GREEN REMEDIATION OF cvoc DNAPL IN BEDROCK

Size: px
Start display at page:

Download "GREEN REMEDIATION OF cvoc DNAPL IN BEDROCK"

Transcription

1 GREEN REMEDIATION OF cvoc DNAPL IN BEDROCK I. Richard Schaffner, Jr., P.G., C.G.W.P. ) and Steven R. Lamb, P.G., C.G.W.P. (GZA GeoEnvironmental, Inc.; Manchester, New Hampshire) Eric C. Lindhult, P.E. (GZA GeoEnvironmental, Inc.; Fort Washington, Pennsylvania) Bernard Fenelon, P.G. (GZA GeoEnvironmental, Inc.; Waukesha, Wisconsin) Michael Reed (Massachusetts Department of Environmental Protection; Springfield, MA) Abstract Natural bioremediation of chlorinated volatile organic compounds (cvocs) via a reductive dechlorination pathway is occurring at many sites, but typically has limited effectiveness due to limited electron donor availability. Enhanced reductive dechlorination (ERD) is a cost-effective treatment technology that stimulates the natural biodegradation of cvocs to expedite site clean-up and reduces the cost of remediation in comparison to conventional remedies. ERD has also been successfully employed at sites where the cvocs exist in fractured bedrock. Three case studies are presented in which a novel bioremediation additive remediated residual, dense non-aqueous phase liquids (DNAPLs) consisting of cvocs in bedrock. Case Study No. 1 Groundwater cvoc contamination was identified at a former manufacturing facility in North Adams, Massachusetts. Historical trichloroethene (TCE) concentrations were as high as 120,000 microgram per liter (μg/l), which indicated the probable presence of residual DNAPL. Complicating the project, the highest TCE concentrations were detected in fractured phyllite-muscovite-quartz schist bedrock. Case Study No. 2 In 1989, an investigation was performed at a Wisconsin farm that reportedly received ~550,000 pounds (250,000 kilograms [kg]) of spent solvent in the early 1970s. The spent solvent was illegally discharged, resulting in contamination of the site s drinking water well. Groundwater analytical results indicated the presence of DNAPL migrating through the glacial till and into the sandstone aquifer, with TCE concentrations as high as 990,000 micrograms per liter (µg/l) in the till groundwater system and up to 75,000 µg/l in the sandstone aquifer. Case Study No. 3 A wastewater treatment plant (WWTP) in New Hampshire was closed in 1986; however, industrial waste haulers apparently entered the facility and illegally discharged industrial septage into the former sludge pits. Groundwater impacted with cvocs extended through the overburden and into the moderately fractured and slightly weathered granofels and schist bedrock. The cvoc concentrations in the bedrock were as high as 11,000 µg/l for TCE and 49,200 µg/l for cis-1,2-dichloroethene (cis-1,2-dce). Case Study No. 1 North Adams, Massachusetts Background and Hydrogeology - Groundwater at a former electrical capacitor manufacturing facility in North Adams, Massachusetts was impacted by a TCE release. The resulting plume extended to a primary recharge area for a municipal well. Historical TCE concentrations were as high as 120,000 μg/l, which is approximately 11% of the aqueous solubility and indicative of the presence of source mass likely in the form of residual DNAPL. The project remedial

2 investigation and design was conducted in accordance with the Massachusetts Contingency Plan (MCP) with regulatory oversight by the Massachusetts Department of Environmental Protection (MADEP). Site geology consists of fine to coarse sand and gravel, with cobbles and boulders from ground surface to a depth of approximately 10 feet (3 meters [m]) in the source area. Underlying the granular subsurface is moderately weathered fractured phyllite-muscovite-quartz schist bedrock, with minor limestone inclusions, with areas of saprolite observed in the study area. There are numerous transmissive fractures in the bedrock in the source area vicinity. Figure 1 presents a general cross-section of the source area and monitoring well locations. Figure 1 Generalized cross-section of North Adams, Massachusetts Site Groundwater Quality Historical TCE concentrations (up to 120,000 μg/l) were detected in groundwater collected from two bedrock monitoring wells, MS-7 and MS-28 in the source area. Groundwater collected from well MS-3R installed in the overburden contained TCE at a concentration of 6,700 μg/l. The maximum concentration of TCE in groundwater allowable by the MCP in drinking water well recharge areas is 5 μg/l. Baseline groundwater sampling performed prior to commencement of remedial activities (in June 2007) detected TCE concentrations at 4,500 μg/l in overburden well MS-3R, and 40,000 and 58,000 μg/l in bedrock wells MS-28 and MS-7, respectively. Green Remediation Program Implementation ERD was proposed to address cvocs in both the bedrock and overburden groundwater systems and to reduce the source mass and size of the cvoc plume. After an evaluation of the existing biogeochemical conditions, an injection program was designed and implemented that consisted of 1,600 pounds (725 kg) of a beta

3 version of ERD ENHANCED from BioStryke Remediation, which was gravity injected into monitoring wells MS-3R, MS-7, and MS-28 in October Due to permeability differences, the majority of the slurry (approximately 98%) was introduced into the overburden according to the MADEP. A second similar injection was performed in August Approximately one year after the initial injection, the TCE concentrations in groundwater samples collected from the test wells indicated a decrease of 73% in the overburden well and approximately 98% in both fractured bedrock wells. The data are shown in Table 1. During this time, the breakdown products cis-1,2-dce and vinyl chloride, which had not previously been detected at the site at significant concentrations, were detected in each of the three wells, with cis-1,2-dce concentrations increasing nearly 2,000% in samples collected from bedrock well MS-7, thus confirming TCE dechlorination. The order of magnitude increase in ethene concentrations in samples collected from well MS-7, from less than 3 μg/l to 81 μg/l, verified the reduction of cis-1,2-dce to vinyl chloride and ultimately to ethene. Table 1 cvoc concentrations (μg/l) in bedrock groundwater well in Massachusetts Well cvoc Baseline Post-ERD ENHANCED Injection Reductions from Peak* Jun-07 Jan-08 Jul-08 Nov-08 Jun-09 Jul-10 Jul-11 MS-28 TCE 40,000 20, <25 <25 <1 ~100% Bedrock cis-1,2-dce ,800 2,200 < % MS-7 TCE 58,000 19,000 1, ,000 3,900 <10 ~100% Bedrock cis-1,2-dce <1,000 13,000 19,000 2,800 3,100 1, % MS-3R TCE 4,500 N/S 1,200 N/S % Overburden cis-1,2-dce 380 N/S 770 N/S % *Reduction from peak TCE and cis-1,2-dce concentrations. Groundwater samples collected in July 2011, less than 4 years after the initial injection, indicated the mass of cvocs (based on mole fraction) had decreased approximately 99% to 100% in each of the three wells. While the cis-1,2-dce and vinyl chloride concentrations did increase over this period, the cis-1,2-dce concentrations subsequently decreased by more than 93% from their peak. Figure 2 presents the molar concentrations of TCE and cis-1,2-dce in groundwater samples collected from bedrock wells MS-7 and MS-28. TCE has not been detected in either well since June The detection of methane in all three wells demonstrates that methanogenic conditions were achieved in bedrock and particularly in the overburden formations, which was also verified by the negative oxidation-reduction potential (ORP) values and minimal dissolved oxygen levels measured in groundwater. These conditions are conducive for robust ERD rates to occur. The beta version of ERD ENHANCED migrated with groundwater and created groundwater conditions suitable for ERD at least 200 feet (60 m) downgradient of the injection wells (i.e., at well MW- 9), where TCE concentrations decreased from a baseline of 640 μg/l to consistently <300 μg/l after The concentration of cis-1,2-dce in groundwater at well MW-9 significantly increased during the ERD program from non-detect baseline concentrations to 180 μg/l, and vinyl chloride was detected there for the first time in 2008.

