Transforming Resources into Mines
|
|
- Megan Gibson
- 6 years ago
- Views:
Transcription
1 Transforming Resources into Mines YEC LNG Workshop January 18th, 2012 JANUARY 2012
2 CASINO PROJECT TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 2
3 CASINO OVERVIEW SIZE LOCATION Reserves: 1.1 billion tonnes Additional inferred resource: 1.7 billion tonnes 120,000 mtpd milling rate Politically stable Yukon, Canada Approximately 380 km NW of Whitehorse Settled Land Claims with First Nations ECONOMICS $1.0 billion NPV at long term prices Very low cash costs TEAM Experienced management Excellent track record TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 3
4 CASINO LOCATION 380 km northwest of Whitehorse, Yukon 560 km from year-round port at Skagway, Alaska Low political risk First Nations settled claims Semi-arid environment, favourable topography One-window environmental assessment process 3 4 IN THE PAST MINES YEARS OPENED TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 4
5 CASINO PRODUCTION LONG MINE LIFE 23+ Years EXPECTED INITAL PRODUCTION 435 k ozs GOLD 234 M lbs COPPER 13 M lbs MOLYBDENUM 1.6 M ozs SILVER TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 5
6 After-Tax Pre- Tax PRE-FEASIBILITY STUDY - APRIL 2011 Note: See note 3 in appendix CAPITAL COSTS ECONOMICS MINE CAPITAL (C$ M) 1,750 POWER PLANT (C$ M) 260 ROAD, PORT, ETC. (C$ M) 120 TOTAL CAPEX (C$ M) 2,130 SEPT 2011 LONG TERM SPOT COPPER (US$/lb) GOLD (US$/oz) 1,761 1,100 MOLYBDENUM (US$/lb) SILVER (US$/oz) FOREIGN EXCHANGE (US$:C$) % (C$ M) 5,800 2,570 8% (C$ M) 3,910 1,570 IRR (100% equity) (%) % (C$ M) 3,964 1,700 8% (C$ M) 2, IRR (100% equity) (%) CASH FLOW (Y1-Y4) (C$ M/y) CASH FLOW ( LOM ) (C$ M/y) PAYBACK (y) Cu CASH COST (net of credits) (US$/lb) TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 6
7 CASINO TAX AND ROYALTY LOM Contribution Avg. Annual Contribution Royalty ($M) Property Tax ($M) Taxes on Income ($M) 1, Total Taxes & Royalty ($M) 2, Note above values exclude personnel income taxes paid by employees TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 7
8 ELECTRICAL POWER GENERATION & FUEL SUPPLY CASINO POWER PLANT The 150 MW Casino power island consists of: Two gas turbine driven generators with heat recovery boilers supplying steam to a steam driven generator for a combined output of 130 MW. This combined cycle configuration results in efficient, low emissions power generation. Internal combustion engine driven generators operating in simple cycle to produce up to 18.6 MW of black start and standby power. These units have dual fuel capability and operate on natural gas or diesel fuel. LNG storage facility, LNG gasification equipment to convert LNG liquid fuel to essentially natural gas to fuel the power generators. Low grade heat recovery (separate from heat recovery for power generation) for use in LNG gasification, process and space heating TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 8
9 Casino Project Power Needs & Characteristics: Typical running load 120 MW Comparatively steady load, ideal for base load generation system Plant operates 24/7, 365 days per year Largest drives are: 28 MW, 22MW Project is remote, off-grid Nature and size of loads requires harmonic filters and PF compensation installation Electrical Power represents about 30 % of cost to process ore. Reliable, cost effective power & fuel supply is key to project success TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 9
10 FUEL SUPPLY FOR POWER GENERATION The 2011 Pre-Feasibility Study assumes that LNG from the, soon to be constructed, LNG export facility(s) in Kitimat, BC would be transported by a marine carrier to Skagway, Alaska and transferred to tanker trucks for delivery to the Casino Project LNG supply chain continues to be evaluated for the project, alternative supply chains being investigated, include: Direct trucking of LNG from Kitimat to the project site thereby eliminating the marine carrier portion of the supply chain and transshipment across the US-Canadian border. Natural gas or LNG from Eagle Plains, Yukon. Construction of a natural gas pre-treatment facility and LNG liquefaction plant in Fort Nelson, BC and trucking the LNG to Casino. Construction of a 130 Km, eight inch diameter natural gas pipeline to connect to the proposed Alaska-Canada Pipeline TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 10
11 Base Load, Power Generation Technologies Evaluated by WC&G: Coal fired power plant (CFB) Natural Gas & LNG fuelled power plant Diesel fuelled internal combustion engine & gas turbine driven generators Simple cycle & combined cycle configurations Alternative technologies evaluated but deemed unacceptable for base load purposes: Solar Wind Power Biomass Geothermal TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 11
12 Conceptual 150 MW CCGT Power Island TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 12
13 LNG STORAGE FACILITY IN MOSJØEN, NORWAY TSX: WRN / NYSE Amex: WRN Appendix 13
14 LNG Opportunities Work cooperatively with YEC and others to develop a reliable, cost effective energy for Casino and the Region. Utilize LNG fuelled tractors to haul concentrates and supplies to Casino. Potential to fuel mine haul trucks with LNG in lieu of diesel. LNG has high potential to displace diesel for transportation purposes in the region and as substitute for heating oil resulting in substantial cost savings for Yukon residents. TSX: WRN / NYSE Amex: WRN Title of Presentation Goes Here 14
