Session Three: Accurate Soil Resistivity Testing for Power System Earthing

Size: px
Start display at page:

Download "Session Three: Accurate Soil Resistivity Testing for Power System Earthing"

Transcription

1 Abstract Session Three: Accurate Soil Resistivity Testing for Power System Earthing Rodney Urban, Karl Mardira Principal Consultant, AECOM Soil resistivity data is of fundamental importance in performing earthing system analyses. Reliable data is required to achieve good correlation between design and measured earthing system performance. The findings of numerous soil resistivity tests in the Sydney area for rail system earthing design is presented in this paper. The installations were inside the rail corridor where testing was often very restricted or not possible due to hazards, space limitations and adjacent buried metallic services or structures. A comparison of the results indicates the possible variation of soil resistivity at various depths over small distances and how this can be accommodated in the design process Introduction A power system earthing design must be both effective and efficient. That is, it must provide a common voltage reference and low impedance fault current path to allow the protection system to reliably clear abnormal or fault conditions while limiting the grid voltage rise and transfer earth potentials to tolerable limits, thereby ensuring the safety of personnel and public in the vicinity of the installation. The design must also be practical, maintainable and easily constructible at minimal cost. An effective design will provide a margin of compliance with minimum performance criteria that is appropriate to uncertainties implicit to the design inputs. This is to ensure acceptable performance of the installed earthing system and avoid expensive remediation designs that may be required if actual and design performance do not correlate. The ability of a group of metallic conductors such as a substation earth grid to conduct current effectively into the soil depends on the resistivity of the soil and the variation thereof in the 3D soil volume surrounding the grid. Two distinct soil profiles with the same average resistivity within the 3D volume can have very different step, touch and transfer voltage performance. Local variations in soil resistivity near the surface may greatly affect step and touch voltage performance, while large variation deeper down can significantly affect the value of transfer EPR to buried metal structures and services. Power system earthing is therefore a specific design process with accurate soil resistivity data the most important input, given that the most significant source of uncertainty in the process is the variation in soil resistivity. Prescribed test methods provide average resistivity values along 2D traverses. It would therefore require a multitude of traverse locations and directions to build up a 3D account of the actual soil resistivity in the area surrounding the site. Standard industry software packages are also limited to simplified soil resistivity models. 1

2 It may also not be possible to conduct comprehensive tests near the installation site due to physical space constraints, buried metal services and access restrictions to private land. Such constraints are particularly relevant inside electrified rail corridors, such as the 1500V DC system in Sydney. Limited available space is often shared with other buried services such as telecommunications, water and gas pipelines. Ideally, soil resistivity measurements should be made in an area free of buried metal services, which may interfere with test data when the resistance of the current path through metal pipeline becomes lower than that through the soil alone. Other factors that influence soil resistivity testing include tight design and construction time frames which limit access to site and may require coordination with site preparation works. Community engagement is also an increasingly important aspect in rail system developments. As installations encroach on residential, industrial and environmental areas, consenting processes for installations become more demanding. The community liaison for the project may request that access to private land be limited or avoided altogether. The approval process for the test plan may also have a long lead time and approval may only be granted for a specific day or limited time period. It is important to be able to respond to the numerous constraints with an efficient yet comprehensive soil resistivity test plan that will enable the designer to assess the level of uncertainty in the soil resistivity model used in the design process. This will ensure that a cost effective earthing system design can be developed and will meet minimum performance criteria. This paper highlights important considerations for an effective soil resistivity test plan. Typical site constraints are identified and their influence of soil resistivity data discussed. The discussions are supported with practical case studies. Methods of best accommodating soil resistivity model uncertainties into the earthing designs are also discussed and examples presented. Soil Resistivity Measurement Methods Numerous methods have been developed to determine the resistivity of soil and variations thereof in a specific plane (e.g. vertically). The most accurate of these methods is the four probe method [1] illustrated in Figure 1. Figure 1: Four electrode soil resistivity test method with equal probe spacing (Wenner) Current is injected into the soil between using two probes (C1 and C2). The current diverges from the buried surface of the probes into the soil in a spherical pattern. The size of the spherical current expansion within the volume of soil is limited by the distance between the two current probes. Two voltage probes are then inserted into the ground between the two current probes such that all electrodes form a straight traverse. The voltage between the 2

3 measurement probes is recorded with a high impedance voltmeter. The ratio of measured voltage to injected current gives the average resistance of the current path through the soil, the apparent resistance. The relationship between the apparent resistance and average soil resistivity is derived from the probe depths and the separation between the probes. If the probes are inserted to a depth less than 5% of the probe spacing and the probe spacings are uniform (i.e. the Wenner method), the relationship simplifies to that included in Figure 1, which is easy to implement in the field during testing. The probe spacing is then increased to an appropriate maximum value to determine the variation of soil resistivity with increased depth. Figure 2: Four electrode test method with unequal probe spacing (Schlumberger) It may not be possible to maintain a uniform probe spacing at all sites due to physical barriers or buried obstacles. If these obstacles do not interfere with the soil tests along the traverse, an unequal probe spacing can be used, with the distance between adjacent current and voltage rods varied to suite (i.e. Schlumberger method). The modified relationship between apparent resistance and average soil resistivity is included in Figure 2 for the unequal probe spacing. The measured soil resistivity test data is then entered into a design software package such as the RESAP module of CDEGS and a simplified single layer or multilayer soil profile derived using iterative curve fitting algorithms. Soil Resistivity Test Plans A Dial-Before-U-Dig search and Detailed Site Survey are requested at the initiation of the design. The data provided indicates the approximate location and construction type for all buried metal services near the installation site. The data is then scaled and mapped onto satellite images of the area. This allows easy identification of preferred test traverses for the design. An example layout drawing, with test plan indicated, is included in Figure 3. An understanding of the specific construction methods used by the various services and pipeline utilities is very important when determining the preferred location of test traverses. Construction methods have also changed over time with the advent of new coating technologies. It may therefore be useful, for critical locations, to know the year of construction for a particular pipeline. Fortunately, most new gas, fuel and water pipeline installations will have high quality polyethylene coatings to prevent corrosion. These have excellent insulation properties and will not cause interference to soil resistivity test data unless significantly damaged. Many older cast iron pipelines are direct buried with no insulating coating but are constructed in short sections (typically less than 10m) with insulating rubber joints between adjacent sections. These will 3

