Boiler Life and Availability Improvement Program - Program 63

Size: px
Start display at page:

Download "Boiler Life and Availability Improvement Program - Program 63"

Transcription

1 Boiler Life and Availability Improvement Program - Program 63 Program Description Program Overview Safety and availability loss due to pressure part failures are two key issues driving R&D on major fossil power plant components, especially in older plants. Boiler tube failures (BTFs) continue to be the leading cause of lost availability (with equipment availability losses due to BTFs averaging approximately 3%) in fossil-fired steam plants worldwide. The majority of fossil plants worldwide are more than 30 years old and are experiencing increased demand for operational flexibility while addressing age-related issues for major components. High-energy steam and water piping systems are among the most important safety issues at fossil plants and must be managed reliably through the aging process. The Electric Power Research Institute s (EPRI s) Boiler Life and Availability Improvement Program (Program 63) uses international collaboration to develop technology and guidance on safe management of boiler component life to ensure high reliability and reduce O&M costs. Efforts focus on advanced inspection techniques for early and accurate identification of component damage; analytical tools to predict remaining life and risk of in-service failure; and decision-support tools to help balance risk and benefit under a variety of operating scenarios. Research Value Utilities need to balance the risks and costs of the largest, most costly equipment within the power plant, and focus on using proven technologies to create solutions. By using the results of the R&D in this program, they can: Reduce cost of lost availability due to boiler tube failures from greater than $10,000/MW/yr to less than $1,000/MW/yr when program results are applied comprehensively. Increase safety of high-energy and high temperature piping systems. Increase safety through control of flow-accelerated corrosion (FAC) in fossil plants. The program portfolio includes guidelines, reports, software code, and tools applicable to all boilers, with the goal of optimal availability and performance. Research for Boiler Component Inspection and Monitoring (P63.001): Develops accurate and costeffective nondestructive evaluation (NDE) to reduce operation and maintenance (O&M) costs and improve life management options. NDE developments in other industries will also be evaluated for application to fossil plants. Tools for Boiler Component Life Management (P63.002): Provides a comprehensive approach to creating technical bases for minimizing in-service component damage and for component remaining-life assessment. Both areas are critical for high reliability and maximum equipment life. High-Energy Steam and Water Piping Safety and Life Management (P63.003): Addresses safety and reliability of high-energy piping systems in fossil power plants. Information on how damage mechanisms affect piping components and remaining life tools will be provided. Tools will be developed that allow utilities to more accurately predict remaining life of piping systems. Accomplishments EPRI s Boiler Life and Availability Improvement program has created and successfully demonstrated a worldrecognized program to reduce boiler tube failures by understanding damage mechanisms, their root causes, and corrective options for root causes. Highlights include: Boiler Life and Availability Improvement Program - Program 63 p. 1

2 Development of the most comprehensive suite of guidelines and analysis tools for boiler component life management. Leading source of guidance, training, and analysis tools for flow-accelerated corrosion (FAC) management in fossil plants. World leader in developing and demonstrating NDE technologies for boilers, high-energy piping, and FAC. Current Year Activities The program R&D for 2010 will focus on developing life-assessment technologies for piping and header base metal degradation. Specific efforts will include: Development of small sample removal and testing procedures to predict remaining life of seamless pressure parts. Guidance to address damage from evolving operating modes within current fossil fleet, including fuel switching, cycling, low load, and environmental constraints. Technology and information to support reliable operation of new and advanced fossil boiler designs. Estimated 2010 Program Funding $4.5M Program Manager Kent Coleman, , Summary of Projects Project Number Project Title Description P Research for Boiler Component Inspection and Monitoring P Tools for Boiler Component Life Management P High-Energy Steam and Water Piping Safety and Life Management This project provides technology, tools, and application support to maximize safety and reliability of boiler components and to determine optimal timing for repair or replacement, and investigates new technologies for NDE. This project focuses on the technology and tools required to costeffectively minimize boiler tube failures and addresses life management issues associated with high-cost and high-impact boiler components such as tubes, headers, and drums. This project provides information about damage mechanisms, their root causes, and appropriate responses to ensure safe operation of high-energy steam and water piping systems. P Research for Boiler Component Inspection and Monitoring (103518) Key Research Question Maximizing safety and reliability of boiler components and determining optimal timing for repair or replacement require accurate and timely detection of service-generated damage. Additionally, new technologies for NDE might allow faster examination of boiler components at lower cost, resulting in shorter outages. This project provides the technology, tools, and application support via R&D, applications, workshops, and training required. Boiler Life and Availability Improvement Program - Program 63 p. 2

3 To achieve longer intervals between inspections and overhauls of boiler components, it is necessary to detect service-related damage at an early stage. EPRI will develop new NDE techniques for detecting damage sooner than currently is possible. This detection is intended to identify a multiyear period during which the power producer must take action to avoid significant risk of failure during service. EPRI also will pursue NDE alternatives that are faster, better, or cheaper than traditional techniques. Guidance will be developed to ensure effective use of NDE tools. EPRI will research the science and application of continuous monitoring technologies that provide the highest degree of information on damage initiation and progression. In conjunction with remaining-life models developed under P and P63.003, these approaches will allow optimal decisions for component repair or replacement with minimal risk of failure during the service life. Impact Improved reliability and lower O&M costs via reduced risk of service failures. Extended intervals between examinations through more sensitive and more accurate NDE applied to boiler components. Reduced O&M costs via more efficient NDE techniques for damage detection. Demonstration of NDE personnel and technology proficiency provides utilities with more accurate examination results. How to Apply Results Research results to develop new or improved NDE techniques generally will be licensed to commercial NDE companies that will offer the technology for sale or performed as a service. Larger utilities might use the results directly via in-house NDE organizations. Guideline reports to support correct application of NDE technology can be used by members as training guides and for process or procedure improvements with an eye to improving reliability while lowering O&M costs. Technology will be presented to members via workshops conducted regionally, in association with EPRI programs or interest group meetings Products Inspection Methods for Boiler Tubing Ceramic Coating: Many companies now offer ceramic coatings for boiler tube protection and ash removal. It is unclear how long the usable life of these coatings is. Methods need to be developed to determine remaining thickness of these coatings, so repairs or replacements of the coating may be scheduled. This project will evaluate examination methods for coating life prediction. Drum Damage Detection and Sizing Guideline: Drum cracking is occurring more frequently as units age and experience cyclic operation. Predicting remaining life and crack propagation requires an accurate assessment of the extent of existing damage. Inspection from the drum's internal surface is difficult because of drum furniture and because multiple cracks may mask larger damage. Inspection from the outside is difficult due to tube locations and dirtiness of the steels used in older drums. Improved crack detection and sizing capabilities are warranted. This project will investigate methods to characterize, measure, and document damage. 03/31/10 03/31/10 Report Boiler Life and Availability Improvement Program - Program 63 p. 3