15 PLAN TIMELINE PFS UP-DATED 4/2011 INITIATE FEASIBILITY STUDY Completed COMPLETE FEASIBILITY STUDY Q SUBMIT ENVIRONMENTAL ASSESSMENT Q RECEIVE INITIAL PERMITS 2015 SECURE FINANCING 2015 INITIATE CONSTRUCTION 2015 PRODUCTION GOLD HEAP LEACH 2017 PRODUCTION MILLING OPERATION 2019 TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 15
16 CASINO DESIGH PHILOSOPHY WESTERN COPPER AND GOLD DESIGN PHILOSOPHY Fully committed to using best practices in the design for closure & reclamation, beginning in pre-feasibility stage and carried throughout the detail design, construction and operating phases of the project. Best practice design solutions applied to each facility design. Project embraces sound environmental design and construction principles and strict adherence to environmental standards and regulations. Combined cycle gas turbine technology with additional waste heat recovery for space and process heating represents the most attractive energy solution for the Casino Project. Project financial performance includes a provision of $100 million fund against future reclamation costs. TSX: WRN / NYSE Amex: WRN Transforming Resources Into Mines 16
17 web phone
Community Presentation
Community Presentation May 2013 Agenda 1. Introduction 2. Proposed Mine Plan 3. Reclamation and Closure Plan 4. YESAB assessment 5. Studies Underway 6. Economic Benefits 2 Introduction What is Casino Copper
More informationDrilling, metallurgical test work and a new resource model add 21% to oxide gold reserves
LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource
More informationSeizing Opportunity and Building Value
Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%
More informationCopper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017
Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation July, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to the
More informationCopper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle
Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Vancouver, B.C., September 27, 2018 Mountain Mining Corporation ( Mountain or the Company) is pleased to announce that
More informationQuality, Diverse Group of Mining Assets. February 2018
Quality, Diverse Group of Mining Assets February 2018 1 Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release,
More informationAlan D. Hatfield PE Braemar Wavespec USA Houston, Texas. Yukon Energy Corporation LNG Workshop
LNG Fundamentals Alan D. Hatfield PE Braemar Wavespec USA Houston, Texas Yukon Energy Corporation LNG Workshop January 18, 2012 What is Liquefied Natural Gas (LNG)? Liquefied Natural Gas (LNG) is a clear,
More informationVALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE
VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward
More informationCorporate Presentation London December, 2011
Corporate Presentation London December, 2011 FORWARD-LOOKING STATEMENTS Certain information regarding Erdene ("the Company") contained herein may constitute forward-looking statements within the meaning
More informationCopper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017
Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to
More informationAzure Minerals Ltd ASX Code:
Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our
More informationSUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:
SUITE 900-999 WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: 604.684.8894 FAX: 604.688.2180 March 14, 2011 #11-06 Capstone Completes Prefeasibility Study on Phase V Expansion of Minto Copper-Gold
More informationMorrison Copper/Gold/Moly (Silver) Project
Pacific Booker Minerals Inc. Morrison Copper/Gold/Moly (Silver) Project Mr. ERIK TORNQUIST, Executive VP & COO November 2008 Forward Looking Statement This presentation may include forward-looking statements
More informationCreating Value Through Operational Excellence
Creating Value Through Operational Excellence Kemess North Project Minerals North April 2004 Northgate Exploration Limited Overview BRITISH COLUMBIA based gold mining company Principal asset is the Kemess
More informationLow-cost, rich, DRC copper
Low-cost, rich, DRC copper May 20, 2014 Brad Marwood, Managing Director Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions and judgments
More informationConfidence in Carrapateena project grows
7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics
More informationNGEX ANNOUNCES POSITIVE PFS RESULTS FOR JOSEMARÍA WITH A US$2.0 BILLION AFTER TAX NPV AND 19% IRR
NEWS RELEASE NGEX ANNOUNCES POSITIVE PFS RESULTS FOR JOSEMARÍA WITH A US$2.0 BILLION AFTER TAX NPV AND 19% IRR Vancouver - November 20, 2018: NGEx Resources Inc. (TSX: NGQ, OMX: NGQ) ("NGEx, or the Company
More informationBan Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum
ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors
More informationA New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 1 May 2018
A New Direction Developing Copper Assets in Canada s North 1 May 2018 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for
More informationAVINO SILVER & GOLD MINES LTD.
