1 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p Engineering, Environment Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND*, Moein PARASTEGARI Department of Electrical Engineering, University of Isfahan, Isfahan, Iran (s): * Corresponding author, phone: , fax: Received: January 3, 217 / Accepted: June 14, 217 / Published: June 3, 217 Abstract Over the past few years, utilization of renewable energy resources (RERs) has become an active and interesting area of research in energy management of power systems. In this paper, a new three-stage generation scheduling method is proposed for thermal units and renewable energy resources. In the method, all generation units are bidding in a competitive market along with the external energy tie-line at the point of common coupling. The scheduling problem is solved while considering uncertainties in both generation and demand. At the first stage, Generation Companies (GenCos) use forecasted information (such as market price and climate conditions) to determine their optimal bidding strategy for maximum revenue. In the next stages, independent system operator (ISO) manages available contracts to minimize the operating cost of the power system. The proposed method is applied to a 1-unit network using GAMS software. Simulation results show that the effectiveness of this method is to the benefit of generation companies and ISO in the presence of traditional tie-line. Keywords Power Market; Renewable resources; Generation scheduling; Uncertainty 17

2 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI Nomenclature a j,bj,c j: Fuel cost coefficient of unit j P sjk: Power generation of unit j at time k in scenario 5 P j Max, P j Min : Maximum and Minimum generation limit of unit j MUj MDj: Minimum up and down time of unitj RUj RDj: Ramp up and down limit of unit j FCj(Psjk): Generation cost of unit j at time k in scenario 5 SCjk: Startup cost of unit j at time k HSCj, CSC j: Hot and Cold start-up cost of unit j T jk cold : T on, T o f f : Continuous off time of unit j at time k Continuous on and off time of unit j P in o u sk,p t sk : Power imported or exported with tie line at time k in scenario 5 C p e n s j k : Penalty for each MWh of unit j at time k in scenario 5 P best jk : Generation bid of unit j at time k P r sk : Available reserve at time k in scenario 5 RPk i MPk: Reserve and Market price at time k RC sk: Spinning reserve cost at time k in scenario 5 P renew sk : Generation of renewable units at time k in scenario 5 P l sk : Demand at time k in scenario 5 R Min sk : P M a x l i n e : Minimum required reserve Line flow limit α, β: Reserve factors Introduction Nowadays, renewable energy resources are increasingly used in restructured power systems. One of the main disadvantages of these resources is their uncertain generation. Scheduling problem of generation units without considering renewable resources is a complex problem, yet by considering these resources, scheduling problem becomes more complex. In most studies, the generation scheduling problem is examined from the ISO s point of view. Hence, the ISO manages the generation units to minimize the total operating cost. In reality, generation scheduling problem is considered from the favorable view of both ISO and GenCos. In this condition, generation scheduling problem could be solved by two general 18

3 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p objective functions: cost minimization [5,7,22] or profit maximization [24,25,28] and by Cost Based Unit Commitment (CBUC) or Profit Based Unit Commitment (PBUC) solutions. In [12-14], scheduling is performed in a cooperative environment. In this case, the hourly load should be lower than the total generation capacity and the system should work in a normal mode [18]. In a normal mode, no power is transferred from or to the system. In [18], two more modes are additionally considered excess demand and excess renewable generation. In these modes, unbalances between generation and consumption are controlled by exchanging power through the tie-line. In [15], a hybrid method is developed through adaptive search which is inspired from artificial immune system and genetic algorithm to carry out profit maximization of generation companies. In a power market, GenCos sell their energy and their reserve to energy and ancillary markets [24]. Changes in energy and reserve prices along with payment methods have a direct effect on the amount of power and reserve bids. There are several methods such as payment for the power delivered and payment for the reserve allocated for reserve market clearing [24]. In a competitive environment, it is not necessary for the power plants to supply the hourly demand. Accordingly, in [24, 29], it is considered that the generated power has to be equal or lower than the hourly demand, so that there is no excess generation in the system. Moreover, [23] tries to determine the optimal or near optimal scheduling to find Influence of improvement of generation scheduling on wheeling cost. The generation scheduling problem has been studied from different aspects such as considering renewable resources [14-17,21-22,24,26], energy storage systems [14-16,22,25], generation uncertainty [14-18,21,27], reliability indices [27], Emission [1-4,14-15], and demand response [14,28]. In [13-15, 18], it is shown that the penetration of renewable energy resources brings about a decrease in the operating cost. Also, simultaneous scheduling of storage systems and renewable resources improve the performance of renewable energy resources [13]. In [26], the uncertainties of renewable energy resources are considered in retail markets. In this case, the scheduling problem is defined as a Multi-Area Dynamic Economic Dispatch (MA-DED) problem. Scheduling problems can be solved by different methods. These methods can be divided into two categories: mathematical and meta-heuristic. Mathematical methods which can be used to solve different optimization problems are Lagrangian Relaxation (LR) [24], Evolutionary Programming (EP) [1], and Dynamic Programming (DP) [8]. The Meta- 19

4 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI heuristic methods which can be used to solve optimization problems are: Bee Colony [14]; Genetic Algorithm (GA) [8]; Unit Characteristic Classification by using Genetic Algorithm (UCC-GA) [9]; Hybrid Particle Swarm Optimization (HPSO) [12]; and some hybrid methods such as LRGA [11]. In this paper, a hybrid method is presented for the generation scheduling of thermal and renewable units. In this method, a multi-objective problem tries to minimize the generation cost and maximize the profit of GenCos simultaneously. For this purpose, at first the optimal bidding strategy of generation units is determined without considering the power system constraints. Then, based on historical data, all scenarios of renewable energy resources and system loads are generated. Finally, by considering all scenarios, the main scheduling problem is modeled by meeting the security constraints of the system and generation units. Simulation results indicate that the proposed method can decreases the cost and increases the profit of the coordinated thermal and renewable units by using the traditional tie-line. Material and method Problem Formulation Generation units can be categorized into two main categories: Dispatch able units and Non-Dispatch able units. In schedulable units, the scheduling program is determined based on fuel cost and other ancillary costs. The goal of the operator of these units is to maximize the profit. Operators of these units submit their bids to the market and if their bids are accepted, the ISO should use the bids in the scheduling program. If there are any violations between scheduling program and the actual state of the units, the ISO should pay the imbalance cost to GenCos. On the other hand, there are uncertainties in the power generation of the nondispatch able units such as wind units; so, it is necessary to model these uncertainties to reach the optimal scheduling program. First, the generation of non-schedulable units is forecasted and then the uncertainties are modeled through the historical data by scenario method to model these uncertainties. It should be noted that the ISO schedules units according to their contracts, the scenarios of the generation of renewable resources, and the load scenarios. ISO uses renewable resources first, then uses the schedulable units, and finally uses tie-line power in its scheduling program. 2

5 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p Optimal bidding strategy of GenCos In this section, optimal bidding strategy of generation units is determined. To determine the optimal bidding strategy of the units, it is first necessary to determine the pattern of the daily prices on the basis of the historical prices data and price fluctuations. Then, optimal bidding strategy of the units is determined by solving optimization problem consisting of an objective function and a set of constraints. The objective function of this problem is as follows: K J max : Pjk. MPk FC j ( Pjk). Y jk SC jk. Y jk.(1 Y j( k 1) ) (1) k 1 j 1 The objective function consists of three parts. The first part represents the sales profit in the market. The second part represents the cost of generated power and the last part represents the startup cost. Yjk variable is a binary variable indicating the status of unit j in period k. Generation and startup costs can be determined as follows: 2 FC j ( Pjk) a j b j. Pjk c j. Pjk (2) off HSC if MD j T jk MD j CST j SC jk (3) off CSC if T jk MD j CST j In order to determine the optimal bidding strategy of the units, it is necessary that to consider the constraints of the generation units. These constraints are as follows: 1. Generation limits: The output power must be within allowable limits: min max P j. Y jk Pjk Pj. Y jk (4) 2. Minimum up and down times: on j T (5) MU j off T j MD j (6) 3. Ramp up and ramp down limits: The change in the output power of the units must comply with the following limits: Pj k Pjk RU j ( 1) (7) Pjk Pj k 1) RD j ( (8) 21

