Turbine Commissioning & Data Processing
|
|
- Erick Greer
- 6 years ago
- Views:
Transcription
1 Turbine Commissioning & Data Processing Small Wind Association of Testers Conference Ismael Mendoza April 26, 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.
2 Objective To establish a sense of conformance with the manufacturer to hand over the turbine to start the testing Commissioning consist but not limited to: o Investigate that the turbine is in good operating conditions o Verify that your system and all its subsystems are functioning properly o Check that the Data Acquisition system (DAS) is working properly 2
3 Site Assessment The test site should be assessed in order to identify: The location of the meteorological tower Identify the suitable wind direction sector Estimate appropriate flow correction factors if a site calibration is required 3
4 Initial inspections Check that all components and instrumentation is accounted for Request the latest assembly and owners manual documentation and drawings Perform a safety system verification on the ground and in the air (such as a break release test) Verify the start up procedures with the manufacturer Verify all turbine dimensions and take picture of all system components 4
5 Installation Verify that the turbine tower has been stamped by a Professional Engineer for your site conditions Installation shall always be conducted by train personnel supervised by the manufacturer or turbine manufacture certified installer Verify that the electrical wiring and protection systems are comply with the latest safety standards 5
6 DAS Instrumentation Two anemometers Wind vane Power transducer/current and voltage Pressure sensor Temperature sensor Rotor speed (recommended) Turbine Status (recommended) Wetness sensor (recommended) Data logger (1 Hz or higher sampling rate) Computer 6
7 Data Acquisition system set up 7
8 Standard Data Requirements Power performance (IEC ) Section 7.3 and Annex H of Hz or higher sampling rate 1 minute data sets for small turbines Average, standard deviation, max, min Duration (IEC ) Section Hz or higher sampling rate 10 minute data sets Average and max wind speed Safety and Function (IEC ) Section 9.6 No listed requirements Noise (IEC ) 10 second averages 8
9 DAS End to End Check Purpose: To verify that the instrumentation output does not degrade on its path to the Data Logger o A table of values to inject is created for each instrument from the calibration sheet values o A signal corresponding to the operating range is injected into the signal wires for each instrument and verified at the computer/das 9
10 Test Readiness Certificate Once both the testing institution and the manufacturer agree with the commissioning, installation, and final adjustment a certificate is issued to release the turbine to the test institution to initiate the certification testing. Once the test readiness certificate is issued no further modification to the turbine system are allowed for the duration of the testing If there any updates to the system due to performance or failure, testing needs to be restarted 10
11 Data Processing Data validation is an iterative analysis There are different sources that could result in invalid data and there required different plots to visualize Reanalysis is required once invalid data is found 11
12 Data Analysis Keep a log book to help identify system errors Manually check the data quality in combined raw data files o Time series of average, min and max o Anemometer comparison o Wind speed vs. Power 12
13 Data Rejection The IEC standard provides some examples of data rejection External conditions other than wind speed are out of the operating range of the wind turbine Turbine cannot operate because of a turbine fault condition Turbine is manually shut down or in a test or maintenance operating mode Failure or degradation (e.g. due to icing) of test equipment; Wind direction outside the measurement sector Wind directions outside valid (complete) site calibration sectors. Also Failure or maintenance of the test institute s DAS 13
14 Log Book Example The log book should consist of all the annotations of events that help identify the events that could affect the quality of the data Example: February st, 13:51 Anemometer not spinning, Freezing temperatures ranging to -17 F. 4 th, 10:54 Warmer temperatures and system seem to be working properly 7 th, 9:27 Turbine found at a fault. (Under frequency) Manual Reset the fault. 21 th, 11:25 Turbine had a fault on the 19 th but reset it self after inverter routine check 22 nd, 14:35 Turbine down due to a site grid fault 23 th, 15:04 Power restored on site. Turbine restarted. 14
