1 Colorado River Municipal Water District WATER CONSERVATION and DROUGHT CONTINGENCY PLAN Adopted by the Board of Directors

2 Adopted by the District s Board of Directors WATER CONSERVATION & DROUGHT CONTINGENCY PLAN for the COLORADO RIVER MUNICIPAL WATER DISTRICT ***TABLE OF CONTENTS*** 1.0 INTRODUCTION Colorado River Municipal Water District Water Supply System Water Supplies to our Member & Customer Cities City of Odessa Water System City of Big Spring Water System City of Snyder Water System City of Midland Water System City of San Angelo Water System City of Abilene Water System City of Stanton Water System City of Robert Lee Water System City of Grandfalls Water System City of Pyote Water System Industrial Customers OBJECTIVES WATER CONSERVATION Metering and Water Accounting System Conjunctive use District Water Quality Enhancement System Strategic Water Releases Precipitation Enhancement Brush Management Total Maximum Daily Load Studies Leak Detection & Reduction Public Education Water Reclamation Projects Water Conservation Plans of Member & Customer Cities (a) City of Odessa Plan (b) City of Big Spring Plan (c) City of Snyder Plan (d) City of Midland Plan (e) City of San Angelo Plan (f) City of Abilene Plan Colorado River Municipal Water District Page i

3 ***TABLE OF CONTENTS (Continued)*** Adopted by the District s Board of Directors 3.11(g) City of Stanton Plan (h) City of Robert Lee Plan (i) City of Grandfalls Plan (j) City of Pyote Plan DROUGHT CONTINGENCY Introduction Public Involvement Wholesale Water Customer Information Coordination with Region F-RWPG Authorization Variances Contractual Obligations and Limitations The District's Water Supply System Source Constraints Distribution Capacity Constraints Supply Trigger Levels (a) Condition 1 - Mild Drought (b) Condition 2 Moderate Drought (c) Condition 3 Severe Drought System Emergency (Critical Condition) Composite Triggers for the West End Cities Notice to Texas Commission on Environmental Quality (TCEQ) Continuing Notice Termination Procedures Plan Reviews Drought Contingency Plans of our Member & Customer Cities APPENDIX A - Water Use of our Member & Customer Cities Colorado River Municipal Water District Page iii

4 Adopted by the District s Board of Directors WATER CONSERVATION & DROUGHT CONTINGENCY PLAN for the COLORADO RIVER MUNICIPAL WATER DISTRICT 1.0 INTRODUCTION The Colorado River Municipal Water District (CRMWD or District) was authorized in 1949 by an Act of the 51st Legislature of the State of Texas for the purpose of providing water to the District's Member Cities of Odessa, Big Spring, and Snyder (see Figure No. 1). The District also has contracts to provide specified quantities of water to the Cities of Midland, San Angelo, Stanton, Robert Lee, Grandfalls, Pyote, and Abilene (through the West Central Texas Municipal Water District). FIGURE No. 1 - Member & Customer Cities Colorado River Municipal Water District Page 1

5 The District is governed by a twelve-member Board of Directors. Four Board members are appointed by each Member City. Members serve on the Board for two-year terms. The structure of this Board insures our Member Cities an active voice in the operation of the District. Also, they provide a conduit for feedback to the cities, which is especially useful for a coordinated response to severe conditions, such as droughts or water shortages. The District owns and operates three major surface water supplies on the Colorado River in west Texas. These are Lake J. B. Thomas, the E. V. Spence Reservoir, and the O. H. Ivie Reservoir. Together, the full combined capacity of these reservoirs is million acre-feet. Additionally, CRMWD operates four well fields for water supply. Two of these fields were developed by the Member Cities prior to The third field, located in Martin County, began delivering water in The fourth field, located in Ward County southwest of Monahans, can supply up to 21 million gallons of water per day. The District primarily uses these well fields to supplement surface water deliveries during the summer months. CRMWD also operates a "diverted water" supply system. The primary function of this system is to prevent the highly mineralized low flow of the Colorado River and Beals Creek (a tributary of the Colorado River) from reaching the Spence Reservoir. The system delivers this highly mineralized water to oil companies for use in oil field secondary recovery operations. The District provides raw untreated surface and well water to our Member and Customer cities. This water is not available for resale by these cities without proper treatment, disinfection, and distribution. Since these cities cannot resell the water directly without alteration, it can be argued that the District does not fit the following definition of a wholesale public water supplier as presented in the Texas Commission on Environmental Quality (TCEQ) rules: (A Wholesale Water Provider is) an individual or entity that for compensation supplies water to another for resale to the public for human consumption Also, since we have no direct contact or control over the water s end user, District contracts with Member and Customer cities typically have no mechanism to limit or restrict water consumption, except in a dire emergency Colorado River Municipal Water District Water Supply System. The District's water supply system includes eight major reservoirs, three diversion works, numerous storage reservoirs, and more than 600 miles of transmission line. Lake J. B. Thomas is the oldest water supply reservoir. It was constructed in Borden and Scurry Counties in The E. V. Spence Reservoir was completed in Coke County in 1969, and the O. H. Ivie Reservoir, the District's newest water supply reservoir, was finished in Five of the reservoirs are used to control and evaporate poor quality "diverted water". The Barber Reservoir and its diversion works, located near Colorado City, were built in 1969 to Page 2 Colorado River Municipal Water District

6 Adopted by the District s Board of Directors reduce the chloride pollution entering the Spence Reservoir downstream. Red Draw Reservoir was constructed in 1985 along with a diversion works on Beals Creek. Both the Natural Dam Lake improvements and the Sulphur Draw Reservoir were built following the 1986 spill of poor quality water from Natural Dam Lake. The Mitchell County Reservoir was created to expand the District's ability to store and dispose of poor quality water. The complete scope of the District's Water Quality Enhancement System will not be addressed within this document. Table No. 1 presents a summary of the District reservoirs, their purpose, year of construction, and maximum capacity in acre-feet. TABLE No. 1 - District Reservoirs Reservoir Purpose Year Max. Capacity J.B. Thomas... Water Supply ,600 (1) E.V. Spence... Water Supply ,270 (2) O.H. Ivie... Water Supply ,340 Moss Creek... Water Supply ,030 Powell... Water Supply ,650 Barber... Quality Control ,500 Red Draw... Quality Control ,538 Natural Dam... Quality Control ,560 Mitchell Co.... Quality Control ,266 Sulphur Draw... Quality Control ,000 Table Notes: (1) The Texas Water Development Board prepared a VOLUMETRIC SURVEY OF LAKE J.B. THOMAS on October 30, This resurvey reduced the reservoir s maximum capacity from 204,000 acre feet to 200,600 acre feet. (2) The Texas Water Development Board prepared a VOLUMETRIC SURVEY OF E.V. SPENCE RESERVOIR on October 27, This resurvey increased the reservoir s maximum capacity from 488,760 acre feet to 517,270 acre feet. The District operates four well fields for municipal water supply. Two of these fields, located at Snyder and near Odessa, served as those cities water supplies prior to the District's inception. The third field, located in Martin County northwest of Stanton, was developed by the District in the early 1950's. The fourth field, which is the largest District well field, is located in Ward County, southwest of Monahans, and was developed in Table No. 2 lists the District's well fields, their locations, and their maximum production rates. TABLE No. 2 - District Well Fields Well Field Location Year Production Snyder W.F....Scurry Co 's MGD Odessa W.F...Ector Co 's MGD Martin Co. W.F... Martin Co MGD Ward Co. W.F... Ward Co MGD Colorado River Municipal Water District Page 3

7 (This page intentionally left blank) Page 4 Colorado River Municipal Water District

