watershed Division in McCall Idaho and Midas Gold as interested and affected parties April 1, A public scoping notice was sent to 229 subscribers via GovDelivery on April 1, 2016 and comments were solicited in the Comment Analysis and Application System. Six comments were received, most disputing the status of the road as a closed road. Comments received and Forest Service response to those comments is found in the project record. This project was also presented at a regularly scheduled monthly meeting of the Big Creek - Yellow Pine Collaborative on March 31, Many s and phone calls were received outside of the public scoping period in protest to the road status as. closed to motorized public access, but those comments are outside the scope of this project. FINDINGS REQUIRED BY OTHER LAWS AND REGULATIONS This decision is consistent with the 2003 Payette National Forest Land Management Plan. The project was designed in conformance with the management direction, goals, objectives, and standards of the Forest Plan. This project is within the Big Creek/Stibnite Forest Plan Management Area 13 and Forest Plan MPC Active Restoration and Maintenance of Aquatic, Terrestrial & Hydrologic Resources. The Sugar Creek, Upper East Fork of the South Fork Salmon River, Upper Marble Creek, Upper Big Creek, and Smith Creek subwatersheds are identified as important to the recovery of listed fish species, and as high-priority areas for restoration. Sugar Creek provides spawning and rearing habitat for Chinook salmon, steelhead trout, bull trout, and westslope cutthroat trout. MPC/Resource Area MPC3.2 Active Restoration and Maintenance of Aquatic, Terrestrial, and Hydrologic Resources Soil, Water, Riparian, and Aquatic Resources Direction Road Standard Goal Number Management Direction Description a) Road construction or reconstruction may only occur where needed: b) To provide access related to reserved or outstanding rights, or c) To respond to statute or treaty, or d) To support aquatic, terrestrial, and watershed restoration activities, or To address immediate response situations where, if action is not taken, unacceptable impacts to hydrologic, aquatic, riparian or terrestrial resources, or health and safety, would result. Maintain or restore habitat for threatened species in the Sugar Creek and Upper East Fork South Fork Watershed, and to maintain habitat for listed fish species in the Upper Big Creek, Upper Monumental Creek, Smith Creek, and Upper Marble Creek subwatersheds. Page 5 of 9
6 -:::-= Improve water quality by reducing impacts from accelerated sediment and chemical contamination in the Objective 1316 Upper East Fork South Fork drainage, including the Sugar Creek and Upper East Fork South Fork Salmon River subwatersheds. Reduce impacts to riparian areas from recreation sites or uses. Identify recreational campsites, parking areas, or Objective 1317 trails that are contributing unacceptable levels of accelerated sediment, compaction, or vegetation loss. Rehabilitate, relocate, or harden sites where needed to reduce impacts. Restore fish habitat degraded from past mining activities Objective 1318 in the Upper East Fork South Fork Salmon River drainage, including the Sugar Creek and Upper East Fork South Fork Salmon River subwatersheds. ADMINISTRATIVE REVIEW (APPEAL) OPPORTUNITIES This decision is not subject to administrative review, appeal, or objection. The procedures for legal notice (Sec ) and opportunity to comment (Sec ) do not apply to projects and activities which are categorically excluded from documentation in an environmental impact statement (EIS) or environmental assessment (EA) pursuant to FSH , Chapter 30, section 31. (Sec ). IMPLEMENTATION DATE Project implementation is anticipated to be completed mid-july to September, with all in-stream work completed prior to August 15 th, 2016 due to protection of spawning fish and redds. CONTACT For additional information concerning this decision, contact: John Dixon, Hydrologist, or Anthony B. Botello Krassel District Ranger Date Page 6 of 9
7 .,-:;;;;; In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident. Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA's TARGET Center at (202) (voice and TTY) or contact USDA through the Federal Relay Service at (800) Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at and at any USDA office or write a letter addressed ~o USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) Submit your completed form or letter to USDA by : (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C ; (2) fax: (202) ; or (3) program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender Page 7 of 9
