1 RECOVERY BOILER WATER AND FIRE SIDE DAMAGE MECHANISMS April 2015 Western Canada BLRBAC Craig Reid, M.A.Sc., P.Eng. Acuren Group Inc., Richmond, B.C.

2 GENERAL CORROSION FAC (Alias erosion) Feedwater Piping SULFIDATION Lower furnace OXIDATION Upper furnace

3 CRACKING MECHANICAL Simple overload Mechanical and Thermal fatigue ENVIRONMENTALLY ASSISTED (EAC) Stress Corrosion Corrosion Fatigue Combination of both

4 EAC ENVIRONMENTS Feedwater oxygen Fire side gases and smelt Metal temperature STRESS Residual stress from fabrication Cyclic stress from operation Residual + Cyclic

5 RESIDUAL STRESS Cold bending Welding Thermal expansion mismatch composite tubes A major driver for cracking Water side deaerators, economizer tubes, etc. Composite tubes floors (and wall tubes which think they are floor tubes)

6 THERMAL CYCLIC STRESS Due to temperature gradients Low frequency start ups and shutdowns Important for water side cracking Higher frequency combustion at primaries Corrosion fatigue cracking in composite tubes can enter the carbon steel inner layer

7 MECHANICAL CYCLIC STRESS Low frequency Superheater platen swinging due to sootblowing Higher frequency Resonant vibration due to gas flow Screen tubes and economizer tubes depending on anti-vibration

8 Water Side Cracking Corrosion fatigue, Stress assisted corrosion (SAC) cracking It s all about oxygen (and residual stress) deaerators, economizers, steam and mud drums, boiler floor and water wall tubes attemperators, desuperheaters condensate receivers steam piping where oxygenated condensate can dwell

9 Oxygen Thresholds Pitting means oxygen has been high enough to enable cracking if the stress state can drive it

10 1983 Deaerator Storage Tank Failure Head to shell weld failed Oxygen scavenger not added to the storage tank Oxygen pitting present

11

12

13 Cracking followed the heat affected zone in the shell

14 North Head (Intact) Typical cracked length 2 long X 0.2 deep

15 DEAERATOR STORAGE TANK FAILURE ANALYSIS Officially labeled as corrosion fatigue Welding residual stress identified as the prime cause no residual stress no failure Oxygen scavenger not added in storage tank so oxygen > 5 ppb

16 ECONOMIZERS the economizer inlet often experiences transient elevated oxygen at start up Scavenge oxygen by corroding economizer tubes Transient active strain is produced by temperature gradients during boiler start up Active strain is: added to residual stress concentrated at welded attachments e.g. fins Active strain + residual stress + > 5 ppb O2 = Water side cracking

17 Mill C water side cracking RB A RB B Hog PB Gas PB 1974 Start up 1991 Lo odour added second economizer 2012 First leaks water side cracking - 11 years 1991 Start up 2002 First leaks erosion thinning of tubes at lower headers 2004 Orifice change 2006 First water side cracking leaks 15 years 1978 Start up 2003 New economizer 15 years 2012 First water side cracking leaks 9 years 1985 Start up 2007 Wall tube leaks 22 years 2012 Tube leaks at drums (Gas fired PB has a very small economizer)

18 Originally Mill C - The oxygen sins of the fathers Feedwater from DA storage to economizers (O 2 scavenger only added at steam drum) Current Feedwater from DA storage 5 ppb O 2 O 2 scavenger added to feedwater line to recovery boilers (not yet to power boilers) Boiler fill Warm treated un-deaerated feedwater Feedwater from DA after boiler steaming

19 ECONOMIZER - new 1990

20 First Leaks at Header turbulent flow (not FAC)

21 Orifice Change

22

23

24 2006 First Bottom Bend Leak The red circle indicates the leak. Bends cold bent. Residual stress at yield stress.

25 Close up view of the leak

26 Oxygen pitting

27 Close up of cracking in pitted surface arrows indicate crack tips.

28 Fluorescent magnetic particle testing revealed 40 transverse cracks 1/8" to ½" long.

29 Metallographic section showing cracking 0.094" deep.

30

31 2008 Straight Tube Cracking

32 Through wall crack

33 Additional Crack Growing diagonally across the fin

34 Additional Crack Half way through the wall

35

36 Mill C Hog Boiler Economizer water side crack leaking at shutdown

37 Eastern Mill Gas fired PB Gen Bank Tube

38

39 Mill C Gas Fired PB cracking due to residual stress from roller expanding

40

41 B&W RB, 750 psig design. 304L Composite wall tube installed in 1983 rebuild sample removed

42

43

44 Water Side Cracking cracking only occurs when critical values of both oxygen and active strain overlap in time. the total service time to the first leak depends on the number of start ups a year and the time during each start up when the critical combination of oxygen and strain occurs. Residual stress promotes cracking So stress relieve wherever practical

45 Gotaverken 1500 psig design

46 Bend 57 after grit blast cleaning. The surfaces displayed only superficial oxygen pitting and there was no evidence of under deposit corrosion.

