Republic of the Philippines

Size: px
Start display at page:

Download "Republic of the Philippines"

Transcription

1 Republic of the Philippines Department of Environment and Natural Resource ENVIRONMENTAL MANAGEMENT BUREAU Greenplains Subdivision, Banilad, Mandaue City Telephone No.(032) Fax No.(032) Visit us at April 11, 2018 ECC-OL-R Mr. Juan C. Dy, Jr. President Unit 804 Future Point Panay Ave., Quezon City Subject: ENVIRONMENTAL COMPLIANCE CERTIFICATE Dear Sir/Madam; This refers to the (ECC) application for the 15-Storey Commercial Building to be located at Ayala Business Park, Leyte Loop, Cebu City, Cebu. After satisfying the requirements of the said application, this Bureau has decided to grant an ECC for the above-mentioned project. Along with the issuance of this ECC, you are expected to implement the measures presented in the Initial Environmental Examination Checklist (IEEC). This is intended to protect and mitigate the project s adverse impacts on community health, welfare, and the environment. Environmental considerations shall be incorporated in all phases and aspects of this project. This Certificate does not create any right, nor be used as an authorization to implement the project. Hence, you are hereby directed to secure all the necessary permits from other pertinent government agencies, but not limited to the enumeration as stated in Annex B. Thereafter, submit the same to this Office for the issuance of notice of project implementation prior to any construction activities. You may proceed with the implementation only after securing all the necessary and relevant permits from other pertinent Government Agencies. This Office shall be monitoring the project periodically to ensure strict compliance with the stipulations cited in the attached ECC. Please be guided accordingly. Engr. William P. Cuñado Regional Director

2 Republic of the Philippines Department of Environment and Natural Resource ENVIRONMENTAL MANAGEMENT BUREAU Greenplains Subdivision, Banilad, Mandaue City Telephone No.(032) Fax No.(032) Visit us at ENVIRONMENTAL COMPLIANCE CERTIFICATE (Issued under Presidential Decree 1586) ECC-OL-R THIS IS TO CERTIFY THAT THE PROPONENT, MDC TOTAL MOMENTUM INC., represented by its President, Mr. Juan C. Dy, Jr., is granted this (ECC), for the 15-STOREY COMMERCIAL BUILDING located in, by the Department of Environment and Natural Resources (DENR), through the Environmental Management Bureau (EMB). SUBJECT ONLY to the conditions and restrictions set in this ECC and in the attached document labelled as Annexes A and B. This Certificate is issued with the following details: PROJECT DESCRIPTION The ECC covers the proposed 15-STOREY COMMERCIAL BUILDING with a land area of Six Hundred Ninety (690) square meters and Total Project/Building Footprint Area of Eleven Thousand Six Hundred Forty One (11,641) square meters to be located in Ayala Business Park, Leyte Loop Cebu City, Cebu, Region R07 with geographical coordinates of N Latitude and E Longitude. PROJECT COMPONENTS 1. Fifty Three (53) Units Office and Business Process Outsourcing - Six Thousand Four Hundred Seventy point Fifteen (6,470.15) square meters; 2. 2nd, 3rd and 5th Floor Parking Area - Two Thousand Two Hundred Twenty Six point Sixty Two (2,226.62) square meters; 3. Landscape Area & Open Space - One Thousand Nine Hundred Thirty Four point Sixty Six (1,934.66) square meters; 4. Transformer Room - Twenty Eight point Twenty Three (28.23) square meters; 5. Workers Barracks - Fifty (50) square meters; 6. Guard House - One point Eight (1.8) square meters; 7. Cistern Utility Area - Forty Seven point Ninety Five (47.95) square meters; 8. Genset Room - Forty Three point Sixty Eight (43.68) square meters; 9. Meter Center - Seventeen point Ninety Five (17.95) square meters; 10. Pipe Chase - One point Sixty Seven (1.67) square meters; 11. Thirteen (13) Units Main Stair 1 - One Hundred Eighty Seven point Ninety Two (187.92) square meters;

3 12. Eight (8) Units Fire Exit Stair 1 - One Hundred Forty Eight point Sixteen (148.16) square meters; 13. Eight (8) Units Electrical and Electronic Room - Thirty Four point Forty Eight (34.48) square meters; 14. Eight (8) Units Accu Deck - One Hundred Fifty Nine point Zero Four (159.04) square meters; 15. Ten (10) Units Comfort Rooms - One Hundred Eighty Six point Sixty One (186.61) square meters; 16. Nine (9) Units Electronic Rooms - Nine point Forty Five (9.45) square meters; 17. Three (3) Units Telecommunications Rooms - Thirty point Eighty Six (30.86) square meters; 18. Primary Wastewater Catchment (zero-discharge to public drainage or to any nearby waterbodies; discharge directed to the centralized Ayala Business Park Sewage Treatment Plant) Twenty Four (24) square meters; 19. Materials Recovery Facility (composting inside the project site, re-usable and recyclable materials will be sold to third party scrap buyers, adapt zero-waste disposal scheme) Four point Five (4.5) square meters and solid waste capacity of Five point Twenty Five (5.25) cubic meters; 20. Rainwater Cistern (rainwater harvesting for watering greeneries and other purposes) Thirty Three point Twenty Seven (33.27) square meters with a capacity of Seventeen Thousand (17,000) gallons; This Certificate is issued in compliance with the requirements of Presidential Decree No. 1586, and in accordance to DENR Administrative Order (D.A.O.) No Non-compliance with any of the provisions of this Certificate shall be a sufficient cause for the cancellation of this Certificate and/or imposition of a fine in an amount not to exceed Fifty Thousand Pesos (P50, ) for every violation thereof without prejudice to imposition of fines and penalties under other environmental laws. The EMB, however, is not precluded from reevaluating and correcting any deficiencies or errors that may be found after issuance of this Certificate. Issued at EMB-R07, Greenplains Subdivision, Banilad, Mandaue City this April 11, Recommending Approval: Engr. Ranzel A. Dioko OIC-Chief, Clearance & Permitting Division Approved: Engr. William P. Cuñado Regional Director