4 Advanced NDE Systems for Boiler Components: Development of new NDE methods for boiler components. This work may be an application of existing technology, development of new technology, or a combination in which an existing technology is augmented with new hardware in order to apply it to a previously inaccessible location. Workshop on Boiler Component Inspection and Monitoring: The workshop materials developed in 2009 will be packaged as a formal workshop that can be conducted regionally; in association with EPRI programs or user or interest group meetings; or otherwise, based on interest. Hardware Workshop, Training, or Conference P Tools for Boiler Component Life Management (103519) Key Research Question Boiler tube failures (BTFs) are consistently the leading cause of lost availability for fossil power plants, with equipment availability losses due to BTFs averaging around 3% worldwide. Headers and boiler internal piping continue to age and degrade. This project will continue to focus on the technology and tools required to costeffectively minimize boiler tube failures. The project also will address life management issues associated with high- cost and high-impact boiler components such as tubes, headers, and drums. The project includes support for implementing a boiler tube failure reduction program, performing life management of headers and drums, and facilitating peer-to-peer communications on boiler issues through the Boiler Reliability Interest Group (BRIG). Projects will advance the understanding of boiler tube and other pressure component damage mechanisms and their root causes, while establishing programs and corrective actions to control risks of in-service failures. This science and information will be captured in practical guides for fossil plant personnel. As needed, tools for more accurate remaining-life analysis will be created to support the life-management objectives. Impact Improve boiler availability through fewer boiler tube failures. Lower O&M costs through longer operating lives for major boiler components. Reduce risk of in-service failures in tubes, headers, and drums. How to Apply Results Guidance on boiler tubing, headers, and drums can be used by members to establish a boiler tube failure reduction (BTFR) program and perform life-management analyses. Peer-to-peer communications on boiler issues optimally, through attendance at the Boiler Reliability Interest Group (BRIG) allows members to take advantage of industry lessons learned. Analytical tools may be licensed to commercial vendors to take the technology to market, allowing members to apply the tools directly or via a service. Targeted workshops with EPRI staff bring worldwide expertise to members, to increase the likelihood of implementing these research results. Boiler Life and Availability Improvement Program - Program 63 p. 4

5 2010 Products Effect of Operational Variables, Final Report: EPRI has been evaluating the effect of different operational variables on boiler remaining life. Some of these variables include ramp rate during start-up and shutdown, number of cycles, chemistry, and topping off drums on shutdowns. Units have been instrumented to determine the stress caused by these operational variables. Information developed during the last two years will be compiled into a final report. of Boiler Tubing Life Assessment Software: Two software packages have been the industry standard for predicting boiler tubing remaining life in superheaters and reheaters, and both are based on the oxide thickness methodology developed by EPRI. The original package, Tubelife, provided tools to determine remaining life of boiler tubing deterministically and provided good graphical output to guide utilities on tubing replacement. A later software development, Tulip, provided methods to probabilistically predict damage to boiler tubing, but is more suited to single-tube evaluations. This update will incorporate the best from both prior software packages to allow batch processing of oxide thickness data and provide deterministic or probabilistic failure predictions while providing a database for oxide measurements. Improved report output will also be developed. Boiler Condition Assessment Guideline : EPRI has developed a guideline for boiler components that is the industry standard for determining the amount of time that a component may be operated. This update will provide new information on inspection technologies and remaining-life calculations for specific boiler components and will include information on new materials. International Conference on Advances in Condition and Remaining Life Assessment for Fossil Power Plants: EPRI conducts the International Conference on Advances in Condition and Remaining Life Assessment of Boiler Components every three years. This conference will present the latest information on managing boiler assets. Guideline for Cold Air Balancing for Fly Ash Erosion Control: EPRI has pioneered the use of cold air velocity tests (CAVT) for minimizing flyash erosion damage. Many advances with this technology have been demonstrated since the last guideline was published, including computational fluid dynamics, which may simplify installation of flow control devices used to minimize fly ash erosion. This report will document advancements in the field of CAVT for flyash damage prevention. Boiler Reliability Interest Group Meetings and Information Exchange: Boiler Reliability Interest Group (BRIG) meetings are conducted during the second weeks of June and December. This meeting provides informal peerto-peer interfaces to discuss industry issues, new services, and equipment, and to introduce vendors to utility engineers and managers. Report Software Report Workshop, Training, or Conference Report Resource Boiler Life and Availability Improvement Program - Program 63 p. 5

