PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH

Size: px
Start display at page:

Download "PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH"

Transcription

1 PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR-34 A, CHANDIGARH Petition No. 31 of 2016 Date of Order: Present: Shri D.S. Bains, Chairman Shri S.S. Sarna, Member In the matter of: Petition under Section 86 (1) (b) and 86 (1) (e) and other applicable provisions of The Electricity Act, 2003 for purchase of electricity from solar energy generators in the State of Punjab. AND In the matter of: Punjab State Power Corporation Limited (PSPCL), The Mall, Patiala Petitioner Versus Punjab Energy Development Agency (PEDA), Chandigarh ----Respondent ORDER Punjab State Power Corporation Limited (PSPCL) filed this petition seeking approval of the Commission to procure electricity including the tariff from solar PV power projects (total capacity 500 MW) to be established in the State of Punjab by solar energy generators and also to the Power Purchase Agreement (PPA) executed with the solar energy generators. 2. PSPCL has submitted that Government of Punjab (GoP) issued the New and Renewable Sources of Energy (NRSE) Policy, 2012, which is aimed at the development of renewable energy 1

2 sources and in particular solar energy generation in the State of Punjab. GoP has designated Punjab Energy Development Agency (PEDA) as the nodal agency for development of renewable energy projects in the State under the said NRSE Policy. 3. In pursuance to above, PEDA initiated competitive bidding process for inviting solar power developers for establishment of an aggregate 500 MW capacity solar projects under phase-iii in the State of Punjab. The minimum and maximum capacity to be allotted to a single company was kept as 50 MW and 150 MW respectively. Bidders could set up the minimum allotted Solar PV capacity of 50 MW in multiples of 5 MW at maximum 10 locations. The allotment of project capacity beyond minimum 50 MW was to be made in multiples of 10 MW. The tender documents issued by PEDA included the draft Implementation Agreement (IA) to be entered into by the successful bidder with PEDA for implementation of the project and draft Power Purchase Agreement (PPA) to be executed with PSPCL for supply of electricity. A total capacity of 500 MW Solar PV power projects has been allotted by PEDA to various developers after concluding the competitive bidding process. The tariff discovered varies from 5.09 per kwh to 5.98 per kwh. Detail of the allocations made and the discovered tariff is attached as Annexure-I of this Order. PEDA has signed the IAs with the selected bidders as envisaged in the bidding documents. The electricity generated by the solar energy projects to be established by the developers shall be procured by PSPCL at the tariff discovered in the bidding process. 2

3 4. PSPCL submitted that solar energy generation has been promoted by other States and the Central Govt. through policies issued by the Govt. of India. GoP has taken proactive steps to ensure development of solar energy generation capacity at tariff discovered through competitive bidding process. The tariff discovered in the bidding process is less than the tariff that was adopted in the previous bidding process. The procurement of electricity by PSPCL at the tariff discovered in the previous bidding process for 250 MW and 282 MW ( rooftop) in FY and FY was approved by the Commission in its Order dated in petition no. 52 of 2013 and Order dated in petition no. 21 of 2015 respectively, filed by PSPCL. 5. PSPCL further submitted that being the distribution licensee in the State of Punjab, it is required to fulfil its minimum Renewable Purchase Obligation (RPO) specified by the Commission. The quantum of electricity procured from these solar projects would ensure that Solar RPO is adequately met and also sufficiently encouraged. As per the prevailing RPO trajectory fixed by the Commission, with purchase of 500 MW solar power, PSPCL would be excess of the solar power upto The present installed capacity for solar energy generation projects is about MW which includes 65 MW from NVVN & SECI. From FY onwards, the annual power purchase cost from these 500 MW solar power projects will be crore (approx.) considering an average tariff of 5.65 per kwh. Taking into account the long term benefits of renewable energy, especially solar, PSPCL proposes to procure electricity from these solar projects, which also fulfils the mandate in The Electricity Act, 2003 (Act) that the 3

4 renewable sources are to be promoted. The cost of solar electricity purchase has reduced in the present bidding process as compared to the previous bidding process conducted by PEDA. It has been further submitted by PSPCL that as per provisions of the IA, if the project COD occurs after , tariff awarded to the developers shall cease to exist and the developers shall get the tariff re-determined from the Commission. 6. PSPCL submitted that in terms of sections 86 (1) (b) and 86 (1) (e) of the Act, the procurement of electricity by it including from renewable sources is to be regulated by the Commission. The regulatory jurisdiction includes giving approval to the procurement of electricity, the terms and conditions for such procurement and also approving the tariff at which the electricity is to be procured by PSPCL. The cost of power so purchased by PSPCL will be a pass through in its Annual Revenue Requirement (ARR) and it is incumbent upon PSPCL to seek the approval of the Commission for the proposed procurement of electricity. 7. In the prayer, PSPCL has requested the Commission to approve the procurement of electricity by it from solar energy generators at the tariff discovered in the competitive bidding process conducted by PEDA as per details in Annexure-I of this Order including the Power Purchase Agreement forming part of the tender documents, and approve, as a pass through, the power purchase cost from these Solar power projects in the ARR. 8. The petition was admitted by the Commission and notice issued to PEDA. PSPCL was directed to file deviations in PPA from the bid documents. The Commission observed that PPAs 4

5 were signed by PSPCL with the developers in February 2016 whereas the instant petition has been filed on after much delay. PSPCL filed the deviations in the PPAs signed with the developers and the draft PPA annexed with the bidding documents on In the hearing on , the Commission noted that despite the notice dated , PEDA has not filed the reply. Vide Order dated , the Commission directed PEDA to file reply by especially commenting upon the deviations conveyed by PSPCL with a copy to PSPCL. The next date of hearing was fixed as In the deviations filed by PSPCL, it has been submitted that the word Transmission Lines has been added in the definition of Project under clause (Definitions). Further, as provided in the RfP that provision for a pooling sub-station as per CERC guidelines may be made in the PPA, sub-clause under clause (Synchronisation & Interconnection Facilities) has been added. It has been provided that power plants located close to each other can set up a pooling sub-station to evacuate power through a common transmission line. A common energy accounting meter with CT/PT shall be installed on the outgoing bay of the pooling sub-station for billing purpose and energy measured on the main meter installed on each incoming line from the individual plants to the pooling station shall be adjusted proportionately. 10. In reply filed on , PEDA submitted that competitive bidding was carried out through e-tendering mechanism in a transparent manner. Bids were invited for setting 5