4 ACCOUNTABILITY STATEMENT I, Mr. Juan C. Dy, Jr., President, representing with office address located in Unit 804 Future Point Panay Ave., Quezon City takes full responsibility in complying with all conditions in this Environmental Compliance Certificate (ECC) relative to the 15-Storey Commercial Building in Ayala Business Park, Leyte Loop, Cebu City. Mr. Juan C. Dy, Jr. Signature TIN No. Subscribed and sworn before me this, the above-named affiant taking oath presenting, issued on at. Notary Public Doc. No. Page No. Book No. Series of

5 I. CONDITIONS Annex A ENVIRONMENTAL MANAGEMENT All commitments, mitigating measures and monitoring requirements, contained in the Initial Environmental Examination Checklist Report for the proposed (15-Storey Commercial Building), particularly in the Environmental Management Plan/ Environmental Monitoring Plan, including any modifications and/or additional information as approved by the EMB, shall be instituted to minimize any adverse impact of the project to the environment throughout its implementation, which shall include among others to wit: 1. Conduct an effective Information, Education and Communication (IEC) Program to inform and educate all stakeholders, especially its contractors, workers, and local residents about the mitigating measures embodied in its IEEC, the conditions stipulated in this Certificate and the environmental and human safety features of the project for greater awareness, understanding and sustained acceptance of the project. The program shall be submitted to EMB Regional Office on an annual basis; 2. Implement a Comprehensive Social Development Program (SDP) and submit a separate report together with the Compliance Monitoring Report (CMR) to the EMB RO on a semi-annual basis; 3. No cutting down of trees during project implementation, however, when clearing an area is unavoidable, a Tree Cutting Permit must be secured for affected trees from DENR-CENRO concerned, or earth-balled and transferred elsewhere per CENRO recommendation without prejudice to the filing of criminal complaint in consonance to the Presidential Decree (PD) 705, Executive Order (EO) 23 and other existing forestry laws, rules and regulations. Necessary documents such as clearance from the Secretary, balling permit etc., must be secured prior to the implementation of the project; 4. Establishment of a reforestation program using endemic/indigenous species to mitigate greenhouse gas (GHG) emissions of the project in line with the DENR s thrust for GHG emissions reduction programs and National Greening Program. The proponent shall establish a nursery program for the seedling production of One Hundred Seventy Three (173) in support to the Green Philippines Master Plan which will be utilized for tree planting activities. The proponent shall likewise submit an approved work and financial program (WFP) for the tree planting activities after one (1) month from the receipt of the approved ECC as well as an affidavit of execution by the proponent for the tree planting activities. However, if tree planting activities will be conducted by the 3rd party organization, the proponent shall submit copy of MOA between their 3rd party organization. As proof of compliance, geotagged pictures of the tree planting area and CENRO Certification should be secured and submitted to this Office accordingly;