6 P High-Energy Steam and Water Piping Safety and Life Management (060364) Key Research Question High-energy steam and water piping failures are one of the most important safety and availability issues in fossil power plants. EPRI research has identified key damage mechanisms such as creep, fatigue, and corrosion that can lead to piping failure. Flow-accelerated corrosion (FAC) is a major safety issue in fossil plants. Research continues to refine the understanding of these damage mechanisms and how they are affected by component aging and variation in operating modes for the plant. Safe and reliable operation of piping systems requires active damage prevention, periodic inspection, remaining-life assessment, and repair or replacement programs. These activities require a proactive life-management approach. This project will provide information about damage mechanisms, their root causes, and appropriate responses to ensure safe operation of these piping systems. Projects will improve the understanding of damage mechanisms and their root causes, and will establish programs and corrective actions to control risks of in-service failures. Tools for more accurate and costeffective analysis of damage rates will be created. This project will begin to develop life-assessment tools to address aging of base metal in traditional and advanced ferritic piping systems. Impact Reduce risk of high-consequence failures of high-energy steam and water piping systems by applying tools and guidance developed by this project. Eliminate FAC as a safety issue in fossil plants. Reduce O&M cost associated with piping life management by improving inspection accuracy and efficiency. Reduce O&M costs by lessening very conservative assumptions of piping life and providing more accurate assessment of timing for pipe replacement. How to Apply Results This program will help members establish a proactive life-management approach to high-energy piping systems and FAC control. This project will provide information about damage mechanisms, their root causes, and appropriate responses to ensure safe operation of these piping systems, and will include workshops and training to ensure proper application of life management processes. Advanced analysis tools developed in the project may also be licensed to third parties for application to fossil plants Products Development of Creep Indentation Test Methods for Life Assessment: Many hot reheat and main steam piping systems have reached or exceeded design life, yet these systems continue to be operated. A method is needed to predict when these systems will develop risk of failure. A new method of more accurately predicting remaining life will be developed around recently developed small sample creep testing, particularly impression creep tests. Using this test method, small 1-inch (25-mm) samples will be removed from each piping system and tested via impression creep test equipment. Comparison with databases developed by this project will allow utilities to determine if their piping system is at risk. Boiler Life and Availability Improvement Program - Program 63 p. 6

7 Workshop on High-Energy Steam Piping: Regional two-day workshop on high-energy piping life management including traditional and advanced materials. Guideline on Piping Stress Analysis and Hanger Testing: As piping systems age, damage accumulates at welds. This damage is accelerated by excessive bending loads that may result from improper piping system design and maintenance of hanger systems. This guideline will include detailed assumptions made in performing a piping system stress analysis, and will show benefits for life assessment of piping systems. The guideline will also provide information about pipe hanger testing and the importance of hanger operation on piping stress. Cold Reheat Piping and Attemperator Inspection Guideline: The guideline will describe options for inspection of cold reheat lines, desuperheater sprays, and liners. It builds on the cold reheat inspection guidelines. Desuperheater nozzle design and control logic will also be included. Workshop, Training, or Conference Future Year Products to High-Energy Piping: Theory and Practice: "High-Energy Piping: Theory and Practice" was issued in This report will provide an updated guideline on high-energy piping damage mechanisms and remaining life tools that have been developed in the last three years. New inspection techniques will also be included. 03/31/11 Report Boiler Life and Availability Improvement Program - Program 63 p. 7

Boiler Life and Availability Improvement Program - Program 63

Boiler Life and Availability Improvement Program - Program 63 Program Description Program Overview The majority of fossil plants worldwide are more than 30 years old and are experiencing increased demand for operational flexibility while addressing age-related issues

More information

Heat Recovery Steam Generator (HRSG) Dependability - Program 88

Heat Recovery Steam Generator (HRSG) Dependability - Program 88 Heat Recovery Steam Generator (HRSG) Dependability - Program 88 Program Description Program Overview Heat recovery steam generators (HRSGs) pose a unique set of operational challenges, due in part to their

More information

Combined Cycle HRSG and Balance of Plant - Program 88

Combined Cycle HRSG and Balance of Plant - Program 88 Program Description Program Overview The design of modern heat recovery steam generators (HRSGs) and balance-of-plant (BOP) systems is a complex interrelationship between many parameters and variables.

More information

Combined Cycle HRSG and Balance of Plant - Program 88

Combined Cycle HRSG and Balance of Plant - Program 88 Combined Cycle HRSG and Balance of Plant - Program 88 Program Description Program Overview The design of modern heat recovery steam generators (HRSGs) and balance-of-plant (BOP) systems is a complex interrelationship

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants increasingly are adopting market-driven operating strategies such as cycling, pushing for maximum

More information

Steam Turbines-Generators and Auxiliary Systems - Program 65

Steam Turbines-Generators and Auxiliary Systems - Program 65 Program Description Program Overview A majority of outages planned at coal, nuclear, and combined-cycle power plants involve maintenance tasks performed on turbines and generators. Owners of aging turbine-generator

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants are being tasked with flexible operation by pushing for maximum output during peak price periods, transitioning to low-load and multi-shift

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants are increasingly adopting market-driven operating strategies such as cycling, pushing for maximum

More information

Boiling Water Reactor Vessel and Internals (QA)

Boiling Water Reactor Vessel and Internals (QA) Boiling Water Reactor Vessel and Internals (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared, first

More information

Pressurized Water Reactor Materials Reliability Program (QA)

Pressurized Water Reactor Materials Reliability Program (QA) Pressurized Water Reactor Materials Reliability Program (QA) Program Description Program Overview Stress corrosion cracking and general environmental corrosion of reactor coolant system components have

More information

Boiler and Turbine Steam and Cycle Chemistry - Program 64

Boiler and Turbine Steam and Cycle Chemistry - Program 64 Boiler and Turbine Steam and Cycle Chemistry - Program 64 Program Description Program Overview Safety and availability loss due to failures are two key issues driving R&D on major fossil power plant components,

More information

Boiling Water Reactor Vessel and Internals Project (QA)

Boiling Water Reactor Vessel and Internals Project (QA) Boiling Water Reactor Vessel and Internals Project (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared,

More information

HRSG Inspection Planning Guide

HRSG Inspection Planning Guide HRSG Inspection Planning Guide Second Edition P. Jackson D. Moelling J. Malloy M. Taylor Copyright 2006 by Tetra Engineering Group, Inc. All Rights Reserved. Reproduction or translation of any part of

More information

Steam Generator Management (QA)

Steam Generator Management (QA) Steam Generator Management (QA) Program Description Program Overview Many factors affect materials degradation in steam generators, including water chemistry, inspection limitations, material performance

More information

PWR Steam Generator Management

PWR Steam Generator Management PWR Steam Generator Management Program Description Program Overview Materials degradation in steam generators is impacted by many factors, including water chemistry, inspection limitations, material performance

More information

- Identify inspection finding that "rise to the top", or are most common to units across the fleet

- Identify inspection finding that rise to the top, or are most common to units across the fleet AEP BRO Conference 2009 AEP Core Boiler Inspection Group (ACBIG) In 2007 the (ACBIG) was conceived and implemented by AEP in an effort to improve boiler availability and consistency across the AEP fleet.

