1 Federal Regulation: Final Boiler MACT Rule Requirements Summary NESHAP 40 CFR 63 Subpart DDDDD Proposed rule published 6/4/2010 Final rule signed 2/21/2011 Info at Affected Source: The affected source is: (1) the collection of all existing industrial, commercial, or institutional boilers or process heaters within a subcategory located at a major source facility that do not combust solid waste or (2) each new or reconstructed industrial, commercial, or institutional boiler or process heater located at a major source facility that do not combust solid waste, as that term is defined under RCRA. A boiler or process heater is new if you commence construction of the boiler or process heater after June 4, 2010, and you meet the applicability criteria at the time you commence construction. The affected source does not include boilers and process heaters that are subject to another standard under 40 CFR 63 or a standard established under CAA section 129. Exemptions: An electric utility steam generating unit (note that non-fossil fuel fired utility boilers and utility boilers <25 MW are covered). A recovery boiler or furnace covered by 40 CFR 63, subpart MM. A boiler or process heater that is used specifically for research and development. This does not include units that provide heat or steam to a process at a research and development facility. A hot water heater (<120 gal, <160 psig pressure, <210 F). A refining kettle covered by 40 CFR 63, subpart X. An ethylene cracking furnace covered by 40 CFR 63, subpart YY. Blast furnace stoves. Any boiler or process heater specifically listed as an affected source in another standard(s) under 40 CFR part 63. Any boiler or process heater that is used as a control device to comply with another subpart under Part 63, provided that at least 50 percent of the heat input to the boiler is provided by the gas stream that is regulated under another subpart. Temporary boilers (onsite less than 180 consecutive days). Blast furnace gas fuel-fired boilers and process heaters. Subcategories: (a) Pulverized coal/solid fossil fuel units. (b) Stokers designed to burn coal/solid fossil fuel. (c) Fluidized bed units designed to burn coal/solid fossil fuel. (d) Stokers designed to burn biomass/bio-based solid. (e) Fluidized bed units designed to burn biomass/bio-based solid. (f) Suspension burners/dutch Ovens designed to burn biomass/bio-based solid. (g) Fuel Cells designed to burn biomass/bio-based solid. (h) Hybrid suspension/grate burners designed to burn biomass/bio-based solid. (i) Units designed to burn solid fuel. (j) Units designed to burn liquid fuel. Page 1 of 10

2 (k) Units designed to burn liquid fuel in non-continental States or territories. (l) Units designed to burn natural gas, refinery gas or other gas 1 fuels. (m) Units designed to burn gas 2 (other) gases. (n) Metal process furnaces. (o) Limited-use boilers and process heaters. For the fuel based HAP (PM/mercury/HCl), if your new or existing unit combusts at least 10 percent solid fuel on an annual basis, your unit is subject to emission limits that are based on data from all of the solid fuel-fired combustor designs. If your new or existing boiler or process heater burns at least 10 percent biomass on an annual average heat input basis, the unit is in one of the biomass subcategories for CO and D/F. If your new or existing boiler or process heater burns at least 10 percent coal, on an annual average heat input basis, and less than 10 percent biomass, on an annual average heat input basis, the unit is in one of the coal subcategories for CO and D/F. If your new or existing boiler or process heater burns at least 10 percent liquid fuel (such as distillate oil, residual oil), and less than 10 percent solid fuel, on an annual heat input basis, the unit is in the liquid subcategory. If your facility is located outside of North America and your new or existing unit combusts at least 10 percent liquid fuel and less than 10 percent solid fuel, your unit is subject to the non-continental liquid fuel emission limits. If your unit combusts only natural gas, refinery gas, or equivalent fuel (other gas that qualifies as Gas 1 fuel), with limited exceptions for gas curtailment and emergencies, your unit is subject to a work practice standard that requires an annual tune-up in lieu of emission limits. Important Definitions: Biomass or bio-based solid fuel means any biomass-based solid fuel that is not a solid waste. This includes, but is not limited to, wood residue; wood products (e.g., trees, tree stumps, tree limbs, bark, lumber, sawdust, sander dust, chips, scraps, slabs, millings, and shavings); animal manure, including litter and other bedding materials; vegetative agricultural and silvicultural materials, such as logging residues (slash), nut and grain hulls and chaff (e.g., almond, walnut, peanut, rice, and wheat), bagasse, orchard prunings, corn stalks, coffee bean hulls and grounds. This definition of biomass is not intended to suggest that these materials are or are not solid waste. Boiler means an enclosed device using controlled flame combustion and having the primary purpose of recovering thermal energy in the form of steam or hot water. Controlled flame combustion refers to a steady-state, or near steady-state, process wherein fuel and/or oxidizer feed rates are controlled. A device combusting solid waste, as defined in 241.3, is not a boiler unless the device is exempt from the definition of a solid waste incineration unit as provided in section 129(g)(1) of the Clean Air Act. Waste heat boilers are excluded from this definition. Coal means all solid fuels classifiable as anthracite, bituminous, sub-bituminous, or lignite by the American Society for Testing and Materials in ASTM D388 05, Standard Classification of Coals by Rank (incorporated by reference, see 63.14), coal refuse, and petroleum coke. For the purposes of this subpart, this definition of coal includes synthetic fuels derived from coal for creating useful heat, including but not limited to, solvent-refined coal, coal-oil mixtures, and coal-water mixtures. Coal derived gases are excluded from this definition. Page 2 of 10

3 Electric utility steam generating unit means a fossil fuel-fired combustion unit of more than 25 megawatts that serves a generator that produces electricity for sale. A fossil fuel-fired unit that cogenerates steam and electricity and supplies more than one-third of its potential electric output capacity and more than 25 megawatts electrical output to any utility power distribution system for sale is considered an electric utility steam generating unit. Gaseous fuel includes, but is not limited to, natural gas, process gas, landfill gas, coal derived gas, refinery gas, and biogas. Blast furnace gas is exempted from this definition. Liquid fuel includes, but is not limited to, distillate oil, residual oil, on-spec used oil, and biodiesel. Limited-use boiler or process heater means any boiler or process heater that burns any amount of solid, liquid, or gaseous fuels, has a rated capacity of greater than 10 MMBtu per hour heat input, and has a federally enforceable limit of no more than 876 hours per year of operation. Metal process furnaces include natural gas-fired annealing furnaces, preheat furnaces, reheat furnaces, aging furnaces, heat treat furnaces, and homogenizing furnaces. Process heater means an enclosed device using controlled flame, and the unit's primary purpose is to transfer heat indirectly to a process material (liquid, gas, or solid) or to a heat transfer material for use in a process unit, instead of generating steam. Process heaters are devices in which the combustion gases do not come into direct contact with process materials. A device combusting solid waste, as defined in 241.3, is not a process heater unless the device is exempt from the definition of a solid waste incineration unit as provided in section 129(g)(1) of the Clean Air Act. Process heaters do not include units used for comfort heat or space heat, food preparation for on-site consumption, or autoclaves. Temporary boiler means any gaseous or liquid fuel boiler that is designed to, and is capable of, being carried or moved from one location to another by means of, for example, wheels, skids, carrying handles, dollies, trailers, or platforms. A boiler is not a temporary boiler if any one of the following conditions exists: o o o o The equipment is attached to a foundation. The boiler or a replacement remains at a location for more than 12 consecutive months. Any temporary boiler that replaces a temporary boiler at a location and performs the same or similar function will be included in calculating the consecutive time period. The equipment is located at a seasonal facility and operates during the full annual operating period of the seasonal facility, remains at the facility for at least 2 years, and operates at that facility for at least 3 months each year. The equipment is moved from one location to another in an attempt to circumvent the residence time requirements of this definition. Emissions Limits and Work Practices: Emission limits were developed for new and existing sources for 15 subcategories, which EPA developed based on unit design. Fuel based emission limits for PM, HCl, Hg Fuel and boiler design based limits for CO, dioxin/furan Page 3 of 10

