1 Tonga Renewable Energy Project (TREP), under the Pacific Islands Renewable Energy Investment Program Kingdom of Tonga Asian Development Bank (ADB) 17 March 2017

2 Project/Programme Title: Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program Country/Region: Kingdom of Tonga Accredited Entity: Asian Development Bank National Designated Authority: Ministry for Meteorology, Energy Information, Disaster Management, Environment, Climate Change and Communications (MEIDECC)

3 A. Project / Programme Information A.1. Project / programme title A.2. Project or programme A.3. Country (ies) / region A.4. National designated authority(ies) A.5. Accredited entity A.6. Executing entity / beneficiary PROJECT / PROGRAMME CONCEPT NOTE GREEN CLIMATE FUND PAGE 1 OF 5 Please submit the completed form to fundingproposal@gcfund.org 1 Tonga Renewable Energy Project (TREP), under the Pacific Islands Renewable Energy Investment Program Project Kingdom of Tonga Ministry for Meteorology, Energy Information, Disaster Management, Environment, Climate Change and Communications (MEIDECC) Asian Development Bank (ADB) Executing Entity: Ministry of Finance and National Planning (MFNP) Beneficiary: Ministry for Meteorology, Energy Information, Disaster Management, Environment, Climate Change and Communications (MEIDECC) and Tonga Power Limited (TPL) A.7. Access modality Direct International A.8. Project size category (total investment, million USD) A.9. Mitigation / adaptation focus A.10. Public or private Micro ( 10) Small (10<x 50) Medium (50<x 250) Large (>250) Mitigation Adaptation Cross-cutting public Which of the following targeted results areas does the proposed project/programme address? A.11. Results areas (mark all that apply) A.12. Project / programme life span Reduced emissions from: Energy access and power generation (E.g. on-grid, micro-grid or off-grid solar, wind, geothermal, etc.) Low emission transport (E.g. high-speed rail, rapid bus system, etc.) Buildings, cities, industries and appliances (E.g. new and retrofitted energy-efficient buildings, energy-efficient equipment for companies and supply chain management, etc.) Forestry and land use (E.g. forest conservation and management, agroforestry, agricultural irrigation, water treatment and management, etc.) Increased resilience of: Most vulnerable people and communities: Diversification of power generation sources (E.g. mitigation of operational risk associated with climate change diversification of supply sources and supply chain management, relocation of manufacturing facilities and warehouses, etc.) Health and well-being, and food and water security (E.g. climate-resilient crops, efficient irrigation systems, etc.) Infrastructure and built environment (E.g. sea walls, resilient road networks, etc.) Ecosystems and ecosystem services (E.g. ecosystem conservation and management, ecotourism, etc.) 25 years 1 Please use the following naming convention for the file name: [CN]-[Agency short name]-[date]-[serial number] (e.g. CN-ABC ).

4 GREEN CLIMATE FUND PAGE 2 OF 5 A.13. Estimated implementation start and end date B. Project/Programme Details Start: October 2017 End: December 2020 The Fund requires the following preliminary information in order to promptly assess the eligibility of project/programme investment. These requirements may vary depending on the nature of the project/programme. The Board of the Green Climate Fund (GCF) announced its support for the Pacific Islands Renewable Energy Program (the Program) in December The Program will help seven Pacific island countries transition to a renewable energy future. The Program Objective is to transform the electricity production sectors across the Pacific to low carbon, climate resilient pathways, and the Program Outcome will be expanded access to clean, resilient and affordable energy. Further, the Board approved a $12 million grant for battery energy storage system (BESS) in the Cook Islands and a $5 million grant for regional capacity building and sector reform, under the Program. This proposed Tonga Renewable Energy Project (TREP) take place within the Program, and is the second project submitted after the Cook Islands. Benefits: TREP: will deliver an estimated lifetime reduction of 475,750 tco2e emissions; and it will contribute greatly to increasing the contribution of renewables to Tonga electricity production from under 10% to 50% by Paradigm shift: TREP will play a central role in carrying renewable energy use in Tonga to a tipping point after which renewable energy will become a more default investment for both private and public sectors. B.1. Project / programme description (including objectives) The Kingdom of Tonga (Tonga) is a small island developing state (SIDS) consisting of 177 islands with a total area of 748 km 2 divided into the following four island groups: Tongatapu, Ha'apai, Vava'u and Niuas. 36 of Tonga s islands are inhabited and the total population is estimated at 105,000 (IMF, 2014). The entire country can be considered remote from most markets, lying in the Pacific approximately 1,000km from Fiji and over 4,000 km from New Zealand. Like many other small Pacific islands, until recently Tonga s electricity production relied almost exclusively on diesel generation. All grid-supplied electricity, i.e. over 95% of electricity used in Tonga, was generated using imported diesel fuel. An estimated 13 million litres of diesel were consumed annually to only generate electricity, at a cost equivalent to approximately 10% of total gross domestic product and 15% of national imports. This had the following negative implications: high greenhouse gas emissions, high electricity production costs and tariffs, high input price volatility, high dependency on imports, and localised pollution. As of March 2017, about 11%of electricity demand is met by renewables. To respond, the Government of Tonga issued the Renewable Energy Act in Transition to renewable energy has been a national priority ever since. In 2009, the Tonga Energy Road Map, (TERM) established the target of generating 50% of all electricity from renewables by A pillar of efforts to reach the TERM target is the following three-phase plan:

5 GREEN CLIMATE FUND PAGE 3 OF 5 Phase 1, The Outer Island Renewable Energy Project (OIREP), supported by several international partners. OIREP outcomes are: (i) optimized use of on-grid and off-grid generation systems, and (ii) increased consumer access to electricity generated by solar power. OIREP outputs include: (i) the construction and installation of solar power systems with a total capacity of 1.32 MWp on 9 outer islands, (ii) the transfer of operation and maintenance knowledge, and (iii) rehabilitation of the existing grid network near the solar power generation systems on the islands of 'Eua and Vava u; Phase 2: Initial expansion through the most financially attractive projects, with a total investment of $10 15 million. This includes one solar farm to be funded and built by an independent power producer (IPP), and one wind farm to be funded by the Japan International Cooperation Agency (JICA); Phase 3, This proposed project, TREP is central to Phase 3. Phase 3 is to help Tonga meet renewable energy targets in its largest demand centre (Tongatapu) and on the outer islands not covered through OIREP. In parallel, under Phase 3, ADB support has been requested for a new biomass plant. Hence GCF support to TREP is part of a strategic package of investments supporting implementation of TERM. TREP investments focus on renewable energy generation and BESS. Generation is both on-grid and on mini-grids. TREP invests on Tongatapu and at least seven outer islands. TREP also includes the necessary capacity development and training programs to ensure long-term sustainability of impacts. TREP includes the following sub projects: Sub-project no., location and technology Generation capacity Storage capacity No. of beneficiaries 1. Tongatapu: 3 units of BESS - 6.9MW/18.30MWh Indirectly: 75,000 (all island) 2. Tongatapu: grid connected solar PV 4MW 1.4MW/0.7MWh Indirectly: 75,000 (all island) 3. Eua: solar PV and BESS 0.4MW 0.5kWh Indirectly: 5,000 (all island) 4. Vava u: solar PV BESS 0.5MW 1.1MW/1.5MWh Indirectly: approx. 10,000 (all island) 5. Tongatapu: grid connected wind farm 5.3 MW 1.8MW/0.9MWh Indirectly: 75,000 (all island) 6. 4 outer islands (Nomuka, 0.32MW 1.68MWh 1-2,000 Ha afeva, Uiha and Ha ano): solar mini-grid and BESS 7. Niuafo ou: solar mini-grid and 0.122MW 0.52MWh 650 BESS 8. Capacity building n/a n/a n/a

