1 Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually illustrates procedural steps to be considered by applicants for new substation construction and for existing substation modifications. Each question is to be answered with: yes, no, not applicable (N/A), or explain accordingly. Development of new substations The following sections apply only if the project involves the development of a new substation. General: 1) Have you described the existing (i.e. pre-construction) environmental and land-use conditions on the substation site and in the local study area? 2) Does your project incorporate the guidelines contained in Alberta Environment and Parks (AEP) Environmental Protection Guidelines for Transmission Lines (R&R/11-03) document, and if not, have you described what aspects of the project do not incorporate the guidelines? 3) Have you described the potential adverse effects of the substation on the environment, including, as applicable, terrain and soils, surface water bodies and hydrology, groundwater, wetlands, vegetation species and communities, wildlife species and habitat, aquatic species and habitat, air quality, environmentally sensitive areas and land use? 4) Have you described the approach to manage stormwater runoff on the substation site to protect on-site and off-site terrain, soils, surface water quality, groundwater, and land use? 5) Have you submitted a project-specific environmental protection plan or otherwise itemized and described the mitigation measures and monitoring activities that you will implement during construction and operation to minimize any adverse effects of the substation on the environment? 6) Have you identified the government agencies or departments that you consulted with as part of your site selection phase, described any prescribed guidelines and stated in the application how the guidelines will be followed?
2 Substation Developments Environmental Guidelines Effective date: February 1, 2016 Checklist for Applicants Page 2 of 6 Land use: 7) If the substation is being developed on Crown lands, have you consulted with the regional approvals program area of AEP on the project, regarding siting and the potential disturbance by the project of land with protective notations on the land title and any other surface activity dispositions and described any specific mitigation measures that you will incorporate into the project as a result of that consultation? 8) Have you determined if the proposed development is compatible with any area restrictions and ensured the project is not in an area where development of new transmission facilities is prohibited under federal or provincial authority such as the Wilderness Areas, Ecological Reserves and Natural Areas Act, Provincial Parks Act or Willmore Wilderness Park Act? 9) If the substation site occurs on or is bordered by agricultural land, have you developed procedures and consulted with the landowners and appropriate local municipalities with respect to rules and procedures on preventing the spread of weeds and pests 1 on agricultural land? 10) If the substation site is located on land where soils or vegetation have not been previously disturbed, did you obtain Historical Resources Act approval from Alberta Culture and Tourism for the project? Wildlife and aquatic species: 11) If the substation is proposed within or adjacent to a wetland or potential fish and wildlife habitat: (a) Have you described consultation with AEP in regard to any Water Act or Wildlife Act related aspects of the proposed substation, described any AEP prescribed guidelines and stated how the guidelines will be followed? (b) Have you described the results of a self-assessment under Department of Fisheries and Oceans Canada (DFO) guidelines or, if necessary, have you described the results of a DFO review of the project? (c) Have you described any outstanding wildlife, vegetation, or aquatic issues identified by AEP or DFO biologists regarding the proposed development, which have not yet been fully addressed? 12) Have you described any mitigation measures you will implement during operation of the substation to minimize the electrocution of birds and animals by substation equipment? 1 Pests are defined in the Alberta Agricultural Pests Act RSA 2000, Chapter A-8.
3 Substation Developments Environmental Guidelines Effective date: February 1, 2016 Checklist for Applicants Page 3 of 6 Substation modifications The following sections apply to the non-emergency salvage, modification or repair of existing substations where soil excavation or disturbance, on or immediately adjacent to a substation site, is proposed. Basic substation information: 1) Have you provided the substation name with a unique identification number? 2) Have you provided the legal land description, as well as the latitude and longitude or municipal address of the substation? 3) Have you indicated the date the substation commenced operations? 4) Have you described the existing environmental and land-use conditions on the substation site and in the local study area? 5) Have you described the potential adverse effects of the substation modification on the environment, including as applicable, terrain and soils, surface water bodies and hydrology, groundwater, wetlands, vegetation species and communities, wildlife species and habitat, aquatic species and habitat, air quality, environmentally sensitive areas and land use? 6) Have you described how any potential environmental effects of the project will be mitigated? Operational history to determine the detail and type of information needed: 7) Was any electrical equipment containing insulating oil installed with underlying secondary containment on the existing substation site? If yes ensure you complete line 12 Adequacy Of Secondary Containment. 8) Have you described the duration of any polychlorinated biphenyls (PCB) use on-site and indicated both the maximum and the current PCB content of all fluid-filled electrical equipment that is not hermetically sealed? 9) Was a secondary containment system installed after the substation commenced operations? If yes ensure you complete line 11 Substations Operated for a Time Without Secondary Containment.