47 Bend 57 after magnetic particle testing. Crack indications were found at the surface mandrel scarring.

48 The major crack extends from oxygen pitting. One adjacent crack had been blunted by pitting while another had not.

49

50 warm de-oxygenated water used for boiler fill in cross section the cracking is not classic water side cracking i.e. oxide filled wide cracks but cracks do initiate at superficial water side pits steaming rate increased from 585,000 lbs/hour in 1987 to 700,000 lbs/hour in 2012 speculate there are significant cyclic stresses during operation recommended all bends be replaced using stress relieved panels installed by welding membrane to membrane so no welding on the tubes

51 COMPOSITE TUBES Developed for resistance to sulfidation Cr increases sulfidation resistance Ni decreases sulfidation resistance but needed for welding and thermal expansion considerations Sanicro 304 Sanicro overlaid 309 filler Sandvik 310/T filler Sanicro 67 ERNiCrFe-7 Cr Ni Mo Cu

52 PAPRICAN LAB TESTS 1% H 2 S in Nitrogen SA210 becomes unsuitable above about 400C metal T

53 PAPRICAN LAB TESTS

54 Stress Corrosion Cracking 1983 B&W Recovery Boiler, 1500 psig operating 304L Composite Floor Tube

55

56

57 1983 B&W RB Floor Tube Repairs 1993, 94, Floor replaced with Sanicro 38

58

59 1983 B&W Recovery Boiler Rebuild, 750 psig design 304L Composite Floor Tube

60

61

62

63

64 Sandvik Composite Tubes Sandvik Composite Tube Specification OD min delivered thickness total wall clad A210 A1 1 1/ /

65 ASME ASME DESIGN tmin = (PD/(2S+P))+0.005D 2.5" 3" OD SA210 A1 2.37" 2.87" T = Tsat + ΔT Sources Recovery Boiler Ref Manual B&W 1700 psig RB Kvaerner radiant heat superheater Gotaverken 1500 psig RB ΔT > 50 F 83 F 122 F 3 F

66 Sandvik Composite Tubes Tsat + 122F Pre 1998 Allowable Stress psig Tsat (F) Tsat+ 122 S 2.5 inch 3 inch t min CA t min CA

67 Walls that think they are floors

68

69 Kvaerner/Tampella 1650 psig design 1250 psig operating 2007 Start up 304L composite wall tubes cracked up to carbon steel cut line no cracking in Sanicro 38

70 Front Wall PT crack monitoring areas

71

72

73 Cracks which enter the carbon steel PPRIC/ORNL Research Project Thermal fatigue alone cannot explain A corrosion component is also needed So Corrosion Fatigue Floor tubes only one case? Smelt spout opening tubes not uncommon Primary air port tubes rare Wall tubes not common but most mills do not look

74 B&W 1125 psig design 304 composite smelt runs

75

76 CE 1075 psig 1998 air system upgrade 304L composite tube wall installed 2007 VT 2008 Unusual rust bleed out from butt welds just above primaries PT cracking into carbon steel Excavated and weld repaired sample removal

77

78

79 46 tubes > crack depth so into carbon steel deepest so into carbon steel

80 2007 sample tube

81

82 Cracking occurred at repair weld toe in less than 1 year Consistent with cyclic stress

Recovery Boiler Corrosion Chemistry

Recovery Boiler Corrosion Chemistry Recovery Boiler Corrosion Chemistry Sandy Sharp and Honghi Tran SharpConsultant University of Toronto Pulp and Paper Centre Symposium on Corrosion in Pulp and Paper Mills and Biorefineries, RBI at Georgia

More information

PROCESS CHANGES AND CORROSION OF MATERIALS IN RECOVERY BOILERS

PROCESS CHANGES AND CORROSION OF MATERIALS IN RECOVERY BOILERS PROCESS CHANGES AND CORROSION OF MATERIALS IN RECOVERY BOILERS Black Liquor Combustion Coloquium Park City, Utah May 13, 23 Doug Singbeil and Joey Kish Paprican Jim Keiser ORNL 2 1 3 Recovery boiler evolution:

More information

Sulfur Unit Equipment Problems and Low Silicon Carbon Steel Corrosion Gerald W. Wilks Lemont Refinery CITGO Petroleum

Sulfur Unit Equipment Problems and Low Silicon Carbon Steel Corrosion Gerald W. Wilks Lemont Refinery CITGO Petroleum Sulfur Unit Equipment Problems and Low Silicon Carbon Steel Corrosion Gerald W. Wilks Lemont Refinery CITGO Petroleum 2010 CITGO Petroleum Corporation. Summary Weld cracking in piping connecting a reaction

More information

Finding the Root Cause is Critical

Finding the Root Cause is Critical Finding the Root Cause is Critical Have you ever repaired a tube leak and put the boiler back in service, only to be forced off-line by another leak? Identifying and correcting the root cause is essential.

More information

RECOVERY BOILER GENERATING BANK TUBE THINNING David G. Stasuk, P.Eng. President Stasuk Testing & Inspection Ltd. Burnaby, B.C.

RECOVERY BOILER GENERATING BANK TUBE THINNING David G. Stasuk, P.Eng. President Stasuk Testing & Inspection Ltd. Burnaby, B.C. Reprinted from Tappi Engineering Conference, Sept. 1991 RECOVERY BOILER GENERATING BANK TUBE THINNING David G. Stasuk, P.Eng. President Stasuk Testing & Inspection Ltd. Burnaby, B.C., Canada ABSTRACT This

More information

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs Presented To: Hot Topic Hour A Babcock Power Inc. Company By: Deron Johnston Date: Mar.7/13 Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs Authors: Akber Pasha,

More information

GN01 DEAERATOR CRACKING

GN01 DEAERATOR CRACKING GN01 DEAERATOR CRACKING 1 SCOPE 1.1 This note summarises the results of surveys and investigations of Australian and overseas incidents with deaerators and associated water storage vessels, and makes recommendations

More information

Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers

Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers Ramifications Of Cracks At The Fillet Welds Of High Temperature Steam Headers R W Coade 1, J D Butler 2 & D Zimmerman 2 1 HRL Technology Pty Ltd., e-mail: rcoade@hrl.com.au 2 ATCO Power Canada Ltd., Alberta,

More information

Corrosion Fatigue. PPChem. PPChem 101 BOILER AND HRSG TUBE FAILURES LESSON 2: INTRODUCTION FEATURES OF FAILURES IDENTIFICATION