6 GREEN CLIMATE FUND PAGE 4 OF 5 B.2. Background information on project/programme sponsor B.3. Market overview B.4. Regulation, taxation and insurance In total TREP should lead to approximately MW of installed RE capacity and almost 24MWh of BESS capacity. The ADB is a multilateral development bank that provides loans, grants and technical assistance. ADB is composed of 67 members, 48 of which are from the Asia and Pacific region. ADB s clients are its member governments, who are also its shareholders. Moreover, ADB provides direct assistance to private enterprises of developing member countries through equity investments and loans. In 2016, loan, grant and technical assistance approvals to ADB's developing member countries amounted to $17.8 billion, and total co-financing mobilized, with donor support, amounted to $13.9 billion, bringing total sovereign operations to $31.7 billion in Non-sovereign operations for the same year amounted to $2.5 billion. ADB has the largest energy portfolio amongst development partners in the Pacific, covering electricity generation, transmission and distribution. Currently, the regional energy portfolio consists of 14 projects in 8 countries for a total investment of over $350 million. ADB has been operating in Tonga since 1972 and has provided the country with $168.5 million in loans, grants, and technical assistance. Not applicable The following are to play leading roles in the project: Tonga Power Limited (TPL), a regulated public enterprise. Its core business is the generation and distribution of electricity across four grid system in the country; MEIDECC Department of Energy, responsible for policy formulation as well as implementation of rural electrification and demand management projects; Electricity Commission, responsible for the establishment of the tariffs; Minister for Finance and Planning, supervises the Electricity Commission and reports to the Legislative Assembly The implementing partners - MEIDECC and TPL - have the mandate and authority to implement the activities foreseen under this project. They have significant experience executing and implementing energy sector projects. MEIDECC and TPL will be required to obtain project development permits. In doing so, they will respect all national laws and regulations, including environmental regulations, and regulations guiding the need for consultation and stakeholder consent, and all national procedures for land acquisition. Notably, the Tonga Environmental Impact Act (2003) requires all major projects to undertake an environmental impact assessment, and this will be undertaken, if required. ADB financed projects in Tonga are tax exempt. As per the Electricity Amendment Act (2010), all plant and machinery required for setting up power plants in Tonga is exempt from all taxes and duties. Governance B.5. Implementation arrangements The Government of Tonga has established a high level Taskforce to implement TERM. Under the TERM Taskforce, a GCF sub-committee has been established for this TREP project to support TREP project development and coordination. The sub-committee is chaired by MEIDECC and its members include TPL, the Ministry of Finance and National Planning, an OIREP representative, and a representative from the Tonga ADB extended mission office. It reports directly to the Deputy Prime Minister. After approval, this sub- Committee will become the Project Steering Committee. With support from a Project Management Unit (PMU), the Committee will oversee project implementation, facilitate information flows and support coordination. Implementation TPL will implement all grid-connected renewable energy and BESS sub-projects (#1, 2, 3, 4, and 5 of Table in B1). MEIDECC will implement mini and off-grids renewable subprojects coupled with BESS sub-projects (#6 and 7). The PMU will be established in MEIDECC and be responsible for all sub-projects.

7 GREEN CLIMATE FUND PAGE 5 OF 5 Design and supervision consultants will be mobilized through separate contractual arrangements. These consultants, on behalf of the Government of Tonga and ADB, will oversee all implementation: procurement, contracting, civil works and maintenance. Timetable GCF Board Approval: October 2017 ADB Board Approval: April 2018 Bidding documents and bidding: Q Q4, 2018 Contract award: by Q4, 2018 Construction: Q Q4, 2019 Testing/Commissioning: Q Q Training, O&M: Q onwards Evaluation: Q C. Financing / Cost Information Investment Program The TREP cost is estimated at $84.47 million. The indicative financing plan for TREP is presented in the following table: Source Net Amount ($ million) Share (%) Green Climate Fund Co-financing from donors Tonga Power Limited Government of Tonga (GoT) Total Notes All amounts to be confirmed during full project development stage. Government contribution includes exemptions from taxes and duties C.1. Description of financial elements of the project / programme The estimated cost breakdown by sub-project is presented in the following table: Sub-project Cost ($ million) 1. Tongatapu: battery storage Tongatapu: grid connected solar PV Eua: solar PV and battery storage Vava u: solar PV and battery storage Tongatapu: grid connected wind farm Four outer islands (Nomuka, Ha afeva, Uiha and Ha ano): solar mini-grid and battery storage Niuafo ou: solar mini-grid and battery storage Capacity Building Management support Land acquisitions Taxes and duties 9.00 Total C. 2. Pr oj Total project The estimated cost breakdown by input is presented in the following table (details to be discussed and confirmed during the detailed project design stage): Item GCF GoT TPL Other Total Design, Supply and Install for Plants Consulting services Taxes and duties Land acquisition Total All figures in US$ million Financial Instrument Amount Currency Tenor Pricing $84.47 million

8 GREEN CLIMATE FUND PAGE 6 OF 5 ec t fin an cin g inf or m ati on financin g (a) = (b) + (c) (i) Senior Loans (ii) Subordinated Loans (iii) Equity (iv) Guarantees (v) Reimbursable grants * (vi) Grants * $64.37 million ( ) years ( ) years ( ) % ( ) % ( ) % IRR As described above, TREP is part of Phase 3 of implementing the TERM. Phases 1, 2 and 3 have had significant support from many partners, including ADB. Aside from TREP, the investments in the 3 Phases so far total approximately $45 million, as follows: Phase 1: total investment of $24.72 million, including $11.44 million from ADB ($7.44 million grant and $4 million loan); Phase 2: total investment of $10 15 million; Phase 3: (i) TREP and (ii) $8 million biomass plant, 50% financed by concessional loan (currently under consideration by ADB). Justification for grant financing (b) Request ed GCF amount SIDS status and vulnerability: Tonga is a small island development state and is highly vulnerable to external economic and climatic shocks. Tonga is ranked second among the countries considered most at risk from natural disasters (2016 World Risk Report). Further, although not considered to be in a fragile and conflict-affected situation (FCAS), Tonga and other Pacific island countries do meet some of the criteria for FCAS classification. Foreign exchange risk: As of end-june 2016, over 90 percent of the total public debt stock was denominated in foreign currency, and therefore exposed the country to exchange rate risks. Need for socially equitable Tariffs: Electricity tariffs are already very high in Tonga and government social policy precludes increasing them. Analysis suggests that utilising grant instead of loan for TREP would reduce tariffs to consumers by up to about 18.6%, thereby helping to meet social objectives. Debt ceilings: According to the 2016 International Monetary Fund/World Bank Debt Sustainability Analysis, Tonga is considered at moderate risk of debt distress. As such, the debt levels must be carefully managed and monitored. The GCF ITAP review of the Regional Programme stated the Cook Islands and Tonga have reached national debt ceilings. It is not considered reasonable for the GCF to extend loans to these SIDS (GCF ITAP, December 2016) 2. Finally, in December 2016, GCF approved $12 million grant investment in renewable energy/battery storage on the Cook Islands a nation facing similar conditions to Tonga. 2 GCF/B.15/13/Add.16/Rev.01n (December 2016)