8 Adopted by the District s Board of Directors The District also owns and operates a water distribution network encompassing twenty-two pump stations and more than 600 miles of water transmission pipeline (see Figure No. 2). The system features numerous miles of parallel lines and interconnects, which makes it quite flexible. Consequently, the District is able to furnish almost any customer with water from any source. FIGURE No. 2 - District Pipeline System 1.10 Water Supplies to our Member & Customer Cities. Below is a city by city summary of the District's water supply capabilities for our Member and Customer Cities. Included therein are the City's recent water demands, sources used to meet those demands, and a description of their water treatment plant. Additional information regarding water demands is presented in Appendix A. Colorado River Municipal Water District Page 5

9 1.11 City of Odessa Water System. The District is responsible for providing all of the water needs for the City and its customers. As a Member City, our contract with Odessa states in part: " (the) District agrees to sell and to deliver to the City at the delivery points hereinafter specified, and City agrees to purchase and take at said delivery points all water required by City during the period of this agreement for its own use and for distribution to all of the customers served by the City." Odessa's water needs have increased substantially over the years. Their FY 2000 demand was a record billion gallons (25,235 acre-feet), some 7.4 times their 1952 usage. Last year their total use was down somewhat at 6,961 billion gallons. The peak month use during the year was 29.5 MGD, while the peak day was almost 40 MGD. Odessa Historical Water Use Billion Gallons Year Under ordinary conditions, the City of Odessa obtains raw water furnished by the District from a blend of six different sources: (1) the Ivie Reservoir, (2) Spence Reservoir, (3) Lake Thomas, (4) Martin County Well Field, (5) Ward County Well Field, and (6) the Odessa Well Field. The District sets this blend based on reservoir contents, source water quality, economics, and the needs of our customers. Page 6 Colorado River Municipal Water District

10 Adopted by the District s Board of Directors City of Odessa Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month The City typically consumes water at rates between 12 and 30 Million Gallons Per Day (MGD). During the past 5 years, their summer use has averaged 915 MG in July, while winter demands have averaged about 387 MG in December. The District has the ability to deliver a maximum of 34 MGD of water from the Terminal Pump Station to Odessa on a consistent basis. This ability is supplemented by the two 80 MG ground storage reservoirs located across the street from Odessa's Treatment Plant. Water being delivered to the plant from these reservoirs can reach 55 MGD rates on a short-term basis. The District operates the Ward County Well Field near Monahans, Texas. Currently this field can produce up to 28 MGD; however, the transmission system from the field to the City can only pump a maximum of 24 MGD. Normally system is operated at 16 MGD during the summer months only. Odessa's Treatment Plant features two parallel systems: one which is rated at 34.5 MGD; and the other, is rated at 40 MGD. Regardless, the combined plant can only treat 50 MGD today, due to hydraulic constraints and filter capacity limitations. Colorado River Municipal Water District Page 7

11 1.12 City of Big Spring Water System. Like Odessa, the District is responsible for providing all of the water consumed by the City of Big Spring and its customers. As a Member City, our contract with Big Spring states in part: " (the) District agrees to sell and to deliver to the City at the delivery points hereinafter specified, and City agrees to purchase and take at said delivery points all water required by City during the period of this agreement for its own use and for distribution to all of the customers served by the City." Big Spring's water needs have increased over the years. Their FY 2004 demand totaled billion gallons (6,270 acre-feet), roughly 70% more than their 1953 consumption. Their peak month use averaged 7.7 MGD last year, while the peak day was 8.7 MGD. Big Spring Historical Water Use 4 3 Billion Gallons Year Under ordinary conditions, the City of Big Spring obtains raw water furnished by the District from a blend of four different sources: (1) the Ivie Reservoir, (2) Spence Reservoir, (3) Lake Thomas, and (4) the Martin County Well Field. The District sets this blend based on reservoir contents, source water quality, economics, and the needs of our customers. Typically Big Spring consumes between 4.4 and 8.4 MGD throughout the year. Summer use has averaged 259 MG in the month of July, while winter use averaged as low as 138 MG for the month of December. Page 8 Colorado River Municipal Water District

12 Adopted by the District s Board of Directors City of Big Spring Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month The District has the ability to deliver up to 21 MGD of water from Lake Thomas and up to 40 MGD of Spence water from Moss Lake to the 15 MG reservoir located at the Big Spring Pump Station north of the City. Alternatively, the District can gravity flow up to 11 MGD of Ivie/Martin County water to this 15 MG reservoir from the west. A 27" concrete cylinder water line feeds the Big Spring Treatment Plant from the 15 MG reservoir. Currently this line operates by gravity with a capacity of 12 MGD, but could be boosted to increase this capacity. The City of Big Spring's Treatment Plant features two trains with a combined normal capacity of 12 MGD. This can be pushed to 13 MGD for short periods of time. The City contracted with the Howard County Water Control and Improvement District No. 1 in the late 1950's to supply water to the City of Coahoma and the community of Sand Springs. All of the water consumed by these entities originates from District sources, and is treated by the City of Big Spring. Colorado River Municipal Water District Page 9

13 1.13 City of Snyder Water System. The District is responsible for providing all of the water needs for the City and its customers. As a Member City, our contract with Snyder states in part: " (the) District agrees to sell and to deliver to the City at the delivery points hereinafter specified, and City agrees to purchase and take at said delivery points all water required by City during the period of this agreement for its own use and for distribution to all of the customers served by the City." Snyder Historical Water Use Billion Gallons Year Snyder's water needs have increased more than 40% since Their FY 2004 demand totaled billion gallons (2,268 acre-feet). Peak month use averaged 3.3 MGD last year, while the peak day was 4.8 MGD. Page 10 Colorado River Municipal Water District

14 Adopted by the District s Board of Directors City of Snyder Average Monthly Water Use 4 3 MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Under ordinary conditions, the City of Snyder obtains all of its water from Lake J. B. Thomas. When Thomas reserves are low, the City's needs can be supplemented with water from the Snyder Well Field, whose seven wells are scattered throughout the city. Low Thomas reserves can also be augmented by pumping either 5 MGD of water from the Ivie Reservoir, or 9 MGD of water from the Spence Reservoir "in reverse" through the 33-inch water line and dropping it into the lake at the Big Spring/Odessa Intake Station. This operation was actually used between 1997 and 1999, during which earthen canals within the lake basin were used to minimize evaporative losses. The District's delivery system to the City consists of a 27-inch concrete cylinder line from the pump station at Lake Thomas to a 15 MG reservoir located on top of a hill. The District can pump up to 12 MGD to this reservoir. From there, water flows by gravity through a low-head 21" concrete line to the Snyder Water Treatment Plant. The design capacity of this line was 9 MGD, however, tests showed a current maximum flow of only 7 MGD. Snyder's Treatment Plant features two parallel 5.0 MGD rated plants which have two trains each. The combined 10 MGD capacity could be exceeded for short periods of time. Snyder also delivers treated water to the communities of Ira, Dunn, Rotan, and Fluvanna. Colorado River Municipal Water District Page 11

15 1.14 City of Midland Water System. The District entered its first contract with the City of Midland on May 10, This contract specified an escalating take-or-pay annual quantity and maximum delivery rate. For FY 2004, the contract quantity was MGD average (15,964 acre-feet per year) with a peak delivery rate not to exceed 15.0 MGD. Historically, water delivered by the District under this contract was a blend of water coming from Lake Thomas and the Spence Reservoir. Since 1995, however, some or all of the water for this contract has come from the Ivie Reservoir. Midland Historical Water Use Contract Ivie Contract 8 7 Billion Gallons Year The District typically blended the Thomas-Spence water at the 15 MG reservoir located north of Big Spring. The 27" and 36" supply lines have a combined capacity of 30 MGD from that reservoir to the Martin County Pump Station. From there, a 30" line, with a capacity of 15 MGD, travels on to the Midland Filter Plant. The District can increase this capacity by opening bypass valves from the 27" and 33" Martin County to Odessa pipelines adjacent to the filter plant. This bypass system can be used to deliver either the Thomas-Spence blend or Ivie Reservoir water, depending on pumping conditions. The District contracted with Midland for a fixed MGD average (15,000 acre-feet per year) of water from the Ivie Reservoir on September 1, Actual water deliveries from this source begin when the pipeline was completed in The City has contracted for the District to deliver this Ivie water, at a rate not to exceed 20 MGD, to the 100 MG Terminal Reservoir located west of the Midland International Airport. By contract, the City is responsible for transporting that water from the reservoir to their treatment plant, however, through subsequent Page 12 Colorado River Municipal Water District