Corrosion Fatigue. PPChem. PPChem 101 BOILER AND HRSG TUBE FAILURES LESSON 2: INTRODUCTION FEATURES OF FAILURES IDENTIFICATION 101 Boiler and HRSG Tube Failures 101 BOILER AND HRSG TUBE FAILURES LESSON 2: Corrosion Fatigue R. Barry Dooley and Albert Bursik INTRODUCTION Fatigue damage occurs in general when a boiler tube is subject

More information

View from the Penthouse

View from the Penthouse View from the Penthouse The DNFM Technical News Letter David N. French Metallurgists Ph: 502-955-9847 Fax: 502-957-5441 Web: www.davidnfrench.com Load Cycling As many coal-fired power plants designed for

More information

ATI 2205 ATI Technical Data Sheet. Duplex Stainless Steel GENERAL PROPERTIES. (UNS S31803 and S32205)

ATI 2205 ATI Technical Data Sheet. Duplex Stainless Steel GENERAL PROPERTIES. (UNS S31803 and S32205) ATI 2205 Duplex Stainless Steel (UNS S31803 and S32205) GENERAL PROPERTIES ATI 2205 alloy (UNS S31803 and/or S32205) is a nitrogen-enhanced duplex stainless steel alloy. The nitrogen serves to significantly

More information

Corrosion in GASCO Habshan CBA Units and its mitigation

Corrosion in GASCO Habshan CBA Units and its mitigation Corrosion in GASCO Habshan CBA Units and its mitigation Orlando de Matos Inspection Department Head MESPON 2016 - Abu Dhabi 9 th to 11 th October 2016 AGENDA Introduction Process Description for CBA Units

More information

HRSG Inspection Planning Guide

HRSG Inspection Planning Guide HRSG Inspection Planning Guide Second Edition P. Jackson D. Moelling J. Malloy M. Taylor Copyright 2006 by Tetra Engineering Group, Inc. All Rights Reserved. Reproduction or translation of any part of

More information

Western BLRBAC Review/Refresher of Tappi Water Quality Guidelines and Contamination Procedures for mill boilers operating on high purity water

Western BLRBAC Review/Refresher of Tappi Water Quality Guidelines and Contamination Procedures for mill boilers operating on high purity water Western BLRBAC Review/Refresher of Tappi Water Quality Guidelines and Contamination Procedures for mill boilers operating on high purity water October 29, 2014 Commitment makes the best chemistry. 1 TAPPI

More information

Newman Station Units 1, 2, and 4 Condition Assessment Report. El Paso Electric, Inc. El Paso, TX

Newman Station Units 1, 2, and 4 Condition Assessment Report. El Paso Electric, Inc. El Paso, TX Newman Station Units 1, 2, and 4 Condition Assessment Report prepared for El Paso Electric, Inc. El Paso, TX April 2010 Project No. 53549 prepared by Burns & McDonnell Engineering Company, Inc. COPYRIGHT

More information

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT By K.K.Parthiban / Venus Energy Audit System & Sri Devi Boiler Equipment and Spares. Introduction

More information

View from the Penthouse

View from the Penthouse View from the Penthouse The DNFM Technical News Letter David N. French Metallurgists Ph: 502-955-9847 Fax: 502-957-5441 Web: www.davidnfrench.com Stress-corrosion-cracking (SCC) is a well-defined failure

More information

SANICRO 30 TUBE AND PIPE, SEAMLESS

SANICRO 30 TUBE AND PIPE, SEAMLESS SANICRO 30 TUBE AND PIPE, SEAMLESS DATASHEET Sanicro 30 is a low-carbon version of Alloy 800 austenitic nickel-iron-chromium alloy. The grade is used for steam generator tubing in nuclear stations (PWR)

More information

Physical and Metallurgical Analysis Aids in Understanding Recovery Boiler Tube Cracking. November, 2014

Physical and Metallurgical Analysis Aids in Understanding Recovery Boiler Tube Cracking. November, 2014 Physical and Metallurgical Analysis Aids in Understanding Recovery Boiler Tube Cracking November, 2014 PdM Technology Infrared Thermography Gas Find IR Example of LNG Leak Safety Minute Economizer Tube

More information

UPDATED CASE STUDY OF FIRESIDE CORROSION MANAGEMENT IN AN RDF FIRED ENERGY-FROM-WASTE BOILER

UPDATED CASE STUDY OF FIRESIDE CORROSION MANAGEMENT IN AN RDF FIRED ENERGY-FROM-WASTE BOILER UPDATED CASE STUDY OF FIRESIDE CORROSION MANAGEMENT IN AN RDF FIRED ENERGY-FROM-WASTE BOILER Steve Vrchota Great River Energy Elk River, MN, United States Tim Peterson Great River Energy Elk River MN,

More information

MANAGING TUBE METAL WASTAGE IN RDF-FIRED BOILERS AT ELK RIVER STATION

MANAGING TUBE METAL WASTAGE IN RDF-FIRED BOILERS AT ELK RIVER STATION MANAGING TUBE METAL WASTAGE IN RDF-FIRED BOILERS AT ELK RIVER STATION TIMOTHY P. STEINBECK United Power Association Elk River, Minnesota NOMENCLATURE RDF = refuse derived fuel MSW = municipal solid waste

More information

RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS

RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS A DB RILEY TECHNICAL PUBLICATION RECENT EXPERIENCE IN CONDITION ASSESSMENTS OF BOILER HEADER COMPONENTS AND SUPPORTS by James P. King DB Riley, Inc. Worcester, Massachusetts Presented at the 1996 ASME

More information

Amines in Air Cooled Condensers San Diego Annual Conference September 24, Bill Stroman

Amines in Air Cooled Condensers San Diego Annual Conference September 24, Bill Stroman Amines in Air Cooled Condensers San Diego Annual Conference September 24, 2014 Bill Stroman AIR COOLED CONDENSER Large iron surface area Potential for air inleakage Air inleakage can lead to problems with