4 Limits for existing sources are based on top 12% of units for which EPA has data in subcategories with population greater than or equal to 30 units, and top 5 units in subcategories with population less than 30 units. Limits for new sources are based on the top performing unit in each subcategory. Variability was taken into account using a 99 percent upper prediction level (99.9 UPL for CO) and a fuel content variability adjustment for mercury and chloride. Emissions averaging is allowed for existing affected sources in the same subcategory (solid, liquid, or gas) for PM, HCl, and Hg, but the average emissions have to be within 90 percent of the allowable emissions. Facilities using this approach cannot increase emissions over emission levels achieved upon the effective date of the rule or begin using a less effective control technology than the technology that was in place upon the effective date of the rule. HAP/Fuel Proposal Final Proposal Final Units Output Based (lb/mmbtu steam output) Existing Boilers New Boilers Existing New Hg Biomass lb/tbtu 4.50E E-06 PM Biomass lb/mmbtu HCl Biomass lb/mmbtu Hg Coal lb/tbtu 4.50E E-06 PM Coal lb/mmbtu HCl Coal lb/mmbtu Hg Oil lb/tbtu 3.30E E-07 Hg Oil non-continental lb/tbtu 8.00E E-07 PM Oil lb/mmbtu HCl Oil lb/mmbtu Hg Gas lb/tbtu 7.80E E-07 PM Gas lb/mmbtu HCl Gas lb/mmbtu Hg Hg content content <40 <40 NA µg/m 3 NA µg/m 3 - NA NA Or clean gas 2 can opt in to Gas 1 work practice if prior to combustion: H 2S content <4ppmv H 2S content <4ppmv - NA NA CO Biomass stoker ppm at 3%O CO Biomass FB ppm at 3%O CO Biomass Dutch/ Suspension ppm at 3%O CO Biomass Fuel Cell ppm at 3%O CO Biomass Hybrid Suspension/ Grate NA 3500 NA 1500 ppm at 3%O Page 4 of 10

5 HAP/Fuel Proposal Final Proposal Final Units Output Based (lb/mmbtu steam output) Existing Boilers New Boilers Existing New CO Coal pulverized ppm at 3%O CO Coal stoker ppm at 3%O CO Coal FB ppm at 3%O CO Oil ppm at 3%O CO Oil non-continental ppm at 3%O CO Gas ppm at 3%O D/F Biomass stoker %O2 4.40E E-12 D/F Biomass FB %O2 1.80E E-11 D/F Biomass Dutch/ Suspension %O2 1.80E E-10 D/F Biomass Fuel Cell %O2 3.50E E-12 D/F Biomass Hybrid Suspension/Grate NA 0.2 NA 0.2 7%O2 1.80E E-10 D/F Coal pulverized %O2 3.70E E-12 D/F Coal stoker %O2 2.80E E-12 D/F Coal FB %O2 1.80E E-12 D/F Oil %O2 9.20E E-12 D/F Gas %O2 3.90E E-12 A work practice applies during periods of startup and shutdown. You must follow the manufacturer s recommended procedures for minimizing periods of startup and shutdown. The emissions and operating limits apply during malfunction periods. You may use the affirmative defense provision to justify excess emissions during malfunction periods that meet the 9 criteria in the rule. Limited-use boilers and process heaters must complete a biennial tune-up. They are not subject to the emission limits, the annual tune-up requirement, or the operating limits. Major sources that have limited-use boilers and process heaters must complete an energy assessment only if the source has other existing boilers subject to this subpart that are not limited-use boilers. Page 5 of 10

6 Work practices are required for all new and existing units less than 10 MMBtu/hr in size (biennial tune-up) and for all natural gas/refinery gas units and metal process furnace units (annual tune-up for gas units >10 MMBtu/hr). If the unit is not operating on the required date of the tune-up, it must be conducted within one week of startup. 1. Inspect the burner, and clean or replace any components of the burner as necessary (you may delay burner inspection until next scheduled unit shutdown, but must inspect burner at least once per 36 months), 2. Inspect the flame pattern, as applicable, and make any adjustments to the burner necessary to optimize the flame pattern consistent with the manufacturer s specifications, 3. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly, 4. Optimize total emissions of CO consistent with the manufacturer s specifications, 5. Measure the concentrations in the effluent stream of CO in ppmv and O 2 in percent, before and after the adjustments are made, 6. Maintain a report containing the concentrations of CO in the effluent stream in ppmv, and oxygen in percent, measured before and after the adjustments of the boiler, a description of any corrective actions taken as a part of the combustion adjustment, and the type and amount of fuel used over the 12 months prior to the annual adjustment if the unit is capable of burning more than one fuel. As provided in 63.6(g), EPA may approve use of an alternative to the work practice standards in the rule. A beyond the floor requirement is also included for all existing major source facilities having affected boilers or process heaters that would require the performance of a one-time energy assessment by qualified personnel on the affected boilers and energy use system to identify any cost-effective energy conservation measures (cost effective means items having a payback period of 2 years or less). The facility must also implement an energy management program. Energy assessment means an in-depth assessment of a facility to identify immediate and longterm opportunities to save energy, focusing on the steam and process heating systems, which involves a thorough examination of potential savings from energy efficiency improvements, waste minimization and pollution prevention, and productivity improvement. Energy assessment for facilities with affected boilers and process heaters using less than 0.3 trillion Btu per year heat input will be one day in length maximum. The boiler system and energy use system accounting for at least 50 percent of the energy output will be evaluated to identify energy savings opportunities, within the limit of performing a one-day energy assessment. The Energy assessment for facilities with affected boilers and process heaters using 0.3 to 1.0 trillion Btu per year will be 3 days in length maximum. The boiler system and any energy use system accounting for at least 33 percent of the energy output will be evaluated to identify energy savings opportunities, within the limit of performing a 3-day energy assessment. In the Energy assessment for facilities with affected boilers and process heaters using greater than 1.0 trillion Btu per year, the boiler system and any energy use system accounting for at least 20 percent of the energy output will be evaluated to identify energy savings opportunities. Page 6 of 10

7 Energy management program means the set of practices and procedures designed to manage energy use that are demonstrated by the facility s energy policies, a facility energy manager and other staffing responsibilities, energy performance measurement and tracking methods, an energy saving goal, action plans, operating procedures, internal reporting requirements, and periodic review intervals used at the facility. Testing Requirements for Units with Emission Limits: Affected sources must demonstrate initial compliance within 180 days of the compliance date or within 180 days of startup. Testing must be conducted during representative operating load conditions. Future operating load must not exceed 110 percent of load during testing. Sources that cease burning solid waste and become regulated under Boiler MACT must demonstrate initial compliance within 60 days of the effective date of the waste to fuel switch. (1) Conduct initial and annual stack tests to determine compliance with the PM emission limits using EPA Method 5 or 17. (Note that if a unit is >250 MMBtu and burns solid fuel or residual oil, PM CEMS are required, which require extensive calibration testing.) (2) Conduct initial and annual stack tests to determine compliance with the mercury emission limits using EPA method 29, 101A, or ASTM-D (Ontario Hydro Method). (3) Conduct initial and annual stack tests to determine compliance with the HCl emission limits using EPA Method 26A or EPA Method 26 (if no entrained water droplets in the sample). (4) Use EPA Method 19 to convert measured concentration values to pound per million Btu values. (5) Conduct initial and annual test to determine compliance with the CO emission limits using EPA Method 10. (6) Conduct initial test to determine compliance with the D/F emission limits using EPA Method 23. Conduct HCl and Hg performance tests while operating at representative operating load and burning the fuel mixture that has the highest content of Hg and chlorine (may have to do 2 tests). Develop maximum Cl and Hg fuel input limits based on fuel sampling and operating parameter monitoring ranges based on initial performance testing. If you are only burning one type of fuel, you are exempt from fuel sampling requirements. You can conduct performance stack tests less often for a given pollutant if your performance stack tests for the pollutant for at least 2 consecutive years show that your emissions are at or below 75 percent of the emission limit, and if there are no changes in the operation of the affected source or air pollution control equipment that could increase emissions. In this case, you can conduct a performance test every 3 years, but no more than 37 months after the last performance test. If a performance test shows emissions greater than 75 percent of the applicable emission limit, then you revert to annual performance testing for the next 2 years. The reduced testing frequency cannot be used if you are using emissions averaging. If you are demonstrating compliance using fuel analysis for mercury or HCl, fuel analysis must be performed monthly and before burning a new type of fuel. You are not required to conduct fuel analysis for fuels used only for startup, shutdown, or transient flame stability purposes. If 12 consecutive monthly fuel analyses demonstrate compliance, you may request decreased fuel analysis frequency by applying to the EPA Administrator for approval of alternative monitoring under 63.8(f). Page 7 of 10

