Workshop F. Air Permitting How to Determine Whether a Modification Is Triggered Under PTI/PTIO, Title V, PSD, NSPS and/or MACT Rules and Regulations?

Size: px
Start display at page:

Download "Workshop F. Air Permitting How to Determine Whether a Modification Is Triggered Under PTI/PTIO, Title V, PSD, NSPS and/or MACT Rules and Regulations?"

Transcription

1 Workshop F Air Permitting How to Determine Whether a Modification Is Triggered Under PTI/PTIO, Title V, PSD, NSPS and/or MACT Rules and Regulations? Wednesday, July 19, :45 p.m. to 4:15 p.m.

2 Biographical Information Ron Hansen, Owner/Principal Consultant GT Environmental, Inc., 635 Park Meadow Road, Suite 112, Westerville, OH Phone: (614) ext. 21 Fax: (614) Ron Hansen has over twenty-five years of air permitting, regulatory and stack testing consulting experience. Ron is an owner and Principal Consultant with GT Environmental, Inc. (GT). Ron graduated from the University of Cincinnati with a B.S. in Civil Engineering. Ron is a member of the Air and Waste Management Association (AWMA). Ron has extensive experience in preparing Title V permit applications, PSD permit applications, nonattainment NSR permit applications, minor source permit applications, negotiating permit terms and conditions with state agencies, performance testing programs and assisting clients with enforcement resolution. Ron has prepared permit applications for utilities, steel mills, chemical plants, wood cabinet manufacturers, animal feed manufacturers, municipal solid waste landfills, aggregate mining and processing facilities, and bulk gasoline terminals. Ron has prepared air permit applications for clients located in Ohio, Michigan, Missouri, Kentucky, Indiana, Tennessee, West Virginia, Pennsylvania and Rhode Island. Amy C. Kesterman, Environmental Compliance Specialist III Southwest Ohio Air Quality Agency 250 William Howard Taft Road, Cincinnati, OH Phone: (513) Fax: (513) amy.kesterman@hamilton-co.org Amy Kesterman is an Environmental Compliance Specialist III in the Permits and Enforcement Section of the Southwest Ohio Air Quality Agency (Agency), a Division of the Hamilton County Department of Environmental Services. Amy has been an Environmental Compliance Specialist with the Agency since She is responsible for on-site inspections of air pollution sources and control equipment, determining source compliance with air permits and air pollution regulations, assessing source emissions, responding to air quality complaints, and reviewing and processing permit applications for complex source installations and modifications. Amy serves as a point of contact at the Agency for assisting industry representatives with navigating Ohio EPA s electronic tool, Air Services. She periodically serves as an air permit instructor for Cincinnati State Technical and Community College s Environmental Engineering Technology program and as a guest lecturer for the University of Cincinnati s Environmental Studies program. Amy was awarded a Hamilton County Employee of the Year Award in 2013 for her individual effort to go the extra mile in providing excellent service in her work. In 2014, Amy was awarded her second Hamilton County Employee of the Year Award as a member of an Agency team being recognized for their innovative team approach to processing an air permit for General Electric Aviation. Amy received a B.S. in Environmental Studies from the University of Cincinnati.

3 Biographical Information Kevin J. Kilroy, Safety & Environmental Manager Smithers-Oasis North America, 919 Marvin Street, P.O. Box 790, Kent, OH Phone: (330) Kevin Kilroy has almost forty years of experience in environmental, health and safety programs in a manufacturing setting. He works for Smithers-Oasis, a privately held company headquartered in Kent, Ohio where it has manufacturing and distribution facilities. The company manufactures and markets water-absorbing floral foams, accessories and floral mechanics to the retail floral market worldwide. They manufacture and market a complete line of post-harvest flower care products for the floral industry through its Floralife Division. They also manufacture and market products for the grower/greenhouse industry. At Smithers-Oasis, Kevin has responsibility for the safety and environmental programs of the North American and Floralife Divisions in the North America and provides consulting services to other global operations of the company, particularly on product and safety related issues. Prior to joining Smithers-Oasis, Kevin worked nineteen years for an Ohio based Fortune 500 chemical and aerospace company, mostly at a chemical manufacturing facility where he was responsible for managing the plant s environmental program. Over the course of seventeen years at the plant, he also worked on health and safety programs. Prior to this, he worked for two years in the chemical division environmental department conducting permit review and project environmental impact assessments. Kevin received a B.S. in both Chemical Engineering and Plastic Technology from Lowell Technological Institute and a M.S. in Environmental Studies from the University of Lowell. He is a member of the American Institute of Chemical Engineers (AICHE). He was past chairman of the Akron Section of AICHE. Eric B. Gallon, Of Counsel Porter Wright, Morris & Arthur LLP, 41 S. High Street, Columbus, OH Phone: (614) Fax: (614) egallon@porterwright.com Eric Gallon s environmental practice focuses on Clean Air Act compliance and defense. Eric defends manufacturers, utilities, and other companies in administrative and judicial enforcement proceedings; reviews draft and proposed installation and operating permits; appeals permits and other final actions of the Ohio Environmental Protection Agency to the Environmental Review Appeals Commission; analyzes and comments on proposed state and federal rulemakings; and prepares petitions for reinstatement of debarred companies. Eric also represents electric and natural gas companies in rulemaking, ratemaking, and complaint case proceedings before the Public Utilities Commission of Ohio and in appeals before the Supreme Court of Ohio. Separately, his litigation practice encompasses a variety of complex business and corporate matters, including tort class actions and antitrust matters. In addition, he regularly lectures on the application of the attorney-client privilege and work-product doctrines under Ohio and federal law. Eric earned his B.A. in Political Science from The Ohio State University and his J.D. from the University of Chicago Law School. He has been recognized by Ohio Super Lawyers Rising Stars Edition five times (in 2010, 2011, ).