9 GREEN CLIMATE FUND PAGE 7 OF 5 In line with the above, grant financing is requested in order to meet this opportunity to support the adoption of renewable energy technology in Tonga. Total Requested (i+ii+iii+iv+v+vi) $64.37 million Financial Instrument Amount Currency Name of Instituti on Seniority (c) Cofinancin g Grant Grant Grant $5 million $6.1 million $9 million Options Options Options Options Donor (tbc) TPL Govern ment (d) Covena nts (e) Conditio ns precede nt to disburse ment Lead financing institution: Asian Development Bank Not applicable The GCF grant proceeds administered by ADB will be disbursed in accordance with the procedures set out in ADB s Grant Disbursement Handbook (2007, as amended from time to time), and detailed arrangements agreed upon between the Government and ADB. Pursuant to ADB's Safeguard Policy Statement (2009) (SPS), ADB funds may not be applied to the activities described on the ADB Prohibited Investment Activities List set forth at Appendix 5 of the SPS. All financial institutions will ensure that their investments are in compliance with applicable national laws and regulations and will apply the prohibited investment activities list to the components financed by ADB. D. Expected Performance against Investment Criteria Please explain the potential of the Project/Programme to achieve the Fund s six investment criteria as listed below. Mitigation D.1. Climate impact potential [Potential to achieve the GCF's objectives and results] The TREP will contribute to climate change mitigation by reducing emissions of greenhouse gases. The reduction estimates for the sub-projects are presented in the following table: Fuel Saving (Liter/ yr) CO2 Emission Reduction (ton/yr) Battery energy storage system (BESS) 1 3 units of BESS in Tongatapu 1,200,000 3,250 Grid-connected solar PV farms 2 2 grid-connected solar PV plants in Tongatapu 1,500,000 4,100 3 Solar PV Farm with BESS in 'Eua 200, Solar PV Farm with BESS in Vava u 300, Grid-connected wind farms 5 Grid-connected wind farms in Tongatapu 3,600,000 9,800 Solar + BESS mini-grid in outer islands 6 80kWp solar mini-grids with 420 kwh battery storage 141, each in 4 outer islands of Ha'apai 7 122kWp solar mini-grid with 520kWh battery storage in Niuafo ou 86, Capacity Building Project Management Support - - Total 7,027,000 19,030 Source: Based TPL s estimates and OIREP reports The total estimated savings are 19,030 tons of CO2e on an annual basis.

10 GREEN CLIMATE FUND PAGE 8 OF 5 Adaptation Tonga is highly vulnerable to climate change induced sea level rise and the increased frequency/intensity of storms, including tropical cyclones. The infrastructure provided through this project will be designed to be resilient through all realistic climate change scenarios. This represents a material improvement over the baseline situation. The TREP will contribute greatly to energy security on Tonga. There will be less reliance on imported fuels. The grids and mini-grids will be designed to be more reliable and more resilient. There will be greater capacity to manage and maintain grids. The more reliable energy supply will support early warning systems, information systems as well as health care and awareness raising programs. As a result of these changes, Tonga s society and economy will be more resilient to climate change. Paradigm shift As mentioned earlier, TERM represents a paradigm shift, not only for Tonga, but also for the Pacific. However, until now, due to financial constraints, TERM implementation has been limited. Tonga, as for many of the Pacific islands, stands at important cross-roads. It can either continue on the previous path of fossil fuel dependence with consolidated investments or it can achieve a transition to low carbon energy sector through renewable energy. The Government of Tonga, through the TERM, has opted for the latter transition. This will also lead to benefits in terms of energy security, improved balance of payments, increased energy access for marginalized communities and reduced local pollution. Tonga already has some experience with a small scale of solar, biomass energies and limited experience with a large (utility) scale wind power and storage systems. However, to take the sector to tipping point, after which renewables will be in most cases the default investment for both public and private sector, the transition require a sizable push in investments and in technology development, to build momentum on Tongapatu and to demonstrate technical and economic feasibility on the outer islands and in the mini-grids. The 3-Phase journey described in the previous sections should take Tonga to that tipping point. D.2. Paradigm shift potential [Potential to catalyze impact beyond a one-off project or programme investment] This is in line with the findings of the GCF ITAP review of the Regional Program which stated Most Pacific countries lack the budget to support rural electrification programmes. Renewable energy for rural electrification offers a paradigm shift as low cost power generation will allow power utilities to extend grids and improve access at lower power generation costs (GCF ITAP, December 2016). Knowledge management and lesson learning TREP is the second to be proposed to GCF under the Program, following the Cook Islands project in December Further projects are being developed in the Federated States of Micronesia, Nauru, Papua New Guinea, Republic of Marshal Islands and Samoa. Under the Program, a regional coordination and knowledge management mechanism will be established with the support of ADB. Initially, the following knowledge exchange will be supported: Tonga to learn from the Cook Island experience with installing BESS, including the institutional and capacity support mechanisms; All countries to learn from Tonga with regards to BESS, grid-integration of intermittent electricity generated by solar and wind power, and institutional and capacity support mechanisms. Enabling Environment and Regulatory Framework Tonga has already taken steps to strengthen its enabling environment and regulatory framework, starting in 2008 with the Renewable Energy Act and the preparation of TERM in Notably TERM, a ten year action plan covering , included comprehensive measures to update policy, legal, regulatory and institutional arrangements. Much of this has been implemented, including actions under Phases 1 and 2 described above. The Government of Tonga is currently preparing a National Energy Bill. This should set out further institutional, regulatory and policy reforms and lead to streamlined policy and decision making. It should also lead to the formal establishment of a Department of Energy. TREP implementation will be interacting with this process and helping to implement the provisions of the Bill, once approved. This is in line with the findings of the GCF ITAP review of the regional Program which stated the first few projects under the current project/programme intervention will help to establish links with

11 GREEN CLIMATE FUND PAGE 9 OF 5 international investors, lenders, specialized consultants (engineering, legal, etc.) and equipment suppliers, and to further develop the capacities of local partners across the supply of the SIDS region, which will foster the development and implementation of renewable power projects (GCF ITAP, December 2016). Environmental: The anticipated environmental benefits include (i) reduced localized air pollution due to less use of diesel generators and (ii) reduced risk from diesel spills resulting in less land and water contamination. These benefits applies to Tongapatu and to all involved islands, affecting a population of over 70,000. Social: the anticipated benefits include: (i) improved reliability of electricity supplies, especially on the outer islands (ii) reduced tariffs for electricity on Tongapatu and all involved islands. These in turn will lead to many social and cultural benefits such as facilitating educational and health-care activities. D.3. Sustainable development potential [Potential to provide wider development co-benefits] Economic: Increased reliability and reduced tariffs for electricity facilitate local business and economic development. The reduced imports of fossil fuel facilitates the reduction of Tonga s negative balance of payments. A renewable-led electricity sector also makes Tonga more attractive as a tourist destination. Gender: Experience from the region and across the world suggest that, if well designed and planned, renewable energy use can deliver gender benefits. TREP will ensure that there is equal opportunities provided for all females at all stages. TREP impacts will also facilitate income-generating opportunities for women in rural and isolated communities and enhance women s social and political status. An ongoing gender assessment will identify needs and opportunities and set out the required actions through the Gender Action Plan (GAP). This is in line with the findings of the GCF ITAP review of the Program which stated all these cobenefits will enhance the sustainable development potential of the intervention. These metrics and the fact that the revenue generation potential of the renewable energy projects in each of the SIDS countries will enhance the sustainability of the projects (GCF ITAP, December 2016). D.4. Needs of recipient [Vulnerability to climate change and financing needs of the recipients] D.5. Country ownership [Beneficiary country ownership of project or programme and capacity to implement the proposed activities] As for all Pacific island states, Tonga is small in size and has limited natural resources. The economy is not diverse, and Tonga is far from markets, and vulnerable to exogenous shocks. All these factors affect growth and contribute to economic volatility. Tonga faces challenges to address economic and social poverty. For example, an estimated 22.5% of the population lies below the national poverty line, and this percentage has been increasing in recent years. In addition, approximately 0.14% of children die before their first birthday. (Source: ADB website). These figures are worse for rural areas and on outer islands. Sustainable energy can play a key role in overcoming these poverty challenges. Natural climate disasters and climate change pose a threat to the people of Tonga, its society, livelihoods and its national environment. Despite Tonga s minute contributions to greenhouse gas emissions, climate change is already affecting Tonga s development, livelihood of its people and future. Energy policy and interventions in Tonga are partly driven by regional level initiatives and accords. This project in part responds to the regional Framework for Action on Energy Security in the Pacific (FAESP) , as endorsed by all Pacific Island leaders in FAESP assessed the threats to achieving energy security in the Pacific. It found that the threats arise from the interaction of a multitude of factors including: fast growing populations without economies to match; remoteness and distances from main centres and supply chain pathways; vulnerability of energy infrastructure to natural disasters such as cyclones, earthquakes, flooding and tsunamis; inability to take advantage of economies of scale due to small populations and limited industrial activity; old and poorly maintained energy infrastructure, etc. The regional Program was set up as a response to FAESP. This is the second project under the Program and the first for Tonga. However, and as mentioned above, Tonga, through TERM, was a key driver of the above regional developments. Energy security, renewable energy and TREP are all amongst the highest priorities of the Tonga government and stakeholders. This is stated clearly in TERM, in Tonga s Second National Communication to the UNFCCC and in the Tonga (I)NDC to UNFCCC. All of these specify the objective