6 5. Establishment of carbon sink programs such as the use of biochar to mitigate greenhouse gas (GHG) emission of the project in line with the DENR s thrust for GHG emission reduction programs; GENERAL CONDITIONS 6. The plant operations shall conform with the following provisions: a. RA 6969 (Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990); b. RA 8749 (Philippine Clean Air Act of 1999); c. RA 9003 (Ecological Solid Waste Management Act of 2000); d. RA 9275 (Philippine Clean Water Act of 2004); and e. Other relevant policies, rules and regulations such as stated in Annex B; 7. That a Material Recovery Facility (MRF) should be constructed within the project area within ninety (90) days from receipt of this Certificate. The MRF should accommodate the 5.25 cu.m. of solid waste generated from the subdivision operation. Composts shall be utilized as soil conditioner or fertilizer and recyclable materials shall be collected by private contractor. A zero waste management scheme shall be adapted to minimize disposal of garbage to LGU s disposal site; 8. The proponent should establish a Primary Wastewater Catchment within six (6) months from receipt of this Certificate to serve as holding tank for the wastewater generated and the effluent should be directed to the centralized sewage treatment of Ayala Business Park; 9. The proponent should establish a cistern tank or rainwater catchment with a a capacity of 17,000 gallons within ninety (90) days from receipt of this Certificate and rainwater collected shall be utilized for flushing toilets and plant watering to prevent storm run-off water overflowing to nearby areas or road networks; 10. The sludge generated from the WTF/septic vaults shall not be disposed of to any water body or public drainage. The proponent shall provide adequate treatment of sludge generated from the WTF/septic vaults or hire a third party treater for hauling and treatment of generated sludge. If the sludge will be treated thru a 3rd party treater, a MOA between the proponent and the third party treater shall be submitted to EMB7 before project operation and a Certificate of Treatment (COT) shall likewise be submitted within one (1) week after each hauling event. If the sludge will be treated onsite, disposal of sludge to any water body shall still be avoided, but instead same be used as fertilizer or soil conditioner or any other purpose as long as it will not cause any negative environmental impacts; 11. The proponent should ensure that whatever declared in the attached Site Development Plan (SDP) will be followed and implemented, especially the prescribed Wastewater Treatment Facility, Material Recovery Facility, Cistern Tank, Drainage System, and etc.. In case of change in engineering designs, the proponent should apply an amendment of the approved ECC based on the final and approved engineering designs prior project's implementation;

7 12. Creation of an Environmental Unit (EU) within sixty (60) days from issuance of this Certificate that shall competently handle the environment-related aspects of the project. In addition to the monitoring requirements as specified in the Environmental Management Plan/ Environmental Monitoring Plan, the EU shall have the following responsibilities: a. Monitor actual project impacts vis-à-vis the predicted impacts and management measures in the IEEC; b. Recommend revisions to the EMP/EMoP, whenever necessary subject to the approval of EMB RO; c. Ensure that data gathered during monitoring activities are properly documented, assessed, evaluated and reported to EMB in accordance with the standard formats; and, d. Ensure that monitoring and submissions of reports to EMB are carried out as required; 13. That a 2' x 4' billboard containing this message: Notice to the Public, This project (title of the project) of (Name of the proponent) has been issued an (ECC Number) by the Environmental Management Bureau of the Department of Environment and Natural Resources, Region VII. The billboard must be installed at all entry and exit points of the project facing the road to inform the general public before project implementation. A copy of the certificate shall also be posted by the Proponent at the barangay bulletin board of the affected barangays within thirty (30) days upon receipt hereof. An accomplishment report which shall be include picture verification of compliance to the posting of notices and the billboards shall be submitted to this Office within ninety (90) days from receipt of the ECC. The proponent shall provide copies of this Approved ECC to the following government agencies, to wit: DENR7-PENRO, DENR7-CENRO, DENR7-LMB, DENR-MGB, PENRO-Cebu Capitol, HLURB 7, DOH 7, DOLE 7, and LGUs concerned; 14. The proponent should allow entry of EMB-7 field personnel into the project site at all times to conduct tangible monitoring and to validate project s compliance to the ECC conditions stipulated therein; II. RESTRICTIONS 15. The proponent should secure a Notice to Proceed prior to project implementation of which requires the proponent to submit all necessary permits from other pertinent government agencies but not limited to as stated in Annex B, such as the following; Building Permit, Locational Clearance/Variance, DOLE, LGU Permits, DOH Permit, Tree Cutting Permit, CENRO Permit, EGGAR, Philippine Coconut Authority (PCA) Permit, and other applicable Environmental and Sanitation Permits among others, is required. No activity shall be conducted by the proponent at the project area without a Notice to Proceed from this Office; 16. No activities shall be undertaken other than what were stipulated in the IEEC. Should there be any expansion of the project beyond the project description or

8 any change in the activity or transfer of location shall be subject to a new Environmental Impact Assessment; and 17. In case of transfer of ownership of this project, these same conditions and restrictions shall apply and the transferee shall be required to notify the EMB Regional Office within fifteen (15) days from the transfer of ownership to allow the necessary changes brought about by such transfer.

9 Annex B PROJECT ASSESSMENT PLANNING TOOL For the assistance of the Proponent and the Government agencies concerned in the management of the Project and for better coordination in mitigation of the impacts of the Project on its surrounding areas and the environment, and by way of recommendation, forwarding these recommendations to the parties and authorities concerned for appropriate action. OTHER REGULATORY REQUIREMENTS/CONDITIONS 1. Compliance with the Sanitation Code of the Philippines; 2. Compliance with the Labor Code of the Philippines 3. Compliance with the Building Code of the Philippines 4. Compliance with the Ecological Solid Waste Management Act. CONCERNED GOVERNMENT AGENCIES/ENTITIES DOH / LGU Concerned DOLE Bureau of working condition LGU Concerned LGU Concerned 5. Secure tree cutting permit FMB DENR 7 6. Administer, survey, manage, and dispose alienable and disposable (A&D) lands and other government lands not placed under the jurisdiction of other government agencies. LMD DENR 7 ENVIRONMENTAL PLANNING RECOMMENDATIONS FOR THE PROPONENT 7. Priority of employment shall be given to qualified local residents. Adequate public information for jobs available to local residents in the affected areas shall be provided; Engr. Ranzel A. Dioko OIC-Chief, Clearance & Permitting Division Engr. William P. Cuñado Regional Director