6 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI Scheduling problem from the point of view of ISO The scheduling problem used by ISO is introduced in this section. ISO executes the scheduling problem and the inputs of the problem are the generation bids (determined in the last subsection), the scenarios of the generation of the renewable energy resources, and the load scenarios. The objective of this scheduling problem is to minimize the operation cost of the system. This objective function is as follows. S K J K pen s.( FC j ( Psjk ). Y jk SCjk. Y jk.(1 Y j k 1) ) Csjk s 1 k 1 j 1 k 1 in out min : ( RCsk ( Psk Psk ). MPk ) (9) This objective function (Eq. (9)) consists of four parts. In (9), pen C sjk represents the violation penalty for any bid for unit j at period k in scenario s. RC sk represents the cost of the spinning reserve at period k in scenario s. Also, cost of the tie-line. Meanwhile, imbalanced and the reserve cost can be calculated as follows: pen best C sjk Psjk Pjk. Y jk. MPk in out ( P sk Psk ). MPk presents the energy s parameter indicates the probability of scenario s. Also, (1) r RC sk Psk. RPk 2 FC j ( Psjk ) a j b j. Psjk c j. Psjk (11) (12) off HSC if MD j T jk MD j CST j SC jk (13) off CSC if T jk MD j CST j Constraints of the scheduling problem from the point of view of ISO are as follows: 1. Generation Limits: This constraint is the same as that in (4); 2. Minimum up and down times: These constraints are the same as those presented in (5) and (6); 3. Ramp up and ramp down limits: These constraints are the same as those presented in (7) and (8); 4. System power balance: the following equation represents the load balance equality. J in renew l out Psjk Psk Psk Psk Psk j 1 Where: Psk in and Psk out represent the input and output transmitted power by the tie-line at period kin scenario s, respectively. Also, Psk renew represents the power generated by the (14) 22

7 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p renewable resources at period k in scenario s, and Psk l represents the demand at period k in scenario s. 1. System reserve: the reserve of the network must be provided under the following conditions. J r max Psk Pj. Y jk Psjk j 1 r max in min Psk ( Pline Psk ) Rsk (15) min l renew Rsk. Psk. Psk In Eq. (15), the spinning and non- spinning reserve value is specified. The total available reserve must be at least equal to required amount (i.e. Percentage of hourly demand or biggest generation unit capacity). Psk r represents the value of the spinning reserve provided by schedulable units at period k in scenario s. Pline max - Psk in represents the non-spinning reserve value provided by the tie-line at period k in scenario s. Also, Rsk min represents the minimum reserve requirements at period k in scenario s. The coefficients α and β represent the percentage of the demand and the generation of the renewable resources for the minimum reserve requirements. 2. Tie-line flow limits: The value of the limits are as follows: in max Psk Pline (16) out max Psk Pline (17) A method proposed for the defined problem The algorithm of the proposed method is shown in Figure 1. 23

8 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI Start Stage I Forecasting of Market Prices Forecasting of Wind Speed, Temperature, insolation And Load With Uncertaintes Stage II Profit-Base Unit Commitment Generation Profile For Thermal Units Generate Scenarios & Computing PDF Factors of Load And Generation of Renewable Resources ISO Stage III Unit s Contract Hour Ahead Market Load And Renewable Generation Scenarios Cost-Base Unit Commitment Generation Scheduling Figure 1. The proposed algorithm As shown in this figure, this algorithm consists of three stages. In the first stage, the input data includes the market price forecasts, the predicted demand, and the forecast determined for the generation of renewable resources. In the second stage, by solving the PBUC problem, the optimal bidding strategies of GenCos are determined. The scenarios of the renewable generation and demand should be determined at this stage as well. In the last stage, based on previous results, the scheduling problem is modeled and solved by considering the power system constraints from the point of view of ISO. Generation scheduling problems can be examined with regard to two contexts: Cooperative and Competitive. In the cooperative context, the generation units have to meet the demand with minimum reserve requirements. In this case, the network has no dealings with the outside network and the network must be self-sufficient to meet its demands. In the End 24

9 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p competitive context, the system operator can use the tie-line power to satisfy the demand. In this case, the system generation can be lower or higher than that of the demand required. Obviously, the profit of GenCos in competitive markets is more than that of cooperative markets. It should be noted that in a competitive context, the GenCos offer bids in a way that they make the maximum profit. But in a cooperative context, the GenCos should satisfy the demand. In the following, the three stages of the proposed method are introduced. First stage At this stage, the information required for solving the scheduling problem is determined as an input data to the generation scheduling problem. These input data are as follows: 1. Forecasted day-ahead market prices. 2. Forecasted load and its scenarios. 3. Forecasted generation of renewable resources for the next 24 hours and its scenarios Second stage In this stage, by using the information determined in the previous stage, optimal bidding strategies of the schedulable units are determined. For this purpose, the following data should be determined. 1. Bids of the schedulable GenCos: the schedulable GenCos determine their optimal bidding strategy based on market prices by solving the problem presented in section (2-1). 2. Demand scenarios: ISO calculates the demand scenarios based on historical information. The method used for scenario generation is described in the next sub-section. Scenarios for the renewable generation of energy resources: based on the historical data of the renewable energy resources, renewable generation scenarios can be determined. The method used for the scenario generation is described as follows. Scenario generation method: One of the main methods to generate the load and renewable power scenarios is to discretize the probability distribution function (PDF) of the forecasting error [18]. Demand and wind power generation errors can be modeled by using this method based on normal PDFs. Each continuous PDF is discretized to create a set of finite states such that a probability is assigned to each state according to its PDF. Forecasting 25

10 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI errors are defined as per-unit and can be changed several times in one scenario. We assumed that these values are provided by renewable resources. The discrete sets of the load D and wind power W forecasting errors are described as follows: D W W W W n m i i D W 1 i 1 i n n ed, D, e D, D,, e D, D m m e,, e,,, e, W W W (18) Where: S n m n m i j s D. W 1 (19) s 1 i 1 j 1 n e D - the error of scenario n of the forecasted load, probability, and n - the total number of load scenarios. Also, n D - the corresponding m m e W, and W - the error and the probability of the wind generation forecast of the m-th scenario and m - the total number of wind generation scenarios. S represents the total number of scenarios. In this stage, the data which is determined in the previous stages are used to schedule units. The optimal bidding strategy of the schedulable units determined in the previous stage will be considered as contracts on the market. Also, all the pieces of information such as the market price and the scenarios are collected for primary generation scheduling by solving the objective function (9). Results and discussion In order to illustrate the advantages of the algorithm presented in Section 3, this algorithm has been implemented on a 1-Units power system. At first, simulation results for both the cooperative and competitive contexts are introduced and then the results are compared with those of other studies. Finally, the results of the proposed algorithms are evaluated. It should be noted that DICOPT (Discrete and continuous optimizer) solver of GAMS software is used for solving the optimization problem. This solver is a program for solving mixed-integer nonlinear programming (MINLP) problems that involve linear binary or integer variables and linear and nonlinear continuous variables. While the modeling and solution of MINLP optimization problems have not yet reached the stage of maturity and reliability achieved by linear, integer, or non-linear programming modeling, these problems 26

11 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p still have rich areas of application. The MINLP algorithm inside DICOPT solves a series of NLP and MIP sub-problems. NLP and MIP solvers that used for this simulation are CONOPT and CPLEX. Initial data The case under study consists of 1 thermal units with a total capacity of 1662 MW. The details of the 1 power units are presented in appendix A. The demand profile and the hourly market price are shown in Table 1 [24]. In this system, the required reserve is 1% of the hourly demand (α=.1). Interval Table 1. Forecasted demands and spot market price Demand Spot Price Interval Demand (MW) ($/MWh) (h) (MW) Spot Price ($/MWh) Comparing GAMS results with those of other solvers By comparing the simulation result with [8-12, 24], scheduling problem is solved by both CBUC and PBUC objective functions [24]. CBUC problem is considered in the cooperative context and PBUC problem in the competitive context. CBUC Problem The purpose of this scheduling is to minimize the operational cost resulting from limitations in the generation and the network. The results of the GAMS software compared with those of other methods are shown in Table 2. 27

12 Time Intervals (h) Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI Table 2. Comparing simulation results of proposed method with others Cost-Base Unit Commitment (Total Cost ($)) GA [8] UCC-GA [9] EP [1] DP [8] LR [24] LRGA [11] HPSO [12] DICOPT Best 565, ,977 N/A 565,825 N/A 564,8 563, ,937.7 Average N/A N/A 565,825 N/A 565,825 N/A 564, Worst 57,32 565,66 N/A N/A N/A N/A 565, The responses obtained with respect to occurrence are divided into three categories: the best, average and the worst. Also, because of the unavailability of all responses, the term N/A is used in some methods. It is clear that the GA [8], DP [8], and LR [24] methods have the same answer and UCC-GA [9] and LRGA [11] attain better results. The results obtained by the GAMS software shows $ that is less than the amount obtained by the best solution in [12]. Numerical generation result of the 1 thermal units for the day-ahead scheduling is shown in Table 3. Compared to [24], better results are obtained due to changes in the generation power of units 5 and 6 over a period of 23. Table 3. Power setting and generation cost of 1-Units Thermal Units Power Generation(MW) Total Start-Up Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Generation Cost ($) Cost ($)