12 GREEN CLIMATE FUND PAGE 10 OF 5 of having 50% of electricity generated from renewable energy sources by Further, the present Government, on taking office in December 2014, stated that access to affordable and reliable sources of energy is crucial to sustainable livelihoods in Tonga s scattered islands. Finally, the ITAP review of the Program found ample evidence.. of a high level of interaction with relevant stakeholders in all the countries and so ranked the country ownership as high. (GCF ITAP, December 2016). First, TREP Project takes place within a multi-phase program, with ongoing activities financed for approximately $45 million. The costs and mitigation targets for TREP specifically are summarized as follows: D.6. Effectiveness and efficiency [Economic and financial soundness and effectiveness of the proposed activities] a) Total project cost: $84.47 million b) Requested GCF amount: $64.37 million c) Expected annual tco2eq reductions: 19,030 d) Estimated lifetime tco2eq reductions (25 year): 475,750 e) Estimated GCF cost per tco2eq reduction (b)/(d): $135.3/ton TREP will reduce GHG emissions by an estimated 475,750 tco2e for a total GCF investment of $64.37 million at a rate of $135.3 per tco2e. As noted in the ITAP review of the Program (GCF ITAP, December 2016), this compares favorably to recent solar power development project in the Solomon Islands that yielded a cost of USD 724 per t CO2 eq. Hence the mitigation impact can be considered as high. Previous economic assessments suggest that each individual sub-project within TREP is economically feasible. However, a full economic and financial analysis is currently being undertaken. Efficiency in implementing TREP will be optimized by: As part of the Pacific Islands Renewable Energy Investment Program, it is expected to benefit from shared input mobilization and possibly joint procurement; ADB s experience and network of partners in the region; ADB and other partners will continually observe the prices of concerned technologies, to ensure that best available technology is obtained at most affordable prices. E. Brief Rationale for GCF Involvement and Exit Strategy Rational for GCF involvement Tonga has an opportunity to transform to a low carbon, resilient electricity sector and has already made progress, with its own limited funds and support from international partners. However, without continued and significant support, the way ahead is uncertain. Tonga cannot access the financial resources necessary to make the investments, and certainly cannot at the rapid pace required to secure this opportunity. With support from GCF and other partners, it should be possible to take renewable energy electricity generation (and associated storage) to a tipping point beyond which investment in renewables becomes the automatic course of action. In addition, GCF support, through the ADB, and as part of the Pacific Islands Renewable Energy Investment Program, will have the following benefits: access to international networks to ensure best possible technologies and practices are adopted; support to ensure best prices are negotiated for procured equipment and civil works. Sustainability TREP takes place within TERM and is fully supported by the Government of Tonga. MEIDECC and TPL will be the implementing agencies of TREP. They are committed to the project s success and sustainability. In line with TERM, Tonga has already made institutional and financial reforms necessary to support sustainable development of the electricity sector. These ensure that revenue is sufficient to support operations and maintenance, that capacity is sufficient to support technology maintenance, and that the institutional responsibilities are clear. Further, key to sustainability is the Government s commitment to O&M and asset management. Other aspects of TREP contribute to its sustainability, notably: the project will help drive the costs of renewable energy down, and so make electricity more affordable on Tonga; and all project assets will be incorporated into the national power utility asset base, and operated and managed accordingly.

13 GREEN CLIMATE FUND PAGE 11 OF 5 F. Risk Analysis Operational/financial risks A risk assessment is being undertaken as part of the ongoing feasibility study. Currently, two significant risks have been identified: Capacity to operate and manage: Assessment: Previous capacity to operate and maintain energy infrastructure has exhibited some weaknesses on Tonga. Further, the project does introduce some new technologies that require new skills to operate and maintain. Hence the risk is medium. Mitigation: Government has committed to taking all necessary maintenance measures. For instance, on 16 December 2015, the Hon. Cabinet Ministers approved that (i) TPL undertake the maintenance of both the outer island mini grid component and solar home system component, and (ii) the Government will cover the annual maintenance estimated costs and any other associated costs. The project includes a major capacity development component, based on a thorough capacity assessment. As a result, multiple staff will be trained in the operation and maintenance of the generation and battery storage facilities to ensure that there is a broad body of technically qualified people. Price of diesel: Should the price of diesel fall too low, the cost of producing electricity from renewable sources will become non-competitive. Assessment: It is noted that (a) the price of oil has held up at reasonable levels in recent years and there is no reason to expect a significant fall (b) the price of renewable energy technologies continue to fall and independent of petroleum prices. Hence the risk is low. Mitigation: given low level of current risk, the situation will be monitored. Environmental and social risks The project is being developed in accordance with ADB procedures and rules, notably ADB s Safeguard Policy Statement (2009). The project is expected to be categorised as Category B for environment and for involuntary resettlement and Category C for indigenous people. A team of experts has been mobilized to confirm these categories and undertake due diligence assessment. With regards to environment, Category B means few, if any, potential adverse impacts that are site-specific, and, if any, are irreversible, and mitigation measures can be designed readily. To address and mitigate these risks, an Initial Environmental Evaluation (IEE) and Environmental Management Plan will be prepared. This will set out the potential adverse environmental impacts of the activities, and the measures to be taken to manage and to mitigate them. With regards to involuntary resettlement, if Category B, a Land Acquisition and Review Framework (LARF) will be prepared. This will outline social safeguard procedures to follow. Next, a Resettlement plan will be prepared. This will describe the population affected by resettlement, and will describe how they are to be assisted. For indigenous people, Category C means the project is not expected to have impacts on indigenous peoples and no further action is required. G. Multi-Stakeholder Engagement The identification and design of this Project builds on the thorough consultation process that led to the TREM in Subsequently, at the national level, detailed consultation has occurred and is ongoing with concerned government departments (MFNP, MEIDECC and TPL) and with potential partners (JICA and Government of Australia). On the ground consultations with beneficiaries. Significant consultations have already taken place with many beneficiaries and many local stakeholders - see details in the pre-feasibility studies provided in Annex. As mentioned above, a gender assessment is being undertaken and a gender action plan is being prepared. The ongoing process to finalize the feasibility study and to undertake the due diligence will include the preparation of a stakeholder participation plan. H. Status of Project/Programme Pre-Feasibility study: Initial, although in some cases detailed, studies have been completed for all project infrastructure components. These are attached in Annex and include: Sub-project Study title