15 Data Analysis Examples of data plots to help visualize the data Grid Voltage vs. Time Density vs. Time Temperature vs. Time Precipitation vs. Time Wind direction vs. Time Anemometer vs. Time Primary Anemometer vs. Secondary Anemometer Anemometer Ratio vs. Time Anemometer Ratio vs. Direction Power vs. Rotor Speed Rotor Speed vs. Wind Power vs. Wind Speed 15
16 Time series Wind Speed Ratio Single Anemometer Recovered Frozen Anemometer 16
17 Wind Speed Time Series Grid Outage Frozen Anemometer 17
18 Signals Time Series Frozen Anemometer Grid Outage Turbine Fault 18
19 Power and Availability Time Series Grid Fault Turbine Fault 19
20 Power Vs. Wind Speed Scatter Plot Fault 20
21 Wind Direction Vs. Wind Speed Ratio 21
22 Anemometer comparison Scatter Plot Frozen Anemometer 22
23 Example of Power Limitation Red: maxima, Green: minima, Blue: average 23
24 Example of Rotor Speed Control Red: maxima, Green: minima, Blue: average 24
25 Power Degradation Chart 25
26 Questions Ismael Mendoza
Wind Turbine Generator System Acoustic Noise Test Report. Bergey Excel Wind Turbine
June 2003 NREL/EL-500-33833 Wind Turbine Generator System Acoustic Noise Test Report for the Bergey Excel Wind Turbine By National Wind Technology Center National Renewable Energy Laboratory 1617 Cole
More informationSite and Field Services
Site and Field www.narec.co.uk Site and Field Our specialist skills, project experience and field services equipment for conducting resource measurements, investigations and electrical testing provides
More informationIndia-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, Type Certification of Wind Turbines In India
India-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, 2009 Type Certification of Wind Turbines In India A. Senthil Kumar Standards & Certification Unit C-WET, Chennai Standards & Certification
More informationLoads Measurement and Validation of a 2.1-kW HAWT on a Fiberglass Composite Tower Scott Dana, Rick Damiani, Jeroen van Dam
Loads Measurement and Validation of a 2.1-kW HAWT on a Fiberglass Composite Tower Scott Dana, Rick Damiani, Jeroen van Dam Small Wind Conference 2016 June 13 th June 15 th Motivation Ongoing efforts to
More informationSmall Wind Turbine Electrical System Considerations
Small Wind Turbine Electrical System Considerations Presented by: Tom Buchal Senior Staff Engineer Intertek Renewables International Small Wind Association of Testers Conference Ithaca, NY April 25, 2012
More informationPossible Approaches to Turbine Structural Design
1 Possible Approaches to Turbine Structural Design Rick Damiani, Ph.D., P.E. Jeroen van Dam National Wind Technology Center NREL - 11/13/14 Turbine Design Possible Approaches It is some sort of tragedy
More informationA Guide to Design Load Validation
A Guide to Design Load Validation Holger Söker, Martina Damaschke, Deutsches Windenergie-Institut GmbH, Ebertstr. 96, D-26382 Wilhelmshaven, Germany, Tel. : +49-4421-4808 0, Fax: +49-4421-4808-43, h.soeker@dewi.de
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationOnshore Services for. Manufacturers. of Wind Turbines & Components
Onshore Services for Manufacturers of Wind Turbines & Components Research & Studies Customers benefit from our in-depth knowledge based on UL s participation in a number of stateof-the-art research projects,
More informationWILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY
WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:
More informationSafeDesign: Machine Safety Validation
SafeDesign: Machine Safety Validation Host: Steve Ludwig Rockwell Automation Safety Business Programs Manager Copyright 2010 Rockwell Automation, Inc. All rights reserved. 1 Today s Agenda 1. Review of
More informationBanyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL
SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationStandard EOP System Restoration from Blackstart Resources
A. Introduction 1. Title: System Restoration from Blackstart Resources 2. Number: EOP-005-2 3. Purpose: Ensure plans, Facilities, and personnel are prepared to enable System restoration from Blackstart
More informationIECRE OPERATIONAL DOCUMENT