4 Southwest Ohio Air Quality Agency Cincinnati, Ohio

5 What is a Title V Operating Permit? Federal major source permitting program established by the Clean Air Act. Umbrella permit that includes all emissions units at a facility. Operating permit with a 5 year renewal cycle.

6 How to incorporate changes into the Title V Operating Permit There are six methods for addressing changes Operational Flexibility Off Permit Change Administrative Permit Amendment Minor Permit Modification Significant Permit Modification Reopening for Cause Guidance for Incorporating Facility Changes into a Title V Permit Ohio EPA Engineering Guide #63

7 Engineering Guide #63 epa.ohio.gov/dapc/engineer/eguides.aspx

8 Engineering Guide #63 epa.ohio.gov/portals/27/title_v/visio DecisionTreeA2004.pdf

9 Engineering Guide #63 epa.ohio.gov/portals/27/title_v/visio DecisionTreeB2004.pdf

10 Engineering Guide #63 epa.ohio.gov/portals/27/title_v/visio DecisionTreeC2004.pdf

11 Operational Flexibility When a change is counter to a permit term or condition, but does not require a permit revision or affect the monitoring, record keeping, reporting, or emission limitations. For example, the Title V permit indicates a specific brand of coating be used. Operational Flexibility can be used to change brands, as long as the new brand complies with any emission limitations. Notification of the change must be received 7 days prior to the proposed change. Notification should be made in the form of a certified letter.

12 Off Permit Change When a facility makes a change that is not specifically addressed or prohibited by the Title V permit. Used to incorporate the terms and conditions of a new PTI, a PTI exempt source without applicable requirements, or a de minimis source. For example, a facility plans to install a new emissions unit where the potential to emit does not violate any established emission limitation and is not a modification.

13 Off Permit Change If required, a PTI must first be applied for and issued final before construction of the new unit can begin. Operation of the new unit may begin immediately, once a PTI is issued. An Off Permit Change request must be submitted in Air Services within the time frame specified in the PTI, but not to exceed one year.

14 Administrative Permit Amendment Used for making small administrative changes, such as: Typographical errors to the terms and conditions. Small administrative changes names, addresses, etc. Increases in monitoring or reporting frequency. Changes in ownership or operational control. For example, an emission limit was issued as 8 lbs/hr rather than 80 lbs/hr. Or, it is determined that monitoring should be increased from weekly to daily checks.

15 Minor Permit Modification Used for making non significant changes, such as: Synthetic minor changes. Best Available Technology (BAT) changes. Changes in monitoring, record keeping, or reporting. For example, an increase in capacity, which will increase emissions, but the change does not qualify as a significant modification. A modification to the PTI must be applied for when necessary.

16 Significant Permit Modification Used for making significant changes, such as: Increase in Hazardous Air Pollutants above major source threshold. Changes trigger PSD or Nonattainment NSR. Changes in monitoring, record keeping, or reporting. Relaxation of reporting or record keeping. For example, removing a synthetic minor limitation that had been in place to avoid PSD. Now, PSD review is required. A modification to the PTI must be applied for when necessary.

17 Reopening for Cause Often these changes are initiated by Ohio EPA. Used for making changes, such as: Adding additional requirements that become applicable during the permit cycle. Correcting mistakes. For example, a new MACT becomes applicable with more than 3 years remaining in the permit cycle. Or, a piece of control equipment was mistakenly included in emissions unit terms and must be removed.

18 Air Services Home Page

19 Request Administrative Permit Modification

20 Title V PTO Application Detail Page

21 The Takeaway Contact your Ohio EPA District Office or Local Air Agency to discuss proposed changes. Review Engineering Guide #63 A new or modified PTI may be necessary prior to or in conjunction with making changes to the Title V permit.

22 Thank you! Contact info: Amy Kesterman Environmental Compliance Specialist III co.org (513)

23 Wednesday, July 19, :45 4:15 p.m. Workshop F Presented by Ron Hansen GT Environmental, Inc. Amy Kesterman Southwest Ohio Air Quality Agency Eric Gallon Porter Wright Morris Arthur Kevin Kilroy Smithers Oasis

24 Major Topics PTI/PTIO Title V Modifications PSD/NNSR Modifications NSPS Modifications MACT Modifications Legal Updates New Ozone Standard 21 of 28

25 PTI/PTIO Modifications Definition of New Source OAC rule (WWW) New source means any air contaminant source for which an owner or operator undertakes a continuing program of installation or modification or enters into a binding contractual obligation to undertake and complete, within a reasonable time, a continuing program of installation or modification, after January 1, 1974, and that at the time of installation or modification, would have otherwise been subject to the provisions of this chapter. The replacement of an entire air contaminant source is considered a new source. 22 of 28

26 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Sometimes referred to as the minor modification definition. Not to be confused with the major modification definition for projects at major stationary sources. Applies to projects at both minor stationary sources and major stationary sources. You can trigger a permit requirement under this definition without triggering a PSD or NNSR permitting requirement under the major modification definition. If you trigger a PSD or NNSR permitting requirement under the major modification definition, then you automatically trigger a permitting requirement under the minor modification definition. 23 of 28