16 Adopted by the District s Board of Directors agreement, the District has assumed the operation and maintenance of the pumps required for this transfer. City of Midland Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month Midland's Treatment Plant has four trains which are rated at a combined 32 MGD. The plant can achieve a 44 MGD rate for short periods. Additionally, the City operates and maintains two well fields used for water supply. These fields, and their associated transmission system, has a maximum capacity of 25 MGD. Colorado River Municipal Water District Page 13

17 1.15 City of San Angelo Water System. The District entered its first contract with the City of San Angelo on May 13, This contract, which expired and was replaced on August 19, 1997, now carries a contract quantity of million gallons (3,000 acre-feet) per year for water in the Spence Reservoir. The City may accrue up to 6,000 acre-feet of additional water if it does not take this contract quantity for one or more years. Withdrawals for any single year are limited to a maximum of 9,000 acre-feet. The City constructed, operates, and maintains its supply line and pump stations from the Spence Reservoir to their Water Treatment Plant. The District also contracted with San Angelo for a fixed MGD average (15,000 acre-feet per year) of water from the Ivie Reservoir on September 1, The City has contracted for the District to deliver this Ivie water, at a rate not to exceed 20 MGD, to one of the City's water transmission lines which is adjacent to the District's San Angelo Pump Station. This rate will eventually be increased to 25 MGD. San Angelo's primary source of water is the Twin Buttes Reservoir, owned and operated by the Bureau of Reclamation, and the O. C. Fisher Reservoir, owned and operated by the U.S. Army Corps of Engineers. Additionally, the City uses Lake Nasworthy for supplemental storage. San Angelo Historical Water Use 7.0 Spence Contract 6.0 Ivie Contract 5.0 Billion Gallons Year Because of their other water supplies, San Angelo has been very erratic in their water demands from the District. Many years the City would operate off of their "local" sources, without taking Page 14 Colorado River Municipal Water District

18 Adopted by the District s Board of Directors any District water. However, in F.Y the city took 4,605 billion gallons (14,134 acre-feet) from the Ivie Reservoir. City of San Angelo Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month San Angelo's Treatment Plant is located adjacent to the Concho River. The City normally passes water from Twin Buttes Reservoir through Lake Nasworthy, and on down the river to the plant. Low-head pumps on the river are capable of lifting up to 60 MGD from the river into the plant itself. Currently the City is able to gravity flow 20 MGD of water either from the O. C. Fisher Reservoir, or Ivie water from the San Angelo Pump Station, without supplemental pumping. This capacity will need to be increased once the Ivie Pipeline System is upgraded and the City's right increases to 25 MGD. The City's plant has three treatment trains rated at a combined 42 MGD. The plant can produce a peak rate of 55 MGD for short periods of time. For perspective, their peak day during 2004 was 23 MGD, somewhat over their peak contract flowrate. Colorado River Municipal Water District Page 15

19 1.16 City of Abilene Water System. The District contracted with the West Central Texas Municipal Water District for a fixed MGD average (15,000 acre-feet per year) of water from the Ivie Reservoir on September 1, The City of Abilene constructed, owns, and operates a 50 mile long, 36-inch diameter pipeline from the Ivie Reservoir to the city. The system has a maximum capacity of 24 MGD, but is currently equipped to pump only 20 MGD. The system started operation in June Typically the city has pumped around 4 MGD throughout the year, except during the low demand months of winter. The graph below illustrates Abilene s water use during City of Abilene Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month The City constructed a membrane filtration plant to treat this Ivie Reservoir water. This plant features microfiltration of the full stream followed by partial stream reverse osmosis (RO) treatment. Currently the plant can take 9 MGD in and output about 6 MGD of finished water. They operate with about a 60% bypass around the RO plant in order to match the conductivity and Total Dissolved Solids (TDS) with the water produced by their other plant. The Ivie filtration plant is ultimately expandable to 24 MGD capacity. Page 16 Colorado River Municipal Water District

20 Adopted by the District s Board of Directors 1.17 City of Stanton Water System. The City of Stanton derives its water requirements from the District under the terms and conditions of a contract dated June 1, This contract authorized the City to take up to two million gallons of water per day from the District's 27-inch and 36-inch supply lines between Big Spring and the Martin County Pump Station. The point of delivery is where said lines cross State Highway 137, approximately six miles north of Stanton. The City owns and operates a pipeline from that point to their treatment plant. Stanton has taken between 50 and 127 million gallons per year for each of the past 10 years. During FY 2004, they received 104 million gallons (319 acre-feet). Their peak month occurred in May, when they took 11.5 MG (0.37 MGD average). Below is a graph of their average monthly use for the past 5 years: City of Stanton Average Monthly Water Use MGD Year Annual Average Use JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Month The City of Stanton also owns and operates several wells which can be used to supplement or replace the District's water deliveries. The District's contract with Stanton expires January 1, Colorado River Municipal Water District Page 17

21 1.18 City of Robert Lee Water System. The City of Robert Lee entered into a water purchase contract with the District on May 23, The City has a take-or-pay quantity of million gallons (50 acre-feet) of water per year from the E. V. Spence Reservoir. The City constructed its own transmission facilities from the reservoir to their water treatment plant, located immediately below the Mountain Creek Reservoir dam. Mountain Creek Reservoir serves as the City's primary source of water. In FY 2004, the City diverted million gallons (146 acre-feet) of water from Spence Reservoir. The contract carries a provision allowing the City to exceed the contract quantity, provided the city pays the District a per thousand gallon surcharge for all water over the contract quantity. The peak month delivery averaged MGD City of Grandfalls Water System. The City of Grandfalls contracted with the District for water from the Ward County Well Field on July 24, This contract carries a maximum of 125 million gallons (384 acre-feet) per year, with a point of delivery located on the southern end of the District's well field. The City owns, operates, and maintains a transmission line from that point to the city's treatment and distribution system. During FY 2004, the City received a total of million gallons (133 acre-feet) of water. The peak month had an average MGD delivery rate City of Pyote Water System. The City of Pyote and the West Texas State School (formerly the West Texas Childrens' Home) at Pyote receive their water supply from wells operated by the District. The wells are located on the western edge of the Ward County Well Field, and are operated under the terms and conditions of a contract between the District and the University of Texas System. The FY 2004 deliveries to Pyote and the State School totaled million gallons (226 acrefeet) of water. The peak month reached an average of MGD. Page 18 Colorado River Municipal Water District

22 Adopted by the District s Board of Directors 1.21 Industrial Customers. Throughout the years, the District has sold and delivered large quantities of water to industrial customers. Most of these were involved in oil production, and used this water to repressure depleted down-hole oil reservoirs. Deliveries for this purpose reached a peak of billion gallons during 1974, but had fallen to a paltry 683 million gallons (2,095 acre-feet) by FY The bulk of water used for this purpose comes from the District's diverted water system, which is too high in dissolved solids for use as municipal water. Water from the diverted water system will not be addressed in this document. Three industrial users, namely Atheon, Power Resources, and a portion of the Alon USA water deliveries, are provided by waters from the E. V. Spence Reservoir. These customers took a combined million gallons (757 acre-feet) of Spence water during The water needs of these three industrial customers only will be considered in subsequent portions of this document. Colorado River Municipal Water District Page 19