8 If you are demonstrating that a gaseous fuel meets the H 2 S and Hg specifications of an other gas 1 fuel, you must conduct an initial fuel specification analysis. If your gas could vary above the specifications, you must conduct monthly testing and maintain records. Report results of all stack tests and fuel analyses within 60 days of completion. Stack test reports must verify that operating limits have not changed or provide documentation of revised operating limits. Results must be reported to the EPA s online ERT. Use of Output Based Limits and Emission Credits from Energy Conservation Measures You can comply with the output based emission limits and take credit for implementing energy conservation measures identified in the energy assessment. To use this approach, you must establish an emissions benchmark, calculate and document the emission credits, develop an implementation plan, comply with the general reporting requirements, and apply the following emission credit procedures: Establish a benchmark for each affected boiler in terms of trillion Btu per year heat input. The benchmark is established for the one-year period prior to the energy demand reduction. Determine the starting point from which to measure progress. Inventory all fuel purchased and generated onsite. Document all uses of energy from the affected boiler. Collect data to normalize the benchmark to current operations. Emissions credits can be generated if the energy conservation measures were implemented after January 14, 2011 and if sufficient information is available to determine the value of the credits. Boilers that are shutdown cannot be used to generate credits. Credits are generated by the difference between the benchmark that is established for each boiler and the actual energy demand reductions. The credit is equal to the energy input savings divided by the baseline energy input. Adjusted emission level for each boiler = (measured emissions, lb/mmbtu)x(1-credit) Operating Limits: Control Device Wet scrubber control Fabric filter control (for sources not using PM CEMS) ESP (dry control system, sources not using PM CEMS) ESP (followed by wet scrubber, sources not using PM CEMS) Operating Limits Minimum 12-hour average pressure drop and liquid flow is 90 percent of performance test average (3-hour average for sources using emissions averaging); For HCl control, minimum 12-hour average ph is 90 percent of performance test average. Operate bag leak detection system and fabric filter such that alarms are less than 5% of the operating time during a semi-annual period, initiate corrective action within 1 hour of an alarm; OR Maintain daily block average opacity <10% Maintain daily block average opacity <10% Minimum 12-hour average voltage and current or 12- hour average minimum power is 90 percent of performance test average Dry scrubber Minimum 12-hour average sorbent injection rate is 90 percent of performance test average (adjusted for load) Page 8 of 10

9 Control Device Operating Limits Carbon injection Minimum 12-hour average sorbent injection rate is 90 percent of performance test average (adjusted for load) Other dry control system (sources Maintain daily block average opacity <10% not using PM CEMS) Operating load (if demonstrating Maintain 12-hour average operating load at or below 110 compliance using stack testing) percent of load during performance test Oxygen concentration (for boilers Measure the oxygen concentration in the flue gas during and process heaters that are the initial CO and dioxin/furan performance test. The subject to a CO and a dioxin/furan lowest hourly average oxygen concentration during the emission limit) most recent performance test is your operating limit, and your unit must operate at or above your operating limit on a 12-hour average basis. Fuel analysis option Maintain fuel type or fuel mixture such that the calculated emission rate is less than the applicable emission limit. For units combusting coal, biomass, or residual oil with heat input capacities of 250 MMBtu/hr or greater, PM CEMS must be installed and operated such that PM levels (30-day rolling average) are maintained below the applicable PM limit. If PM CEMS are used, no PM pollution control device or opacity operating parameter limits apply. Operating above established maximum or below established minimum operating limits is a deviation except during performance tests conducted to determine compliance with the emission limits or to establish new operating limits. Development of Plans: Site specific monitoring plan Site specific test plan Site specific fuel analysis plan Emissions averaging plan (if applicable) Output based limits emission credits implementation plan (if applicable) Continuous Compliance/Monitoring Requirements: Continuously monitor control device parameters for which operating limits have been developed, 12-hour block averages. For boilers subject to CO and D/F limits, must install an O2 CEMS, 12-hour averaging period for operating limit. For solid fuel or residual oil-fired boilers with dry control devices not using PM CEMS or bag leak detectors, install COMS and maintain opacity <10%, daily block average. If burning multiple fuels, maintain fuel mixture Hg and Cl content at or below the maximum fuel input levels established during initial performance test. For boilers >250 MMBtu/hr burning coal, biomass, or residual oil, must install a PM CEMS, 30-day averaging period. Follow applicable plans, including QA requirements for monitoring systems. Notifications: Page 9 of 10

10 Initial Notification no later than 120 calendar days after you become subject to the rule (even if you submitted one under the 2004 rule); Notification of intent to conduct performance test at least 60 days prior to any compliance demonstration; Notification of compliance status within 60 days of completion of any compliance demonstration; For natural gas fired units that intend to fire an alternative fuel during a curtailment period or supply interruption, a Notification of alternative fuel use within 48 hours of the declaration of a period of natural gas curtailment of supply interruption. For boilers that choose to commence or recommence burning solid waste, must provide 30 day notice. If you intend to switch fuels and change subcategories, provide 30 days notice. Recordkeeping Requirements: Records demonstrating compliance with above requirements. Records documenting malfunctions and deviations. Hours of operation for each limited use unit. Monthly fuel use records. Documentation that you are not burning solid waste. Owners or operators of sources with units with heat input capacity of less than 10 MMBtu/hr, units combusting natural gas or other clean gas, metal process furnaces, and limited use units must keep records of the dates and the results of each required boiler tune-up. Page 10 of 10

11 COMPARISON OF FINAL FEB 2011 BOILER MACT LIMITS TO JUN 2010 PROPOSED BOILER MACT LIMITS Output Based Factor Factor Proposal Final Proposal Final Units (lb/mmbtu steam HAP/Fuel Better Better output) Existing Boilers New Boilers Existing New Hg Biomass lb/tbtu 4.50E E-06 PM Biomass lb/mmbtu HCl Biomass lb/mmbtu Hg Coal lb/tbtu 4.50E E-06 PM Coal lb/mmbtu HCl Coal lb/mmbtu Hg Oil lb/tbtu 3.30E E-07 Hg Oil non-continental lb/tbtu 8.00E E-07 PM Oil lb/mmbtu HCl Oil lb/mmbtu Hg Gas lb/tbtu 7.80E E-07 PM Gas lb/mmbtu HCl Gas lb/mmbtu Or clean gas 2 can opt in to Gas 1 work practice if: NA Hg content <40 ug/m3 H 2 S content <4ppmv NA Hg content <40 ug/m3 H 2 S content <4ppmv - NA NA - NA NA CO Biomass stoker CO Biomass FB CO Biomass Dutch/ Suspension CO Biomass Fuel Cell CO Biomass Hybrid Suspension/ Grate NA 3500 NA NA 1500 NA CO Coal pulverized CO Coal stoker CO Coal FB CO Oil CO Oil non-continental CO Gas ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O ppm at 3%O D/F Biomass stoker D/F Biomass FB D/F Biomass Dutch/ Suspension D/F Biomass Fuel Cell D/F Biomass Hybrid Suspension/Grate NA 0.2 NA NA 0.2 NA D/F Coal pulverized D/F Coal stoker D/F Coal FB D/F Oil D/F Gas %O2 4.40E E-12 7%O2 1.80E E-11 7%O2 1.80E E-10 7%O2 3.50E E-12 7%O2 1.80E E-10 7%O2 3.70E E-12 7%O2 2.80E E-12 7%O2 1.80E E-12 7%O2 9.20E E-12 7%O2 3.90E E-12 Follow manufacturer's recommended procedures for minimizing periods of startup and shutdown. Emission limits are 30-day averages where CEMS are used (e.g., PM CEMS for residual oil or solid fuel units >250 MMBtu/hr).

