1 Turbine Commissioning & Data Processing Small Wind Association of Testers Conference Ismael Mendoza April 26, 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

2 Objective To establish a sense of conformance with the manufacturer to hand over the turbine to start the testing Commissioning consist but not limited to: o Investigate that the turbine is in good operating conditions o Verify that your system and all its subsystems are functioning properly o Check that the Data Acquisition system (DAS) is working properly 2

3 Site Assessment The test site should be assessed in order to identify: The location of the meteorological tower Identify the suitable wind direction sector Estimate appropriate flow correction factors if a site calibration is required 3

4 Initial inspections Check that all components and instrumentation is accounted for Request the latest assembly and owners manual documentation and drawings Perform a safety system verification on the ground and in the air (such as a break release test) Verify the start up procedures with the manufacturer Verify all turbine dimensions and take picture of all system components 4

5 Installation Verify that the turbine tower has been stamped by a Professional Engineer for your site conditions Installation shall always be conducted by train personnel supervised by the manufacturer or turbine manufacture certified installer Verify that the electrical wiring and protection systems are comply with the latest safety standards 5

6 DAS Instrumentation Two anemometers Wind vane Power transducer/current and voltage Pressure sensor Temperature sensor Rotor speed (recommended) Turbine Status (recommended) Wetness sensor (recommended) Data logger (1 Hz or higher sampling rate) Computer 6

7 Data Acquisition system set up 7

8 Standard Data Requirements Power performance (IEC ) Section 7.3 and Annex H of Hz or higher sampling rate 1 minute data sets for small turbines Average, standard deviation, max, min Duration (IEC ) Section Hz or higher sampling rate 10 minute data sets Average and max wind speed Safety and Function (IEC ) Section 9.6 No listed requirements Noise (IEC ) 10 second averages 8

9 DAS End to End Check Purpose: To verify that the instrumentation output does not degrade on its path to the Data Logger o A table of values to inject is created for each instrument from the calibration sheet values o A signal corresponding to the operating range is injected into the signal wires for each instrument and verified at the computer/das 9

10 Test Readiness Certificate Once both the testing institution and the manufacturer agree with the commissioning, installation, and final adjustment a certificate is issued to release the turbine to the test institution to initiate the certification testing. Once the test readiness certificate is issued no further modification to the turbine system are allowed for the duration of the testing If there any updates to the system due to performance or failure, testing needs to be restarted 10

11 Data Processing Data validation is an iterative analysis There are different sources that could result in invalid data and there required different plots to visualize Reanalysis is required once invalid data is found 11

12 Data Analysis Keep a log book to help identify system errors Manually check the data quality in combined raw data files o Time series of average, min and max o Anemometer comparison o Wind speed vs. Power 12

13 Data Rejection The IEC standard provides some examples of data rejection External conditions other than wind speed are out of the operating range of the wind turbine Turbine cannot operate because of a turbine fault condition Turbine is manually shut down or in a test or maintenance operating mode Failure or degradation (e.g. due to icing) of test equipment; Wind direction outside the measurement sector Wind directions outside valid (complete) site calibration sectors. Also Failure or maintenance of the test institute s DAS 13

14 Log Book Example The log book should consist of all the annotations of events that help identify the events that could affect the quality of the data Example: February st, 13:51 Anemometer not spinning, Freezing temperatures ranging to -17 F. 4 th, 10:54 Warmer temperatures and system seem to be working properly 7 th, 9:27 Turbine found at a fault. (Under frequency) Manual Reset the fault. 21 th, 11:25 Turbine had a fault on the 19 th but reset it self after inverter routine check 22 nd, 14:35 Turbine down due to a site grid fault 23 th, 15:04 Power restored on site. Turbine restarted. 14