More information

SANDVIK 6R44 TUBE AND PIPE, SEAMLESS

SANDVIK 6R44 TUBE AND PIPE, SEAMLESS SANDVIK 6R44 TUBE AND PIPE, SEAMLESS DATASHEET Sandvik 6R44 is an austenitic, niobium-stabilized stainless chromium-nickel steel for use at temperatures up to 850 C (1560 F). STANDARDS ASTM: TP347, TP347H

More information

Steam Cycle Chemistry in Air-Cooled Condensers. NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy

Steam Cycle Chemistry in Air-Cooled Condensers. NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy Steam Cycle Chemistry in Air-Cooled Condensers NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy Steam Cycle Chemistry Goal for ACC: minimize corrosion of carbon steel Resulting

More information

TECHNICAL PUBLICATION

TECHNICAL PUBLICATION TECHNICAL PUBLICATION REFURBISHMENT OF AN EXISTING 1000 TPD MSW FACILITY USING MODERN STATE-OF-THE-ART EQUIPMENT by Craig Gillum, Staff Engineer Babcock Borsig Power, Inc. and Arthur Cole, Vice President

More information

ANALYSIS OF A CRACKED HEAT EXCHANGER TUBE

ANALYSIS OF A CRACKED HEAT EXCHANGER TUBE Steel Image Inc., Failure Analysis and Metallography 7 Innovation Drive, Suite 155, Flamborough Ontario, Canada, L9H 7H9, (289) 895-8363 ANALYSIS OF A CRACKED HEAT EXCHANGER TUBE EXAMPLE REPORT OVERVIEW

More information

Boiler Energy Efficiency & Overview of Economizers

Boiler Energy Efficiency & Overview of Economizers Boiler Energy Efficiency & Overview of Economizers May 2008 Presented by: Sunil Kumar, P.Eng. GENIVAR Ph: 905-475-7270 Sunil.kumar@genivar.com Outline of Presentation 1. Steam System Overview 2. Energy

More information

Therma 310S/4845 EN , ASTM TYPE 310S / UNS S31008

Therma 310S/4845 EN , ASTM TYPE 310S / UNS S31008 Therma 310S/4845 EN 1.4845, ASTM TYPE 310S / UNS S31008 General characteristics Austenitic heat resisting 4845 grade with very good oxidation resistance. This grade 4845 belongs to austenitic chromium-

More information

Incoloy Alloy 800H/800HT (UNS N08810/088011)

Incoloy Alloy 800H/800HT (UNS N08810/088011) Incoloy 800H/800HT (UNS N08810/088011) Incoloy 800H/HT is an outstanding corrosion resistant alloy that is recommended for use in the high temperature industrial conditions. It has higher strength than

More information

SANDVIK 253 MA TUBE AND PIPE, SEAMLESS

SANDVIK 253 MA TUBE AND PIPE, SEAMLESS SANDVIK 253 MA TUBE AND PIPE, SEAMLESS TIETOLOMAKE Sandvik 253 MA is an austenitic chromium-nickel steel alloyed with nitrogen and rare earth metals. The grade is characterized by: High creep strength

More information

Relationship Between Design and Materials for Thermal Power Plants. S. C. Chetal

Relationship Between Design and Materials for Thermal Power Plants. S. C. Chetal Relationship Between Design and Materials for Thermal Power Plants S. C. Chetal Contents *Introduction to design codes *Operational life vs design basis life *Material selection basics *Materials for boiler

More information

Boiler Life and Availability Improvement Program - Program 63

Boiler Life and Availability Improvement Program - Program 63 Boiler Life and Availability Improvement Program - Program 63 Program Description Program Overview Safety and availability loss due to pressure part failures are two key issues driving R&D on major fossil

More information

Corrosion. in Boiler Tube Bundles

Corrosion. in Boiler Tube Bundles Corrosion in Boiler Tube Bundles Introduction: Corrosion in Boiler Tube Bundles Corrosion in the boiler system is a phenomenon that continuously costs the industry billions of dollars per year, and leads

More information

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING

PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING 2013 Thielsch Engineering, Inc. Pamela Smoske, Executive Director of Development and Operations; 4-SYTE Systems PROLONG THE INTEGRITY OF HIGH ENERGY PIPING SYSTEMS: UNIT SPECIFIC STRATEGIC PLANNING High-energy

More information

Downsizing a Claus Sulfur Recovery Unit

Downsizing a Claus Sulfur Recovery Unit INFRASTRUCTURE MINING & METALS NUCLEAR, SECURITY & ENVIRONMENTAL Downsizing a Claus Sulfur Recovery Unit OIL, GAS & CHEMICALS By Charles L. Kimtantas and Martin A. Taylor ckimtant@bechtel.com & mataylo1@bechtel.com

More information

Case Study on Premature Failure of Super-Heater Tubes in Oil & Gas Fired Boiler. Vibhav Gupta

Case Study on Premature Failure of Super-Heater Tubes in Oil & Gas Fired Boiler. Vibhav Gupta Paper No. PPU14 Case Study on Premature Failure of Super-Heater Tubes in Oil & Gas Fired Boiler Vibhav Gupta Indian Oil Corporation Limited, Begusarai, India guptav3@indianoil.in Harsh Vardhan, S.K.Yadav

More information

ATI ATI 2205 Alloy (UNS S31803 and S32205) Duplex Stainless Steel. Technical Data Sheet

ATI ATI 2205 Alloy (UNS S31803 and S32205) Duplex Stainless Steel. Technical Data Sheet Alloy (UNS S31803 and S32205) Duplex Stainless Steel GENERAL PROPERTIES alloy (UNS S31803 and/or S32205) is a nitrogenenhanced duplex stainless steel alloy. The nitrogen serves to significantly improve