4 also not significantly affect measurements unless the small probe spacing tests are within a few meters of the pipeline. Figure 3: Buried services layout example with soil resistivity test plan Geotechnical data is often available for the installation site as part of the civil and structural designs for the installation. Soil resistivity tests can then be conducted at geotechnical test locations and correlations identified between the soil resistivity and geotechnical test data. The most important features of the geotechnical test data, as concerns soil resistivity modelling is the identified depth of ground water and the main classification of soil types with associated layer thickness. By associating a specific range of soil resistivity value to a distinct soil layer, soil profiles can be constructed at installation locations where accurate soil resistivity testing is not feasible but geotechnical data is available. Variations in the depth of ground water have a significant effect on the resistivity of certain soils (but not all soils). These effects, if present, are therefore seasonal with soil drying during extended dry periods causing an increase in the resistivity of the first few meters of clayey type soil layers. It is therefore very important that the date of the test, the rainfall on the test day and days leading up to the test are recorded. Rainfall patterns for the area can then be referred to using historical data in order to determine how the derived soil model may vary seasonally. It is important that such variations are accommodated in the earthing system design. The Electricity Authority of New South Wales Earthing Handbook [2] provides useful data regarding the recorded seasonal variation of soil resistivity at various test sites throughout the Sydney area. Similar references for other areas are equally useful when determining appropriate seasonal variations in soil resistivity for the design process (i.e. to limit input uncertainty). The length of each test traverse (i.e. the maximum probe spacing) must be appropriate to the depth of the soil which must be interrogated. This is determined by the size of the required earth grid. The basic guideline is that the depth to which the soil is interrogated is typically about that of the maximum 4

5 probe spacing. This is however only valid for small to moderate variations in soil resistivity with increasing depth. A soil profile comprising a very high resistivity middle layer just below the surface may require very large probe spacings to get sufficient test current into the lower resistivity bottom layer such that you can accurately determine its value. At sites where the maximum possible length of a test traverse is restricted, there may still be value in measuring the apparent resistance at short probe spacings at the installation site. Variations at the surface are typically more pronounced due to construction activity and small geological features, while those deeper down typically vary less over smaller distances. Large probe spacing measurements further from the installation site can be used to derive the depth and resistivity of the bottom soil layers while the small probe spacing measurements can be used to derive the actual soil resistivity of the top soil in which the electrodes will be installed. Care must however be exercised in interpreting soil resistivity data from restricted test traverses. The above mentioned considerations for developing an effective soil resistivity test plan are next discussed with the aid of three case studies. The final test plan and soil test results are presented. Features of the final design that accommodate the assessed uncertainty in the soil resistivity model are also discussed. Case Study 1 Using Geotechnical Input Data The first case study involves a number of earth grid designs that formed part of upgrade works along 5km of duplicated track in Western Sydney. These included earthing system designs for a new traction substation, passenger station supply and signalling supply upgrades at two existing stations. The new passenger station is located on pasture land with no records of buried metal services. The location therefore facilitated a long test traverse centred at the installation site, as well as along a traverse normal to the primary traverse. The test traverse locations are indicated in Figure 4 along with the RESAP modelling reports included in Figure 5. The soil resistivity profiles derived at various locations along the route are summarized in Table 1. They exhibit a common profile, including an extremely low resistivity middle layer. There were no buried metal services or structures indicated on the layout maps and there was a strong correlation between data measured along the orthogonal test traverses. The feature was however unusual and was identified as having a significant impact on the earthing system designs for the project. Geological references for the region were therefore sought to understand the reason for the observed soil electrical properties and the level of uncertainty associated with variations of it along the route. Geological observations in [3] noted that the area comprises Wianamatta shales with scattered zones of fracture porosity in the weathered shale allowing saline ground water to rise to the surface, causing surface salting. The source of the salt is windblown aerosols which accumulate in the clay subsoil aquifer. The recorded soil salinity in the area is about 19g/litre which is very high. The reference also noted that the thickness of the aquifer varied from about 1m on hill crests to 12m on valley floors (typically 10m near the midpoint). 5

6 Figure 4: Services layout drawing with soil resistivity test plan for case study 1 Figure 5: RESAP reports for orthogonal test traverses for case study 1 The following conclusions were therefore made from a comparison of the derived soil resistivity models and the geological observations for the area: The A-horizon (root zone) soil is between 0.3 and 0.5m thick and has an electrical resistivity of between 48 and 105m. As the soil has a low salt content (organic and inorganic), the resistivity is not expected to significantly decrease when wet; The B-horizon (residual clay aquifer) soil is between 1.3m and 10.5m thick and has an electrical resistivity of between 3 and 16m; The fresh shale soils have an electrical resistivity of between 42 and 66m and extend to a depth of about 100m. Soil drying will not significantly affect the resistivity of this soil layer; 6

7 Location GPS Layer Resistivity[ m] Thickness[m] Quakers Hill Station (test 2) Relocated Schofields Station (test 3 & 4) Reycroft (midway) (test 1) New Schofields Substation (test 5) X = Y = X = Y = X = Y = X = Y = Top Middle Bottom 66 Top Middle Bottom 42 Top Middle Bottom 48 Top Middle Bottom 42 Table 1: Soil resistivity models along project route While there had been no rain on the day of the soil tests, there had been significant rainfall in the weeks leading up to the tests. There was therefore a concern, given the nature of the most significant feature of the soil model (i.e. the middle soil aquifer layer), that soil drying may significantly affect the seasonal performance of the earthing systems. All designs therefore considered a 100% increase in resistivity of the middle soil layer. This value was consistent with recorded seasonal variations in an adjacent region, documented in the NSW Earthing Handbook [2]. It was therefore expected to accommodate the assessed level of uncertainty in the input data without resulting in an overly elaborate and expensive earthing system. The project design phase continued for more than a year. During this time, various grid resistance measurements were conducted on existing installations and additional soil resistivity tests were conducted at specific locations along the route. Tests taken during dry spells indicated no significant change in soil resistivity in the middle soil layer. The design feature included to accommodate soil drying was therefore proven to be conservative. The final design for the project involved a new earth grid for a pole mount transformer. The installation was adjacent to sensitive signalling equipment and within 10m of a frequented public platform and access footpath at an existing station. The required design criteria were therefore onerous. Furthermore, there was no space available in the congested rail corridor (including direct buried tracer wires associated with the signalling cables) to do meaningful soil resistivity testing. Geotechnical data was however available for test locations adjacent to the relevant pole. This data indicated that the clayey aquifer previously identified was 5m deep and 0.5m below the surface. The soil resistivity model in the area was therefore adjusted (depth and thickness of middle layer) for use in the design. It was found by CDEGS modelling that it was not possible to accommodate a 100% increase in middle layer resistivity with a reasonable design due to significant public hazards adjacent to the installation. It was therefore decided to ignore soil drying, based on the confidence gained in the accuracy of the soil resistivity models and the expected variation due to soil drying. The design, 7