12 Comparison of Emission Limits between CISWI and Major Boiler Rules Major Boiler Limits CISWI Limits for ERUs HAP/Fuel Final Final Units Final Final Units Higher Higher Existing New Existing New Existing New Hg Biomass lb/tbtu lb/tbtu MACT MACT PM Biomass lb/mmbtu lb/mmbtu CISWI CISWI HCl Biomass lb/mmbtu lb/mmbtu MACT MACT Hg Coal lb/tbtu lb/tbtu MACT MACT PM Coal lb/mmbtu lb/mmbtu CISWI CISWI HCl Coal lb/mmbtu lb/mmbtu MACT MACT Hg Oil lb/tbtu lb/tbtu MACT CISWI Hg Oil noncontinental lb/tbtu lb/tbtu CISWI MACT PM Oil lb/mmbtu lb/mmbtu CISWI CISWI HCl Oil lb/mmbtu lb/mmbtu CISWI CISWI Hg Gas lb/tbtu lb/tbtu MACT MACT PM Gas lb/mmbtu lb/mmbtu CISWI CISWI HCl Gas lb/mmbtu lb/mmbtu CISWI CISWI CO Biomass stoker ppm at 3%O ppm at 3%O2 CISWI CISWI CO Biomass FB ppm at 3%O ppm at 3%O2 CISWI MACT CO Biomass Dutch/ Suspension ppm at 3%O2 ppm at 3%O2 CISWI MACT CO Biomass Fuel Cell ppm at 3%O ppm at 3%O2 MACT MACT CO Biomass Hybrid Suspension/ Grate ppm at 3%O2 ppm at 3%O2 MACT MACT CO Coal pulverized ppm at 3%O ppm at 3%O2 MACT CISWI CO Coal stoker ppm at 3%O ppm at 3%O2 MACT CISWI CO Coal FB ppm at 3%O ppm at 3%O2 MACT CISWI CO Oil 10 3 ppm at 3%O ppm at 3%O2 CISWI CISWI CO Oil noncontinental ppm at 3%O ppm at 3%O2 MACT MACT CO Gas2 9 3 ppm at 3%O ppm at 3%O2 CISWI CISWI D/F Biomass stoker D/F Biomass FB D/F Biomass Dutch/ Suspension D/F Biomass Fuel Cell D/F Biomass Hybrid Suspension/Grate D/F Coal pulverized at 7%O2 at 7%O at 7%O at 7%O D/F Coal stoker D/F Coal FB D/F Oil D/F Gas at 7%O at 7%O at 7%O at 7%O at 7%O at 7%O %O2 CISWI CISWI 7%O2 CISWI MACT %O2 MACT MACT %O2 MACT CISWI 7%O2 MACT MACT 7%O2 CISWI CISWI 7%O2 CISWI CISWI 7%O2 CISWI CISWI 7%O2 MACT CISWI 7%O2 CISWI MACT

13 Health based Compliance Approach How Major Issues are Addressed in the Final Boiler MACT Rule Issue Recommendation Outcome Include for both HCl and Mn and allow facility specific assessment using look-up table Source based limits instead of pollutant by pollutant Combination boilers (biomass and coal) Dioxin work practice Performance Variability Subcategorization Biomass Look at boiler performance holistically and not HAP by HAP for PM, Hg, and HCl Apply biomass limits for combustion byproducts (CO/D/F) and coal limits for fuel contaminant HAPs (Hg, PM and HCl) Replace limits set below limit of detection with good combustion practices; we don t know how to predict or control D/F Raise various limits to account for greater variability in fuels, designs, processes and products based on new emission data. Use CO CEMS data to set limits to account for CO variability. Adopt additional subcategories for limited use, dry/wet biomass, coal types, liquid types. Don t disadvantage biomass boilers Rejected citing lack of data on co-located sources and need to set standard, specifically reject Mn limit Support HAP by HAP, criticize source based and toxicity weighting; acknowledge control conflicts but other changes improve achievability Biomass and coal merged for fuel based HAPs into a solid fuel subcategory; combustion based HAPs in biomass subcategories when burning >10 biomass no matter how much coal Had to set D/F limit because had some detects. Initial compliance test then set 90% of average oxygen concentration during initial test as ongoing limit (also for CO), must follow good combustion practices; non-detects from Method 23 treated as zero. Rejects focusing only on the congeners specifically listed as HAP because all D/F are POM and POM is a listed HAP. Not using other data sources, only stack test data; looked at fuel variability factor (no control efficiency adjustment and different outlier consideration); considered load for CO using 99.9 UPL; new data increasing limits; more use of fuel analysis (Hg oil); don t have CEM data for CO thus stack tests (CO CEMS requirement gone) 15 now (12 before). Did not add subcategories by coal or liquid type. Combined biomass/coal into one solid fuel subcategory for fuel based HAPs. Added non-continental (for refineries), limited use (tune up only), and hybrid suspension grate (bagasse). Helped by merger with coal for fuel based HAPs scrubbers no longer needed for all biomass boilers. Page 1 of 5

14 Issue Recommendation Outcome Retain natural gas work practices and expand to Gas II units Gas work practices Energy Audits Limit of Detection Biased Data Set Data quality Realistic new source limits Surrogates Set TSM limit Drop audits as unjustified Adjust limits by three fold to account for practical quantitation limits of methods for Hg and D/F Use alternative statistical approaches that reflect biased HAP testing and data base. Augment with other available data. Found many errors in data set. Set achievable limits that do not discourage investment in new systems. Need to be able to get guarantees from vendors. Retain existing PM, HCl and CO surrogates, but set more reasonable CO limits (ultra low CO doesn t guarantee ultra low HAP) Work practices for natural gas, refinery gas and other equivalent clean gases (Hg <40 ug/m 3 and H 2 S <4 ppmv); Remaining Gas 2 has limits; all new and existing <10 MMBTU boilers have work practices One time energy audit but ongoing energy management program required; set duration and requirements for energy saving opportunities 1. <0.3 trillion Btu/yr look at 50% of output, 1 day max length to 1 trillion look at 33% of output, 3 days max length 3. >1 trillion - examine 20% of energy output Cost effective energy conservation measure has 2 year payback. Can take credit for recent audits. Inappropriate to set floor below MDL; if floor is >3x representative MDL then limit OK, otherwise set at 3x representative MDL. 99% UPL still except 99.9% for CO; using Bhaumik-Gibson approach; mix of confidence intervals; blame industry for not doing more testing, use available data; reject idea that always need at least 5 sources in floor EPA has developed memo cataloguing all changes made to database. Some higher, a few lower still set on a pollutant by pollutant basis from lowest emitting boilers in subcategories, still likely unachievable as a whole. Kept proposed surrogates, did not propose any others (e.g., THC, TSM), replaced CO CEMS and ongoing D/F testing with O2 CEMS. Considered measurement capabilities of Method 10, used 99.9 UPL to improve CO limits. Set metals standard in No TSM limits, no Mn HBCA addition to PM limit; also critical to Mn HBCA Page 2 of 5

15 Issue Recommendation Outcome Size cutoffs Raise cutoffs from 10 to Stayed at 10, but added work practices for 30 MM Btu new units <10 MMBtu/hr (were subject to Emission Averaging Averaging Periods SSM CO load issue Encourage by eliminating discount factor and allowing averaging for all pollutants across all subcategories Averaging periods for CPMS should be longer, 30 day averaging for CEMS good Include exemptions for SSM If use CO CEMS, can t meet limits during SS due to high O2. Exclude data at <50% load from compliance. limits in proposal) Kept discount factor, no averaging with new units; averaging only within subcategory but solid fuel category will allow coal-biomass averaging for fuel based HAP Retained 30 day averaging for CEMS, only 12-hour averaging for CPMS. For startup/shutdown follow manufacturer s procedures for minimizing time during startup/shutdown, affirmative defense for malfunction. Only using stack test data to set limits. Used 99.9UPL to increase variability. No more CO CEMS only O2 monitoring as operating parameter limit. CEMS Drop or restrict PM CEMS for >250 MMBtu/hr solid fuel and residual oil units maintained (but 30 day avg instead of daily); no CO CEMS (O2 monitoring instead) One MACT No double coverage Agreed boilers that are affected sources in other MACTs are exempt, also specified that boilers burning streams as control devices for other MACTs are exempt as long as those streams make up 50% of heat input. Flexibility Provide other options for limits, like % reduction Did not have enough data for % reduction option. Added output based option so facilities can take credit for efficiency improvements pound per MMbtu of steam output., but not sure at this point who benefits. Page 3 of 5