More information

Flow Accelerated Corrosion Failures in Gas to Liquids Plant ( Methane Gas Reforming Plant) Tsepo Ndou Senior Metallurgist PetroSA South Africa

Flow Accelerated Corrosion Failures in Gas to Liquids Plant ( Methane Gas Reforming Plant) Tsepo Ndou Senior Metallurgist PetroSA South Africa Flow Accelerated Corrosion Failures in Gas to Liquids Plant ( Methane Gas Reforming Plant) Tsepo Ndou Senior Metallurgist PetroSA South Africa Introduction to Flow-Accelerated Corrosion Flow-accelerated

More information

Process Recovery Boilers. Reliable and efficient steam production for the pulp and paper industry

Process Recovery Boilers. Reliable and efficient steam production for the pulp and paper industry Process Recovery Boilers Reliable and efficient steam production for the pulp and paper industry Since 1929, when The Babcock & Wilcox Company (B&W) developed the world s first Kraft recovery boiler with

More information

Heat Recovery Steam Generators for Flexibility

Heat Recovery Steam Generators for Flexibility Heat Recovery Steam Generators for Flexibility Landon Tessmer IAGT October 2016 Overview The grids needs flexible power HRSG and OTSG Designs Supplementary Firing Fresh Air Firing Case Study Balance of

More information

Results are presented in Table 1. The tube was fabricated from a Type 347 and no unusual conditions were noted.

Results are presented in Table 1. The tube was fabricated from a Type 347 and no unusual conditions were noted. 1. Introduction Hydroprocessing units such as isomax in oil refineries upgrade hydrocarbon feedstocks by converting heavier feeds into more valuable lighter products. The reactions occur under a hydrogen-rich

More information

PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION

PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION CONTENTS Foreword... xv Statements of Policy... xvii Personnel... xix Preamble... xxxi Summary of Changes... xxxiii List of Changes in BC Order... xxxvi PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF

More information

Kraft Liquor Corrosion

Kraft Liquor Corrosion Pulp and Paper Corrosion Symposium Georgia Tech Renewable Bioproducts Institute November 2014 Kraft Liquor Corrosion Margaret Gorog Federal Way, WA Topics Brown Stock Corrosion Alkaline Liquor Corrosion

More information

Typical Applications: Chimneys, bridges, tubular bridges, façades, containers, tanks.

Typical Applications: Chimneys, bridges, tubular bridges, façades, containers, tanks. COR-TEN Hot-Rolled Weather Resistant Steel Generally 3 Thick & Above technical data COR-TEN A and COR-TEN B are weather resistant steel grades optimised through their alloying elements (copper, chromium,

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants increasingly are adopting market-driven operating strategies such as cycling, pushing for maximum

More information

AL 29-4C AL 29-4C. Technical Data Sheet. Stainless Steel: Superferritic INTRODUCTION (UNS S44735)

AL 29-4C AL 29-4C. Technical Data Sheet. Stainless Steel: Superferritic INTRODUCTION (UNS S44735) AL 29-4C Stainless Steel: Superferritic (UNS S44735) INTRODUCTION AL 29-4C alloy, is a superferritic stainless steel developed by ATI in the early 1980s specifically for power plant surface condenser tubing.

More information

PRESSURFECT CNG TUBE AND PIPE, SEAMLESS

PRESSURFECT CNG TUBE AND PIPE, SEAMLESS PRESSURFECT CNG TUBE AND PIPE, SEAMLESS DATASHEET Pressurfect CNG is a dual grade certified (ASTM 316/316L) austenitic chromium-nickel steel with minimum 2.5% molybdenum and a low carbon content used for

More information

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines A Copper-Plated Thief: The Problem of Copper Deposits in Turbines By Dave Daniels and John Latcovich, The Hartford Steam Boiler Introduction Operators at a coal-fired, 2,600 PSI power plant performed monthly

More information

IMPROVEMENTS IN P.F. COAL BOILER FOR BEST HEAT RATE PERFORMANCE VOLUME 1, ISSUE 1 AUTHOR :- A. R. KULKARNI, DIRECTOR PUBLISHED DATE :- 19/09/2009

IMPROVEMENTS IN P.F. COAL BOILER FOR BEST HEAT RATE PERFORMANCE VOLUME 1, ISSUE 1 AUTHOR :- A. R. KULKARNI, DIRECTOR PUBLISHED DATE :- 19/09/2009 VOLUME 1, ISSUE 1 AUTHOR :- A. R. KULKARNI, DIRECTOR PUBLISHED DATE :- 19/09/2009 Now with regulatory regime in India and also with many players entering the Power Generation field, it has become utmost

More information

SANDVIK SAF 2304 TUBE AND PIPE, SEAMLESS

SANDVIK SAF 2304 TUBE AND PIPE, SEAMLESS SANDVIK SAF 2304 TUBE AND PIPE, SEAMLESS DATASHEET Sandvik SAF 2304 is a lean duplex (austenitic-ferritic) stainless steel characterized by the following properties: Very good resistance to stress corrosion

More information

SANDVIK 3RE60 TUBE AND PIPE, SEAMLESS

SANDVIK 3RE60 TUBE AND PIPE, SEAMLESS SANDVIK 3RE60 TUBE AND PIPE, SEAMLESS DATASHEET Sandvik 3RE60 is a duplex (austenitic-ferritic) stainless steel characterized by the following properties: High resistance to stress corrosion cracking (SCC)

More information

Visual Examination Assisted; RCA of Cracks In Thin Walled Duplex Stainless Steel Welds

Visual Examination Assisted; RCA of Cracks In Thin Walled Duplex Stainless Steel Welds More info about this article: http://www.ndt.net/?id=22345 Abstract: Visual Examination Assisted; RCA of Cracks In Thin Walled Duplex Stainless Steel Welds Kuldip KUMBEPHALKAR,P B PATIL, Bhagwan SHINDE

More information

Tech Brief - Coil Failure Analysis. Tech Brief: Coils Series. Coil Failure Analysis

Tech Brief - Coil Failure Analysis. Tech Brief: Coils Series. Coil Failure Analysis Tech Brief: Coils Series Coil Failure Analysis This tech brief is on coil failure analysis. This is an important topic for those responsible for replacing coils that have failed prematurely. Obviously,

More information

This presentation covers process steam energy reduction projects supported by the Ameren Illinois ActOnEnergy program.