8 -::-= D APPENDIX A: PROJECT DESIGN FEATURES AND/OR MITIGATION MEASURES FOR SUGAR CREEK STORM TREATMENT/ FORD REHAB In addition to Forest Plan standards and guidelines designed to mitigate impacts, the following measures would be used. These design features have been incorporated by the Forest Service to reduce or prevent undesirable effects resulting from proposed management activities. Fisheries and Wildlife Mitigations: Implementation would occur at or near base stream flow levels and prior to the August 15 1 h instream work limitation Minimize use of heavy equipment in-stream and crossings with support truck (back and forth one time) The Forest Service will complete a survey for Chinook salmon and bull trout redds and adult spawning fish of both species prior to commencement of work. If redds or spawning adults are observed within 600 ft downstream of the ford, work will be postponed until a solution can be found that avoids take of eggs or adults. Prior to fording with heavy equipment the ford will be block netted and fish will be relocated following the procedures described in the stream crossing BA and BO. The "bays" created by the approaches will be dewatered using an Aquadam coffer dam or more traditional gravel filled bags, and if necessary a sump will be constructed to further dewater the bay of turbid water. If used, the Aquadam will be filled with approximately 400 gallons from Sugar Creek. If gravel filled bags are used, clean gravel will be used or the bags will be double lined to prevent tearing and turbidity. The pump intake will be screened with 3/32" inch or smaller mesh and have the appropriate surface area to meet NMFS velocity requirements. Turbid water will be pumped into area (e.g., dense vegetation or filter bag) that will trap sediment before entering the stream. Dewatering and streambank construction will occur one side at a time. After dewatering the streambank will be reconstructed using Coir logs, natural logs, rock, and fill wrapped jute mat or some other biodegradable fabric. Live willow and alder plugs will be incorporated into the streambank. Dewatered areas will be slowly rewatered and the excavator will drive back across to the opposite side of Sugar Creek. Once on the other side the dewatering and streambank reconstruction will occur. After streambank reconstruction the channel will be slowly rewatered and the fish block nets will be removed. If used as a coffer dam, water in the Aquadam will be released back into Sugar Creek. Potential water sources will be surveyed for Columbia spotted frog egg masses and other amphibians after ice melt and avoid disturbing any water sources with identified egg masses or other species. Page 8 of 9
9 = a Heritage Resources Mitigation: If any cultural materials are encountered during the course of the project, then all ground disturbing activities will cease until a qualified archaeologist is consulted and regional inadvertent discovery protocols are followed. Page 9 of 9
DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO
,:::-:;;;;;;; a DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO BACKGROUND The purpose of this project is
More informationMoonlight Aquatic Organism Passage Project
Notice of Proposed Action Moonlight Aquatic Organism Passage Project Mt. Hough Ranger District Plumas National Forest Plumas County, California Figure 1. Hungry 1 aquatic organism passage outlet showing
More informationBACKGROUND DECISION. June 2016 Page 1 of 6
BACKGROUND DECISION MEMO HOUSE ROCK WILDLIFE AREA PASTURE FENCE USDA FOREST SERVICE, SOUTHWEST REGION (R3) KAIBAB NATIONAL FOREST - NORTH KAIBAB RANGER DISTRICT COCONINO COUNTY, ARIZONA The Kaibab National
More informationDraft Decision Memo OHV Trails 22 and 42 Reroute Project
Draft Decision Memo OHV Trails 22 and 42 Reroute Project USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T13S, R7E, Sections 25 and 34 Willamette Meridian
More informationDecision Memo. Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines. United States Department of Agriculture
United States Department of Agriculture Forest Service Decision Memo Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines Coconino National Forest Coconino, Gila,
More informationDecision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project
Decision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project USDA Forest Service Mount Hough and Beckwourth Ranger Districts Plumas County, CA Background We, (the USDA Forest
More informationDECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA
DECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA Forest Service, Northern Region North Fork Ranger District, Clearwater National Forest Clearwater County, Idaho I. Decision I have decided to authorize
More informationHungry Creek Watershed Road Maintenance and Stony Quarry Development
Notice of Proposed Action Opportunity to Provide Scoping Comments Hungry Creek Watershed Road Maintenance and Stony Quarry Development Mt. Hough Ranger District Plumas National Forest Plumas County, California
More informationDECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT
DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT U.S.D.A. Forest Service Cleveland National Forest Trabuco Ranger District Orange County, California Background The current configuration
More informationThe project will be conducted in partnership with the Nez Perce Tribe.