13 Time Intervals(h) Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p PBUC Problem The purpose of this scheduling is to maximize the profit of generation companies due to constraints and market price fluctuations. In a competitive context, reserve payment can be made in different ways: payment for an allocated reserve and payment for a reserve that is actually used. The second method is the method used in this section. The price of the ancillary service market is fixed at five times the spot price. In Table 4, the results of the generation and reserve scheduling for 1 units are shown. The results show that under these conditions the maximum profit is $ This value can be calculated by subtracting the total cost from the revenue in Table 4 which is $ more than [24]. This difference is due to changes in the generation rates and reserve power in stations 2, 5, and Table 4. Power setting and generation cost of 1-Units Thermal Units Power Generation/Reserve(MW) Unit Unit Unit Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit / 245 / / 295 / 75 Unit 1 Start-Up Cost ($) Revenue ($) Generation Cost ($) / / / / / / / / / / / / / / / / / 395/6 / / / / / / / / / 455/ / / 4/95 / / / / / / 62 / 455 / / / 1 / / / / / / 13 / 52 / 455 / / 11 / / / / / / 13 / 47 / 455 / / 115 / / / / / / 13 / 42 / 455 / / 12 / / / / / / 455 / 13 / 13 / 32 / 13 / / / / / / 455 / 13 / 13 / 162 / / / / / / / 455 / 13 / 13 / 162 / 8 / / / / / / 455 / 13 / 13 / 162 / 8 / / / / / / 455 / 13 / 13 / 25 / 137 / / / / / / 455 / 13 / 13 / 32 / 13 / / / / / / 455 / 13 / 13 / 3 / 12 / / / / / / 13 / 57 / 455 / / 15 / / / / / / 13 / 62 / 455 / / 1 / / / / / / 455 / / 13 / 52 / / / / / /

14 Generation scheduling of renewable energy resources under uncertainties in competitive environments / / / / / / / 42 / 455 / / / 25 / 455 / / / 32 / 455 / / / 52 / 455 / / / / 8 Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / To demonstrate the capabilities of the proposed algorithm in the network, the influence of market price fluctuations, penetration of renewable resources, and uncertainty in the scheduling problem have been tested. Four intended cases are shown in Table 5. Case 1: Scheduling is offered without renewable resources, uncertainty, and volatility of the market price. Case 2: Scheduling is offered with the effects of fluctuations in the market price. Table 5. Cases considerations Swinging Market Price Renewable Unit Uncertainty Case1 No No No Case2 Yes No No Case3 Yes Yes No Case4 Yes Yes Yes Case 3: Scheduling is offered with renewable resources and fluctuations in the market price. Case 4: Scheduling is offered with renewable resources, uncertainty, and volatility of the market price. In the scheduling, communication line capacity is set to 7 MW and the coefficient α=.1. Penalties for each megawatt hour are equal to the spot market. The reserve price is equal to 25% of the market price. In this case, no penalties have been paid to the generation companies. So, the generation companies are working at their optimum point for maximum benefit. The results show that the cost is reduced from to because of the exchanged power through the lie-line. Also, by the use of the proposed method the profit is increased about $ in comparison with the generation pattern of thermal units in [8, 24]. Discussion of case 1: The results of the proposed algorithm, in case 1, are presented in Table 6. 3

15 Time Intervals(h) Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p Table 6. Simulation result of proposed method Case 1 Thermal Units Generation Cost ($) Start-Up Cost ($) Profit ($) Penalty ($) Unit Unit Unit Unit Unit Unit6 Unit7 Unit8 Unit9 Unit1 Total Operation Cost ($)= 543,34.9 Total Profit ($)= 11,46.9 Using renewable energy resources and storage systems presented in [15] leads to, operating cost about $ This cost is more than the cost of the proposed method. So, by selling the surplus power to the market, ISO not only did not pay any penalties to GENCOs but also reduced the operational cost. The details of the proposed scheduling are shown in Table 7. Table 7. Power setting and reserve cost of 1-Units Case 1 Thermal Units Power Generation(MW) P tn P out Reserve Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 Unit 8 Unit9 Unit 1 (MW) (MW) Cost($)

16 MW Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI According to this table, it is clear that due to the cheaper cost of the market price compared to the marginal cost of thermal units at peak points, lack of power is supplied by the tie-line. By canceling the contracts of the expensive units over these hours, the system operator purchases the required power from the market and vice versa. Discussion of case 2: In the case, the hourly price pattern is taken from [25]. To maximize profits, the generation pattern of thermal units is shown in Figure 2. According to this figure, units 7 to 1 did not offer any power because of the average market price is low Hour Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 Unit 8 Unit 9 Unit 1 Figure 2. Profit-Base unit commitment of 1-Units Case2 As we can see in Table 8, no penalties have been paid to the units. So, the plants are working at their optimum point for maximum profit. Table 8. Simulation result of proposed method Case 2 Thermal Units Generation Cost Start-Up Cost Profit Penalty ($) ($) ($) ($) Unit Unit Unit Unit Unit Unit Unit7 Unit8 Unit9 Unit1 Total Operation Cost ($) = 529,663.9 Total Profit ($) = 147,

17 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p As it is shown in the table, the total cost of the system is reduced from $ to $ , because a part of the energy is provided from power market via the tie-line. On the other hand, price uncertainty leads to an increase in the total profit of the system from in out $ to $ The hourly rates of the purchased ( P ) and sold ( P ) power are shown in Table 9. P in (MW) P out (MW) Table 9. T-Line power setting Case Time Intervals (h) Discussion of case 3: In this case, besides considering the volatility of the market price, there is a wind farm with a capacity of 15 MW in addition to thermal power units [14] with a coefficient of β =.13 [18]. In this new condition, operational cost is decreased from $ to $ compared to case 2. Also, the operating cost is $ which is less than [14]. So, with same amount of wind power, the use of the proposed method leads to more profit by selling the exceeded power. In both cases of 2 & 3, profit is equal to $ The details of the scheduling in case 3 are shown in Table 1. P w (MW) P tn (MW) P out (MW) 2 Table 1. T-Line & renewable resources power setting Case Time Intervals (h) According to this table, it is clear that at any period the amount of the sale or purchase increased or decreased based on generation amount of renewable resources, respectively. Of course, it also depends on the capacity of the tie-line. Discussion of case 4: Results of case 4 are presented in Table 11. This table shows the effects of using proposed multi-scenario stochastic model to solve the day-ahead UC problem. 33

18 pu Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI Table 11. Discrete probability distribution of wind and load Load Wind Probability Expected Expected Probability % 1%.5 1% 1% % 98%.15 99% 98%.15 12% 13%.15 11% 12%.5 98% 97% % 95%.5 13% 14% % 15% As shown in this table, five scenarios are considered for demand errors and wind power generation [15]. So, there are 25 scenarios employed to calculate through the use of Eq. (1). The scenario details include the PDFs and per unit errors as shown in Figure Load(1-11) Wind(1-11) Load(12-24) Wind(12-24) Scenarios Figure 3. Scenario details The operational cost of the system is increased from $ to $ and the profit is equal to case 3. By checking the expected values, it is clear that the most frequent scenario is no. 2. In this scenario, due to the decreased generation of renewable energy and increased demand, costs have increased significantly. Scenario 3 is the most expected one. It occurs when the demand is not changed and the renewable energy generation is reduced. Conclusions In this paper, a new method is presented for the generation scheduling in a competitive environment. Simulation results show that power trade via tie-line makes the generation scheduling problem more flexible. Therefore, ISO can prevent major penalties by exchanging 34

19 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p power in the presence of high uncertainty. On the other hand, the proposed algorithm increases the profit of GenCos by following their bidding strategies as much as possible. As a result, the proposed algorithm improves the performance of energy management system by increasing the profit of both participants in the market. Appendix Characteristic information for economic dispatch and unit commitment problems of units for the 1-unit system are given in Tables 1 and 2, respectively. Table a.1. Main characteristics of thermal units Units P max P min a b c (MW) (MW) ($) ($/MWh) ($/MWh 2 ) E E E E E E E E E E-3 Table a.2. Additional characteristics of thermal units Units MU MD RU RD HSC CSC CST IS (h) (h) (MW) (MW) ($) ($) (h) (h)