4 Moles/Liter st Injection 2nd Injection Jun-07 Dec-07 Jun-08 Dec-08 Jun-09 Dec-09 Jun-10 Dec-10 Jun-11 TCE (MS-7) DCE (MS-7) TCE (MS-28) DCE (MS-28) Figure 2 cvoc concentrations (moles/liter) in bedrock groundwater The longevity of the additive in bedrock was demonstrated by the elevated total organic carbon (TOC) concentrations that existed in the formation for at least 4 years following the initial injections, which is consistent with the longevity (up to 9 years) observed at other sites. The longevity of the additive in the overburden was approximately 2 years, likely due to the recharge of oxygenated surface water into the highly permeable overburden, which limited the longevity but not the effectiveness of the anaerobic dechlorination. Conclusions The beta version of ERD ENHANCED successfully created the desired biogeochemical conditions to destroy residual cvoc source mass and its daughter byproducts in bedrock, as well as in the overburden. Based on a nearly 4-year period with no measurable rebound in TCE concentrations following the initial injection, chemically reducing conditions were maintained in the groundwater system, which resulted in the nearly complete destruction of source mass as well as the downgradient plume. Case Study No. 2 Watertown, Wisconsin Background and Geologic Conditions - In 1989, an investigation began at a Watertown, Wisconsin farm site that received 900 drums (~550,000 pounds [~250,000 kg]) of spent solvent during a 6-month period between 1970 and The spent solvent, which consisted primarily of TCE, was dumped onto the ground surface at three locations along the flanks of a drumlin, resulting in contamination of the site s drinking water well and local water-supply aquifer, the St. Peter Sandstone. Approximately 80 to 100 feet (25 to 30 m) of glacial till overlies the St. Peter Sandstone. A discontinuous layer of sand and gravel up to 23-feet (7 m) thick overlies the sandstone primarily along the flanks of the drumlin. Given the limited timeframe between release and remedial action, TCE migration in groundwater did not extend more than 200 feet (61 m) from each of the source areas, and potential receptors, including a wetland and local drinking water wells, were more than a half mile from the source area, or were located upgradient of the site.

5 A remediation system was installed, which consisted of hydraulic control in the sandstone bedrock utilizing two groundwater extraction wells, groundwater extraction from the glacial till utilizing fifteen extraction wells, and soil vapor extraction (SVE) from twelve, nested SVE wells with a sparge well installed at each SVE-well cluster. In 2002, after about 10 years of remedial action, a Remedial Strategy Review was conducted on behalf of the responsible party to evaluate the appropriateness of the existing environmental efforts at the site. The Conceptual Site Model was reviewed with respect to information gained during remediation, and the remedial system was evaluated with respect to the progress made towards meeting remedial objectives. It was concluded that, although there was progress in groundwater cleanup in the shallow sandstone, TCE concentrations in many monitoring wells had not decreased significantly. The review revealed that TCE mass recoveries consisted of approximately 2,500 pounds (1,135 kg) from the two bedrock groundwater extraction wells, approximately 1,000 pounds (455 kg) from the 15 glacial till extraction wells, and approximately 40,000 pounds (18,150 kg) from the SVE system. Thus, less than 10% of the estimated TCE release had been recovered after 10 years of active remediation. It was further concluded that the TCE recovery rates had become asymptotic for the groundwater extraction systems, and that TCE soil vapor recovery was rapidly declining by approximately 50 percent (%) each year. Based on these findings, deactivation of each of the three remedial systems was recommended. However, due to the potential for long-term off-site migration, ERD was recommended through the introduction of a proprietary ERD additive into the sandstone aquifer. This green technology would allow for the destruction of contaminant mass in situ without the continuous use of electrical equipment and anticipated replacement of aging remedial components. Groundwater Quality Groundwater analytical results suggested that DNAPL migrated through 80 to 100 feet (25 to 30 m) of clayey glacial till and into the sandstone aquifer, with TCE concentrations up to 990,000 μg/l or 90 percent of the solubility of TCE in the till and up to 75,000 μg/l in the sandstone. Due to the limited migration timeframe and low groundwaterflow velocities (estimated to be ~35 feet/year [11 m/year]) at this relatively large site, the potential for off-site migration was deemed minimal. Green Remediation Program Implementation The recommendation to use ERD to limit plume migration beyond the TCE source area was presented to the Wisconsin Department of Natural Resources (WDNR) in late After consideration of the rationale, WDNR approved the recommended approach. The existing remedial system was deactivated in October 2002, and the monitoring well network was expanded with the addition of six monitoring wells. Semiannual groundwater monitoring events were conducted to evaluate post-active remediation groundwater quality and migration potential. Six injection wells screened in the bedrock were installed and remedial additive injections into the sandstone aquifer were performed in late 2004, using approximately 30,000 pounds (9,145 kg) of the beta version of ERD ENHANCED. Table 2 summarizes the TCE, cis-1,2-dce, and vinyl chloride (VC) concentrations detected in groundwater samples from the three closest (at distances of one to two years travel time) monitoring wells downgradient of the injection wells, before and after additive injections in September and October 2004.

