1 Murphy Oil Operations in the PEACE RIVER AREA April 27 th, 2015 Craig Sinclair Manager, Special Projects MURPHY OIL CORPORATION NYSE: MUR 1

2 Our purpose today includes: Our Purpose Today Introducing Murphy Oil s global operations; Providing a brief overview of Murphy's current primary as well as possible future thermal operations in Northern Sunrise County; Describing the actions and commitments that arose from the AER s March 31 st, 2014 Inquiry into Odours and Emissions from Heavy Oil; Providing an update on the March 1 st, 2015 Seal condensate spill; and Answering any questions you may have arising from this presentation MURPHY OIL CORPORATION NYSE: MUR 2

3 Murphy s Current Peace River Operations (2015) Murphy is an international company producing oil and gas in the U.S., Malaysia, Canada, and various other countries. In Canada, Murphy is the operator in two areas: Northern B.C. (Dawson Creek); Northern Alberta (Peace River) Murphy has been operating in the Peace River area since 2003 Current Peace River operations are made up of: Cold Heavy Oil Cliffdale 2 well pads 13 well Seal Lake 95 well pads/4 central treat facilities Thermal Heavy Oil Cadotte Pilot 2 well pads MURPHY OIL CORPORATION NYSE: MUR 3

4 Murphy s Current Peace River Oil and Gas Production Murphy Field Number of Facilities Oil Production (bbl/d) Raw Gas Production Internal Gas Use Sales Gas Gas Flared Gas Vented Cadotte 4* Cliffdale Seal Lake 95 1, Total 112 1, ** * Includes both cold and thermal production ** The gas targeted for reduction in Murphy s Integrated Action Plan, submitted to the AER on Oct 31 st, 2014 MURPHY OIL CORPORATION NYSE: MUR 4

5 New Developments: The Seal Central HCSS Thermal Project The Project Uses Horizontal Cyclic Steam Stimulation (HCSS) Est. 12,450 bbl/day bitumen production Initially 7 well pads/84 producing wells Project life 35 years Schedule File application (complete) Q Start construction Q First steam Q Socio/Economics Total capital cost $624 million Total Prov. employment 2,000 P-Y Total Prov. income $254 million GDP created $414 million MURPHY OIL CORPORATION NYSE: MUR 5

6 Murphy s Response to the AER 2014 Inquiry into Heavy Oil Emissions AER s concerns included possible health and other effects form heavy oil emission To address these, the AER required that all Peace River operators move to: Eliminate both routine and non routine venting Substantially reduce routine flaring and increase gas conservation Significantly reduce emergency flaring Murphy s plans, as approved by the AER, have resulted in: The effective elimination of routine and non-routine venting at Three Creeks by Aug, 15, 2014 A steady and meaningful reduction in routine and non-routine venting at Seal beginning in Q and to be complete by Q Ongoing improvements in gas conservation and emergency flaring controls over the same time frame AER inspections continue to confirm that Murphy s operations are in full compliance with AER requirements MURPHY OIL CORPORATION NYSE: MUR 6

7 The Condensate Transfer Pipeline Release On March 1, 2015 a Murphy employee located condensate pooling at 3 separate locations over 1 km along a 7.8 km condensate transfer pipeline located with the Murphy Seal Lake development area. Condensate, which has several characteristics in common with gasoline, is used to dilute the much heavier bitumen so that it can be shipped by pipeline. Upon discovery the pipeline was immediately de-pressurized, Murphy s Emergency Response Plan and a wildlife deterrent program were initiated, access was limited to essential personnel, and the AER was notified. Trenches and berms now prevent the spill from spreading on the surface; and ongoing testing has confirmed the spill is not moving below ground and there was no risk of a similar release from another Murphy pipeline. Murphy is now actively removing liquid condensate from the three surface sites as an initial step in the eventual remediation and reclamation of the entire spill site. In the interim ongoing monitoring along with AER inspections continue to confirm that the spill does not present a risk to health and safety or the environment. MURPHY OIL CORPORATION NYSE: MUR 7

8 Thank You! Thank you for your time and attention.? We would be pleased to try to answer any questions you might have MURPHY OIL CORPORATION NYSE: MUR 8

Shell Canada Limited. Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No

Shell Canada Limited. Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No Shell Canada Limited Shell s Comments for Phase 4: Oral Proceeding Related to Alberta Energy Regulator Proceeding No. 1769924 January 22, 2014 Good (morning/afternoon) Panel Members, AER staff, members

More information

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE 1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE April 9, Primrose/Wolf Lake Oil Sands Project (PAW) is a thermal in situ operation located approximately 65 km north of Bonnyville and about

More information

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE 1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE March 3, 2014 Primrose/Wolf Lake Oil Sands Project (PAW) is a thermal in situ operation located approximately 65 km north of Bonnyville