20 Generation scheduling of renewable energy resources under uncertainties in competitive environments References Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI 1. Ahmadi, A., Sharafi Masouleh, M., Janghorbani, M., Yadollahi Ghasemi Manjili, Navid, Sharaf, A. M., Esmaeel Nezhad, A., Short term multi-objective hydrothermal scheduling, Electric Power Systems Research, vol. 121, pp , Vithayasrichareon, P., MacGill, I. F., Incorporating short-term operational plant constraints into assessments of future electricity generation portfolios, Applied Energy, vol. 128, pp , Hooshmand, R.-A., Parastegari, M., Morshed, M. J., Emission, reserve and economic load dispatch problem with non-smooth and non-convex cost functions using the hybrid bacterial foraging-nelder Mead algorithm, Applied Energy, vol. 89, no. 1, pp , Glotić, A., Zamuda, A., Short-term combined economic and emission hydrothermal optimization by surrogate differential evolution, Applied Energy, vol. 141, pp , Rasoulzadeh-akhijahani, A. Mohammadi-Ivatloo, B., Short-term hydrothermal generation scheduling by a modified dynamic neighborhood learning based particle swarm optimization, International Journal of Electrical Power & Energy Systems, vol. 67, pp , Uyar, A. Ş., Türkay, B., Keleş, A., A novel differential evolution application to shortterm electrical power generation scheduling, International Journal of Electrical Power & Energy Systems, vol. 33, no. 6, pp , Zhang, J., Lin, S., Qiu, W., A modified chaotic differential evolution algorithm for short-term optimal hydrothermal scheduling, International Journal of Electrical Power & Energy Systems, vol. 65, pp , Kazarlis, S. A., Bakirtzis, A. G., Petridis, V., A genetic algorithm solution to the unit commitment problem, IEEE Trans. Power Syst., vol. 11, no. 1, pp , Senjyu, T., Yamashiro, H., Uezato, K., Funabashi, T., A unit commitment problem by using genetic algorithm based on unit characteristic classification, In Winter Meeting of the Power Engineering Society, 58 63, Juste, K. A., Kita, H., Tanaka, E., Hasegawa, J., An evolutionary programming solution to the unit commitment problem, IEEE Trans. Power Syst., vol. 14, no. 4, pp

21 Leonardo Electronic Journal of Practices and Technologies ISSN Issue 3, January-June 217 p , Chuan-Ping Cheng, Chih-Wen Liu, Chun-Chang Liu, Unit commitment by Lagrangian relaxation and genetic algorithms, IEEE Trans. Power Syst., vol. 15, no. 2, pp , Ting, T. O., Rao, M., Loo, C. K., A Novel Approach for Unit Commitment Problem via an Effective Hybrid Particle Swarm Optimization, IEEE Trans. Power Syst., vol. 21, no. 1, pp , Logenthiran, T., Srinivasan, D., Short term generation scheduling of a Microgrid, In TENCON IEEE Region 1 Conference, Govardhan, M. and Roy, R., Generation scheduling in smart grid environment using global best artificial bee colony algorithm, International Journal of Electrical Power & Energy Systems, vol. 64, pp , M. Kamel, Ahmed M. Azmy, A. Abou ElEla, Ahmed I.A. Shobair, Optimal Management and Operation of a Hybrid Energy System Based on Wind Energy Units, Journal of Electrical Systems, vol. 9, no. 2, pp , Cau, G., Cocco, D., Petrollese, M., Knudsen Kær, S., and Milan, C., Energy management strategy based on short-term generation scheduling for a renewable microgrid using a hydrogen storage system, Energy Conversion and Management, vol. 87, pp , Osório, G. J., Lujano-Rojas, J. M., Matias, J., and Catalão, J., A fast method for the unit scheduling problem with significant renewable power generation, Energy Conversion and Management, vol. 94, pp , ZeinAlabedin, A. M., El-Saadany, E. F., Salama, M. M. A., Generation scheduling in Microgrids under uncertainties in power generation, in 212 IEEE Electrical Power & Energy Conference (EPEC), Hinojosa, V. H. and Leyton, C., Short-term hydrothermal generation scheduling solved with a mixed-binary evolutionary particle swarm optimizer, Electric Power Systems Research, vol. 92, pp , Gjorgiev, B., Kančev, D., Čepin, M., A new model for optimal generation scheduling of power system considering generation units availability, International Journal of Electrical Power & Energy Systems, vol. 47, pp , Simoglou, C. K., Kardakos, E. G., Bakirtzis, E. A., Chatzigiannis, D. I., Vagropoulos, S. 37

22 Generation scheduling of renewable energy resources under uncertainties in competitive environments Emad NEMATBAKHSH, Rahmat-Allah HOOSHMAND, Moein PARASTEGARI I., Ntomaris, A. V., Biskas, P. N. et al., An advanced model for the efficient and reliable short-term operation of insular electricity networks with high renewable energy sources penetration, Renewable and Sustainable Energy Reviews, vol. 38, pp , Wang, Y., Zhang, K., Teng, X., Ding, Q., Huang, X., Coordinated operation of wind power and other resources considering power system requirements, J. Renewable Sustainable Energy, vol. 7, no. 2, pp , I. Kranthi Kiran, A. Jaya Laxmi, Influence of improvement of generation dispatch together with generation scheduling on wheeling cost, Journal of Electrical Systems, vol. 1, no. 1, pp , Logenthiran, T., Woo, W. L., Van Phan, T., Lagrangian relaxation hybrid with evolutionary algorithm for short-term generation scheduling, International Journal of Electrical Power & Energy Systems, vol. 64, pp , Parastegari, M., Hooshmand, R.-A., Khodabakhshian, A., Zare, A.-H., Joint operation of wind farm, photovoltaic, pump-storage and energy storage devices in energy and reserve markets, International Journal of Electrical Power & Energy Systems, vol. 64, pp , Soroudi, A. and Rabiee, A., Optimal multi-area generation schedule considering renewable resources mix: a real-time approach, IET Generation, Transmission & Distribution, vol. 7, no. 9, pp , MacCormack, J., Hollis, A., Zareipour, H., Rosehart, W., The large-scale integration of wind generation: Impacts on price, reliability and dispatchable conventional suppliers, Energy Policy, vol. 38, no. 7, pp , Saebi, J. and Hossein Javidi, M., Economic evaluation of demand response in power systems with high wind power penetration, J. Renewable Sustainable Energy, vol. 6, no. 3, pp , Sharma, D., Trivedi, A., Srinivasan, D., Thillainathan, L., Multi-agent modeling for solving profit based unit commitment problem, Applied Soft Computing, vol. 13, no. 8, pp , Amjady, N. and Vahidinasab, V., Security-constrained self-scheduling of generation companies in day-ahead electricity markets considering financial risk, Energy Conversion and Management, vol. 65, pp ,

Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables

Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables Optimal Scheduling Strategy in Insular Grids Considering Significant Share of Renewables Marcos D. B. Silva 1, Gerardo J. Osório 2, Miadreza Shafie-khah 2, Juan M. Lujano-Rojas 3, João P. S. Catalão 1,2,3

More information

Resource Scheduling in a Smart Grid with Renewable Energy Resources and Plug-In Vehicles by MINLP Method

Resource Scheduling in a Smart Grid with Renewable Energy Resources and Plug-In Vehicles by MINLP Method Amirkabir University of Technology (Tehran Polytechnic) Vol. 7, No., Fall, pp. 9-7 Amirkabir International Journal of Science& Research )AIJ-EEE) Resource Scheduling in a Smart Grid with Renewable Energy

More information

Optimization of Wind-Pumped Storage Hydro Power System

Optimization of Wind-Pumped Storage Hydro Power System International Journal of Engineering Technology, Management and Applied Sciences Optimization of Wind-Pumped Storage Hydro Power System 1 Mahesh Kumar P.G. Student Mechanical Engg.Dept. MMMT Gorakhpur

More information

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET

CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET 61 CHAPTER 5 SOCIAL WELFARE MAXIMIZATION FOR HYBRID MARKET 5.1 INTRODUCTION Electricity markets throughout the world continue to be opened to competitive forces. The underlying objective of introducing

More information

Solutions for Power Generation

Solutions for Power Generation EM SG SOLutions Solutions for Power Generation Energy Management Smart Grid Solutions Solutions for Power Generation Overview Power Applications Generation Planning and Trading Summary Page 2 Solutions

More information

Thermal Unit Commitment Strategy Integrated with Solar Energy System

Thermal Unit Commitment Strategy Integrated with Solar Energy System Thermal Unit Commitment Strategy Integrated with Solar Energy System K. Selvakumar 1, B. Vignesh 2, C.S.Boopathi 3 and T. Kannan 4 1,3 Assistant Professor, Dept. of EEE, SRM University, Kattankulathur-603203,