More information

Ten Year Retrospective Look at HRSG FAC Assessment and Incidence. Peter S. Jackson, PhD, PE, David S. Moelling, PE, Mark Taylor, Mech. Eng.

Ten Year Retrospective Look at HRSG FAC Assessment and Incidence. Peter S. Jackson, PhD, PE, David S. Moelling, PE, Mark Taylor, Mech. Eng. Ten Year Retrospective Look at HRSG FAC Assessment and Incidence Peter S. Jackson, PhD, PE, David S. Moelling, PE, Mark Taylor, Mech. Eng. Ten years after we first reported at the 1999 EPRI Maintenance

More information

Technology Options for New Coal Units

Technology Options for New Coal Units Technology Options for New Coal Units Advanced Ultra- Supercritical (A-USC) Power Plants Revis W. James Senior Technical Executive Generation Sector Research and Development Workshop on Best Practices

More information

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs Presented To: Hot Topic Hour A Babcock Power Inc. Company By: Deron Johnston Date: Mar.7/13 Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs Authors: Akber Pasha,

More information

3 Steps to Better Steam Temperature Control Proven Strategies to Minimize Thermal Stress and Tube Leaks

3 Steps to Better Steam Temperature Control Proven Strategies to Minimize Thermal Stress and Tube Leaks December 17 3 Steps to Better Proven Strategies to Minimize Thermal Stress and Tube Leaks www.emerson.com/ December 17 Commercial power generators are having to significantly change how they operate their

More information

High Energy Piping Inspection Program for Power Generation and Process Industries. For Regulatory Compliance, Safety, and System Longevity

High Energy Piping Inspection Program for Power Generation and Process Industries. For Regulatory Compliance, Safety, and System Longevity High Energy Piping Inspection Program for Power Generation and Process Industries For Regulatory Compliance, Safety, and System Longevity EAPC Industrial Services offers an inspection plan for assessment

More information

RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS

RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS A DB RILEY TECHNICAL PUBLICATION RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS by James P. King DB Riley, Inc. Worcester, Massachusetts Presented at the 1996 ASME

More information

1 Title of Presentation 1 January 2015 EDF Energy plc. All rights Reserved

1 Title of Presentation 1 January 2015 EDF Energy plc. All rights Reserved 1 Title of Presentation 1 January 2015 EDF Energy plc. All rights Reserved Pressure Systems Installations: Significant Technical Challenges in a Difficult Commercial Climate A Morris Chief Mechanical Engineer

More information

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING 2013 Thielsch Engineering, Inc. Pamela Smoske, Executive Director of Development and Operations; 4-SYTE Systems PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING High-energy

More information

Boiling Water Reactor Vessel and Internals

Boiling Water Reactor Vessel and Internals Boiling Water Reactor Vessel and Internals Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared, first in

More information

Steam Turbines-Generators and Auxiliary Systems - Program 65

Steam Turbines-Generators and Auxiliary Systems - Program 65 Steam Turbines-Generators and Auxiliary Systems - Program 65 Program Description Program Overview Up to 70% of outages planned for steam power plants involve work on the turbines. Power producers continually

More information

Balance-of-Plant Corrosion

Balance-of-Plant Corrosion Balance-of-Plant Corrosion Program Description Program Overview Corrosion in the secondary side of nuclear power plants costs individual plants up to $25 million per year for detection, monitoring, and

More information

View from the Penthouse

View from the Penthouse View from the Penthouse The DNFM Technical News Letter David N. French Metallurgists Ph: 502-955-9847 Fax: 502-957-5441 Web: www.davidnfrench.com Load Cycling As many coal-fired power plants designed for

More information

Advanced Nuclear Technology

Advanced Nuclear Technology Advanced Nuclear Technology Program Description Program Overview New nuclear power plants incorporating advanced light water reactor (ALWR) technology must overcome a number of regulatory, economic, technical,

More information

Material Degradation Management of the Point Lepreau Reactor Coolant System. by John Slade & Tracy Gendron 1 of 23

Material Degradation Management of the Point Lepreau Reactor Coolant System. by John Slade & Tracy Gendron 1 of 23 Material Degradation Management of the Point Lepreau Reactor Coolant System by John Slade & Tracy Gendron 1 of 23 Serious RCS Degradation Early Refurbishment, 2008 Recirculating SGs (alloy 800 tubing)

More information

Steam Turbines-Generators and Auxiliary Systems - Program 65

Steam Turbines-Generators and Auxiliary Systems - Program 65 Steam Turbines-Generators and Auxiliary Systems - Program 65 Program Description Program Overview Because up to 70% of outages planned for steam power plants involve work on the turbine, power producers

More information

HIGH ENERGY PIPING INSPECTION PROGRAM

HIGH ENERGY PIPING INSPECTION PROGRAM HIGH ENERGY PIPING INSPECTION PROGRAM JOEL LUNDQUIST STRESS ANALYSIS SECTION B&V ENERGY AGENDA About Black & Veatch Introduction Power Piping Code Initial Baseline Assessment Evaluation by Non-Destructive

More information

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION

Power plant Asset. Thermal power Hydro power Geothermal power. QuestIntegrity.com CHALLENGE CONVENTION Power plant Asset Integrity Management Thermal power Hydro power Geothermal power QuestIntegrity.com CHALLENGE CONVENTION Effective Asset Integrity Management in Power Plants Effective asset integrity

More information

Materials Aging Management Programs at

Materials Aging Management Programs at Materials Aging Management Programs at Nuclear Power Plants in the United States Timothy J. Griesbach Structural Integrity Associates IAEA 2 nd International Symposium on Nuclear Power Plant Life Mgmt.