Photographic Processing Facility Sector Control Policy

Photographic Processing Facility Sector Control Policy Photographic Processing Facility Sector Control Policy Persigo Wastewater Treatment Plant Industrial Pretreatment Division 2145 River Road Grand Junction, CO 81505 970-256-4180 I. INTRODUCTION The United

More information

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION TOWN OF WAYLAND MASSACHUSETTS 01778 CONSERVATION COMMISSION TOWN BUILDING 41 C0CHITUATE ROAD TELEPHONE: (508) 358-3669 FAX: (508) 358-3606 Wayland s Wetlands and Water Resources Bylaw CHAPTER 194 (D-768)

More information

INTERIM GUIDELINES FOR THE IMPORTATION OF RECYCLABLE MATERIALS CONTAINING HAZARDOUS SUBSTANCES

INTERIM GUIDELINES FOR THE IMPORTATION OF RECYCLABLE MATERIALS CONTAINING HAZARDOUS SUBSTANCES DENR ADMINISTRATIVE ORDER NO. 28 SERIES OF 1994 Subject: INTERIM GUIDELINES FOR THE IMPORTATION OF RECYCLABLE MATERIALS CONTAINING HAZARDOUS SUBSTANCES 1. GENERAL POLICY As a general policy and consistent

More information

Current Practice of Recycling and Treatment of Hazardous Wastes in the Philippines

Current Practice of Recycling and Treatment of Hazardous Wastes in the Philippines Current Practice of Recycling and Treatment of Hazardous Wastes in the Philippines Health Outline of the Presentation I. Hazardous Waste Management Requirements and Procedures II. Treatment, Storage and

More information

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS The tower permit is based on the following: 1. The architect or engineer, upon request, must submit to the building

More information

CHAPTER 110 SEWAGE DISPOSAL

CHAPTER 110 SEWAGE DISPOSAL 110-1. Title. 110-6. System rehabilitation. 110-2. Purpose. 110-7. Liability. 110-3. Definitions. 110-8. Conflict with other 110-4. Applicability. regulations. 110-5. Applicable standards for sewage 110-9.

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

SS-178 WEST VIRGINIA DIVISION OF HEALTH LEGISLATIVE RULES TITLE 64, SERIES 9 SEWER SYSTEMS SEWAGE TREATMENT SYSTEMS AND SEWAGE TANK CLEANERS

SS-178 WEST VIRGINIA DIVISION OF HEALTH LEGISLATIVE RULES TITLE 64, SERIES 9 SEWER SYSTEMS SEWAGE TREATMENT SYSTEMS AND SEWAGE TANK CLEANERS SS-178 WEST VIRGINIA DIVISION OF HEALTH LEGISLATIVE RULES TITLE 64, SERIES 9 SEWER SYSTEMS SEWAGE TREATMENT SYSTEMS AND SEWAGE TANK CLEANERS Effective May 1, 1998 64-9-14. Administrative Due Process.

More information

CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION. Permit Number

CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION. Permit Number Please direct all documents and questions to: John Glover, R.S. Pollution Control Abatement Officer 1100 S. Mayhill Rd. Denton, TX 76208 (940) 349-8619 CITY OF DENTON ON-SITE SEWAGE FACILITY PERMIT APPLICATION

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS 4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS 4.1 EXISTING UNPERMITTED INDUSTRIAL USERS Within 60 calendar days after the effective date of this SUO, or at such time when the participant ties into the Authority's

More information

SUPPLEMENTAL BID BULLETIN NO. 1. This Supplemental Bid Bulletin No. 1 is issued to amend the project title,

SUPPLEMENTAL BID BULLETIN NO. 1. This Supplemental Bid Bulletin No. 1 is issued to amend the project title, Batangas State University Bidding Documents (Based on Revised IRR of RA 9184, Fourth Edition, December 2010) January 7, 2016 SUPPLEMENTAL BID BULLETIN NO. 1 This Supplemental Bid Bulletin No. 1 is issued

More information

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS Section 1201 Applicability For the purpose of this Article, recreation vehicles and recreational vehicle

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION OPERATOR CERTIFICATION PROGRAM DIVISION

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION OPERATOR CERTIFICATION PROGRAM DIVISION ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION OPERATOR CERTIFICATION PROGRAM DIVISION 335-10 1400 Coliseum Boulevard Montgomery, Alabama 36110-2059 (334) 271-7700 CITE AS ADEM Admin. Code

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1300 CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT 15.1301 SECTION 13.01 STATEMENT OF PURPOSE To provide for manufactured home park development, of long-term duration of stay, in

More information

Subtitle C of the Resource Conservation and Recovery Act of 1976

Subtitle C of the Resource Conservation and Recovery Act of 1976 William & Mary Environmental Law and Policy Review Volume 3 Issue 2 Article 5 Subtitle C of the Resource Conservation and Recovery Act of 1976 Repository Citation Subtitle C of the Resource Conservation