This presentation covers process steam energy reduction projects supported by the Ameren Illinois ActOnEnergy program. This presentation covers process steam energy reduction projects supported by the Ameren Illinois ActOnEnergy program. 1 2 Before we get started, here are four questions to find out what you already know

More information

PUB NLH 600 Island Interconnected System Supply Issues and Power Outages Page 1 of 5

PUB NLH 600 Island Interconnected System Supply Issues and Power Outages Page 1 of 5 PUB NLH 600 Island Interconnected System Supply Issues and Power Outages Page 1 of 5 1 2 3 4 5 6 7 8 9 Q. Please provide the specific reasons for Hydro s decision to reduce the ratings of the Holyrood

More information

HRSG Inspection Tasks. HRSG Inspection

HRSG Inspection Tasks. HRSG Inspection HRSG Inspection Tasks Presented By: Bryan F. Craig, P.E HRST Inc. 1 Goals: HRSG Inspection 1. Document condition of equipment 2. Identify items that need immediate maintenance 3. Identify items that need

More information

Regulatory Perspective on CANDU Feeder Pipe Degradation due to FAC and IGSCC

Regulatory Perspective on CANDU Feeder Pipe Degradation due to FAC and IGSCC Regulatory Perspective on CANDU Feeder Pipe Degradation due to FAC and IGSCC John C. Jin, Specialist Raoul Awad, Director, Canadian Nuclear Safety Commission Commission canadienne de surete nucleaire IAEA

More information

TUBE AND TUBE WELD CORROSION AND TUBE COLLAPSE

TUBE AND TUBE WELD CORROSION AND TUBE COLLAPSE Dennis H. Martens Consultant and Technical Advisor (martensdh@pm-engr.com) Porter McGuffie Inc. (pm-engr.com) Presented at the 2011 Brimstone Sulfur Symposium Facilitated by Brimstone STS Limited Vail

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

What is the difference between the material specifications for A106 Grade B Seamless pipe and A53 Grade B (Type S) seamless pipe?

What is the difference between the material specifications for A106 Grade B Seamless pipe and A53 Grade B (Type S) seamless pipe? WHITEPAPER WHITEPAPER: Seamless A106B & A106C vs Seamless A53B What is the difference between the material specifications for A106 Grade B Seamless pipe and A53 Grade B (Type S) seamless pipe? We are sometimes

More information

Different types of pyrolysis coil failure

Different types of pyrolysis coil failure Different types of pyrolysis coil failure Rob Gommans M.Sc. Gommans Metallurgical Services Stevensweert, NL ABSTRACT The most occurring failure mechanisms are explained for tubes, bends and outlet parts

More information

Factors Influencing Materials Selection in Condensing Economizers

Factors Influencing Materials Selection in Condensing Economizers Materials Selection for Condensing Economizers Gary M. Carinci, Ph.D. Outokumpu Stainless Outokumpu Stainless Factors Influencing Materials Selection in Condensing Economizers Temperature ph control Sulfur

More information

Recovery & Utility Management

Recovery & Utility Management Recovery & Utility Management Jim Brewster Mill Manager Irving Pulp & Paper, Limited Saint John, New Brunswick, Canada Tappi Kraft Recovery Short Course St. Petersburg, FL, January 7-10, 2008 Recovery

More information

NEW GENERATION OF TUBE SURFACE TREATMENTS HELP IMPROVE EFW BOILER RELIABILITY

NEW GENERATION OF TUBE SURFACE TREATMENTS HELP IMPROVE EFW BOILER RELIABILITY Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 Proceedings of the 18th Annual North American May 11-13, Waste-to-Energy 2010, Orlando, Florida, Conference USA NAWTEC18

More information

APPLICATION OF HIGH TEMPERATURE GRADES IN CARBON BLACK INDUSTRY

APPLICATION OF HIGH TEMPERATURE GRADES IN CARBON BLACK INDUSTRY APPLICATION OF HIGH TEMPERATURE GRADES IN CARBON BLACK INDUSTRY SAFETY FIRST Sandvik s objective is zero harm to our people, the environment we work in, our customers and our suppliers. PROTECTIVE EQUIPMENT

More information

SANDVIK 3R65 TUBE AND PIPE, SEAMLESS

SANDVIK 3R65 TUBE AND PIPE, SEAMLESS SANDVIK 3R65 TUBE AND PIPE, SEAMLESS DATASHEET Sandvik 3R65 is a molybdenum-alloyed austenitic stainless chromium-nickel steel with a low carbon content. STANDARDS ASTM: TP316L, TP316 UNS: S31603, S31600

More information

REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION

REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION The Future of Gas Turbine Technology 7 th International Gas Turbine Conference 14-15 October 2014, Brussels, Belgium Paper ID Number (14) REVIEW OF HRSG CAPABILITIES FOR FLEXIBLE OPERATION Pascal Decoussemaeker

More information

View from the Penthouse

View from the Penthouse View from the Penthouse The DNFM Technical News Letter David N. French Metallurgists Ph: 502-955-9847 Fax: 502-957-5441 Web: www.davidnfrench.com Fireside corrosion remains a leading cause of failure in