14 GREEN CLIMATE FUND PAGE 12 OF 5 1. Tongatapu: battery storage Sustainable Utility-Scale Energy Storage on the Four Island Grids (ITP, 2016) 2. Tongatapu: grid connected solar PV Tonga Renewable Energy Master Plan - 6 MW Roadmap (AECOM, 2016) 3. Eua: solar PV and battery storage Kingdom Of Tonga - Outer Islands Renewable Energy Project 4. Vava u: solar PV and battery storage (OIREP) - inception report (STR, 2015) 5. Tongatapu: grid connected wind farm Tongatapu Wind Generation Feasibility Study (Aurecon, 2016) 6. Four outer islands (Nomuka, Ha afeva, Uiha and Ha ano): solar mini-grid and battery storage 7. Niuafo ou: solar mini-grid and battery storage Tonga Outer Island Renewable Energy Project (OIREP) - Phase 2 Site Visit Report (TPL, 2016). However, some gaps exist in the above-mentioned analyses. Further, the rapidly evolving nature of the technology means that some of these studies require updating particularly the cost and economic analyses. The updating and gap-filling is now ongoing, together with the due diligence and gender assessment. 1) Please indicate whether a feasibility study and/or environmental and social impact assessment has been conducted for the proposed project/programme: Yes No (It s currently being conducted) (If Yes, please provide them in section J.) 2) Will the proposed project/programme be developed as an extension of a previous project (e.g. subsequent phase), or based on a previous project/programme (e.g. scale up or replication)? Yes No (If yes, please provide an evaluation report of the previous project in section J, if available.) As described previously, this forms part of Phase 3 of a multi-phase package of activities. As of yet no activities have been completed hence evaluation reports are not available. I. Remarks J. Supporting Documents for Concept Note Map indicating the location of the project/programme (To be included in a final proposal) Financial Model (To be included in a final proposal after completion of the feasibility assessments) Pre-feasibility Study Sustainable Utility-Scale Energy Storage on the Four Island Grids (ITP, 2016); Tonga Renewable Energy Master Plan - 6 Mw Roadmap (Aecom, 2016); Kingdom Of Tonga - Outer Islands Renewable Energy Project (OIREP) - inception report (STR, 2015) Tongatapu Wind Generation Feasibility Study (Aurecon, 2015); Tonga Outer Island Renewable Energy Project (OIREP) - Phase 2 Site Visit Report (TPL, 2016); Upgrade of Grids and Preparing the Utility for Operations with Renewable Energy Plants - Stage 2 - Modelling of Renewable Energy Penetration Scenarios (Aecom, 2016). Feasibility Study (if applicable) (To be included in a final proposal after completion of the feasibility assessments) Environmental and Social Impact Assessment (if applicable) (To be included in a final proposal after completion of the feasibility assessments) Evaluation Report (if applicable) GCF-ITAP Report prepared in December 2016

Nauru Solar Power Development Project under the Pacific Islands Renewable Energy Investment Program. Asian Development Bank Nauru

Nauru Solar Power Development Project under the Pacific Islands Renewable Energy Investment Program. Asian Development Bank Nauru Nauru Solar Power Development Project under the Pacific Islands Renewable Energy Investment Program Asian Development Bank Nauru 17 January 2018 Project/Programme Title: Nauru Solar Power Development Project

More information

FP090: Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program

FP090: Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program FP090: Tonga Renewable Energy Project under the Pacific Islands Renewable Energy Investment Program Tonga Asian Development Bank (ADB) Decision B.21/34 28 November 2018 Project/Programme Title: Tonga Renewable

More information

Tajikistan Asian Development Bank (ADB)

Tajikistan Asian Development Bank (ADB) Water Resources Management in the Pyanj River Basin (Additional Financing) - Institutional Development of the State Agency for Hydrometeorology of Tajikistan Tajikistan Asian Development Bank (ADB) 07

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Interim Country Partnership Strategy: Maldives, 2014 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities A. Sector Performance 1. The Maldives

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43452 June 2013 Proposed Grant and Administration of Grant Kingdom of Tonga: Outer Island Renewable Energy Project CURRENCY

More information

Energy Sector Priorities Asian Development Bank. David C. Elzinga, Senior Energy Specialist

Energy Sector Priorities Asian Development Bank. David C. Elzinga, Senior Energy Specialist Energy Sector Priorities Asian Development Bank David C. Elzinga, Senior Energy Specialist Mega-trends affecting the Energy Sector Sustainability: Financial Economic Social Technology: Distributed Digital

More information

Costs of Renewables in Pacific Island Countries (PICs)

Costs of Renewables in Pacific Island Countries (PICs) IRENA Workshop Accelerated Renewable Energy Deployment in Islands with Emphasis on the Pacific Islands Costs of Renewables in Pacific Island Countries (PICs) Katerina Syngellakis Senior Engineer IT Power

More information

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND June 1, 2009 DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND BACKGROUND 1. Low income countries face a

More information

Report and Recommendation of the President to the Board of Directors. Proposed Facility Pacific Renewable Energy Investment Facility

Report and Recommendation of the President to the Board of Directors. Proposed Facility Pacific Renewable Energy Investment Facility Report and Recommendation of the President to the Board of Directors Project Number: 49450-004 May 2017 Proposed Facility Pacific Renewable Energy Investment Facility Distribution of this document is restricted

More information

International Seminar of Energy Security in the Pacific Island Countries. Presentation by Steven Esau and Nikolasi Fonua

International Seminar of Energy Security in the Pacific Island Countries. Presentation by Steven Esau and Nikolasi Fonua International Seminar of Energy Security in the Pacific Island Countries Presentation by Steven Esau and Nikolasi Fonua 1. Introductions 2. An overview of the Pacific Islands 3. Tonga in General 4. National

More information

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA

SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SCALING-UP RENEWABLE ENERGY PROGRAM (SREP) COUNTRY INVESTMENT PLAN KENYA SREP Sub- Committee Meeting, Cape Town June 21, 2011 1 Introduction Kenya is one of the six Pilot Countries selected to benefit

More information

Outline of Expression of Interest to Participate in SREP 1

Outline of Expression of Interest to Participate in SREP 1 Outline of Expression of Interest to Participate in SREP 1 I. COUNTRY AND GOVERNMENT AGENCY SUBMITTING EXPRESSION OF INTEREST COUNTRY: KINGDOM OF TONGA GOVERNMENT AGENCY: TONGA ENERGY ROAD MAP (TERM) IMPLEMENTATION

More information

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project Document: EB 2017/LOT/P.20 Date: 17 November 2017 Distribution: Public Original: English E President s memorandum Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification 1. A project preparatory technical assistance (PPTA) is required to prepare all documents for the sector project framework and core

More information

Solar Plus: Diversified Low-Carbon Systems to Improve Energy Supply and Climate Resilience. Islamic Republic of Afghanistan Asian Development Bank

Solar Plus: Diversified Low-Carbon Systems to Improve Energy Supply and Climate Resilience. Islamic Republic of Afghanistan Asian Development Bank Solar Plus: Diversified Low-Carbon Systems to Improve Energy Supply and Climate Resilience Islamic Republic of Afghanistan Asian Development Bank 20 June 2016 Solar Plus: Diversified Low-Carbon Systems

More information

NIUE NATIONAL ENERGY POLICY

NIUE NATIONAL ENERGY POLICY NIUE NATIONAL ENERGY POLICY Gerhard Zieroth Project Manager PIEPSAP Project Report 37 November 2005 ~ Participating Pacific Islands Countries ~ Cook Islands, Federated States of Micronesia, Fiji, Kiribati,

More information

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Ministry of Economy Republic of Fiji Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji Pre-feasibility Study Results December 2017 Context of National Policy and Nationally

More information

Delivering and Tracking Climate Change Related ODA

Delivering and Tracking Climate Change Related ODA Delivering and Tracking Climate Change Related ODA Author/Owner: Principal Development Manager - Environment and Climate Change Policy approved: 21/10/2010 by DLT Guidelines approved by: Deputy Director,

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

Maldives: Towards Low- Carbon Growth. Presented by: Akram Waheed, Maldives Energy Authority

Maldives: Towards Low- Carbon Growth. Presented by: Akram Waheed, Maldives Energy Authority Maldives: Towards Low- Carbon Growth Presented by: Akram Waheed, Maldives Energy Authority Country background Estimated 1192 islands, 26 natural atolls 188 Inhabited islands 111 resort islands Key economic