23 (This page intentionally left blank) Page 20 Colorado River Municipal Water District

24 Adopted by the District s Board of Directors 2.0 OBJECTIVES. Water in West Texas is a scarce commodity. New sources of water may be many miles from the need, and are most often very costly to develop and operate. Therefore, proper water conservation and drought management will continue to play a critical role in the development and usage of water throughout the next century; not as a direct source, but in the "stretching" of available supplies. The Colorado River Municipal Water District's objective, with regard to water conservation, is to increase the efficient use of water, thereby reducing water demands without adversely affecting this area's population or economic growth potentials. The objective can be achieved through the proper management of water at the wholesale level, using tools such as the water reclamation, conjunctive use of water sources, diversion of poor quality water, strategic water releases, precipitation enhancement, brush management, leak detection and reduction, and public education. At the retail level, the objective can be achieved through techniques such as leak reduction, water pricing strategies, proper landscaping, water reuse and recycling, and public education. The efficient use of water also includes water management during times of drought. By selective use and management of the District's multiple water sources we have been able to continue an uninterrupted water supply to our customers, even when our reservoirs experience extended periods of limited inflow. This includes the transfer of water from one reservoir to another by allowing the water to run backwards through existing pipelines and pump stations. This operation successfully transferred Ivie and Spence Reservoir water to Lake Thomas during FY 1998 and 1999, when the Lake reached elevations as low as Additionally, the District has developed ways of transferring lake water up to a pump station intake after the lake level drops below the elevation of that intake. These "pump back" operations have allowed us to continue the deliveries of water from a lake after it is "functionally dry" and very little water remains in the basin. By meeting this objective of efficient use of water, the District and its customers can delay the costly construction of new or upgraded water supplies, thereby realizing a considerable savings for all concerned. Colorado River Municipal Water District Page 21

25 (This page intentionally left blank) Page 22 Colorado River Municipal Water District

26 Adopted by the District s Board of Directors 3.0 WATER CONSERVATION PLAN. The Colorado River Municipal Water District has been involved in the conservation of municipal quality water for many years. Our efforts on the wholesale level have included the conjunctive use of water sources, diversion of poor quality water, strategic water releases, precipitation enhancement, leak detection and reduction, and public education Metering and Water Accounting System. The District meters the water passing through our system at each point of diversion, well, and customer location. The diversion meters are typically high volume venturi tubes with integral totalizers. The rate of flow at these locations is electronically transmitted to our operators at the Central Control station on a "real time" basis. Large volume customers are typically metered with venturi tubes, while the smaller users and wells typically metered by either turbine or propeller meters. Recently the District has purchased and installed a few transit-time ultrasonic meters to replace selected turbine meters. These meters, with accuracies typically less than ±2, have been successful in applications where poor quality water is being metered since the meter probes do not need to be immersed in the liquid. The District's meter technicians calibrate and maintain all meters on a regular basis. Also, a meter balance is performed monthly to spot meter inaccuracies. All water deliveries, diversions, sales, and losses are determined from these meter readings Conjunctive use. Groundwater throughout most of West Texas is essentially mined. Recharge rates are quite low, or in some cases nonexistent, and thus the water you pump out today may never be replaced. Consequently, the District has practiced the conjunctive use of our surface and groundwater assets for many years. During the 1950's, we used the Martin County Well Field only in the summer months when Odessa's water demands exceeded the transmission capacity from Lake Thomas. A parallel 33" line was laid from the Martin County Pump Station to Odessa for that purpose. During the 1960's, the District even used aquifer storage in the Martin County Well Field by injecting surplus water from Lake Thomas into this aquifer during the winter months, thereby increasing the quantity available for pumping next summer. This practice ended once the Spence system was completed in Colorado River Municipal Water District Page 23

27 When the Ward County Well Field came on line in the early 70's, the District continued its practice of conjunctive use. Water from that source is typically used only during the summer months to meet the increased demands by the City of Odessa. The well field is rested during the fall, winter, and spring months. In contrast, water from our surface reservoirs are the "backbone" of our delivery system, and are used at a mostly uniform rate throughout the year District Water Quality Enhancement System. As previously mentioned the District has developed an extensive system of diversions, pipelines, and reservoirs in an effort to reduce the overall tonnage of chlorides and dissolved solids accumulating in the E. V. Spence Reservoir. These efforts began in 1969 with the construction of the diversion works and Barber Reservoir north of Colorado City. They have expanded such that today's system includes five reservoirs, with a combined storage capacity of more than 100,000 acre-feet, three diversion stations, and approximately 100 miles of water transmission line (Figure No. 3). In all, the District has spent more than $28 million on efforts to improve the water quality at the Spence Reservoir. Water taken from the diversion works is either sold to oil companies for use in oil field repressurization (see Section 1.21 above), or sent to either the Barber, Red Draw, or Mitchell County Reservoirs for evaporation. Although the District's permits from the Texas Natural Resource Conservation Commission authorize the use of up to 8,000 acre-feet of potable surface water annually for repressurization purposes, since 1969 the District's Board of Directors has elected to restrict the use of municipal quality surface or groundwater for that purpose. Page 24 Colorado River Municipal Water District

28 Adopted by the District s Board of Directors FIGURE No. 3 - District's Water Quality Enhancement System The District's diversions have been largely successful. Between 1969 and 2004, we have captured a total of 936,959 tons of chlorides which would have otherwise traveled to and accumulated within the Spence Reservoir (see Figure No. 4). Overall, these efforts have helped the District retain Spence as a valid municipal water supply source, which might not have been possible had the chlorides continued to gather within the reservoir and deteriorate its water quality. Colorado River Municipal Water District Page 25

29 FIGURE No. 4 - District Diversion History District Diversion History '69-04 Tons of Chlorides per Year 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5, Year 3.04 Strategic Water Releases. Despite the District's diversion efforts, the water impounded in the Spence Reservoir has tended to be quite high in dissolved solids and chlorides. Prior to 1986, chloride levels rose to a high around 1000 ppm in Heavy rainfall that year dropped this level to 600 ppm, where it remained until the spill of saline water from the Natural Dam Lake in That spill resulted in the chlorides rising to a ppm level by the late 1990 s. The municipal use of water containing such high concentrations of chlorides is marginal at best, even with extensive dilution by better quality waters from other sources. Consequently, the District made a water release totaling 50,000 acre-feet during May and June of This release reduced the total impounded chlorides (tons) by one-third. We repeated this process when conditions again became favorable in That year the release totaled 20,000 acre-feet of water, which reduced the impounded chlorides by 22,000 tons. Both of these releases were timed to be passed through the Ivie Reservoir downstream with minimal impact on that reservoir's water quality. These releases were expected to provide better quality water within Spence Reservoir once significant inflow was received. The expectation was realized with the November 04 and February 05 rainfall. Chlorides had dropped within Spence Reservoir to 520 ppm by March 1, Page 26 Colorado River Municipal Water District