More information

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE. January 10, 2014

MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE. January 10, 2014 1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE January 10, 2014 Canadian Natural Resources Limited Primrose/Wolf Lake Oil Sands Project is a thermal in situ operation located primarily

More information

Heavy Oil. Central Processing Facilities Wellpads and Flowlines

Heavy Oil. Central Processing Facilities Wellpads and Flowlines Heavy Oil Central Processing Facilities Wellpads and Flowlines Equinox Engineering Ltd. Equinox Engineering Ltd. is a world class provider of EPCM services to the global oil and gas marketplace. Central

More information

Cold Lake expansion project

Cold Lake expansion project Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing

More information

In us, you ll find a trusted resource. Oil Sands

In us, you ll find a trusted resource. Oil Sands In us, you ll find a trusted resource Oil Sands 20% increase of plant throughput at Cenovus Foster Creek in situ facility. In Canada s oil sands, you are tapping into one of the world s largest oil reserves.

More information

Meadow Creek West. Project overview:

Meadow Creek West. Project overview: Project overview: Meadow Creek West will be a steam assisted gravity drainage (SAGD) oil sands development in northeast Alberta. Meadow Creek West is an additional phase to our Meadow Creek project and

More information

Let s talk. About everything. Let s put it all on the table. Every sustainable solution, every safety practice, every infrastructure decision we want

Let s talk. About everything. Let s put it all on the table. Every sustainable solution, every safety practice, every infrastructure decision we want Let s talk. About everything. Let s put it all on the table. Every sustainable solution, every safety practice, every infrastructure decision we want to share it all with you because it has an impact on

More information

Upgrading with a soft touch

Upgrading with a soft touch Upgrading with a soft touch Canadian Heavy Oil Conference 4 November 2014 Agenda Heavy Oil Industry the market & its challenges Upgrading in Canada Fractal Systems JetShear Technology Commercializing JetShear

More information

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir

Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir Progressing C-SAGD recovery of bitumen from the Grosmont D reservoir LARICINA ENERGY Steve Brand P. Eng. WHOC15-280 Organized by: Outline Project overview 1D experience and knowledge gained Early cycle

More information

Seal Main HCSS Pilot Approval Annual Performance Presentation

Seal Main HCSS Pilot Approval Annual Performance Presentation Seal Main HCSS Pilot Approval 11377 Annual Performance Presentation 11-Feb-2015 Agenda Introductions Seal Main Horizontal Cyclic Steam Stimulation (HCSS) Pilot Subsurface Surface Harmon Valley South HCSS

More information

VSD is a commercially proven technology for bitumen recovery that is used worldwide and in Western Canada by other operators.

VSD is a commercially proven technology for bitumen recovery that is used worldwide and in Western Canada by other operators. RECOVERY PROCESS Section 4.1 APPLICATION FOR APPROVAL OF THE CARMON CREEK PROJECT VOLUME 1: PROJECT DESCRIPTION SELECTED RECOVERY PROCESS 4.1.1 SELECTION BASIS Vertical steam drive (VSD), complemented

More information

D-3 7/6/2018 Enbridge Activity Update Peace River Regional District July 12, 2018 Jay Morrison Community and Indigenous Engagement Enbridge & Spectra

D-3 7/6/2018 Enbridge Activity Update Peace River Regional District July 12, 2018 Jay Morrison Community and Indigenous Engagement Enbridge & Spectra Enbridge Activity Update Peace River Regional District Jay Morrison Community and Indigenous Engagement Enbridge & Spectra Energy Merger On Monday, February 27, 2017, Spectra Energy completed its merger

More information

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 01 STONY MOUNTAIN PIPELINE Laricina will develop and follow an environmental protection plan that meets or exceeds

More information

CARMON CREEK FIELD DEVELOPMENT

CARMON CREEK FIELD DEVELOPMENT CARMON CREEK FIELD DEVELOPMENT Canadian Heavy Oil Association November 3, 2014 Use this area for cover image (height 6.5cm, width 8cm) Fred Wasden General Manager, Carmon Creek Development Copyright of

More information

GROUSE GROUSE IN SITU OIL SANDS PROJECT. Proposed Development Plan. Plain Language Project Summary

GROUSE GROUSE IN SITU OIL SANDS PROJECT. Proposed Development Plan. Plain Language Project Summary GROUSE Proposed Development Plan GROUSE IN SITU OIL SANDS PROJECT Plain Language Project Summary ABOUT CANADIAN NATURAL WHO WE ARE Canadian Natural Resources Limited (Canadian Natural) is a senior independent

More information

PROJECT OVERVIEW. 12 new pump stations, 19 new tanks, space for three Aframax vessels at the Westridge Marine Terminal

PROJECT OVERVIEW. 12 new pump stations, 19 new tanks, space for three Aframax vessels at the Westridge Marine Terminal PROJECT OVERVIEW Expansion Approximately 980 kilometres of new pipeline and additional infrastructure at three existing terminal locations along the existing Trans Mountain Pipeline system between Edmonton,