More information

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program Initial Poverty and Social Analysis Project Number: 43220 May 2016 Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program The views

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Nepal, 2013-2017 A. Overview 1. Nepal has long recognized the development of its large hydropower potential as an important cornerstone

More information

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA

SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA SCALING UP RENEWABLE ENERGY PROGRAME IN TANZANIA By: Edward Ishengoma Assistant Commissioner Renewable Energy Ministry of Energy and Minerals Tanzania 25 July, 2013 CONTENTS 1. Introduction 2. Status of

More information

Canada s Biennial Submission on Strategies and Approaches for Long-Term Climate Finance. November 2016

Canada s Biennial Submission on Strategies and Approaches for Long-Term Climate Finance. November 2016 Canada s Biennial Submission on Strategies and Approaches for Long-Term Climate Finance November 2016 Introduction Canada is pleased to submit its 2016 Biennial Submission on Strategies and Approaches

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 48346-002 May 2016 Proposed Loan, Grant, and Administration of Grant Solomon Islands: Solar Power Development Project

More information

ANNUAL REPORT

ANNUAL REPORT ANNUAL REPORT 2017 www.adb.org/ar2017 Keywords: cofinancing, commercial cofinancing, private sector, nonsovereign s Involving Direct Value-Added Official and Other Concessional Grant Cofinancing, 2017

More information

TERMS OF REFERENCE FOR CONSULTANTS. Preparing the Central Cross Island Road Upgrading Project in Samoa

TERMS OF REFERENCE FOR CONSULTANTS. Preparing the Central Cross Island Road Upgrading Project in Samoa A. Consulting Firm TERMS OF REFERENCE FOR CONSULTANTS Preparing the Central Cross Island Road Upgrading Project in Samoa 1. Project Background 1. Samoa s land transport depends on key arterial roads that

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 45124 Regional Capacity Development Technical Assistance (R-CDTA) December 2011 Smart Grid Capacity Development (Financed by the Japan Fund for Poverty Reduction)

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities West Kalimantan Power Grid Strengthening Project (RRP INO 41074) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems and Opportunities 1. Development of Indonesia s energy

More information

Samoa Expression of Interest to Participate in SREP 1

Samoa Expression of Interest to Participate in SREP 1 Samoa Expression of Interest to Participate in SREP 1 I. COUNTRY AND GOVERNMENT AGENCY SUBMITTING THE EXPRESSION OF INTEREST Samoa, Ministry of Finance II. DESCRIPTION OF THE COUNTRY AND ENERGY SECTOR

More information

Feasibility Study project for GCF / CTCN

Feasibility Study project for GCF / CTCN FY2016 Report Feasibility Study project for GCF / CTCN Development of Geothermal power plant using GCF in Papua New Guinea & other Pacific Islands Summary Report March, 2017 ERM Japan Ltd. Table of Contents

More information

TERMS OF REFERENCE FOR TA CONSULTANTS

TERMS OF REFERENCE FOR TA CONSULTANTS Skills for Competitiveness Project (TRTA CAM 50394) TERMS OF REFERENCE FOR TA CONSULTANTS A. Individual consultants for preliminary analytical work 1. Industrial Human Resource Development Specialist (2.5

More information

Hybrid Islands Initiative Smart Energy Integration for Resilient Islands

Hybrid Islands Initiative Smart Energy Integration for Resilient Islands International Seminar on Energy Security in the Pacific Island Countries JICA s Cooperation for Energy Sector in Pacific Island Counties Hybrid Islands Initiative Smart Energy Integration for Resilient

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569 PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA569 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Enhancing

More information

Results Framework. Quick Guide

Results Framework. Quick Guide Results Framework 2013 2016 Quick Guide Background and Purpose The Asian Development Bank (ADB) corporate results framework is a management tool that helps ADB monitor and improve its performance to achieve

More information

Energy Security in the Pacific Islands. Renewable Energy and Energy Efficiency Partnership (REEEP)

Energy Security in the Pacific Islands. Renewable Energy and Energy Efficiency Partnership (REEEP) Energy Security in the Pacific Islands Renewable Energy and Energy Efficiency Partnership (REEEP) Clean Energy Expo Asia 2010 Singapore 3 November 2010 Eva Oberender Regional Director REEEP South East

More information

Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project (PIGGAREP) - Update CDM Workshop, Suva, Fiji 31 st Nov 3 rd Dec 2011

Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project (PIGGAREP) - Update CDM Workshop, Suva, Fiji 31 st Nov 3 rd Dec 2011 Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project (PIGGAREP) - Update CDM Workshop, Suva, Fiji 31 st Nov 3 rd Dec 2011 Nixon Kua Climate Change Mitigation Officer (CCMO) Background

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map A. Sector Performance, Problems, and Opportunities 1. Azerbaijan is rich in energy resources. The

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: People s Republic of China, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Sector Road Map A. Sector Performance, Problems,

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia

Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Government of Ethiopia Ministry of Agriculture REDD+ Secretariat Addis Ababa, Ethiopia Terms of Reference(ToR) for the Strategic Environmental and Social Assessment (SESA) and Environmental Social Management

More information

Japan International Cooperation Agency (JICA) and Climate Risk Assessment

Japan International Cooperation Agency (JICA) and Climate Risk Assessment Scoping Workshop to enhance the Climate Adaptation Actions of Asia-Pacific Network (APN) Developing Countries Organized by the APN and the Institute of Global Change Adaptation Science (ICAS) of Ibaraki

More information

Climate Finance Study Group

Climate Finance Study Group Climate Finance Study Group G20 Outlook on Mainstreaming Climate Change Considerations into Development Assistance and Climate Finance Programs June, 2016 EXECUTIVE SUMMARY The G20 Climate Finance Study

More information

Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017

Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017 Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017 United Nations Conference Center Bangkok, 14 December

More information

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact. Lapis Elite Consulting Services Text for Profile on Website Overview Lapis Elite Consulting Services provides a broad range of consultancy and professional services, including management consulting, organisational

More information

Team Leader (TTL) 8. Brief Description of Project/Program (including objectives and expected outcomes) 2

Team Leader (TTL) 8. Brief Description of Project/Program (including objectives and expected outcomes) 2 Cover Page for CTF Project/Program Approval Request 1 1. Country/Region India 2. CIF Project ID# XCTFIN209A 3. Project/Program Title Rajasthan Renewable Energy Transmission Investment Program (Multi-tranche

More information

'Perspectives for Adaptation and Mitigation Co-Benefits -JICA's Cooperation for Resilient and Low- Carbon Development'

'Perspectives for Adaptation and Mitigation Co-Benefits -JICA's Cooperation for Resilient and Low- Carbon Development' 3rd Asia-Pacific Climate Change Adaptation Forum Panel 2.1 Investing in adaptation technologies with mitigation co-benefits in Incheon, Republic of Korea, 18 March, 2013 'Perspectives for Adaptation and

More information

Flood Protection Bamako. Mali Kreditanstalt für Wiederaufbau (KfW)

Flood Protection Bamako. Mali Kreditanstalt für Wiederaufbau (KfW) Flood Protection Bamako Mali Kreditanstalt für Wiederaufbau (KfW) 17 May 2015 I. Project/Programme Description (Please submit the completed form to fundingproposal@gcfund.org ) 1 1.1. Project/Programme

More information

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION

ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROJECTS IN THE APEC REGION Beijing, the People s Republic of China, 22 October 2014 2014 APEC Finance Ministers Meeting Joint Ministerial Statement ANNEX A THE IMPLEMENTATION ROADMAP TO DEVELOP SUCCESSFUL INFRASTRUCTURE PUBLIC-PRIVATE