DECISION MEMO Tributary to Brushy Fork Culvert Replacements Private Land USDA Forest Service, Northern Region Powell Ranger District Nez Perce Clearwater National Forests Idaho County, Idaho I. Decision
More informationDECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO
DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO Background and Project Description In order to improve forest health and reduce hazardous
More informationDecision Memo for the City of Detroit Root Rot Timber Sale Project
Decision Memo for the City of Detroit Root Rot Timber Sale Project USDA Forest Service Detroit Ranger District Willamette National Forest Marion and Linn Counties, OR T.10S., R.5 E., Section 2, Willamette
More informationSHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL
DRAFT DECISION MEMO SHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL U.S. FOREST SERVICE TOWNSHIP 40, 41, 42 AND 43 NORTH, RANGE 1, 2, 3 WEST,
More informationKENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION TOWER REPLACEMENT DECISION MEMO
UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE SOUTHERN REGION DANIEL BOONE NATIONAL FOREST KENTUCKY MARCH 2016 KENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION
More informationDECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho
DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho I. Decision II. I have decided to authorize issuance of
More informationMeacham Creek Restoration Project
Meacham Creek Restoration Project Meacham Creek Restoration Project Umatilla National Forest Walla Walla Ranger District Michael Rassbach, District Ranger Public Scoping Document Proposal Summary The Walla
More informationTenmile and Priest Pass Restoration Project Scoping Notice
Introduction Tenmile and Priest Pass Restoration Project Scoping Notice USDA Forest Service Helena National Forest Helena Ranger District Lewis and Clark County, Montana The Helena Ranger District of the
More informationDraft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension
Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T.13 S., R.7 E., Section 14,
More informationDECISION MEMO. Griz Thin (Stand )
Background DECISION MEMO Griz Thin (Stand 507089) USDA Forest Service Siuslaw National Forest Central Coast Ranger District Lane County, Oregon Township 16 South, Range 10 West, Sections 6 and 7 The Cummins-Tenmile
More informationDECISION MEMO Divide Creek Barrier Enhancement
Page 1 of 7 Background DECISION MEMO USDA Forest Service Butte Ranger District Silver Bow County, Montana T. 2 N., R. 9 W., Section 32 The North Fork of Divide Creek is approximately 4 miles west of the
More informationUSDA BACKGROUND DECISION
7::Z'.i - a ECISION MEMO PONY CREEK OUTFITTERS SPECIAL USE AUTHORIZATION U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL AN KRASSEL ISTRICTS IAHO AN VALLEY COUNTIES, IAHO BACKGROUN The purpose of the
More informationDECISION MEMO WEST RIVER COOPERATIVE TELEPHONE COMPANY BURIED FIBER OPTIC CABLE PROJECT
DECISION MEMO WEST RIVER COOPERATIVE TELEPHONE COMPANY BURIED FIBER OPTIC CABLE PROJECT USDA, FOREST SERVICE GRAND RIVER NATIONAL GRASSLAND GRAND RIVER RANGER DISTRICT INTRODUCTION: West River Cooperative
More informationDecision Memo. Cabin #5 Electric, Water, Septic Improvements
Decision Memo Cabin #5 Electric, Water, Septic Improvements USDA Forest Service Ocoee/ Hiwassee Ranger District, Cherokee National Forest Polk County, Tennessee Section 18, Township 2, Range 3 East; Lot
More informationDecision Memo North Boundary Salvage