More information

RULE 317B Protection of Drinking Water Supply Sources

RULE 317B Protection of Drinking Water Supply Sources RULE 317B Protection of Drinking Water Supply Sources Comprehensive Rulemaking of 2008: Navigating the New Oil and Gas Regulatory Landscape David Brown, Manager Regulatory Affairs HSE, BP America Jennifer

More information

Environmental Setting

Environmental Setting Trans Mountain is seeking approval for a Certificate of Public Convenience and Necessity (CPCN) from the National Energy Board (NEB) for a $5.4 billion expansion of its oil pipeline system from Strathcona

More information

The Canadian Oil Sands in the Context of the Global Energy Demand

The Canadian Oil Sands in the Context of the Global Energy Demand Extended Abstract for 17 th Convocation of the International Council of Academies of Engineering and Technological Sciences (CAETS), Tokyo, Japan, October 2007. The Canadian Oil Sands in the Context of

More information

Air & Waste Management Association - (CPANS) September 7, 2012

Air & Waste Management Association - (CPANS) September 7, 2012 Air & Waste Management Association - (CPANS) September 7, 2012 Canadian Crude Oil Exports By Destination Non-US 1% US West Coast US Mid-Continent 74% 9% US East Coast 8% US Gulf Coast 7% 2 Source: NEB

More information

vapour leaving from the top and routed to gas treatment diluted bitumen leaving from the middle produced water leaving from the bottom

vapour leaving from the top and routed to gas treatment diluted bitumen leaving from the middle produced water leaving from the bottom Section 6.2 APPLICATION FOR APPROVAL OF THE CARMON CREEK PROJECT VOLUME 1: PROJECT DESCRIPTION CPF PROCESSES 6.2.1 INLET FACILITIES AND EMULSION TREATING The bitumen, water and gas produced from the field

More information

NOVA Chemicals Redwater Lateral Upgrade. Project Information Document and Confirmation of Non-objection

NOVA Chemicals Redwater Lateral Upgrade. Project Information Document and Confirmation of Non-objection NOVA Chemicals Redwater Lateral Upgrade Project Information Document and Confirmation of Non-objection December 20, 2016 NOVA Chemicals Redwater Lateral Upgrade 2 Contents Project Necessity... 3 Project

More information

Project Summary Table BlackPearl Resources Inc Blackrod Commercial SAGD Project Proponent Name: BlackPearl Resources Inc. Date: November, 2011

Project Summary Table BlackPearl Resources Inc Blackrod Commercial SAGD Project Proponent Name: BlackPearl Resources Inc. Date: November, 2011 Project Summary Table BlackPearl Resources Inc Blackrod Commercial SAGD Project Proponent Name: BlackPearl Resources Inc. Date: vember, 2011 Project Name: Blackrod Commercial SAGD Project Company Contact

More information

Teck Frontier Oil Sands Mine Project

Teck Frontier Oil Sands Mine Project Teck Frontier Oil Sands Mine Project Agenda Introduction Alberta Oil Sands Overview Teck Frontier Mine Wood Buffalo National Park CPAWS Northern Alberta s Role What s happening now 2 1 Introduction 3 Who

More information

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away James Cairns Vice President, Petroleum and Chemicals Upgrading Crude by Rail Capacity Summit February 26-27, 2013 Houston, TX FORWARD-LOOKING

More information

Saint John, New Brunswick Community Panel Session. National Energy Board August 8, 2016

Saint John, New Brunswick Community Panel Session. National Energy Board August 8, 2016 Saint John, New Brunswick Community Panel Session National Energy Board August 8, 2016 1 What is Energy East? $15.7 billion* 100% privately financed project 4,500 km length of pipeline from Alberta to

More information

Section 1 Project Introduction

Section 1 Project Introduction Section 1 Project Introduction TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 2 1.2 PROJECT PROPONENT... 3 1.3 PROJECT OVERVIEW... 4 1.4 PROJECT REGULATORY APPROVAL PROCESS...

More information

Pressure Communication

Pressure Communication Pressure Communication Industry, government collaborate on gas over bitumen R&D BY DEBORAH JAREMKO Slant drilling has helped push bitumen development, but more advances are needed 44 Oilweek February 2006

More information

Under Section 113 of the Environmental Protection and Enhancement Act

Under Section 113 of the Environmental Protection and Enhancement Act Order Made at Slave lake, in the Province of Alberta, on July 13, 2018 ALBERTA ENERGY REGULATOR Under Section 113 of the Environmental Protection and Enhancement Act Under Section 29 of the Pipeline Act

More information

Telephone Lake project

Telephone Lake project Telephone Lake project Cenovus Energy Inc. is a Canadian oil company. We re committed to applying fresh, progressive thinking to safely and responsibly unlock energy resources the world needs. Our operations