6 Table 2 - cvoc concentrations (μg/l) in bedrock groundwater wells in Wisconsin Well No. Compound Baseline Post-ERD ENHANCED Injection Reduction from Peak 8/04 3/05 10/05 2/06 11/06 3/07 10/07 11/08 MW-40D TCE 5,500 2,700 3,900 3,850 4,900 3, % DCE 1,300 2,400 6,900 8,620 5,900 4,700 2, % VC <5 <5 <10 < % MW-41D MW-42D TCE < % DCE <0.8 < VC <1 <1 <1 <1 <1 <0.3 <0.3 <0.3 TCE % DCE <0.8 <0.8 < VC <1 <1 <1 <1 <1 <1 <0.3 <0.3 The TCE concentration at well MW-40D decreased initially from 5,500 μg/l to 2,700 µg/l and then increased likely due to a surfactant/co-solvent effect owing to the additive that enhances source mass dissolution, which is a common observation for ERD ENHANCED source area applications. Between November 2006 and November 2008, TCE concentrations decreased from 4,900 μg/l to 80 μg/l; a decrease of more than 98%. The concentration of cis-1,2-dce, a byproduct of TCE dechlorination, but less readily dechlorinated than TCE, increased from 1,300 μg/l to 8,620 μg/l by February 2006, before decreasing more than 99 percent to 63.9 μg/l in less than 3 years, as dechlorination continued. Similarly, the concentrations of vinyl chloride, a degradation byproduct of cis-1,2-dce, initially increased from <5 μg/l to 90 μg/l prior to decreasing by 93% to 6.3 μg/l. Total cvocs, on a molar basis, decreased by almost 99% from the peak of 1.2x10-3 moles/liter (mol/l) in February, to 1.5x10-6 mol/l in November The increase and then decrease in cis-1,2-dce and vinyl chloride concentrations was anticipated at the site due to the generation and subsequent degradation of TCE daughter products. The concentrations of ethene, a byproduct of vinyl chloride dechlorination, increased in well MW-40D from below detection to 55 μg/l in March 2007, which demonstrates that dechlorination was going to completion as a result of ERD. The TCE concentrations in well MW-41D initially increased from 26 μg/l to 160 μg/l and then decreased to below analytical reporting limits before rebounding slightly. The cis-1,2-dce concentrations generally increased throughout the post-injection period, consistent with the favorable conditions for dechlorination. At well MW-42D, which had low concentrations inconsistent with the presence of residual DNAPL, TCE and cis-1,2-dce were observed to decrease nearly continuously throughout the post-injection monitoring period, given the lack of source mass, and eventually approaching the analytical reporting limit. Vinyl chloride was not detected in samples from this well. Conclusions The implementation of ERD using the proprietary additive was highly effective at the site and allowed for the continued, effective remediation of TCE impacts utilizing this green technology, and termination of the costly, former electrical power-based system. The effectiveness of the remediation at this site improved dramatically while the remedial cost decreased significantly due to elimination of the operation and maintenance of an active

7 treatment system. Due to a change in the corporate status of the responsible party, groundwater monitoring at the site was discontinued in 2009, which prevented long-term evaluation of the ERD program. Case Study No. 3 Southern New Hampshire Background and Hydrogeology A municipal WWTP was closed in 1986; however, illegal dumping at the site resulted in cvoc impacts to the overburden and bedrock groundwater systems. Site stratigraphy consists of about 40 to 75 feet (12 to 23 m) of overburden (fine sand and silt, overlying clayey silt, coarse sandy glacial till, and silty glacial till). Metamorphic bedrock consisting of moderately fractured and slightly weathered granofels and schist underlies the till. Leakage from the upper overburden groundwater system through the tills recharges the shallow bedrock groundwater system. Groundwater contamination, consisting principally of dissolved-phase cvocs, persists in the upper and lower overburden and in the underlying shallow bedrock. The major contaminant transport mechanisms within each hydrogeologic unit are advection and hydrodynamic dispersion, with groundwater flow towards a river. Groundwater Quality Overburden and bedrock wells were installed in Historical cvoc concentrations in bedrock well GZ-3B were as high as 11,000 µg/l TCE, 49,200 µg/l cis-1,2-dce, and 660 µg/l 1,1-dichlorethane (1,1-DCA). Overburden concentrations were higher, with TCE concentrations >1,000,000 µg/l in some wells and cis-1,2-dce concentrations up to 79,390 µg/l. Groundwater concentrations in the bedrock had decreased by as much as an order of magnitude between 1988 and the initiation of ERD injections in 2001, but the baseline total cvoc concentration in bedrock was still 4,740 µg/l, which was several orders of magnitude greater than New Hampshire s regulatory standards. Green Remediation Program Implementation ERD was initiated at the site using a beta version of ERD ENHANCED for injections into the overburden in Additional additive was injected into the bedrock groundwater system later in As shown on Table 3, cvoc concentrations in groundwater decreased dramatically following additive injection into the bedrock groundwater system. In particular, the concentration of cis- 1,2-DCE decreased over an order of magnitude (from 3,949 µg/l to 85 µg/l) within the first year following the injection. Concentrations continued to decrease and, by December 2003, VC was the only compound detected at concentrations exceeding regulatory standards (11 µg/l versus a standard of 2 µg/l). No cvocs were detected at concentrations exceeding regulatory standards after 2003, including vinyl chloride. The total cvoc concentration in December 2006 was 11 µg/l, a decrease of greater than 99.7% during the more than 5 years since the injections. Total cvoc concentrations decreased further to 5.7 µg/l by November Importantly, there have been no rebounds in cvoc concentrations since the 2001 injection.

8 Table 3 - cvoc concentrations (μg/l) in bedrock groundwater well in New Hampshire cvoc Baseline Post-Injection Sampling Reductions from Peak Aug-01 Sep-01 Dec-01 Jun-02 Oct-02 Dec-03 Dec-06 Nov-08 Nov-11 TCE <20 <1 <2 <2 <1 <1 <1 >99.6% 1,2-DCE 3,949 4,111 1, <2 <1 >99.9% 1,1-DCE 25 <10 <20 <1 <1 <5 <1 <1 <1 >96.0% VC < <1 <1 >99.7% 1,1-DCA <20 <11 <2 < >94.6% Total cvocs 4,733 4,422 1, >99.8% Conclusions The beta version of ERD ENHANCED successfully dechlorinated cvocs in fractured bedrock, and destroyed cvoc source mass in the overburden groundwater system. Summary/Lessons Learned. Each of the three case studies demonstrated that positive results from the ERD injections were observed in bedrock groundwater proximate to injection wells, with reduction in TCE concentrations approaching 100% observed in both bedrock and overburden groundwater systems. The beta version of ERD ENHANCED at each of the three sites was effective in establishing the desired biogeochemical conditions required to reductively dechlorinate cvocs, even in fractured bedrock. An understanding of the fractured bedrock groundwater system and proper delivery of bioremediation additive is critical for a successful ERD remedy. But as demonstrated in these examples, residual DNAPL in fractured bedrock can be remediated to meet regulatory standards. ERD is a green technology with a small carbon footprint that uses no energy-consuming equipment after the initial injection, with some additive remaining effective for 5 years or more. The longevity of this remedial additive in the formation, relative to many other additives, can result in more cost-effective remediation by reducing or eliminating the need to perform additional injections to achieve the desired reduction in cvoc concentrations. This paper was prepared for the proceedings of The Eighth International Conference on Remediation of Chlorinated and Recalcitrant Compounds Conference; Monterey, California; May 2012.