More information

POWER TURBINE STEAM CHEST LIFE ASSESSMENT. Proceedings of the ASME Power Conference POWER2010 July 13-15, 2010, Chicago, Illinois, USA

POWER TURBINE STEAM CHEST LIFE ASSESSMENT. Proceedings of the ASME Power Conference POWER2010 July 13-15, 2010, Chicago, Illinois, USA Proceedings of the ASME Power Conference POWER2010 July 13-15, 2010, Chicago, Illinois, USA POWER2010-27248 TURBINE STEAM CHEST LIFE ASSESSMENT Daniel T. Peters, PE Structural Integrity Associates Uniontown,

More information

Finding the Root Cause is Critical

Finding the Root Cause is Critical Finding the Root Cause is Critical Have you ever repaired a tube leak and put the boiler back in service, only to be forced off-line by another leak? Identifying and correcting the root cause is essential.

More information

Structural Performance of next-generation nuclear components: lessons from the UK's R5 and R6 structural integrity assessment procedures

Structural Performance of next-generation nuclear components: lessons from the UK's R5 and R6 structural integrity assessment procedures Structural Performance of next-generation nuclear components: lessons from the UK's R5 and R6 structural integrity assessment procedures MATISSE Workshop on cross-cutting issues in structural materials

More information

Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa,

Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa, Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa, Bilfinger Power Systems South Africa Summary Introduction

More information

Condition Assessment Services. Put our team of specialists to work for you

Condition Assessment Services. Put our team of specialists to work for you Condition Assessment Services Put our team of specialists to work for you HEADERS Don t let a steam leak be your first sign of header problems High Temperature Headers High temperature superheater and

More information

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines A Copper-Plated Thief: The Problem of Copper Deposits in Turbines By Dave Daniels and John Latcovich, The Hartford Steam Boiler Introduction Operators at a coal-fired, 2,600 PSI power plant performed monthly

More information

P Boiling Water Reactor Vessel and Internals Program (BWRVIP)

P Boiling Water Reactor Vessel and Internals Program (BWRVIP) 2018 Research Portfolio P41.01.03 - Boiling Water Reactor Vessel and Internals Program (BWRVIP) Program Description As boiling water reactors (BWRs) age, various types of materials degradation mechanisms

More information

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS SECTOR / ENGINEERING NON-TECHNICAL & CERTIFIED TRAINING COURSE Appropriate material selection is the cornerstone of pressure equipment

More information

Corrosion Fatigue. PPChem. PPChem 101 BOILER AND HRSG TUBE FAILURES LESSON 2: INTRODUCTION FEATURES OF FAILURES IDENTIFICATION

Corrosion Fatigue. PPChem. PPChem 101 BOILER AND HRSG TUBE FAILURES LESSON 2: INTRODUCTION FEATURES OF FAILURES IDENTIFICATION 101 Boiler and HRSG Tube Failures 101 BOILER AND HRSG TUBE FAILURES LESSON 2: Corrosion Fatigue R. Barry Dooley and Albert Bursik INTRODUCTION Fatigue damage occurs in general when a boiler tube is subject

More information

Leakage Failure Analysis in a Power Plant Boiler

Leakage Failure Analysis in a Power Plant Boiler Available online at www.sciencedirect.com ScienceDirect IERI Procedia 5 (2013 ) 107 111 2013 International Conference on Agricultural and Natural Resources Engineering Leakage Failure Analysis in a Power

More information

Online Fatigue Monitoring and Predictive Analytics for Improved Flexibility of Plant Operation. Dr.Tomasz Kaminski

Online Fatigue Monitoring and Predictive Analytics for Improved Flexibility of Plant Operation. Dr.Tomasz Kaminski Online Fatigue Monitoring and Predictive Analytics for Improved Flexibility of Plant Operation Dr.Tomasz Kaminski 1. Challenges 2. Elements of Condition-Based Maintenance 3. Use of Online Systems for Condition

More information

CMI Energy Aftermarket Solutions

CMI Energy Aftermarket Solutions CMI Energy Aftermarket Solutions 1 Optimize with CMI Aftermarket Solutions Complete support for any HRSG make or configuration! Field Services Inspections / Evaluations Failure Analysis Technical Consultations

More information

PRB COAL USERS GROUP at the ELECTRIC POWER 2008 Conference

PRB COAL USERS GROUP at the ELECTRIC POWER 2008 Conference A Technical Paper: The Domino Effect from Conversion to PRB Fuel Prepared for the: PRB COAL USERS GROUP at the ELECTRIC POWER 2008 Conference May 6-8, 2008 Baltimore, Maryland at the Baltimore Convention

More information

SMARTER BOILERS Maximizing Your Boiler Performance to Enhance Your Bottom Line

SMARTER BOILERS Maximizing Your Boiler Performance to Enhance Your Bottom Line SMARTER BOILERS Maximizing Your Boiler Performance to Enhance Your Bottom Line SMARTER INNOVATION For the Power Industry Efficiencies Your company s teams are tasked with ensuring operations run smoothly.