More information

Stochastic Optimization for Unit Commitment A Review

Stochastic Optimization for Unit Commitment A Review Stochastic Optimization for Unit Commitment A Review Qipeng P. Zheng +, Jianhui Wang and Andrew L. Liu + Department of Industrial Engineering & Management Systems University of Central Florida Argonne

More information

Tailoring MIP-based Generation Scheduling Program for Korean Electricity Market

Tailoring MIP-based Generation Scheduling Program for Korean Electricity Market Tailoring MIP-based Generation Scheduling Program for Korean Electricity Market D. HUR *, H. S. JEONG ** Department of Electrical Engineering Kwangwoon University Kwangwoon Rd. 26, Nowon-gu, Seoul, 139-701

More information

A Solution to the Unit Commitment Problem Using Imperialistic Competition Algorithm

A Solution to the Unit Commitment Problem Using Imperialistic Competition Algorithm IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 27, NO. 1, FEBRUARY 2012 117 A Solution to the Unit Commitment Problem Using Imperialistic Competition Algorithm Moosa Moghimi Hadji, Student Member, IEEE, and

More information

http://www.diva-portal.org This is the published version of a paper presented at 14th International Symposium on District Heating and Cooling, Stockholm, September 6-10, 2014. Citation for the original

More information

Power Grid Simulation Model for Long Term Operation Planning

Power Grid Simulation Model for Long Term Operation Planning A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 35, 2013 Guest Editors: Petar Varbanov, Jiří Klemeš, Panos Seferlis, Athanasios I. Papadopoulos, Spyros Voutetakis Copyright 2013, AIDIC Servizi

More information

Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement

Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement 2014 47th Hawaii International Conference on System Science Robust Optimization Based Economic Dispatch for Managing System Ramp Requirement Anupam A. Thatte Texas A&M University, College Station, Texas,

More information

Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response

Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response The 6th International Conference on Renewable Power Generation (RPG) 19 20 October 2017 Bi-level two-stage stochastic SCUC for ISO day-ahead scheduling considering uncertain wind power and demand response

More information

A Novel TANAN s Algorithm for Solving Economic Load Dispatch Problems

A Novel TANAN s Algorithm for Solving Economic Load Dispatch Problems International Journal of Scientific and Research Publications, Volume 3, Issue 7, July 2013 1 A Novel TANAN s Algorithm for Solving Economic Load Dispatch Problems Subramanian R*, Thanushkodi K** *Associate

More information

Solving Environmental Economic Dispatch Problem with Lagrangian Relaxation Method

Solving Environmental Economic Dispatch Problem with Lagrangian Relaxation Method International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 7, Number 1 (2014), pp. 9-20 International Research Publication House http://www.irphouse.com Solving Environmental

More information

Keywords - Distributed generation, Demand response program, Demand side management, Multi-objective particle swarm optimization.

Keywords - Distributed generation, Demand response program, Demand side management, Multi-objective particle swarm optimization. MULTI-OBJECTIVE OPTIMIZATION OF DEMAND SIDE MANAGEMENT IN THE PRESENCE OF DG AND DEMAND RESPONSE H. SHAYEGHI, 2 M. ALILOU, 3 B. TOUSI, 4 R. DADKHAH DOLTABAD Electrical Engineering Department, University

More information

Robust Supply Function Bidding in Electricity Markets With Renewables

Robust Supply Function Bidding in Electricity Markets With Renewables Robust Supply Function Bidding in Electricity Markets With Renewables Yuanzhang Xiao Department of EECS Email: xyz.xiao@gmail.com Chaithanya Bandi Kellogg School of Management Email: c-bandi@kellogg.northwestern.edu

More information

Power Scheduling for Renewable Energy Connected to the grid

Power Scheduling for Renewable Energy Connected to the grid Power Scheduling for Renewable Energy Connected to the Ismail El kafazi 1, Rachid Bannari 2, Abdellah Lassioui 3 and My Othman Aboutafail 4 1,2 Laboratory Systems Engineering, Ensa, Ibn Tofail University

More information

Genetic Algorithm Based Economic Optimization of Microgrid Including Multi-Energy Supply System

Genetic Algorithm Based Economic Optimization of Microgrid Including Multi-Energy Supply System Journal of Physics: Conference Series PAPER OPEN ACCESS Genetic Algorithm Based Economic Optimization of Microgrid Including Multi-Energy Supply System To cite this article: Shujian Zhao et al 2018 J.

More information

Analysis on the Influence Factors of Wind Power Accommodation

Analysis on the Influence Factors of Wind Power Accommodation Journal of Power and Energy Engineering, 25, 3, 62-69 Published Online April 25 in SciRes. http://www.scirp.org/journal/jpee http://dx.doi.org/.4236/jpee.25.3423 Analysis on the Influence Factors of Wind

More information

Optimal Behavior of Demand Response Aggregators in Providing Balancing and Ancillary Services in Renewable-Based Power Systems

Optimal Behavior of Demand Response Aggregators in Providing Balancing and Ancillary Services in Renewable-Based Power Systems Optimal Behavior of Demand Response Aggregators in Providing Balancing and Ancillary Services in Renewable-Based Power Systems E. Heydarian-Forushani 1, M.E.H. Golshan 1, M. Shafie-khah 2,and J.P.S. Catalão

More information

Price Formation Education Session Day 1 Economic Dispatch

Price Formation Education Session Day 1 Economic Dispatch Slide 1 Price Formation Education Session Day 1 Economic Dispatch Anthony Giacomoni Melissa Maxwell Laura Walter December 4, 2017 Slide 2 Disclaimer Slide This is not a committee meeting. This session

More information

Applying Robust Optimization to MISO Look-ahead Unit Commitment

Applying Robust Optimization to MISO Look-ahead Unit Commitment 1 Applying Robust Optimization to MISO Look-ahead Unit Commitment Yonghong Chen, MISO Qianfan Wang, Xing Wang, Alstom Grid Yongpei Guan, University of Florida IEEE General Meeting July, 2014 2 Outline

More information

Using PLEXOS to Validate TIMES

Using PLEXOS to Validate TIMES Using PLEXOS to Validate TIMES Paul Deane and Alessandro Chiodi Sustainable Energy Research Group, Environmental Research Institute University College Cork, Cork, Ireland ETSAP workshop, Cork, Ireland

More information

Stackelberg Game Model of Wind Farm and Electric Vehicle Battery Switch Station

Stackelberg Game Model of Wind Farm and Electric Vehicle Battery Switch Station IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Stackelberg Game Model of Wind Farm and Electric Vehicle Battery Switch Station To cite this article: Zhe Jiang et al 2017 IOP

More information

Coordination of Generation Maintenance Scheduling in Electricity Markets

Coordination of Generation Maintenance Scheduling in Electricity Markets IEEE TRANSACTIONS ON POWER SYSTEMS 1 Coordination of Generation Maintenance Scheduling in Electricity Markets Yang Wang, Student Member, IEEE, Daniel S. Kirschen, Fellow, IEEE, Haiwang Zhong, Member, IEEE,

More information

Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact

Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact Journal of Clean Energy Technologies, Vol. 4, No., March 6 Fuel Cost Optimization of an Islanded Microgrid Considering Environmental Impact Vinod M. Raj and Saurabh Chanana Abstract This paper shows how

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style A Model Predictive Control Approach for Long Term Planning of Capacity Investments in a District Heating System Jose L. Mojica Michelle Chen Damon Petersen Dr. John D.