IECRE OD501-4 Edition 1.0 2017-04-06 IECRE OPERATIONAL DOCUMENT IEC System for Certification to Standards relating to Equipment for use in Renewable Energy applications (IECRE System) Conformity Assessment
More informationARTICLE 16 - WIND ENERGY CONVERSION FACILITIES
ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion
More informationType and component certification of wind turbines
SERVICE SPECIFICATION DNVGL-SE-0441 Edition June 2016 Type and component certification of wind turbines The electronic pdf version of this document found through http://www.dnvgl.com is the officially
More informationGrid Code Compliance. For India S.Balasubramoniam, Senior Consultant. 08 September September 2017 SAFER, SMARTER, GREENER
Grid Code Compliance For India S.Balasubramoniam, Senior Consultant 08 September 2017 1 DNV GL 2015 08 September 2017 SAFER, SMARTER, GREENER Organized to maximise customer value MARITIME OIL & GAS ENERGY
More informationMANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS
MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION IEC TS 61400-13 First edition 2001-06 Wind turbine generator systems Part 13: Measurement of mechanical loads Aérogénérateurs Partie 13: Mesure des charges mécaniques IEC 2001 Copyright
More informationNance County Zoning Regulations for Wind Energy Conversion Systems
Nance County Zoning Regulations for Wind Energy Conversion Systems ARTICLE 1: SMALL / NON-COMMERCIAL WIND ENERGY SYSTEMS Section 1. Purpose It is the purpose of this regulation to promote safe, effective
More informationIECEE OPERATIONAL DOCUMENT
IECEE OD-G-4001 Edition 1.3 2013-06-20 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Guidance for Factory Inspectors
More information: Rodger Jeffery (Principal Author); Hardy Engineering Team; Hardy Tech Support Team
Document : AN EXPLANATION OF TRADITIONAL AND C2 CALIBRATION/VALIDATION METHODS & USE Last Revised : Q2 2017 Authors : Rodger Jeffery (Principal Author); Hardy Engineering Team; Hardy Tech Support Team
More informationTechnical Requirements for Distributed Generation Connection
Technical Requirements for Distributed Generation Connection Distributed Generation Connection Requirements SECTION 1: INTRODUCTION 1.1 General Purpose This document defines the requirements for connecting
More informationOnshore Services for. Wind Farms. Developers, Operators, Owners, Lenders & Investors
Onshore Services for Wind Farms Developers, Operators, Owners, Lenders & Investors Global Wind Energy Measurement Services All-in-One Service Provider Combining technical expertise with many years of in-depth
More informationABB drives. Technical guide no.10 Functional safety
ABB drives Technical guide no.10 Functional safety 2 Technical guide no. 10 - Functional safety ABB drives Technical guide no. 10 Functional safety 3AUA0000048753 REV D EFFECTIVE: 14.3.2011 Copyright 2011
More informationUGANDA NATIONAL BUREAU OF STANDARDS CERTIFICATION SCHEME
1. NAME AND ADDRESS OF APPLICANT Company Name Company Tax Identification Number (TIN) A. APPLICANT S INFORMATION Business Registration Please attach certificate of registration of business COMPANY ADDRESS
More informationTotal 155 files quick download in editable form by e delivery
Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document
More informationEHPA regulations for granting the international quality label for electrically driven heat pumps
EHPA regulations for granting the international quality label for electrically driven heat pumps Version 1.6 Release 16.02.17 European Heat Pump Association Rue d Arlon 63-67 B-1040 Brussels www.ehpa.org
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationWind Turbine Certification
ENERGY Wind Turbine Certification Benefits and value added Tomasz Sieradzan 1 SAFER, SMARTER, GREENER Agenda Type Certification- Introduction Purpose of Type Certification Governing and technical standards,
More informationTotal 155 files quick download in editable form by e delivery
Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document
More informationsafe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS
TITLE: GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS DOCUMENT STATUS: FINAL REVISION: DATE: 1 21 September 2015 2015 Electricity Networks Corporation trading
More informationREGULATION FOR PRODUCTION CONTROL OF PERSONAL
Page 1 of 6 INDEX 1 PURPOSE AND PREMISE... 2 2 ENTRUSTMENT OF ASSIGNMENT... 2 3 INSPECTION OPERATIONAL ACTIVITY... 2 3.1 Methodology... 2 3.1.1 Sampling... 2 3.1.2 Verifica della omogeneità della produzione...