More information

TO: MEMBERS, BOARD OF EDUCATION AMENDED APPROVE AMENDMENT NO. 1 TO SOLAR POWER DESIGN/BUILD CONTRACT WITH SK SOLAR INC. (PROJECT 14-29F) ACTION

TO: MEMBERS, BOARD OF EDUCATION AMENDED APPROVE AMENDMENT NO. 1 TO SOLAR POWER DESIGN/BUILD CONTRACT WITH SK SOLAR INC. (PROJECT 14-29F) ACTION TO: MEMBERS, BOARD OF EDUCATION AMENDED FROM: DR. ANTHONY W. KNIGHT, SUPERINTENDENT DATE: AUGUST 19, 2014 SUBJECT: ISSUE: BACKGROUND: ALTERNATIVES: APPROVE AMENDMENT NO. 1 TO SOLAR POWER DESIGN/BUILD CONTRACT

More information

Biosolids Electronic Reporting User s Guide Version 2 Updated 1/25/2018

Biosolids Electronic Reporting User s Guide Version 2 Updated 1/25/2018 Biosolids Electronic Reporting User s Guide Version 2 Updated 1/25/2018 EPA s Biosolids Annual Program Report User Guide v2 Updated 1/26/2018 Table of Contents 1. Introduction to the EPA Biosolids Annual

More information

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS Statutory authority: N.J.S.A. 13:1B-3 et seq., 13:1D-1 et seq., 13:1E-1 et seq., 26-2C-1 et seq.,

More information

Pretreatment Streamlining Rule

Pretreatment Streamlining Rule Pretreatment Guidance 2 Final Pretreatment Streamlining Rule Statutory references: ORC 6111.03(Q) and 6111.042 Rule references: OAC 3745-3; 40 CFR 403 Ohio EPA, Division of Surface Water Revision 0, October

More information

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS

ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY DWELLINGS AND MULTIPLE-FAMILY DWELLINGS HAVING THREE OR FOUR DWELLING UNITS Community Planning and Economic Development Development Services Division 250 South 4 th Street, Room 300 Minneapolis MN 55415-1316 612-673-3000 ADMINISTRATIVE SITE PLAN REVIEW FOR SINGLE- AND TWO-FAMILY

More information

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent

-01k( Rec.by:DZ. ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS. Section Intent ARTICLE IX - STANDARDS FOR TELECOMMUNICATIONS TOWERS AND ANTENNAS Section 900 - Intent The intent and purpose of this Article is to establish general guidelines for the sitting of commercial telecommunications

More information

WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT

WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT WATER AND SEWER SYSTEMS ASSISTANCE ACT - ENACTMENT Act of Jul. 9, 2008, P.L. 915, No. 64 Cl. 71 AN ACT Authorizing the incurring of indebtedness, with the approval of the electors, of $400,000,000 for

More information

PIKES PEAK REGIONAL BUILDING DEPARTMENT

PIKES PEAK REGIONAL BUILDING DEPARTMENT PIKES PEAK REGIONAL BUILDING DEPARTMENT Manufactured Residential Buildings - WOODLAND PARK (CITY LIMITS) Pikes Peak Regional Building Department issues permits and performs inspections of manufactured

More information

Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 24 April 2013 PROXY MODEL

Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 24 April 2013 PROXY MODEL Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 24 April 2013 PROXY MODEL If you wish to be represented at these Meetings, you should return this form

More information

WHEREAS, the existing trees so located are in need of protection and active measures to support their health and growth.

WHEREAS, the existing trees so located are in need of protection and active measures to support their health and growth. AN ORDINANCE REGULATING PROTECTION AND REMOVAL OF TREES IN THE CITY OF RIDGELAND, MISSISSIPPI PROVIDING A METHOD FOR PERMIT OF REMOVAL, PROVIDING FOR PENALTIES FOR VIOLATION OF ANY PROVISIONS OF THIS ORDINANCE

More information

SECTION 5. Labor-Management Committee.

SECTION 5. Labor-Management Committee. Republic of the Philippines Congress of the Philippines Metro Manila Fourth Regular Session Begun and held in Metro Manila, on Monday, the twenty-third day of July, nineteen hundred and ninety. REPUBLIC

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

130A-294. Solid waste management program.

130A-294. Solid waste management program. 130A-294. Solid waste management program. (a) The Department is authorized and directed to engage in research, conduct investigations and surveys, make inspections and establish a statewide solid waste

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

COMPREHENSIVE PROJECT PROFILE

COMPREHENSIVE PROJECT PROFILE Republic of the Philippines Province of Bohol City of Tagbilaran COMPREHENSIVE PROJECT PROFILE 1) PROJECT TITLE: Material Recovery Facility as an Enterprise: A Model in BIAD-I 1.1 Project Location : Dauis,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No / EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C Draft COMMISSION REGULATION (EU) No / of [ ] amending Commission Regulation (EC) No 1702/2003 laying down implementing rules for the airworthiness

More information

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via the e-mail noted in the solicitation, and will be accepted no later than