More information

11-13 November 2015, Hotel Novotel Suva Lami Bay, Suva, Fiji SUMMARY OF OUTCOMES

11-13 November 2015, Hotel Novotel Suva Lami Bay, Suva, Fiji SUMMARY OF OUTCOMES REGIONAL CONSULTATIVE WORKSHOP ON RENEWABLE ENERGY DEVELOPMENTS IN THE PACIFIC 11-13 November 2015, Hotel Novotel Suva Lami Bay, Suva, Fiji SUMMARY OF OUTCOMES This summary of outcomes for the Regional

More information

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND

PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized project THE GEF TRUST FUND Re-submission Date: 27 November 2009 PART I: PROJECT IDENTIFICATION INDICATIVE CALENDAR GEF PROJECT ID: 4004 PROJECT

More information

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project)

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project) Technical Assistance Report Project Number: 45010 Project Preparatory Technical Assistance (PPTA) December 2012 Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing

More information

Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology

Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology Japan Fund for Joint Crediting Mechanism and Innovative Low Carbon Technology Ryuzo Sugimoto, Environment Specialist, ADB Knowledge Partnership Week: Innovative Technology & Solutions For Resilient & Smart

More information

Identification of results areas where targeted GCF investment would have the most impact

Identification of results areas where targeted GCF investment would have the most impact Meeting of the Board 1 4 July 2018 Songdo, Incheon, Republic of Korea Provisional agenda item 14 GCF/B.20/Inf.15 8 June 2018 Identification of results areas where targeted GCF investment would have the

More information

IRENA SUPPORT FOR CAPITAL MOBILIZATION FOR THE DEPLOYMENT OF RENEWABLE ENERGY IN SIDS

IRENA SUPPORT FOR CAPITAL MOBILIZATION FOR THE DEPLOYMENT OF RENEWABLE ENERGY IN SIDS IRENA SUPPORT FOR CAPITAL MOBILIZATION FOR THE DEPLOYMENT OF RENEWABLE ENERGY IN SIDS SIDS Global Business Network Forum 2018 Balaclava, Mauritius 21-22 May, 2018 Contents SIDS Lighthouses Overview Support

More information

GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT

GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT Clean Development Mechanism (CDM) National Operational Strategy GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT (January, 2006) CONTENTS 1.0 INTRODUCTION 1 2.0 DESIGNATED NATIONAL AUTHORITY FOR CLEAN DEVELOPMENT

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA46701 Project Name

More information

PARTNERSHIPS AND INVESTMENTS FOR A MORE CLIMATE-RESILIENT CARIBBEAN

PARTNERSHIPS AND INVESTMENTS FOR A MORE CLIMATE-RESILIENT CARIBBEAN PARTNERSHIPS AND INVESTMENTS FOR A MORE CLIMATE-RESILIENT CARIBBEAN Introduction As very small islands and low-lying coastal states, countries in the Caribbean Region are among the most vulnerable to climate

More information

Rural Electrification NAMA for Vanuatu. Asia Carbon Forum, Macao, 27 th March

Rural Electrification NAMA for Vanuatu. Asia Carbon Forum, Macao, 27 th March Rural Electrification NAMA for Vanuatu Asia Carbon Forum, Macao, 27 th March 1 Country Context Island nation in South Pacific Ocean - more than 80 islands - 65 inhabited. Population 234,000 in more than

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Country Partnership Strategy: Timor-Leste, 2010 2015 A. Sector Road Map SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. The energy sector is dominated by offshore

More information

Presentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader)

Presentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader) Presentation to the National Climate Change Country Team and Other Stakeholders Suva, 29 March, 2011 John E. Hay (GOPA Team Leader) Presentation to the National Climate Change Country Team and Other Stakeholders

More information

THE EUROPEAN INVESTMENT BANK IN THE PACIFIC

THE EUROPEAN INVESTMENT BANK IN THE PACIFIC THE EUROPEAN INVESTMENT BANK IN THE PACIFIC PALAU FEDERATED STATES OF MICRONESIA MARSHALL ISLANDS TIMOR LESTE PAPUA NEW GUINEA NAURU SOLOMON ISLANDS TUVALU KIRIBATI VANUATU NEW CALEDONIA FIJI WALLIS AND

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

LATIN AMERICAN AND CARIBBEAN REGIONAL WORKSHOP ON TRANSFER OF TECHNOLOGY SAN SALVADOR, EL SALVADOR, MARCH 2000

LATIN AMERICAN AND CARIBBEAN REGIONAL WORKSHOP ON TRANSFER OF TECHNOLOGY SAN SALVADOR, EL SALVADOR, MARCH 2000 UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE LATIN AMERICAN AND CARIBBEAN REGIONAL WORKSHOP ON TRANSFER OF TECHNOLOGY SAN SALVADOR, EL SALVADOR, 29-31 MARCH 2000 PAPER SUBMITTED BY PORTUGAL ON

More information

Sustainable Energy Investment Plan in National Development Strategy - TUVALU

Sustainable Energy Investment Plan in National Development Strategy - TUVALU REGIONAL MEETING ON SUSTAINABLE ENERGY FOR ASIA PACIFIC LEAST DEVELOPED COUNTRIES KATHMANDU, NEPAL, 22 ND 23 RD MARCH 2017 Sustainable Energy Investment Plan in National Development Strategy - TUVALU Tuvalu

More information

(1) Current State and Issues of the Electricity Sector in Indonesia

(1) Current State and Issues of the Electricity Sector in Indonesia Japanese ODA Loan Ex-ante Evaluation 1. Name of the Project Country: The Republic of Indonesia Project: Lumut Balai Geothermal Power Plant Project Loan Agreement: March 30, 2011 Loan Amount: 26,966 million

More information

February 24, 2010 CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE PROGRAM FOR SCALING UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES

February 24, 2010 CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE PROGRAM FOR SCALING UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES February 24, 2010 CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE PROGRAM FOR SCALING UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES I. BACKGROUND 1. There is increasing consensus that addressing

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Tsunami Disaster Recovery in India Report No.: AB1770 Region SOUTH ASIA Sector General agriculture, fishing and forestry sector (90%);Other

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46122 May 2014 Proposed Grant and Administration of Grant Maldives: Preparing Outer Islands for Sustainable Energy Development

More information

DECISION B.14/10 DECISION B.14/11

DECISION B.14/10 DECISION B.14/11 Page 12 (c) (d) Further takes note that, pursuant to decision B.08/03, paragraph (k), the Secretariat, in consultation with the Accreditation Panel, is proposing that the eligibility to apply under the

More information

Credit Enhancement Mechanism for Non-Sovereign Backed Power Purchase Agreements ( PPAs ) South Africa Development Bank of Southern Africa (DBSA)

Credit Enhancement Mechanism for Non-Sovereign Backed Power Purchase Agreements ( PPAs ) South Africa Development Bank of Southern Africa (DBSA) Credit Enhancement Mechanism for Non-Sovereign Backed Power Purchase Agreements ( PPAs ) South Africa Development Bank of Southern Africa (DBSA) 3 November 2017 Project/Programme Title: Credit Enhancement

More information

Tokyo 20 th October 2017 United Nation University, Japan. Kireua B Kaiea Energy Planner Ministry of Infrastructure and Sustainable Energy

Tokyo 20 th October 2017 United Nation University, Japan. Kireua B Kaiea Energy Planner Ministry of Infrastructure and Sustainable Energy Tokyo 20 th October 2017 United Nation University, Japan Kireua B Kaiea Energy Planner Ministry of Infrastructure and Sustainable Energy Our efforts on mitigation to impact climate change in energy planning

More information

ECONOMIC ANALYSIS. A. Background and Approach

ECONOMIC ANALYSIS. A. Background and Approach A. Background and Approach ECONOMIC ANALYSIS Rural Renewable Energy Development Project (RRP BHU 42252) 1. Economic analysis was undertaken to determine the economic viability of the project. The analysis