27 Ohio EPA Air Toxics Modeling Policy ORC (F)(4) OAC Rule (Air Toxics List) This is not included in the definition of modification in OAC Rule (SSS). This is not a federally enforceable requirement. Air Toxics permit terms and conditions should appear in the state only section of PTIs/PTIOs/Title V permits. 24 of 28

28 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 25 of 28

29 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 26 of 28

30 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 27 of 28

31 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 28 of 28

32 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 29 of 28

33 PTI/PTIO Modifications Definition of Modification OAC rule (SSS) Decision Tree 30 of 28

34 PTI Modifications Definition of Major Modification OAC rule (LLL) Only applies to major stationary sources as defined in OAC rule (NNN). Projects that trigger a major modification will be issued a PTI not a PTIO because major stationary sources will operate under the Title V permitting program (major source operating permit program). Projects can trigger a major modification and a minor modification. 31 of 28

35 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 32 of 28

36 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 33 of 28

37 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 34 of 28

38 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 35 of 28

39 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 36 of 28

40 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 37 of 28

41 PTI Modifications Definition of Major Modification OAC rule (LLL) Decision Tree 38 of 28

42 New Source Performance Standards (NSPS) 40 CFR 60 Regulates emissions of criteria pollutants generated at approximately 97 different source categories. Applies to new sources installed after rule specific dates. Applies to existing sources modified after rule specific dates. Applies to existing sources reconstructed after rule specific dates. 39 of 28

43 New Source Performance Standards (NSPS) 40 CFR 60 Modification Modification is defined in 40 CFR 60.2 and Modification means any physical or operational change to an existing facility which results in an increase in the emission rate to the atmosphere of any pollutant to which a standard applies. Emission rate shall be expressed in kg/hr or lbs/hr. Therefore, an increase in annual emissions without a corresponding increase in hourly emissions is not a modification. Must achieve compliance with all applicable standards within 180 days of the completion of the modification. 40 of 28

44 New Source Performance Standards (NSPS) 40 CFR 60 Exclusions from the Definition of Modification Routine maintenance, routine repair and routine replacement are not modifications. An increase in production rate of an existing facility that can be accomplished without a capital expenditure is not a modification. An increase in the hours of operation is not a modification. Use of an alternative fuel or raw material that the facility is designed to accommodate is not a modification. The addition or use of any system or device designed to reduce air emissions is not a modification. 41 of 28

45 New Source Performance Standards (NSPS) 40 CFR 60 Reconstruction Reconstruction is defined in 40 CFR An existing facility, upon reconstruction, becomes an affected facility even if emissions do not increase. Reconstruction means the replacement of components of an existing facility to such an extent that: (1) The fixed capital cost of the new components exceed 50% of the fixed capital cost that would be required to construct a comparable entirely new facility, and (2) It is technologically and economically feasible to meet the applicable standards. Fixed Capital Cost means the capital needed to provide all the depreciable components. Must notify the Administrator at lease 60 days prior to commencing construction on the proposed reconstruction. 42 of 28

46 Maximum Achievable Control Technologies (MACT) Standards 40 CFR 63 Regulates emissions of 188 hazardous air pollutants (HAPs) generated at approximately 134 different source categories. May apply to both major sources and area sources of HAPs. Applies to new sources, reconstructed sources and existing sources. Requirements for new sources and reconstructed sources are typically more stringent than those for existing sources. Applies to existing sources reconstructed after rule specific dates. Modifications that do not satisfy the definition of reconstruction are still regulated as existing affected sources. Modifications that meet the definition of reconstruction are regulated as new affected sources. 43 of 28

47 Maximum Achievable Control Technologies (MACT) Standards 40 CFR 63 Reconstruction Reconstruction is defined in 40 CFR An existing facility, upon reconstruction, becomes a new affected source, even if emissions do not increase. Reconstruction means the replacement of components of an existing facility to such an extent that: (1) The fixed capital cost of the new components exceed 50% of the fixed capital cost that would be required to construct a comparable entirely new facility, and (2) It is technologically and economically feasible to meet the applicable standards. Fixed Capital Cost means the capital needed to provide all the depreciable components. Must obtain approval from the Administrator prior to commencing construction on a new affected source or reconstruction on an existing affected source. 44 of 28

48 Like Kind Replacement Can you replace a 500 ton/hr grinder with a smaller less emitting 400 ton/hr grinder without obtaining an air permit? Answer: No the 400 ton/hr grinder is considered a new source New Source means any air contaminant source for which an owner or operator undertakes a continuing program of installation or modification or enters into a binding contractual obligation to undertake and complete, within a reasonable time, a continuing program of installation or modification, after January 1, 1974, and that at the time of installation or modification, would have otherwise been subject to the provisions of this chapter. The replacement of an entire air contaminant source is considered a new source. 45 of 28

49 How Do You Define the Full Extent of an Air Contaminant Source or Emissions Unit? Example 1 How Many Air Contaminant Sources Do You See? Answer: 1 46 of 28

50 How Do You Define the Full Extent of an Air Contaminant Source or Emissions Unit? Example 2 How Many Air Contaminant Sources Do You See? Answer: 3 47 of 28

51 Obtaining a Timely Air Permit Modification Presented by Kevin Kilroy Safety & Environmental Manager Smithers Oasis Company Smithers-Oasis Company 1

52 Obtaining a Timely Air Permit Modification Current Actions What you should be doing now Handling the Future Project Management Review System Permit Background Work Obtaining Flexibility & Operational Uptime Permitting What Has Worked 2