More information

West Virginia Department of Health & Human Resources Department of Health

West Virginia Department of Health & Human Resources Department of Health SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

16. ASSESSMENT OF TREE REGISTRATION IN LEYTE AND BILIRAN ISLANDS

16. ASSESSMENT OF TREE REGISTRATION IN LEYTE AND BILIRAN ISLANDS 16. ASSESSMENT OF TREE REGISTRATION IN LEYTE AND BILIRAN ISLANDS Emma M. Germano, Emmanuel G. Tan, Eduardo O. Mangaoang, Steve Harrison, Edilberto E. Nasayao, Edwin D. Cedamon, Nestor O. Gregorio and John

More information

TITLE 64 LEGISLATIVE RULE BUREAU FOR PUBLIC HEALTH SERIES 15 CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION. use.

TITLE 64 LEGISLATIVE RULE BUREAU FOR PUBLIC HEALTH SERIES 15 CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION. use. TITLE 64 LEGISLATIVE RULE BUREAU FOR PUBLIC HEALTH SERIES 15 CROSS-CONNECTION CONTROL AND BACKFLOW PREVENTION 64-15-1. General. 1.1. Scope. -- This legislative rule governs cross-connection control and

More information

DEPARTMENT OF THE TREASURY

DEPARTMENT OF THE TREASURY STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY DIVISION OF PURCHASE & PROPERTY CONTRACT COMPLIANCE AND AUDIT UNIT EEO MONITORING PROGRAM PUBLIC AGENCY Guidelines for Administering Equal Employment Opportunity

More information

Wastewater System and Potable Water Supply Rules

Wastewater System and Potable Water Supply Rules Wastewater System and Potable Water Supply Rules Vermont Attorneys Title Program June 13, 2017 Montpelier, VT Ernie Christianson Program Manager Purpose of the Rules To protect human health and the environment.

More information

ARTICLE X TRANSMISSION TOWER REGULATIONS

ARTICLE X TRANSMISSION TOWER REGULATIONS ARTICLE X TRANSMISSION TOWER REGULATIONS 10.1 - PURPOSE The purposes of the following regulations are to: facilitate the provision of wireless service facilities and services to the community; minimize

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Maple Lake Park Limited 16 Levy Crt Woodbridge, Ontario

More information

Highlands Housing Authority

Highlands Housing Authority Highlands Housing Authority 215 Shore Drive, Highlands, New Jersey 07732 TELEPHONE: (732) 872-2022 FAX: (732) 291-8743 REQUEST FOR PROPOSALS for CONCRETE SIDEWALK REPAIRS at JENNIE PARKER MANOR HIGHLANDS,

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TIMBERLAKE COMMUNITY CLUB, INC. 2880 East Timberlake West Drive Shelton, WA 98584-7936 Phone: 360-427-8928 ~ Fax: 360-427-1755 E-mail: timberlakecc@hctc.com ~Pride in Ownership~ BUILDING PERMIT APPLICATION

More information

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment GENERAL PERMIT FOR THE CONSTRUCTION AND OPERATION OF TIRE COLLECTION CENTERS AND MOBILE TIRE PROCESSING EQUIPMENT ISSUED BY ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT NUMBER: 0000-TAP-TCCMTP AUTHORITY:

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

Privatization of Solid Waste Collection Technological Advancement in the Disposal System Integration of the IS to the Formal SWMS

Privatization of Solid Waste Collection Technological Advancement in the Disposal System Integration of the IS to the Formal SWMS THE GREAT QUEZON CITY CLEAN-UP The Role of the Informal Sector in Solid Waste Management MARY BEAULAH A. RIOS Sr. Environmental Management Specialist Quezon City Profile Quezon City Solid Waste Management

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems Manitoba Water Stewardship Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems Date: June 2007 Prepared for Office of Drinking Water

More information

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 2nd September, 1999 1 [S. 0.705 (E-).-Whereas draft rules in exercise of the powers

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION-MUNICIPAL SECTION PO BOX 301463 MONTGOMERY, ALABAMA 36130-1463 INSTRUCTIONS: APPLICATIONS

More information

SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250

SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250 SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250 1. Name and Street Address of Facility: Active Recycling Material Recovery Facility and Transfer Station 2000 W. Slauson Avenue Los Angeles,

More information

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT PROCEDURE FOR REQUESTING A BUILDING PERMIT A. CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT APPLICATION: The following checklist indicates the requirements based on the type of Building Permit being requested.