April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES
More informationOur Strategy for Climate Action
Our Strategy for Climate Action Introduction Climate change is real, it is directly influenced by human activity, and it requires decisive global action to address. At Teck, we believe our company and
More informationSierra Metals Exploration Update Call
Sierra Metals Exploration Update Call October 5, 2017 TSX SMT NYSE AMERICAN: SMTS BVL SMT Forward Looking Statements Disclaimer Certain statements in this presentation constitute forward-looking information
More informationFOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR
FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR AZARGA METALS ANNOUNCES POSITIVE, INDEPENDENT, PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT HIGHLIGHTS: Positive PEA result achieved
More informationINV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA
INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA TORONTO, ON July 14, 2016 INV Metals Inc. ( INV Metals or the Company ) (TSX:INV) is pleased to announce the positive results of
More informationMCEWEN MINING FILES FENIX PRELIMINARY ECONOMIC ASSESSMENT EXTENDS EL GALLO MINE LIFE BY 12 YEARS
MCEWEN MINING FILES FENIX PRELIMINARY ECONOMIC ASSESSMENT EXTENDS EL GALLO MINE LIFE BY 12 YEARS TORONTO, ONTARIO - (July 9, 218) - (NYSE: MUX) (TSX: MUX) ( McEwen Mining or the Company ) reports that
More informationPatrick Soares President & CEO Canada s Next Base Metal Mining Camp
Patrick Soares President & CEO Canada s Next Base Metal Mining Camp TakeStock! AB Nov. 6, 2015 www.foranmining.com Forward Looking Statements This presentation contains "forward-looking information" (also
More informationTEPAL PROJECT MEXICO Corporate update
Corporate update September, 2018 Cautionary Statement on Forward-Looking Information & Statements This presentation may contain statements which constitute 'forward-looking statements, including statements
More informationMETATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY
March 7, 2011 Symbol: TSX V-CKG NR1-2011 METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY Chesapeake Gold Corp. ( Chesapeake ) is pleased to announce the results
More informationQUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS
QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS Vancouver, Canada October 13 th, 2009 Quadra Mining Ltd. ( Quadra or the Company ) (QUA:TSX) announces the production results for the third quarter
More informationMinerals to Market. September 26 th 2011
Minerals to Market Luqman Ahmad September 26 th 2011 Balochistan Mining Sector Technical Assistant Project Workshop on International Norms in Large-Scale Mining September 27 28, 2011 Islamabad Pakistan
More informationEXCO S PROJECT PIPELINE
EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to
More informationEnergy : Expanding Clean Energy and Energy Efficiency Manitoba Helping the World
Energy : Expanding Clean Energy and Energy Efficiency Manitoba Helping the World 16 Manitoba is fortunate to have access to many sources of renewable energy. Our provincial greenhouse gas (GHG) emissions
More informationFor personal use only
Results of the Phased Implementation Update for the High-Grade Kola Sylvinite Project located in the Republic of Congo Initial project capex reduced to US$908 million After-tax NPV10% of US$1,836 million
More informationTEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME
ASX ANNOUNCEMENT 23 February 2012 (8 pages by email) TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME Sumatra Copper & Gold plc ( Sumatra or the Company ) is pleased to announce that the Prefeasibility
More informationPositive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick
NEWS RELEASE Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick Overview Pre production capital requirements $261 million Mill throughput