15 Data Analysis Examples of data plots to help visualize the data Grid Voltage vs. Time Density vs. Time Temperature vs. Time Precipitation vs. Time Wind direction vs. Time Anemometer vs. Time Primary Anemometer vs. Secondary Anemometer Anemometer Ratio vs. Time Anemometer Ratio vs. Direction Power vs. Rotor Speed Rotor Speed vs. Wind Power vs. Wind Speed 15

16 Time series Wind Speed Ratio Single Anemometer Recovered Frozen Anemometer 16

17 Wind Speed Time Series Grid Outage Frozen Anemometer 17

18 Signals Time Series Frozen Anemometer Grid Outage Turbine Fault 18

19 Power and Availability Time Series Grid Fault Turbine Fault 19

20 Power Vs. Wind Speed Scatter Plot Fault 20

21 Wind Direction Vs. Wind Speed Ratio 21

22 Anemometer comparison Scatter Plot Frozen Anemometer 22

23 Example of Power Limitation Red: maxima, Green: minima, Blue: average 23

24 Example of Rotor Speed Control Red: maxima, Green: minima, Blue: average 24

25 Power Degradation Chart 25

26 Questions Ismael Mendoza

Wind Turbine Generator System Acoustic Noise Test Report. Bergey Excel Wind Turbine

Wind Turbine Generator System Acoustic Noise Test Report. Bergey Excel Wind Turbine June 2003 NREL/EL-500-33833 Wind Turbine Generator System Acoustic Noise Test Report for the Bergey Excel Wind Turbine By National Wind Technology Center National Renewable Energy Laboratory 1617 Cole

More information

Site and Field Services

Site and Field Services Site and Field www.narec.co.uk Site and Field Our specialist skills, project experience and field services equipment for conducting resource measurements, investigations and electrical testing provides

More information

India-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, Type Certification of Wind Turbines In India

India-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, Type Certification of Wind Turbines In India India-Sri Lanka Wind Energy Knowledge Exchange Program Nov 03 06, 2009 Type Certification of Wind Turbines In India A. Senthil Kumar Standards & Certification Unit C-WET, Chennai Standards & Certification

More information

Loads Measurement and Validation of a 2.1-kW HAWT on a Fiberglass Composite Tower Scott Dana, Rick Damiani, Jeroen van Dam

Loads Measurement and Validation of a 2.1-kW HAWT on a Fiberglass Composite Tower Scott Dana, Rick Damiani, Jeroen van Dam Loads Measurement and Validation of a 2.1-kW HAWT on a Fiberglass Composite Tower Scott Dana, Rick Damiani, Jeroen van Dam Small Wind Conference 2016 June 13 th June 15 th Motivation Ongoing efforts to

More information

Small Wind Turbine Electrical System Considerations

Small Wind Turbine Electrical System Considerations Small Wind Turbine Electrical System Considerations Presented by: Tom Buchal Senior Staff Engineer Intertek Renewables International Small Wind Association of Testers Conference Ithaca, NY April 25, 2012

More information

Possible Approaches to Turbine Structural Design

Possible Approaches to Turbine Structural Design 1 Possible Approaches to Turbine Structural Design Rick Damiani, Ph.D., P.E. Jeroen van Dam National Wind Technology Center NREL - 11/13/14 Turbine Design Possible Approaches It is some sort of tragedy

More information

A Guide to Design Load Validation

A Guide to Design Load Validation A Guide to Design Load Validation Holger Söker, Martina Damaschke, Deutsches Windenergie-Institut GmbH, Ebertstr. 96, D-26382 Wilhelmshaven, Germany, Tel. : +49-4421-4808 0, Fax: +49-4421-4808-43, h.soeker@dewi.de

More information

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26 Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including

More information

Onshore Services for. Manufacturers. of Wind Turbines & Components

Onshore Services for. Manufacturers. of Wind Turbines & Components Onshore Services for Manufacturers of Wind Turbines & Components Research & Studies Customers benefit from our in-depth knowledge based on UL s participation in a number of stateof-the-art research projects,

More information

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:

More information

SafeDesign: Machine Safety Validation

SafeDesign: Machine Safety Validation SafeDesign: Machine Safety Validation Host: Steve Ludwig Rockwell Automation Safety Business Programs Manager Copyright 2010 Rockwell Automation, Inc. All rights reserved. 1 Today s Agenda 1. Review of

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Standard EOP System Restoration from Blackstart Resources

Standard EOP System Restoration from Blackstart Resources A. Introduction 1. Title: System Restoration from Blackstart Resources 2. Number: EOP-005-2 3. Purpose: Ensure plans, Facilities, and personnel are prepared to enable System restoration from Blackstart

More information

IECRE OPERATIONAL DOCUMENT

IECRE OPERATIONAL DOCUMENT IECRE OD501-4 Edition 1.0 2017-04-06 IECRE OPERATIONAL DOCUMENT IEC System for Certification to Standards relating to Equipment for use in Renewable Energy applications (IECRE System) Conformity Assessment

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

Type and component certification of wind turbines

Type and component certification of wind turbines SERVICE SPECIFICATION DNVGL-SE-0441 Edition June 2016 Type and component certification of wind turbines The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

Grid Code Compliance. For India S.Balasubramoniam, Senior Consultant. 08 September September 2017 SAFER, SMARTER, GREENER

Grid Code Compliance. For India S.Balasubramoniam, Senior Consultant. 08 September September 2017 SAFER, SMARTER, GREENER Grid Code Compliance For India S.Balasubramoniam, Senior Consultant 08 September 2017 1 DNV GL 2015 08 September 2017 SAFER, SMARTER, GREENER Organized to maximise customer value MARITIME OIL & GAS ENERGY

More information

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 61400-13 First edition 2001-06 Wind turbine generator systems Part 13: Measurement of mechanical loads Aérogénérateurs Partie 13: Mesure des charges mécaniques IEC 2001 Copyright

More information

Nance County Zoning Regulations for Wind Energy Conversion Systems

Nance County Zoning Regulations for Wind Energy Conversion Systems Nance County Zoning Regulations for Wind Energy Conversion Systems ARTICLE 1: SMALL / NON-COMMERCIAL WIND ENERGY SYSTEMS Section 1. Purpose It is the purpose of this regulation to promote safe, effective

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-G-4001 Edition 1.3 2013-06-20 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Guidance for Factory Inspectors

More information

: Rodger Jeffery (Principal Author); Hardy Engineering Team; Hardy Tech Support Team

: Rodger Jeffery (Principal Author); Hardy Engineering Team; Hardy Tech Support Team Document : AN EXPLANATION OF TRADITIONAL AND C2 CALIBRATION/VALIDATION METHODS & USE Last Revised : Q2 2017 Authors : Rodger Jeffery (Principal Author); Hardy Engineering Team; Hardy Tech Support Team

More information

Technical Requirements for Distributed Generation Connection

Technical Requirements for Distributed Generation Connection Technical Requirements for Distributed Generation Connection Distributed Generation Connection Requirements SECTION 1: INTRODUCTION 1.1 General Purpose This document defines the requirements for connecting

More information

Onshore Services for. Wind Farms. Developers, Operators, Owners, Lenders & Investors

Onshore Services for. Wind Farms. Developers, Operators, Owners, Lenders & Investors Onshore Services for Wind Farms Developers, Operators, Owners, Lenders & Investors Global Wind Energy Measurement Services All-in-One Service Provider Combining technical expertise with many years of in-depth

More information

ABB drives. Technical guide no.10 Functional safety

ABB drives. Technical guide no.10 Functional safety ABB drives Technical guide no.10 Functional safety 2 Technical guide no. 10 - Functional safety ABB drives Technical guide no. 10 Functional safety 3AUA0000048753 REV D EFFECTIVE: 14.3.2011 Copyright 2011