More information

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official DEVELOPMENT SERVICES PO Box 1110 Tampa, FL 33601-1110 DEVELOPMENT SERVICES DEPARTMENT Date: May 12, 2017 To: From: SUBJECT: Interested Parties John L. Barrios, CBO, Building Official THRESHOLD BUILDINGS

More information

Environmental Information Form

Environmental Information Form CITY OF MODESTO Community and Economic Development Department/Planning Division 1010 Tenth Street, Suite 3300, P.O. Box 642 Modesto, CA 95353 (209) 577-5267 (209) 491-5798 FAX This questionnaire will assist

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Council Member Laliberte introduced the following resolution and moved its adoption:

Council Member Laliberte introduced the following resolution and moved its adoption: EXTRACT OF MINUTES OF MEETING OF THE CITY COUNCIL OF THE CITY OF ROSEVILLE Pursuant to due call and notice thereof, a regular meeting of the City Council of the City of Roseville, County of Ramsey, Minnesota,

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness GOVERNMENT No. 35-2006-ND-CP SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 31 March 2006 DECREE MAKING DETAILED PROVISIONS FOR IMPLEMENTATION OF THE COMMERCIAL LAW WITH RESPECT

More information

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX: MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA 16801 TELEPHONE: 814-231-3021 FAX: 814-231-3020 Checklist for Submission of APPLICATION for DEMOLITION PERMIT To obtain a permit for demolition

More information

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK I, swear (affirm) that I have read the Town of Ocean Ridge s Construction Site Management Handbook in its entirety and do hereby agree to comply

More information

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges.

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges. TOWN OF HASTINGS, FLORIDA TOWN CODE Chapter 18 Previous Page Water and Sewer Article II Sewers -- Prohibited Discharges. Sec. 18-20. General Prohibition No Person shall discharge or cause to be discharged

More information

1. Furnishing and applying hydromulch seeding including all materials and equipment required for the specified method of lawn installation.

1. Furnishing and applying hydromulch seeding including all materials and equipment required for the specified method of lawn installation. SECTION 32 92 13 HYDROMULCH SEEDING PART 1 GENERAL 1.1 SCOPE A. Refer to the Drawings, Schedules and Details for type and locations of work required herein. Furnish all labor, materials, equipment and

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL Mail To: WDEQ/WQD ATTN: UIC Program 122 W. 25 th St. 4W Cheyenne, WY

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY

More information

Main Building Auditorium

Main Building Auditorium Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY

More information

Guide to Industrial Waste Fees for Commercial and Industrial Users

Guide to Industrial Waste Fees for Commercial and Industrial Users Industrial Waste Discharge Permit Application Fee Guide to Industrial Waste Fees for Commercial and Industrial Users All industries and certain commercial facilities discharging other than domestic sewage

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

GUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems

GUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems GUIDE FOR APPLYING FOR DWWP Amendments Licence Amendments Licence Renewals & New System Applications Municipal Residential Drinking Water Systems SAFE DRINKING WATER BRANCH November 2010 PIBS 7014e01 Guide

More information

Information on the focal point for the Convention. Information on the point of contact for the Convention

Information on the focal point for the Convention. Information on the point of contact for the Convention Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

Convention on Long-Range Transboundary Air Pollution (1979) ENTERED INTO FORCE: 16 March 1983

Convention on Long-Range Transboundary Air Pollution (1979) ENTERED INTO FORCE: 16 March 1983 Convention on Long-Range Transboundary Air Pollution (1979) ENTERED INTO FORCE: 16 March 1983 The Parties to the present Convention, Determined to promote relations and cooperation in the field of environmental

More information

Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 17 May 2017 PROXY MODEL

Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 17 May 2017 PROXY MODEL Ordinary and Extraordinary General Meetings of Shareholders of ageas SA/NV to be held in Brussels on 17 May 2017 PROXY MODEL If you wish to be represented at these Meetings, you should return this form

More information

Name: Social Security #: # years at residence: Telephone #: Message/Cell #:

Name: Social Security #: # years at residence: Telephone #: Message/Cell #: BINGHAM COUNTY EMPLOYMENT APPLICATION 501 NORTH MAPLE STREET #202, BLACKFOOT, IDAHO 83221 Bingham County is an Equal Opportunity Employer. Equal access to programs, services, and employment is available

More information

FORM SJ INSTRUCTIONS FOR FILING APPLICATION FOR PERMIT PROPOSED SEWAGE COLLECTION AND TREATMENT SYSTEM

FORM SJ INSTRUCTIONS FOR FILING APPLICATION FOR PERMIT PROPOSED SEWAGE COLLECTION AND TREATMENT SYSTEM FORM SJ INSTRUCTIONS FOR FILING APPLICATION FOR PERMIT For PROPOSED SEWAGE COLLECTION AND TREATMENT SYSTEM Prepared by: WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER AND WASTE

More information

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.

to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22. STATUTORY INSTRUMENTS SUPPLEMENT No. 13 5th May, 2017 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government.