53 Current Actions What You Should Be Doing Now Permitting Not just another activity its your legal basis to operate Understand current permitting status and any restrictions that apply Impacts future project options Communicate current circumstances internally Pay attention to agency proposals and be prepared to comment or appeal any rules, which may impact your company s operations 3

54 Current Actions What You Should Be Doing Now Become familiar with a more complicated permitting system This system ranges from permit exemptions to permits by rule to general, synthetic minor and/ or major permits Understand what constitutes a permit modification Communicate internally with examples A very useful exemption is the Deminimis exemption at OAC Summary: Potential or actual emissions < 10 lbs/day with HAP emissions < 1 tpy, and potential emissions from this and similar emission units < 25 tpy. If you use it, remember to keep records of daily and annual emissions 51

55 Handling the Future Project Management Review System Need early on compliance review for projects Impact on scope, costs and ultimately compliance Critical to conduct project scope review and analyze permit options Constraints with project scope and options/alternatives Impacts of wants vs. needs Communicate in writing no surprises Be simple, but address key questions on impact to project, such as timing, costs, restrictions, etc. Target key internal functions (i.e., Tech., R&D, maintenance, etc.) both to educate and to track projects early on 52

56 Permit Background Work Work with project manager to collect basic project data: Purpose, scope, and timing Simple process diagram Emission estimates looking at actual and potential Discuss emission reduction methods, costs, and the emissions Develop with project manager a schedule that includes permitting Establish key data required and timetable to receive it Understand proposed project(s) to be able to describe in general terms in the permit application 53

57 Permit Background Work During permit strategy brainstorming sessions, keep in mind: That some regulated chemicals or source categories have emission reduction and/or monitoring requirements If possible, restructure emission units for best permitting scenario: Separate out operations by source categories or chemicals If a regulated chemical emission is minor and grouping applies a control requirement to much larger source Maximize in the permit application emissions by regulated pollutant classes up to level of permitting selected keeping in mind BAT and/ or Toxic Modeling requirements 54

58 Permit Background Work Participate proactively in permit data development: You are the company representative who is ultimately responsible for data being complete and accurate. Pay attention to key permitting details associated with each project, including data collection; permit strategy and possible terms and conditions Question all emission data and assumptions: Add unit emissions together and compare to overall operations mass balance Document and scrutinize emission assumptions are they realistic and defendable? Pay attention to raw material impurities and/or by product chemistry may change emission/ compliance basis! 55

59 Obtaining Flexibility & Operational Uptime Explore all emission reduction approaches in place of installing expensive controls, including pollution prevention alternatives: Expand existing in process recovery at facility Change handling/ work practices Set limitations on mixture s content, material substitution (of HAPs or OEPA Air Toxics), etc. 56

60 Obtaining Flexibility & Operational Uptime During project review and early permit work, make judgment on most likely agency permit requirements Keep in mind that you as the sources must live with any permit Terms and Conditions (T&Cs) and not the agency Provide your own permit T&Cs to minimize restrictive or poor fitting ones: To expedite permit processing, and Gives the agency an idea of your approach for demonstrating compliance, for example monthly averaging versus daily 57

61 Obtaining Flexibility & Operational Uptime Controls: When controls are required, keep in mind both source economics and operational uptime are variability in agency negotiations. Only agree to a level of control which can be met all the time and not most of the time Design capture and collection system(s) to minimize expenditures while maximizing result Combine vents to minimize monitoring and control costs Separate vents with low flow or pollutant concentration Develop cost analysis for agency discussion Maintain source operation by providing equipment to: Collect Monitor (i.e., LEL), and Regulate process discharge surges 58

62 Obtaining Flexibility & Operational Uptime Monitoring: If options exist, propose monitoring scheme(s), which are simple, reliable and fit your situation Agency personnel tend to think everything can be measured but that may not be true for your circumstances Where possible, propose a surrogate monitoring scheme: For example, propose operational data as appropriate, such as: Equipment hours of operation, or Emissions from material usage, for example: Track hours worked daily, Inventory solvent usage monthly, and Back calculate daily solvent emissions 59

63 Obtaining Flexibility & Operational Uptime Monitoring: Propose monitoring (& control) schemes, which make sense for your operation using proven, cost effective and reliable technology To monitor compliance all the time the source is operating For example, propose monitor exit gas temperature instead of VOC concentration For compliance demonstration establish period of compliance demonstration which are practical and repeatable: Tie compliance monitoring to periods of discharge within process cycle Usually, longer time periods are better, particularly for variable or non routine operations 13

64 Permitting What Has Worked? Submit complete and accurate application: Provide written process/ project description and simplified process flow diagram Answer all standard PTI application questions as applies Provide emission activity category form(s) Provide emission calculations Make sure numbers are consistent even for different averaging times Be specific leave no open ended points Provide listing of applicable requirements from good faith review Propose T&Cs on monitoring and emission reduction Answer key questions from your point of view Have authorized company representative sign application 61

65 Permitting What Has Worked? Make permit reviewer s job easy: Useful to provide narrative describing project and key points Provide summary of applicable regulatory classification of raw materials Meet permit reviewer: To submit application Explain project scope and timing Review any key points Request fast track handling if needed Determine how application will be handled How familiar is permit reviewer with facility? Offer tour 62

66 Permitting What Has Worked? Determine extent of permit writer s discretion and try for best terms Content of many T&Cs is often negotiable Keep making your point(s) and you may persuade agency Permits are public information and if you claim trade secrets, provide two versions (one sanitized ) for agency processing Keep in contact with District Office or Local Air Agency during processing Ask for a copy of the draft permit to review and comment Be ready for agency questions when they come Develop backup materials during preparation of the permit application preparation 63