16 Issue Recommendation Outcome Costs Costs are understated by factor of two Still understated by factor of two; EPA says $5.1 billion, ($1.8 billion annually, $400M less with energy savings) and URS estimates $11B (EPA refutes URS detailed points, with higher Hg limits activated carbon not likely, CO catalyst proprietary so could not include, still assuming packed bed scrubbers). Little cost assigned to new Job Impacts Benefits Tune ups Allowance for oil firing during curtailment Boiler design ERT Compliance timeframe Argued significant jobs at risk due to potential mill closures due to higher costs Should not claim PM and SO2 benefits for MACT rule Should not tune based on CO. May not shut down annually to accommodate tune up. Procedures specified may not apply to all units. Should not limit the amount of oil that a gasfired boiler can burn during curtailment. Boilers are not designed to burn one fuel. ERT should not be required A longer timeframe for compliance should be required. units EPA claims job gains for pollutant controls and operation offset losses (2000 gained); using macro model based on old information and fails to disaggregate forest products industry $22-55 billion in benefits (17-41 before); include SO2 and VOC/ozone benefits in addition to PM (SO2 still biggest value); 2,500 to 6,500 lives saved Requirement is to record beginning and ending CO, not minimize CO. Frequency still annual for units >10 MMBtu/hr. Agreed no limit to oil firing during natural gas curtailment, just keep records and report. Boilers can be considered single fuel if they have a different startup fuel than that fired during normal operations. Solid fuel boilers have been combined into one category for the fuel based HAP. ERT is required No additional time is given. Page 4 of 5

17 Issue Recommendation Outcome Solid waste Units should be able to switch back and forth between 112 and 129 depending on whether they are burning solid waste. Incidental burning of solid waste should be allowed. CPMS QA/QC Requirements are too onerous, should be site specific Definitions Refinery gas and natural gas Fuel analysis Should not be required for each supplier, only for each fuel type. If not stack testing, monthly fuel analysis is too frequent, with limits so low no one will be able to use. Stack Testing Definition of EGU Annual testing should not be required, not necessary when continuous monitoring is performed. Should be allowed to test one unit if representative of many. Four hour runs not necessary. Specify handling of non-detects. Need to make clear what units are covered here and what units covered under Utility MACT Units can come back under 112 if they stop burning solid waste but can only go back and forth every 6 months. Incidental burning of solid waste is not allowed. Requirements for QA/QC for CPMS are still specified, rather than left to site specific monitoring plans. Added definition of refinery gas, corrected definition of natural gas. Sampling is now required per fuel type, not per fuel supplier. Still monthly fuel analysis. With better HCl and Hg limits more facilities may be able to use instead of stack testing. Initial test only for D/F. Can test every 3 years if <75% of the limit for the first 2 years of testing, unless you are using emissions averaging then testing still annual. No allowance for similar units. Test run time of 4 hours for everything not specified in final rule, but sample volumes are. D/F non-detects can be zero. New limitation to operate below 110% of load during compliance test. Electric utility steam generating unit means a fossil fuel fired combustion unit of more than 25 megawatts that serves a generator that produces electricity for sale. A fossil fuel fired unit that cogenerates steam and electricity and supplies more than one-third of its potential electric output capacity and more than 25 megawatts electrical output to any utility power distribution system for sale is considered an electric utility steam generating unit. They did not specify net output as requested. Biomass utility boilers will be under this rule. Page 5 of 5

BOILER MACT 40 CFR 63 DDDDD

BOILER MACT 40 CFR 63 DDDDD BOILER MACT 40 CFR 63 DDDDD I. Applicability (63.7485): Industrial, commercial, or institutional boiler or process heater (63.7575) located at a HAP major, except for (63.7491) exempted listed below. Note:

More information

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Boiler MACT & Related Rules Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Clean Air Act Rules Recently Finalized National Emissions Standard for Hazardous Air

More information

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4 Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers Table of Contents General (Q1 Q9)....2 Applicability (Q10 Q22)...4 Compliance Testing (Q23-Q30).....7 Implementation: Tune-ups (Q31

More information

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr Department of the Environment COMAR 26.11.09 Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr October 30, 2013 Topics Covered Standards,

More information

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered Department of the Environment Technology Advancement and Standards for Biomass Fuel to Energy Conversion Husain Waheed Ph.D., Ad.Tech February 18, 2015 For discussion only Topics Covered Standards, Technology,

More information

Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers

Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers OPERATIONAL EXCELLENCE A WORLD LEADER STEWARDSHIP Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers Daniel

More information

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131 A.6 Boilers The following are Minnesota Standards of Performance for Indirect Heating Equipment (Minn. R. 7011.0500-7011.0553) New boilers: construction, modification, or reconstruction commenced after

More information

Proposed Boiler MACT Sets Aggressive Emission Limits

Proposed Boiler MACT Sets Aggressive Emission Limits regulatory update Proposed Boiler MACT Sets Aggressive Emission Limits Tom Muscenti, PE Managing Consultant Charlotte On June 4, 2010, U.S. EPA proposed National Emission Standards for Hazardous Air Pollutants

More information

CISWI and solid-waste-identification rules

CISWI and solid-waste-identification rules CISWI and solid-waste-identification rules This regulatory summary is for informational purposes and serves only as a general reference. Refer to the regulation when evaluating its applicability to specific

More information

EPA EMISSION RULES - BOILERS

EPA EMISSION RULES - BOILERS EPA EMISSION RULES - BOILERS WHAT S NEXT FOR OWNER AND OPERATORS? On March 21, 2011 the U.S. Environmental Protection Agency published three rules regarding air emission standards in the Federal Register.

More information

EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011

EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011 EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011 Topics Overview of actions Who is covered Why we issued the rules Benefits, costs,

More information

Update on EPA s Rulemakings Affecting Biomass-Fired Boilers

Update on EPA s Rulemakings Affecting Biomass-Fired Boilers Update on EPA s Rulemakings Affecting -Fired Boilers Emissions and Health Impacts of Combustion State College, PA May 20, 2010 Rules & Rulemakings Industrial Boiler and Process Heater NESHAP Subpart DDDDD

More information

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Reconsidered Rules Requirements Summary Federal Regulations: 40 C 60 Subpart CCCC NSPS for new/reconstructed/modified CISWI 40 C 60 Subpart

More information

Update on ICI Boiler MACT

Update on ICI Boiler MACT Update on ICI Boiler MACT Bruce Hedman March 5, 2013 Clean Air Acts Standards for Boilers and Incinerators On December 20, 2012, EPA finalized a specific set of adjustments to March 2011 Clean Air Act

More information

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011 FROM: HQ AFCESA/CEO 139 Barnes Drive, Suite 1 Tyndall AFB FL 32403-5319 SUBJECT: Engineering Technical Letter

More information

Industrial and Institutional Boilers after Boiler MACT

Industrial and Institutional Boilers after Boiler MACT Representing the Interests of America s Industrial Energy Users since 1978 Industrial and Institutional Boilers after Boiler MACT for The National Board 2011 General Meeting May 9, 2011 What do I Want

More information

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry. BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ Applicability: Industrial Boilers used in manufacturing processing, mining, refining or other industry. Commercial Boilers used in stores/malls, laundries,

More information

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers World Water & Environmetal Resources Congress 2004 Salt Lake City June 24-27 New Air Quality Requirements for Facilities with Boilers F. Jason Martin, PE, ASCE Member 1 1 Short Elliott Hendrickson, 809

More information

502(b)(10) Permit for Part 70 Source

502(b)(10) Permit for Part 70 Source 502(b)(10) Permit for Part 70 Source Permit Attachment No.: 2075-139-0002-V-03-1 Effective Date: November 9, 2015 Facility Name: Mailing Address: Parent/Holding Company: 862 West Ridge Road Gainesville,

More information

Gas-Fired Boilers under EPA s Boiler MACT

Gas-Fired Boilers under EPA s Boiler MACT Gas-Fired Boilers under EPA s Boiler MACT What Do I Need to Know About the Rules for Gas-Fired Units Now that Reconsideration Is Complete? Prepared by: Shannon Broome Darrin Gambelin Katten Muchin Rosenman

More information

Representing the Interests of America s Industrial Energy Users since 1978

Representing the Interests of America s Industrial Energy Users since 1978 Representing the Interests of America s Industrial Energy Users since 1978 COMMENTS OF THE COUNCIL OF INDUSTRIAL BOILER OWNERS on EPA Proposed Reconsidered Rule National Emission Standards for Hazardous