8 which had a minimum 15% margin of compliance, was therefore approved for construction. An off-frequency current injection test [1] was subsequently conducted to verify the performance of the installed earthing system. The verification test results were within 5% of the calculated design values. It was therefore possible to successfully design the critical earthing system without requiring soil resistivity test data at the actual installation site. Instead, geotechnical data, correlations between geotechnical and electrical resistivity data and a measure of the expected seasonal variations in soil electrical behaviour were used as inputs into the design. Case Study 2 Accommodating Probe Spacing Restrictions The next case study involves an 11kV padmount substation earth grid with cable screen bonded UGOH transition pole earth electrode adjacent to a system substation with substantial buried earth grid. Soil resistivity tests were conducted using the Wenner method along a traverse orthogonal to the grid to mitigate the effect of the buried structure on the data. The maximum possible probe spacing along this traverse was 40m. The RESAP modelling report is included in Figure 6 and the derived soil profile is summarized in Table 2. Figure 6: RESAP report for soil resistivity test traverse for case study 2 Location GPS Layer Resistivity [ m] Thickness [m] SD S E Top Middle Middle Bottom 58 Table 2: Soil resistivity model for the UGOH pole earth electrode design for case study 2 The most significant feature of the derived soil profile is a thick, high-resistivity middle soil layer. Geotechnical investigations in the area confirmed the presence of a substantial sandstone shelf a few meters below the surface. In order to achieve a suitably low resistivity and limit the earth grid voltage rise to 8

9 an acceptable level, an 18m vertical earth electrode was used in the design to prevent interference to sensitive signalling installations adjacent to the pole. The 40m probe spacing limit was considered adequate for this design. To limit excessive transfer voltage to nearby metal pipelines and signalling installations, the vertical electrode was insulated from the low-resistivity top soil layers. The critical soil parameters, as regards the performance of the earth grid, are the resistivity and depth of the bottom soil layer in which the electrode is buried. The traverse centre point was located at the pole base and far from any buried metal services or structures. The derived soil profile was therefore considered accurate for the electrode design and the design implemented. A verification test using the Fall-of-Potential method [1] was undertaken on the installed pole earth electrode. This was done to verify the EPR risk assessment which was based on the design performance calculations. The design grid resistance for the pole earth electrode was 21. The measured earth resistance of the installed electrode was 10, which is substantially lower than the design value. A review of the modelling error considered that if the depth of the middle/bottom layer interface was incorrectly modelled, the earth resistance would have either remained almost unchanged (interface higher than expected) or increased (interface lower than expected). Since the installed value is lower than the design value, it was concluded that the resistivity of the bottom soil layer was incorrect in the soil model used for the design. A review of the design process concluded that the calculation error was due to inadequate resistivity data between 10m and 30m probe spacings along the test traverse. The average resistivity at small probe spacings is about 100m, that of the top soil layer. It decreases slightly before the probe spacing exceeds the depth of the top/middle layer interface. The much higher resistivity middle layer steadily increases the average resistivity as a weighted average of the two layers (first inflection point) until the probe spacing is much larger than the thickness of the top soil layer and the average resistivity value flattens off to that of the middle layer resistivity. When the probe spacing exceeds the depth of the middle/bottom layer interface, the average resistivity begins to steadily decrease (second inflection point). The calculated value of the bottom soil layer is taken from the gradient of the fitted curve after the second inflection point. It is important to note that there is only a single data point on this section of the curve. The bottom layer resistivity is therefore determined by the gradient between the second-last and last measured data points and its accuracy depends on the assumption that the second-last point is the exact point of inflection. Measurements were made at probe spacings of 0.5m, 1m, 2m, 3m, 4m,6m, 8m, 10m, 15m, 20m and 40m as specified in the generic test plan. An accurate soil profile could have been derived from the maximum 120m traverse but required refined probe spacings between 10m and 30m to determine the correct location of the inflection point and therefore the gradient of the final curve section. The following conclusions were made: The selected test traverse location and extent was appropriate for the soil structure and design; It was correct to follow the generic test plan with set probe spacings initially; 9

10 The data points should have been plotted on graph paper during the test; The critical design parameters should have been identified in light of the observed hazards and basic soil structure; The dependence of the bottom layer soil resistivity on the observed inflection point of the plotted curve and the lack of data points on the final curve section should have been flagged as inadequate for the purposes of the design; Refined probe spacings between 10m and 30m should have been used during the tests. Case Study 3 Influence of Buried services The final case study involved the design of a padmount substation in Western Sydney. The services layout and test plan for the soil resistivity measurements are indicated in Figure 7. A second traverse, at 45 to the first was chosen to determine the possible interference to the data caused by the water pipeline adjacent to the first test traverse. The test locations are not ideal due to space limitation and adjacent buried metallic services. Traverse 1 runs parallel to the metal pipeline. The separation distance is about 5m. Legend Metallic Water Services Traverse Proposed Substation 1 2 Figure 7: Services layout drawing with soil resistivity test plan for case study 3 The RESAP modelling reports are included in Figure 8 for both test traverses. The best-fit soil resistivity models are both three layer soil profiles. The resistivity curve on traverse 1 which runs parallel to the metallic pipe shows a degree of interference with the test data after the 1m probe spacing. This is because the distance between voltage probes and current probes is increasing while the distance between the metallic pipe and the current probe remains constant (5m).The resistance of the current path between the current probes through the metal pipeline becomes increasingly lower than the current path through the soil. This causes the influence of the metallic pipe to become larger with increased probe spacing. This can be seen at the test results after 1m probe spacing. 10