67 Permitting What Has Worked? Review agency draft or final permit(s) carefully for accuracy and agency written terms and conditions Immediately report errors in draft to agency for revision After permit is issued, it is difficult to get changes made Simple errors may end up being more than little annoyances Provide written comments to unacceptable parts of draft permit within allotted timeframe; establishing possibility of later appeal Involve legal counsel on permit comments or to appeal permit to the Environmental Review Appeals Commission Be courteous and professional in all dealings with agency personnel 64 of 57

68 Permitting What Has Worked? Utilize Consultants and/or Legal Counsel as resources: Assist in permitting needs assessment Assist in permit strategy development and possible ways to obtain Deminimis or Minor Permit status Assist in permit data collection and preparing the application Usually several options exist on permit T&Cs and research may be needed Define data needed and critical questions to be answered Talk with agency (directly or indirectly) If Consultant hired, track and assist with permit data collection by internal personnel 65

69 RECENT LEGAL DEVELOPMENTS IN MAJOR NSR Eric B. Gallon July 19, Porter Wright Morris & Arthur LLP

70 RECENT CHANGES TO OHIO S MAJOR MODIFICATION DEFINITIONS 2017 Porter Wright Morris & Arthur LLP

71 PURPOSE OF AMENDMENTS To comply with EPA s requirements for state plans (SIPs) to attain and maintain the 2012 national ambient air quality standard (NAAQS) for fine particulate matter (PM 2.5 ). 81 Fed. Reg. 58,010 (Aug. 24, 2016) 2017 Porter Wright Morris & Arthur LLP

72 MAJOR MODIFICATION A major modification is a physical change in, or change in the method of operation of, a major stationary source that causes both: (1) a significant emissions increase and (2) a significant net emissions increase of a regulated NSR pollutant. Ohio Adm.Code (LLL)(1) 2017 Porter Wright Morris & Arthur LLP

73 MAJOR STATIONARY SOURCE Attainment Areas: Each source with PTE > 100 tpy of a regulated NSR pollutant in the 26 original NSPS categories, e.g.: o Fossil fuel boilers w/ > 250 mmbtu/hr heat input o Chemical process plants All other sources with PTE > 250 tpy of a regulated NSR pollutant Any change at a non-major source that would itself be a major stationary source Ohio Adm.Code (NNN)(2) 2017 Porter Wright Morris & Arthur LLP

74 MAJOR STATIONARY SOURCE Nonattainment Areas Each source with PTE > 100 tpy of a regulated NSR pollutant New lower thresholds for certain nonattainment areas: 50 tpy VOC in serious ozone nonattainment areas or, generally, in ozone transport regions (OTR) 25 tpy VOC in severe O 3 nonattainment areas 10 tpy VOC in extreme O 3 nonattainment areas 50 tpy CO in serious CO nonattainment areas 70 tpy PM 10 in serious PM 10 nonattainment areas 70 tpy PM 2.5, or any individual precursor for PM 2.5, in serious PM 2.5 nonattainment areas Ohio Adm.Code (NNN)(1) 2017 Porter Wright Morris & Arthur LLP

75 MAJOR STATIONARY SOURCE Ohio currently has: No O 3 nonattainment areas No CO nonattainment areas No PM 10 nonattainment areas No serious PM 2.5 nonattainment areas (Cuyahoga and Lorain Counties are moderate nonattainment) 2017 Porter Wright Morris & Arthur LLP

76 MAJOR STATIONARY SOURCE Ohio is not currently in an OTR, but: Dec. 2013: Nine NE states petitioned EPA in to expand the OTR to include Ohio Jan. 2017: Obama EPA proposed denying that petition < Oct. 27, 2017: Final decision due The NE states will likely sue if EPA denies the petition Addition to OTR would require RACT for VOC emissions, enhanced vehicle I/M programs in large cities, other measures 2017 Porter Wright Morris & Arthur LLP

77 REGULATED NSR POLLUTANT Includes (but is not limited to): Criteria pollutants and their precursors VOCs and NOx are precursors to O 3 SO 2 and NOx are precursors to PM 2.5 Ohio Adm.Code (NNNNN) 2017 Porter Wright Morris & Arthur LLP

78 REGULATED NSR POLLUTANT The control requirements applicable under plans in effect under this part for major stationary sources of PM 10 shall also apply to major stationary sources of PM 10 precursors, except where the Administrator determines that such sources do not contribute significantly to PM 10 levels which exceed the standard in the area. 42 U.S.C. 7513a(e) Porter Wright Morris & Arthur LLP

79 REGULATED NSR POLLUTANT For Nonattainment New Source Review: VOCs and ammonia are PM 2.5 precursors for now, although Ohio EPA submitted a demonstration that emissions of those pollutants do not contribute significantly to PM 2.5 concentrations in the Cleveland area Ohio Adm.Code (WWWW); FINAL.pdf 2017 Porter Wright Morris & Arthur LLP

80 REGULATED NSR POLLUTANT For Prevention of Significant Deterioration: VOCs are not PM 2.5 precursors, unless Ohio EPA or EPA demonstrates that emissions of those pollutants are a significant contributor to PM 2.5 concentrations in the Cleveland area Ohio Adm.Code (NNNNN)(2)(a)(ii)(d) 2017 Porter Wright Morris & Arthur LLP