6 up solar PV projects in the State from the solar PV project developers. The RfP documents also provided a draft PPA which was finalized after due diligence by PSPCL. The competitive bidding was carried out by PEDA on the basis of discount to be offered by the bidders in line with Commission s findings in Order dated in petition no. 42 of 2014 (Suo-Motu) and Order dated in petition no. 43 of 2015 (Suo-Motu). As per the RfP, the date of commissioning of the projects has been stipulated as 12 months from the date of signing of the PPA by the developer with PSPCL. PSPCL has signed the PPAs with the developers on different dates. Therefore, the date of commercial operation (CoD) for the respective projects will be different and not same. However, the control period of the tariff is upto and in case the CoD of the project is achieved thereafter, the applicable tariff for the project is to be determined by the Commission. The tariff discovered in the bidding process is between 5.09/kWh to 5.98/kWh. IAs have been signed by PEDA with the successful bidders. PSPCL, being the distribution licensee, is under a bounden obligation to purchase the renewable energy from the allocated solar PV projects under the current phase-iii bidding. PSPCL is also the obligated entity to fulfil the solar renewable purchase obligation (RPO). The total solar generating capacity in the State of Punjab is 463 MW ending April, As regards PSPCL s contention that with the addition of 500 MW capacity solar projects, excess solar power would be available, PEDA submitted that MNRE, GoI has already written to GoP and also to the Commission for revising the solar RPO as per revised Tariff Policy, 2016 (wrongly mentioned by PEDA as National Tariff Policy, 6

7 2014). PEDA submitted that with this likely revision, PSPCL would require additional solar power for meeting its RPO. CERC REC Regulations provide for the issuance of RECs to distribution licensee procuring solar power in excess of the RPO, which are tradable (on the energy exchanges). PEDA submitted that setting up of the said solar PV power projects will be in the interest of the State. Agreeing to the prayer made by PSPCL in the petition to the extent of seeking approval of the Commission for procurement of solar energy from the projects as per Annexure-I of this Order at the tariff discovered in the competitive bidding process conducted by PEDA and approval of the cost of such power purchase in ARR of PSPCL, PEDA requested the Commission to accept the same. However, as regards part of PSPCL s prayer for approval of the draft PPA appended with the tender documents, PEDA submitted that the PPA has been amended by PSPCL as per its requirements, which has been executed by PSPCL with the developers accordingly. PSPCL has invoked the jurisdiction of the Commission under section 86(1)(b) and 86(1)(e) of the Act seeking approval of the PPA. These sections do not stipulate seeking approval of the terms and conditions for procurement of electricity by PSPCL from the Commission. PEDA contended that in view of above, the approval of the PPA sought for by PSPCL does not fall under the ambit of ibid sections. 11. After hearing the parties on , the Order was reserved vide Commission s Order dated The Commission has carefully gone through the submissions made by PSPCL and PEDA. PSPCL filed this petition to seek 7

8 approval of the Commission (i) for procurement of electricity by it from solar PV power projects at the tariff discovered in the competitive bidding process conducted by PEDA as per details in Annexure-I of this Order (ii) for the Power Purchase Agreement forming part of the tender documents, and (iii) pass through of the power purchase cost from these solar PV power projects in the ARR of PSPCL. PEDA undertook the competitive bidding process through e- tendering for procurement of 500 MW power from grid connected solar PV power projects (Phase-III) to be set up in the State of Punjab. Request for Proposal document (RfP) for the same was issued by PEDA after obtaining approval of Govt. of Punjab in June, The RfP document included detailed information and instructions to the bidders as also the evaluation criteria, besides the format for bid submission and other relevant details. The bidders were required to submit their bids on the basis of discount to be offered on the generic tariff determined by CERC for solar PV power projects for FY The same tariff for such projects was approved/determined by the Commission in Order dated in petition no. 43 of 2015 (Suo-Motu). On the successful completion of the competitive bidding process, PEDA allocated 10 projects of 50 MW capacity each to various project developers. The tariff discovered for the 10 projects ranges from 5.09 per kwh to 5.98 per kwh as brought out in Annexure-I of this Order. PEDA signed the Implementation Agreements with all the successful bidders. Also, PSPCL signed the PPAs with all the project developers for procuring the electricity to be generated from the ibid solar PV power projects. 8

9 13. PSPCL submitted that Central Govt. as well as other States are promoting solar energy generation. Punjab Govt. has also taken proactive steps to develop solar energy generation through competitive bidding process. In FY and FY , on the basis of similar competitive bidding process conducted by PEDA, solar capacity of 250 MW and 282 MW was allotted to solar project developers for setting up projects in Punjab. The tariff for the said projects was approved by the Commission. PSPCL has further submitted that it is obligated for compliance of RPO specified by the Commission. The present solar PV capacity installed in the State is about 403 MW including 65 MW from NVVN and SECI. Keeping in view the long term benefits of solar power, PSPCL proposes to procure electricity from the 500 MW projects allotted by PEDA in phase-iii bidding for which PPAs have already been signed by it with the developers. PSPCL has emphasized that this would also fulfil the mandate in the Act with regard to promotion of renewable energy sources. The tariff discovered in the present competitive bidding process is less than that in the previous biddings. The deviations in the PPAs signed by PSPCL with the developers and the draft PPA annexed with the bidding documents pertain to the addition of the word Transmission Lines in the definition of Project and provision for pooling sub-station for evacuating power through a common transmission line for power plants located close to each other under the relevant clause for Synchronization & Interconnection Facilities. 14. PEDA while providing details of the bidding process brought out in para 12 above, submitted that PSPCL is under obligation to 9

10 comply with the RPO specified by the Commission. As per PEDA, the solar capacity in the State of Punjab is 463 MW ending April, As regards PSPCL s contention that the addition of 500 MW solar capacity allotted under phase-iii would result in excess capacity, PEDA submitted that the revised Tariff Policy, 2016 provides for revising the solar RPO as provided in the Policy and MNRE has already taken up the matter in this regard with the State Govt. and also requested the Commission to consider revising the solar RPO. The excess capacity would be utilized for complying with the likely revision in the RPO. PEDA also contended that as per CERC REC Regulations, the distribution licensees procuring solar power in excess of the RPO are eligible for issuance of RECs which are tradable in the energy exchanges. PEDA has requested the Commission to accept the prayer of PSPCL to the extent it seeks approval of the Commission for procurement of solar energy from the projects as per details in Annexure-I of this Order at the tariff discovered in the competitive bidding process conducted by it and allow pass through of cost of such power purchase in the ARR of PSPCL. However, with regard to prayer of PSPCL for approval of the draft PPA annexed with the tender documents, PEDA pointed out that section 86(1)(b) and 86(1)(e), under which the jurisdiction of the Commission has been invoked by PSPCL, do not cover approval of the terms & conditions of the procurement of electricity by PSPCL. As such, approval of PPA does not fall under the ambit of these sections of the Act. 15. The Commission is mandated under the Act, National Electricity Policy and the Tariff Policy notified by the Ministry of 10