11 Traverse 1 Traverse 2 Figure 8: RESAP report for soil resistivity test traverses for case study 8 In traverse 2, the second current probe moves further away from the pipeline as the distance between the current probes is increased, thereby limiting the influence of the pipeline on the test data. The derived soil profiles for each traverse are summarised in Table 3. The discrepancy in top soil layer resistivity is attributed to different measurement centre points and is expected. Ideally, we would aim to keep the centre point the same for orthogonal traverses in order to minimise the number of variables and facilitate an easier comparison. It was however not possible, given obstacles on site, to achieve this. Traverse Layer Soil Resistivity [m] Depth [m] Upper Middle Underlying 10 Infinite Upper Middle Underlying 14.8 Infinite Table 3: Soil resistivity models for the two test traverses in case study 3 The variation of the middle soil layer resistivity is significant and attributed to the interference of the metal pipeline on the test data from the first traverse. Similar interference would be more pronounced if the middle and bottom soil layer resistivities were higher. Orthogonal test traverses are therefore essential for assessing the accuracy of tests conducted near pipelines, regardless of the pipeline construction. The influence of the pipeline on the test data may be less apparent if the soil resistivity in the adjacent soil is low. Conclusions 11

12 The most significant sources of uncertainty in the earthing system design process are the variations in the resistivity of the soil surrounding the earthing system and seasonal variations thereof. An effective earthing system design must accommodate the level of uncertainty in the design inputs in a practical, constructible and maintainable design at minimal cost. This requires an accurate assessment of the uncertainties. Buried services, physical obstacles and project related access limitations constrain the accuracy of soil resistivity measurement data. Service layout maps, geotechnical data and published meteorological data can be used to assess the optimal soil model and uncertainty thereof for the design process. Soil resistivity test data should be plotted during measurements in order to identify possible inaccuracies that can be reduced by further testing at/near the test site. References [1] IEEE 81, Guide for Measuring Earth Resistivity, Ground Impedance and Surface Potentials of a Ground system, [2] Electricity Authority of New South Wales, Earthing Handbook, Sydney, [3] G. McNally, Shale, Salinity and Groundwater in Western Sydney, Australian Geomechanics Vol. 39 No. 3, September

Soil Resistivity Data Computations; Single and Two - Layer Soil Resistivity Structure and Its Implication on Earthing Design

Soil Resistivity Data Computations; Single and Two - Layer Soil Resistivity Structure and Its Implication on Earthing Design Vol:7, No:, 3 Soil Resistivity Data Computations; Single and Two - Layer Soil Resistivity Structure and Its Implication on Earthing Design M. Nassereddine, J. Rizk, and G. Nasserddine International Science

More information

Earthing in electrical network purpose, methods and measurement

Earthing in electrical network purpose, methods and measurement Earthing in electrical network purpose, methods and measurement Earth / Ground Conductive ground whose electrical potential at each point is set equal to zero, It is a conductor which provides a low impedance

More information

APPLICATION NOTE 6. Use of Decouplers for AC Voltage Mitigation. PART 2: DESIGN CONSIDERATIONS

APPLICATION NOTE 6. Use of Decouplers for AC Voltage Mitigation.   PART 2: DESIGN CONSIDERATIONS APPLICATION NOTE 6 Use of Decouplers for AC Voltage Mitigation Introduction AC voltage mitigation is primarily of concern when cathodically protected pipelines are adjacent to electric power distribution

More information

Estimation of apparent soil resistivity for two-layer soil structure

Estimation of apparent soil resistivity for two-layer soil structure INTENATIONAL JOUNAL OF ENEGY AND ENVIONMENT Volume 4, Issue 4, 03 pp.573-580 Journal homepage: www.ijee.ieefoundation.org Estimation of apparent soil resistivity for two-layer soil structure M. Nassereddine,

More information

Substation Grounding Tutorial

Substation Grounding Tutorial Joe Gravelle, P.E. Eduardo Ramirez-Bettoni, P.E. Minnesota Power Systems Conference Thursday, Nov. 9, 2017 Presenter Joe Gravelle, P.E. Joe Gravelle earned BSEEE from NDSU in 1988. After graduation Joe

More information

THE OFFICIAL TRADE JOURNAL OF BICSI

THE OFFICIAL TRADE JOURNAL OF BICSI ICT TODAY THE OFFICIAL TRADE JOURNAL OF BICSI January/February 2017 PLUS + + Information Security and ESS in the Age of the Internet of Things + Grounding System Design and Testing for Critical Facilities

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC/TS 62344 Edition 1.0 2013-01 colour inside Design of earth electrode stations for high-voltage direct current (HVDC) links General guidelines INTERNATIONAL ELECTROTECHNICAL

More information

The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping

The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping NACE: August 2010 The Advancement of Direct Assessment Methodologies for Difficult-to-Assess Piping Area Potential Earth Current Inspections for station piping Andy Jensen Sr. Consultant, NACE CP Technologist

More information

Induced currents in gas pipelines due to nearby power lines

Induced currents in gas pipelines due to nearby power lines University of Wollongong Research Online University of Wollongong Thesis Collection 1954-2016 University of Wollongong Thesis Collections 2005 Induced currents in gas pipelines due to nearby power lines

More information

Parameters Effecting Substation Grounding Grid Resistance. Dwarka Prasad 1, Dr.H.C Sharma 2

Parameters Effecting Substation Grounding Grid Resistance. Dwarka Prasad 1, Dr.H.C Sharma 2 Parameters Effecting Substation Grounding Grid Resistance Dwarka Prasad 1, Research Scholar, Uttarakhand Technical University, Dehardun (Uttarakhand), India Department of Electrical Engineering Laxmi Devi

More information

Review of Substation Grounding Practices, Safety and Constructability Enhancements. Authors: V. SIMHA, X.WU, M.THAKUR

Review of Substation Grounding Practices, Safety and Constructability Enhancements. Authors: V. SIMHA, X.WU, M.THAKUR Review of Substation Grounding Practices, Safety and Constructability Enhancements Authors: V. SIMHA, X.WU, M.THAKUR Agenda Grounding Study and Analysis: Substation Grounding Practices Grounding Concepts

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

Electrical Network Design, Engineering & Construction

Electrical Network Design, Engineering & Construction Electrical Network Design, Engineering & Construction www.uea.com.au UEA know how. Because we know the network. UEA Electrical is an A Grade Accredited Service Provider specialising in the design, engineering

More information

4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING.