81 REGULATED NSR POLLUTANT Different pollutants, including individual precursors, are not summed to determine applicability of a major stationary source. Ohio Adm.Code (NNN) Different pollutants, including individual precursors, are not summed to determine applicability of a major modification. Ohio Adm.Code (LLL)(6) 2017 Porter Wright Morris & Arthur LLP

82 SIGNIFICANT Carbon Monoxide: Nitrogen Oxides: Sulfur Dioxide: Ozone (VOCs/NOx): Particulate Matter: PM 10 : PM 2.5 : 100 tpy 40 tpy 40 tpy 40 tpy 25 tpy 15 tpy 10 tpy (direct) 40 tpy (SO 2 ) 40 tpy (NOx) 40 tpy (VOC) Ohio Adm.Code (VVVVV)(1) 2017 Porter Wright Morris & Arthur LLP

83 PROJECTING POST-PROJECT EMISSIONS AFTER DTE II 2017 Porter Wright Morris & Arthur LLP

84 SIGNIFICANT EMISSIONS INCREASE For projects involving only existing units, requires comparing: the projected actual emissions to baseline actual emissions for each affected unit, and then adding up the differences. Ohio Adm.Code (LLL)(3)(a) 2017 Porter Wright Morris & Arthur LLP

85 SIGNIFICANT EMISSIONS INCREASE Baseline Actual Emissions: Existing EUSGUs: Generally high 24/60 Other existing units: Generally high 24/120 Includes quantifiable fugitive emissions Includes SSM emissions Excludes unlawful emissions May use different period for each regulated NSR pollutant Must use same period for each unit Ohio Adm.Code (O) 2017 Porter Wright Morris & Arthur LLP

86 SIGNIFICANT EMISSIONS INCREASE Projected Actual Emissions (tpy): High 24/60 after the project, or High 24/120 after the project, if Project increases the emissions unit s design capacity or PTE the regulated NSR pollutant, and Full utilization of the emissions unit would result in a significant emissions increase or a significant net emissions increase, or PTE Ohio Adm.Code (GGGGG) 2017 Porter Wright Morris & Arthur LLP

87 SIGNIFICANT EMISSIONS INCREASE Projected Actual Emissions (tpy): Must consider all relevant information in projecting actual emission, including: Historical operational data Company representations and filings Expected business activity Compliance plans Includes quantifiable fugitive emissions Includes SSM emissions Excludes increases the source could have accommodated during the baseline that are unrelated to the project 2017 Porter Wright Morris & Arthur LLP

88 NON- MAJOR MODIFICATIONS Certain major stationary sources, under certain circumstances, must still do some or all of the following: Document their pre-project emissions calculations Submit those calculations to Ohio EPA Monitor their post-project emissions Report their post-project emissions to Ohio EPA Ohio Adm. Code Porter Wright Morris & Arthur LLP

89 NON- MAJOR MODIFICATIONS What if EPA later determines that your preproject emissions projections were wrong? United States v. DTE Energy Co., 711 F.3d 643 (6th Cir. 2013) ( DTE I ) United States v. DTE Energy Co., 845 F.3d 735 (6th Cir. 2017) ( DTE II ) 2017 Porter Wright Morris & Arthur LLP

90 DTE PROJECT Monroe Power Plant, Unit 2 Began in March 2010 Required approximately 83 days, 600 construction workers, and $65 million Replaced approx sq. ft. of tubes, economizer, large sections of reheater Installed new exciter Refurbished boiler feedwater pumps 2017 Porter Wright Morris & Arthur LLP

91 DTE PROJECT Projected significant emissions increases: 3,701 tpy SO 2 4,096 tpy NOx Excluded all of it under the demand grown (capable of accommodating) exclusion EPA brought enforcement action, said project was really a major modification NRDC and Sierra Club intervened 2017 Porter Wright Morris & Arthur LLP

92 DTE I The district court in this case appears to have ruled... that no [enforcement] proceeding is permitted until there is postconstruction data [showing a significant emissions increase]. That is not correct Porter Wright Morris & Arthur LLP

93 DTE I While the regulations allow operators to undertake projects without having EPA second-guess their projections, EPA is not categorically prevented from challenging even blatant violations of its regulations until long after modifications are made Porter Wright Morris & Arthur LLP

94 DTE I If operators had to defend every projection to the agency s satisfaction, companies would hesitate to make any changes.... On the other hand, if EPA were barred from challenging preconstruction projections that fail to follow regulations, [NSR] would cease to be a preconstruction review program. The... regulations take a middle road by trusting operators to make projections but giving them specific instructions to follow Porter Wright Morris & Arthur LLP

95 DTE I If there is no projection, or the projection is made in contravention of the regulations guiding how the projection is to be made, then the system is not working. But if the agency can second-guess the making of the projections, then a project-and-report scheme would be transformed into a prior approval scheme Porter Wright Morris & Arthur LLP

96 DTE II On remand, the district court... focus[ed] on language in our first opinion to the effect that the regulations allow operators to undertake projects without having EPA second-guess their projections. The district court apparently (and mistakenly) took this to mean that the EPA had to accept DTE s projections at face value Porter Wright Morris & Arthur LLP

97 DTE II [I]n reviewing an operator's attribution of increased emissions to demand growth, the EPA definitely is not confined to a surface review or cursory examination Porter Wright Morris & Arthur LLP