More information

UGANDA NATIONAL BUREAU OF STANDARDS CERTIFICATION SCHEME

UGANDA NATIONAL BUREAU OF STANDARDS CERTIFICATION SCHEME 1. NAME AND ADDRESS OF APPLICANT Company Name Company Tax Identification Number (TIN) A. APPLICANT S INFORMATION Business Registration Please attach certificate of registration of business COMPANY ADDRESS

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

EHPA regulations for granting the international quality label for electrically driven heat pumps

EHPA regulations for granting the international quality label for electrically driven heat pumps EHPA regulations for granting the international quality label for electrically driven heat pumps Version 1.6 Release 16.02.17 European Heat Pump Association Rue d Arlon 63-67 B-1040 Brussels www.ehpa.org

More information

Quality Management System

Quality Management System Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material

More information

Wind Turbine Certification

Wind Turbine Certification ENERGY Wind Turbine Certification Benefits and value added Tomasz Sieradzan 1 SAFER, SMARTER, GREENER Agenda Type Certification- Introduction Purpose of Type Certification Governing and technical standards,

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

safe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS

safe reliable affordable GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS 1 21 September 2015 TITLE: PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS TITLE: GENERATOR COMPLIANCE MONITORING PROGRAM REQUIREMENTS PREPARED BY: SYSTEM ANALYSIS & SOLUTIONS DOCUMENT STATUS: FINAL REVISION: DATE: 1 21 September 2015 2015 Electricity Networks Corporation trading

More information

REGULATION FOR PRODUCTION CONTROL OF PERSONAL

REGULATION FOR PRODUCTION CONTROL OF PERSONAL Page 1 of 6 INDEX 1 PURPOSE AND PREMISE... 2 2 ENTRUSTMENT OF ASSIGNMENT... 2 3 INSPECTION OPERATIONAL ACTIVITY... 2 3.1 Methodology... 2 3.1.1 Sampling... 2 3.1.2 Verifica della omogeneità della produzione...

More information

SUSTAINABLE GREEN ELECTRICITY FOR RURAL DEVELOPEMNT IN TANZANIA

SUSTAINABLE GREEN ELECTRICITY FOR RURAL DEVELOPEMNT IN TANZANIA RIFT VALLEY ENERGY CUSTOMER SERVICE CHARTER Page 1 of 7 RIFT VALLEY ENERGY TANZANIA 1. SERVICE DELIVERY STANDARDS Rift Valley Energy (RVE) forms the energy division of Rift Valley Corporation (RVC), and

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

PACIFIC MARINE SERVICES

PACIFIC MARINE SERVICES APPR No : PMS/D.A.RSP/ Date : Pages : One (7) /UAE Data Sheet for Approval of Firms Issued within the scope of the Pacific Marine Services General Conditions - Radio Service Supplier for Inspection Services

More information

Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products

Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products Normative Document on Enterprise Declaration of Conformity on the Pollution Control of Electrical and Electronic Products Ministry of Industry and Information Technology May 2012 Page 1 of 8 Normative

More information

Performance Standards for Indicative Ambient Particulate Monitors Environment Agency July 2012 Version 2

Performance Standards for Indicative Ambient Particulate Monitors Environment Agency July 2012 Version 2 Performance Standards for Indicative Ambient Particulate Monitors Environment Agency July 2012 Version 2 Foreword We set up our Monitoring Certification Scheme (MCERTS) to provide a framework of standards

More information

USER S MANUAL 400W and 600W

USER S MANUAL 400W and 600W USER S MANUAL 400W and 600W 1108 Summit Avenue, Suite 8 Plano, TX 75074 866-WND-PWRD www.acgreenenergy.com CONTENTS 1. WIND TURBINE INTRODUCTION 2. SITING 3. CHOOSING A SUITABLE WIND TURBINE 4. YOUR WIND

More information

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) SECTION: 10-28-1: Purpose 10-28-2: Application 10-28-3: Declaration of Conditions 10-28-4: Site Plan Drawing 10-28-5: Compliance with State Building Code