4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING. 4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING. 4.1 All equipment (i.e., switches, breakers, control cabinets, etc.) inside switchyards or substations which require operations by workers must

More information

Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton

Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton Mears Group, Inc. Integrity Assessment for Non-Piggable Pipelines By Jim Walton External Corrosion Direct Assessment Why use ECDA? To evaluate the Cathodic Protection and Coating condition and give a forward

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by. /0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements

More information

Grounding Principles. The need to ground! Definitions. Introduction. Grounding Codes and Standards. 2 Ph:

Grounding Principles. The need to ground! Definitions. Introduction. Grounding Codes and Standards. 2 Ph: Introduction Grounding and bonding are an integral part of any modern electrical protection system design. An effective, low-impedance ground system is a key element of this system. It is crucial in ensuring

More information

Journal of American Science 2014;10(7) A. H. Almasoud, Mosallam Al-Solami

Journal of American Science 2014;10(7)  A. H. Almasoud, Mosallam Al-Solami Jeddah Soil Resistivity and Grounding Resistance A. H. Almasoud, Mosallam Al-Solami Electrical and Computer Engineering Dept., King Abdulaziz University, Jeddah, Saudi Arabia amasoud@kau.edu.sa Abstract:

More information

Investigation of leakage current flow through wooden poles structures on overhead distribution system

Investigation of leakage current flow through wooden poles structures on overhead distribution system Proceedings of the 7th WSEAS International Conference on Power Systems, Beijing, China, September 15-17, 2007 120 Investigation of leakage current flow through wooden poles structures on overhead distribution

More information

SuCCeSSful rooftop PhotovoltaiCS

SuCCeSSful rooftop PhotovoltaiCS SuCCeSSful rooftop PhotovoltaiCS How to AcHieve A HigH - QuAlity, well- MAintAined, compatible Rooftop pv SySteM. Center for environmental innovation in roofing 816 Connecticut Ave, NW Fifth Floor Washington,

More information

DESIGN OF IMPRESSED CURRENT CATHODIC PROTECTION SYSTEMS

DESIGN OF IMPRESSED CURRENT CATHODIC PROTECTION SYSTEMS DESIGN OF IMPRESSED CURRENT CATHODIC PROTECTION SYSTEMS Advanced Corrosion Course 2017 February 21-23, 2017 Keith Boswell, National Pipeline Services, LLC. 1 OBJECTIVES To Provide Corrosion Control Personnel

More information

Part 1: On-land pipelines

Part 1: On-land pipelines Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 15589-1 Second edition 2015-03-01 Petroleum, petrochemical and natural gas industries Cathodic protection of pipeline systems Part 1: On-land pipelines

More information

Walk through the associated design considerations associated with transmission line design

Walk through the associated design considerations associated with transmission line design Walk through the associated design considerations associated with transmission line design Follow-up to Transmission Design 101 (2012) & Transmission Design 102 (2013) Additional design considerations

More information

MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER

MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER USDA FOREST SERVICE RESEARCH PAPER FPL 290 1977 U.S. DEPARTMENT OF AGRICULTURE FOREST SERVICE FOREST PRODUCTS LABORATORY

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

Analysis of Current Density in Soil for Resistivity Measurements and Electrical Grounding Designs

Analysis of Current Density in Soil for Resistivity Measurements and Electrical Grounding Designs Journal of Electrical and Electronic Engineering 2017; 5(5): 198-208 http://www.sciencepublishinggroup.com/j/jeee doi: 10.11648/j.jeee.20170505.17 ISSN: 2329-1613 (Print); ISSN: 2329-1605 (Online) Analysis

More information

Substation Design Volume X

Substation Design Volume X PDHonline Course E477 (4 PDH) Substation Design Volume X Grounding Instructor: Lee Layton, P.E 2015 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Data analysis and laboratory investigation of the behaviour of pipes buried in reactive clay

Data analysis and laboratory investigation of the behaviour of pipes buried in reactive clay Data analysis and laboratory investigation of the behaviour of pipes buried in reactive clay Derek Chan Faculty of Civil Engineering, Monash University, Melbourne, VIC, Australia J.K. Kodikara Faculty

More information

Regional Cathodic Protection Design of a Natural Gas Distribution Station

Regional Cathodic Protection Design of a Natural Gas Distribution Station CORROSION SCIENCE AND TECHNOLOGY, Vol.16, No.5(2017), pp.235~240 pissn: 1598-6462 / eissn: 2288-6524 [Research Paper] DOI: https://doi.org/10.14773/cst.2017.16.5.235 Regional Cathodic Protection Design

More information

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main

Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Dynamic Stray Current Interference Testing And Mitigation Design For A 90-Inch Water Main Authors: Rogelio de las Casas, Ron Turner, Kristi Roe; EN Engineering This paper discusses two sections of pipeline

More information

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements. FIELD TEST AND OPERATIONAL CHECK SECTION 16080 PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Refer to Section 16010, Electrical General Requirements. 1.2 WORK INCLUDED A. General Scope: 1. The Contractor

More information

Substation Grounding. Presented by: Bruce Kayser, PE Assisted by Danny Seele

Substation Grounding. Presented by: Bruce Kayser, PE Assisted by Danny Seele Substation Grounding Presented by: Bruce Kayser, PE 785-633-5756 Assisted by Danny Seele Introduction Bruce Kayser, PE BSEE from KSU in 1989 Licensed Professional Engineer in KS Employed by ElectriComm,

More information

The DuoGuard Hybrid Anode Range Installation Guidelines

The DuoGuard Hybrid Anode Range Installation Guidelines Installation Guidelines IMPORTANT: This installation methodology is an outline modifications will be made for local site requirements and will be identified in the final specification. 1.0 Preliminaries

More information

Electrical Grounding In Mining Applications

Electrical Grounding In Mining Applications Electrical Grounding In Mining Applications Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq The mining industry

More information

Evalouation of Expansive Soil Properties by Electrical Resistivity

Evalouation of Expansive Soil Properties by Electrical Resistivity International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Evalouation of Expansive Soil Properties by Electrical Resistivity Mahmoud M. Abu zeid 1, Ahmed M. Hassan 2, Ahmed M. Abu Bakr 3,

More information

oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as

oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as [ [ T oday s operators continue to face challenges in gathering quality cathodic protection (CP) data. Most operators employ indirect methods such as potential and coating survey techniques to monitor

More information

Automated Tools for Reducing Earthwork Costs

Automated Tools for Reducing Earthwork Costs Automated Tools for Reducing Earthwork Costs Engineering problems are under-defined, there are many solutions, good, bad and indifferent. The art is to arrive at a good solution. This is a creative activity,