Map # Proposal and Need for the Proposal Decision Memo North Boundary Salvage USDA Forest Service Chequamegon-Nicolet National Forest Medford-Park Falls Ranger District The U.S. Forest Service (USFS) is
More informationDecision Memo - Elko Grade Improvement Project, Jarbidge Ranger District, Elko County, Nevada
Forest Service Humboldt-Toiyabe National Forest Ruby Mountains/Jarbidge Ranger Districts P. O. Box 246 Wells, NV 89835 File Code: 7730 Date: February 28, 2011 Route To: (7730) Subject: To: Decision Memo
More informationUSDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project
USDA Forest Service Decision Memo Mattie V Creek Minesite Rehabilitation Project Ninemile Ranger District Lolo National Forest Mineral County, Montana I. DECISION TO BE IMPLEMENTED A. Decision Description:
More informationDecision Memo. North Fork Calispell Creek Restoration Project
Project Description Decision Memo North Fork Calispell Creek Restoration Project USDA Forest Service Newport-Sullivan Lake Ranger Districts Colville National Forest Pend Oreille County, Washington Surveys
More informationPreliminary Decision Memo Recreation Residence Septic Repairs
Preliminary Decision Memo 2014 Recreation Residence Septic Repairs USDA Forest Service McKenzie River Ranger District Willamette National Forest Lane County, Oregon T. 16 S., R. 5 E, Section 16 Willamette
More informationLake Fire Restoration and Hazardous Tree Removal. Project Proposed Action and Scoping Document
United States Department of Agriculture Forest Service November 2016 Lake Fire Restoration and Hazardous Tree Removal Heather McRae Project Proposed Action and Scoping Document USDA Forest Service Shasta-Trinity
More informationDECISION MEMO. East Fork Blacktail Trail Reroute
Page 1 of 6 DECISION MEMO USDA Forest Service Madison Ranger District Madison County Background The East Fork Blacktail Trail #6069 is a mainline trail in the Snowcrest Mountains. The Two Meadows Trail
More informationDECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois
DECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Background
More informationFinal Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District
Final Decision Memo Murphy Meadow Restoration Project USDA Forest Service Willamette National Forest McKenzie River Ranger District T19S, R5E, Sec. 23, 24. Lane County Oregon BACKGROUND The Murphy Meadow
More informationDecision Memo Sawtooth Trail #3634 Reroute
Decision Memo Sawtooth Trail #3634 Reroute USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane County, OR T.25S, R.5.5E, Section 22, Willamette Meridian Purpose and Need The
More informationDECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT
Page 1 of 7 DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT Background USDA Forest Service Pintler Ranger District Granite County, Montana T8N, R13W, sections 5, 6 and 7 The Kennecott Exploration
More informationScoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting
United States Department of Agriculture Forest Service Monongahela National Forest Greenbrier Ranger District Box 67 Bartow, WV 24920 Phone (304) 456-3335 File Code: 2020/2070/1950 Date: November 15, 2012
More informationDECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008
DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 USDA Forest Service, Mt. Hood National Forest Hood River Ranger District Hood River County, Oregon Flooding in the fall of 2006 caused significant
More informationDecision Memo El Paso CGP Company, LLC Special Use Authorization