11 Power, Govt. of India to promote generation of electricity from renewable sources of energy. The Commission in its Order dated in Petition No. 43 of 2015 (Suo-Motu) in the matter of determination of generic levellised generation tariff for renewable energy power projects for FY had observed: 11. Further, Para 6.4 (2) of the Tariff Policy notified by Ministry of Power, Govt. of India on provides that procurement of electricity from renewable sources of energy for future requirements shall be done, as far as possible, through competitive bidding under Section 63 of The Electricity Act, Accordingly, the Commission decides that if tariff based competitive bids are invited for purchase of electricity from RE Power Projects and the per unit tariff offered by the lowest bidder is less than the aforementioned tariff, a petition shall be filed by the procurer for consideration and adoption of tariff by the Commission under Section 63 of The Electricity Act, The Commission further decides that till such time tariff based competitive bidding is resorted to, bidding may be carried out on the basis of discount to be offered by the prospective bidders on the generic tariffs determined by the Commission in this Order, which would be the maximum / ceiling tariff for the purpose. The revised Tariff Policy, 2016 also provides that States shall endeavour to procure power from renewable energy sources through competitive bidding to keep the tariff low, except from waste to energy plants. With regard to the issue of surplus solar capacity contemplated by PSPCL after commissioning of the ibid solar 11

12 projects of 500 MW capacity, the Commission notes that PEDA has submitted that as per the revised Tariff Policy, 2016 the solar RPO needs to be revised upwardly and the solar capacity being created would adequately provide for compliance of revised solar RPO. PEDA also contended that as per CERC REC Regulations, the distribution licensee procuring solar power in excess of the RPO is eligible for issuance of RECs which are tradable in the energy exchanges. Notwithstanding the above, the Commission notes that as per the information furnished by PSPCL for purchase of solar power for FY , there is likely to be a shortfall in solar RPO compliance by about MU* (as per calculation below) after taking into account the shortfall of 1.68 MU for FY carried over to FY , which will spill over to FY , to be complied by PSPCL, with or without penalty, as per decision of the Commission in due course of time on merits of the case. * [solar power purchase by PSPCL in FY : MU; input energy as per T.O : MU; solar RPO specified: 1% i.e MU; shortfall: MU { ( )}]. Considering the information furnished by PSPCL vide letter no. 246 dated in ARR of PSPCL for FY , the projections for the input energy available to PSPCL for consumption in its area of distribution, work out to 51,007 MU. The solar RPO at 1.3% specified by the Commission would be 663 MU which after including the shortfall of FY (110 MU) works out to 773 MU. To meet this requirement, the major contribution would be from 463 MW existing capacity as the 500 MW capacity under consideration is likely to be added, mostly at the end of the 12

13 commissioning period of 12 months provided in the PPAs signed in Feb., 2016 i.e Feb., 2017, though some capacity is likely to be added progressively during the interregnum. This is without considering the fact that there may be some slippage in the commissioning of the projects as noted by the Commission in case of projects allotted in the earlier two biddings by PEDA. As such, solar power availability for FY would more or less match with the requirement of solar power for RPO compliance. With regard to the issue of approval of draft PPA sought by PSPCL, the Commission notes that PSPCL, in the first para of the petition, sought approval of the Commission to the PPA executed by it with the solar energy generators, whereas, in the prayer, it has sought approval of the PPA forming part of the tender documents. The Commission also notes that only the draft PPA has been appended as part of the RfP documents with the petition. In this regard, PEDA has submitted that section 86(1)(b) and 86(1)(e), under which the jurisdiction of the Commission has been invoked by PSPCL, do not stipulate approval of the terms & conditions of the procurement of electricity by PSPCL. As such, approval of PPA does not fall under the ambit of these sections of the Act. The Commission observes that in the earlier Orders dated in Petition No.52 of 2013 and in Petition No.21 of 2015 in similar matters, it had noted that as per the Guidelines for Tariff Based Competitive Bidding Process for Grid Connected Power Projects Based on Renewable Energy Sources issued by Ministry of New and Renewable Energy, Government of India in December, 2012, standard bid documents (SBD) shall be prepared and issued by the Central Govt. in accordance with the 13

14 guidelines and approval of Appropriate Regulatory Commission shall be obtained unless the bid documents are as per the SBD. In the instant case, the bid documents i.e. RfP including draft PPA were approved by Govt. of Punjab in June 2015 as conveyed by PEDA. Accordingly, the Commission is required to approve the deviations in the PPA signed by PSPCL with the successful bidders and the draft PPA appended with the RfP. The Commission notes that the deviations in the above said PPAs pertain to addition/insertion of (i) the words Transmission Lines in the definition of Project and (ii) provision for setting up a pooling sub-station by power plants located close to each other for evacuating power through a common transmission line to PSPCL/PSTCL sub-station. The Commission considers the said deviations/additions as need based and therefore approve the same. 16. Considering the discussion above, submissions made by PSPCL & PEDA and the statutory provisions, the Commission approves the procurement of power from the solar PV projects by PSPCL at the tariff determined in the competitive bidding process conducted by PEDA on the basis of discount offered by the bidders on the generic tariff for such projects for FY as per details in Annexure-I of this Order. The cost of power purchase from these projects would be considered as pass through in the ARR of PSPCL. The tariff period for supply of power from the said projects would be twenty five (25) years as provided in RfP which is as per Regulation 6(c) of the Central Electricity Regulatory 14

15 Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 adopted by the Commission in its Order dated in Petition No. 35 of 2012 (Suo-Motu) with State specific modifications. The tariffs approved above would be applicable upto provided the PPAs have been signed on or before and the entire capacity covered in each PPA is commissioned on or before , in line with Regulation 8 of the said Regulations. It is further clarified that barring force majeure / change in law etc., the applicability of the said approved tariff beyond the aforementioned date i.e will not be allowed even if punitive clauses in the PPA are made applicable. Sd/- (S.S. Sarna) Member Sd/- (D. S. Bains) Chairman Chandigarh Dated:

16 Solar PV Power Projects Annexure-I Sr. No. Name of the Company Capacity (MW) Tariff ( /kwh) 1. Azure Power Pluto Private Limited i.e SPV company of Azure Power India Private Limited Azure Power India Private Limited Prayatna Developers Pvt. Limited Photon Ojas Pvt. Ltd. i.e. SPV company of Photon Ultrawave Pvt. Ltd. 7. Photon Sunbeam Pvt. Ltd. i.e. SPV company of Photon Ultrawave Pvt. Ltd. 8. Photon Suryodaya Pvt. Ltd. i.e. SPV company of Photon Ultrawave Pvt. Ltd. 9. Magnet Buildtech Pvt. Ltd. i.e. SPV company of Hindustan Clean Energy Ltd. 10. Mytrah Aadhya Power Pvt. Limited SPV company of Mytrah Energy (India) Ltd Note: The aforementioned tariff for all projects is applicable without availing benefit of Accelerated Depreciation except for Magnet Buildtech Pvt. Ltd. i.e. SPV company of Hindustan Clean Energy Ltd. (Sr. No.9) for which the tariff is after availing benefit of Accelerated Depreciation. 16

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 1 Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 800 021 Case No. Misc. 36/2014 In the matter of : In the matter of sale of 42 Million Units (MkWh) of electricity to the

More information

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228

Comm/CP/NCE/Tariff/28362 Date: COMMERCIAL CIRCULAR No. 228 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

Market Mechanisms in India s Clean Energy Efforts

Market Mechanisms in India s Clean Energy Efforts Market Mechanisms in India s Clean Energy Efforts Renewable Energy Certificate Mechanism Balawant Joshi Director, ABPS Infrastructure Advisory Pvt. Ltd. ABPS Infrastructure Advisory Advisory Pvt. Ltd October,

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Petition no. 1013/2015 u/s 33

More information

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India

Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India Jawaharlal Nehru National Solar Mission Building Solar India Ministry of New and Renewable Energy Government of India 1 st Concentrated Solar Thermal Power Summit New Delhi, September 2010 Under the National

More information

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018

APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018 2018 APSERC (Draft Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2018 ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION (APSERC) 2/28/2018 0 Table of

More information

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260

CE/Comm/CP/NCE/Tariff/6699 Date: COMMERCIAL CIRCULAR No. 260 (A Govt. of Maharashtra Undertaking) CIN: U40109MH2005SGC153645 Maharashtra State Electricity Distribution Co. Ltd. Office of the Chief Engineer (Commercial) Prakashgad, 5th Floor, Station Road, Bandra

More information

CASE No. 120 of And. Miscellaneous Application No. 16 of 2016

CASE No. 120 of And. Miscellaneous Application No. 16 of 2016 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Renewable Energy Tariffs, RPO and REC Mechanism

Renewable Energy Tariffs, RPO and REC Mechanism Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Forum of Regulators Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July,

More information

Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow

Director, U.P. New and Renewable Energy Development Agency, Vibhuti Khand, Gomtinagar, Lucknow The previous Solar Power Policy-2013 and Solar Rooftop PV Plant Policy-2014 is hereby being presented as Draft U.P. Solar Power Policy-2017 Comments/Suggestions are invited till 15-07-2017 on draft Uttar

More information

Impact of Renewable Energy Certificate (REC) Mechanism in India

Impact of Renewable Energy Certificate (REC) Mechanism in India Impact of Renewable Energy Certificate (REC) Mechanism in India Authors: S. K. Soonee, K. V. S. Baba, U. K. Verma, Minaxi Garg, Shailendra Kr. Verma and K. C. Saini Power System Operation Corporation Ltd.

More information

REPLIES TO QUERIES. Sr. Clause No Reference from RfQ cum RfP Queries Clarification. Developer. Bidder shall furnish the please.

REPLIES TO QUERIES. Sr. Clause No Reference from RfQ cum RfP Queries Clarification. Developer. Bidder shall furnish the please. REPLIES TO QUERIES ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) SERVICES FOR 1.00MW MODEL SOLAR POWER PROJECT AT NEEMRANA INDUSTRIAL AREA ON TURNKEY BASIS AND OPERATION & MAINTENANCE OF 1.00MW SOLAR

More information

Gujarat Electricity Regulatory Commission

Gujarat Electricity Regulatory Commission Discussion Paper DETERMINATION OF TARIFF FOR PROCUREMENT OF POWER BY DISTRIBUTION LICENSEES AND OTHERS FROM BIOMASS BASED POWER PROJECTS AND BAGASSE BASED CO-GENERATION PROJECTS FOR THE STATE OF GUJARAT

More information

Purchase Preference Ploicy

Purchase Preference Ploicy Purchase Preference Ploicy Subject:- Price/Purchase Preference for Production and Servicing of Public Enterprises. Reference is invited to O.M.No.BPE/GL-008/80/23.1.80/BPE/MM dated 15.10.80 on the above

More information

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the

More information

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd) (Formerly known as Amtek Energy & Power Pvt Ltd) SOLAR BUSINESS CATALOGUE 2015-16 2 P a g e Contents 1. Introduction 2. Mission SOLAR 3. Why us? 4. Engineering Procurement Construction Services 4.1 Process

More information

GLOBAL SOLAR EPC SUMMIT

GLOBAL SOLAR EPC SUMMIT 3 rd Annual Conference & Exhibition GLOBAL SOLAR EPC SUMMIT 3 rd 4 th June,2013 HOTEL HILTON Janakpuri, New Delhi EXHIBITOR S CONFERENCE 3 RD GLOBAL SOLAR EPC SUMMIT: 2013 3-4 June, 2013 Organized by Solar

More information

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism 1 Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2 3 Tariff regulations of the Regulatory Commissions to be guided by promotion of generation of electricity

More information

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA Rules on Initiation of Power Procurement and Review of Power Purchase Agreements Eng. Anastas Mbawala, EWURA 1 Overview of this Presentation Background on statutory powers and purpose of the Rules Description

More information

EOI for System integrator in Smart City project

EOI for System integrator in Smart City project No. ND/NCNGN/2017-18/SI EOI Dated-05 /04/2017 1.0 Introduction: EOI for System integrator in Smart City project 1.1 Bharat Sanchar Nigam Ltd (BSNL), a wholly owned Public Sector Enterprise of the Govt

More information

CASE No. 114 of Coram Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maha Cold Storage Association

CASE No. 114 of Coram Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Maha Cold Storage Association Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Development and Financing of Renewable Energy Projects in India

Development and Financing of Renewable Energy Projects in India Development and Financing of Renewable Energy Projects in India A Perspective By K.S. Popli Director (Technical) Indian Renewable Energy Development Agency Limited New Delhi ( India ) World primary energy

More information

(On Stamp Paper of Rs.100/-) Net Metering Inter Connection agreement

(On Stamp Paper of Rs.100/-) Net Metering Inter Connection agreement (On Stamp Paper of Rs.100/-) Inter connection Agreement between Distribution Licensees and solar roof top PV project owner Net Metering Inter Connection agreement This Agreement is made and entered into

More information

India Solar Market Update Q Executive Summary.