98 DTE II The Sixth Circuit found DTE could not justify its application of the demand-growth exclusion : Superficial calculation (just results) Couldn t actually accommodate increase during the baseline: Unit 2 was running at full capacity pre-project, and the project was supposed to reduce outages by at least 12 days per year 2017 Porter Wright Morris & Arthur LLP

99 DTE I & II TAKE AWAY EPA may bring enforcement actions for sources not obtaining major NSR permits for at least three reasons: 1) significant post-project emissions increases and net emissions increases; 2) failure to follow the pre-project calculation, recordkeeping, and reporting requirements; 3) faulty pre-project calculations 2017 Porter Wright Morris & Arthur LLP

100 DTE II Interesting Panel Decisions: DTE I: Opinion by Rogers Joined by Daughtrey Dissent by Batchelder DTE II: Opinion by Daughtrey Concurrence by Batchelder Dissent by Rogers Status: Mandate stayed pending cert filing 2017 Porter Wright Morris & Arthur LLP

101 THANK YOU Eric B. Gallon Porter Wright Morris & Arthur LLP

102 2017 Porter Wright Morris & Arthur LLP

Air Permitting for Major Sources/Title V (Part 2)

Air Permitting for Major Sources/Title V (Part 2) Air Permitting for Major Sources/Title V (Part 2) Bob Hodanbosi Bob.hodanbosi@epa.state.oh.us Mike Hopkins Mike.hopkins@epa.state.oh.us Introduction Who, what, where, why of Title V permitting How can

More information

New Source Review Rulemakings & Court Decisions

New Source Review Rulemakings & Court Decisions Speaker 8: Kirk A. Lilley of K&L Gates Page 1 New Source Review Rulemakings & Court Decisions The federal New Source Review (NSR) program imposes preconstruction permitting requirements on new major stationary

More information

Air Pollution Control Program Permits Section

Air Pollution Control Program Permits Section Air Pollution Control Program Permits Section July 11, 2013 Air Permitting Two types of air permits: New Source Review (NSR)/Construction Permit Permit required prior to commencing construction Allows

More information

New Source Review Reform: What Lies Ahead

New Source Review Reform: What Lies Ahead New Source Review Reform: What Lies Ahead Presented at: Flexible Packaging Association 2004 Environmental Summit January 23, 2004 Ken Weiss, P.E. DEE, Director, Air Quality Services ERM ken.weiss@erm.com

More information

PSD Background Presentation

PSD Background Presentation PSD Background Presentation May 3 rd 2011 John Holmes 1 Prevention of Significant Deterioration (PSD): Overview Federal preconstruction permitting applies to new major stationary sources and major modifications

More information

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530) YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA 95618 Phone (530)757-3650; Fax (530)757-3670 AUTHORITY TO CONSTRUCT (ATC) APPLICATION A separate application must be

More information

11/10/2014 Oklahoma s SIP Submittal Infrastructure Checklist 2010 Primary Sulfur Dioxide (SO 2 ) NAAQS Update 1

11/10/2014 Oklahoma s SIP Submittal Infrastructure Checklist 2010 Primary Sulfur Dioxide (SO 2 ) NAAQS Update 1 Oklahoma s State Implementation Plan (SIP) Submittal Infrastructure Checklist CAA 110(a)(2)(A)-(M) Requirements in the Current SIP or Pending SIP Revisions Updated for the 2010 Primary Sulfur Dioxide (SO

More information

Michigan Guide to Air Use Permits to Install

Michigan Guide to Air Use Permits to Install Michigan Guide to Air Use Permits to Install Forward...3 1. How do I determine if an air permit is needed?...4 2. Are there exemptions from permits to install?...7 3. What happens if a required permit

More information

42 USC 7511a. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

42 USC 7511a. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 42 - THE PUBLIC HEALTH AND WELFARE CHAPTER 85 - AIR POLLUTION PREVENTION AND CONTROL SUBCHAPTER I - PROGRAMS AND ACTIVITIES Part D - Plan Requirements for Nonattainment Areas subpart 2 - additional

More information

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011) RULE 370. POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011) A. Applicability 1. General Applicability: This Rule shall apply to any stationary source

More information

AIR REGULATION IN SOUTH CAROLINA 3 JUNE 2016

AIR REGULATION IN SOUTH CAROLINA 3 JUNE 2016 AIR REGULATION IN SOUTH CAROLINA Presented by Phil Conner 3 JUNE 2016 pconner@nexsenpruet.com SCDHEC s Authority for Administering Air Quality Regulations South Carolina Pollution Control Act (The PCA

More information

New Source Review (NSR) Program Review Questionnaire May 14, 2003

New Source Review (NSR) Program Review Questionnaire May 14, 2003 New Source Review (NSR) Program Review Questionnaire May 14, 2003 Note: This questionnaire does not address implementation of changes made to the major NSR rules in EPA s rulemaking on December 31, 2002.