More information

Operation & Maintenance. HRSG Performance Management and Service. Continuous Condition Assessment. siemens.com/power-generation-services

Operation & Maintenance. HRSG Performance Management and Service. Continuous Condition Assessment. siemens.com/power-generation-services Operation & Maintenance HRSG Performance Management and Service Continuous Condition Assessment siemens.com/power-generation-services Expertise over a wide range of HRSG designs Customers worldwide have

More information

Solar - Program 187. Program Overview

Solar - Program 187. Program Overview Program Program Overview The U.S. Department of Energy estimates that solar power will represent approximately 1% of worldwide electric generation capacity in less than five years, and trends suggest that

More information

UNIVERSST&TSBIBUOTHEK HANNOVER

UNIVERSST&TSBIBUOTHEK HANNOVER The Spalling of Steam-Grown Oxide From Superheater and Reheater Tube Steels FP-686 Technical Planning Study 76-655 Final Report, February 1978 Prepared by CENTRAL ELECTRICITY RESEARCH LABORATORIES Kelvin

More information

Welding & Repair Technology Center

Welding & Repair Technology Center Welding & Repair Technology Center Program Description Program Overview High-quality, reliable welds, repair methodologies, and mitigation processes are critical to safe nuclear plant operation. The safety

More information

Materials Assessment Services

Materials Assessment Services Materials Assessment Services ANSTO is a specialist materials assessment provider offering an integrated service concentrated on maximizing the performance of capital assets and infrastructure. With over

More information

Combustion Performance and Emissions Control - Program 71

Combustion Performance and Emissions Control - Program 71 Program Description Program Overview As the most cost-effective means of reducing emissions from coal-fired power plants, combustion modifications should be viewed as the first step in any emissions control

More information

ALLOY 600 REACTOR VESSEL HEAD PENETRATION ISSUES. Dudenstrasse 44, Mannheim, Germany. Post Office Box 355 Pittsburgh, PA ABSTRACT

ALLOY 600 REACTOR VESSEL HEAD PENETRATION ISSUES. Dudenstrasse 44, Mannheim, Germany. Post Office Box 355 Pittsburgh, PA ABSTRACT ALLOY 600 REACTOR VESSEL HEAD PENETRATION ISSUES Herbert Lenz 1, Edward Siegel 2 and Donald Seeger 2 1 Westinghouse Reaktor GmbH, Dudenstrasse 44, 68167 Mannheim, Germany 2 Westinghouse Electric Company

More information

============================================================== ETD, 6 Axis Centre, Cleeve Road, Leatherhead, Surrey, KT22 7RD, UK

============================================================== ETD, 6 Axis Centre, Cleeve Road, Leatherhead, Surrey, KT22 7RD, UK ============================================================== ETD, 6 Axis Centre, Cleeve Road, Leatherhead, Surrey, KT22 7RD, UK E-mail: etd@etd1.co.uk or, etd@etd-consulting.com Web address: www.etd1.co.uk

More information

Distribution Systems - Program 128

Distribution Systems - Program 128 Distribution Systems - Program 128 Program Description Program Overview Utility distribution systems are challenged by an aging infrastructure, conventional designs, and increased demands for power. Electricity

More information

Combustion Performance and Emissions Control - Program 71

Combustion Performance and Emissions Control - Program 71 Combustion Performance and Emissions Control - Program 71 Program Description Program Overview Forced outages due to fireside corrosion, circumferential cracking, and deposition of ash (e.g., slagging

More information

RECOVERY BOILER WATER AND FIRE SIDE DAMAGE MECHANISMS April 2015 Western Canada BLRBAC. Craig Reid, M.A.Sc., P.Eng. Acuren Group Inc., Richmond, B.C.

RECOVERY BOILER WATER AND FIRE SIDE DAMAGE MECHANISMS April 2015 Western Canada BLRBAC. Craig Reid, M.A.Sc., P.Eng. Acuren Group Inc., Richmond, B.C. RECOVERY BOILER WATER AND FIRE SIDE DAMAGE MECHANISMS April 2015 Western Canada BLRBAC Craig Reid, M.A.Sc., P.Eng. Acuren Group Inc., Richmond, B.C. GENERAL CORROSION FAC (Alias erosion) Feedwater Piping

More information

Flexible Operation. Integrating thermal power with Renewable Energy & Challenges. Y M Babu Technical Services, Noida

Flexible Operation. Integrating thermal power with Renewable Energy & Challenges. Y M Babu Technical Services, Noida Flexible Operation Integrating thermal power with Renewable Energy & Challenges 1 Y M Babu Technical Services, Noida Why Flexible Operation? Limitations with Renewable generation has called for flexible

More information

STEAG Energy Services Approach to Higher Flexibilization Tools and Results

STEAG Energy Services Approach to Higher Flexibilization Tools and Results Tools and Results Jatinder Singh 30.11.2018 Challenges of Flexibilisation Decreased, but still robust low load operation Faster start-up and ramping dynamics Controllability: proof of potential to provide

More information

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants DS485 17 July 2017 IAEA SAFETY STANDARDS for protecting people and the environment STEP 13: Establishment by the Publications Committee Reviewed in NSOC (Asfaw) Ageing Management and Development of a Programme

More information

Boiler and Turbine Steam and Cycle Chemistry - Program 64

Boiler and Turbine Steam and Cycle Chemistry - Program 64 Boiler and Turbine Steam and Cycle Chemistry - Program 64 Program Description Program Overview Safety and availability loss due to failures are two key issues driving R&D on major fossil power plant components,

More information

Combustion Performance and NOx Control - Program 71

Combustion Performance and NOx Control - Program 71 Combustion Performance and NOx Control - Program 71 Program Description Program Overview As the most cost-effective means of reducing emissions from coal-fired power plants, combustion considerations should

More information

Material Services for Coal & Gas fired Power Plants Analyze today to anticipate tomorrow

Material Services for Coal & Gas fired Power Plants Analyze today to anticipate tomorrow Material Services for Coal & Gas fired Power Plants Analyze today to anticipate tomorrow Material Services for Coal & Gas fired Power Plants Analyze today to anticipate tomorrow Unavailability is a major

More information

Take Control of Your Future

Take Control of Your Future Take Control of Your Future The Path to Independent Automated Analysis of Nuclear Steam Generator Tube Inspection START 1 Look Confidently Toward the Future Confidence is a critical element of steam generator

More information

Combined Cycle Plant Services

Combined Cycle Plant Services Combined Cycle Plant Services COMBINED Engineered Solutions for Ensuring the Safe and Reliable Performance of Combined Cycle Plant Systems, Equipment, and Materials. Toronto, Canada San Jose, CA Corporate