India Solar Market Update Q Executive Summary. India Solar Market Update Q3 2017 Executive Summary India Solar Demand Forecast Annual Installations (MW) India Solar Demand Forecast (MW) 12,000 Annual Rooftop Solar Installations (MW) Annual Utility-scale

More information

Jawaharlal Nehru National Solar Mission

Jawaharlal Nehru National Solar Mission Jawaharlal Nehru National Solar Mission Deepak Gupta Secretary Ministry of New and Renewable Energy Government of India 8 th June, 2011 Jawaharlal Nehru National Solar Mission (JNNSM) India has set up

More information

Minutes of the Pre-Bid Meeting for the PPP projects of Delhi Police held on 07 th June 2010 (11.30 A.M.) at Delhi Police Headquarters

Minutes of the Pre-Bid Meeting for the PPP projects of Delhi Police held on 07 th June 2010 (11.30 A.M.) at Delhi Police Headquarters Minutes of the Pre-Bid Meeting for the PPP projects of Delhi Police held on 07 th June 2010 (11.30 A.M.) at Delhi Police Headquarters The meeting was chaired by Special Commissioner of Police (Administration).

More information

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY Presentation to the Promoters of Renewable Energy Technologies Energy Regulation Board November 2015 CONTENTS 1. BACKGROUND 2. REFiT POLICY

More information

Electricity Supply Agreement

Electricity Supply Agreement Electricity Supply Agreement 1. General 1.1 Mazoon Electricity Company SAOC (the Supplier) shall on or from the Start Date, subject to the satisfactory completion of a Supply Application Form, provide

More information

G.O. Ms. No.48. i) Tariff determination ii) Allotment of Potential Sites iii) Wheeling Charges and allied issues

G.O. Ms. No.48. i) Tariff determination ii) Allotment of Potential Sites iii) Wheeling Charges and allied issues GOVERNMENT OF ANDHRA PRADESH ABSTRACT Clean and Green Energy Development of Wind Power in Andhra Pradesh New Wind Power Policy Orders Issued. ENERGY (RES) DEPARTMENT G.O. Ms. No.48 Date: 11.04.2008 ORDER:

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification No.: UPERC/Secretary/RSPVRegulations/2015/2150 Dated: 20/03/2015 In exercise of powers conferred under section 61, 66, 86(1)(e) and 181 of the

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL BPACKAGE NO. K.G.B.V. TEACHER'S GUIDELINE ( GUJARATI)/ 2014-15 Gujarat Council of Elementary Education Sarva Shiksha Abhiyan REQUEST FOR PROPOSAL REGARDING PRINTING OF "K.G.B.V. TEACHER'S GUIDELINE ( GUJARATI)

More information

Jhabua Power Ltd. NOTICE INVITING BIDS

Jhabua Power Ltd. NOTICE INVITING BIDS Jhabua Power Ltd. 2nd Floor, Centrum plaza, Golf Course Road, Sector- 53, Gurgaon-122002 Ph.: +91-124-4392000 Fax: +91-124-4376496 NOTICE INVITING BIDS BY JHABUA POWER LIMITED (JPL) 2nd Floor, Centrum

More information

Karnataka Electricity Regulatory Commission Tariff Order 2017 HESCOM CHAPTER 6 DETERMINATION OF RETAIL SUPPLY TARIFF FOR FY18

Karnataka Electricity Regulatory Commission Tariff Order 2017 HESCOM CHAPTER 6 DETERMINATION OF RETAIL SUPPLY TARIFF FOR FY18 CHAPTER 6 DETERMINATION OF RETAIL SUPPLY TARIFF FOR FY18 6.0 Revision of Retail Supply Tariff for FY18-HESCOM s Proposals and Commission s Decisions: 6.1 Tariff Application As per the Tariff application

More information

Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing

Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing www.mynergy.in Accelerating Adoption of Rooftop Solar PV in India Through Project Aggregation and Financing Bhaskar Deol Chief Executive Officer, Mynergy Renewables India June 9, 2016, Asia Clean Energy

More information

Renewable Energy policies and challenges -Developers perspective

Renewable Energy policies and challenges -Developers perspective Limited Renewable Energy policies and challenges -Developers perspective -Raghunath Mahapatra CSE - Annual South Asian Media Briefing on Climate Change, 2013 18 September 2013 Limited WELSPUN GROUP One

More information

Draft JSERC (Rooftop Solar PV Grid Interactive Systems and Net/ Gross Metering) Regulations, 2015

Draft JSERC (Rooftop Solar PV Grid Interactive Systems and Net/ Gross Metering) Regulations, 2015 Draft JSERC (Rooftop Solar PV Grid Interactive Systems and Net/ Gross Metering) Regulations, 2015 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION CHAPTER I : SCOPE, EXTENT AND DEFINITIONS A1: SHORT TITLE,

More information

THE TAMIL NADU TRANSPARENCY IN TENDERS RULES, 2000

THE TAMIL NADU TRANSPARENCY IN TENDERS RULES, 2000 THE TAMIL NADU TRANSPARENCY IN TENDERS RULES, 2000 THE TAMIL NADU TRANSPARENCY IN TENDERS RULES, 2000 CHAPTER RULES CONTENT I. PRELIMINARY 1. Short tile, extent and commencement 2. Definitions II. GENERAL

More information

SMALL HYDRO PROGRAMME IN INDIA

SMALL HYDRO PROGRAMME IN INDIA SMALL HYDRO PROGRAMME IN INDIA Bhuwanesh Kumar Bhatt Ministry of New and Renewable Energy Hydropower represents use of water resources towards inflation free energy due to absence of fuel cost with mature

More information

Market Procedure: Network Control Services

Market Procedure: Network Control Services ELECTRICITY INDUSTRY ACT 2004 ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES Market Procedure: Network Control Services Version 2 Commencement:

More information

Draft RAJASTHAN SOLAR POLICY, 2010

Draft RAJASTHAN SOLAR POLICY, 2010 Draft RAJASTHAN SOLAR POLICY, 2010 Issued by Government of Rajasthan Energy Department..., 2010 1 1.1 Vision RAJASTHAN SOLAR POLICY, 2010 (Issued vide Energy Deptt. letter no. F.20 (4) Energy/2010 dated

More information

UNCITRAL Model Legislative Provisions

UNCITRAL Model Legislative Provisions UNCITRAL Model Legislative Provisions on Privately Financed Infrastructure Projects Prepared by the United Nations Commission on International Trade Law UNITED NATIONS UNCITRAL Model Legislative Provisions

More information

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/039 DATE PUBLISHED: CLOSING DATE: RESPONSES

More information

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017

Date of Request for Comment: April 7, 2017 Period of Comment: April 7, 2017 through May 5, 2017 Market Participant Comments and AESO Replies Matrix Proposed Amended Section 304.3, Wind and Solar Power Ramp Up Management ( amended Section 304.3 ) Date of Request for Comment: April 7, 2017 Period of

More information

NOIDA METRO RAIL CORPORATION (NMRC) LIMITED

NOIDA METRO RAIL CORPORATION (NMRC) LIMITED EXPRESSION OF INTEREST (EoI) For Property Development at Sector 71 NOIDA METRO RAIL CORPORATION (NMRC) LIMITED December 2016 Issued by: Noida Metro Rail Corporation (NMRC) Limited Block-III, 3 rd Floor,

More information

Department of Information and Public Relations, Government of Andhra Pradesh invites applications from reputed advertising agencies for empanelment.