More informationSUSTAINABLE GREEN ELECTRICITY FOR RURAL DEVELOPEMNT IN TANZANIA
RIFT VALLEY ENERGY CUSTOMER SERVICE CHARTER Page 1 of 7 RIFT VALLEY ENERGY TANZANIA 1. SERVICE DELIVERY STANDARDS Rift Valley Energy (RVE) forms the energy division of Rift Valley Corporation (RVC), and
More informationSECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS
SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and
More informationPACIFIC MARINE SERVICES
APPR No : PMS/D.A.RSP/ Date : Pages : One (7) /UAE Data Sheet for Approval of Firms Issued within the scope of the Pacific Marine Services General Conditions - Radio Service Supplier for Inspection Services
More informationNormative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products
Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products Ministry of Industry and Information Technology May 2012 Page 1 of 8 Normative
More informationPerformance Standards for Indicative Ambient Particulate Monitors Environment Agency July 2012 Version 2
Performance Standards for Indicative Ambient Particulate Monitors Environment Agency July 2012 Version 2 Foreword We set up our Monitoring Certification Scheme (MCERTS) to provide a framework of standards
More informationUSER S MANUAL 400W and 600W
USER S MANUAL 400W and 600W 1108 Summit Avenue, Suite 8 Plano, TX 75074 866-WND-PWRD www.acgreenenergy.com CONTENTS 1. WIND TURBINE INTRODUCTION 2. SITING 3. CHOOSING A SUITABLE WIND TURBINE 4. YOUR WIND
More informationCHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)
CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) SECTION: 10-28-1: Purpose 10-28-2: Application 10-28-3: Declaration of Conditions 10-28-4: Site Plan Drawing 10-28-5: Compliance with State Building Code
More informationA REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE
B E L L E Q U A N T, L L C L A U R E N S E. H O W L E, P H. D. WHALEPOWER WENVOR BLADE A REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE JANUARY 24, 2009 6 0 0 2 D I
More informationResults of the IEC Functional Safety Assessment HART transparent repeater. PR electronics
exida Certification S.A. 2 Ch. de Champ-Poury CH-1272 Genolier Switzerland Tel.: +41 22 364 14 34 email: info@exidacert.com Results of the IEC 61508 Functional Safety Assessment Project: 9106 HART transparent
More informationStandard PRC-002-NPCC-01 Disturbance Monitoring
A. Introduction 1. Title: Disturbance Monitoring 2. Number: PRC-002-NPCC-01 3. Purpose: Ensure that adequate disturbance data is available to facilitate Bulk Electric System event analyses. All references
More informationTechnical University of Moldova EMM Departament. plus. Author: Rachier Vasile. Scientific coordinator: prof. dr. ing. Sobor Ion
EMM Departament Author: Scientific coordinator: Rachier Vasile prof. dr. ing. Sobor Ion sre.utm@gmail.com, rachier.vasile@yahoo.com, http://www.energy.utm.md Chişinău 2012 The aim of the project: Integration
More informationINTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION
PLATEAU ELECTRIC COOPERATIVE INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION Policy B32 1 P a g e TABLE OF CONTENTS PAGE 1. GENERAL PROCEDURES & STANDARDS 3 1.1 Scope 1.2 Application for Interconnection
More informationCity of Walker DRAFT 1_6_09 Wind Energy Ordinance
ARTICLE XIX. SUSTAINABLE ENERGY City of Walker DRAFT 1_6_09 Wind Energy Ordinance Sec. 94-524. A. PURPOSE AND INTENT. The purpose of this Ordinance is to establish regulations for the locating, installation
More informationVaccine Management Plan
KEEP YOUR MANAGEMENT PLAN NEAR THE VACCINE STORAGE UNITS The California VFC Program requires each practice to maintain a vaccine management plan for routine and emergency situations. This template includes
More informationResults of the IEC Functional Safety Assessment
Results of the IEC 61508 Functional Safety Assessment Project: 3051S Electronic Remote Sensors (ERS ) System Customer: Emerson Automation Solutions (Rosemount, Inc.) Shakopee, MN USA Contract No.: Q16/12-041
More informationINSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL
. August 2017 were approved by Manager of Product Certification Bureau of the Polish Register of Shipping on 25 August 2017 Copyright by, 2017. GDAŃSK, AUGUST 2017 1/12 CONTENTS 1. Factory Production Control
More information1600 Currency counting machines
600 Currency counting machines user guide DE LA RUE CASH SYSTEMS SIZE AUTO CFA 0 8 9 5 6 Walton Rd, Farlington, Portsmouth Hampshire P06 ITJ Tel: + (0) 9 86 Fax: + (0) 9 58 REFERENCE- TML09 600 De La Rue
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 61400-11 Second edition 2002-12 Wind turbine generator systems Part 11: Acoustic noise measurement techniques Aérogénérateurs Partie 11: Techniques de mesure du bruit acoustique
More informationSan Roque Multi-Purpose Project
San Roque Multi-Purpose Project Accurately Metering Power Plants Using the Most Advanced Power Monitoring Available Today 1 Background: San Roque Power Corporation (SRPC) is a special-purpose company incorporated