Decision Memo El Paso CGP Company, LLC Special Use Authorization Background USDA Forest Service Jicarilla Ranger District, Carson National Forest Rio Arriba County, New Mexico PALS Project Number 47726
More informationDECISION MEMO NORTH FORK INSTREAM RESTORATION U.S
DECISION MEMO NORTH FORK INSTREAM RESTORATION U.S. FOREST SERVICE GIFFORD PINCHOT NATIONAL FOREST COWLITZ VALLEY RANGER DISTRICT LEWIS AND SKAMANIA COUNTIES, WASHINGTON DECISION AND ACTION TO BE IMPLEMENTED
More informationDECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS
DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin/White Cloud Ranger District Newaygo County, Michigan
More informationEnvironmental Assessment
United States Department of Agriculture Forest Service May 2009 Environmental Assessment Powder River Campground Decommissioning Powder River Ranger District, Bighorn National Forest Johnson and Washakie
More informationPROJECT INFORMATION Warren Falls Parking Lot Expansion Project
PROJECT INFORMATION Warren Falls Parking Lot Expansion Project The USDA Forest Service (USFS) has initiated an environmental analysis process for the proposed Warren Falls Parking Lot Expansion Project
More informationDECISION MEMO WILLOW CREEK RECREATION AREA FACILITY RESTORATION U.S. FOREST SERVICE WILLOW CREEK RESERVE RANGER DISTRICT CATRON COUNTY, NEW MEXICO
DECISION MEMO WILLOW CREEK RECREATION AREA FACILITY RESTORATION U.S. FOREST SERVICE WILLOW CREEK RESERVE RANGER DISTRICT CATRON COUNTY, NEW MEXICO BACKGROUND The Willow Creek recreational area is located
More informationStorrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project
Notice of Proposed Action Opportunity to Provide Scoping Comments Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project Mt. Hough Ranger District Plumas National Forest
More informationPROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project
PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project The USDA Forest Service is proposing to release and prune living apple trees in the Manchester Ranger District,
More informationMount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30
DECISION MEMO Walker Ridge Gold Exploration Project Plan of Operations #06-12-05 Mountain City Ranger District, Humboldt-Toiyabe National Forest Elko County, Nevada BACKGROUND On February 21, 2012, Columbia
More informationGeneral Location: Approximately 6 miles east of Huntsville, Utah along the South Fork of the Ogden River (Figure 1)
PUBLIC SCOPING SOUTH FORK WUI OGDEN RANGER DISTRICT, UINTA-WASATCH-CACHE NATIONAL FOREST WEBER COUNTY, UTAH OCTOBER 6, 2017 1.0 INTRODUCTION The Ogden Ranger District of the Uinta-Wasatch-Cache National
More informationDECISION MEMO. Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY
DECISION MEMO Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY 2007-2013 USDA Forest Service Bankhead National Forest - National Forests in Alabama Winston
More informationDecision Notice/Finding of No Significant Impact 1
DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT BULL RUN CULVERT REPLACEMENTS U.S. FOREST SERVICE WHITMAN RANGER DISTRICT, WALLOWA-WHITMAN NATIONAL FOREST GRANT COUNTY, OREGON TOWNSHIP 9 SOUTH, RANGE
More informationDECISION MEMO USDA FOREST SERVICE (USFS)
DECISION MEMO USDA FOREST SERVICE (USFS) Lakewood-Laona Ranger District Chequamegon-Nicolet National Forest Oconto County, Wisconsin DECISION I have decided to implement Project, as identified below, and
More informationScoping Document. Sardine/Cloudburst Meadow Restoration Project. United States Department of Agriculture. Forest Service.