Department of Information and Public Relations, Government of Andhra Pradesh invites applications from reputed advertising agencies for empanelment. GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF INFORMATION AND PUBLIC RELATIONS: Vijayawada. **** Tender Schedule Terms and conditions for Empanelment of Print Media Advertising Agencies-2017 Department of

More information

Net Metering inter connection agreement

Net Metering inter connection agreement Net Metering inter connection agreement This Agreement is made and entered into at (location) on this (date) day of (month) year between The Consumer, by the name of --------------- having premises at

More information

Renewable Portfolio Standards

Renewable Portfolio Standards Renewable Portfolio Standards Lisa Schwartz Presentation to Oregon State University Energy Economics Class Feb. 22, 2010 The Regulatory Assistance Project China EU India United States About the Regulatory

More information

Business Practice Manual for Reliability Requirements. Version 34

Business Practice Manual for Reliability Requirements. Version 34 Business Practice Manual for Reliability Requirements Version 34 Last Revised: January 1, 2009July 28, 2010 Approval History Approval Date: 3/27/09 Effective Date: 3/31/09 BPM Owner: Chetty Mamandur BPM

More information

Green Power Market Development Group - India. Tara Parthasarathy, Ashok Thanikonda Progress Review - Collaborative Rooftop PV Purchase Sept 30, 2013

Green Power Market Development Group - India. Tara Parthasarathy, Ashok Thanikonda Progress Review - Collaborative Rooftop PV Purchase Sept 30, 2013 Green Power Market Development Group - India Tara Parthasarathy, Ashok Thanikonda Progress Review - Collaborative Rooftop PV Purchase Sept 30, 2013 Overview Renewable Energy is expensive, unreliable and

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

Gujarat Council of Elementary Education Sarva Shiksha Abhiyan

Gujarat Council of Elementary Education Sarva Shiksha Abhiyan Package No. Pragna Printing /2015-16/A Gujarat Council of Elementary Education Sarva Shiksha Abhiyan REQUEST FOR PROPOSAL REGARDING PRAGNA PRINTING WORK "PACKAGE-A" UNDER SSA Name of Client STATE PROJECT

More information

The Kingdom of Saudi Arabia National Renewable Energy Program. Renewable Project Development Office (REPDO) July, 2017

The Kingdom of Saudi Arabia National Renewable Energy Program. Renewable Project Development Office (REPDO) July, 2017 The Kingdom of Saudi Arabia National Renewable Energy Program Renewable Project Development Office (REPDO) July, 2017 Legal Disclaimer The information contained in this presentation is provided as general

More information

TENDER FOR SALE OF IMPORTED CRUDE PALM OIL & RBD PALMOLEIN. Tender No. STC/HYD/EO/SALE/ /1 DATED 20/12/2016

TENDER FOR SALE OF IMPORTED CRUDE PALM OIL & RBD PALMOLEIN. Tender No. STC/HYD/EO/SALE/ /1 DATED 20/12/2016 THE STATE TRADING CORPORATION OF INDIA LTD (A GOVT. OF INDIA ENTERPRISE) 5th Floor, Moguls Court, Basheerbagh, Hyderabad- 500001 Phone: 040-23237389,23296460 Fax:040-232136786 TENDER FOR SALE OF IMPORTED

More information

Maharashtra Project on Climate Resilient Agriculture

Maharashtra Project on Climate Resilient Agriculture Public Disclosure Authorized Maharashtra Project on Climate Resilient Agriculture Country: INDIA Procurement Plan for First 18months Borrower: Government of India on behalf of Government of Maharashtra

More information

Power Purchase Agreements

Power Purchase Agreements Foro de Eficiencia Energética y Energía Renovable: Herramientas de Análisis Económico para Aumentar la Competitividad Empresarial Mayaguez, PR Octubre 2012 Renewable Energy Power Purchase Agreement (PPA)

More information

Headline Germany - Experiences with implementing RES E auctions

Headline Germany - Experiences with implementing RES E auctions Headline Germany - Experiences with implementing RES E auctions Dr. Aike Müller Federal Ministry for Economic Affairs an Energy, Division: Renewable Energy in the Electricity Sector (IIIB5) Overview Background

More information

Executive Engineer (Electrical) Damodar Valley Corporation (DVC), West Bengal, India India DOI: /ijarcsse/SV7I5/0112

Executive Engineer (Electrical) Damodar Valley Corporation (DVC), West Bengal, India India DOI: /ijarcsse/SV7I5/0112 Volume 7, Issue 5, May 2017 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Techno Economic

More information

Initiatives taken for Facilitating Large Scale Integration of Renewable Energy in India

Initiatives taken for Facilitating Large Scale Integration of Renewable Energy in India Initiatives taken for Facilitating Large Scale Integration of Renewable Energy in India S K Soonee, K V S Baba, S R Narasimhan, S S Barpanda, S C Saxena, Mohit Joshi*, KVN Pawan Kumar Power System Operation

More information

Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai

Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai 400 025 Invitation for Expression of Interest (EOI) For engagement of consultancy firm for

More information

Renewable energy: Investing in Africa

Renewable energy: Investing in Africa 1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission

More information

Q3 FY Analyst Meet Mumbai February 10, 2017

Q3 FY Analyst Meet Mumbai February 10, 2017 Q3 FY 2016-17 Analyst Meet Mumbai February 10, 2017 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound by the following limitations:

More information

Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage.

Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage. Analysis of POC charging method and Regional Postage Stamp method for cost allocation for transmission line usage. SAMEER MEHRA School of Electrical Engineering, VIT University Vellore, T.N. INDIA sameermehra2008@vit.ac.in

More information

HIRING OF PRIVATE GODOWN FOR STORAGE AND HANDLING OF FERTILIZERS TENDER DOCUMENT (FOR BISHNAH)

HIRING OF PRIVATE GODOWN FOR STORAGE AND HANDLING OF FERTILIZERS TENDER DOCUMENT (FOR BISHNAH) 1. HIRING OF PRIVATE GODOWN FOR STORAGE AND HANDLING OF FERTILIZERS TENDER DOCUMENT (FOR BISHNAH) Last date of submission of Tender: 23.12.2016 up to 2.30 p.m. at Zonal Office, Chandigarh Date of Opening

More information

Comments of National Grid to the New England States Committee on Electricity on the Coordinated Competitive Renewable Power Procurement Process

Comments of National Grid to the New England States Committee on Electricity on the Coordinated Competitive Renewable Power Procurement Process Ian Springsteel Director, Regulatory Strategy U.S. Regulation and Pricing Oct. 2, 2012 Comments of National Grid to the New England States Committee on Electricity on the Coordinated Competitive Renewable

More information

CUC s Response to Alternative Energy

CUC s Response to Alternative Energy CUC s Response to Alternative Energy 13 th Annual Caribbean Energy Conference January 24-25, 2013 I Paradise Island, The Bahamas Richard Hew, President & Chief Executive Officer CUC s Caribbean Response

More information

Draft Renewable Portfolio Standard Rule

Draft Renewable Portfolio Standard Rule Draft Renewable Portfolio Standard Rule Submitted to the President of the Senate and the Speaker of the House of Representatives to Fulfill the Requirements of Section 366.92(3), Florida Statutes Florida

More information

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal

More information

Strategy for Renewable Energy in Tamilnadu. Venue: The Raintree Hotel, St Mary s Road, Alwarpet, Chennai Date: 4 th and 5 th February, 2015

Strategy for Renewable Energy in Tamilnadu. Venue: The Raintree Hotel, St Mary s Road, Alwarpet, Chennai Date: 4 th and 5 th February, 2015 Strategy for Renewable Energy in Tamilnadu Venue: The Raintree Hotel, St Mary s Road, Alwarpet, Chennai Date: 4 th and 5 th February, 2015 Executive Summary Excellent Wind & Solar Insolation in many parts

More information

Government of India. Ministry of Communication and Information Technology

Government of India. Ministry of Communication and Information Technology Government of India Ministry of Communication and Information Technology Invitation for Expression of Interest (EOI) For Implementation of August 2015 (The Department of Electronics and Information Technology

More information

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.

1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. 1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. There is no target for MW of renewable capacity (except in

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna-800021 Case No. 22/2015 In the matter of: The petition of Patna Green Energy Private Limited (PGEPL) under section 62 and

More information

Subject: Inviting Tender / Quotation for Printing of University Annual Report (Hindi Version)

Subject: Inviting Tender / Quotation for Printing of University Annual Report (Hindi Version) No. AUD/1-10/2014-15/Annual Report/ 02 December, 2014 To, ------------------------------------------------- -------------------------------------------------- --------------------------------------------------

More information

Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation

Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation Clean Energy Regulation and Civil Society in India: Need and challenges to effective participation Prayas (Energy Group), Pune, India October 2010 Clean Energy Regulation and Civil Society in India 1 Clean

More information

Note on Solar Energy Policy in Andhra Pradesh. M. Thimma Reddy

Note on Solar Energy Policy in Andhra Pradesh. M. Thimma Reddy Note on Solar Energy Policy in Andhra Pradesh M. Thimma Reddy People s Monitoring Group on Electricity Regulation Submitted to WRI December 2012 Abbreviations AP APERC APPCC APTRANSCO CEA CERC DISCOM

More information

PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF. May 1, 2009

PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF. May 1, 2009 PLATTE RIVER POWER AUTHORITY OPEN ACCESS TRANSMISSION TARIFF May 1, 2009 Original Sheet No.1 TABLE OF CONTENTS I. COMMON SERVICE PROVISIONS... 8 1 Definitions... 8 1.1 Ancillary Services... 8 1.2 Annual

More information

Developing, Financing and Investing in Solar PV Projects in Lower Mekong Countries Workshop

Developing, Financing and Investing in Solar PV Projects in Lower Mekong Countries Workshop VIETNAM MINISTRY OF INDUSTRY AND TRADE Developing, Financing and Investing in Solar PV Projects in Lower Mekong Countries Workshop Regulatory framework for solar PV in Viet Nam and discussion on Decision

More information

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008)

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PREPARED BY: Government Audit Services Branch Government of Yukon APPROVED BY: Audit Committee Table of Contents Page PREFACE 3 EXECUTIVE SUMMARY

More information

3 Responsibility Centre COS - CenPEEP 4 Brief scope of work The engagement with NTPC will be in the following steps:

3 Responsibility Centre COS - CenPEEP 4 Brief scope of work The engagement with NTPC will be in the following steps: NTPC LTD CenPEEP, EOC Annexe, NOIDA VENDOR ENLISTMENT FOR HIRING OF A CONSULTANT / INSTITUTIONS FOR INTERNATIONAL PARAMETRIC BENCHMARKING STUDY OF OPERATION & MAINTENACE (O&M) PARAMETERS OF NTPC THERMAL

More information

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC

2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 TABLE OF CONTENTS 1. GENERAL INFORMATION... 1 1.1. Introduction...

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. specify the relevant regulatory framework

More information

BHARAT HEAVY ELECTRICALS LTD., BHOPAL HYDRO MACHINERY DEVELOPMENT STATION NOTICE INVITING TENDER (NIT)

BHARAT HEAVY ELECTRICALS LTD., BHOPAL HYDRO MACHINERY DEVELOPMENT STATION NOTICE INVITING TENDER (NIT) BHARAT HEAVY ELECTRICALS LTD., BHOPAL HYDRO MACHINERY DEVELOPMENT STATION NOTICE INVITING TENDER (NIT) Sealed tenders are invited from the bidders, for the following work as per details given below: 1.

More information

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard Section-by-Section Summary SB 838, C-engrossed version As passed by Oregon House of Representatives, May 23 rd, 2007.

More information

Synergies between DSM and ongoing electricity reforms in India Utility CEO Forum on Demand Side Management. Tenth meeting.