More information

Kearl Kearl Oil Sands Project Project Description November 2003

Kearl Kearl Oil Sands Project Project Description November 2003 earl Kearl Oil Sands Project Project Description November 2003 PROPOSED DEVELOPMENT Imperial Oil Resources (Imperial) and ExxonMobil Canada Ltd. (ExxonMobil) are advancing public consultation and other

More information

The Dan River Coal Ash Release: Description & Timeline of Events. Environmental Review Commission February 17, 2014

The Dan River Coal Ash Release: Description & Timeline of Events. Environmental Review Commission February 17, 2014 The Dan River Coal Ash Release: Description & Timeline of Events Environmental Review Commission February 17, 2014 1 Overview Overview of Coal Ash in NC What happened at Dan River? Reporting requirements

More information

SemCAMS Area Project Description

SemCAMS Area Project Description REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory

More information

TransCanada Pipelines The Company and Its Projects. BC Metis Industry Forum May 10, 2014 Vancouver, B.C.

TransCanada Pipelines The Company and Its Projects. BC Metis Industry Forum May 10, 2014 Vancouver, B.C. TransCanada Pipelines The Company and Its Projects BC Metis Industry Forum May 10, 2014 Vancouver, B.C. TransCanada Corporation (TSX/NYSE: TRP) TransCanada is a leading North American energy infrastructure

More information

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016.

The Alberta Energy Regulator (AER) has approved this directive on February 17, 2016. Directive 007 Release date: February 17, 2016 Effective date: February 17, 2016 Replaces previous edition issued February 25, 2015 Volumetric and Infrastructure Requirements The Alberta Energy Regulator

More information

Hydraulic Fracturing & Public Health: What we know, what we can infer and how we can move forward

Hydraulic Fracturing & Public Health: What we know, what we can infer and how we can move forward Hydraulic Fracturing & Public Health: What we know, what we can infer and how we can move forward Merry Turtiak, Alberta Health Canadian Public Health Association 2014 May 29, 2014 Overview The Basics:

More information

River Crossings: SaskEnergy's Approach to Protecting River Systems During Pipeline Construction

River Crossings: SaskEnergy's Approach to Protecting River Systems During Pipeline Construction River Crossings: SaskEnergy's Approach to Protecting River Systems During Pipeline Construction Oct 2, 2018 Dan Dietrich Manager, Environmental Assessment SaskEnergy Incorporated Overview Open Cut River

More information

Equinox Engineering Ltd. Pipelines Expertise. Trunk Lines

Equinox Engineering Ltd. Pipelines Expertise. Trunk Lines Pipelines Equinox Engineering Ltd. Equinox Engineering Ltd is a world class provider of EPCM services to the global oil and gas marketplace. Founded in 1997, Equinox has successfully executed over 4,000

More information

Fredericton, New Brunswick Community Panel Session. National Energy Board August 15, 2016

Fredericton, New Brunswick Community Panel Session. National Energy Board August 15, 2016 Fredericton, New Brunswick Community Panel Session National Energy Board August 15, 2016 1 What is Energy East? $15.7 billion* 100% privately financed project 4,500 km length of pipeline from Alberta to

More information

ALBERTA WILDERNESS ASSOCIATION

ALBERTA WILDERNESS ASSOCIATION Pipeline Construction and Operation Position (AWA) believes pipelines pose significant risks to human and environmental health. Pipelines must be built to the highest possible standards of safety. Pipelines

More information

Alberta Groundwater Policy Update

Alberta Groundwater Policy Update Alberta Groundwater Policy Update Steve Wallace Director, Groundwater Policy Alberta Environment and Parks Water Technologies Symposium April 6-8, 2016 Presentation Outline Water Conversation update on

More information

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission 2012 Pipeline Performance and Activity Report BC Oil and Gas Commission Table of Contents BC Oil and Gas Commission 2 Pipeline Performance and Activity 3 Integrity Management Programs 5 Pipeline Requirements

More information

Flaring, Incinerating and Venting Reduction Report for 2010

Flaring, Incinerating and Venting Reduction Report for 2010 Flaring, Incinerating and Venting Reduction Report for 2010 1 About the BC Oil and Gas Commission The BC Oil and Gas Commission (Commission) is an independent, single-window regulatory agency with responsibilities

More information

Seal Main HCSS Pilot Subsurface Review

Seal Main HCSS Pilot Subsurface Review Seal Main HCSS Pilot Subsurface Review Subsurface Agenda 1. Background 2. Geology 3. Drilling and Completions 4. Artificial Lift 5. Well Instrumentation 6. 4D Seismic 7. Scheme Performance 8. Future Plans