More informationWIND ENERGY CONVERSION SYSTEMS
CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure
More informationINTRODUCTION TO ISO 14001
INTRODUCTION TO ISO 14001 An environmental management system, such as ISO 14001, is a powerful tool that can be utilized by an organization. The obvious beneficiaries are those organizations that have
More informationInstruction Manual. for. gskin U-Value Kit
Instruction Manual for gskin U-Value Kit Status: July 12, 2016 gskin U-Value KIT: Instruction Manual 1 / 10 Content 1. The gskin U-Value KIT delivery overview... 1 2. General overview of the gskin U-value
More informationProcedure: Station Power Portfolio Application
Overview Introduction FERC has established a policy that allows a single corporate entity that owns one or more Generating Units to self-supply Station Power over a monthly netting period using Energy
More informationGRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES
GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES Nils Schäfer, Dr. Gunter Arnold, Wolfram Heckmann Fraunhofer Institute for Wind Energy and Energy System Technology Kassel,
More informationComparison of Requirements ISO/TS vs. AS9100 and ISO 13485
ISO/TS 16949 vs. AS9100 and ISO 13485 Introduction If your business is starting to diversify into the Medical or Aerospace industries, your existing ISO/TS 16949 certified quality management system (QMS)
More informationMANUAL QUALITY CONTROL & QUALITY ASSURANCE
MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85
ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting
More informationPalm Beach County Project, LLC
Palm Beach County Project, LLC February 9, 2011 Agenda Introductions Wind Capital Group Four basics of a wind farm Why Florida? Environmental Process How we build a wind farm Wind Capital Group Independently
More informationDistributed Generation. Technical Requirements and Interconnection Agreements
Distributed Generation Technical Requirements and Interconnection Agreements February 2005 Table of Contents Section 1: Interconnection Process for Distributed Generation Systems (17 pages) Section 2:
More informationFacility Interconnection Requirements
Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents
More informationWastewater Flow Monitoring Services
Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,
More information9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:
SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities
More informationBaker s Pride, Model 455GDCOGN1 Gas Full-Size Convection Oven Performance Test
Baker s Pride, Model 455GDCOGN1 Gas Full-Size Convection Oven Performance Test Application of ASTM Standard Test Method F 1496-99 SCGAT060530A Energy Resource Center Downey, CA July 2006 Prepared by: The
More informationMaterion AMTS Supplier Quality Manual
Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt
More informationHP Standard Supplier Requirements for Safe and Legal Products
HP Standard 014-2 Supplier Requirements for Safe and Legal Products Document Identifier Revision and Date Last Revalidation Date Abstract Applicability Status HX-00014-02 G, This standard describes HP
More informationCity of Ottawa Street Lighting. Streetlight Brackets and Adapters
TITLE: Engineering Specification RECOMMENDED: S. Edey, NO: 1 REV: APPROVED: D. O Keefe LBS0001 OF REV. DATE: 2010-01-07 6 5 City of Ottawa Street Lighting Streetlight Brackets and Adapters For City of
More informationV MW. One turbine for one world. vestas.com
V112-3.0 MW One turbine for one world vestas.com No. 1 in Modern Energy The world needs ever-greater supplies of clean, sustainable energy. Modern energy that promotes sustainable development and greater
More informationLABORATORY MODULES FOR WIND WINDLAB FACILITY AT THE UNIVERSITY OF QUEENSLAND TURBINE EXPERIMENTS USING THE
LABORATORY MODULES FOR WIND TURBINE EXPERIMENTS USING THE WINDLAB FACILITY AT THE UNIVERSITY OF QUEENSLAND Mike Evrat and Rahul Sharma School of Information Technology and Electrical Engineering Power
More informationLesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System
Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Primary Interest Groups Balancing Authorities (BAs) Transmission Operators (TOPs) Generator Operators
More information4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:
Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationCalibration/Validation Guidance For Miller Welding Equipment
275053C 2016 12 Calibration/Validation Guidance For Miller Welding Equipment For product information, Owner s Manual translations, and more, visit www.millerwelds.com TABLE OF CONTENTS SECTION 1 INTRODUCTION...
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More information1 Workshop on Power System Testing
1 Workshop on Power System Testing DERlab/ SIRFN, 19 March 2015, 9:00 12:00 Moderators: Peter Vaessen (DNV GL), Wolfram Heckmann (Fraunhofer IWES) 1.1 Motivation Our society has become highly dependent
More informationSupplier Quality Manual
Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).