More information

Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers

Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers R W Coade 1, J D Butler 2 & D Zimmerman 2 1 HRL Technology Pty Ltd., e-mail: rcoade@hrl.com.au 2 ATCO Power Canada Ltd., Alberta,

More information

HRSG Inspection Tasks. HRSG Inspection

HRSG Inspection Tasks. HRSG Inspection HRSG Inspection Tasks Presented By: Bryan F. Craig, P.E HRST Inc. 1 Goals: HRSG Inspection 1. Document condition of equipment 2. Identify items that need immediate maintenance 3. Identify items that need

More information

TECHNICAL PUBLICATION

TECHNICAL PUBLICATION TECHNICAL PUBLICATION Usage of DCS Data for Quantifying HRSG Component Life Consumption by Jimmy McCallum Dean Sheffield Southern Company Generation Suichi Sun Systems Design Engineer Vogt Power International

More information

Heat Recovery Steam Generators for Flexibility

Heat Recovery Steam Generators for Flexibility Heat Recovery Steam Generators for Flexibility Landon Tessmer IAGT October 2016 Overview The grids needs flexible power HRSG and OTSG Designs Supplementary Firing Fresh Air Firing Case Study Balance of

More information

Newman Station Units 1, 2, and 4 Condition Assessment Report. El Paso Electric, Inc. El Paso, TX

Newman Station Units 1, 2, and 4 Condition Assessment Report. El Paso Electric, Inc. El Paso, TX Newman Station Units 1, 2, and 4 Condition Assessment Report prepared for El Paso Electric, Inc. El Paso, TX April 2010 Project No. 53549 prepared by Burns & McDonnell Engineering Company, Inc. COPYRIGHT

More information

Relationship Between Design and Materials for Thermal Power Plants. S. C. Chetal

Relationship Between Design and Materials for Thermal Power Plants. S. C. Chetal Relationship Between Design and Materials for Thermal Power Plants S. C. Chetal Contents *Introduction to design codes *Operational life vs design basis life *Material selection basics *Materials for boiler

More information

PPCHEM. 484 PowerPlant Chemistry 2011, 13(8) ABSTRACT INTRODUCTION LOW FREQUENCY ELECTROMAGNETIC TECHNIQUE. Shawn Gowatski and Gary Miner

PPCHEM. 484 PowerPlant Chemistry 2011, 13(8) ABSTRACT INTRODUCTION LOW FREQUENCY ELECTROMAGNETIC TECHNIQUE. Shawn Gowatski and Gary Miner The Use of the Low Frequency Electromagnetic Technique to Detect and Quantify the Amount of Magnetite Deposits in Stainless Steel Superheater Tubes Due to Exfoliation Shawn Gowatski and Gary Miner ABSTRACT

More information

REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION

REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION The Future of Gas Turbine Technology 7 th International Gas Turbine Conference 14-15 October 2014, Brussels, Belgium Paper ID Number (14) REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION Pascal Decoussemaeker

More information

Combustion Turbine (CT) and Combined-Cycle (CC) O&M - Program 79

Combustion Turbine (CT) and Combined-Cycle (CC) O&M - Program 79 Combustion Turbine (CT) and Combined-Cycle (CC) O&M - Program 79 Program Description Program Overview Cycling and high-temperature operations adversely affect combustion turbine component life as well

More information

Condenser Performance Solutions

Condenser Performance Solutions Condenser Performance Solutions Your gateway to improved condenser performance, fast response maintenance and optimized operations Condenser Performance Services Your Condenser Solutions Provider. Intek

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants increasingly are adopting market-driven operating strategies such as cycling, pushing for maximum

More information

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM LAST UPDATED 09-11-2017 API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM SUPPLEMENTAL INSPECTION CERTIFICATION PROGRAM DAMAGE MECHANISMS AFFECTING FIXED EQUIPMENT IN THE REFINING

More information

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM

API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM LAST UPDATED 29-11-2018 API 571 CORROSION & MATERIALS PROFESSIONAL CERTIFICATION PREPARATION PROGRAM SUPPLEMENTAL INSPECTION CERTIFICATION PROGRAM DAMAGE MECHANISMS AFFECTING FIXED EQUIPMENT IN THE REFINING

More information

Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO

Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO INNOVATIVE MARITIME SOFTWARE Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO Kevin Brunn, Head of Clients & Markets, Maritime Software, DNV GL Tanker

More information

RESIDUAL LIFE ASSESSMENT IN HIGH TEMPERATURE ZONES OF POWER PLANT COMPONENTS

RESIDUAL LIFE ASSESSMENT IN HIGH TEMPERATURE ZONES OF POWER PLANT COMPONENTS RESIDUAL LIFE ASSESSMENT IN HIGH TEMPERATURE ZONES OF POWER PLANT COMPONENTS 1 PRAFUL R DONGRE, 2 VIBHAV B RAKHUNDE 1,2 CPRI, Bangalore Email_id :- prafulrd@rediffmail.com Abstract: The present paper gives

More information

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT By K.K.Parthiban / Venus Energy Audit System & Sri Devi Boiler Equipment and Spares. Introduction

More information

Fossil Combined Cycle Plant Services

Fossil Combined Cycle Plant Services Fossil Combined Cycle Plant Services SUPPORT Engineered solutions for Ensuring the Safe and Reliable Performance of Fossil Plant Systems, Equipment, and Materials. Toronto, Canada San Jose, CA Corporate

More information

SUSTAINING OUR CURRENT NUCLEAR ASSETS

SUSTAINING OUR CURRENT NUCLEAR ASSETS SUSTAINING OUR CURRENT NUCLEAR ASSETS K. Huffman EPRI-Electric Power Research Institute, USA E-mail address of main author:khuffman@epri.com Abstract. Examinination of today s United States big picture

More information

Amines in Air Cooled Condensers San Diego Annual Conference September 24, Bill Stroman

Amines in Air Cooled Condensers San Diego Annual Conference September 24, Bill Stroman Amines in Air Cooled Condensers San Diego Annual Conference September 24, 2014 Bill Stroman AIR COOLED CONDENSER Large iron surface area Potential for air inleakage Air inleakage can lead to problems with