More information

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File

IN THE MATTER of a CONTRAVENTION. of the OIL AND GAS ACTIVITIES ACT. [SBC 2008] Chapter 36. Before. The BC OIL & GAS COMMISSION. Case File IN THE MATTER of a CONTRAVENTION of the OIL AND GAS ACTIVITIES ACT [SBC 2008] Chapter 36 before The BC OIL & GAS COMMISSION Case File 2017-061 BETWEEN The BC Oil & Gas Commission AND Pavilion Energy Corporation

More information

PIPELINE EMERGENCY RESPONSE GUIDELINES

PIPELINE EMERGENCY RESPONSE GUIDELINES PIPELINE EMERGENCY RESPONSE GUIDELINES FOR SCHOOLS In the event of an actual or suspected pipeline release call 911 and Kinder Morgan Canada at 1.888.876.6711 If you see someone working or digging near

More information

DRAFT MESA COUNTY ENERGY POLICY PLAN PHASE 1 Draft Mitigation Measures 07/25/2007

DRAFT MESA COUNTY ENERGY POLICY PLAN PHASE 1 Draft Mitigation Measures 07/25/2007 Transportation Directional/Horizontal Drilling Directional/Horizontal Drilling allows for multiple wells to be drilled from a common well pad. Greatly reduces surface related impacts by minimizing the

More information

UPDATE CONSTRUCTION ASKED AND ANSWERED: RESTORING AGRICULTURAL LAND. COMMUNITY BENEFITS Williams hiring veterans CONTACT ATLANTIC SUNRISE 310 SR 29 N

UPDATE CONSTRUCTION ASKED AND ANSWERED: RESTORING AGRICULTURAL LAND. COMMUNITY BENEFITS Williams hiring veterans CONTACT ATLANTIC SUNRISE 310 SR 29 N CONSTRUCTION UPDATE JUNE 2018 Nine months into our construction schedule, our crews are making safe, steady and environmentally responsible progress on activities such as backfilling, welding, coating,

More information

Heavy Oil Systems Experience and expertise to enhance productivity

Heavy Oil Systems Experience and expertise to enhance productivity Heavy Oil Systems Experience and expertise to enhance productivity In the emerging and rapidly growing market of heavy oil extraction, production using conventional techniques can be difficult and costly.

More information

Jackfish 2 Project. Public Disclosure Document. August 2005

Jackfish 2 Project. Public Disclosure Document. August 2005 Jackfish 2 Project Public Disclosure Document August 2005 Table of Contents Introduction...1 Company Profile...2 Preliminary Project Description...2 The Plan...2 The Process...3 Facilities...3 Physical

More information

Oil Pipelines Information for Emergency Responders. Please retain this booklet for your information

Oil Pipelines Information for Emergency Responders. Please retain this booklet for your information 062017 Oil Pipelines Information for Emergency Responders Please retain this booklet for your information Why are you receiving this booklet? This brochure contains important safety information about crude

More information

Human Health Risk Assessment of Oil and Gas Activity in Northeastern British Columbia. June 2015 Presented by Bart Koppe, Intrinsik Inc.

Human Health Risk Assessment of Oil and Gas Activity in Northeastern British Columbia. June 2015 Presented by Bart Koppe, Intrinsik Inc. Human Health Risk Assessment of Oil and Gas Activity in Northeastern British Columbia June 2015 Presented by Bart Koppe, Intrinsik Inc. 1 Overview of Project Phase 1 HHRA. Identification of health concerns

More information

ABC Oil and Gas. Aug 19 th, Report No: SMP-0002 Budgetary Plant Estimate. Powered by Solaris-MCI

ABC Oil and Gas. Aug 19 th, Report No: SMP-0002 Budgetary Plant Estimate. Powered by Solaris-MCI ABC Oil and Gas Aug 19 th, 2016 Report No: SMP-0002 Budgetary Plant Estimate Powered by Solaris-MCI Contents Executive Summary 3 1.0 Assumptions 3 1.1. Napkin Assumptions 3 1.2. Client Discussed Assumptions

More information

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document

Proposed Heartland Cavern Lateral Pipeline and Meter Station. Public Information Document Proposed Heartland Cavern Lateral Pipeline and Meter Station Public Information Document April 16, 2015 Proposed Heartland Cavern Lateral Pipeline and Meter Station Project 2 Contents Project Necessity...