More information

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No. 412-0011 This draft initial Title V Major Source Operating Permit (MSOP) is issued

More information

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources 40 CFR Part 63, Subpart JJJJJJ National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers March 28, 2013 Barb Goode, Kansas Small Business

More information

Control Options For FPI Boilers to Meet Proposed Boiler MACT Limits

Control Options For FPI Boilers to Meet Proposed Boiler MACT Limits Control Options For FPI Boilers to Meet Proposed Boiler MACT Limits by Arun V. Someshwar NCASI West Coast Regional Meeting Vancouver, WA September 30, 2010 1 Outline Currently available options for control

More information

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Permit Issue Date: NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Facility Data Applicant (Facility s Name): CPI USA North Carolina - Roxboro Plant Facility Address: CPI USA North Carolina -

More information

Clean Air Act Update MATS (and CSAPR)

Clean Air Act Update MATS (and CSAPR) Clean Air Act Update MATS (and CSAPR) Brian Higgins Nalco Mobotec February 9, 2012 MATS and CSAPR Power Plant Mercury and Air Toxics Standards MATS Utility MACT Final Rule in Federal Register on February

More information

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland Commonwealth of Kentucky Environmental and Public Protection Cabinet Department for Environmental Protection Division for Air Quality 803 Schenkel Lane Frankfort, Kentucky 40601 (502) 573-3382 AIR QUALITY

More information

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS The following information will be used for the technical review of a permit to install application

More information

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments September 20, 2012 H. Carl Horneman Industrial, Commercial & Institutional Boilers, Process Heaters and Waste Incinerator Rules Final rules

More information

A Baselining of Alternative Fuel Usage

A Baselining of Alternative Fuel Usage The Open Fuels & Energy Science Journal, 212, 5, 1-8 1 A Baselining of Alternative Fuel Usage Jack Fuller *,1 and Robert Bessette 2 Open Access 1 College of Business and Economics, West Virginia University,

More information

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES ACTION On February 21, 2011, the Environmental Protection Agency

More information

MATS 2015: Are Your Units Ready? Outage Management for Power Plants July 15, 2014 Stephanie Sebor

MATS 2015: Are Your Units Ready? Outage Management for Power Plants July 15, 2014 Stephanie Sebor MATS 2015: Are Your Units Ready? Outage Management for Power Plants July 15, 2014 Stephanie Sebor Topics Emission Limits Monitoring and Testing Requirements Startup and Shutdown Work Practice Standards

More information

Biomass Emissions Permitting in Pennsylvania

Biomass Emissions Permitting in Pennsylvania Biomass Emissions Permitting in Pennsylvania Penn State Bioenergy Emissions and Health Short Course March 22, 2012 1 John Slade jslade@all4inc.com Meghan Schulz mschulz@all4inc.com Agenda Basics: Regulated

More information

For audio participation, please dial: ; Passcode

For audio participation, please dial: ; Passcode For audio participation, please dial: 1.866.861.4872; Passcode 1510194 U.S. EPA S New Final Boiler MACT, CISWI, and Solid Waste Rules Highlights and First Reactions Thursday, February 24, 2011 11:30 a.m.

More information

09/30/2010 Waterside Power Redline Version: Matt Lydon Formatted: Font: Bold, Italic Formatted: Font: Bold, Italic Draft Model Rule Control of Natural

09/30/2010 Waterside Power Redline Version: Matt Lydon Formatted: Font: Bold, Italic Formatted: Font: Bold, Italic Draft Model Rule Control of Natural 09/30/2010 Waterside Power Redline Version: Matt Lydon Formatted: Font: Bold, Italic Formatted: Font: Bold, Italic Draft Model Rule Control of Natural Gas and Distillate Oil Fired HEDD Combustion Turbine

More information

Qenvironmental quarterly

Qenvironmental quarterly Issue No. 15 Qenvironmental quarterly A Trinity Consultants Publication winter 2013 ERegulatory UPDATE 2 EPA Finalizes Boiler NESHAP (Again) 10 Understanding and Preparing for an Inspection 23 RICE MACT

More information

Representing the Interests of America s Industrial Energy Users since 1978

Representing the Interests of America s Industrial Energy Users since 1978 Representing the Interests of America s Industrial Energy Users since 1978 COMMENTS OF THE COUNCIL OF INDUSTRIAL BOILER OWNERS on EPA Proposed Reconsidered Rule National Emission Standards for Hazardous

More information

PM Compliance Options for MACT and MATS Rules. Ed McCall PCME

PM Compliance Options for MACT and MATS Rules. Ed McCall PCME PM Compliance Options for MACT and MATS Rules Ed McCall PCME 1 First Some Definitions: PM- CEM, PM-CPMS and BLDs PM-CEM (PM- Continuous Emission Monitor) PM-CPMS (PM-Continuous Parametric Monitoring System)

More information

PC MACT Updates. Cemtek Environmental Emissions Monitoring Seminar Costa Mesa, CA September 28, Vineet Masuraha Trinity Consultants Irvine, CA

PC MACT Updates. Cemtek Environmental Emissions Monitoring Seminar Costa Mesa, CA September 28, Vineet Masuraha Trinity Consultants Irvine, CA PC MACT Updates Cemtek Environmental Emissions Monitoring Seminar Costa Mesa, CA September 28, 2016 Vineet Masuraha Trinity Consultants Irvine, CA Agenda 1. Introduction 2. Overview of the applicable AQ

More information

Greenhouse Gas Regulation (new Federal)

Greenhouse Gas Regulation (new Federal) Mercury & Air Toxics (MATS) Interstate Transport (CAIR/CSAPR) Regional Haze/Visibility Portland Cement NESHAP Greenhouse Gas Regulation (new Federal) Mercury & Air Toxics (MATS) Finalized December 2011

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service

More information

Key Differences Between Proposed and Final Rule

Key Differences Between Proposed and Final Rule CONCORD, MA - WASHINGTON, DC 47 Junction Square Drive Concord, MA 01742 978-369-5533 www.mjbradley.com MJB&A Summary August 14, 2015 Summary of EPA s Final Standards of Performance for Greenhouse Gas Emissions

More information

DoD Regulatory Update Hazardous Air Pollutants

DoD Regulatory Update Hazardous Air Pollutants DoD Regulatory Update Hazardous Air Pollutants Drek Newton Naval Facilities Engineering Service Center Environment, Energy, Sustainability & Security Symposium June 14-17, 2010 Report Documentation Page

More information

Draft Technical Support Document For Air Emission Permit No

Draft Technical Support Document For Air Emission Permit No Draft Technical Support Document For Air Emission Permit No. 13700028-101 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama Statement of Basis Daikin America, Inc. Morgan County Decatur, Alabama 712-0061 Daikin America, Inc. ( Daikin ) has applied for renewal of Major Source Operating Permit No. 712-0061. This proposed Title

More information

2014-CIC Index Terms -- Air pollution, cement industry, environmental management-pollution control, fuels.

2014-CIC Index Terms -- Air pollution, cement industry, environmental management-pollution control, fuels. Page 1 of 8 2014-CIC-1044 Cement Industry Readiness Check for Upgraded Environmental Regulations: Final Actions to Implement the Latest MACT, NSPS, and Alternative Fuels Requirements Carrie Yonley, PE

More information

PERMITTEE Seminole Electric Cooperative, Inc North Dale Mabry Highway Tampa, FL 33618

PERMITTEE Seminole Electric Cooperative, Inc North Dale Mabry Highway Tampa, FL 33618 PERMITTEE 16313 North Dale Mabry Highway Tampa, FL 33618 Authorized Representative: James R. Frauen, Project Director Air Permit No. 1070025-004-AC Units 1-2 Pollution Controls Upgrade Facility ID No.

More information

Comments of Council of Industrial Boiler Owners (CIBO) and American Chemistry Council (ACC)

Comments of Council of Industrial Boiler Owners (CIBO) and American Chemistry Council (ACC) National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers; Proposed Rule 80 Fed. Reg. 2871 (Jan. 21, 2015) (2015 Area Source Proposed

More information

Guideline for the Control of Air Emissions from Large Wood-Fired Combustors ( 3 MW) Guideline A-13

Guideline for the Control of Air Emissions from Large Wood-Fired Combustors ( 3 MW) Guideline A-13 Guideline for the Control of Air Emissions from Large Wood-Fired Combustors ( 3 MW) Guideline A-13 January 2015 Contents 1.0 PURPOSE and INTRODUCTION... 3 2.0 DEFINITIONS AND ABBREVIATIONS... 4 3.0 APPLICABILITY...