More information

Internal Recirculation Circulating Fluidized-Bed Boilers

Internal Recirculation Circulating Fluidized-Bed Boilers Internal Recirculation Circulating Fluidized-Bed Boilers High Availability Low Maintenance Proven Flexible Reliable Economical ENERGY ENVIRONMENTAL B&W IR-CFB Boiler Steam Drum Feedwater Reheater Downcomer

More information

Pressurized Water Reactor Materials Reliability Program

Pressurized Water Reactor Materials Reliability Program Pressurized Water Reactor Materials Reliability Program Program Description Program Overview Stress corrosion cracking and general environmental corrosion of reactor coolant system components have cost

More information

Regulatory Guide An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping

Regulatory Guide An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping Regulatory Guide 1.178An Approach For Plant-S... Page 1 of 32 July 1998 Regulatory Guide 1.178 An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping Publication Information

More information

BOILER TUBE INTEGRITY PUTTING RELIABILITY FIRST

BOILER TUBE INTEGRITY PUTTING RELIABILITY FIRST ARIPPA Technical Symposium August 15th and 16th, 2017 Sheraton Harrisburg Hershey Hotel BOILER TUBE INTEGRITY PUTTING RELIABILITY FIRST Tim Batton Regional Sales Manager 904-553-3184 tim.batton@whertec.com

More information

View from the Penthouse

View from the Penthouse View from the Penthouse The DNFM Technical News Letter David N. French Metallurgists Ph: 502-955-9847 Fax: 502-957-5441 Web: www.davidnfrench.com Stress-corrosion-cracking (SCC) is a well-defined failure

More information

RPV and Primary Circuit Inspection. Nondestructive Examination Standard for PWR Vessel Internals J. Spanner, EPRI, USA

RPV and Primary Circuit Inspection. Nondestructive Examination Standard for PWR Vessel Internals J. Spanner, EPRI, USA RPV and Primary Circuit Inspection Nondestructive Examination Standard for PWR Vessel Internals J. Spanner, EPRI, USA INTRODUCTION The Electric Power Research Institute s Materials Reliability Program

More information

Operational flexibility enhancements of combined cycle power plants

Operational flexibility enhancements of combined cycle power plants Operational flexibility enhancements of combined cycle power plants Reprint from Power-Gen Europe 2007 Authors: Dr. Norbert Henkel, Siemens Energy, Germany Erich Schmid, Siemens Energy, Germany Edwin Gobrecht,

More information

Boiler Tube Life Management

Boiler Tube Life Management Boiler Tube Life Management D.J. Marks, P.J. James & C.J. Davis Materials & Corrosion Team, Uniper Technologies Limited Fuel & Energy Research Forum Sheffield 11 th April 2018 We are Uniper Expertise built

More information

ASSESSMENT OF REMAINING LIFE OF SUPERHEATER AUSTENITIC STEEL TUBES IN OIL SHALE PF BOILERS

ASSESSMENT OF REMAINING LIFE OF SUPERHEATER AUSTENITIC STEEL TUBES IN OIL SHALE PF BOILERS Oil Shale, 2006, Vol. 23, No. 3 ISSN 0208-189X pp. 267 274 2006 Estonian Academy Publishers ASSESSMENT OF REMAINING LIFE OF SUPERHEATER AUSTENITIC STEEL TUBES IN OIL SHALE PF BOILERS I. KLEVTSOV *, H.

More information

POWER INTEGRATED PERFORMANCE MONITORING FOR ASSET OPTIMIZATION

POWER INTEGRATED PERFORMANCE MONITORING FOR ASSET OPTIMIZATION Proceedings of POWER 2009 ASME Power 2009 July 21-23, 2009, Albuquerque, New Mexico, USA POWER2009-81212 INTEGRATED PERFORMANCE MONITORING FOR ASSET OPTIMIZATION Robert Holzworth Scientech a Curtiss-Wright

More information

Installation and Operation Experiences with the Clyde Bergemann SmartCannon System at Alabama Power s Plant Miller

Installation and Operation Experiences with the Clyde Bergemann SmartCannon System at Alabama Power s Plant Miller Installation and Operation Experiences with the Clyde Bergemann SmartCannon System at Alabama Power s Plant Miller Presented at Electric Power Conference 2003 Charles Boohaker Brian Mead John Sorge Southern

More information

THE USE OF THE ENAMELLED STEEL ON ROTARY AIR PREHEATERS AND GAS-GAS HEATERS: ADVANTAGES AND PROFITABILITY

THE USE OF THE ENAMELLED STEEL ON ROTARY AIR PREHEATERS AND GAS-GAS HEATERS: ADVANTAGES AND PROFITABILITY THE USE OF THE ENAMELLED STEEL ON ROTARY AIR PREHEATERS AND GAS-GAS HEATERS: ADVANTAGES AND PROFITABILITY THE CONTEXT Rotary Air prehetaers (AHs) are installed in all the power stations equipped with traditional

More information

Turnkey Boiler Overhauls. Plant Retrofits and Modifications. Specialty and Code Welding. Long-Term Maintenance

Turnkey Boiler Overhauls. Plant Retrofits and Modifications. Specialty and Code Welding. Long-Term Maintenance Turnkey Boiler Overhauls Plant Retrofits and Modifications Specialty and Code Welding Long-Term Maintenance Turnkey Planned Outages With a national skilled labor force and an experienced and professional

More information

Casing Life & Stress Analysis. Proven, Innovative Solutions. Turnkey Casing Repair Services. Heatrate Improvement. Stress Monitoring Software

Casing Life & Stress Analysis. Proven, Innovative Solutions. Turnkey Casing Repair Services. Heatrate Improvement. Stress Monitoring Software Casing Life & Stress Analysis Proven, Innovative Solutions Turnkey Casing Repair Services Heatrate Improvement Stress Monitoring Software Thorough Analysis Of Your Turbine Needs. Only Turbine Consultants

More information