30 Adopted by the District s Board of Directors 3.05 Precipitation Enhancement. In 1971, the District began a precipitation enhancement program (weather modification) in an attempt to increase the rainfall over the drainage areas of Lake Thomas and the Spence Reservoir. This program has operated almost every year since, and has been evaluated by the Texas Natural Resource Conservation Commission, the U.S. Department of the Interior, and the Bureau of Reclamation. It is believed that an increase of 10 to 15 percent in rainfall has been achieved through these efforts. One indicator of this increase has been the rise in dryland cotton production within the "target area" of the project. Although there is evidence that weather modification has increased precipitation, it is difficult, if not impossible to determine what increase in runoff has actually occurred Brush Management. Brush control and brush management has significantly increased in the upper Colorado River basin during the past five years. State funded projects on the North Concho River watershed, Champion Creek Reservoir watershed, Middle Concho River watershed and the Ballinger Municipal Lake watershed (Valley and Quarry Creeks). These state fund projects administered by the Texas State Soil and Water Conservation Board (TSSWCB) are targeting upland brush species (mesquite and Juniper) that severely limit rainfall infiltration and runoff into rivers, streams, creeks, and surface water reservoirs. Additional watershed investigations in the upper basin by the U.S. Army Corps of Engineers and the District are focused on management and restoration of riparian reaches of the Colorado and Concho Rivers with the goal of restoring stream flow, habitat restoration, and greater surface water storages in area reservoirs. The District s primary focus in brush management is in the control of saltcedar. This exotic, invasive brush species has taken over and dominated the riparian habitats of the upper Colorado River basin. All of the District s reservoirs (Lake J.B. Thomas, E.V. Spence Reservoir, and O.H. Ivie Reservoir) and other reservoirs in the upper basin have become overtaken by this phreatophytic brush species within the last 15 years. The impact to surface water resources has reached catastrophic levels considering the quantity of water being consumed by the estimated 20,000 to 25,000 acres of saltcedar. Additionally, saltcedar is causing a significant impact to water quality through it s metabolic uptake of highly saline water and the transfer of these salts to the soils where the tree grows. The District is cooperating with the TSSWCB on a saltcedar control project in the upper basin scheduled to begin treating saltcedar with aerial application of an herbicide in 2005 and continuing in The goal is to kill all the saltcedar on the mainstem Colorado River and Beals Creek starting at the Lake Thomas Dam and downstream to and including the E.V. Spence Reservoir basin. Follow-up control is being planned through a biocontrol project conducted by the USDA-ARS in Temple, Texas. Colorado River Municipal Water District Page 27

31 3.07 Total Maximum Daily Load Studies. Total Maximum Daily Load (TMDL) studies are an important part of water conservation as a tool to isolate the source of poor quality water with the goal of eliminating its contamination of streams, rivers, and lakes. Reducing or eliminating such pollution will increase the amount of adequate quality water for municipal and industrial purposes. The District completed TMDLs on E.V. Spence Reservoir for sulfate and TDS in These TMDLs were approved by the TCEQ in November, 2000 and the Implementation Plan was approve in August, The E.V. Spence Reservoir was violating TCEQ segment standards for sulfate and TDS primarily because of inflows from a catastrophic rain event that caused the Natural Dam Lake east of Big Spring to overflow in 1986 causing very poor quality water loaded with high levels of TDS to inundate the reservoir. The reduction of pollutant loads to Spence reservoir will be achieved by a number of best management practices (BMPs) that are being implemented by the District, the TCEQ, the Texas Railroad Commission (TRRC), and the TSSWCB. These practices include the revision of municipal discharge permits; reservoir release management; river diversion management; oil well plugging; weather modification; remediation of the magnesium plant site; and targeted brush control on saltcedar. The TCEQ has undertaken another TMDL project targeting load reductions in the Colorado River between Spence Reservoir and Ivie Reservoir. Presently, stream standards are being violated for chloride and TDS and the TCEQ has a contract with EA Engineering to complete these TMDLs. The District is cooperating with the TCEQ as a stakeholder in this investigation and working closely with the EA Engineering consultants to complete these stream loading requirements. Project completion is scheduled for March Leak Detection & Reduction. The District controls our pump stations remotely using a "real-time" SCADA system. Our Central Control room has operators on duty continuously who monitor the pump status, pressures and flow rates throughout the system. Any major leak in the pipeline network is quickly spotted by the operators who then shut off pumps, adjust valves, and dispatch maintenance men rapidly to minimize lost water. Additionally, District employees either drive or fly the pipeline routes about twice per month to look for minor pipeline leaks. Any leaks found are repaired in a timely manner Public Education. Since 1992, the District has placed water conservation information into the hands of area fourthgraders through the distribution of the Major Rivers program. Students also received specific West Texas water information through the District's companion booklet entitled the Wonderful World of West Texas Water. Page 28 Colorado River Municipal Water District

32 Adopted by the District s Board of Directors By the late 1990 s approximately 6,800 students from 274 fourth-grade classrooms on 18 different campuses received these resources which include booklets, stickers, pamphlets and maps. Also, District employees were visiting classrooms and providing field trips for several fourth-grade classes throughout each school year. Demand for the resource materials and field trips has dwindled in recent years. The State s focus on standardized testing for school children has left little time for teachers to incorporate outside materials and activities. Consequently, the District is providing such services on a demand only basis Water Reclamation Projects. In 2004 the District began a study to consider the feasibility of directly reusing effluent water from our Member Cities Waste Water Treatment Plants. Currently we are moving into the preliminary design phase for a reuse facility near the City of Big Spring, and conducting further studies on possible projects near Odessa, Midland, and Snyder. Partial funding for this work is being provided by the Texas Water Development Board Water Conservation Plans of Member & Customer Cities. Under current contracts, the District is limited in its ability to require and enforce specific water conservation principles on our Member and Customer Cities. As previously noted, we are obligated to provide all of the raw water needs for our Member Cities, without regard for how those needs may change from year-to-year. Customer Cities mostly have take-or-pay provisions linked to specific contract quantities. The District is not free to demand reductions in these contract quantities. Consequently, the District believes water conservation is best encouraged and implemented by our Member and Customer Cities at the retail level. Most of the District's Member and Customer Cities have developed their own Water Conservation and Drought Contingency Plans. Below are short summaries of many of these plans. 3.11(a) City of Odessa Plan. The City of Odessa provided the District with a copy of their Revised Water Conservation and Drought Contingency Plan on August 25, This plan sets an objective of reducing the quantity of water required by 5 percent within the next five years through efficient water use practices and additional effluent reuse. Odessa plans to achieve this objective through public education, plumbing code changes, improved metering, immediate leak repair, and continued water recycling. Odessa has been very aggressive in their water recycling program. Huntsman, a local industry, currently takes up to 3 million gallons per day of effluent for their processes, in-lieu of Colorado River Municipal Water District Page 29

33 using potable water. Additionally, several school campuses, golf courses, and even the Texas Department of Transportation, are using treated sewage effluent for lawn irrigation. In the Drought Contingency portion of their plan, Odessa established three drought predicated triggers. A mild drought would be when demands exceeded 90% of supplies for three consecutive days, a moderate drought when demands exceeded 95% of supplies, and a severe drought when demand exceed all of the available supplies. In response to the triggers, Odessa plans to inform the public, request voluntary water rationing by industrial users, implement voluntary lawn watering schedules, and encourage lawn watering conservation techniques. For moderate conditions, they plan to add mandatory lawn watering schedules and set limits on industrial users. Severe conditions will add prohibitions on landscape watering except during designated hours with hand held hoses. It will also ban certain water uses which are not necessary for human health. 3.11(b) City of Big Spring Plan. The District received a Revised Water Conservation Plan and a Revised Drought Contingency Plan from the City of Big Spring on April 26, This plan noted the City's average daily water use is quite high. Their average gallons per capita day (GPCD) use was shown as 258, which compares unfavorably with the 180 GPCD statewide average established in the year Consequently, the City will attempt to reduce their GPCD consumption by from this figure to 228 GPCD by the year For water conservation, the City plans to achieve this goal through several different ways such as encouraging the use of water conserving plumbing fixtures, public education programs, reducing seasonal water use, reducing wholesale water use, and improving water metering devices. In the Drought Contingency Plan, the Cities mild condition will exist when demands exceed 95% of the safe capacity of the water system, or lake levels reach specified conditions. In response the City has set a goal of a 5% reduction in water use by media notification, voluntary water use restrictions, and voluntary wholesale water reductions. A moderate condition has a goal of a 10% reduction in water use through mandatory water restrictions for residential and industrial users. A severe condition warrants 35% reduction in water use through the prohibition of landscape watering, swimming pool filling, and vehicle washing in addition to the mild and moderate condition restrictions. Page 30 Colorado River Municipal Water District