More information

Multi-node offer stack optimization over electricity networks

Multi-node offer stack optimization over electricity networks Lecture Notes in Management Science (2014) Vol. 6: 228 238 6 th International Conference on Applied Operational Research, Proceedings Tadbir Operational Research Group Ltd. All rights reserved. www.tadbir.ca

More information

Dynamic Economic Dispatch Considering Emission Using Multi-Objective Flower Pollination Algorithm

Dynamic Economic Dispatch Considering Emission Using Multi-Objective Flower Pollination Algorithm Dynamic Economic Dispatch Considering Emission Using Multi- Flower Pollination Algorithm Muhammad Fadli Azis 1, Albert Ryanta 2, Dimas Fajar Uman Putra 3, Okto Fenno 4 1 Electrical Engineering, Institut

More information

Modeling Hydro Power Plants in Deregulated Electricity Markets: Integration and Application of EMCAS and VALORAGUA

Modeling Hydro Power Plants in Deregulated Electricity Markets: Integration and Application of EMCAS and VALORAGUA Modeling Hydro Power Plants in Deregulated Electricity Markets: Integration and Application of EMCAS and Prakash Thimmapuram 1, Thomas D. Veselka 1, Vladimir Koritarov 1 Sónia Vilela 2, Ricardo Pereira

More information

WITH the deregulation of electrical power systems, market

WITH the deregulation of electrical power systems, market IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 15, NO. 3, AUGUST 2000 981 Optimization Based Bidding Strategies in the Deregulated Market Daoyuan Zhang, Yajun Wang, Peter B. Luh, Fellow, IEEE Abstract With the

More information

Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High Renewable Energy Penetration

Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High Renewable Energy Penetration University of Denver Digital ommons @ DU Electronic Theses and Dissertations Graduate Studies 1-1-2014 Statistical Scheduling of Economic Dispatch and Energy Reserves of Hybrid Power Systems with High

More information

CHAPTER 2 REACTIVE POWER OPTIMIZATION A REVIEW

CHAPTER 2 REACTIVE POWER OPTIMIZATION A REVIEW 14 CHAPTER 2 REACTIVE POWER OPTIMIZATION A REVIEW 2.1 INTRODUCTION Reactive power optimization is an important function both in planning for the future and day-to-day operations of power systems. It uses

More information

FAST Tool and Exercise

FAST Tool and Exercise FAST Tool and Exercise Sustainable Energy Training Electricity Generation and Supply Challenges and Opportunities for Asia Adam Brown Renewable Energy Division International Energy Agency 28 November 2013

More information

Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems

Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems Robust and Decentralized Operations for Managing Renewable Generation and Demand Response in Large-Scale Distribution Systems Research Team Andy Sun, Georgia Tech Duncan Callaway, UC Berkeley PSERC Industry-University

More information

Applying Robust Optimization to MISO Look- Ahead Commitment

Applying Robust Optimization to MISO Look- Ahead Commitment Applying Robust Optimization to MISO Look- Ahead Commitment Yonghong Chen, Qianfan Wang, Xing Wang, and Yongpei Guan Abstract Managing uncertainty has been a challenging task for market operations. This

More information

A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems

A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems A Heuristic Approach for Economic Dispatch Problem in Insular Power Systems G.J. Osório 1, J.M. Lujano-Rojas 1, J.C.O. Matias 1, J.P.S. Catalão 1,2,3 1 University of Beira Interior, Covilha, Portugal 2

More information

Cuckoo Search based Long-term Emission Constrained Generation Scheduling for Thermal- Wind Hybrid System

Cuckoo Search based Long-term Emission Constrained Generation Scheduling for Thermal- Wind Hybrid System Cuckoo Search based Long-term Emission Constrained Generation Scheduling for Thermal- Wind Hybrid System Biswa Ranjan Kuanr, Niladri Chakraborty Department of Power Engineering Jadavpur University Kolkata,

More information

Mixed Integer Programming for HVACs Operation

Mixed Integer Programming for HVACs Operation Mixed Integer Programming for HVACs Operation Mohemmed Alhaider, Lingling Fan, Senior Member, IEEE Abstract Mixed integer programming (MIP) problems are formulated in this paper to model the operation

More information

A Review of Unit Commitment in Deregulated Electricity Markets

A Review of Unit Commitment in Deregulated Electricity Markets A Review of Unit Commitment in Deregulated Electricity Markets Adline K. Bikeri, Christopher M. Muriithi, and Peter K. Kihato Abstract As electricity markets undergo deregulation all over the world, the

More information

A Study of Energy Procurement Strategies for Intermittent Sources

A Study of Energy Procurement Strategies for Intermittent Sources A Study of Energy Procurement Strategies for Intermittent Sources Muhammad Kumail Haider, Ghufran Baig, and Syed Taha LUMS School of Science and Engineering, Lahore, Pakistan {13100183,13100162,13100123}@lums.edu.pk

More information

OPTIMAL DESIGN OF DISTRIBUTED ENERGY RESOURCE SYSTEMS UNDER LARGE-SCALE UNCERTAINTIES IN ENERGY DEMANDS BASED ON DECISION-MAKING THEORY

OPTIMAL DESIGN OF DISTRIBUTED ENERGY RESOURCE SYSTEMS UNDER LARGE-SCALE UNCERTAINTIES IN ENERGY DEMANDS BASED ON DECISION-MAKING THEORY OPTIMAL DESIGN OF DISTRIBUTED ENERGY RESOURCE SYSTEMS UNDER LARGE-SCALE UNCERTAINTIES IN ENERGY DEMANDS BASED ON DECISION-MAKING THEORY Yun YANG 1,2,3, Da LI 1,2,3, Shi-Jie ZHANG 1,2,3 *, Yun-Han XIAO

More information

Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System

Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System Modelling of Locational Marginal Based Transmission Pricing in Restructured Power System 1 Mr.V.G.Umale, 2 Dr. S.B.Warkad 1 Priyadarshini College of Engineering, 2 Pote College of Engineering Abstract:

More information

Optimum Planning and Operation of Compressed Air Energy Storage with Wind Energy Integration

Optimum Planning and Operation of Compressed Air Energy Storage with Wind Energy Integration Optimum Planning and Operation of Compressed Air Energy Storage with Wind Energy Integration Salman Kahrobaee Department of Electrical Engineering University of Nebraska-Lincoln Lincoln, Nebraska, United

More information

Archive of SID. Congestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices.

Archive of SID. Congestion Management in Electricity Markets Using Demand Response Programs and Series FACTS Devices. 148 International Journal of Smart Electrical Engineering, Vol.1, No.3, Fall 2012 ISSN: 2251-9246 pp.148:158 Congestion Management in Electricity Markets Using Demand Response Programs and Series FACTS

More information

Deterministic optimization of short-term scheduling for hydroelectric power generation

Deterministic optimization of short-term scheduling for hydroelectric power generation Ian David Lockhart Bogle and Michael Fairweather (Editors), Proceedings of the 22nd European Symposium on Computer Aided Process Engineering, 17-20 June 2012, London. 2012 Elsevier B.V. All rights reserved.

More information

Influence of Natural Gas Price and Other Factors on ISO-NE Electricity Price

Influence of Natural Gas Price and Other Factors on ISO-NE Electricity Price Influence of Natural Gas Price and Other Factors on ISO-NE Electricity Price Final Report for Undergraduate Research Opportunities Program Prepared by: Christiane Adcock, Milos Cvetkovic, Anuradha Annaswamy

More information

How to Cite or Link Using DOI

How to Cite or Link Using DOI Computers & Operations Research Volume 39, Issue 9, September 2012, Pages 1977 1987 A stochastic production planning problem with nonlinear cost Lixin Tang a,,, Ping Che a, b,, a, c, Jiyin Liu a Liaoning

More information

SECURITY ASPECTS OF MULTI AREA ECONOMIC DISPATCH WITH RENEWABLE ENERGY AND HVDC TIE LINES.

SECURITY ASPECTS OF MULTI AREA ECONOMIC DISPATCH WITH RENEWABLE ENERGY AND HVDC TIE LINES. SECURITY ASPECTS OF MULTI AREA ECONOMIC DISPATCH WITH RENEWABLE ENERGY AND HVDC TIE LINES. PROJECT INDEX: 134. PRESENTED BY KIPKOECH C. JOHN. SUPERVISOR: MR. PETER MOSES MUSAU. EXAMINER: DR. CYRUS WEKESA.

More information

Facilitating Flexible Service Provision in Electric Power Markets via Swing Contracting. Presenter

Facilitating Flexible Service Provision in Electric Power Markets via Swing Contracting. Presenter Facilitating Flexible Service Provision in Electric Power Markets via Swing Contracting Presenter Leigh Tesfatsion Professor of Economics, Mathematics, and Electrical & Computer Engineering Iowa State

More information

Flexibility from the Demand Side

Flexibility from the Demand Side Flexibility from the Side Daniel S. Kirschen, Fellow, IEEE, Angel Rosso, Juan Ma, Student Member, IEEE, Luis F. Ochoa, Member, IEEE Abstract The stochastic nature of renewable energy sources such as wind

More information

SOLVING CONSTRAINED UNIT COMMITMENT PROBLEM CONSIDERING VALVE POINT EFFECT K.M. Abo-Al-Ez, M. M. El-Saadawi 1, A. Fathy 2 1

SOLVING CONSTRAINED UNIT COMMITMENT PROBLEM CONSIDERING VALVE POINT EFFECT K.M. Abo-Al-Ez, M. M. El-Saadawi 1, A. Fathy 2 1 SOLVING CONSTRAINED UNIT COMMITMENT PROBLEM CONSIDERING VALVE POINT EFFECT K.M. Abo-Al-Ez, M. M. El-Saadawi 1, A. Fathy 2 1 Dept. of Electrical Engineering, Faculty of Engineering 1 University of Mansoura,