More information

Citations from CRF as required in WV DEP's 45CSR24

Citations from CRF as required in WV DEP's 45CSR24 Citations from CRF 40.60 as required in WV DEP's 45CSR24 NOTE: Unoffical Document meant to summarize WV regulations, using 40-CFR-60 passed July, 2002 TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL

More information

Control Technology Options for Boiler MACT and CISWI Compliance

Control Technology Options for Boiler MACT and CISWI Compliance Control Technology Options for Boiler MACT and CISWI Compliance by Arun V. Someshwar, NCASI Northern Regional Meeting Thursday, May 9, 2013 Wausau, WI Overview 12/12 Boiler MACT & CISWI Limits & Control

More information

The Economic Impact of Proposed EPA Boiler/Process Heater MACT Rule on Industrial, Commercial, and Institutional Boiler and Process Heater Operators

The Economic Impact of Proposed EPA Boiler/Process Heater MACT Rule on Industrial, Commercial, and Institutional Boiler and Process Heater Operators The Economic Impact of Proposed EPA Boiler/Process Heater MACT Rule on Industrial, Commercial, and Institutional Boiler and Process Heater Operators Prepared For: Council of Industrial Boiler Owners August

More information

Ray Chalmers - EPA Region III

Ray Chalmers - EPA Region III Ray Chalmers - EPA Region III On December 16, 2011 EPA finalized the Mercury and Air Toxics Standards, the first national standards to reduce emissions of mercury and other toxic air pollutants from new

More information

Representing the Interests of America s Industrial Energy Users since May 20, 2011

Representing the Interests of America s Industrial Energy Users since May 20, 2011 Representing the Interests of America s Industrial Energy Users since 1978 May 20, 2011 The Honorable Lisa P. Jackson, Administrator U.S. Environmental Protection Agency Ariel Rios Building 1200 Pennsylvania

More information

Boiler MACT: Energy Assessments

Boiler MACT: Energy Assessments Boiler MACT: Energy Assessments Conference on the Environment November 12, 2013 Alex Mentzer, EIT Consultant Overview Boiler Rules Brief Recap Energy Assessments Requirements Qualified Energy Assessor

More information

State of the Art (SOTA) Manual for Stationary Gas Turbines

State of the Art (SOTA) Manual for Stationary Gas Turbines State of the Art (SOTA) Manual for Stationary Gas Turbines Original Date: July 1997 Revision Date: November 1999 State of New Jersey Department of Environmental Protection Air Quality Permitting Program

More information

NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2

NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2 NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2 Prepared for: 260 Hudson River Road Waterford, New York 12188 Prepared by: Franklin Engineering

More information

NEW JERSEY STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW JERSEY ADMINISTRATIVE CODE TITLE 7 CHAPTER 27 SUBCHAPTER 10. Sulfur in Solid Fuels

NEW JERSEY STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW JERSEY ADMINISTRATIVE CODE TITLE 7 CHAPTER 27 SUBCHAPTER 10. Sulfur in Solid Fuels NEW JERSEY STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW JERSEY ADMINISTRATIVE CODE TITLE 7 CHAPTER 27 SUBCHAPTER 10 Sulfur in Solid Fuels TABLE OF CONTENTS Section Page REGULATORY HISTORY... 2 7:27-10.1

More information

Boiler Tune-up Guide

Boiler Tune-up Guide Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ

More information

CH-13 Applicability Of State Rules Air Quality Permit Program

CH-13 Applicability Of State Rules Air Quality Permit Program CH-13 Applicability Of State Rules Air Quality Permit Program Doc Type: Permit Application 1a) AQ Facility ID No.: 1b) Agency Interest ID No.: 2) Facility Name: Some businesses and activities in Minnesota

More information

Biomass Air Quality: Measuring, Controlling, and Regulating Emissions

Biomass Air Quality: Measuring, Controlling, and Regulating Emissions Biomass Air Quality Biomass Air Quality: Measuring, Controlling, and Regulating Emissions This Webinar is brought to you by: Biomass Thermal Energy Council (BTEC) With the generous support of the U.S.

More information

Texas Industries of the Future November 20, 2013

Texas Industries of the Future November 20, 2013 For Texas Industries of the Future November 20, 2013 Bob Bessette, President Council of Industrial Boiler Owners CIBO is dedicated to ensuring that non-utility industrial, commercial and institutional

More information

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC AIR QUALITY PERMIT Permit No. Effective Date January 22, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date:?? Facility Data Applicant (Facility s Name): KapStone Kraft Paper Corporation Facility Address: KapStone Kraft Paper Corporation

More information

EPA S MACT RULE FOR HAZARDOUS WASTE COMBUSTORS. Fredric D. Chanania Chief, Waste Treatment Branch Office of Solid Waste U.S. EPA

EPA S MACT RULE FOR HAZARDOUS WASTE COMBUSTORS. Fredric D. Chanania Chief, Waste Treatment Branch Office of Solid Waste U.S. EPA EPA S MACT RULE FOR HAZARDOUS WASTE COMBUSTORS Fredric D. Chanania Chief, Waste Treatment Branch Office of Solid Waste U.S. EPA Note: The information and views contained in this paper are solely those

More information

NSPS for Dc Boilers Burning Residual Oil

NSPS for Dc Boilers Burning Residual Oil Minnesota Pollution Control Agency AQ Doc. # 8.07 February 1998 Facts about NSPS for Dc Boilers Burning Residual Oil In an effort to regulate new sources of air pollution and ensure that those sources

More information

Technical Contact. William Horton Lead Environmental Specialist (980) South Church Street (EC13K) Charlotte, NC 28202

Technical Contact. William Horton Lead Environmental Specialist (980) South Church Street (EC13K) Charlotte, NC 28202 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date: Facility Data Applicant (Facility s Name): Duke Energy Carolinas, LLC - Marshall Steam Station Facility Address: Duke Energy

More information

SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS

SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS 252:100-17-60. Effective date; applicability (a) This Part applies to each individual commercial and industrial

More information

DAILY LIFE of CEMS QA & PM

DAILY LIFE of CEMS QA & PM DAILY LIFE of CEMS QA & PM Presented at: ENVIRONMENTAL COMMITTEE TECHNICAL FOCUS GROUP December 8, 2015 DANIEL L. TODD, QEP, CHMM OVERALL CONCEPT To provide the perspective of the folks that are responsible

More information

Dollars and Sense: Boiler Tuning as a Best Management Practice

Dollars and Sense: Boiler Tuning as a Best Management Practice WHITE PAPER Dollars and Sense: Boiler Tuning as a Best Management Practice John A. Bacon, MBA, PG, CEM TRC Environmental Corporation August 1, 2018 Dollars and Sense: Boiler Tuning as a Best Management

More information

Mercury and Air Toxics Standard for Power Plants. Marney Hoefer January 26, 2012

Mercury and Air Toxics Standard for Power Plants. Marney Hoefer January 26, 2012 Mercury and Air Toxics Standard for Power Plants Marney Hoefer January 26, 2012 1 Overview Background on mercury air toxics rule Overview of the new standards to regulate mercury and air toxics for power

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

Presentation Overview Air Quality Regulations Evolution in the U.S. Summary of Current NESHAPS Regulations Mercury Emissions Control and Measurement T

Presentation Overview Air Quality Regulations Evolution in the U.S. Summary of Current NESHAPS Regulations Mercury Emissions Control and Measurement T A Review of the Evolution, Status and Compliance Initiatives Associated with Process Mercury Emissions Monitoring Standards in the United States CEM 2014 International Conference and Exhibition On Emissions

More information

Update on Proposed Solid Waste Rule for Incinerators

Update on Proposed Solid Waste Rule for Incinerators Update on Proposed Solid Waste Rule for Incinerators Jim Welp Black & Veatch NBP-WEF Holds Future of Biosolids Management Forum Purpose: Identify trends in technology, operations, and management; regulatory

More information

Industrial Boiler MACT Rule Impact and Control Options for Mercury and Dioxins/Furans

Industrial Boiler MACT Rule Impact and Control Options for Mercury and Dioxins/Furans Industrial Boiler MACT Rule Impact and Control Options for Mercury and Dioxins/Furans Hot Topic Hour November 19, 2010 Richard Miller VP Business Development ADA Environmental Solutions The ADA Team...