More informationEducating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours
Background The class will be delivered over a 3-day period. The class is comprised of three training modules covering the areas of: Communications, Critical Thinking, and Restoration. The course consists
More informationControlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70
Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller
More informationInvestigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration Using Frequency Response Model
Investigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration Using Frequency Response Model Jin Tan, a Yingchen Zhang, a, * Ibrahim Krad, a Vahan Gevorgian, a
More informationSOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory
More informationPRODUCT CONFORMITY CERTIFICATE
PRODUCT NFORMITY CERTIFICATE This is to certify that the G-CEM 4000 In-situ Multigas Analyser manufactured by: DEL International Ltd Station Building Station Road Bakewell Derbyshire DE45 1GE UK has been
More informationSubj: Installation and Operation of ECDIS on board Greek Vessels
Subj: Installation and Operation of ECDIS on board Greek Vessels Ref: a) IMO Res. A.817(19) as amended b) IMO Res. MSC 232(82) c) Reg. V/ 19.2.10 of SOLAS 74 as amended and in force d) IMO SN.1/Circ.266/Rev.1/
More informationPermanent Load Shifting Program
1. Program Description Permanent Load Shifting (PLS) can help reduce system peak load by storing energy produced during off-peak period and shifting electricity use from on-peak to off-peak periods on
More informationPRODUCT CONFORMITY CERTIFICATE
PRODUCT CONFORMITY CERTIFICATE This is to certify that the MCS 100E HW Multi-Component Analyser Manufactured by: SICK AG Dr Zimmermann Strasse 18 88709 Meersburg Germany Has been assessed by Sira Certification
More informationProduction Part Approval Process (PPAP)
Document ID: QN-M04 Page 1 of 13 Aerojet Rocketdyne Quality Note M04 Date: 03/16/2016 Table of Contents 1. PURPOSE... 2 2. APPLICATION... 2 2.1. Resubmissions... 2 2.2. Applicable Documents... 3 3. CONVENTIONS...
More informationThe Responsible Person AKA Technical Person with Executive Functions
Peter Roberts Explosive Atmospheres Essential Guidance Series EGS 0035 Edition 1 Supplement for the CompEx Ex 14 training course. The Responsible Person AKA Technical Person with Executive Functions ExVeritas
More informationQuality Systems Basics
Quality Systems Basics This presentation was developed by Allison Transmission Global Purchasing. All rights reserved. No part of this material may be reproduced in any form, or by any method, for any
More informationSADCAS POLICY ISO/IEC 17020:2012 TRANSITION
SADCAS POLICY ISO/IEC 17020:2012 TRANSITION Prepared by: SADCAS Approved by: SADCAS CEO Approval Date:2012 09 25 Effective Date: 2012 10 01 Page 1 of 11 Table of Contents Page 1. INTRODUCTION... 3 2. TRANSITION
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa
More informationVariations of sound from wind turbines during different weather conditions
Variations of sound from wind turbines during different weather conditions Conny Larsson 1 Olof Öhlund 2 Department of Earth Sciences, Uppsala University, Villavägen 16, SE-752 36 Uppsala, Sweden Long-term
More informationFUNCTIONAL SAFETY CERTIFICATE. Topworx, Inc 3300 Fern Valley Road, Louisville, Kentucky, 40213, USA
FUNCTIONAL SAFETY CERTIFICATE This is to certify that the GO TM switch models: 73, 74, 75, 76, 77, 7G, 7H, 7I, 7J Manufactured by Topworx, Inc 3300 Fern Valley Road, Louisville, Kentucky, 40213, USA Have
More informationNew Zealand Technical Standard Order NZTSO 2001
New Zealand Technical Standard Order NZTSO 2001 Revision 1 Time in Service Recorders 17/11/15 Published by Civil Aviation Authority PO Box 3555 WELLINGTON 6140 NEW ZEALAND Approved by Manager Aircraft
More informationSAFETY ASSESSMENT OF THE EMSLAND TRANSRAPID TEST FACILITY FOLLOWING MAJOR TECHNICAL MODIFICATIONS
SAFETY ASSESSMENT OF THE EMSLAND TRANSRAPID TEST FACILITY FOLLOWING MAJOR TECHNICAL MODIFICATIONS No. 15 Wolfgang Otto TÜV Rheinland InterTraffic GmbH ISA Independent Safety Assessment Cologne, Germany
More informationPRODUCT CONFORMITY CERTIFICATE
PRODUCT CONFORMITY CERTIFICATE This is to certify that the FLOWSIC100 Gas Flowmeter Manufactured by: SICK Engineering GmbH Bergener Ring 27 01458 Ottendorf-Okrilla Germany Has been assessed by Sira Certification
More informationPressure Control Supplier Quality Requirements Non-Metallic Seals SQ-04 Rev: 1.1
Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to
More informationCEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition
CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product
More information