TREATMENT OF PERCHLORATE AND 1,1,1-TRICHLOROETHANE IN GROUNDWATER USING EDIBLE OIL SUBSTRATE (EOS )

TREATMENT OF PERCHLORATE AND 1,1,1-TRICHLOROETHANE IN GROUNDWATER USING EDIBLE OIL SUBSTRATE (EOS ) Paper 4B-1, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds 24. Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant

More information

Biological Reductive Dechlorination of Chlorinated Compounds. Barry Molnaa WSW Remediation Practice Manager ARCADIS

Biological Reductive Dechlorination of Chlorinated Compounds. Barry Molnaa WSW Remediation Practice Manager ARCADIS Biological Reductive Dechlorination of Chlorinated Compounds Barry Molnaa WSW Remediation Practice Manager ARCADIS 1 Presentation Outline What are we trying to do? How is it supposed to work? What are

More information

Challenges in Planning for Groundwater Remedy Transition at a Complex Site

Challenges in Planning for Groundwater Remedy Transition at a Complex Site Challenges in Planning for Groundwater Remedy Transition at a Complex Site Abstract William N. O Steen and Ralph O. Howard, Jr. U.S. Environmental Protection Agency Region 4, Atlanta, Georgia May 2014

More information

Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass

Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass Comparison of EHC, EOS, and Solid Potassium Permanganate Pilot Studies for Reducing Residual TCE Contaminant Mass Defense Distribution Depot San Joaquin-Sharpe Site Lathrop, California Corinne Marks, PE

More information

Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence. Josephine Molin, PeroxyChem October

Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence. Josephine Molin, PeroxyChem October Subsurface Distribution of ZVI/EHC Slurry Validating Radius of Influence Josephine Molin, PeroxyChem October 2 2014 Presentation Objective / Outline To empirically summarize our experience from a range

More information

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Site Profiles - View. General Information. Contaminants: Site Hydrology: Site Profiles - View General Information Site Name and Location: Description: Historical activity that resulted in contamination. Tiger Cleaners Memphis, Tennessee, United States Tiger Cleaners is located

More information

OPTIMIZATION OF A CHEMICAL OXIDATION TREATMENT TRAIN PROCESS FOR GROUNDWATER REMEDIATION. Gary Cronk, P.E., CHMM

OPTIMIZATION OF A CHEMICAL OXIDATION TREATMENT TRAIN PROCESS FOR GROUNDWATER REMEDIATION. Gary Cronk, P.E., CHMM OPTIMIZATION OF A CHEMICAL OXIDATION TREATMENT TRAIN PROCESS FOR GROUNDWATER REMEDIATION Gary Cronk, P.E., CHMM Presentation at the Battelle 5 th International Conference on Remediation of Chlorinated

More information

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project ABSTRACT In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project R. Juhlin, M. Butherus S.M. Stoller Corporation 2597 B ¾ Road, Grand Junction, C0 81506 USA The

More information

OBSTACLES TO COMPLETE PCE DEGRADATION DURING REDUCTIVE DECHLORINATION

OBSTACLES TO COMPLETE PCE DEGRADATION DURING REDUCTIVE DECHLORINATION OBSTACLES TO COMPLETE PCE DEGRADATION DURING REDUCTIVE DECHLORINATION Judie A. Kean, Florida Department of Environmental Protection, Tallahassee, Florida, USA; Duane Graves, Dgraves@GeoSyntec.com, (GeoSyntec

More information

Impacts of a Zero Valent Iron PRB on Downgradient Biodegradation Processes. John E. Vidumsky DuPont Corporate Remediation Group

Impacts of a Zero Valent Iron PRB on Downgradient Biodegradation Processes. John E. Vidumsky DuPont Corporate Remediation Group Impacts of a Zero Valent Iron PRB on Downgradient Biodegradation Processes John E. Vidumsky DuPont Corporate Remediation Group Why is Downgradient Biodegradation Important? Significant contaminant mass

More information

Bioremediation of Comingled 1,4-Dioxane and Chlorinated Solvent Plumes

Bioremediation of Comingled 1,4-Dioxane and Chlorinated Solvent Plumes Bioremediation of Comingled 1,4-Dioxane and Chlorinated Solvent Plumes Bilgen Yuncu, PhD, PE; Jessica L. Keener, PG and Robert C. Borden, PhD, PE Solutions-IES, Inc., Raleigh, NC TCE PCE Stephen D. Richardson,

More information

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds

In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds In Situ, Low Temperature Thermal Remediation of LNAPL with Pesticides and Other Recalcitrant Compounds RemTech 2017, Banff Springs Hotel and Conference Centre October 11, 2017 Presented by - Jay Dablow,

More information

In Situ Thermal Remediation and Principles of Electrical Resistance Heating (ERH)

In Situ Thermal Remediation and Principles of Electrical Resistance Heating (ERH) In Situ Thermal Remediation and Principles of Electrical Resistance Heating (ERH) Reusing Contaminated Land Conference Session 1C Cleanup Approaches that Work Seattle WA, October 2, 2014 David Fleming

More information

Groundwater modelling to help diagnose contamination problems

Groundwater modelling to help diagnose contamination problems Groundwater modelling to help diagnose contamination problems ZHANG Chuan-mian 1*, GUO Xiao-niu 1, Richard Henry 1, James Dendy 2 AECOM 1 8181 East Tuffs Avenue, Denver, CO 80237, USA. 2 105 Mitchell Road,

More information

Use of ph Tolerant Bioaugmentation Cultures For Bioremediation at Low ph

Use of ph Tolerant Bioaugmentation Cultures For Bioremediation at Low ph Use of ph Tolerant Bioaugmentation Cultures For Bioremediation at Low ph Jeff Roberts, Phil Dennis, Sandra Dworatzek and Peter Dollar 24 February 2016 Enhanced Bioremediation Injection of KB-1 at a site

More information

Fractured Bedrock Pump-and-Treat Conversion to In Situ Bioremediation

Fractured Bedrock Pump-and-Treat Conversion to In Situ Bioremediation Paper B-15, in: Bruce M. Sass (Conference Chair), Remediation of Chlorinated and Recalcitrant Compounds 2006. Proceedings of the Fifth International Conference on Remediation of Chlorinated and Recalcitrant

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for Rapid Remediation of DNAPL April 2003 David Fleming 425-396-4266 dfleming@thermalrs.com www.thermalrs.com What is Electrical Resistance

More information

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISCO Treatment Program: O&G Superfund Site Site O&G Superfund Drum Reconditioning Site;

More information

September 20, 2015 PN:

September 20, 2015 PN: AECOM 1155 Elm Street, Suite 401 Manchester, NH 03101-1508 www.aecom.com 603 606 4800 tel 603 606 4801 fax September 20, 2015 PN: 60422003 Dr. Brenda K. Weis, Director Board of Health City of New Bedford

More information

Substrate Flood-Injection Approach to Treat the Source Area of a Thin Discontinuous Aquifer

Substrate Flood-Injection Approach to Treat the Source Area of a Thin Discontinuous Aquifer Substrate Flood-Injection Approach to Treat the Source Area of a Thin Discontinuous Aquifer David Springer, P.G. (david.springer@tetratech.com) (Tetra Tech, Inc., Santa Barbara, CA, USA); Amena Atta, (Vandenberg

More information

AFCEE PROTOCOL FOR ENHANCED ANAEROBIC BIOREMEDIATION USING EDIBLE OILS

AFCEE PROTOCOL FOR ENHANCED ANAEROBIC BIOREMEDIATION USING EDIBLE OILS Paper 3D-03, in: A.R. Gavaskar and A.S.C. Chen (Eds.), Remediation of Chlorinated and Recalcitrant Compounds 2004. Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant

More information

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES

EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES EFFECTIVE CLEANUP AT LAWRENCE LIVERMORE NATIONAL LABORATORY: INNOVATIVE TECHNOLOGIES AND APPROACHES Albert L. Lamarre Lawrence Livermore National Laboratory Kathy Angleberger U.S. Dept. of Energy Michael

More information

Behavior of a Chlorinated Ethene Plume following Source-Area Treatment with Fenton s Reagent