More information

Permit to Install Applica on Permanent Addi on of Engineered Fuel Pellets. L Anse Warden Electric Company, LLC 157 South Main Street L Anse, Michigan

Permit to Install Applica on Permanent Addi on of Engineered Fuel Pellets. L Anse Warden Electric Company, LLC 157 South Main Street L Anse, Michigan Permit to Install Applica on Permanent Addi on of Engineered Fuel Pellets L Anse Warden Electric Company, LLC 157 South Main Street L Anse, Michigan Project No. 110264A17 July 3, 2018 Fishbeck, Thompson,

More information

A detailed index of changes is attached with this summary.

A detailed index of changes is attached with this summary. Summary of Reasons Supporting the Adoption of the Proposed Amendments to the Alabama Department of Environmental Management s Administrative Code for Division 3 (Air Division) And State Implementation

More information

For audio participation, please dial: ; Passcode Clean Air Act Updates: EPA's Important December Rulemakings

For audio participation, please dial: ; Passcode Clean Air Act Updates: EPA's Important December Rulemakings For audio participation, please dial: 1.866.961.7942; Passcode 1510194 Clean Air Act Updates: EPA's Important December Rulemakings Thursday, January 12, 2012 11:30 a.m. 12:30 p.m. Central Attorney Advertisement

More information

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Naughton Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0

More information

Reducing Power Plant Emissions: EPA s New Proposed Rules For Mercury

Reducing Power Plant Emissions: EPA s New Proposed Rules For Mercury Reducing Power Plant Emissions: EPA s New Proposed Rules For Mercury U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Research Triangle Park, North Carolina EPA Proposes

More information

Wellington Development WVDT, LLC Greene Energy Resource Recovery Project 3. GENERAL CONDITIONS

Wellington Development WVDT, LLC Greene Energy Resource Recovery Project 3. GENERAL CONDITIONS 3. GENERAL CONDITIONS 2 a) This Plan Approval authorizes the construction of two waste coal-fired, circulating fluidized bed (CFB) boilers and a steam generator capable of producing 580 gross megawatts

More information

Technical Contact. Conrad Carter, Jr. President (704) PO Box 1760 Albemarle, NC

Technical Contact. Conrad Carter, Jr. President (704) PO Box 1760 Albemarle, NC NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date: January 5, 2016 Facility Data Region: Fayetteville Regional Office County: Montgomery NC Facility ID: 6200015 Inspector s Name:

More information

Air Quality Permit File: TVOP & AR Cambria CoGen Company / Cambria Generation Facility

Air Quality Permit File: TVOP & AR Cambria CoGen Company / Cambria Generation Facility PA DEP SOUTHWEST REGIONAL OFFICE MEMO TO FROM Air Quality Permit File: TVOP-11-00332 & AR-11-00332 Cambria CoGen Company / Martin L. Hochhauser, P.E. Air Quality Eng. Specialist Air Quality Program THROUGH

More information

AIR EMISSION PERMIT NO [AMENDMENT TO AIR EMISSION PERMIT NO ] IS ISSUED TO

AIR EMISSION PERMIT NO [AMENDMENT TO AIR EMISSION PERMIT NO ] IS ISSUED TO AIR EMISSION PERMIT NO. 05301050-021 [AMENDMENT TO AIR EMISSION PERMIT NO. 05301050-011] IS ISSUED TO THE UNIVERSITY OF MINNESOTA AND FOSTER WHEELER TWIN CITIES, INC. FOR THE UNIVERSITY OF MINNESOTA TWIN

More information

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER 1200-03-10 REQUIRED SAMPLING, RECORDING, AND REPORTING TABLE OF CONTENTS 1200-03-10-.01 Sampling

More information

Analysis-Based Regulatory Advocacy: EPA s Boiler MACT Rules

Analysis-Based Regulatory Advocacy: EPA s Boiler MACT Rules 2011/SOM1/EC/WKSP2/017 Session 6 Analysis-Based Regulatory Advocacy: EPA s Boiler MACT Rules Submitted by: American Forest & Paper Association (AF&PA) Workshop on Using Regulatory Impact Analysis to Improve

More information

SECTION 2.0 PERMIT BY RULE: Asphalt Plants

SECTION 2.0 PERMIT BY RULE: Asphalt Plants FACILITY NAME: DATE NDEQ Facility ID# TE: YOU MUST ALSO FILL OUT SECTION 1.0 IN ITS ENTIRETY TE: If you are already covered by the Asphalt Plant Permit-by-Rule and are applying for a relocation, you need

More information

Western Regional Boiler Association

Western Regional Boiler Association Western Regional Boiler Association MACT Solution Synergies: How Improving Combustion Can Reduce MACT APC Footprint, Investment and Operating Cost Edmundo R. Vasquez Dennis Shanahan March 13 2013 Content

More information

DEC 7, 2012 Biomass Project Partnership

DEC 7, 2012 Biomass Project Partnership DEC 7, 2012 Biomass Project Partnership Part 5 Fuel Yard / Project Website / Regulatory Issues Biomass / Coal Fuel & Boiler Considerations Photo credit: Ferman Milster Fuel Yard UI Main Power Plant on

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05700002-006 IS ISSUED TO Potlatch Land & Lumber LLC, Bemidji POTLATCH LAND & LUMBER LLC, BEMIDJI 50518 County Road 45 Bemidji, Hubbard County, Minnesota 56601 The

More information

Cross-effects and total gas clean-up system lay-out

Cross-effects and total gas clean-up system lay-out Cross-effects and total gas clean-up system lay-out Gas clean-up for power plants and waste incinerators Effect of emission control on emissions and emission control for other species see: www.hut.fi/~rzevenho

More information

Control Device Technology

Control Device Technology Control Device Technology A quick summary of various control measures and important monitoring characteristics Peter Westlin, EPA, OAQPS Example Control Measures and Monitoring Approaches Organics gases

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

Part Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

Part Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities Part 266 Subparts A - B - Reserved Part 266 - Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities Subpart C - Recyclable Materials Used

More information

OFFICE OF ENVIRONMENTAL QUALITY CONTROL BUREAU OF AIR QUALITY PSD, NSPS (40CFR60), NESHAP (40CFR63) CONSTRUCTION PERMIT Santee Cooper (Pee Dee Generating Station) 2651 South Old River Road Pamplico, SC

More information

Sent Electronically. August 23, 2010

Sent Electronically. August 23, 2010 Sent Electronically August 23, 2010 EPA Docket Center U.S. Environmental Protection Agency Mail Code 2822T 1200 Pennsylvania Avenue, NW Washington, DC 20460 RE: Standards of Performance for New Stationary

More information

Duke Energy Seminar September 3 5, 2008 Concord, NC

Duke Energy Seminar September 3 5, 2008 Concord, NC Duke Energy Seminar September 3 5, 2008 Concord, NC Babcock Power Inc. Overview One Source Many Solutions One Purpose For: WPCA/Duke Seminar Craig Penterson & Tony Licata Babcock Power Inc. September 4,

More information

EMO August 1, Bobby I.T. Chen Client Program Manager

EMO August 1, Bobby I.T. Chen Client Program Manager EMO August 1, 2013 Bobby I.T. Chen Client Program Manager MATS Overview Subcategory Total Filterable Particulate Matter (PM) Hydrogen Chloride (HCl) Mercury (Hg) Existing coal fired unit designed for coal

More information

Atmospheric Emissions from Stationary Combustion Turbines

Atmospheric Emissions from Stationary Combustion Turbines GUIDELINE A-5 Atmospheric Emissions from Stationary Combustion Turbines Legislative Authority: Environmental Protection Act, Sections 6, 9, and 14 Ontario Regulation 346 Responsible Director: Director,

More information

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 250-RICR-120-05-20 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 120 AIR RESOURCES SUBCHAPTER 05 AIR POLLUTION CONTROL PART 20 Burning of Alternative Fuels 20.1 Purpose and Authority 20.1.1

More information