Scoping Document United States Department of Agriculture Sardine/Cloudburst Meadow Restoration Project Forest Service March, 2017 Humboldt-Toiyabe National Forest Bridgeport Ranger District Mono County,
More informationU.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine Ranger District Jasper County, Texas
DECISION MEMO WESTWOOD WATER SUPPLY CORPORATION SPECIAL USE PERMIT REISSUANCE AND MODIFICATION PROJECT U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine
More informationDECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing
Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management
More informationRecreation Report Kimball Hill Stands Management Gold Beach Ranger District, Rogue River-Siskiyou National Forest Date: April 27, 2016
Kimball Hill Stands Management Gold Beach Ranger District, Rogue River-Siskiyou National Forest /s/ Date: April 27, 2016 Lorelei Haukness, Resource Specialist Rogue River-Siskiyou National Forest In accordance
More informationPROPOSED ACTION FOR THE NAVAJO CINDER PIT RECLAMATION PROJECT
PROPOSED ACTION FOR THE NAVAJO CINDER PIT RECLAMATION PROJECT U.S. FOREST SERVICE DIXIE NATIONAL FOREST CEDAR CITY RANGER DISTRICT KANE COUNTY, UTAH PROJECT BACKGROUND AND SUMMARY The Navajo Cinder Pit,
More informationDECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH
DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH BACKGROUND The Rock Creek drainage is a very popular recreation
More informationTwo Med/Pike Oblit/Restoration Project Rocky Mountains
S DA 0, TED DEP1R-VENT AGR,CUL-JPE FOREST SERPCE Two Med/Pike Oblit/Restoration Project Rocky Mountains Decision Memo Rocky Mountain Ranger District Glacier County, Montana NORTHERN REGION Lewis and Clark
More informationProposed New Type and Diameter (ft)* T30N, R6E, Sec. 5, NW¼ NW¼- South Fork Clear Creek. Diameter (ft)
DECISION MEMO CLEAR CREEK CULVERTS REPLACEMENTS USDA Forest Service, Northern Region Moose Creek Ranger District, Nez Perce National Forest Idaho County, Idaho I. Decision I have decided to authorize replacement
More informationDecision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada
Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Background The Ann Exploration Project is located on the
More informationDecision Memo Rose Canyon Salvage Project
Decision Memo Rose Canyon Salvage Project USDA Forest Service Coronado National Forest Pima County, Arizona Background The Rose Canyon Salvage Project is located in the Rose Canyon Campground on the Santa
More informationDECISION MEMO Eureka Fire Whitebark Pine Planting
Page 1 of 6 DECISION MEMO Eureka Fire Whitebark Pine Planting USDA Forest Service Madison Ranger District Madison County T11S, R2W, Sections16, 17, 18, 19, 20, 29, 30, 31 & 32 T11S, R3W, Sections 25 &
More informationProposed Action Report Big Creek WBP Enhancement Project
Proposed Action Report Big Creek WBP Enhancement Project USDA Forest Service Cascade Ranger District Boise National Forest Valley County, Idaho July 2013 PURPOSE AND NEED FOR THE PROPOSED ACTION The encroachment
More informationOUTREACH NOTICE 2018 TEMPORARY POSITIONS BEAVERHEAD-DEERLODGE NATIONAL FOREST HOW TO APPLY: RECREATION POSITIONS BEING HIRED:
OUTREACH NOTICE 2018 TEMPORARY POSITIONS BEAVERHEAD-DEERLODGE NATIONAL FOREST The Beaverhead-Deerlodge National Forest will be filling multiple temporary (seasonal) positions for the upcoming 2018 field
More informationDecision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho
Decision Memo BOGUS CREEK OUTFITTERS SPECIAL USE PERMIT RENEWAL USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho August 2014 DECISION It is my decision to renew
More informationLambson Draw On/Off Allotment Livestock Conversion Decision Notice
United States Department of Agriculture Forest Service Lambson Draw On/Off Allotment Livestock Conversion Decision Notice Ashley National Forest Flaming Gorge-Vernal Ranger District Uintah County, Utah
More informationDECISION MEMO. Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit
DECISION MEMO Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit United States Department of Agriculture Forest Service (FS) Eastern Region
More informationDecision Notice and Finding of No Significant Impact
Decision Notice and Finding of No Significant Impact Gold Lake Bog Research Natural Area Boundary Adjustment and Nonsignificant Forest Plan Amendment #53 USDA Forest Service Middle Fork Ranger District,
More informationPRELIMINARY DECISION MEMO
PRELIMINARY DECISION MEMO Snoqualmie Christmas Tree Project USDA Forest Service Mt. Baker-Snoqualmie National Forest Snoqualmie Ranger District King County, Washington Proposed Action, Purpose and Need
More informationDecision Memo Stock Tank Non-native Aquatic Species Management Coconino National Forest Coconino, Gila, and Yavapai County, Arizona
United States Department of Agriculture Decision Memo Stock Tank Non-native Aquatic Species Management Coconino National Forest Coconino, Gila, and Yavapai County, Arizona Forest Service February 2016
More informationDecision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA
Background Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA USDA Forest Service Black Range, Quemado, and Reserve Ranger Districts
More informationDecision Memo Starkey Elk Handling Facility Water System Improvements
Decision Memo Starkey Elk Handling Facility Water System Improvements USDA Forest Service Wallowa-Whitman National Forest La Grande Ranger District Union County, Oregon I. DECISION TO BE IMPLEMENTED A.