More information

A REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE

A REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE B E L L E Q U A N T, L L C L A U R E N S E. H O W L E, P H. D. WHALEPOWER WENVOR BLADE A REPORT ON THE EFFICIENCY OF A WHALEPOWER CORP. 5 METER PROTOTYPE WIND TURBINE BLADE JANUARY 24, 2009 6 0 0 2 D I

More information

Results of the IEC Functional Safety Assessment HART transparent repeater. PR electronics

Results of the IEC Functional Safety Assessment HART transparent repeater. PR electronics exida Certification S.A. 2 Ch. de Champ-Poury CH-1272 Genolier Switzerland Tel.: +41 22 364 14 34 email: info@exidacert.com Results of the IEC 61508 Functional Safety Assessment Project: 9106 HART transparent

More information

Standard PRC-002-NPCC-01 Disturbance Monitoring

Standard PRC-002-NPCC-01 Disturbance Monitoring A. Introduction 1. Title: Disturbance Monitoring 2. Number: PRC-002-NPCC-01 3. Purpose: Ensure that adequate disturbance data is available to facilitate Bulk Electric System event analyses. All references

More information

Technical University of Moldova EMM Departament. plus. Author: Rachier Vasile. Scientific coordinator: prof. dr. ing. Sobor Ion

Technical University of Moldova EMM Departament. plus. Author: Rachier Vasile. Scientific coordinator: prof. dr. ing. Sobor Ion EMM Departament Author: Scientific coordinator: Rachier Vasile prof. dr. ing. Sobor Ion sre.utm@gmail.com, rachier.vasile@yahoo.com, http://www.energy.utm.md Chişinău 2012 The aim of the project: Integration

More information

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION PLATEAU ELECTRIC COOPERATIVE INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION Policy B32 1 P a g e TABLE OF CONTENTS PAGE 1. GENERAL PROCEDURES & STANDARDS 3 1.1 Scope 1.2 Application for Interconnection

More information

City of Walker DRAFT 1_6_09 Wind Energy Ordinance

City of Walker DRAFT 1_6_09 Wind Energy Ordinance ARTICLE XIX. SUSTAINABLE ENERGY City of Walker DRAFT 1_6_09 Wind Energy Ordinance Sec. 94-524. A. PURPOSE AND INTENT. The purpose of this Ordinance is to establish regulations for the locating, installation

More information

Vaccine Management Plan

Vaccine Management Plan KEEP YOUR MANAGEMENT PLAN NEAR THE VACCINE STORAGE UNITS The California VFC Program requires each practice to maintain a vaccine management plan for routine and emergency situations. This template includes

More information

Results of the IEC Functional Safety Assessment

Results of the IEC Functional Safety Assessment Results of the IEC 61508 Functional Safety Assessment Project: 3051S Electronic Remote Sensors (ERS ) System Customer: Emerson Automation Solutions (Rosemount, Inc.) Shakopee, MN USA Contract No.: Q16/12-041

More information

INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL

INSTRUCTIONS FOR CERTIFICATION OF FACTORY PRODUCTION CONTROL . August 2017 were approved by Manager of Product Certification Bureau of the Polish Register of Shipping on 25 August 2017 Copyright by, 2017. GDAŃSK, AUGUST 2017 1/12 CONTENTS 1. Factory Production Control

More information

1600 Currency counting machines

1600 Currency counting machines 600 Currency counting machines user guide DE LA RUE CASH SYSTEMS SIZE AUTO CFA 0 8 9 5 6 Walton Rd, Farlington, Portsmouth Hampshire P06 ITJ Tel: + (0) 9 86 Fax: + (0) 9 58 REFERENCE- TML09 600 De La Rue

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61400-11 Second edition 2002-12 Wind turbine generator systems Part 11: Acoustic noise measurement techniques Aérogénérateurs Partie 11: Techniques de mesure du bruit acoustique