More information

Institute for Diagnostic Imaging Research

Institute for Diagnostic Imaging Research Institute for Diagnostic Imaging Research (Repair applications of the LPCS process) Roman Gr. Maev, Emil Strumban, Volf Leshchinskiy, and Dmitry Dzhurinskiy CSAT 2014, Worcester, MA Low Pressure Cold Spray

More information

Advanced Sodium Technological Reactor for Industrial Demonstration

Advanced Sodium Technological Reactor for Industrial Demonstration A S T R I D Advanced Sodium Technological Reactor for Industrial Demonstration Sodium-Water Reaction approach and mastering for ASTRID Steam Generator design Manuel SAEZ 1, Sylvain MENOU 2, Alexandre ALLOU

More information

Condition Assessment Services. Put our team of specialists to work for you

Condition Assessment Services. Put our team of specialists to work for you Condition Assessment Services Put our team of specialists to work for you HEADERS Don t let a steam leak be your first sign of header problems High Temperature Headers High temperature superheater and

More information

Full-Thickness Decarburization of the Steel Shell of an Annealing Furnace

Full-Thickness Decarburization of the Steel Shell of an Annealing Furnace Metallogr. Microstruct. Anal. (2012) 1:59 64 DOI 10.1007/s13632-012-0005-0 TECHNICAL NOTE Full-Thickness Decarburization of the Steel Shell of an Annealing Furnace A. M. Dalley Received: 18 December 2011

More information

STARTUP TIME REDUCTION FOR COMBINED CYCLE POWER PLANTS

STARTUP TIME REDUCTION FOR COMBINED CYCLE POWER PLANTS The Future of Gas Turbine Technology 8 th International Gas Turbine Conference 12-13 October 2016, Brussels, Belgium Paper ID Number (07-IGTC16) STARTUP TIME REDUCTION FOR COMBINED CYCLE POWER PLANTS Pascal

More information

Best Practice Corrosion/Erosion Monitoring and Critical Process Indicators Salton Sea KGRA. by Dr. Dan Hoyer, PE Veizades & Associates, Inc.

Best Practice Corrosion/Erosion Monitoring and Critical Process Indicators Salton Sea KGRA. by Dr. Dan Hoyer, PE Veizades & Associates, Inc. 1 Best Practice Corrosion/Erosion Monitoring and Critical Process Indicators Salton Sea KGRA by Dr. Dan Hoyer, PE Veizades & Associates, Inc. Outline Process Indicators Challenges in High Temperature Corrosion

More information

XXL size recovery boilers present status and future prospects

XXL size recovery boilers present status and future prospects XXL size recovery boilers present status and future prospects Executive Summary XXL size recovery boilers have operated since 2004, when the first XXL size recovery boiler started up in China. From the

More information

SEAMLESS AND WELDED PIPE

SEAMLESS AND WELDED PIPE Pipe and Tube SEAMLESS AND WELDED PIPE Is available throughout TPS in accordance with material specification ASTM A312 and dimensional specification ANSI/ASME B36.19M and ANSI/ASME B36.10M. Comprehensive

More information

Presented by: Jeff Freitag, The Water Guy Jon Tiegs, General Manager

Presented by: Jeff Freitag, The Water Guy Jon Tiegs, General Manager Presented by: Jeff Freitag, The Water Guy Jon Tiegs, General Manager OBJECTIVES Understand The Importance of Practicing Key Performance Indicators (KPI s) in Your Boiler Room Identify Key Components of

More information

Filtration & Pretreatment Basics

Filtration & Pretreatment Basics 2014 Service Technician Training Program Filtration & Pretreatment Basics Mr. Stephen Lowe, CWT Cascade Water Services, Inc. Boiler System Layout Pretreatment Softeners - Feedwater Boiler Filtration Boiler

More information

Connecting the Dots between Process Operation and Materials Failures in Kraft Recovery Boilers

Connecting the Dots between Process Operation and Materials Failures in Kraft Recovery Boilers Connecting the Dots between Process Operation and Materials Failures in Kraft Recovery Boilers Joey Kish, Doug Singbeil, Laurie Frederick Paprican Corrosion Control Ibrahim Karidio, Vic Uloth Paprican

More information

Safe remaining lifetime assessment of power plant steam boilers

Safe remaining lifetime assessment of power plant steam boilers Safety and Security Engineering II 287 Safe remaining lifetime assessment of power plant steam boilers V. Mentl 1 & V. Liska 2 1 Department of Material Science and Technology, University of West Bohemia,

More information

CMI Energy Aftermarket Solutions

CMI Energy Aftermarket Solutions CMI Energy Aftermarket Solutions 1 Optimize with CMI Aftermarket Solutions Complete support for any HRSG make or configuration! Field Services Inspections / Evaluations Failure Analysis Technical Consultations

More information

Boiler and. steadily increases while the supply decreases energy

Boiler and. steadily increases while the supply decreases energy FEATURE ARTICLE by William G. Acker ENERGY SURVEYS FOR Stewart Cohen/Stone The efficient use of energy is fast becoming a top concern for industry. As business managers become more conscientious about

More information

a Amendments for nuclear applications: Cr, 0.04 max. C, 0.10 max. Co.

a Amendments for nuclear applications: Cr, 0.04 max. C, 0.10 max. Co. www.specialmetals.com INCONEL alloy 69 (UNS N669/W. Nr. 2.4642) is a high-chromium nickel alloy having excellent resistance to many corrosive aqueous media and hightemperature atmospheres. In addition

More information

Fatigue Life & Reliability Consideration During Field Repair of Coke Drum & Piping

Fatigue Life & Reliability Consideration During Field Repair of Coke Drum & Piping Fatigue Life & Reliability Consideration During Field Repair of Coke Drum & Piping 2017 Refcomm Presentation at Galveston, Texas May 8-12, 2017 Anand Umakanthan Senior Vice President Head- Reliability

More information

Mat UK Energy Materials Review R&D Priorities for PF Boiler Materials. 7 th August Prepared by: Matt Barrie Doosan Babcock Energy Ltd.