4 Substation Developments Environmental Guidelines Effective date: February 1, 2016 Checklist for Applicants Page 4 of 6 Environmental evaluation: 10) For substations currently operating without underlying secondary containment, or in cases where the history of the secondary containment is unknown, have you: (a) Completed the steps in Figure 1 Process Flowchart for New Substations and Existing Substation Modifications and provided the date that the environmental evaluation was completed? (b) Described the methodology and summarized the conclusions of the environmental evaluation conducted to assess the likelihood of encountering contamination and any need for further assessment? (c) Complied with Alberta release reporting requirements (if needed)? 2 (d) Described any additional contaminant assessment or remediation proposed during the proposed work (if needed)? (e) Described any soil sampling or further environmental evaluation to be undertaken during the proposed work? (f) Briefly described plans to safely manage, transport and dispose of any used insulating oil during the proposed work? (g) Briefly described plans to assess and, if needed, transport and dispose of soil affected by releases of regulated fluids? (h) Described any public health and safety measures to protect the public from environmental hazards during the proposed work? (i) Described how contaminated or potentially contaminated soil and groundwater is being managed to prevent the migration of contaminants off the substation site? 2 The Environmental Protection and Enhancement Act RSA 2000 Chapter E-12 requires any release of substances that may cause, is causing or has caused an adverse effect to the environment to be reported to Alberta Environment and Parks. An adverse effect is impairment of, or damage to, the environment, human health or safety, or property. The Release Reporting Regulation sets out what must be reported, when, how and to whom reports must be made. Table 1 of Alberta Tier 1 Soil and Groundwater Remediation Guidelines contains maximum contaminant levels for various compounds. Individual approvals and codes of practice may also have requirements for reporting contraventions of the terms and conditions of the approval or code of practice, monitoring results and sampling programs.
5 Substation Developments Environmental Guidelines Effective date: February 1, 2016 Checklist for Applicants Page 5 of 6 Substations operated for a time without secondary containment: 11) For substations where secondary containment was installed after the electrical equipment commenced operations, have you: (a) Indicated the date secondary containment was installed? (b) Briefly described the nature of the secondary containment and its installation? (c) Described any soils assessment conducted prior to installation of the secondary containment? i. If yes, have you summarized the conclusions and recommendations of the soils assessment report and described any contaminant risk management or further environmental evaluation proposed during the proposed work? ii. If no, have you described how the potential for contaminants under the secondary containment was assessed and how any associated contaminant risks are being managed? Adequacy of secondary containment: 12) For substations where secondary containment is now in place have you: (a) (b) (c) (d) (e) (f) (g) Listed the electrical equipment under which secondary containment was installed? Indicated if the integrity of the secondary containment(s) has been tested in accordance with applicable standards and/or electrical industry best management practices and briefly described the test results? Indicated the date of any environmental field inspection conducted and summarized the conclusions and recommendations? Briefly described plans to safely manage, transport and dispose of any used insulating oil during the proposed work? If planning to excavate within the secondary containment, have you briefly described plans to assess and, if needed, transport and dispose of backfill material affected by releases of regulated fluids? Described any public health and safety measures to protect the public from environmental hazards during the proposed work? Described how contaminated or potentially contaminated soil and groundwater is being managed to prevent the migration of contaminants off the substation site?