More information

Auditing of Cathodic Protection Systems and Anticorrosion Coating Conservation Status in Oil and Gas Pipelines (CIPS DCVG Surveys)

Auditing of Cathodic Protection Systems and Anticorrosion Coating Conservation Status in Oil and Gas Pipelines (CIPS DCVG Surveys) Auditing of Cathodic Protection Systems and Anticorrosion Coating Conservation Status in Oil and Gas Pipelines (CIPS DCVG Surveys) Engineering Company in Duct Integrity We know what we do... 2007 Página

More information

DESIGN OF ROAD OVERBRIDGES

DESIGN OF ROAD OVERBRIDGES Civil Engineering Technical Requirement CIVIL-SR-001 DESIGN OF ROAD OVERBRIDGES Revision: G Updated: 30 May 2011 Queensland Rail 2011 Reproduction by any means (including electronic, mechanical, photocopying,

More information

POTENTIAL FOR GEOLOGICAL CARBON SEQUESTRATION USING DEEP SALINE AQUIFERS IN THE ILLINOIS BASIN

POTENTIAL FOR GEOLOGICAL CARBON SEQUESTRATION USING DEEP SALINE AQUIFERS IN THE ILLINOIS BASIN POTENTIAL FOR GEOLOGICAL CARBON SEQUESTRATION USING DEEP SALINE AQUIFERS IN THE ILLINOIS BASIN DECEMBER 4, 2015 GIS TERM PAPER Julien Botto Table of Contents Introduction... 2 Background... 3 Objective...

More information

NTW.1 Network Utilities

NTW.1 Network Utilities NTW.1 Network Utilities NOTE: The following provisions apply district wide in addition to any other provisions in this Plan applicable to the same areas or site. Index NTW.1 Network Utilities NTW.1.1 NTW.1.2

More information

Specification for UDC Electrical Testing

Specification for UDC Electrical Testing Ergon Energy Corporation Limited Specification for UDC Electrical Testing RSC10 Abstract: Electrical Testing for Underground Distribution Construction (UDC) Specification RSC10 Ver 5 Contents 1. Purpose

More information

Ergon Energy Corporation Limited. Specification for UDC Design RSD01. Specification RSD01 Ver 7. Ergon Energy Corporation Limited ABN

Ergon Energy Corporation Limited. Specification for UDC Design RSD01. Specification RSD01 Ver 7. Ergon Energy Corporation Limited ABN Ergon Energy Corporation Limited Specification for UDC Design RSD01 Specification RSD01 Ver 7 Contents 1. PURPOSE AND SCOPE... 1 2. REFERENCES... 1 2.1 ERGON ENERGY CONTROLLED DOCUMENTS... 1 3. DEFINITIONS,

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

10 Network Utilities Introduction Kaipara District Council Engineering Standards Resource Management Act 1991 Requirements

10 Network Utilities Introduction Kaipara District Council Engineering Standards Resource Management Act 1991 Requirements 10 Network Utilities [ENV-2011-AKL-000250 Meridian Energy Ltd. renewable energy resources] 10.1 Introduction The Kaipara District provides for a range of important local and regional strategic assets including

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

CHAPTER 2. Objectives of Groundwater Modelling

CHAPTER 2. Objectives of Groundwater Modelling CHAPTER 2 Objectives of Groundwater Modelling In the last two decades mathematical modelling techniques have increasingly proved their value in furthering the understanding of groundwater systems and,

More information

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements

Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Introduction Cross Borehole Electrical Resistivity Tomography (ERT) Measurements Resistivity imaging at the surface may be used for applications such as cavity detection, geotechnical investigation, site

More information

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.

Primary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane. 17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately

More information

Article 495 WELL YIELD PUMPING FOR RESIDENTIAL PROPERTY TRANSFERS Adopted by the CGA Board of Directors on October 14, 2006

Article 495 WELL YIELD PUMPING FOR RESIDENTIAL PROPERTY TRANSFERS Adopted by the CGA Board of Directors on October 14, 2006 California Groundwater Association An NGWA Affiliate State 700 R Street Suite 200 Sacramento, CA 95811 cga@groundh2o.org 916-231-2134 Article 495 WELL YIELD PUMPING FOR RESIDENTIAL PROPERTY TRANSFERS Adopted

More information

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model)

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model) STANDARD SPECIFICATION EARTH GROUNDING Section 16000 (Straight Shaft Model) PART 1 - GENERAL 1.01 DESCRIPTION A. Related Work Specified Elsewhere: 1. Electrical General Provisions ( Section xxx) 2. Basic

More information

General Groundwater Concepts

General Groundwater Concepts General Groundwater Concepts Hydrologic Cycle All water on the surface of the earth and underground are part of the hydrologic cycle (Figure 1), driven by natural processes that constantly transform water

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Settlement assessment of running tunnels a generic approach

Settlement assessment of running tunnels a generic approach Settlement assessment of running tunnels a generic approach D.I. Harris & J.N. Franzius Geotechnical Consulting Group, London, UK ABSTRACT: This paper introduces a new generic approach to the second stage

More information

WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002

WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002 WELLHEAD PROTECTION DELINEATION REPORT FOR THE VILLAGE OF BEAR LAKE DECEMBER 2002 Prepared by: Gosling Czubak Engineering Sciences, Inc. 1280 Business Park Drive Traverse City, Michigan 48686 Telephone:

More information

Distribution Systems - Program 128

Distribution Systems - Program 128 Distribution Systems - Program 128 Program Description Program Overview Utility distribution systems are challenged by an aging infrastructure, conventional designs, and increased demands for power. Electricity

More information

Worksite Safety Update Promoting safety in road construction

Worksite Safety Update Promoting safety in road construction Worksite Safety Update Promoting safety in road construction No 122 August 2012 In this Edition: Work Near Overhead and Underground Utility Services Page 1 The Regional Rail Link Experience Page 9 This

More information

Dynamic Pump Design of Complex Rising Main Injector Systems

Dynamic Pump Design of Complex Rising Main Injector Systems Dynamic Pump Design of Complex Rising Main Injector Systems Morten Just Kjølby 1, Arne Møller 1 1 DHI Denmark. (Presenter: Morten Just Kjølby mjk@dhigroup.com) Abstract In low laying coastal areas sewerage

More information

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events)

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) TABLE OF CONTENTS 12 HAZARD ANALYSIS AND RISK ASSESSMENT... 12-1 12.1 Introduction... 12-1 12.2 Pipeline Design and Risk... 12-1 12.2.1