Raw Water Supply Master Plan Development

Raw Water Supply Master Plan Development Raw Water Supply Master Plan Development Stakeholder Outreach Meeting - II 31 August 2016 Welcome Introductions Master Plan Goals and Objectives Refine our standard approach to long-term plan for securing

More information

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis San Antonio Water System enhancement. This recommendation was based on limited water quality data provided by SAWS and using a free-water surface constructed wetland with approximately 112 acres of wetted

More information

Raw water sources, facilities, and infrastructure

Raw water sources, facilities, and infrastructure WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project University of Colorado Law School Colorado Law Scholarly Commons Western Water Law, Policy and Management: Ripples, Currents, and New Channels for Inquiry (Martz Summer Conference, June 3-5) Getches-Wilkinson

More information

Colorado River Challenges Impacts to Southern Arizona

Colorado River Challenges Impacts to Southern Arizona Colorado River Challenges Impacts to Southern Arizona 2 3 4 5 Colorado River Basics 7 States, 2 Nations Annual Flow 15.0 MAF 40 Million People All of the Major Cities in Southwest 5.5m Irrigated Acres

More information

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council. U.S. Water Budget Figure 10.18 10-9 Source:Data from The Nation s Water Resources 1975-2000, Vol. 1, U.S. Water Resources Council. Average U.S. Precipitation Figure 10.19 10-10 Source: U.S. Water Resources

More information

Drought Contingency Plan

Drought Contingency Plan for San Jacinto River Authority Highlands Division Prepared by San Jacinto River Authority Adopted: March 27, 2014 This page intentionally left blank. Table of Contents Table of Contents Section Page Section

More information

The State of the Colorado River

The State of the Colorado River April 2014 The State of the Colorado River Executive Summary The Colorado River Basin is now in its fifteenth year of drought. System runoff during this period has been comparable to or less than that

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

Leila Talebi and Robert Pitt. Department of Civil, Construction, and Environmental Engineering, The University of Alabama, P.O. Box , Tuscaloosa

Leila Talebi and Robert Pitt. Department of Civil, Construction, and Environmental Engineering, The University of Alabama, P.O. Box , Tuscaloosa Leila Talebi and Robert Pitt Department of Civil, Construction, and Environmental Engineering, The University of Alabama, P.O. Box 870205, Tuscaloosa May 2012 Global consumption of water increases every

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

System Plan Components Inventory

System Plan Components Inventory Northeast San Joaquin County Groundwater Bank System Plan Components Inventory Northeast San Joaquin County Groundwater Banking Authority April, 2002 The Northeast San Joaquin County Groundwater Banking

More information

Committee on Water. Desalination as a Water Source

Committee on Water. Desalination as a Water Source Committee on Water Committee on Water Desalination as a Water Source Water Supply Reliability for San Diego County NARUC Summer Policy Summit July 17, 2017 Bob Yamada Director of Water Resources San Diego

More information

Ithaca Area Intermunicipal Cooperation NYAWWA Conference. Chris Bordlemay Padilla Cornell University Water Manager 4/27/17

Ithaca Area Intermunicipal Cooperation NYAWWA Conference. Chris Bordlemay Padilla Cornell University Water Manager 4/27/17 Ithaca Area Intermunicipal Cooperation NYAWWA Conference Chris Bordlemay Padilla Cornell University Water Manager 4/27/17 Three Water Purveyors in Ithaca Area Cornell University City of Ithaca Bolton Point

More information

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly. 10.1 INTRODUCTION The reliable supply, treatment and distribution of potable water is vital to the health, safety and welfare of urban areas. The citizens and officials of the have long been involved with

More information

The Impacts of Climate Change on Portland s Water Supply

The Impacts of Climate Change on Portland s Water Supply The Impacts of Climate Change on Portland s Water Supply Richard Palmer and Margaret Hahn University of Washington Department of Civil and Environmental Engineering Joe Dvorak, Dennis Kessler, Azad Mohammadi

More information

Argyle Water Supply Corporation WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN May 2007

Argyle Water Supply Corporation WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN May 2007 Argyle Water Supply Corporation WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN May 2007 1. INTRODUCTION AND OBJECTIVES Water supply has always been a key issue in the development of Texas. In recent years,

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management Spring 2011 Public Meetings April 12 th 11:00 a.m. Nebraska City, NE April 12 th 7:00 p.m. Fort Peck, MT April 13 th 1:00 p.m. Bismarck, ND April 13 th 7:00 p.m. Pierre,

More information

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed Jason Afinowicz Department of Biological and Agricultural Engineering Texas A&M University

More information

Issue paper: Aquifer Water Balance

Issue paper: Aquifer Water Balance Issue paper: Aquifer Water Balance 1. Introduction And Background 1.1. Purpose and Scope The population in Kitsap County has grown rapidly in recent years and is expected to increase substantially in the

More information

ARIZONA CONSERVATION REQUIREMENTS. Management Plans MUNICIPAL CONSERVATION REQUIREMENTS

ARIZONA CONSERVATION REQUIREMENTS. Management Plans MUNICIPAL CONSERVATION REQUIREMENTS ARIZONA CONSERVATION REQUIREMENTS Management Plans The Arizona Groundwater Management Code establishes the legal framework for conserving water in Arizona's most populous areas. To help achieve its goals,

More information

NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT

NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT Denise Hickey Agenda NTMWD Background Water Planning East Fork Raw Water Supply Project Overview Benefits Nature Center NTMWD BACKGROUND

More information

November 28, Dear Mr. Bechtold:

November 28, Dear Mr. Bechtold: 4000 Hollywood Boulevard Seventh Floor, North Tower Hollywood, Florida 33021 (954) 987-0066 Fax: (954) 987-2949 November 28, 2012 Wastewater Compliance and Enforcement Section FLORIDA DEPARTMENT OF ENVIRONMENTAL

More information

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult INTRODUCTION What is groundwater? Water contained in saturated soil and rock materials below the surface of the earth. It is not NEW water, but is recycled water through the hydraulic cycle. The source

More information

The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below:

The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below: SURFACE WATER HYDROLOGY The surface water hydrology of the site has been logically divided into six phases of monitoring, analyses, and investigation as outlined below: Sample Station Locations and Descriptions

More information

Continued Extreme Drought Conditions. April 1, 2015 Snowpack was lowest ever recorded. Impacts and Risk to People and Nature

Continued Extreme Drought Conditions. April 1, 2015 Snowpack was lowest ever recorded. Impacts and Risk to People and Nature Eric Oppenheimer May 19, 2015 http://saveourwater.com Background Continued Extreme Drought Conditions April 1, 2015 Snowpack was lowest ever recorded Impacts and Risk to People and Nature Unemployment

More information

Myths and Facts about a Drought Year in the San Joaquin Valley

Myths and Facts about a Drought Year in the San Joaquin Valley Myths and Facts about a Drought Year in the San Joaquin Valley 2013 has been the driest year on record in California and Southern Oregon. In the San Joaquin Valley, Hanford, California, got only 1.99 inches

More information

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016 United Water Conservation District November 216 Hydrologic Conditions Report 217 Water Year December 6, 216 Page Intentionally Left Blank PRECIPITATION (INCHES) PRECIPITATION (INCHES) PRECIPITATION (INCHES)

More information

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living organisms that inhabit a geographic area and depend on it

More information

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? John C. Tracy, Director Idaho Water Resources Research Institute

More information

WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN REVISED MAY 2014

WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN REVISED MAY 2014 WATER CONSERVATION AND DROUGHT CONTINGENCY PLAN REVISED MAY 2014 FINAL ADOPTED JULY 10, 2014 THIS PAGE LEFT INTENTIONALLY BLANK page i Contents Section 1 Introduction... 1 1.1 Sabine River Authority...