6 Substation Developments Environmental Guidelines Effective date: February 1, 2016 Checklist for Applicants Page 6 of 6 Figure 1 - New substation construction or existing substation modification flow chart (return to text) Flow_Chart_ docx (consists of 4 pages)
7 Environmental guidelines for new substation construction or existing substation modification flow chart Prepare scope of work for equipment change or addition of substation Describe project components and activities Describe other approvals. (e.g. Historical Resources Act, Water Act, or Public Land Act clearances...etc.) Determine project type New substation (go to page 2) Equipment change using existing infrastructure; no soil excavation (go to page 3) Existing substation soil excavation required to change equipment or expand disturbed area (go to page 4) Page 1 of 4
8 New substation New or expanded disturbed area Environmental assessment As appropriate for the existing land-use assess current conditions and predict effects to: vegetation wildlife and wildlife habitat soil and terrain hydrology and wetlands water quality existing land use other Assess to AEP guidelines/criteria and other legislation where applicable Consult with AEP and Alberta Culture and Tourism when applicable Describe environmental effects and any mitigation, EPP. Submit application to the AUC AUC permit and licence received Secure approvals from other applicable regulatory agencies Implement mitigation measures and conduct environmental monitoring during construction and operation Document and retain on file Page 2 of 4
9 Equipment change using existing infrastructure; no soil excavation Describe basic environmental protection measures Submit application to the AUC AUC permit and licence received Page 3 of 4
10 Existing substation Soil excavation required to change equipment or expand disturbed area There is no electrical equipment with the local study area that contains nonhermetically sealed insulating fluids Liner under fluidfilled equipment when constructed Electrical equipment within the local study area contains insulating fluids that are not hermetically sealed Liner installed under fluid-filled equipment after construction No liner under fluidfilled equipment or no assessment of residual contamination when liner installed Contamination assessment Review site history to evaluate potential contamination: Biophysical components (based on existing land use) Hydrology and surface water quality Review site information O & M record Incident spill records PCB records Existing environmental reports Complete a site visit (under snow free condition) Document soil staining or other deficiencies Other Describe environmental effects and any mitigation, EPP. Submit application to AUC Describe how the integrity of the liner is monitored. Describe results of monitoring to date. Characterize risk of residual contamination based on assessment at time of liner installation. Describe action regarding any site-specific risk management. No Incorporate AEP guidelines and consult with AEP if required Contamination found If file record is incomplete explain and propose sampling of excavated area Review results of contaminant assessment in relation to regulatory requirements AUC permit and license received If reportable release (see footnote 1 below): Notify AEP and implement mitigation as required If non-reportable: Document and retain on file and describe plans to address deficiencies in future modification work or ongoing operation and maintenance Yes Potential contamination outside of area proposed for excavation Potential contamination within area proposed for excavation AUC permit and license received Submit application to the AUC Not expanding disturbed area Include a contaminated soil management procedure (sitespecific) and/or EPP If reportable release (see footnote 1 below): Notify AEP and implement mitigation as required If non-reportable: Document any deficiencies, leaks, and soil staining within the scope of work, and describe how addressed in application Substation decommissioning/ abandonment and reclamation Environmental monitoring during decommissioning Remove equipment Phase II ESA or equivalent Delineate and excavate Sample walls and base of excavation (closure sampling) Dispose recovered soils at an approved facility Clean up to reclamation criteria Prepare site for reclamation certification Monitor Complete a detailed site assessment Apply to AEP for reclamation certification Upgrade/repair/replacement/salvage (within scope of proposed work) Environmental monitoring during construction If contaminated soil found in planned ground disturbance area, excavate and recover soil to the sagest and most practical extent possible Sample walls and base of excavation (closure sampling) If residual contamination implement site-specific contaminant risk management plan. Dispose recovered soils at an approved facility If unsafe to clean up (e.g. energized substation), document and retain on file. Consult AEP as appropriate Expanding disturbed area (go to page 2 of the flow chart) Document and retain on file Footnote 1: AEP, Release Reporting Guidelines, Page 4 of 4
Environmental Guidelines Checklist
Environmental Guidelines Checklist Stakeholder: Alberta Environment & Parks (Brian Lambert), AltaLink, ATCO Electric, EPCOR Distribution & Transmission (EDTI) Section Subsection Existing Proposed changes
More informationDecision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018
Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and Salvage November 8, 2018 Alberta Utilities Commission Decision 23890-D01-2018 Swan Hills F.P.L. 744S Substation Decommission and
More informationChapter 4. Airport Authority Governance, Statutes and Policies
Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2
More informationENVIRONMENTAL SCREENING REPORT
ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationKEY GOVERNING LEGISLATION, STANDARDS AND CODES
Filed: September, 0 EB-0-00 Tab Page of KEY GOVERNING LEGISLATION, STANDARDS AND CODES.0 INTRODUCTION Hydro One Inc. is subject to direction from its shareholder (the Government of Ontario), Ontario Energy
More informationEPCOR Distribution & Transmission Inc.
Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions December 19, 2016 Alberta Utilities Commission Decision 22229-D01-2016 Victoria E511S Substation Breaker Additions Proceeding 22229 Application
More informationWestridge Marine Terminal Environmental Protection Plan
Westridge Marine Terminal Environmental Protection Plan 1 Westridge Marine Terminal Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June
More information10.0 Environmental protection, follow-up and monitoring
10.0 Environmental protection, follow-up and monitoring 10.1 Introduction Manitoba Hydro will implement the mitigation measures, monitoring and other follow-up actions identified in chapter 8 through an
More informationAlberta Transportation The City of Edmonton The City of Calgary
Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for
More informationSunEEarth Alberta Solar Development Inc.
Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on March
More informationEnvironmental Assessment Approval. Alton Natural Gas Storage Project
Approval Approval Date: Original Dated December 18, 2007 Alton Natural Gas Storage Project Alton Natural Gas Storage LP, Proponent Colchester County, Nova Scotia Alton Natural Gas Storage (the Undertaking
More informationSantoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.
Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION
More informationAppendix 8. Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan
Appendix 8 Petroleum Hydrocarbon Products, Ammonium Nitrate and Explosives Management Plan Petroleum Hydrocarbon Products, Ammonium Nitrate, and Explosives Management Plan This Petroleum Hydrocarbon Products,
More information9.0 Environmental Protection Program
9.0 Environmental Protection Program 9.1.1 Overview Manitoba Hydro s Environmental Protection Program (EPP) provides the framework for the delivery, management and monitoring of environmental and socio-economic
More informationTITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED]
TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 616. INDUSTRIAL WASTEWATER SYSTEMS SUBCHAPTER 1. INTRODUCTION [AMENDED] 252:616-1-1. Purpose 252:616-1-2. Definitions [AMENDED] 252:616-1-2. Definitions
More informationShell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More informationCanadian Federal Legislation Pertinent to Contaminated Site Management
Canadian Federal Legislation Pertinent to Contaminated Site Management Remediation Technologies Workshop 2 Licence to Spill? Banff, AB Oct. 17, 2012 Murray Heap, Environment Canada 1 Federal Legislation
More informationC&B Alberta Solar Development ULC
Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017
More informationUnder Section 113 of the Environmental Protection and Enhancement Act
Order Made at Slave lake, in the Province of Alberta, on July 13, 2018 ALBERTA ENERGY REGULATOR Under Section 113 of the Environmental Protection and Enhancement Act Under Section 29 of the Pipeline Act
More informationHydrology and Watershed Management
Hydrology and Watershed Management The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must
More informationCHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS
CHAPTER 19.66 SURFACE MINING AND RECLAMATION PLAN REGULATIONS Section: 19.66.010 PURPOSE AND INTENT 19.66.020 INCORPORATION OF SMARA AND STATE REGULATIONS 19.66.030 APPLICABILITY 19.66.040 EXEMPTIONS 19.66.050
More informationBackground Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT
Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT I. BACKGROUND FOR MANURE STORAGE AND HANDLING SYSTEMS Supplementary Information Form on sizing and safety
More informationChapter 11: Hazardous Materials A. INTRODUCTION
Chapter 11: Hazardous Materials A. INTRODUCTION This chapter relies on the analysis from the Fresh Kills Park Final Generic Environmental Impact Statement (FGEIS) and summarizes the conclusions drawn from
More informationAlberta Electric System Operator Yeo 2015S Substation Needs Identification Document
Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities
More informationEnvironmental Assessment Matrix
For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where
More informationSTORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No
STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total
More informationAlberta Electric System Operator Needs Identification Document Application
Decision 22618-D01-2017 Alberta Electric System Operator Needs Identification Document Application Facility Applications June 22, 2017 Alberta Utilities Commission Decision 22618-D01-2017: Alberta Electric
More informationFacilities Environmental Protection Plan: Burnaby Terminal
Facilities Environmental Protection Plan: Burnaby Terminal 1 Facilities Environmental Protection Plan: Overview What The Environmental Protection Plan (EPP) communicates environmental procedures and mitigation
More informationPreliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and
Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,
More informationCode of Practice for Exploration Operations
Code of Practice for Exploration Operations September 2005 Made under the Environmental Protection and Enhancement Act Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza
More informationThe following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:
TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationCanadian Federal Legislation pertinent to Contaminated Site Management
Canadian Federal Legislation pertinent to Contaminated Site Management Chinese Brownfields Delegation, Vancouver, British Columbia December 13, 2010 Presented by Paul Ross (paul.ross@ec.gc.ca), Environment
More informationThe following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:
Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management
More informationMONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE
1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE April 9, Primrose/Wolf Lake Oil Sands Project (PAW) is a thermal in situ operation located approximately 65 km north of Bonnyville and about
More informationMONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE
1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE March 3, 2014 Primrose/Wolf Lake Oil Sands Project (PAW) is a thermal in situ operation located approximately 65 km north of Bonnyville
More informationAppendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PURPOSE... 1 3.0
More informationIncident Reporting Requirements
Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
More informationRECORD OF SITE CONDITION FREQUENTLY ASKED QUESTIONS. December, 2012
RECORD OF SITE CONDITION FREQUENTLY ASKED QUESTIONS December, 2012 ISBN: 978-1-4601-0070-7 (Printed version) ISBN: 978-1-4601-0071-4 (On-line version) Web Site: http://environment.gov.ab.ca/info/ Record
More informationPROJECTS ON FEDERAL LANDS. Making a determination under section 67 of the Canadian Environmental Assessment Act, 2012
PROJECTS ON FEDERAL LANDS Making a determination under section 67 of the Canadian Environmental Assessment Act, 2012 December 2014 Disclaimer: The approach in this guide is presented as an option and is
More informationCEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E
Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT
More informationSaskatchewan Environmental Code Quick Reference Guide
Saskatchewan Environmental Code Quick Reference Guide [Updated: October 31, 2014] Table of Contents How to use this guide Quick reference and frequently asked questions Division A: General Environmental
More informationThe Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations
ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective
More informationTerms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report
The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO
More informationRemediation Certificates 101
Remediation Certificates 101 Outline What are they? Regulatory basis for issuing remediation certificates Definitions and brief history of the program Why should I want one? Benefits for the site owner
More informationChapter 18 Environment Regulating Landfills 1.0 MAIN POINTS
Chapter 18 Environment Regulating Landfills 1.0 MAIN POINTS As of December 2017, the Ministry of Environment had made progress in addressing the seven outstanding recommendations we initially made in our
More informationAppendix 4. Soil Management Plan
Appendix 4 Soil Management Plan Soil Management Plan This Soil Management Plan (SMP) has been developed for the Giscome Quarry and Lime Plant Project. The SMP is a living document and will be updated as
More informationEligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to
Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A-310.65 to 310.77 North Carolina Department of Environment and Natural Resources Division
More informationT&D Facilities & Equipment: Environmental Issues - Program 51
T&D Facilities & Equipment: Environmental Issues - Program 51 Program Description Program Overview As the nation's electric transmission and distribution (T&D) infrastructure expands and ages, power companies
More informationWATER SUPPLY WELLS - REQUIREMENTS AND BEST MANAGEMENT PRACTICES
December 2009 WATER SUPPLY WELLS - REQUIREMENTS AND BEST MANAGEMENT PRACTICES PIBs # 7333e Note: The numbers and details presented in this manual are current as of the date of publication. Any new regulation
More informationMONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE. January 10, 2014
1 Introduction MONTHLY UPDATE PRIMROSE OIL SANDS FLOW TO SURFACE January 10, 2014 Canadian Natural Resources Limited Primrose/Wolf Lake Oil Sands Project is a thermal in situ operation located primarily
More informationAlberta Wetland Mitigation Directive
June 2018 Title: Number: Program Name: Water Policy Branch Effective Date: June 1, 2015 This document was updated on: Disclaimer: June 21, 2018 This publication is issued under the Open Government Licence
More informationApproval and Permitting Requirements Document for Renewable Energy Projects
Approval and Permitting Requirements Document for Renewable Energy Projects Ministry of Natural Resources September 2009 Approval and Permitting Requirements Document for Renewable Energy Projects Ontario
More informationAlberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects
Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1
More informationAppendix D. Fisheries and Oceans Canada (DFO) Letter of Advice