Behavior of a Chlorinated Ethene Plume following Source-Area Treatment with Fenton s Reagent Behavior of a Chlorinated Ethene Plume following Source-Area Treatment with Fenton s Reagent by Francis H. Chapelle, Paul M. Bradley, and Clifton C. Casey Abstract Monitoring data collected over a 6-year

More information

In Situ Bioremediation Technologies by Tersus Environmental

In Situ Bioremediation Technologies by Tersus Environmental In Situ Bioremediation Technologies by Tersus Environmental Page 2 Gas infusion Page 3 Tersus Environmental In Situ bioremediation Gas delivery Edible oil Achieve site closure Low cost solution Soil vapor

More information

Using Mass Balance to Assist in Determining Remedial Options. Stephen Thomson URS New Zealand Limited

Using Mass Balance to Assist in Determining Remedial Options. Stephen Thomson URS New Zealand Limited Using Mass Balance to Assist in Determining Remedial Options Stephen Thomson URS New Zealand Limited Presentation Outline Introduction. Example Site. Mass Balance. Calculations. Outcomes. Introduction

More information

TECHNICAL REPORT TR-2307-ENV

TECHNICAL REPORT TR-2307-ENV ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 TECHNICAL REPORT TR-2307-ENV COST AND PERFORMANCE REPORT FOR A ZERO VALENT IRON (ZVI) TREATABILITY STUDY AT NAVAL AIR STATION NORTH ISLAND

More information

Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract

Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract Case Study Using Fenton s Reagent Under a Performance- Based Remediation Contract Presented at JSEM 2006 Presented by: John Mieher, RG 7500 N Dreamy Draw Dr., Suite 2321 Phoenix, AZ 85020 602.266.2011

More information

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer Paul D. Rohde, CH2M HILL and Cynthia R. Butler, P.E., CH2M HILL Abstract Site Background A pilot-scale study of in

More information

GROUNDWATER INFORMATION SHEET. Tetrachloroethylene (PCE)

GROUNDWATER INFORMATION SHEET. Tetrachloroethylene (PCE) GROUNDWATER INFORMATION SHEET Tetrachloroethylene (PCE) The purpose of this groundwater information sheet is to provide general information regarding a specific constituent of concern (COC). The following

More information

In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure

In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure In-Situ Containment and Treatment of a Free Phase Hydrocarbon Plume beneath Plant Infrastructure M. Brewster 1, S. Penny 1, B. Odell 1 and T. Jorgensen-Nelson 2 Abstract A very shallow (1 2 m deep) hydrocarbon

More information

Plume Stability Analysis

Plume Stability Analysis Groundwater Contaminant Plume Stability Analysis Joe A. Ricker, P.E. A member of the Earth Consulting Group, Inc. family of companies Ricker Plume Stability Analysis Background Ricker Plume Stability Analysis

More information

A Robust Model for Biotic and Abiotic Degradation of Chlorinated Aliphatic Hydrocarbons in an In Situ Bioreactor

A Robust Model for Biotic and Abiotic Degradation of Chlorinated Aliphatic Hydrocarbons in an In Situ Bioreactor A Robust Model for Biotic and Abiotic Degradation of Chlorinated Aliphatic Hydrocarbons in an In Situ Bioreactor Robert Edwards- Noblis Gabriel Moreno-Ferguson Camp Stanley Storage Activity Chris Beal

More information

Thermal Remediation Services, Inc.

Thermal Remediation Services, Inc. Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770) 794-1168 gbeyke@thermalrs.com www.thermalrs.com 1 1 2 2

More information

Executive Summary. 2. Property Investigations Groundwater Sampling Soil Sampling Soil Vapor Sampling 5

Executive Summary. 2. Property Investigations Groundwater Sampling Soil Sampling Soil Vapor Sampling 5 Table of Contents Executive Summary iv 1. Introduction 1 1.1 Purpose 1 1.2 Scope 2 1.3 Submittals 2 1.4 Public Record 2 1.5 Contact Information 2 1.6 Conceptual Site Model 3 1.6.1 Property Location and

More information

Environmental Management Division. David Amidei NASA HQ

Environmental Management Division. David Amidei NASA HQ NASA s Remediation Challenges David Amidei NASA HQ Environmental Management Division i i NASA Facilities Environmental Management Division Previous Practices Environmental Management Division and more

More information

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology Detailed site assessment work at a manufacturing facility in South Carolina indicated that a former French drain

More information

MTBE Fact Sheet #2 Remediation Of MTBE Contaminated Soil And Groundwater Background

MTBE Fact Sheet #2 Remediation Of MTBE Contaminated Soil And Groundwater Background United States Office Of Solid Waste And EPA 510-F-98-002 Environmental Protection Emergency Response Agency (5401G) www.epa.gov/oust/mtbe/ Office Of Underground Storage Tanks MTBE Fact Sheet #2 Remediation

More information

A Multi-Site Performance Review of Liquid Activated Carbon for Groundwater Treatment

A Multi-Site Performance Review of Liquid Activated Carbon for Groundwater Treatment A Multi-Site Performance Review of Liquid Activated Carbon for Groundwater Treatment Doug Davis Director of Remediation Design, Central/East Region Technical Services Manager This presentation is the property

More information

PILOT TEST OF ELECTROKINETIC-ENHANCED BIOREMEDIATION OF PCE DNAPL

PILOT TEST OF ELECTROKINETIC-ENHANCED BIOREMEDIATION OF PCE DNAPL PILOT TEST OF ELECTROKINETIC-ENHANCED BIOREMEDIATION OF PCE DNAPL cer@niras.dk Charlotte Riis, NIRAS Renare Mark, Nov 20 2013 TEAM EK-BIO NIRAS A/S Charlotte Riis Martin Bymose Geosyntec Consultants, US

More information

TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: FINAL REPORT

TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: FINAL REPORT 2011 Groundwater and Surface Water Monitoring Program FINAL REPORT TOWNSHIP OF NORTH GLENGARRY MAXVILLE COMMUNAL SEWAGE LAGOONS 2011 GROUNDWATER AND SURFACE WATER MONITORING PROGRAM REF.: 09-511 Submitted:

More information

Abstract. Thomas R. Eschner and David Dinsmore, Woodard & Curran.