More information

CATHODIC PROTECTION ON SINTAJOINT PIPELINES

CATHODIC PROTECTION ON SINTAJOINT PIPELINES Tyco Water Pty Ltd ABN 75 087 415 745 Pipelines Research 63 Haig St Southbank VIC 3006 Phone: 03 9685 5902 Fax: 03 9696 1548 Email: afletcher@tycowater.com Ref: PR 14127 Mat s & Prod s - Coatings Date:

More information

Transmission Losses Report 2015

Transmission Losses Report 2015 SP Energy Networks October 2015 Transmission Losses Report 2015 1. INTRODUCTION Special condition 2K of SPT s transmission licence requires SPT to publish an annual transmission losses report detailing

More information

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10 EXECUTIVE SUMMARY Background The proposal for Rail Deck Park (RDP) comprises the construction of a decking structure over the rail corridor in downtown Toronto between Blue Jays Way and Bathurst Street

More information

D26. National Grid Corridor Overlay

D26. National Grid Corridor Overlay D26. National Grid Corridor Overlay D26.1. Overlay description The National Grid is important to the social and economic well-being of Aucklanders and New Zealanders. All infrastructure owned or operated

More information

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System Introduction This document presents an in-depth task analysis (job analysis or key skills analysis) for practitioners

More information

Tailings Seepage Paths Mapped using Electric-Based Technology

Tailings Seepage Paths Mapped using Electric-Based Technology Tailings Seepage Paths Mapped using Electric-Based Technology Cecil Urlich 1, Andy Hughes 2, Val Gardner 3 1 AECOM, 1111 3 rd Avenue, Suite 1600, Seattle, Washington 98101, USA cecil.urlich@aecom.com 2

More information

AC Corrosion - The Unanticipated Problem

AC Corrosion - The Unanticipated Problem AC Corrosion - The Unanticipated Problem Natural gas and oil pipeline operators are installing new pipelines with fusion bonded epoxy (FBE) coatings might think they have addressed most of the integrity

More information

Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions

Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions Review of Cathodic Protection Systems for Concrete Structures in Australia Lessons Learnt and Future Directions A. Cheaitani Remedial Technology Pty Ltd, Sydney, Australia SUMMARY: Impressed current cathodic

More information

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs Photovoltaic mounting systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs 1 Table of contents 1 Introduction 1.1 Intended use 3 1.2 About the document

More information

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng. SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical

More information

National Policy Statement on Electricity Transmission. Implementation Guidance for Local Authorities

National Policy Statement on Electricity Transmission. Implementation Guidance for Local Authorities National Policy Statement on Electricity Transmission Implementation Guidance for Local Authorities Acknowledgements Thank you to Local Government New Zealand, Transpower New Zealand Ltd, Boffa Miskell,

More information

A comparison of DCVG measurements with in-line inspection results on a pipeline under AC influence

A comparison of DCVG measurements with in-line inspection results on a pipeline under AC influence A comparison of DCVG measurements with in-line inspection results on a pipeline under AC influence K. Reber, TÜV Rheinland Industrie Services GmbH, Germany For a pipeline known to be under the influence

More information

S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda

S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda S1004 The Groundwater Survey by using Resistivity Method and its Application in the Republic of Rwanda K. Nakamura* (NTC International Co., Ltd.), T. Aizawa (Suncoh Consultants Co., Ltd.), S. Matsuda (NTC

More information

IOM3 Underground Seminar. Health and Safety Laboratory Buxton. 27 May 2010

IOM3 Underground Seminar. Health and Safety Laboratory Buxton. 27 May 2010 IOM3 Underground Seminar Health and Safety Laboratory Buxton 27 May 2010 Applications and Limitations of Cathodic Protection within Plants Dave Harvey CEng, FICorr Engineering Manager Pipeline Maintenance

More information

Strength Durability Life CORROSION CONTROL The Effect of Overhead AC Power Lines Paralleling Ductile Iron Pipelines by Richard W. Bonds, P.E.

Strength Durability Life CORROSION CONTROL The Effect of Overhead AC Power Lines Paralleling Ductile Iron Pipelines by Richard W. Bonds, P.E. Strength and Durability for Life CORROSION CONTROL The Effect of Overhead AC Power Lines Paralleling Ductile Iron Pipelines by Richard W. Bonds, P.E. Last Revised: March 2017 Sharing of rights-of-way by

More information

Facility and Equipment Grounding

Facility and Equipment Grounding Facility and Equipment Grounding - 2005 Course: PQE203 Presented by: PowerCET Corporation 3350 Scott Blvd. Bldg. 55 Unit 1 Santa Clara, CA 95054 408/988-1346 Fax 408/988-4869 E-mail: training@powercet.com

More information

Use of geophysical methods in investigating PRBs employing non-conductive reactive materials

Use of geophysical methods in investigating PRBs employing non-conductive reactive materials Water Resources Management IV 345 Use of geophysical methods in investigating PRBs employing non-conductive reactive materials Y. S. Kim, J. J. Kim, G. H. Lee & J. B. Park School of Civil, Urban and Geosystem

More information

D26. National Grid Corridor Overlay

D26. National Grid Corridor Overlay D26. National Grid Corridor Overlay D26.1. Overlay description The National Grid is important to the social and economic well-being of Aucklanders and New Zealanders. All infrastructure owned or operated

More information

2 3 4 Distance from centre of reactor (m)

2 3 4 Distance from centre of reactor (m) ONE OPTIMISED NETWORK EQUIPMENT 12 January 2016 c 0MPRMF-4 Magnetic fields and air core reactors 1 Introduction Air core reactors are commonly used as shunt reactors, fault current limiting reactors, tuning

More information

#24. Submission by Transpower NZ Limited on the Upper Hutt City Council Proposed Plan Change 42 Mangaroa and Pinehaven Flood Hazard Extents 2017

#24. Submission by Transpower NZ Limited on the Upper Hutt City Council Proposed Plan Change 42 Mangaroa and Pinehaven Flood Hazard Extents 2017 Submission by Transpower NZ Limited on the Upper Hutt City Council Proposed Plan Change 42 Mangaroa and Pinehaven Flood Hazard Extents 2017 8 May 2017 ADDRESS FOR SERVICE Transpower New Zealand Limited

More information

Phasor measurement units gain credibility through improved test and calibration standards

Phasor measurement units gain credibility through improved test and calibration standards Phasor measurement units gain credibility through improved test and calibration standards Smart grid; PMU calibration position 1 The North American interconnection, or electric transmission grid, is a

More information

MANAV RAIL. Safety Through Design MANAV ENERGY.