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

Environmental Geography

Environmental Geography Environmental Geography Lecture 13 Water Pollution Lecture 13: Water Pollution I. Water Pollution A. Groundwater B. Surface Water C. Regulation II. Water Use in California 1 I. Water Pollution Types of

More information

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado Dual Water Systems in Northern Colorado By Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado In northern Colorado, the cost of water rights acquisition has risen dramatically over the

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management Spring 2015 Public Meetings April 7 th April 7 th April 8 th April 9 th April 9 th 11:00 a.m. 6:00 p.m. 11:00 a.m. 11:00 a.m. 6:00 p.m. Pierre, SD Bismarck, ND Fort

More information

FORWARD. Questions regarding this water conservation plan should be addressed to the following:

FORWARD. Questions regarding this water conservation plan should be addressed to the following: Water Conservation Plan FORWARD This Water Conservation Plan was prepared by Freese and Nichols for the North Texas Municipal Water District (NTMWD), pursuant to Texas Commission on Environmental Quality

More information

CHAPTER 5 WASTEWATER FLOWS

CHAPTER 5 WASTEWATER FLOWS CHAPTER 5 WASTEWATER FLOWS 5.1 REGIONAL FACILITIES Regional Water Recycling Plants Figure 5-1 illustrates the service area boundaries for IEUA s four water recycling plants. The four Regional facilities

More information

Wastewater Reuse - How Viable is It? Another Look

Wastewater Reuse - How Viable is It? Another Look Wastewater Reuse - How Viable is It? Another Look Item Type text; Proceedings Authors Chase, W. L.; Fulton, J. Publisher Arizona-Nevada Academy of Science Journal Hydrology and Water Resources in Arizona

More information

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results. Mission Provide solid waste collection and disposal service to rate-paying customers within our defined

More information

HILTON HEAD WATER SUPPLY & SALTWATER INTRUSION. Beaufort County Council September 2012

HILTON HEAD WATER SUPPLY & SALTWATER INTRUSION. Beaufort County Council September 2012 HILTON HEAD WATER SUPPLY & SALTWATER INTRUSION Beaufort County Council September 2012 HILTON HEAD S WATER UTILITIES Three public water, wastewater, reused water utilities on Hilton Head Formerly, 10 different

More information

PREPARE60 OVERVIEW 1

PREPARE60 OVERVIEW 1 PREPARE60 OVERVIEW 1 UTAH S WATER BUDGET Category Total precipitation 61,500,000 Used by vegetation & natural systems 53,789,000 Basin Yield 7,711,000 Compact decreases 535,000 Ground water mining increases

More information

IRRIGATION CONTROLLERS

IRRIGATION CONTROLLERS IRRIGATION CONTROLLERS TIMERS FOR THE HOMEOWNER Recommended Water Saving Features Water too precious to waste! IRRIGATION CONTROLLERS TIMERS FOR THE HOMEOWNER Recommended Water Saving Features While controllers

More information

ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90

ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90 ARTICLE 10 WATER SHORTAGE CONTINGENCY PLAN 90 5.1001 DECLARATION OF PURPOSE AND PRINCIPLES In accordance with Water Code 10632 requirements, Eastern Municipal Water District (EMWD) is responsible for conserving

More information

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System

Start-up of a Secondary Water Supply Company. and First Phase Design of a Regional System Start-up of a Secondary Water Supply Company and First Phase Design of a Regional System by Stephen W. Smith and Amy L. Johnson Abstract. Highland Ditch Company formed the Highland Secondary Water Company

More information

Utilizing Unconventional Water Sources for Industrial Reuse

Utilizing Unconventional Water Sources for Industrial Reuse Technologies exist to economically treat any strength of acid mine drainage for industrial reuse. Utilizing Unconventional Water Sources for Industrial Reuse Reclamation and reuse of unconventional wastewater

More information

Quantification of lake water level influences for Wawasee and Syracuse lakes: Lake and watershed water budgets for 2011, 2012, and 2013

Quantification of lake water level influences for Wawasee and Syracuse lakes: Lake and watershed water budgets for 2011, 2012, and 2013 Quantification of lake water level influences for Wawasee and Syracuse lakes: Lake and watershed water budgets for 2011, 2012, and 2013 Nathan S. Bosch, Joellyn Moine, Margaret Lee, Anna Burke Center for

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Notice of Preparation of an Environmental Impact Report and Scoping Meeting Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:

More information

Rain Barrel Water Harvesting

Rain Barrel Water Harvesting A Guide: Rain Barrel Water Harvesting By Terry Sprouse Amy McCoy Joaquin Murrieta Water harvesting system in Nogales, Arizona Thank you to: Altria, Inc. for funding for this project; Home Depot for supplying

More information

South Platte River Importance of Return Flows and Replacing Depletions to Down-Stream Water Users

South Platte River Importance of Return Flows and Replacing Depletions to Down-Stream Water Users South Platte River Importance of Return Flows and Replacing Depletions to Down-Stream Water Users American Ground Water Trust Colorado Aquifer Management November 29 th, 2012 Jim Yahn, P.E. North Sterling

More information

City of San Diego Pure Water Project October 2014

City of San Diego Pure Water Project October 2014 City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,

More information

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development Idris Abdi Doctoral Dissertation Presentation Major Advisor: Dr. Teferi Tsegaye April 18, 2005 Alabama

More information

Texas Water Resources Institute

Texas Water Resources Institute Texas Water Resources Institute April 1975 Volume 1 No. 5 Opportunities for Artificial Recharge By Jim Valliant, Research Engineer, Texas Agricultural Experiment Station Put "dirty" water back underground--i'd

More information

Castle Pines North Metropolitan District

Castle Pines North Metropolitan District Castle Pines North Metropolitan District Water Conservation Plan August 2006. Prepared by: A 1331 17th Street, Suite 1200 Denver, CO 80202 Contents Executive Summary Section 1 Introduction 1.1 Purpose...

More information

MUSES Utility Survey Utility Contact Information Utility Contact Information

MUSES Utility Survey Utility Contact Information Utility Contact Information MUSES Utility Survey Utility Contact Information Utility Contact Information 1.) Please fill in the fields below with contact information for your utility office. For the first name and last name fields,

More information

Securing and Protecting Water Rights and Uses in Arizona

Securing and Protecting Water Rights and Uses in Arizona Securing and Protecting Water Rights and Uses in Arizona L. William Staudenmaier One Arizona Center 400 East Van Buren Street, Suite 1900 Phoenix, Arizona 85004 2202 602.382.6000 602.382 6070 (fax) www.swlaw.com

More information

Annual Report. December 2010 November Bradley Cole 2/7/2012

Annual Report. December 2010 November Bradley Cole 2/7/2012 Annual Report December 2010 November 2011 Bradley Cole 2/7/2012 CH2M HILL annual report to the Board of Directors of the Pine-Strawberry Water Improvement District. This annual report provides an overview

More information

URS Corporation (URS) conducted a

URS Corporation (URS) conducted a A Case Study for Industrial Wastewater Desalination and Concentrate Disposal Barriers in Florida Yu Zhao, J. David Burgstiner, and David A. Wilcox EDITOR S NOTE: The following article received a Top Paper

More information

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) Wilmington District, Corps of Engineers Stakeholder Update Presentation January 24, 2014 Authorized under Section 216 of Public