Abstract. Thomas R. Eschner and David Dinsmore, Woodard & Curran. Groundwater Sampling Method Comparison: Low-Flow and Passive Diffusion Bag Sampling Results for Volatile Organic Compounds in Fractured Metamorphic Bedrock Abstract Thomas R. Eschner and David Dinsmore,

More information

Enhanced Bioremediation Pilot Study Of A Cr(Vi)-Impacted Overburden Groundwater System In Kanpur, Uttar Pradesh, India

Enhanced Bioremediation Pilot Study Of A Cr(Vi)-Impacted Overburden Groundwater System In Kanpur, Uttar Pradesh, India Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 13 Article 8 January 2010 Enhanced Bioremediation Pilot Study Of A Cr(Vi)-Impacted Overburden Groundwater

More information

REMEDIATION WORK PLAN ADDENDUM. Indiana Machine Works 135 East Harrison Street Mooresville, Indiana VRP Site #

REMEDIATION WORK PLAN ADDENDUM. Indiana Machine Works 135 East Harrison Street Mooresville, Indiana VRP Site # REMEDIATION WORK PLAN ADDENDUM Indiana Machine Works 135 East Harrison Street Mooresville, Indiana VRP Site #6051201 REMEDIATION WORK PLAN ADDENDUM Indiana Machine Works 135 East Harrison Street Mooresville,

More information

John Wilson, Principal Scientist, Scissortail Environmental Solutions, LLC, Ada, OK

John Wilson, Principal Scientist, Scissortail Environmental Solutions, LLC, Ada, OK Data Needs for Effective Application of MNA and In-Situ Bioremediation Featuring Framework to Apply vel Molecular and Other Screening Tools for MNA Evaluations John Wilson, Principal Scientist, Scissortail

More information

1,4-Dioxane Remediation Technology Development An Overview Based on 70+ Projects

1,4-Dioxane Remediation Technology Development An Overview Based on 70+ Projects 1,4-Dioxane Remediation Technology Development An Overview Based on 70+ Projects Paul M. Dombrowski, P.E. NEWMOA 1,4-Dioxane Assessment & Remediation Workshop Outline Overview of AECOM 1,4-Dioxane Sites

More information

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY IN-SITU REMEDIATION OF HYDROCARBON IMPACTED GROUNDWATER IN PERMAFROST TERRAIN AT A REMOTE SITE. TIBBITT TO CONTWOYTO WINTER ROAD, NORTHWEST TERRITORIES Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER

More information

ENHANCED REDUCTIVE DECHLORINATION AND THE RELATIONSHIP BETWEEN CIS-1,2-DCE ACCUMULATION AND METHANOGENESIS

ENHANCED REDUCTIVE DECHLORINATION AND THE RELATIONSHIP BETWEEN CIS-1,2-DCE ACCUMULATION AND METHANOGENESIS ENHANCED REDUCTIVE DECHLORINATION AND THE RELATIONSHIP BETWEEN CIS-1,2-DCE ACCUMULATION AND METHANOGENESIS Judie A. Kean, (Judie.Kean@dep.state.fl.us) (Florida Department of Environmental Protection),

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

Field Evaluation of the Treatment of DNAPL

Field Evaluation of the Treatment of DNAPL Field Evaluation of the Treatment of DNAPL Using Emulsified Zero-Valent Iron (EZVI) Jacqueline Quinn (NASA Kennedy Space Center, FL) Chris Clausen, Cherie Geiger (University of Central Florida) Tom Krug,

More information

Groundwater Risk Assessment

Groundwater Risk Assessment Groundwater Risk Assessment ELQF - 6 November 2012 Katy Baker Technical Director ARCADIS (UK) Limited Imagine the result Problem definition The importance of the CSM 2 The definition of the problem: 3

More information

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION IPEC 13 November 2013 CLIQUEZ ET MODIFIEZ LE TITRE PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS 1. IN-SITU THERMAL REMEDIATION

More information

James Studer, 2 Barry Ronellenfitch, 2 Adam Mabbott, 2 Heather Murdoch, 2 Greg Whyte, and 3 Ian Hakes. REMTECH 2008 at Banff, Alberta

James Studer, 2 Barry Ronellenfitch, 2 Adam Mabbott, 2 Heather Murdoch, 2 Greg Whyte, and 3 Ian Hakes. REMTECH 2008 at Banff, Alberta PILOT TEST OF ISCO TECHNOLOGIES LEADS TO IMPROVED UNDERSTANDING OF IMMEDIATE AND MID-TERM GEOCHEMICAL RESPONSE AND CONTAMINANT DESTRUCTION WITHIN PETROLEUM HYDROCARBON PLUME 1 James Studer, 2 Barry Ronellenfitch,

More information

Successful Unsaturated Zone Treatment of PCE with Sodium Permanganate

Successful Unsaturated Zone Treatment of PCE with Sodium Permanganate REMEDIATION Spring 2009 Successful Unsaturated Zone Treatment of PCE with Sodium Permanganate John R. Hesemann Martha Hildebrandt In situ chemical oxidation (ISCO) with permanganate has been widely used

More information

Contaminant Flux Reduction Barriers for Managing Difficult-to-Treat Source Zones in Unconsolidated Media

Contaminant Flux Reduction Barriers for Managing Difficult-to-Treat Source Zones in Unconsolidated Media (ER-201328) Contaminant Flux Reduction Barriers for Managing Difficult-to-Treat Source Zones in Unconsolidated Media June 2017 This document has been cleared for public release; Distribution Statement

More information

State of Oregon Department of Environmental Quality

State of Oregon Department of Environmental Quality State of Oregon Department of Environmental Quality Memorandum Date: July 1, 2014 To: From: Subject: File Erin McDonnell, Northwest Cleanup Section Proposed No Further Action for Building 02 Operational

More information

August Prepared by:

August Prepared by: Case Study for the Use of a Decision Support Tool: Evaluating the Applicability of Remediation by Natural Attenuation Using BIOSCREEN at the Administration Area Naval Exchange (NEX) Gas Station, Naval

More information

Tyree 26 Town Forest Road, Webster, MA Fax: Phone:

Tyree 26 Town Forest Road, Webster, MA Fax: Phone: Tyree 26 Town Forest Road, Webster, MA 01570 Fax: 508-640-0370 Phone: 508-640-0300 April 9, 2012 Massachusetts Department of Environmental Protection Northeast Regional Office 205B Lowell Street Wilmington,

More information

SiREM-Major Services/Products

SiREM-Major Services/Products Optimizing in situ Bioremediation of Chlorinated Ethenes in Ontario s Groundwater Phil Dennis, Peter Dollar, Jeff Roberts, Sandra Dworatzek Smart Remediation, Toronto January 30, 2014 SiREM-Major Services/Products

More information

Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies

Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies TASK Tersus Advanced Surface Kinetics NAPL Surfactants Tersus is the worldwide distributor of the

More information

Use Of High Concentration Magnesium Sulfate Solution To Remediate Petroleum Impacted Groundwater

Use Of High Concentration Magnesium Sulfate Solution To Remediate Petroleum Impacted Groundwater Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 12 Article 24 January 21 Use Of High Concentration Magnesium Sulfate Solution To Remediate Petroleum Impacted

More information

ESTCP Project ER

ESTCP Project ER ADDENDUM TO THE PRINCIPLES AND PRACTICES MANUAL Loading Rates and Impacts of Substrate Delivery for Enhanced Anaerobic Bioremediation ESTCP Project ER-200627 JANUARY 2010 Bruce Henry Parsons Infrastructure

More information

Bioremediation Product Series

Bioremediation Product Series No. PREX-GEN101007 In-situ Remediation of Contaminated Soil and Groundwater using the Power of Mother Nature Bioremediation Product Series 694-2, Akada, Toyama 939-8064 Japan Phone: +81-76-420-3122 Fax:

More information

ROUX ASSOCIATES, INC. Environmental Consulting & Management

ROUX ASSOCIATES, INC. Environmental Consulting & Management February 28, 2012 PARTIAL RESPONSE ACTION OUTCOME STATEMENT (RAO) 17 Central Street Property Peabody Essex Museum RTN 3-23396 Prepared for PEABODY ESSEX MUSEUM East India Square Salem, Massachusetts 01907