More information

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE14-00XXX Applicant: Job Description:

More information

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone: 2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen

More information

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10 QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 10 Page: 1 of 54 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY... 5 2. INTRODUCTION... 6 2.1 Purpose... 6 2.2 Scope... 7 Figure 1: Sequence and Interaction

More information

SUPPLIER CODE OF CONDUCT

SUPPLIER CODE OF CONDUCT SUPPLIER CODE OF CONDUCT FOREWORD AND SUPPLIER CERTIFICATION CTS Corporation ( CTS ), founded in 1896, has built its reputation by producing quality products as well as by adhering to the highest ethical,

More information

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS

CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review

More information

Private Sewage Systems Standard of Practice Proposed Revisions

Private Sewage Systems Standard of Practice Proposed Revisions Private Sewage Systems Standard of Practice Proposed Revisions The Government of Alberta is currently reviewing the Standard of Practice (SOP) for Private Sewage Systems. To this end, the Alberta government

More information

Act. on the Promotion of Renewable Energies in the Heat Sector. (Erneuerbare-Energien-Wärmegesetz EEWärmeG)*) of 2008

Act. on the Promotion of Renewable Energies in the Heat Sector. (Erneuerbare-Energien-Wärmegesetz EEWärmeG)*) of 2008 Act on the Promotion of Renewable Energies in the Heat Sector (Erneuerbare-Energien-Wärmegesetz EEWärmeG)*) of 2008 The Bundestag has adopted the following Act: Contents Part 1 General provisions Article

More information

DRAFT OF REGULATION OF THE MINISTER OF COMMUNICATION AND INFORMATION OF THE REPUBLIC OF INDONESIA NUMBER OF 2014 REGARDING

DRAFT OF REGULATION OF THE MINISTER OF COMMUNICATION AND INFORMATION OF THE REPUBLIC OF INDONESIA NUMBER OF 2014 REGARDING DRAFT OF REGULATION OF THE MINISTER OF COMMUNICATION AND INFORMATION OF THE REPUBLIC OF INDONESIA NUMBER OF 2014 REGARDING PROCEDURE FOR CALCULATION OF LOCAL CONTENT IN TELECOMMUNICATION DEVICES BY THE

More information

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance BUILDING A STRUCTURE IN THE FLOODPLAIN When you apply for a zoning permit to build a home or other structure and it is determined your land is in the floodplain, the following procedures will apply: 1.

More information

REPUBLIC ACT NO THE ECOLOGICAL SOLID WASTE MANAGEMENT ACT OF Compliance of Barangay Luz, Cebu City

REPUBLIC ACT NO THE ECOLOGICAL SOLID WASTE MANAGEMENT ACT OF Compliance of Barangay Luz, Cebu City REPUBLIC ACT NO. 9003 THE ECOLOGICAL SOLID WASTE MANAGEMENT ACT OF 2001 Compliance of Barangay Luz, Cebu City Requirements under R. A. 9003 1. Local Government Solid Waste Management Plans Provisions Status

More information

Corporate Procurement. Sustainable Timber Procurement Policy

Corporate Procurement. Sustainable Timber Procurement Policy Corporate Procurement Sustainable Timber Procurement Policy Release: Final Draft 1 Document Control Date Version Description Author Position 12.12.08 0.01 First Draft Peter Faill (PAF) Head of Strategic

More information

Release into Environment of Genetically Modified Organisms Act 1

Release into Environment of Genetically Modified Organisms Act 1 Issuer: Riigikogu Type: act In force from: 01.07.2014 In force until: 31.07.2014 Translation published: 27.06.2014 Release into Environment of Genetically Modified Organisms Act 1 Amended by the following

More information

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALL ITEMS MUST BE COMPLETED BY CONTRACTOR CALL NUMBER CONTRACTOR S NAME CONTRACTOR S FEIN BID AMOUNT DBE GOAL (%) WV LICENSE NUMBER CONTRACTOR

More information

Pima County Travel Reduction Ordinance

Pima County Travel Reduction Ordinance Pima County Travel Reduction Ordinance Source: http://www.municode.com/resources/gateway.asp?pid=16119&sid=3 Chapter 17.40 TRAVEL REDUCTION ORDINANCE Sections: Article I. General Provisions 17.40.010 Short

More information

ENVIRONMENTAL REGULATIONS

ENVIRONMENTAL REGULATIONS ARTICLE 7 ENVIRONMENTAL REGULATIONS Contents of Article 7 ARTICLE 7 ENVIRONMENTAL REGULATIONS... 501 Sec. 700-719 RESERVED... 501 Sec. 720 RESERVED... 511 Sec. 721 FOREST CONSERVATION... 543 Sec. 722-729

More information

ARTICLE XIII. COMMUNICATION TOWERS

ARTICLE XIII. COMMUNICATION TOWERS ARTICLE XIII. COMMUNICATION TOWERS Section 13.1. Purposes. The general purpose of this Section is to regulate the placement, construction, and modification of communication towers, support structures,

More information

Republic of the Philippines Department of Health OFFICE OF THE SECRETARY M a n i l a

Republic of the Philippines Department of Health OFFICE OF THE SECRETARY M a n i l a Republic of the Philippines Department of Health OFFICE OF THE SECRETARY M a n i l a March 15, 1989 ADMINISTRATIVE ORDER No. 67 s. 1989 SUBJECT: Revised Rules and Regulations on Registration of Pharmaceutical

More information

6.20 UTILITIES SOLID WASTE

6.20 UTILITIES SOLID WASTE 6.20 UTILITIES SOLID WASTE 6.20.1 OVERVIEW AND SUMMARY Solid waste generated by the proposed project would be disposed primarily at the Toland Road Landfill. Prior to disposal, recyclable materials would

More information