More information

San Roque Multi-Purpose Project

San Roque Multi-Purpose Project San Roque Multi-Purpose Project Accurately Metering Power Plants Using the Most Advanced Power Monitoring Available Today 1 Background: San Roque Power Corporation (SRPC) is a special-purpose company incorporated

More information

WIND ENERGY CONVERSION SYSTEMS

WIND ENERGY CONVERSION SYSTEMS CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure

More information

INTRODUCTION TO ISO 14001

INTRODUCTION TO ISO 14001 INTRODUCTION TO ISO 14001 An environmental management system, such as ISO 14001, is a powerful tool that can be utilized by an organization. The obvious beneficiaries are those organizations that have

More information

Instruction Manual. for. gskin U-Value Kit

Instruction Manual. for. gskin U-Value Kit Instruction Manual for gskin U-Value Kit Status: July 12, 2016 gskin U-Value KIT: Instruction Manual 1 / 10 Content 1. The gskin U-Value KIT delivery overview... 1 2. General overview of the gskin U-value

More information

Procedure: Station Power Portfolio Application

Procedure: Station Power Portfolio Application Overview Introduction FERC has established a policy that allows a single corporate entity that owns one or more Generating Units to self-supply Station Power over a monthly netting period using Energy

More information

GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES

GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES GRID CODE COMPLIANCE TESTING OF RENEWABLES NEW REQUIREMENTS AND TESTING EXPERIENCES Nils Schäfer, Dr. Gunter Arnold, Wolfram Heckmann Fraunhofer Institute for Wind Energy and Energy System Technology Kassel,

More information

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485

Comparison of Requirements ISO/TS vs. AS9100 and ISO 13485 ISO/TS 16949 vs. AS9100 and ISO 13485 Introduction If your business is starting to diversify into the Medical or Aerospace industries, your existing ISO/TS 16949 certified quality management system (QMS)

More information

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

MANUAL QUALITY CONTROL & QUALITY ASSURANCE MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting

More information

Palm Beach County Project, LLC

Palm Beach County Project, LLC Palm Beach County Project, LLC February 9, 2011 Agenda Introductions Wind Capital Group Four basics of a wind farm Why Florida? Environmental Process How we build a wind farm Wind Capital Group Independently

More information

Distributed Generation. Technical Requirements and Interconnection Agreements

Distributed Generation. Technical Requirements and Interconnection Agreements Distributed Generation Technical Requirements and Interconnection Agreements February 2005 Table of Contents Section 1: Interconnection Process for Distributed Generation Systems (17 pages) Section 2:

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

Baker s Pride, Model 455GDCOGN1 Gas Full-Size Convection Oven Performance Test

Baker s Pride, Model 455GDCOGN1 Gas Full-Size Convection Oven Performance Test Baker s Pride, Model 455GDCOGN1 Gas Full-Size Convection Oven Performance Test Application of ASTM Standard Test Method F 1496-99 SCGAT060530A Energy Resource Center Downey, CA July 2006 Prepared by: The

More information

Materion AMTS Supplier Quality Manual

Materion AMTS Supplier Quality Manual Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt

More information

HP Standard Supplier Requirements for Safe and Legal Products

HP Standard Supplier Requirements for Safe and Legal Products HP Standard 014-2 Supplier Requirements for Safe and Legal Products Document Identifier Revision and Date Last Revalidation Date Abstract Applicability Status HX-00014-02 G, This standard describes HP

More information

City of Ottawa Street Lighting. Streetlight Brackets and Adapters

City of Ottawa Street Lighting. Streetlight Brackets and Adapters TITLE: Engineering Specification RECOMMENDED: S. Edey, NO: 1 REV: APPROVED: D. O Keefe LBS0001 OF REV. DATE: 2010-01-07 6 5 City of Ottawa Street Lighting Streetlight Brackets and Adapters For City of