The City of Winnipeg Bid Opportunity No. 851-2017 Template Version: C420170317 - RW Appendix D Fisheries and Oceans Canada (DFO) Letter of Advice Fisheries and Oceans Canada Pêches et Océans Canada 103-1800
More informationSemCAMS Area Project Description
REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory
More informationReclamation: Legislative / Regulatory Requirements
Reclamation: Legislative / Regulatory Requirements Shane Patterson Science and Technology Specialist Land Conservation and Reclamation Policy Branch Outline Conservation & Reclamation 1) Legislation Environmental
More informationUp to 9.5MW AC solar project located near Burdett, Alberta
PROJECT OVERVIEW Up to 9.5MW AC solar project located near Burdett, Alberta Located on agricultural land within the quarter section NE-21-010-12-W4M near the intersection of Range Road 123 and Township
More informationStandards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities
Standards for SWMF s (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities August 2017 PREAMBLE Development results in a great amount of impervious area,
More informationBACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the
BACKGROUND INFORMATION for the INITIAL FEDERAL PUBLIC COMMENT PERIOD on the Comprehensive Study pursuant to the Canadian Environmental Assessment Act of the Ajax Mine Project Kamloops, British Columbia
More informationENVIRONMENTAL ASSESSMENT CHECKLIST
ENVIRONMENTAL ASSESSMENT CHECKLIST Date: Prepared By: Name Title Borrower: Address: Real Estate: Owned [/] Yes /No Leased [/] Yes /No Municipal description of property: Legal description, property and
More informationFebruary 19, 2007 DENR SUMMARY OF LANDFILL RECOMMENDATIONS
SUMMARY OF LANDFILL RECOMMENDATIONS 1. Specify how a landfill applicant must demonstrate financial qualifications to construct and operate the landfill. The applicant should provide cost estimates for:
More informationCHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS
CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS 20.8.10 PURPOSE AND INTENT... 8-2 20.8.20 INCORPORATION OF SMARA AND STATE REGULATIONS... 8-2 20.8.30 APPLICABILITY...8-2 20.8.40 CONTENTS OF
More informationE16. Trees in open space zones
E16. Trees in open space zones E16.1. Background Trees in the open space zones are an important public asset and need to be managed appropriately. As urban areas intensify, open space zones will be relied
More informationCity of Valdosta Land Development Regulations
Chapter 324 Section 324-1 Environmental Planning Criteria Protection of Groundwater Recharge Areas (A) Purpose and Intent. Pursuant to O.C.G.A. 12-2-8 and the Georgia Department of Natural Resources (DNR),
More informationPort Granby Project ENVIRONMENTAL ASSESSMENT STUDY REPORT EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Introduction Low-level radioactive waste and associated marginally contaminated soils at Port Granby are part of historical industrial activities in the Port Hope area. Since the 1930s,
More informationADDRESSING ENVIRONMENTAL CONCERNS DURING THE EAST VILLAGE BROWNFIELD REDEVELOPMENT PROJECT
Remediation Technologies Symposium October 21 st, 2010 East Village and Fort Calgary circa 2008, looking west Source: CMLC (East Village Master Plan Executive Summary) ADDRESSING ENVIRONMENTAL CONCERNS
More informationProject & Environmental Review. Guidelines Demolition. May 2016
Project & Environmental Review Guidelines Demolition May 2016 TABLE OF CONTENTS 1. Introduction... 3 2. Objectives... 3 3. Applicability and Building Permits... 3 4. Guidelines for Preparing a Project
More informationFORM 001-A Suspension and Abandonment Cost Estimate Report
FORM 001-A Suspension and Abandonment Cost Estimate Report ERCB Licence Number Facility Type (Directive 056, Table 5.1) LSD Location Licence Holder Facility Name Demolition Costs Description Quantities
More informationConditions Annexed to and Forming Part of Land Use Permit # MV2013C0021
Conditions Annexed to and Forming Part of Land Use Permit # MV2013C0021 Part A: Scope of Permit 1. This Permit entitles New Discovery Mines Ltd. to conduct the following land-use operation: a) Use, construction
More informationREASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT
REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT SASKATCHEWAN WATER CORPORATION BUFFALO POUND NON-POTABLE WATER SUPPLY SYSTEM EXPANSION PROJECT Introduction
More informationEnvironmental Setting
Trans Mountain is seeking approval for a Certificate of Public Convenience and Necessity (CPCN) from the National Energy Board (NEB) for a $5.4 billion expansion of its oil pipeline system from Strathcona
More informationKEEYASK TRANSMISSION PROJECT EA REPORT APPENDIX F DRAFT ENVIRONMENTAL PROTECTION PLAN
APPENDIX F DRAFT ENVIRONMENTAL PROTECTION PLAN APPENDIX F DRAFT ENVIRONMENTAL PROTECTION PLAN Keeyask Transmission Project Draft Environmental Protection Plan Prepared by: Manitoba Hydro Winnipeg, Manitoba
More informationTOOELE COUNTY LAND USE ORDINANCE CHAPTER 26 Page 1
CHAPTER 26 CONSTRUCTION DEBRIS AND MUNICIPAL SOLID WASTE ZONES Part 26-1. General. 26-2. Construction debris overlay zone (CDO). 26-3. Municipal solid waste zone (MSW). 26-4. Use tables. Part 1 General
More informationSolar Krafte Utilities Inc.
Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire
More informationAPPENDIX G. Applicable or Relevant and Appropriate Requirements (ARARs) Revised EE/CA. Lower Duwamish Waterway Superfund Site: T-117 Early Action Area
APPENDIX G Applicable or Relevant and Appropriate Requirements (ARARs) Revised EE/CA Appendix G Applicable or Relevant and Appropriate Requirements (ARARS) and Other Requirements to be Considered Table
More informationMitigating Environmental Impacts in the Offshore Oil and Gas Industry
Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle
More informationCHAPTER 6 - How to Prepare a SWPPP
All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be
More informationKENT BREEZE WIND FARMS
Decommissioning Plan Report MAY 2010 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. DECOMMISSIONING PROCESS DESCRIPTION... 2 3. SITE RESTORATION... 3 4. EXCESS MATERIALS AND WASTE MANAGEMENT... 4 5. MANAGING
More informationCONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 610 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS TABLE OF CONTENTS 610.01 SCOPE 610.02 REFERENCES 610.03
More informationRECLAMATION REGULATIONS
RECLAMATION REGULATIONS 1001. INTRODUCTION a. General. The rules and regulations of this series establish the proper reclamation of the land and soil affected by oil and gas operations and ensure the protection
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationEnvironmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
More information(B) "Facility," for the purposes of this rule, means:
3745-27-13 Procedure to engage in filling, grading, excavating, building, drilling, or mining on land where a hazardous waste facility or solid waste facility was operated. (A) No person shall, without
More informationSpill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts
SPCC PLAN Raytheon Company Spill Prevention Control and Countermeasures Plan Former Raytheon Facility 430 Boston Post Road Wayland, Massachusetts 6 November 2002 143.65 Environmental Resources Management
More informationAPPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports
APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan
More informationpatersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group
Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario
More informationTECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Karnalyte Resources Inc. Wynyard Carnallite Project
TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Karnalyte Resources Inc. Wynyard Carnallite Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment Branch December,
More informationSECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4
26 February 2016 RE: SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE 23-76-8W4, SE 26-76-8W4 and NW-24-76-8W4 Dear Sir or Madam, SECURE Energy Services Inc. ( SECURE ) is
More informationCCSD#1 Stormwater Standards
SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless
More informationDRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park
DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the
More informationEnvironment ENVIRONMENTAL PROTECTION ORDER NO. EPO SSR. Sears Canada Inc. [Sears] C/O. Lloyd McLellan. Eli Consulting Canada Inc.
ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT BEING CHAPTER E-12 R.S.A. 2000 (the Act ) current registered owner of the Lands; WHEREAS the Lands were purchased by Concord on June 18, 2015 and Concord is
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated October 1, 2010 Hants County Aggregate Quarry Extension Project Municipal Enterprises Ltd., Proponent Hants County, Nova Scotia The Hants
More informationCode of Practice for Land Treatment of Soil Containing Hydrocarbons
Code of Practice for Land Treatment of Soil Containing Hydrocarbons September 2008 Made under the Environmental Protection and Enhancement Act RSA 2000, ce-12 Published by Alberta Queen s Printer Alberta
More informationSTATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS
STATE OF MISSOURI CLEAN WATER ACT SECTION 401 WATER QUALITY CERTIFICATION 2012 GENERAL AND SPECIFIC CONDITIONS These conditions ensure that activities carried out under Nationwide Permits (NWPs) do not
More informationEnvironmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region
Environmental Review Process Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Outline 1. Overview of the Canadian Environmental Assessment Act (CEAA) 2. Indigenous
More informationAPPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY TECHNICALLY ADMIN.
Revised 02/01 APPLICATION REVIEW CHECKLIST LAND PROTECTION DIVISION HAZARDOUS WASTE PROGRAM Facility Name: Facility ID No.: ODEQ Permit No.: Reference No.: _ Application Type: Date: (New/Modify/Renewal)
More information