More information

Full Scale Implementation Of Sulfate Enhanced Biodegradation To Remediate Petroleum Impacted Groundwater

Full Scale Implementation Of Sulfate Enhanced Biodegradation To Remediate Petroleum Impacted Groundwater Proceedings of the Annual International Conference on Soils, Sediments, Water and Energy Volume 14 Article 15 January 2010 Full Scale Implementation Of Sulfate Enhanced Biodegradation To Remediate Petroleum

More information

Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services

Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services Speaker Lowell Kessel GEO Incorporated - Gas Thermal Remediation Services 2 1980s- Steam Enhanced Extraction Netherlands Soil & GW Remediation 1989- Thermal Conductive Heating Shell Oil Co.- In Situ Soil

More information

Beyond Dig and Haul: A survey of Remedial Technologies. NYS Department of Environmental Conservation

Beyond Dig and Haul: A survey of Remedial Technologies. NYS Department of Environmental Conservation Beyond Dig and Haul: A survey of Remedial Technologies Agenda (20 Minutes) Excavations Bioremediation ISCO SVE Thermal treatment Remedy Selection Do not select the remedy before you investigate the site

More information

In Situ Remediation Conference 14

In Situ Remediation Conference 14 In Situ Remediation Conference 14 2 nd - 4 th September 2014 BOOK OF ABSTRACTS Index Session 1: Urban groundwater contamination and emerging contaminants Challenges in Urban Hydrogeology Examples from

More information

In Situ Bioremediation of DNAPL Source Zones

In Situ Bioremediation of DNAPL Source Zones In Situ Bioremediation of DNAPL Source Zones August 2005 Prepared by Lisa Moretti National Network of Environmental Management Studies Fellow for U.S. Environmental Protection Agency Office of Solid Waste

More information

STRATEGIES FOR LNAPL REMEDIATION

STRATEGIES FOR LNAPL REMEDIATION STRATEGIES FOR LNAPL REMEDIATION J. D. Keetley Petroleum Storage Tank Trust Fund Utah Department of Environmental Quality 2011 ASTSWMO LUST and State Funds Workshop September 13-15, 2011 Chicago, Illinois

More information

Advanced Tools for Subsurface Sampling and Analysis

Advanced Tools for Subsurface Sampling and Analysis Advanced Tools for Subsurface Sampling and Analysis 220 William Pitt Way Pittsburgh, PA 15238 412-286-5245 www.pacelabs.com Advanced Tools TABLE OF CONTENTS: 1. Table of Contents 2. Introduction 3. PAES

More information

Treatability Study for Edible Oil Deployment for Enhanced cvoc Attenuation for T-Area, Savannah River Site:

Treatability Study for Edible Oil Deployment for Enhanced cvoc Attenuation for T-Area, Savannah River Site: SRNL-RP-9-39 Rev. Treatability Study for Edible Oil Deployment for Enhanced cvoc Attenuation for T-Area, Savannah River Site: Interim Report Year One Brian Riha Brian Looney Jay Noonkester Keith Hyde May

More information

August 2002 Bioremediation of Chlorinated Solvents in Fractured Bedrock: Characterization and Case Studies

August 2002 Bioremediation of Chlorinated Solvents in Fractured Bedrock: Characterization and Case Studies August 2002 Bioremediation of Chlorinated Solvents in Fractured Bedrock: Characterization and Case Studies Prepared by Erica Borum National Network of Environmental Management Studies Fellow Prepared for

More information

STEAM ENHANCED EXTRACTION (SEE) AS INNOVATIVE APPROACH FOR TCE REMOVAL

STEAM ENHANCED EXTRACTION (SEE) AS INNOVATIVE APPROACH FOR TCE REMOVAL STEAM ENHANCED (SEE) AS INNOVATIVE APPROACH FOR TCE REMOVAL Pavel Dusílek 1, Petr Kvapil 2, Kent S. Udell 3, Craig M. Hampson 4 1 AQUATEST a.s, Prague, Czech Republic, Phone: 420 234 607 151, Fax: 420

More information

ETHICALCHEM BACKGROUND

ETHICALCHEM BACKGROUND A division of Ethical Solutions LLC Successfully Integrating Surfactants Into Chemox Technologies Dan Socci, CEO, EthicalChem Green Chemical Solutions for Environmental Remediation ETHICALCHEM BACKGROUND

More information

2005 Annual Report. East Hennepin Avenue Site. Prepared for General Mills Inc. February c-s3-15i

2005 Annual Report. East Hennepin Avenue Site. Prepared for General Mills Inc. February c-s3-15i 2005 Annual Report East Hennepin Avenue Site Prepared for General Mills Inc. February 2006 c-s3-15i 2005 Annual Report East Hennepin Avenue Site Prepared for General Mills, Inc. February 2006 2005 Annual

More information

ESTCP Cost and Performance Report

ESTCP Cost and Performance Report ESTCP Cost and Performance Report (ER-200824) Verification of Methods for Assessing the Sustainability of Monitored Natural Attenuation (MNA) January 2013 Environmental Security Technology Certification

More information

Multiphase flow and enhanced biodégradation of dense non-aqueous phase liquids: experimental design

Multiphase flow and enhanced biodégradation of dense non-aqueous phase liquids: experimental design Groundwater Quality: Natural and Enhanced Restoration of Groundwater Pollution (Proceedings of die Groundwater Quality 2001 Conference held at Sheffield. UK., June 2001). IAHS Publ. no. 275.2002. 265 Multiphase

More information

In situ Remediation of 1,4-Dioxane using Electrical Resistance Heating

In situ Remediation of 1,4-Dioxane using Electrical Resistance Heating In situ Remediation of using Electrical Resistance Heating Daniel Oberle, P.E. Emily Crownover, Ph.D. INTRODUCTION An increasing number of states are establishing enforceable 1,4-dioxane cleanup goals

More information

Overburden and Bedrock Remediation Using Activated Carbon Based Injectates. Mike Mazzarese AST Environmental, Inc.