More information

City of Green Construction Update

City of Green Construction Update NEXUS Gas Transmission City of Green Construction Update February 16, 2018 Project Overview Nexus Market Connections Project Summary: Design Capacity: 1.5 Bcf/d New: 257 miles of 36 pipe and 4 compressor

More information

Informational Letter IL 98-1

Informational Letter IL 98-1 Informational Letter IL 98-1 6 February 1998 TO: All Oil, Gas, Oil Sands, and Pipeline Operators A MEMORANDUM OF UNDERSTANDING BETWEEN ALBERTA ENVIRONMENTAL PROTECTION AND THE ALBERTA ENERGY AND UTILITIES

More information

CLIMATE CHANGE ADAPTATION IN TODAY S OIL AND GAS INDUSTRY A Case Study in Water Resource Management. EnviroTech Calgary April 2018

CLIMATE CHANGE ADAPTATION IN TODAY S OIL AND GAS INDUSTRY A Case Study in Water Resource Management. EnviroTech Calgary April 2018 CLIMATE CHANGE ADAPTATION IN TODAY S OIL AND GAS INDUSTRY A Case Study in Water Resource Management EnviroTech Calgary April 2018 1 CLIMATE CHANGE GLOBAL WARMING WEATHER PATTERNS Photo Source: NASA 2 What

More information

2017 Directive 54 Performance Presentation

2017 Directive 54 Performance Presentation 2017 Directive 54 Performance Presentation Seal Scheme Approval No. 11320E September 2017 Agenda Subsurface 1. Overview 2. Geology / Geoscience 3. Drilling and Completions 4. Scheme Performance 5. Injection

More information

ENERGY IN BIG LAKES COUNTY ANOTHER BOOM IS COMING! GO BIGLAKESCOUNTY.CA A COST EFFECTIVE GATEWAY A PRODUCTIVE AREA ALBERTA S TOP EXPORTS

ENERGY IN BIG LAKES COUNTY ANOTHER BOOM IS COMING! GO BIGLAKESCOUNTY.CA A COST EFFECTIVE GATEWAY A PRODUCTIVE AREA ALBERTA S TOP EXPORTS A COST EFFECTIVE GATEWAY A PRODUCTIVE AREA ALBERTA S TOP EXPORTS A KNOWLEDGELE WORKFORCE DIVERSIFIED AND INNOVATIVE ENERGY IN BIG LAKES COUNTY GO BIGLAKESCOUNTY.CA ANOTHER BOOM IS COMING! Since 2015, the

More information

Paper Number:

Paper Number: Paper Number: 2015-04 Implementing Pipelines Integrity Management Using KPIs Sherry Rao Charter Coating Service (2000) Ltd. #6, 4604, 13 St NE, Calgary, AB T2E 6P1 Phone: 1-403-250-3027 Email: srao@chartercoating.com

More information

orporate responsibility 2009 performance measures

orporate responsibility 2009 performance measures orporate responsibility performance measures about cenovus 2 3 4 economic 5 environment 2 4 workforce 6 community 6 governance our approach to CR reporting health and safety energy efficiency and R&D measurement

More information

Sabine River Authority of Texas Summary Report MtBE Contamination in Lake Tawakoni from Gasoline Pipeline Rupture 5. TREATMENT AND REMEDIATION

Sabine River Authority of Texas Summary Report MtBE Contamination in Lake Tawakoni from Gasoline Pipeline Rupture 5. TREATMENT AND REMEDIATION 5. TREATMENT AND REMEDIATION Explorer is responsible for the treatment and remediation of areas contaminated by the gasoline spill, including the reservoir. Explorer has worked cooperatively with SRA to

More information

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency -

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Nov-29, 2017 JAPEX (Japan Petroleum Exploration Co., Ltd) Canada Oil Sands Project Dept. Tanetomo (Tom) Izumi Japan

More information

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER).

Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). Directive 055 Addendum Directive 055 Addendum: Interim Requirements for Aboveground Synthetically- Lined Wall Storage Systems, Updates to Liner Requirements, and Optional Diking Requirements for Single-Walled

More information

Husky Increasing Resiliency with Thermal Momentum and Downstream Integration

Husky Increasing Resiliency with Thermal Momentum and Downstream Integration Husky Increasing Resiliency with Thermal Momentum and Downstream Integration Calgary, Alberta (Sept. 22, 2015) Husky Energy is prudently advancing its resilient thermal production portfolio as its fully

More information

Energy East Pipeline. The Right Choice ACPA 2016 AGM. Sept. 8, 2016

Energy East Pipeline. The Right Choice ACPA 2016 AGM. Sept. 8, 2016 Energy East Pipeline The Right Choice ACPA 2016 AGM Sept. 8, 2016 Energy East: Connecting Canada $15.7 billion investment required to build Energy East 4,500 km length of 42 pipeline from Alberta to New

More information

Montney Development. in the South Peace

Montney Development. in the South Peace Montney Development in the South Peace Fort St. John Table of contents British Columbia Mapped area Dawson Creek British Columbia Pouce Coupe Alberta Beaverlodge Grande Prairie Your feedback matters! Please

More information

Husky Oil Operations Limited

Husky Oil Operations Limited Husky Oil Operations Limited 707 8th Avenue S.W. Bus: (403) 298-6111 Box 6525, Station D Fax: (403) 298-6378 Calgary, Alberta, Canada T2P 3G7 October 27, 2016 Sahtu Land & Water Board Box 1 0E 0H0 SLWB