More informationIndependent Power Production Policy
ENERGY STRATEGY FOR YUKON Independent Power Production Policy October 2015 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy
More information5 th Asian Bauxite & Alumina Conference
5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%
More informationInfrastructure. Services
May 2018 Infrastructure Andres DR Colon, Panama In operation since 2003 LNG tank capacity 160,00m 3 serves: AES Andres 319MW and AES DPP 358 MW CCGT plants 3 party power plants >70 industrial clients,
More informationCMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017
Advancing The Zafranal Project Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Forward-Looking Information These slides contain certain forward-looking statements
More informationGalore Creek Project Update Minerals North Conference April 2006
NovaGold Resources Inc. Galore Creek Project Update Minerals North Conference April 2006 Drilling the Southwest Zone NovaGold Resources Inc. Galore Creek: Premier Cu-Au-Ag Porphyry in North America Demonstrated
More informationPEGMONT PEA HIGHLIGHTS
Advanced Lead-Zinc Resource Development PEGMONT PEA HIGHLIGHTS January 2019 Pegmont Deposit Queensland, Australia IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation
More informationHELLENIC COPPER MINES LTD. History of the Company
HELLENIC COPPER MINES LTD History of the Company Hellenic Copper Mines (HCM) was formed in 1994 by Hellenic Mining Co Ltd a Cypriot company and Oxiana NL an Australia company, later renamed to Oz Minerals.
More informationA Preliminary Economic Assessment of the Hackett River Project features the following highlights:
Thunder Bay, ON: March 5, 2007 Shares Issued: 55,517,567 SABINA S HACKETT RIVER PRELIMINARY ECONOMIC ASSESSMENT POSITIVE ON PRODUCTION OF 12 MILLION OZ SILVER, 324 MILLION LBS ZINC PER YEAR; MOVING TO
More informationInfrastructure to Sustain Canada s North
Infrastructure to Sustain Canada s North AGENDA 11 th CPAR, Whitehorse, Yukon Rick Meyers The Mining Association of Canada MAC & Canada s Mining Industry Towards Sustainable Mining Canada s North Mining
More informationProgress Update on the Lower Footwall Zone
9 February 2015 Progress Update on the Lower Footwall Zone London, England & Baie Verte, Newfoundland and Labrador, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler or the Company ),
More informationSandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade
Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade Toronto, Ontario 9 th April, 2013 Sandspring Resources Ltd. (TSX Venture: SSP)
More informationFrieda River Copper-Gold Project feasibility study completed
PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 7 3117 2000 F: +61 7 3846 4899 E:
More informationEvaluating Renewable Energy Options for Global Mining Sites. Competence Center for Mining & Mineral Resources. Scott Fraser Director Power Projects
1 Evaluating Renewable Energy Options for Global Mining Sites Competence Center for Mining & Mineral Resources Scott Fraser Director Power Projects Presentation Agenda My Background In Renewable Energy
More informationFinancial results for the 6 months to 30 June 2008
28 August 2008 Financial results for the 6 months to 30 June 2008 During the June half 2008, PanAust emerged as a significant producer of copper gold concentrate in Southeast Asia. Activities during the
More informationA New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1
A New Direction Developing Copper Assets in Canada s North 27 Feb 2018 TSX.V:COL CPNVF:US, FRA:79M1 FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking
More informationAppendix 4.4 Industrial Energy and Peak Demand Forecast
Appendix 4.4 Industrial Energy and Peak Demand Forecast 2016-2035 14 November 2016 Contents 1.1 Introduction... 2 1.2 Background... 2 1.3 Source of Information... 2 1.4 Industrial Projects Requirements...