Mat UK Energy Materials Review R&D Priorities for PF Boiler Materials. 7 th August Prepared by: Matt Barrie Doosan Babcock Energy Ltd. Mat UK Energy Materials Review R&D Priorities for PF Boiler Materials. 7 th August 2007. Prepared by: Matt Barrie Doosan Babcock Energy Ltd. Page 1 of 8 1. Executive Summary: This report summarises the

More information

STEEL IMAGE CONTACT METALLOGRAPHY BUT WITHOUT. Shane Turcott, P.Eng., M.A.Sc Principal Metallurgist. (289) x301

STEEL IMAGE CONTACT METALLOGRAPHY BUT WITHOUT. Shane Turcott, P.Eng., M.A.Sc Principal Metallurgist. (289) x301 STEEL IMAGE CONTACT Shane Turcott, P.Eng., M.A.Sc Principal Metallurgist shane@steelimage.ca (289) 895-8363 x301 Steel Image Inc. 7 Innovation Drive., Suite 155 Dundas, ON, L9H 7H9 METALLOGRAPHY BUT WITHOUT

More information

VM12-SHC Technical-Datasheet

VM12-SHC Technical-Datasheet VM12-SHC Technical-Datasheet p.2 / Vallourec / VM12-SHC Technical-Datasheet Innovation by nature Specializing in the most complex applications, Vallourec relies on its 6 R&D centers around the world and

More information

Fossil Materials and Repair - Program 87

Fossil Materials and Repair - Program 87 Fossil Materials and Repair - Program 87 Program Description Program Overview Today s fossil power plants are increasingly adopting market-driven operating strategies such as cycling, pushing for maximum

More information

+ economic + + flexible + + innovative + BENSON Boiler

+ economic + + flexible + + innovative + BENSON Boiler + economic + + flexible + + innovative + BENSON Boiler Research & Development at the BENSON Test Rig by Siemens AG Power Generation (PG) designs and constructs fossil fired power plants manufactures steam

More information

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver Heat Recovery Systems and Heat Exchangers in LNG Applications Landon Tessmer LNG Technical Workshop 2014 Vancouver Presentation Overview LNG plant arrangement with heat recovery (OSMR Process by LNG Limited)

More information

ATI 601 ATI 601. Technical Data Sheet. Nickel-base Alloy INTRODUCTION PRODUCT FORMS SPECIFICATIONS & CERTIFICATES (UNS N06601)

ATI 601 ATI 601. Technical Data Sheet. Nickel-base Alloy INTRODUCTION PRODUCT FORMS SPECIFICATIONS & CERTIFICATES (UNS N06601) Nickel-base Alloy (UNS N06601) INTRODUCTION alloy (UNS Designation N06601) is an austenitic nickel-chromium-iron alloy designed for both heat and corrosion resistance. As compared to ATI 600 alloy (UNS

More information

MICRO-ALLOYING IMPROVES RESISTANCE TO HIGH TEMPERATURE ENVIRONMENTS

MICRO-ALLOYING IMPROVES RESISTANCE TO HIGH TEMPERATURE ENVIRONMENTS MICRO-ALLOYING IMPROVES RESISTANCE TO HIGH TEMPERATURE ENVIRONMENTS J.D. Wilson, T.J. Carney, J.C Kelly Rolled Alloys, Inc. 125 West Stems Road Temperance, MI 48182-9546 ABSTRACT Modern melting and refining

More information

ATI 321 /ATI 347 /ATI 348

ATI 321 /ATI 347 /ATI 348 ATI 321 /ATI 347 /ATI 348 Stainless Steel: Austenitic (UNS S32100, S34700, S34800) GENERAL INFORMATION ATI 321 (UNS S32100), ATI 347 (UNS S34700), and ATI 348 (UNS S34800) alloys are stabilized stainless

More information

ASME B31.3 Process Piping. 19. What s Different in B31.1

ASME B31.3 Process Piping. 19. What s Different in B31.1 ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. What s Different in B31.1-1 19. What s Different in B31.1 Scope Organization of the Code

More information

Kogan Creek Power. Condenser. Contents. Update For ACC User Group. Kogan Creek Power Station and its Air

Kogan Creek Power. Condenser. Contents. Update For ACC User Group. Kogan Creek Power Station and its Air Kogan Creek Power Plant s Air Cooled Condenser Update For ACC User Group September 2011 Contents Kogan Creek Power Station and its Air Cooled Condenser Design Chemistry Issues Actions Ongoing Performance

More information

ASTM A335 Chrome Moly Pipe. Welcome to Sunny Steel Enterprise Ltd. By Mr. Sum Xu

ASTM A335 Chrome Moly Pipe. Welcome to Sunny Steel Enterprise Ltd. By Mr. Sum Xu ASTM A335 Chrome Moly Pipe By Mr. Sum Xu ASTM A335 Pipe (ASME S/A335, Chrome-Moly) is a seamless ferritic Alloy-Steel Pipe for high temperature service. Welcome to Sunny Steel Enterprise Ltd. Sunny Steel

More information

Materials: Steps towards 700 C power plant User Forum of the Power Plant Technology,

Materials: Steps towards 700 C power plant User Forum of the Power Plant Technology, Materials: Steps towards 700 C power plant User Forum of the Power Plant Technology, 21.-25.4.2008 C. Stolzenberger VGB PowerTech e.v. Motivation Actual high efficient Power Plants Activities towards 700

More information

Problems with Deposits

Problems with Deposits Recovery Boiler Deposit Formation and Plugging Prevention Honghi Tran Pulp & Paper Centre University of Toronto Toronto, Canada Tappi Kraft Recovery Course St. Petersburg, Florida, January 7-10, 2008 Problems