More information

Pipelines in Your Community. Important Safety Information

Pipelines in Your Community. Important Safety Information Pipelines in Your Community Important Safety Information Pipelines in Your Community Kinder Morgan Canada Inc., an affiliate of Kinder Morgan Canada Limited (KML), operates the Trans Mountain and Trans

More information

PRELIMINARY FEASIBILITY STUDY

PRELIMINARY FEASIBILITY STUDY PRELIMINARY FEASIBILITY STUDY OF THE CADOTTE LEASES ALBERTA, CANADA REPORT NUMBER: QE-25620080229 REPORT DATE: FEBRUARY 29, 2008 Prepared on Behalf of: Strata Oil and Gas, Inc. Norwest Questa Engineering

More information

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan EIS Techni cal Support Document 20-12 Magino Project Environmental Impact Statement Technical Support Document 20-12 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION

More information

Focus on Hydraulic Fracturing

Focus on Hydraulic Fracturing INTRODUCTION Focus on Hydraulic Fracturing We have been hydraulically fracturing, or fracking, wells to produce natural gas and crude oil for decades. Our Health, Safety and Environment (HSE) Policy and

More information

Kearl. Project Description Update Kearl Mine Development

Kearl. Project Description Update Kearl Mine Development Project Description Update Mine Development May 2006 This document contains forward-looking information on future production, project start-ups and future capital spending. Actual results could differ

More information

MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Drilling/Production Assets 2015 Emission Data

MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Drilling/Production Assets 2015 Emission Data MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Drilling/Production Assets 215 Emission Data MURPHY EXPLORATION & PRODUCTION COMPANY 1 Murphy Oil Corporation Climate Change Activities Murphy s emission

More information

AFTP. Technologies Applicable to Heavy Oil / Bitumen

AFTP. Technologies Applicable to Heavy Oil / Bitumen AFTP Technologies Applicable to Heavy Oil / Bitumen Field - Production/extraction level Midstream - Transportation Level Valorisation - Upgrading level AFTP-Oct-2007 FIELD LEVEL production / extraction

More information

Environmental. Performance

Environmental. Performance Letter Environmental to Shareholders Performance TransAlta is transitioning our generation mix and putting our focus onto less carbon intensive fuels. By 2025, we anticipate that coal will account for

More information

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0 PROTOCOL 15 FOR CONTAMINATED SITES Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil Version 1.0 Prepared pursuant to Section 64 of the Environmental Management

More information

Spectra Energy: Creating Opportunity through Natural Gas Liquids and Export. Gary Weilinger Vice President, Strategic Development and External Affairs

Spectra Energy: Creating Opportunity through Natural Gas Liquids and Export. Gary Weilinger Vice President, Strategic Development and External Affairs Spectra Energy: Creating Opportunity through Natural Gas Liquids and Export Gary Weilinger Vice President, Strategic Development and External Affairs Peace River Regional District November 22, 2012 Safe,

More information

Facilities Environmental Protection Plan: Burnaby Terminal

Facilities Environmental Protection Plan: Burnaby Terminal Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation

More information

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC.

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC. SHELL GLOBAL SOLUTIONS October 2002 2 SHELL GLOBAL SOLUTIONS Gasification Technologies 2002 Integrated Oil Development Using OrCrude Upgrading and Shell Gasification Process Jim Arnold Phil Rettger Max

More information

Peace River Regional District Committee of the Whole

Peace River Regional District Committee of the Whole Peace River Regional District Committee of the Whole Encana Municipal Outreach Dawson Creek November 26 2015 Peace River Regional District Agenda 1. Opening Remarks 2. Introductions 3. Encana CRP Development

More information

Harmon Valley South HCSS Pilot Approval Annual Performance Presentation

Harmon Valley South HCSS Pilot Approval Annual Performance Presentation Harmon Valley South HCSS Pilot Approval 11895 Annual Performance Presentation 11-Feb-2015 Subsurface Agenda 1. Background 2. Geology 3. Drilling and Completions 4. Artificial Lift 5. Well Instrumentation

More information

Hydraulic Fracturing: Fort Nelson First Nation s Perspective

Hydraulic Fracturing: Fort Nelson First Nation s Perspective Hydraulic Fracturing: Fort Nelson First Nation s Perspective Chief Sharleen Gale and Department of Lands & Resources Director Lana Lowe Fort Nelson First Nation A presentation to the Yukon Select Committee

More information

INDUSTRIAL WATER USE INSPECTION REPORT

INDUSTRIAL WATER USE INSPECTION REPORT Indian and Northern Affairs Canada Affaires Indiennes et du Nord Canada INDUSTRIAL WATER USE INSPECTION REPORT INSPECTION DATE: 2010-11-02 COMPANY REP : Jamie Steele LICENSEE: BHP Billiton Canada Inc.