More informationA New Direction. Developing Copper Assets in Canada s North TSX.V:COL. June 1, May 2013
A New Direction Developing Copper Assets in Canada s North June 1, 2017 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements
More informationDEVELOPING CANADA S PREMIER COPPER-GOLD MINE
DEVELOPING CANADA S PREMIER COPPER-GOLD MINE TECHNICAL PRESENTATION NOVEMBER 2018 TSX : WRN I NYSE AMERICAN : WRN FORWARD LOOKING STATEMENTS The information provided in this presentation is not intended
More informationPresentation to the FPT Working Group on Adaptation and Climate Resilience
Presentation to the FPT Working Group on Adaptation and Climate Resilience June 3 rd, 2016 Brendan Marshall, Vice-President, Economic and Northern Affairs, Mining Association of Canada ABOUT THE MINING
More informationFOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR
FOR IMMEDIATE RELEASE 31 August 2018 TSX-V: AZR AZARGA METALS CLARIFIES DISCLOSURE ON PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT AZARGA METALS CORP. ("Azarga Metals" or the
More informationQ PRODUCTION REPORT
Q3 2016 PRODUCTION REPORT NEWS RELEASE, 26 OCTOBER, 2016 STRONG PRODUCTION GROWTH IN Q3 WITH ANTUCOYA ACHIEVING PRODUCTION CAPACITY Antofagasta plc CEO, Iván Arriagada said, Antofagasta has had a strong
More informationRichmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine
NEWS RELEASE Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine 11/1/2016 Potential for Increased Production to 1,100 Tonnes per Day with
More informationSILVERCORP REPORTS Q2 RESULTS: NET INCOME OF $11.1 MILLION, $0.07 PER SHARE
NEWS RELEASE Trading Symbol: TSX: SVM NYSE AMERICAN: SVM SILVERCORP REPORTS Q2 RESULTS: NET INCOME OF $11.1 MILLION, $0.07 PER SHARE VANCOUVER, British Columbia November 8, 2017 Silvercorp Metals Inc.
More informationNiblack Project Poised For Development
Niblack Project Poised For Development AIDEA Board of Directors Meeting 38% 30% 22% 9% July 31, 2014 Forward-Looking Statements Except for statements of historical fact, this presentation contains certain
More informationDENISON ANNOUNCES DECISION TO ADVANCE WHEELER RIVER PROJECT FOLLOWING POSITIVE PFS RESULTS
Denison Mines Corp. 1100 40 University Ave Toronto, ON M5J 1T1 www.denisonmines.com @DenisonMinesCo PRESS RELEASE DENISON ANNOUNCES DECISION TO ADVANCE WHEELER RIVER PROJECT FOLLOWING POSITIVE PFS RESULTS
More informationand future events could differ materially from those anticipated in such statements. Such information contained
US U.S. Geothermal linc. Forward Looking Statements This presentation includes certain Forward Looking Statements. All statements, other than statements of historical fact, are forward looking statements
More informationHard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX
Hard Creek Nickel Emerging Giant Turnagain Nickel Project Ed Beswick P Eng. HNC:TSX www.hardcreeknickel.com Minerals North Conference April 2010 Cautionary Statement The information contained in this presentation
More informationDecember Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea. November 2010
November 2010 December 2012 Underground workings at Debarwa copper-gold deposit Developing Copper, Zinc and Gold Deposits on the Asmara Project, Eritrea Eritrea and the Asmara Project Sudan Zara Bisha
More informationSierra Metals Updates Mineral Resource Estimate for Cusi Mine, Mexico
NEWS RELEASE Sierra Metals Updates Mineral Resource Estimate for Cusi Mine, Mexico 4/13/2017 TORONTO, April 13, 2017 /PRNewswire/ - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) ("Sierra Metals" or "the Company")
More informationSierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico
NEWS RELEASE Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico 4/11/2017 TORONTO, April 11, 2017 /PRNewswire/ - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) ("Sierra Metals"
More informationRenewables and Mining Summit DUNCAN STEVENS AND MARTIN SPROTT Evaluating Renewables for Gold Fields Global Operations 23 June 2014
Renewables and Mining Summit 2014 DUNCAN STEVENS AND MARTIN SPROTT Evaluating Renewables for Gold Fields Global Operations 23 June 2014 Overview Gold Fields renewable energy & carbon goals/commitments
More informationINNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER
INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER Industry Summit, 5th October 2017, Oulu Timo Lindborg CEO, Dr. Tech., Adjunct professor Sotkamo Silver AB SOTKAMO SILVER AB Sotkamo Silver AB is listed in NGM
More informationSTARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.
STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY InCoR Holdings Plc MINING AND METALLURGY April 2014 REPORT Rev. 00 > Internal ref. 140226 Document Number: 140226-0000-49ER-0001 Date: 28/04/2014 Revision:
More informationCu-eq references throughout this press release.
NEWS RELEASE TSX: NCU NEVADA COPPER ANNOUNCES POSITIVE PEA RESULTS FOR PUMPKIN HOLLOW OPEN PIT COPPER PROJECT September 10, 2018 Nevada Copper Corp. (TSX: NCU) ( Nevada Copper or the Company ) is pleased
More informationMineral Development Agreement. Canada-British Columbia
Mineral Development Agreement Canada-British Columbia 1985-1990 Mining in British Columbia Employment (thousands) Over 20 000 people are directly employ in B.C/s mining industry. Another 35 000 are indirectly
More informationAustralia s leading explorer in Mexico
Australia s leading explorer in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO VRIC January 2017 Corporate Overview KEY STATISTICS ASX Code Share Price AZS
More informationNEWS RELEASE. Highlights of the Copperwood Project Feasibility Study
NEWS RELEASE Highland Copper Announces Positive Feasibility Study Results for its Copperwood Project in Michigan - IRR of 18% After Tax, Capital Cost of $275 M and an Average Payable Copper Production
More informationSIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU
No. 41-2013 SIERRA METALS REPORTS A 53.5% INCREASE IN NI 43-101 COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU Vancouver, BC November 19, 2013 Sierra Metals Inc. (TSX:SMT)(BVL:SMT) ( Sierra Metals
More informationHydrogen Energy Supply Chain based on Victorian brown coal linked with CCS
Victorian Brown Coal Forum 2015 in Japan Hydrogen Energy Supply Chain based on Victorian brown coal linked with CCS Kawasaki Heavy Industries, Ltd. 6 October 2015 Contents 1. About Kawasaki Heavy Industries
More informationNEWS RELEASE Trading Symbol: TSX: SVM
NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED VANCOUVER, British Columbia February 5, 2016 Silvercorp Metals Inc.
More informationSILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED
NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED VANCOUVER, British Columbia February 5, 2016 Silvercorp Metals Inc.
More informationSantacruz Silver Reports First Quarter 2017 Production and Financial Results
TSX.V: SCZ FSE: 1SZ May 31, 2017 Santacruz Silver Reports First Quarter 2017 Production and Financial Results Vancouver, B.C. Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the Company or Santacruz ) reports
More informationQ PRODUCTION REPORT
Q2 2018 PRODUCTION REPORT PRODUCTION AND COSTS AS EXPECTED NEWS RELEASE, 25 JULY 2018 Antofagasta plc CEO, Iván Arriagada said: Our performance in terms of copper production and controlling costs during
More informationOZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM
OZ MINERALS JP Morgan Melbourne Mining Day Terry Burgess, Managing Director and CEO Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS: CURRENT STATUS 2 Prominent Hill ramping-up to name-plate capacity
More informationENERGY AND CARBON CHALLENGES FOR REMOTE CANADIAN MINES
ENERGY AND CARBON CHALLENGES FOR REMOTE CANADIAN MINES What are the key energy challenges for remote Canadian mines? What is the impact of carbon pricing on energy choices for mines? What solutions are
More informationRenewable Energy Feasibility Study for Ione Band of Miwok Indians
Renewable Energy Feasibility Study for Ione Band of Miwok Indians By: Community Assessment of Renewable Energy and Sustainability & The Renewable and Appropriate Energy Laboratory Contents i. About CARES
More informationSILVERCORP NET INCOME $43.7 MILLION, $0.26 PER SHARE, FOR FISCAL 2017
NEWS RELEASE Trading Symbol: TSX: SVM NYSE MKT: SVM SILVERCORP NET INCOME $43.7 MILLION, $0.26 PER SHARE, FOR FISCAL 2017 VANCOUVER, British Columbia May 25, 2017 Silvercorp Metals Inc. ( Silvercorp or
More informationNevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics
NEWS RELEASE TSX: NCU Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics September 24, 2018 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper" or the Company ) is pleased
More informationSummary of Peñasquito Technical Report - Goldcorp, December 31, 2007
Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007 History of Peñasquito Property In 1998 Western Silver acquired the entire Penãsquito property from Kennecott. Glamis Gold Inc. acquired
More informationPROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE
4 December 2013 HÄGGÅN URANIUM PROJECT SCOPING STUDY REMODELLED AT LOWER THROUGHPUT RATES PROJECT FINANCIAL ROBUSTNESS CONFIRMED SMALLER SCALE PROJECTS REMAIN IN THE LOWER HALF OF THE SECTOR COST CURVE
More informationFreegold Ventures Announces Positive Results from Independent Preliminary Economic Assessment for the Golden Summit Project
For Immediate Release www.freegoldventures.com Freegold Ventures Announces Positive Results from Independent Preliminary Economic Assessment for the Golden Summit Project January 25th, 2016 (Vancouver,
More informationPhoto Courtesy of Jason Pineau Photography MINING SERVICES
Photo Courtesy of Jason Pineau Photography MINING SERVICES 5000+ PIECES OF EQUIPMENT WITH A REPLACEMENT VALUE OF $1 Billion 82 HYDRAULIC EXCAVATORS up to 550-ton class 110 HEAVY HAUL TRUCKS up to 250-ton
More informationHighlights of the Feasibility Study (all amounts are stated in Canadian dollars):
COPPER FOX ANNOUNCES A POSITIVE FEASIBILITY STUDY ON THE SCHAFT CREEK DEPOSIT OPEN PIT MINING, PROCESSING AT A NOMINAL RATE OF 130,000 TONNES PER DAY; A 21 YEAR MINE LIFE PRODUCING 4.88 BILLION POUNDS
More informationPOSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT
Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au
More informationFor personal use only
Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au
More informationIván Arriagada, CEO Antofagasta Minerals. Producer Challenges
Iván Arriagada, CEO Antofagasta Minerals Producer Challenges Cautionary statement This presentation has been prepared by Antofagasta plc. By reviewing and/or attending this presentation, you agree to the
More informationNorth River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )
North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company ) Namib Project - Mine Development Plan North River is pleased
More informationFor personal use only
Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue
More informationAfrican Gas Infrastructure: Project Development and Financing
23 May 2017 African Gas Infrastructure: Project Development and Financing 1 Gas Midstream in SSA What is Gas Infrastructure? Context What is in scope for midstream gas infrastructure? State of play Project
More informationOZ MINERALS SECOND QUARTER REPORT Andrew Michelmore Managing Director & CEO. 22 July 2008
OZ MINERALS SECOND QUARTER REPORT Andrew Michelmore Managing Director & CEO 22 July 2008 CONTENT 1. HIGHLIGHTS 2. MARKETS 3. SEPON GOLD AND COPPER 4. SEPON COPPER EXPLORATION 5. GOLDEN GROVE 6. PROMINENT
More informationASX Announcement FURTHER DRILLING WARRANTED AT SIMUKU TO PROGRESS TO FEASIBILITY COMPLETION OF CONCEPTUAL MINING STUDY
ADDRESS PHONE PO Box 6965 +61(07) 5592 1001 Gold Coast Mail Centre FAX Qld 9726 Australia +61 (07) 5592 1011 EMAIL ABN 54 126 490 855 info@coppermoly.com.au WEBSITE www.coppermoly.com.au ASX Announcement
More informationWe are building NEW AITIK. New Aitik. 36 million tonnes
We are building NEW AITIK New Aitik 36 million tonnes MODERN SOCIETY needs the metals Boliden produces. IN THIS CONTEXT, the Aitik mine is of major importance as a reliable supplier of copper, gold and
More informationTHE SISSON PARTNERSHIP
THE SISSON PARTNERSHIP A World-class Tungsten and Molybdenum Deposit in Central New Brunswick NBBTU Conference April 2017 Sisson Project Location Commuting distance from Stanley (26 km) Juniper (22 km)
More informationOptimisation Study Yanfolila Gold Project Mali
Optimisation Study Yanfolila Gold Project Mali RNS Number : 1737G Hummingbird Resources PLC 02 March 2015 Hummingbird Resources plc ("Hummingbird Resources" or "the Company") Optimisation Study Completed
More informationModernization of the Power System
Modernization of the Power System Stantec at a glance Founded in 1954 Publicly traded on two stock exchanges TSX, NYSE: STN 60 years of uninterrupted profitability Gross Revenue: CDN $2.5 Billion (2014)
More information