Synergies between DSM and ongoing electricity reforms in India Utility CEO Forum on Demand Side Management. Tenth meeting. http://www.pwc.in/government-reforms-and-infrastructure-development/energy-efficiency.html Synergies between DSM and ongoing electricity reforms in India Utility CEO Forum on Demand Side Management Tenth

More information

INCENTIVES FOR ROOFTOP RESIDENTIAL SOLAR PV

INCENTIVES FOR ROOFTOP RESIDENTIAL SOLAR PV Pro-Solar. Pro-Grid. Pro-Consumer. Solar energy technology has the power to change the face of modern electricity generation dramatically. From rooftop to community to largescale projects, consumers across

More information

Analysis of House Bill 589, Competitive Energy Solutions for NC (Version 3)

Analysis of House Bill 589, Competitive Energy Solutions for NC (Version 3) Analysis of House Bill 589, Competitive Energy Solutions for NC (Version 3) PART I. STANDARD CONTRACTS FOR SMALL POWER PRODUCERS Section 1.(a) Technical change to conform the statute with how the Utilities

More information

Fixing of PVC Net, Self Fusing High Voltage Insulation Tape & Catenary Sleeve (MVLC) on Main line in Delhi. Metro Rail Corporation Ltd.

Fixing of PVC Net, Self Fusing High Voltage Insulation Tape & Catenary Sleeve (MVLC) on Main line in Delhi. Metro Rail Corporation Ltd. DELHI METRO RAIL CORPORATION LTD. (A Joint Venture of Govt. of India & Govt. of NCT, Delhi) Fixing of PVC Net, Self Fusing High Voltage Insulation Tape & Catenary Sleeve (MVLC) on Main line in Delhi TENDER

More information

Address for Correspondence

Address for Correspondence Research Paper RECENT TRENDS IN WIND POWER GENERATION: INDIAN SCENARIO G.C. Biswal, S.P. Shukla Address for Correspondence Department of Electrical Engineering, BIT, Durg, CG, India ABSTRACT: In India,

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

Torrent Power Limited Chairman s Statement 13 th Annual General Meeting 1 st August, 2017 Dear Shareholders,

Torrent Power Limited Chairman s Statement 13 th Annual General Meeting 1 st August, 2017 Dear Shareholders, Torrent Power Limited Chairman s Statement 13 th Annual General Meeting 1 st August, 2017 Dear Shareholders, On behalf of the Company s Board of Directors, I extend you all a very warm welcome to this

More information

Green Energy and Green Economy Act. Changes to Ontario s Electricity Sector

Green Energy and Green Economy Act. Changes to Ontario s Electricity Sector Green Energy and Green Economy Act Changes to Ontario s Electricity Sector What the GEGEA represents Ontario s Legislature passed the Act on May 14, 2009. Intended to attract new investment, create new

More information

Tender Notice No. NCCS/RC/S&P/P-05/2013 Date: TENDER NOTICE FOR ANNUAL RATE CONTRACT

Tender Notice No. NCCS/RC/S&P/P-05/2013 Date: TENDER NOTICE FOR ANNUAL RATE CONTRACT NATIONAL CENTRE FOR CELL SCIENCE, PUNE-411007 NCCS COMPLEX, GANESHKHIND, PUNE-411 007 (An autonomous Institution of the Department of Biotechnology, Govt. of India) Tender Notice No. NCCS/RC/S&P/P-05/2013

More information

The SUN is definitely rising, but will it shine?

The SUN is definitely rising, but will it shine? The SUN is definitely rising, but will it shine? Decoding the trend of falling solar tariffs in India Rahul Gaba Gurpreet Chugh Introduction Solar tariffs in India have continued to fall during the last

More information

REPUBLIC OF KENYA MINISTRY OF HEALTH (NATIONAL PUBLIC HEALTH LABORATORY SERVICES)

REPUBLIC OF KENYA MINISTRY OF HEALTH (NATIONAL PUBLIC HEALTH LABORATORY SERVICES) REPUBLIC OF KENYA MINISTRY OF HEALTH (NATIONAL PUBLIC HEALTH LABORATORY SERVICES) TENDER DOCUMENT FOR CONSTRUCTION OF BIOSAFETY LEVEL II LABORATORY (BSL II) (PUBLIC HEALTH LABORATORY) AT MOI TEACHING REFERRAL

More information

Egyptian Renewable Energy plan

Egyptian Renewable Energy plan Ministry of Electricity and Renewable Energy Egyptian Holding Electricity company Egyptian Renewable Energy plan Eng.Ahmed Abo salem Contents 1 Current Status of the Egyptian Grid 2 Current Status of Renewable

More information

PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AND OFFICES BLOCK AT KWALE TOWN, KWALE COUNTY W.P. ITEM NO. D111 CO / KWL/ 1501 JOB NO.

PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AND OFFICES BLOCK AT KWALE TOWN, KWALE COUNTY W.P. ITEM NO. D111 CO / KWL/ 1501 JOB NO. REPUBLIC OF KENYA MINISTRY OF LAND, HOUSING AND URBAN DEVELOPMENT STATE DEPARTMENT OF LAND PROPOSED ERECTION AND COMPLETION OF LAND REGISTRY AND OFFICES BLOCK AT KWALE TOWN, KWALE COUNTY W.P. ITEM NO.

More information

PUNJAB STATE POWER CORPORATION LIMITED

PUNJAB STATE POWER CORPORATION LIMITED 1 PUNJAB STATE POWER CORPORATION LIMITED CONSULTANCY SERVICES TO THE PUNJAB STATE POWER CORPORATION LIMITED (PSPCL) In Various fields of Accounts, Finance & Internal Controls systems, Compliance of various

More information

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, 2017 Prepared by Interconnection Planning Department PJM 2017 Table of Contents Table of Contents Table of Exhibits...7

More information

(To be published in the Gazette of India Part I, section I) Notification

(To be published in the Gazette of India Part I, section I) Notification (To be published in the Gazette of India Part I, section I) Government of India Ministry of Petroleum & Natural Gas ***** Shastri Bhawan, New Delhi Date: 30 th June, 2017 Notification Open Acreage Licensing

More information

Gujarat Secondary & Higher Secondary Education Board Gandhinagar

Gujarat Secondary & Higher Secondary Education Board Gandhinagar Gujarat Secondary & Higher Secondary Education Board Gandhinagar TENDER NO:- 08/I.AUDIT/2018 APPOINTMENT OF CHARTERED ACCOUNTANT FIRMS FOR INTERNAL AUDIT OF F.Y 2017-18 AND 2018-19 Bid Start Date: 12 /Feb/2018

More information

Ref: AIDC/CC/KP/1/2507 Date: 18/07/2017

Ref: AIDC/CC/KP/1/2507 Date: 18/07/2017 Ref: AIDC/CC/KP/1/2507 Date: 18/07/2017 Response to Pre-Bid Queries - Request for Proposal (RFP) for hiring of Knowledge Partner for Industries & Commerce Department, Government of Assam # 1. Section 3

More information