More informationMichigan Wing-Civil Air Patrol
DECISION MEMO Michigan Wing-Civil Air Patrol (CAP) Navigational Equipment Special Use Permit #MUN250 Hiawatha National Forest Munising Ranger District Alger County, Michigan I DECISION A. Description My
More informationThe location of the valve site is displayed on a map in the project file.
DECISION MEMO Special Use Permit # RAR401201 Amendment #7 Hiawatha National Forest Rapid River Ranger District Delta County, Michigan I DECISION A. Description My decision is to issue an amendment to the
More informationI. Decision to be Implemented. II. Reasons for Categorically Excluding the Decision. A. Description of Decision - 1 -
Decision Memo Guitonville Penelec Power Line Right-of-Way Special Use Permit USDA Forest Service, Eastern Region 9 Allegheny National Forest Marienville Ranger District Warrant 5133, Green Township Forest
More informationDECISION MEMO 4-H Tree Farm LLC Driveway Permit
DECISION MEMO 4-H Tree Farm LLC Driveway Permit I. DECISION USDA Forest Service, Eastern Region, Hoosier National Forest Tell City Ranger District Perry County, Indiana T73S, R2W, SESE Section 36 A. Description
More informationDecision Memo Young Stand Density Management and Conifer Pruning
Decision Memo Young Stand Density Management and Conifer Pruning Purpose and Need USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane and Douglas Counties, OR T17S-T25S and
More informationCoconino National Forest Red Rock Ranger District. File Code: Date:
USDA United States z:::::;;;;; Department of iiiillll Agriculture Forest Service Coconino National Forest Red Rock Ranger District P.O. Box 20429 Sedona,86341 928-202-7500 Fax: 928-527-3620 File Code:
More informationDECISION MEMO Clay Butte Radio Repeater Relocation Project
Background DECISION MEMO Clay Butte Radio Repeater Relocation Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Park County, Wyoming The Shoshone National Forest, Clarks Fork
More informationDECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline
DECISION MEMO Bull Bear 1H-18 Oil and Gas Pipeline USDA, Forest Service Cibola National Forest, Black Kettle National Grasslands Roger Mills County, Oklahoma BACKGROUND: Laredo Petroleum, Inc., in order
More informationDECISION MEMO. Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106
DECISION MEMO Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106 USDA FOREST SERVICE REGION 8 NATIONAL FORESTS AND GRASSLANDS IN TEXAS SABINE NATIONAL FOREST ANGELINA/SABINE
More informationDECISION MEMO. Crow Creek Hardened Crossing
Page 1 of 5 DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W in Section 35 Background A perennial cattle crossing on Crow Creek in in the Gravelly Landscape in the Centennial
More informationDRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S.
DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. FOREST SERVICE CHATTAHOOCHEE-OCONEE NATIONAL FORESTS CONASAUGA RANGER DISTRICT FANNIN,
More informationBig Creek Roads Plan of Operations
United States Department of Agriculture Forest Service Big Creek Roads Plan of Operations Environmental Assessment Krassel Ranger District, Payette National Forest, Valley County, Idaho May 2016 For More
More informationDecision Memo Raptor 1 and 9 Prescribed Burns Project
Decision Memo Raptor 1 and 9 Prescribed Burns Project USDA Forest Service Chemult Ranger District, Fremont-Winema National Forests Klamath County, OR Township (T) 29 South (S), Range (R) 6 East (E), Section
More informationDECISION MEMO ROSS FORK/BITTERROOT DIVIDE TRAILS REHABILITATION AND RELOCATION
Page 1 of 6 BACKGROUND DECISION MEMO ROSS FORK/BITTERROOT DIVIDE TRAILS REHABILITATION AND RELOCATION USDA Forest Service Pintler Ranger District Granite County, Montana The purpose of this project is
More informationAppeal # A215 Appellant: Steven Harshfield Johnson Creek Watershed Improvement Project EA APPEAL ISSUE 1: The Decision is unwarranted and
Appeal #11-04-02-0016 A215 Appellant: Steven Harshfield Johnson Creek Watershed Improvement Project EA APPEAL ISSUE 1: The Decision is unwarranted and unjustified. I did not find one location pinpointed
More informationDECISION MEMO. Vipond Water Development
Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management
More informationTower Fire Salvage. Economics Report. Prepared by: Doug Nishek Forester. for: Priest Lake Ranger District Idaho Panhandle National Forests
Tower Fire Salvage Economics Report Prepared by: Doug Nishek Forester for: Priest Lake Ranger District Idaho Panhandle National Forests April 2016 In accordance with Federal civil rights law and U.S. Department
More informationDecision Memo. Big Spring Gold LLC Big Spring Gold Exploration Project Plan of Operations #
Decision Memo United States Department of Agriculture Forest Service July, 2014 Big Spring Gold LLC Big Spring Gold Exploration Project Plan of Operations # 03-13-01 Austin Ranger District, Humboldt-Toiyabe
More informationDECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT
DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon
More informationInvasive Dandelion Removal in the Alpine Zone. Decision Memo. White Mountain National Forest, NH and ME
United States Department of Agriculture Invasive Dandelion Removal in the Alpine Zone White Mountain National Forest, NH and ME Decision Memo For Information Contact: Dan Sperduto Supervisor s Office 71
More informationScoping Report for the Aldridge Creek Tornado Salvage Project 51712
United States Department of Agriculture Scoping Report for the Aldridge Creek Tornado Salvage Project 51712 Poplar Bluff Ranger District Mark Twain National Forest Butler County, Missouri Cover Photo:
More informationDECISION MEMO. Kelly s Pond / NFSR 204 Hazard Tree Removal. USDA Forest Service Sam Houston National Forest Montgomery County, Texas
DECISION MEMO Kelly s Pond / NFSR 204 Hazard Tree Removal USDA Forest Service Sam Houston National Forest Montgomery County, Texas Decision I have decided to remove approximately 500 hazard trees in and
More informationDecision Notice and Finding of No Significant Impact
Decision Notice and Finding of No Significant Impact Indigo and Middle Fork Willamette Enhancement Project USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane County, Oregon
More informationProjects must fall under one of the nine categories listed in Table 1.
UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE West Coast Region Snake Basin Office 800 Park Boulevard, Plaza IV, Suite 220 Boise,
More informationWarren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description
Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental
More informationRed Mountain OHV Restoration
United States Department of Agriculture Forest Service Red Mountain OHV Restoration Environmental Assessment High Sierra Ranger District, Sierra National Forest, Fresno County, California T8S, R26E, Sections
More informationBig Creek Roads Plan of Operations
Forest Service United States Department of Agriculture Big Creek Roads Plan of Operations Environmental Assessment Krassel Ranger District, Payette National Forest, Valley County, Idaho November 2016 For
More informationDecision Memo. Delta A Septic Repair (#33)
Decision Memo Delta A Septic Repair (#33) USDA Forest Service Willamette National Forest McKenzie River Ranger District T16S, R5E, Section 16 Lane County, OR Proposed Action The McKenzie River Ranger District
More informationDECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL
DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL USDA FOREST SERVICE, CHEQUAMEGON-NICOLET NATIONAL FOREST LAKEWOOD-LAONA RANGER DISTRICT FOREST COUNTY, WISCONSIN T35N, R15E,
More informationDECISION MEMO. Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238)
Decision DECISION MEMO Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238) USDA Forest Service Ocala National Forest Lake, Marion, and Putnam County, Florida Based on the analysis
More information