MANAV RAIL. Safety Through Design MANAV ENERGY. MANAV RAIL Safety Through Design MANAV ENERGY www.manavenergy.com INTRODUCTION Rail transportation has grown to become the mainstream modes of transportation by providing intercity and large regional reach

More information

leinfelder Fauna Spotter Catcher Architects. Engineers. Scientists

leinfelder Fauna Spotter Catcher Architects. Engineers. Scientists Horizons leinfelder Fauna Spotter Catcher Kleinfelder has a large team of accredited, highly competent, and experienced personnel trained to meet construction milestones and manage animal welfare. Architects.

More information

Transactions on Modelling and Simulation vol 8, 1994 WIT Press, ISSN X

Transactions on Modelling and Simulation vol 8, 1994 WIT Press,   ISSN X Invited paper Analysis of stray current corrosion problems using the boundary element method J. Trevelyan* & H.P. Hack& ^ Computational Mechanics, Inc., Billerica, Massachusetts, USA ^ Naval Surface Warfare

More information

The application of selective door opening within a railway system

The application of selective door opening within a railway system The application of selective door opening within a railway system K. Chan & D. Turner Mott MacDonald Limited, UK Abstract In an environment of continuing railway improvement, a new UK Railway Standard

More information

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No.

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No. d/b/a National Grid and Clear River Energy LLC (Burrillville Interconnection Project) RIPUC Dkt. No. Testimony of David J. Beron, P.E., P.M.P. November, 0 0-v R.I.P.U.C. Dkt. No. 0 0 INTRODUCTION Q. Please

More information

Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline

Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline . Paper Number: 2017-02 Evaluation of Key Performance Indicators (KPI s) in Crude Oil Transmission Pipeline Raghav Ravichandran CSIR-Central Electrochemical Research Institute, India Abstract This paper

More information

STATIC GROUNDING VERIFICATION SYSTEM

STATIC GROUNDING VERIFICATION SYSTEM VEHICLE MOUNTED STATIC GROUNDING VERIFICATION SYSTEM By Mike O Brien Mike O Brien is the product manager for Newson Gale s market leading range of static grounding and bonding equipment. Mr. O Brien s

More information

in brief corrs Policy What it means for developments in april 2012

in brief corrs Policy What it means for developments in   april 2012 corrs in brief april 2012 Delivery of the Strategic Regional Land Use Policy What it means for developments in regional areas The NSW Government has recently released a number of draft plans, policies

More information

4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS

4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS 4.8 ENVIRONMENTAL HEALTH - ELECTRIC AND MAGNETIC FIELDS This section provides project-level discussion and analysis of potential health and safety impacts related to power frequency electric and magnetic

More information

To Study the Electrical Resistivity of Deccan Traps at Ranga-Reddy District

To Study the Electrical Resistivity of Deccan Traps at Ranga-Reddy District To Study the Electrical Resistivity of Deccan Traps at Ranga-Reddy District Shaik Abdul Waheed 1 ; Syed Mansoor Ali 1 ; Mohammed Ayaz 1 ; Shaik Abdul Wahed 1 ; Srikanth 2 & Rajesh Kanna 3,* 1 Undergraduate

More information

Electronic materials and components-inductive components

Electronic materials and components-inductive components Electronic materials and components-inductive components Inductive components make use of the voltage that is generated when a field changes either on the same piece of wire (self-induction) or in a nearby

More information

Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1

Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1 Designation: G57 06 (Reapproved 2012) Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method 1 This standard is issued under the fixed designation G57; the

More information

APPENDIX B EMPRESS OVERPASS RESISTANCE TESTING

APPENDIX B EMPRESS OVERPASS RESISTANCE TESTING The City of Winnipeg Appendix B Bid Opportunity No. 602-2018 Page 1 of 1 Template Version: C420180312 - RW APPENDIX B EMPRESS OVERPASS RESISTANCE TESTING June 19 th, 2018 Andrew Gilarski, M.Sc., P.Eng.

More information

EXECUTIVE SUMMARY. 2. The effect of remediation on the distribution and mobility of both the LNAPL and water within the zone of interest.

EXECUTIVE SUMMARY. 2. The effect of remediation on the distribution and mobility of both the LNAPL and water within the zone of interest. EXECUTIVE SUMMARY For many decades, the oil production industry has recognized that significant limitations exist to complete extraction of oil from geologic formations. Attempts to recover fuels and crude

More information

Calibration of the Murrumbidgee Monitoring Network CS616 Soil Moisture Sensors

Calibration of the Murrumbidgee Monitoring Network CS616 Soil Moisture Sensors Calibration of the Murrumbidgee Monitoring Network CS616 Soil Moisture Sensors N. Yeoh, J. Walker, R. Young, C. Rüdiger, A. Smith, K. Ellett, R. Pipunic, A. Western Department of Civil and Environmental

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

FAC Mapping to Proposed NERC Reliability Standard FAC RBS Draft 4 August 22, 2011

FAC Mapping to Proposed NERC Reliability Standard FAC RBS Draft 4 August 22, 2011 Standard FAC-003-1 Proposed Standard FAC-003-2 RBS Draft 4 Observations Definitions of Terms Definitions of Terms Used in Standard Right of Way A corridor of land on which electric lines may be located.

More information

Lightning Protection Practice for Large-Extended Photovoltaic Installations

Lightning Protection Practice for Large-Extended Photovoltaic Installations 202 International Conference on ightning Protection (ICP), Vienna, Austria ightning Protection Practice for arge-extended Photovoltaic Installations Dr. Nikolaos Kokkinos Research and Development Department

More information

Transmission Losses Report 2017

Transmission Losses Report 2017 SP Energy Networks October 2017 Transmission Losses Report 2017 1. INTRODUCTION Special condition 2K of the SP Transmission plc (SPT) transmission licence requires SPT to publish an annual transmission

More information

GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE

GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE GROUNDWATER MODELING OF A PERMEABLE REACTIVE BARRIER TO ENHANCE SYSTEM PERFORMANCE K.C. Scott, P.G., and D. J. Folkes, P.E. EnviroGroup Limited, 7208 South Tucson Way, Suite 125, Englewood, CO 80112; Phone:

More information