More information

V MW. One turbine for one world. vestas.com

V MW. One turbine for one world. vestas.com V112-3.0 MW One turbine for one world vestas.com No. 1 in Modern Energy The world needs ever-greater supplies of clean, sustainable energy. Modern energy that promotes sustainable development and greater

More information

LABORATORY MODULES FOR WIND WINDLAB FACILITY AT THE UNIVERSITY OF QUEENSLAND TURBINE EXPERIMENTS USING THE

LABORATORY MODULES FOR WIND WINDLAB FACILITY AT THE UNIVERSITY OF QUEENSLAND TURBINE EXPERIMENTS USING THE LABORATORY MODULES FOR WIND TURBINE EXPERIMENTS USING THE WINDLAB FACILITY AT THE UNIVERSITY OF QUEENSLAND Mike Evrat and Rahul Sharma School of Information Technology and Electrical Engineering Power

More information

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System

Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Lesson Learned Loss of Wind Turbines due to Transient Voltage Disturbances on the Bulk Transmission System Primary Interest Groups Balancing Authorities (BAs) Transmission Operators (TOPs) Generator Operators

More information

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to: Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

Calibration/Validation Guidance For Miller Welding Equipment

Calibration/Validation Guidance For Miller Welding Equipment 275053C 2016 12 Calibration/Validation Guidance For Miller Welding Equipment For product information, Owner s Manual translations, and more, visit www.millerwelds.com TABLE OF CONTENTS SECTION 1 INTRODUCTION...

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

1 Workshop on Power System Testing

1 Workshop on Power System Testing 1 Workshop on Power System Testing DERlab/ SIRFN, 19 March 2015, 9:00 12:00 Moderators: Peter Vaessen (DNV GL), Wolfram Heckmann (Fraunhofer IWES) 1.1 Motivation Our society has become highly dependent

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).

More information

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours Background The class will be delivered over a 3-day period. The class is comprised of three training modules covering the areas of: Communications, Critical Thinking, and Restoration. The course consists

More information

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70 RUSSTECH PURCHASE ORDER CLAUSES RPOC 1000 EARLY DELIVERY OK "Time is of the essence for performance under this Purchase Order. Seller

More information

Investigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration Using Frequency Response Model

Investigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration Using Frequency Response Model Investigating Power System Primary and Secondary Reserve Interaction under High Wind Power Penetration Using Frequency Response Model Jin Tan, a Yingchen Zhang, a, * Ibrahim Krad, a Vahan Gevorgian, a

More information

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT NFORMITY CERTIFICATE This is to certify that the G-CEM 4000 In-situ Multigas Analyser manufactured by: DEL International Ltd Station Building Station Road Bakewell Derbyshire DE45 1GE UK has been

More information

Subj: Installation and Operation of ECDIS on board Greek Vessels

Subj: Installation and Operation of ECDIS on board Greek Vessels Subj: Installation and Operation of ECDIS on board Greek Vessels Ref: a) IMO Res. A.817(19) as amended b) IMO Res. MSC 232(82) c) Reg. V/ 19.2.10 of SOLAS 74 as amended and in force d) IMO SN.1/Circ.266/Rev.1/

More information

Permanent Load Shifting Program

Permanent Load Shifting Program 1. Program Description Permanent Load Shifting (PLS) can help reduce system peak load by storing energy produced during off-peak period and shifting electricity use from on-peak to off-peak periods on

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT CONFORMITY CERTIFICATE This is to certify that the MCS 100E HW Multi-Component Analyser Manufactured by: SICK AG Dr Zimmermann Strasse 18 88709 Meersburg Germany Has been assessed by Sira Certification

More information

Production Part Approval Process (PPAP)

Production Part Approval Process (PPAP) Document ID: QN-M04 Page 1 of 13 Aerojet Rocketdyne Quality Note M04 Date: 03/16/2016 Table of Contents 1. PURPOSE... 2 2. APPLICATION... 2 2.1. Resubmissions... 2 2.2. Applicable Documents... 3 3. CONVENTIONS...