Overburden and Bedrock Remediation Using Activated Carbon Based Injectates. Mike Mazzarese AST Environmental, Inc. Overburden and Bedrock Remediation Using Activated Carbon Based Injectates Mike Mazzarese AST Environmental, Inc. SMART Remediation Toronto, ON SMART is Powered by: www.vertexenvironmental.ca Overburden

More information

Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies

Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies Advancing the Science of In Situ Groundwater Remediation Petroleum Hydrocarbon Remediation Technologies RemBind Vadose Zone Treatment Tersus is the exclusive North American distributor for RemBind (US

More information

AECOM tel 8000 Virginia Manor Road, Suite fax Beltsville, MD 20705

AECOM tel 8000 Virginia Manor Road, Suite fax Beltsville, MD 20705 AECOM 301-289-3900 tel 8000 Virginia Manor Road, Suite 110 301-289-3901 fax Beltsville, MD 20705 March 30, 2018 Ms. Jeannette DeBartolomeo AECOM Project: 60144763 Maryland Department of Environment Oil

More information

Section 2 Corrective Action Objectives

Section 2 Corrective Action Objectives Section 2 Corrective Action Objectives 2.1 Corrective Action Objectives Corrective action objectives have been developed for this site based on the requirements provided under the North Carolina Solid

More information

November 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC

November 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC November 8, 2016 International Petroleum Environmental Conference Tim Nickels Pastor, Behling & Wheeler, LLC Long term, non-voluntary constant inhalation exposure to toxic compounds Non-voluntarily inhale

More information

Field Evaluation of the Treatment of DNAPL Using Emulsified Zero-Valent Iron (EZVI)

Field Evaluation of the Treatment of DNAPL Using Emulsified Zero-Valent Iron (EZVI) Field Evaluation of the Treatment of DNAPL Using Emulsified Zero-Valent Iron (EZVI) Tom Krug, Suzanne O Hara, Mark Watling (Geosyntec Consultants) Jacqueline Quinn (NASA Kennedy Space Center, FL) Nancy

More information

REMEDIAL INVESTIGATION REPORT Art Brass Plating

REMEDIAL INVESTIGATION REPORT Art Brass Plating REMEDIAL INVESTIGATION REPORT Art Brass Plating Prepared for: Art Brass Plating, Inc. Project No.050067 005C September 27, 2012 Agency Review Draft REMEDIAL INVESTIGATION REPORT Art Brass Plating Prepared

More information

NATURAL ATTENUATION OF CHLORINATED SOLVENTS IN GROUNDWATER: PRINCIPLES AND PRACTICES T E C H N I C A L -FINAL- R E Q U I R E M E N T S.

NATURAL ATTENUATION OF CHLORINATED SOLVENTS IN GROUNDWATER: PRINCIPLES AND PRACTICES T E C H N I C A L -FINAL- R E Q U I R E M E N T S. NATURAL ATTENUATION OF CHLORINATED SOLVENTS IN GROUNDWATER: PRINCIPLES AND PRACTICES T E C H N I C A L R E Q U I R E M E N T S The Interstate Technology and Regulatory Cooperation Work Group, In Situ Bioremediation

More information

Tylerville Center Water Supply Alternatives Evaluation

Tylerville Center Water Supply Alternatives Evaluation Tylerville Center Water Supply Alternatives Evaluation Public Hearing, Scoping Meeting and Presentation June 21, 2017 Connecticut Department of Energy and Environmental Protection Agenda Water Supply Alternatives

More information

Thermal Treatment of Thick Peat Layers DNAPL Removal and Shrinkage

Thermal Treatment of Thick Peat Layers DNAPL Removal and Shrinkage Thermal Treatment of Thick Peat Layers DNAPL Removal and Shrinkage Steffen Griepke Nielsen, (sgn@niras.dk) (NIRAS, Alleroed, Denmark) Gorm Heron (TerraTherm, Inc. Keene, CA, USA) Pia Juul Jensen, Charlotte

More information

Sections 5 & 6. Site Characterization and Lines of Evidence. Steve Posten

Sections 5 & 6. Site Characterization and Lines of Evidence. Steve Posten Sections 5 & 6 Site Characterization and Lines of Evidence Steve Posten Overview Section 5 Site Characterization Conceptual site model Aquifer characteristics Hydraulic conductivity/gradient Porosity Organic

More information

Class A-1 Partial Response Action Outcome Statement. Delivering sustainable solutions in a more competitive world

Class A-1 Partial Response Action Outcome Statement. Delivering sustainable solutions in a more competitive world Class A-1 Partial Response Action Outcome Statement Surrounding Site Area Former Sperry Research Center 100 North Road Sudbury, Massachusetts 13 March 2013 Prepared for: www.erm.com Delivering sustainable

More information

Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology

Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology Self-Sustaining Treatment for Active Remediation (STAR): Overview and Applications of the Technology Shanna Thompson, P.E. Gavin Grant, Ph.D., P.Eng. In Partnership with: siremlab.com/star Overview The

More information

Chlorinated Solvent Contaminants in Arizona Aquifers

Chlorinated Solvent Contaminants in Arizona Aquifers Chlorinated Solvent Contaminants in Arizona Aquifers By Janick F. Artiola, PhD and Mónica D. Ramírez, MPA Part I: Sources, Properties, Health Effects and Fate. Introduction Groundwater contamination by

More information

Combining Low-Energy Electrical Resistance Heating with Biotic and Abiotic Reactions for Treatment of Chlorinated Solvent DNAPL Source Areas

Combining Low-Energy Electrical Resistance Heating with Biotic and Abiotic Reactions for Treatment of Chlorinated Solvent DNAPL Source Areas (ER-200719) Combining Low-Energy Electrical Resistance Heating with Biotic and Abiotic Reactions for Treatment of Chlorinated Solvent DNAPL Source Areas January 2015 This document has been cleared for

More information

February 23, 2010 Version 0.0

February 23, 2010 Version 0.0 February 23, 2010 Version 0.0 New Jersey Department of Environmental Protection Site Remediation Program Guidance for Light Non-aqueous Phase Liquid (LNAPL) Free Product Initial Recovery and Interim Remedial

More information

Water Resources on PEI: an overview and brief discussion of challenges

Water Resources on PEI: an overview and brief discussion of challenges Water Resources on PEI: an overview and brief discussion of challenges Components: Components and links Atmospheric water Surface water (including glacial water) Groundwater Links: Precipitation (atm(

More information

Sites 2 and 12 In-Situ Chemical Oxidation Pilot Study Report Former Fort Ord, California

Sites 2 and 12 In-Situ Chemical Oxidation Pilot Study Report Former Fort Ord, California Sites 2 and 12 In-Situ Chemical Oxidation Pilot Study Report Former Fort Ord, California Prepared for AHTNA Government Services Corporation (AGSC) 1115 Shore Street West Sacramento, California Harding

More information

(,,,) = ( )exp ( + C(x,y,z,t) = the concentration of the contaminant at location x, y, z from the source at time t.

(,,,) = ( )exp ( + C(x,y,z,t) = the concentration of the contaminant at location x, y, z from the source at time t. INTRODUCTION Quick Domenico.xls (QD) is a Microsoft Excel spreadsheet application of An Analytical Model For Multidimensional Transport of a Decaying Contaminant Species, by P.A. Domenico, Journal of Hydrology,

More information

Overburden and Bedrock Remediation Using Activated Carbon Based Injectates. Gary Simpson AST Environmental, Inc.

Overburden and Bedrock Remediation Using Activated Carbon Based Injectates. Gary Simpson AST Environmental, Inc. Overburden and Bedrock Remediation Using Activated Carbon Based Injectates Gary Simpson AST Environmental, Inc. SMART Remediation Ottawa, ON SMART is Powered by: www.vertexenvironmental.ca Insitu Remediation

More information

Design of a passive hydraulic containment system using FEFLOW modelling

Design of a passive hydraulic containment system using FEFLOW modelling Design of a passive hydraulic containment system using FEFLOW modelling Rémi Vigouroux remi.vigouroux@arteliagroup.com Florence Lenhardt florence.lenhardt@arteliagroup.com Noëlle Doucet noelle.doucet@arteliagroup.com

More information