More information

VALUE OF DEMAND RESPONSE FOR WIND INTEGRATION IN DAILY POWER GENERATION SCHEDULING: UNIT COMMITMENT MODELING WITH PRICE RESPONSIVE LOAD

VALUE OF DEMAND RESPONSE FOR WIND INTEGRATION IN DAILY POWER GENERATION SCHEDULING: UNIT COMMITMENT MODELING WITH PRICE RESPONSIVE LOAD VALUE OF DEMAND RESPONSE FOR WIND INTEGRATION IN DAILY POWER GENERATION SCHEDULING: UNIT COMMITMENT MODELING WITH PRICE RESPONSIVE LOAD Cedric De Jonghe Energy Institute, ELECTA branch, Kasteelpark Arenberg

More information

Optimization of the CHP Plant EL-TO Zagreb Operation

Optimization of the CHP Plant EL-TO Zagreb Operation Optimization of the CHP Plant EL-TO Zagreb Operation Mladen Zeljko, Krešimir Komljenović, Dražen Jakšić, Ivana Milinković Turalija and Hrvoje Keko Abstract CHP plant EL-TO Zagreb consists of four cogeneration

More information

Optimizing Operation Indices Considering Different Types of Distributed Generation in Microgrid Applications

Optimizing Operation Indices Considering Different Types of Distributed Generation in Microgrid Applications energies Article Optimizing Operation Indices Considering Different Types of Distributed Generation in Microgrid Applications Niloofar Ghanbari 1, *, Hossein Mokhtari 2 and Subhashish Bhattacharya 2 1

More information

A DYNAMIC FRAMEWORK FOR SMART ENERGY SYSTEMS Opportunities & Challenges

A DYNAMIC FRAMEWORK FOR SMART ENERGY SYSTEMS Opportunities & Challenges A DYNAMIC FRAMEWORK FOR SMART ENERGY SYSTEMS Opportunities & Challenges Anuradha M. Annaswamy Active adaptive Control Laboratory Department of Mechanical Engineering Massachusetts Institute of Technology

More information

Flexible Ramping Product. Draft Technical Appendix

Flexible Ramping Product. Draft Technical Appendix Flexible Ramping Product Draft Technical Appendix June 10, 2015 Table of Contents 1. Introduction... 3 2. Generalized flexible ramping capacity model... 3 3. Flexible ramping product summary... 5 4. Flexible

More information

Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators

Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators Multi Objective Evolutionary Programming Based Optimal Placement of Distributed Generators T.Hussain Basha PG Student, Department of EEE (PS), K.Meenendranath Reddy Assistant Professor, Department of EEE,

More information

Applied Mathematics in the Electricity Industry Management

Applied Mathematics in the Electricity Industry Management Applied Mathematics in the Electricity Industry Management Andres Ramos Universidad Pontificia Comillas, Spain Abstract This paper shows that optimization models are a part of the curriculum of the School

More information

IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS 1. Mehdi Rahmani-Andebili, Member, IEEE, and Haiying Shen, Senior Member, IEEE

IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS 1. Mehdi Rahmani-Andebili, Member, IEEE, and Haiying Shen, Senior Member, IEEE IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS 1 Price-Controlled Energy Management of Smart Homes for Maximizing Profit of a GENCO Mehdi Rahmani-Andebili, Member, IEEE, and Haiying Shen,

More information

Evaluation of TCSC and DR Abilities for Congestion Management

Evaluation of TCSC and DR Abilities for Congestion Management Australian Journal of Basic and Applied Sciences, 5(6): 1011-1019, 2011 ISSN 1991-8178 Evaluation of TCSC and DR Abilities for Congestion Management 1 Y. Hoseynpoor, 2 T. PirzadehAshraf, 1 Sh. Sajedi,

More information

A Multi-Objective Method to Design Demand Response Strategies for Power Systems including Wind Power Generation

A Multi-Objective Method to Design Demand Response Strategies for Power Systems including Wind Power Generation A Multi-Objective Method to Design Demand Response Strategies for Power Systems including Wind Power Generation Miadreza Shafie-khah C-MAST/UBI, Covilha, Portugal miadreza@ubi.pt Marta Ribeiro FEUP, Porto,

More information

DUE to several supportive regulations worldwide [1] [8],

DUE to several supportive regulations worldwide [1] [8], IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 26, NO. 2, MAY 2011 957 Bidding Strategy of Virtual Power Plant for Participating in Energy and Spinning Reserve Markets Part II: Numerical Analysis Elaheh Mashhour,

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

World Scientific Research Journal (WSRJ) ISSN: Research on Intelligent Microgrid and its Reliable Grid Connection

World Scientific Research Journal (WSRJ) ISSN: Research on Intelligent Microgrid and its Reliable Grid Connection World Scientific Research Journal (WSRJ) ISSN: 2472-3703 www.wsr-j.org Research on Intelligent Microgrid and its Reliable Grid Connection Xin Qiao a, * Department of Electrical Power Engineering, North

More information

Available online at ScienceDirect. Energy Procedia 87 (2016 ) 45 52

Available online at   ScienceDirect. Energy Procedia 87 (2016 ) 45 52 Available online at www.sciencedirect.com ScienceDirect Energy Procedia 87 (2016 ) 45 52 5th International Workshop on Hydro Scheduling in Competitive Electricity Markets Intraday Optimization of Pumped

More information

Design and Analysis. Fundamentals of 4HEEE SMART GRID WILEY. James Momoh IEEE PRESS A JOHN WILEY & SONS, INC., PUBLICATION

Design and Analysis. Fundamentals of 4HEEE SMART GRID WILEY. James Momoh IEEE PRESS A JOHN WILEY & SONS, INC., PUBLICATION SMART GRID Fundamentals of Design and Analysis James Momoh PRESS ^^^^^^^^ 0N POWER ENGINEERING Mohamed E. El-Hawary, Series Editor 4HEEE IEEE PRESS WILEY A JOHN WILEY & SONS, INC., PUBLICATION CONTENTS

More information

This is a refereed journal and all articles are professionally screened and reviewed

This is a refereed journal and all articles are professionally screened and reviewed Advances in Environmental Biology, 6(4): 1400-1411, 2012 ISSN 1995-0756 1400 This is a refereed journal and all articles are professionally screened and reviewed ORIGINAL ARTICLE Joint Production and Economic

More information

A New Methodology for Solving Different Economic Dispatch Problems

A New Methodology for Solving Different Economic Dispatch Problems A New Methodology for Solving Different Economic Dispatch Problems Divya Mathur Assistant Professor, JECRC University, Jaipur Abstract- This paper presents a Biogeography-Based Optimization (BBO) algorithm

More information

Two Stage Approach for Economic Dispatch in Using Quasi-Oppositional Based Particle Swarm Optimization

Two Stage Approach for Economic Dispatch in Using Quasi-Oppositional Based Particle Swarm Optimization GRD Journals Global Research and Development Journal for Engineering International Conference on Innovations in Engineering and Technology (ICIET) - 2016 July 2016 e-issn: 2455-5703 Two Stage Approach

More information

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q4 2013 Report on Market Issues and Performance February 10, 2014 Prepared by: Department of Market Monitoring Department of Market Monitoring

More information

Incidence Matrix-Based LMP Calculation: Algorithm and Applications

Incidence Matrix-Based LMP Calculation: Algorithm and Applications Incidence Matrix-Based LMP Calculation: Algorithm and Applications Mohammad Sadegh Javadi Department of Electrical Engineering, Science and Research Branch, Islamic Azad University, Fars, Iran Abstract

More information

Study of AMES Wholesale Power Market Testbed

Study of AMES Wholesale Power Market Testbed Study of AMES Wholesale Power Market Testbed Priyanka S Kole 1 1 PG Scholar, EEE Dept,SDMCET,Dharwad Abstract This study reviews the AMES wholesale power market test bed features and analysis of double

More information

Control Power and Variable Renewables A Glimpse at German Data

Control Power and Variable Renewables A Glimpse at German Data Control Power and Variable Renewables A Glimpse at German Data Lion Hirth* # and Inka Ziegenhagen* * Vattenfall GmbH # Potsdam-Institute for Climate Impact Research University of Leipzig 2013-04-19 Enerday

More information

CARIS Procedure Development and Simulation Model Evaluation

CARIS Procedure Development and Simulation Model Evaluation CARIS Procedure Development and Simulation Model Evaluation Bill Lamanna Manager Long Term Planning New York Independent System Operator ESPWG Meeting NYISO September 16, 2009 Draft 1 for discussion only