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1. Sector Performance, Problems, and Opportunities 1. Fiji s urban centers

More information

TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM

TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM Civil Aviation Investment Program (KSTA PNG 52201) TERMS OF REFERENCE FOR CONSULTANTS I. CONSULTING FIRM A. Introduction 1. A consulting firm (the Consultant) will be recruited to help the Government of

More information

GREENHOUSE GAS MITIGATION IN COUNTRIES PARTICIPATING IN THE PACIFIC ISLANDS CLIMATE CHANGE ASSISTANCE PROGRAMME (PICCAP)

GREENHOUSE GAS MITIGATION IN COUNTRIES PARTICIPATING IN THE PACIFIC ISLANDS CLIMATE CHANGE ASSISTANCE PROGRAMME (PICCAP) GREENHOUSE GAS MITIGATION IN COUNTRIES PARTICIPATING IN THE PACIFIC ISLANDS CLIMATE CHANGE ASSISTANCE PROGRAMME (PICCAP) South Pacific Regional Environment Programme (SPREP) SPREP Library Cataloguing-in-Publication

More information

Bancoldex Green Bond Framework - June 2017

Bancoldex Green Bond Framework - June 2017 Introduction Banco de Comercio Exterior de Colombia S.A. Bancoldex is a state owned entrepreneurial development bank dedicated to business growth in Colombia. Bancoldex provides companies of all sizes,

More information

Regional Overview of Energy Situation in the Pacific Island Countries (PICs)

Regional Overview of Energy Situation in the Pacific Island Countries (PICs) Regional Overview of Energy Situation in the Pacific Island Countries (PICs) Makereta Lomaloma Economic Development Division Secretariat of the Pacific Community Content The PICs - Our geography and location

More information

Derisking Renewable Energy Investment ( NAMA Finance Case Study Guidance Note

Derisking Renewable Energy Investment (  NAMA Finance Case Study Guidance Note Version 2.1 (April 2014) Derisking Renewable Energy Investment (www.undp.org/drei) NAMA Finance Case Study Guidance Note GENERAL CASE STUDY BACKGROUND: Country X is a land-locked developing country which

More information

Theme 6: Sustainable Energy Policy

Theme 6: Sustainable Energy Policy Theme 6: Sustainable Energy Policy Dr. Pho Kaung Dr. Win Maw Hlaing Oo Dr. Nyo Nyo Myint Dr. Naing Naing Oo Policy instruments Sustainable energy policies in developed and developing countries Policy and

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE RY-Second Vocational

More information

Grid Resilience in Developing Countries

Grid Resilience in Developing Countries Grid Resilience in Developing Countries David Elzinga, Senior Energy Specialist Energy Sector Group 15 June 2018 1 ADB ENERGY Overview Prioritizes sustainable energy and low-carbon development: Promoting

More information

Promoting Access to Renewable Energy in the Pacific

Promoting Access to Renewable Energy in the Pacific Technical Assistance Report Project Number: 42465-01 Regional Capacity Development Technical Assistance (R-CDTA) July 2009 Promoting Access to Renewable Energy in the Pacific (Financed by the Multi-Donor

More information

Lano Fonua Tokyo, February 2011

Lano Fonua Tokyo, February 2011 Lano Fonua Tokyo, February 2011 1 The Kingdom of Tonga Tonga depends almost a 100% on imported petroleum for its energy needs. In 2008 the country faced extreme hardships due to severe rise in cost of

More information

Brexit: implications for the energy market

Brexit: implications for the energy market Agenda Advancing economics in business Brexit: implications for the energy market The outcome of the UK s EU referendum on 23 June 2016 had an immediate effect on the financial markets in the EU and beyond.

More information

Energy Perspectives for Asia

Energy Perspectives for Asia Energy Perspectives for Asia By Rajiv Ranjan Mishra Nov 21, 2017 Energy Asia Population Asia 4.06 billion 55% of World 8X of EU Expected to be 8.5 billion by 2030 Source: World Bank, 2016; UN GDP Per Capita

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information

The Energy Environment Nexus A sustainable approach for the Pacific. M. Ghirotti

The Energy Environment Nexus A sustainable approach for the Pacific. M. Ghirotti The Energy Environment Nexus A sustainable approach for the Pacific M. Ghirotti Energy, Ecosystems and Sustainable Livelihoods Initiative (EESLI) in the Pacific Phase I: over M 4,5 Phase II: @ M 5 Participating

More information

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta. Eastern Indonesia Renewable Energy Project (Phase 1) (RRP INO 51209) SECTOR OVERVIEW A. Sector Performance 1. Indonesia is the largest economy in Southeast Asia, with an estimated gross domestic product

More information

Intended Nationally Determined Contribution Ethiopia September 23-24,2015 Entebbe,Uganda

Intended Nationally Determined Contribution Ethiopia September 23-24,2015 Entebbe,Uganda FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA MINISTRY OF ENVIRONMENT AND FOREST FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA Intended Nationally Determined Contribution Ethiopia September 23-24,2015 Entebbe,Uganda

More information

3rd Asia Pacific Adaptation Forum, Incheon. Republic of Korea

3rd Asia Pacific Adaptation Forum, Incheon. Republic of Korea 3rd Asia Pacific Adaptation Forum, Incheon. Republic of Korea 19th of March, 2012 PRESENTER: Mr. Jonah AUKA Policy Analyst-ADAPTATION DIVISION. Office of Climate Change and Development Papua New Guinea

More information

Partnership programme with pacific ocean islands. Partnership programme with pacific ocean islands

Partnership programme with pacific ocean islands. Partnership programme with pacific ocean islands Partnership programme with pacific ocean islands Partnership programme with pacific ocean islands 1 Partnership programme with pacific ocean islands 2 Partnership programme with pacific ocean islands 3

More information

BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015

BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015 BELIZE (INDC) Submitted to the UNFCCC on 1 October, 2015 1. National Context Belize is a small country with relatively minor contributions to global greenhouse gas emissions and has limited capacity to

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Development of Indonesia

More information

GOVERNMENT OF SOLOMON ISLANDS. National Programme Semi-Annual Update Template Solomon Islands

GOVERNMENT OF SOLOMON ISLANDS. National Programme Semi-Annual Update Template Solomon Islands GOVERNMENT OF SOLOMON ISLANDS National Programme Semi-Annual Update Template Solomon Islands UN-REDD Programme Solomon Islands 2 September 2013 1. National Programme Status 1.1 National Programme Identification

More information

TOWARDS CARBON NEUTRALITY Developing a Renewable Energy Investment Plan for the Maldives

TOWARDS CARBON NEUTRALITY Developing a Renewable Energy Investment Plan for the Maldives TOWARDS CARBON NEUTRALITY Developing a Renewable Energy Investment Plan for the Maldives Presented by: Ministry of Housing & Environment Male, Republic of Maldives Introduction Becoming Carbon Neutral

More information

Overview of Climate Finance for Adaptation

Overview of Climate Finance for Adaptation Overview of Climate Finance for Adaptation Prepared by: Global Environmental Finance Unit UNDP 1. Climate finance needs of countries will be very significant Environment Finance/GEF-Climate Change Adaptation

More information

Regional briefing on National Adaptation Plans: ASIA-PACIFIC IN FOCUS

Regional briefing on National Adaptation Plans: ASIA-PACIFIC IN FOCUS Regional briefing on National Adaptation Plans: ASIA-PACIFIC IN FOCUS Regional briefing on National Adaptation Plans: ASIA-PACIFIC in focus In brief Many countries in Asia-Pacific have institutional arrangements

More information

Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02)

Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02) TOR No: 2017-042 Title: Junior Professional Officer Grade: UC Division/VPU: Transport and ICT (GTIDR), Southeast Asia and the Pacific (SEAP - GTI02) Duty Location: Sydney, Australia Appointment Type Two-year

More information