More information

ST Field Surveillance and Operations Branch Field Operations Provincial Summary 2012

ST Field Surveillance and Operations Branch Field Operations Provincial Summary 2012 ST57-2013 Field Surveillance and Operations Branch Field Operations Provincial Summary 2012 ACKNOWLEDGEMENTS Thank you to the following Energy Resources Conservation Board staff who contributed to this

More information

Plains Midstream Canada Spill Interim Water Quality Report. (June 18, 2012)

Plains Midstream Canada Spill Interim Water Quality Report. (June 18, 2012) Executive Summary Plains Midstream Canada Spill Interim Water Quality Report (June 18, 2012) In response to a pipeline break and subsequent discharge of light crude oil into the Red Deer River near Sundre,

More information

Quiet above ground, the extreme subsurface environment of thermal operations spurs evolution in artificial-lift technology for thermal developments

Quiet above ground, the extreme subsurface environment of thermal operations spurs evolution in artificial-lift technology for thermal developments PHOTO: Cenovus Energy Subsurface temperatures and pressures in SAGD development are very hard on the pumping equipment that brings unconventional oil to the surface. Hot and Quiet above ground, the extreme

More information

An Innovative Remediation Approach to an Emergency Spill Response Part One

An Innovative Remediation Approach to an Emergency Spill Response Part One An Innovative Remediation Approach to an Emergency Spill Response Part One Presented at RemTech 2015 Banff, Alberta Sheri Gilmour October 16, 2015 Presentation Summary and Key Items Review the Incident

More information

Grizzly Oil Sands ULC

Grizzly Oil Sands ULC May River SAGD Project A-1 Appendix A Table A-1 ERCB Draft 23 Oil Sands Project Applications (ERCB 2013) 3 GENERAL APPLICATION REQUIREMENTS 3.3 Project Description Requirements 3.3.1 Applicant and the

More information

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures

More information

CHAPTER 15 MITIGATION AND MONITORING

CHAPTER 15 MITIGATION AND MONITORING CHAPTER 15 MITIGATION AND MONITORING 15.1 Overview of Impacts The study of, and commitment to, mitigate measures have become an extensive and meaningful part of the environmental impact assessment process.

More information

Presentation to the Oil Sands Multi-stakeholder Committee Bonnyville, September 13, 2006

Presentation to the Oil Sands Multi-stakeholder Committee Bonnyville, September 13, 2006 Presentation to the Oil Sands Multi-stakeholder Committee Bonnyville, September 13, 2006 Mary Griffiths, Ph.D. Senior Policy Analyst, The Pembina Institute E-mail: maryg@pembina.org Mr. Chairman and Members

More information

Produced Gas Measurement Standard for Heavy Oil Sites

Produced Gas Measurement Standard for Heavy Oil Sites 11..3. Produced Gas Measurement Standard for Heavy Oil Sites July 31, 17 Description The current standards for measurement and estimation of produced gas from various types of primary heavy oil sites are

More information

MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Exploration/Production Assets 2016 Emission Data MURPHY OIL CORPORATION 1

MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Exploration/Production Assets 2016 Emission Data MURPHY OIL CORPORATION 1 MURPHY OIL AND CLIMATE CHANGE Upstream Worldwide Exploration/Production Assets 2016 Emission Data MURPHY OIL CORPORATION 1 Murphy Oil Corporation Climate Change Activities Murphy s emission inventory based

More information

FINAL - Technical Memorandum. Background. DATE: December 13, 2011 YOUR FILE: Delete this if not needed TO: James Craig, BCCF

FINAL - Technical Memorandum. Background. DATE: December 13, 2011 YOUR FILE: Delete this if not needed TO: James Craig, BCCF FINAL - Technical Memorandum DATE: December 13, 2011 YOUR FILE: Delete this if not needed TO: James Craig, BCCF FROM: Craig Sutherland, P.Eng. RE: BC CONSERVATION FOUNDATION Theodosia River Summer Flow

More information

Section 1 - Introduction

Section 1 - Introduction Section 1 - Introduction Algar Lake SAGD Project Section 1 Project Introduction TABLE OF CONTENTS 1. PROJECT INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 PROJECT PROPONENT... 1 1.3 PROJECT OVERVIEW...

More information

HEAVY OIL CAPABILITIES

HEAVY OIL CAPABILITIES HEAVY OIL CAPABILITIES Central Processing Facilities Equinox provides expertise, technical solutions and effective execution strategies for thermal in-situ projects. Our experience spans grassroots facilities,

More information

SHELL ONSHORE OPERATING PRINCIPLES

SHELL ONSHORE OPERATING PRINCIPLES SHELL ONSHORE OPERATING PRINCIPLES FOR TIGHT SAND OR SHALE OIL AND GAS In 2011, Shell publicly shared five aspirational operating principles that govern the activities where we operate and where hydraulic

More information