More information

Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets

Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets 1 Impacts of Strategic Bidding of Wind Power Producers on Electricity Markets Mohsen Banaei, Majid Oloomi Buygi, Member, IEEE and Hamidreza Zareipour, Senior Member, IEEE Abstract In this paper, the impacts

More information

Modeling, Simulation, and Computational Needs for RTOs: A PJM Perspective

Modeling, Simulation, and Computational Needs for RTOs: A PJM Perspective Engineering Conferences International ECI Digital Archives Modeling, Simulation, And Optimization for the 21st Century Electric Power Grid Proceedings Fall 10-22-2012 Modeling, Simulation, and Computational

More information

Store or Sell? A Threshold Price Policy for Revenue Maximization in Windfarms with On-site Storage

Store or Sell? A Threshold Price Policy for Revenue Maximization in Windfarms with On-site Storage Store or Sell? A Threshold Price Policy for Revenue Maximization in Windfarms with On-site Storage Zamiyad Dar, Koushik Kar and Joe H. Chow Electrical Computer and Systems Engineering Rensselaer Polytechnic

More information

SSLR 1.4 User Guide An Optimization and Simulation Application for Unit Commitment and Economic Dispatch

SSLR 1.4 User Guide An Optimization and Simulation Application for Unit Commitment and Economic Dispatch SSLR 1.4 User Guide An Optimization and Simulation Application for Unit Commitment and Economic Dispatch Arktos Project, April 2012 Anthony Papavasiliou, University of California, Berkeley Shmuel S. Oren,

More information

GENETIC ALGORITHM A NOBLE APPROACH FOR ECONOMIC LOAD DISPATCH

GENETIC ALGORITHM A NOBLE APPROACH FOR ECONOMIC LOAD DISPATCH International Journal of Engineering Research and Applications (IJERA) ISSN: 48-96 National Conference on Emerging Trends in Engineering & Technology (VNCET-30 Mar 1) GENETIC ALGORITHM A NOBLE APPROACH

More information

Flexible Ramping Products

Flexible Ramping Products Flexible Ramping Products Revised Draft Final Proposal August 16, 2012 Lin Xu, Ph.D. Senior Market Development Engineer Don Tretheway Senior Market Design and Policy Specialist Agenda Time Topic Presenter

More information

Energy Management of End Users Modeling their Reaction from a GENCO s Point of View

Energy Management of End Users Modeling their Reaction from a GENCO s Point of View Department of Computer Science University of Virginia, Charlottesville, VA, USA Energy Management of End Users Modeling their Reaction from a GENCO s Point of View Mehdi Rahmani-andebili 1 & Haiying Shen

More information

Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications

Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications ECE 620 Lecture Nov. 2nd, 2016 Deregulation, Locational Marginal Pricing, and Critical Load Levels with Applications Fangxing (Fran) Li, Ph.D., P.E. Professor Dept. of EECS The University of Tennessee

More information

Optimal Utilization and Location of Renewable Energy Generator in Deregulated Power Market

Optimal Utilization and Location of Renewable Energy Generator in Deregulated Power Market Optimal Utilization and Location of Renewable Energy Generator in Deregulated Power Market 1 Digambar Singh*, 2 Dwarka Prasad, and 3 Ajay Kumar 1,2 Electrical Engineering Department, 3 Mechanical Engineering

More information

Operation management of a renewable microgrid supplying to a residential community under the effect of incentive based demand response program

Operation management of a renewable microgrid supplying to a residential community under the effect of incentive based demand response program https://doi.org/10.1007/s40095-018-0286-4 ORIGINAL RESEARCH Operation management of a renewable microgrid supplying to a residential community under the effect of incentive based demand response program

More information

Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-Based UC

Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-Based UC (working paper 1 Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-Based UC Germán Morales-España, Member, IEEE, Ross Baldick, Fellow, IEEE, Javier García-González, Member, IEEE,

More information

ISO Net Surplus Collection & Allocation in Wholesale Power Markets under LMP

ISO Net Surplus Collection & Allocation in Wholesale Power Markets under LMP ISO Net Surplus Collection & Allocation in Wholesale Power Markets under LMP Presenter: Leigh Tesfatsion Professor of Econ, Math, and Electrical and Comp. Engineering Iowa State University, Ames, Iowa

More information

MANAGEMENT OF PEM FUEL CELLS FOR RESIDENTIAL APPLICATIONS USING GENETIC ALGORITHMS

MANAGEMENT OF PEM FUEL CELLS FOR RESIDENTIAL APPLICATIONS USING GENETIC ALGORITHMS MANAGEMENT OF PEM FUEL CELLS FOR RESIDENTIAL APPLICATIONS USING GENETIC ALGORITHMS Ahmed M. Azmy, Björn P. Wachholz, and István Erlich, Member IEEE Department of Electrical Engineering, University of Duisburg-Essen,

More information

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES Evangelos Dialynas Professor in the National Technical University of Athens Greece dialynas@power.ece.ntua.gr

More information

Managing Flexibility in MISO Markets

Managing Flexibility in MISO Markets Managing Flexibility in MISO Markets Clean Energy Regulatory Forum November 9, 2012 Outline Impacts of Variable Generation on Ancillary Services Dispatchable Intermittent Resources Introduction to Proposed

More information

Overview of EE394V Restructured Electricity Markets: Locational Marginal Pricing

Overview of EE394V Restructured Electricity Markets: Locational Marginal Pricing Overview of EE394V Restructured Electricity Markets: Locational Marginal Pricing Ross Baldick Copyright 2013 Ross Baldick www.ece.utexas.edu/~baldick/classes/394v/ee394v.html 1 Outline Focus of class Challenges

More information

Time-of-use Short-term Load Prediction Model Based on Variable Step Size Optimized HBMO-LS-SVM Method in Day-head Market

Time-of-use Short-term Load Prediction Model Based on Variable Step Size Optimized HBMO-LS-SVM Method in Day-head Market First International Conference on Economic and Business Management (FEBM 2016) Time-of-use Short-term Load Prediction Model Based on Variable Step Size Optimized HBMO-LS-SVM Method in Day-head Market Guo

More information

CHAPTER 5 EMISSION AND ECONOMIC DISPATCH PROBLEMS

CHAPTER 5 EMISSION AND ECONOMIC DISPATCH PROBLEMS 108 CHAPTER 5 EMISSION AND ECONOMIC DISPATCH PROBLEMS 5.1 INTRODUCTION The operation and planning of a power system is characterized by having to maintain a high degree of economy and reliability. Among

More information

Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges

Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges PSERC Webinar, January 19, 2010 Integrating Wind Power Efficiently into Electricity Markets Poses New Regulatory Challenges Tim Mount Department of Applied Economics and Management Cornell University TDM2@cornell.edu

More information

New Analytical Model for Optimal Placement of Wind Turbines in Power Network under Pool and Reserve Markets Conditions

New Analytical Model for Optimal Placement of Wind Turbines in Power Network under Pool and Reserve Markets Conditions Energy and Power Engineering, 2016, 8, 313-325 http://www.scirp.org/journal/epe ISSN Online: 1947-3818 ISSN Print: 1949-243X New Analytical Model for Optimal Placement of Wind Turbines in Power Network

More information

The Evolution of the PJM Market in the United States: Looking Back to Look Forward

The Evolution of the PJM Market in the United States: Looking Back to Look Forward The Evolution of the PJM Market in the United States: Looking Back to Look Forward Feasibility Study for ASEAN Multilateral Power Trade September 5-6, 2018 Jakarta, Indonesia Craig Glazer Vice President

More information

Market-Based Transmission Expansion Planning

Market-Based Transmission Expansion Planning Energy and Power Engineering, 2012, 4, 387-391 http://dx.doi.org/10.4236/epe.2012.46051 Published Online November 2012 (http://www.scirp.org/journal/epe) Market-Based Transmission Expansion Planning Pavel

More information

Multi-Objective Generation Scheduling with Hybrid Energy Resources

Multi-Objective Generation Scheduling with Hybrid Energy Resources Clemson University TigerPrints All Dissertations Dissertations 12-2007 Multi-Objective Generation Scheduling with Hybrid Energy Resources Manas Trivedi Clemson University, mtrived@clemson.edu Follow this

More information

Reserve Market. PJM State & Member Training Dept. PJM /06/2016

Reserve Market. PJM State & Member Training Dept. PJM /06/2016 Reserve Market PJM State & Member Training Dept. PJM 2016 Objectives Define Reserve products Explain the Reserve requirements Calculate Reserve offers PJM 2016 2 Reserves Reserves are additional generation

More information