More information

The Responsible Person AKA Technical Person with Executive Functions

The Responsible Person AKA Technical Person with Executive Functions Peter Roberts Explosive Atmospheres Essential Guidance Series EGS 0035 Edition 1 Supplement for the CompEx Ex 14 training course. The Responsible Person AKA Technical Person with Executive Functions ExVeritas

More information

Quality Systems Basics

Quality Systems Basics Quality Systems Basics This presentation was developed by Allison Transmission Global Purchasing. All rights reserved. No part of this material may be reproduced in any form, or by any method, for any

More information

SADCAS POLICY ISO/IEC 17020:2012 TRANSITION

SADCAS POLICY ISO/IEC 17020:2012 TRANSITION SADCAS POLICY ISO/IEC 17020:2012 TRANSITION Prepared by: SADCAS Approved by: SADCAS CEO Approval Date:2012 09 25 Effective Date: 2012 10 01 Page 1 of 11 Table of Contents Page 1. INTRODUCTION... 3 2. TRANSITION

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa

More information

Variations of sound from wind turbines during different weather conditions

Variations of sound from wind turbines during different weather conditions Variations of sound from wind turbines during different weather conditions Conny Larsson 1 Olof Öhlund 2 Department of Earth Sciences, Uppsala University, Villavägen 16, SE-752 36 Uppsala, Sweden Long-term

More information

FUNCTIONAL SAFETY CERTIFICATE. Topworx, Inc 3300 Fern Valley Road, Louisville, Kentucky, 40213, USA

FUNCTIONAL SAFETY CERTIFICATE. Topworx, Inc 3300 Fern Valley Road, Louisville, Kentucky, 40213, USA FUNCTIONAL SAFETY CERTIFICATE This is to certify that the GO TM switch models: 73, 74, 75, 76, 77, 7G, 7H, 7I, 7J Manufactured by Topworx, Inc 3300 Fern Valley Road, Louisville, Kentucky, 40213, USA Have

More information

New Zealand Technical Standard Order NZTSO 2001

New Zealand Technical Standard Order NZTSO 2001 New Zealand Technical Standard Order NZTSO 2001 Revision 1 Time in Service Recorders 17/11/15 Published by Civil Aviation Authority PO Box 3555 WELLINGTON 6140 NEW ZEALAND Approved by Manager Aircraft

More information

SAFETY ASSESSMENT OF THE EMSLAND TRANSRAPID TEST FACILITY FOLLOWING MAJOR TECHNICAL MODIFICATIONS

SAFETY ASSESSMENT OF THE EMSLAND TRANSRAPID TEST FACILITY FOLLOWING MAJOR TECHNICAL MODIFICATIONS SAFETY ASSESSMENT OF THE EMSLAND TRANSRAPID TEST FACILITY FOLLOWING MAJOR TECHNICAL MODIFICATIONS No. 15 Wolfgang Otto TÜV Rheinland InterTraffic GmbH ISA Independent Safety Assessment Cologne, Germany

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT CONFORMITY CERTIFICATE This is to certify that the FLOWSIC100 Gas Flowmeter Manufactured by: SICK Engineering GmbH Bergener Ring 27 01458 Ottendorf-Okrilla Germany Has been assessed by Sira Certification

More information

Pressure Control Supplier Quality Requirements Non-Metallic Seals SQ-04 Rev: 1.1

Pressure Control Supplier Quality Requirements Non-Metallic Seals SQ-04 Rev: 1.1 Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to

More information

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition

CEN Keymark Scheme Rules for Thermostatic Radiator Valves. 2 nd Edition CEN Keymark Scheme Rules for Thermostatic Radiator Valves 2 nd Edition Content Foreword... 3 Introduction... 3 1 Scope... 4 2 References... 4 3 Terms and Definitions... 4 4 Application... 5 4.1 Product

More information