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations Cindy Thieman Hood River Watershed Group Ed Salminen & Niklas Christensen

More information

For Bandon Utilities Commission

For Bandon Utilities Commission For Bandon Utilities Commission July 12, 2017 Profile BPA, a component of the U.S. Department of Energy, is a non-profit and self-funded power marketing administration in the Pacific Northwest. Congress

More information

SECTION 7: DEMAND MANAGEMENT MEASURES

SECTION 7: DEMAND MANAGEMENT MEASURES SECTION 7: DEMAND MANAGEMENT MEASURES 7.1 DOCUMENT REQUIREMENTS 7.1.1 UWMP Requirements This section will include the following: Describe how each water demand management measures are being implemented

More information

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT PIMA COUNTY COMPREHENSIVE PLAN CO7-07-04 PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT Arizona law [A.R.S. 11-821(C)(3)] requires: Planning for water resources that addresses: a)

More information

April 2014 Resolution No Adopted by BWA Board on 4/29/14 Print Date 4/30/14

April 2014 Resolution No Adopted by BWA Board on 4/29/14 Print Date 4/30/14 Drought Contingency and Emergency Water Management Plan April 2014 Resolution No. 2014-2 Adopted by BWA Board on 4/29/14 Print Date 4/30/14 This page intentionally left blank Table of Contents I. Introduction

More information

Report on Groundwater Recharge in the Orange County Groundwater Basin

Report on Groundwater Recharge in the Orange County Groundwater Basin 2007-2008 Report on Groundwater Recharge in the Orange County Groundwater Basin Orange County Water District P.O. Box 8300 Fountain Valley, CA 92728-8300 (714) 378-3200 (714) 378-3373 fax www.ocwd.com

More information

WATER STORIES WEST BASIN, CA

WATER STORIES WEST BASIN, CA WATER STORIES WEST BASIN, CA CHALLENGES PAGE 5 SOLUTIONS PAGE 7 RESULTS PAGE 9 INNOVATION & TECHNOLOGY PAGE 11 COMMUNITY INVOLVEMENT PAGE 13 THE FUTURE PAGE 15 THE RIGHT MOVE FOR SOUTHERN CALIFORNIA It

More information

Water and Wisconsin Agriculture: Reducing Withdrawals and Increasing Efficiency

Water and Wisconsin Agriculture: Reducing Withdrawals and Increasing Efficiency Water and Wisconsin Agriculture: Reducing Withdrawals and Increasing Efficiency Bob Smail Water Use Section Wisconsin DNR Presented March 11, 2014 Wisconsin Land and Water Conservation Association Meeting

More information

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY 4/3/213 Platte River Recovery Implementation Program 213 ANNUAL SURFACE WATER FLOW SUMMARY DRAFT Prepared by staff of the Platte River Recovery Implementation

More information

Bottled Water: What s the problem?

Bottled Water: What s the problem? Bottled Water: What s the problem? Where does your water come from? Groundwater Reservoir River What is groundwater? Aquifers and Groundwater Groundwater: any water that is found underground in cracks

More information

Cedar River Watershed Habitat Conservation Plan

Cedar River Watershed Habitat Conservation Plan Cedar River Watershed Habitat Conservation Plan Briefing for the WRIA 8 Salmon Recovery Council November 21, 2013 Cyndy Holtz Seattle Public Utilities cyndy.holtz@seattle.gov What is an HCP? Habitat Conservation

More information

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County

More information

Interruptible Supply Study

Interruptible Supply Study Interruptible Supply Study Prepared by AECOM USA Group, Inc. Kellogg Brown & Root Services, Inc. LBG-Guyton Associates Ekistics Corporation June 2009 AECOM Job No. 60072790 Interruptible Supply Study for

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Northern Arizona Hydrogeology

Northern Arizona Hydrogeology Northern Arizona Hydrogeology Some basics Coconino Plateau Hydrogeology Flagstaff and Coconino Plateau Water Resources Well development, City of Flagstaff Effluent discharge to the Rio de Flag from Wildcat

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

Water Supply Corporation here by adopts the following regulations and restrictions on the delivery and consumption of water.

Water Supply Corporation here by adopts the following regulations and restrictions on the delivery and consumption of water. DROUGHT CONTINGENCY PLAN MUSTANG WATER SUPPLY CORPORATION APRIL 17,2000 Section I: Declaration of Policy, Purpose, and Intent In order to conserve the available water supply and protect the integrity of

More information

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation Ohio Water Environment Association 2016 Technical Conference & Expo June 29, 2016 Objective To create a Stormwater

More information

Long Term Water Supply Board of Directors Workshop. March 10, 2015

Long Term Water Supply Board of Directors Workshop. March 10, 2015 Long Term Water Supply Board of Directors Workshop March 10, 2015 Agenda Water Supply Management Plan (WSMP) 2040 2014 Activities Use of the Freeport Regional Water Project Planning for the Future Freeport

More information

Conservation Strategies for Lawn Irrigation During Drought A Colorado Experience

Conservation Strategies for Lawn Irrigation During Drought A Colorado Experience Conservation Strategies for Lawn Irrigation During Drought A Colorado Experience Brent Q. Mecham 1 CID, CIC, CLIA, CGIA Background: Colorado experienced its worst drought in recorded history during 2002.

More information

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017 REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017 Agenda 1. Welcome & Introductions Project Team Technical Advisory Committee (TAC) 2. Study Overview 3. TAC Charter 4.

More information

City of Portsmouth Department of Public Works

City of Portsmouth Department of Public Works City of Portsmouth Department of Public Works April 7, 2017 Portsmouth Water Supply Status Report Overview The following Portsmouth Water Supply Status Report provides the Portsmouth Water customers an

More information

SALTON SEA SOLAR PONDS PILOT PROJECT

SALTON SEA SOLAR PONDS PILOT PROJECT SALTON SEA SOLAR PONDS PILOT PROJECT Agrarian Research 162 East Line Street Suite E Bishop, CA 93514 Under contract to: Goal of Salinity Management Stabilize (or reduce slightly) the salinity of the Salton

More information

BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY

BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY Report of Progress 544 Agricultural Experiment Station Kansas State University, Manhattan Walter R. Woods, Director BENEFITS FROM IMPROVING FLOOD IRRIGATION

More information

6. Pollutant Sources in

6. Pollutant Sources in 6. Pollutant Sources in 45 6. Pollutant Sources in the Plum Creek Watershed The LDC analysis for Plum Creek indicates that both point and nonpoint sources contribute pollutants in the watershed. Identifying

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore Rainwater Management in Major Cities of Punjab Dr. Iftikhar Ahmad College of Earth and Environmental Sciences. University of The Punjab Lahore Need For Rainfall Harvesting in Urban Areas of Punjab Groundwater

More information

4.2 Step 2 Profile of Water Demands and Historical Demand Management

4.2 Step 2 Profile of Water Demands and Historical Demand Management 4.2 Step 2 Profile of Water Demands and Historical Demand Management Step 2 involves an overview of the historical water demand trends as well as the influence of historical water demand management on

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

CITY AND BOROUGH OF WRANGELL WATER SHORTAGE MANAGEMENT PLAN

CITY AND BOROUGH OF WRANGELL WATER SHORTAGE MANAGEMENT PLAN CITY AND BOROUGH OF WRANGELL WATER SHORTAGE MANAGEMENT PLAN SECTIONS: Findings Purpose and Intent Waste of Water Prohibited Authorization Action for Hydrological Shortage Action for Emergency Shortage

More information

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer? CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor

More information

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1 To: From: Prepared by: Agenda Title: CITY COUNCIL AGENDA MEMORANDUM Mayor and City Council Charles Ozaki, City and County Manager Jim Becklenberg, Assistant City and County Manager David Allen, Director

More information