More information

Minor Source BAT Programs

Minor Source BAT Programs Minor Source BAT Programs Ali Mirzakhalili, P.E. Director DE Division of Air Quality NACAA JOINT PERMITTING AND ENFORCEMENT WORKSHOP December 9 11, 2014 Major Source Thresholds Pollutant Nonattainment

More information

Introduction. Federal Regulatory Background

Introduction. Federal Regulatory Background Introduction Federal Regulatory Background On December 31, 2002, the U.S. Environmental Protection Agency (EPA) revised its regulations governing the New Source Review (NSR) programs required by parts

More information

In Sierra Club v. Environmental Protection Agency, 2013 U.S. App. LEXIS 1408

In Sierra Club v. Environmental Protection Agency, 2013 U.S. App. LEXIS 1408 Skadden Skadden, Arps, Slate, Meagher & Flom LLP & Affiliates If you have any questions regarding the matters discussed in this memorandum, please contact the following attorneys or call your regular Skadden

More information

Legal Review of Clean Air Act Cases. Terry Salem, Staff Attorney, TCEQ

Legal Review of Clean Air Act Cases. Terry Salem, Staff Attorney, TCEQ Legal Review of Clean Air Act Cases Terry Salem, Staff Attorney, TCEQ What kind of deference will a court give to EPA? A lawyer s favorite answer: It depends. Questions of Fact Agencies are held to the

More information

Encouraging Energy Efficiency through the Clean Air Act

Encouraging Energy Efficiency through the Clean Air Act Encouraging Energy Efficiency through the Clean Air Act Moneen Nasmith April 2013 Columbia Law School Center for Climate Change Law Michael B. Gerrard, Director 2013 Columbia Center for Climate Change

More information

ARE Fall 2005 Lecture Slides - Clean Air Act - Part 2 (October 12, 2005)

ARE Fall 2005 Lecture Slides - Clean Air Act - Part 2 (October 12, 2005) ARE309 Fall 2005 Class 8 (October 12) Clean Air Act Part 2 Reading Assignments: Salzman & Thompson, Chapter 4 (pages 85-102) Case: American Trucking Tonight Reading Assignment Quiz #8 (Hand In) Guest:

More information

The EARLY ACTION COMPACT. The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia

The EARLY ACTION COMPACT. The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia The EARLY ACTION COMPACT for The Roanoke Metropolitan Statistical Area (MSA) in the Commonwealth of Virginia (Cities of Roanoke and Salem, Counties of Roanoke and Botetourt, and Town of Vinton) Submitted

More information

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96 RULE 201.3 Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96 I. Purpose The purpose of this Rule is to allow relatively small sources of air pollution to avoid requirements of Rule 201.1

More information

Diving Deeper into PSD Applicability: The RMRR Exemption and the Demand Growth Exclusion

Diving Deeper into PSD Applicability: The RMRR Exemption and the Demand Growth Exclusion Diving Deeper into PSD Applicability: The RMRR Exemption and the Demand Growth Exclusion Chicago, Illinois Midwest Environmental Compliance Conference November 3, 2016 John P. Iwanski, Trinity Consultants

More information

AIR PERMITS FORM 805 APPLICATION

AIR PERMITS FORM 805 APPLICATION PERMIT FORMS PURSUANT TO REGULATIONS FOR THE CONTROL AND ABATEMENT OF AIR POLLUTION COMMONWEALTH OF VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY AIR PERMITS FORM 805 APPLICATION FEDERAL OPERATING PERMIT

More information

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION BROADWAY NEW YORK. NY

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION BROADWAY NEW YORK. NY UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 2. 290 BROADWAY JUl 2 9 2016 NEW YORK. NY 10007-1866 CERTIFIED MAIL - RETURN RECEIPT REQUESTED Global Companies, LLC Attn: Eric Slifka, President and

More information

Update on Michigan Air Pollution Control Rules and Policies. MMEA Fall Conference October 4, 2017

Update on Michigan Air Pollution Control Rules and Policies. MMEA Fall Conference October 4, 2017 Update on Michigan Air Pollution Control Rules and Policies MMEA Fall Conference October 4, 2017 Rhiana C. Dornbos, PE Project Engineer Air Quality Permitting and Compliance 517-702-2953 616-265-5755 rdornbos@nthconsultants.com

More information

Minor Source Permitting Guidance for Facilities Subject To Federal Standards

Minor Source Permitting Guidance for Facilities Subject To Federal Standards Department of Environmental Quality Minor Source Permitting Guidance for Facilities Subject To Federal Standards As a result of the permitting requirements under OAC 252:100-7 (Subchapter7) and the EPA

More information

ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015

ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015 ADEQ NON-CRITERIA POLLUTANT CONTROL STRATEGY Revised April 2015 BACKGROUND Under the federal Clean Air Act, EPA is obligated to establish ambient air quality standards for 6 commonly found criteria pollutants:

More information

Current Topics In Air Quality

Current Topics In Air Quality 76 th KSPE Annual Convention Current Topics In Air Quality Sean Alteri, Assistant Director Division for Air Quality Department for Environmental Protection Energy and Environment Cabinet Current Topics

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY p-ear2-80b STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED REG ALBERT LEA, LLC PROJECT FREEBORN COUNTY

More information

Limiting Potential to Emit (PTE) in New Source Review (NSR) Permitting

Limiting Potential to Emit (PTE) in New Source Review (NSR) Permitting EPA Mid-Atlantic Air Protection, available at http://www.epa.gov/reg3artd/permitting/limitptemmo.htm (last visited April 8, 2014) Limiting Potential to Emit (PTE) in New Source Review (NSR) Permitting

More information

NAAQS and Other Implementation Updates

NAAQS and Other Implementation Updates NAAQS and Other Implementation Updates M E G A N V. B R A C H T L, R H E A J O N E S A N D V E R A KO R N Y L A K E PA - O A Q P S, A I R Q U A L I T Y P O L I C Y D I V I S I O N A A P C A FA L L M E

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: Title V Permit No.: Permit Application Nos.: Site ID: Equipment Address: Goal Line, L.P. APCD2016-TVP-00043 APCD2016-APP-004597 APCD1992-SITE-08447 555 North Tulip Street Escondido, CA 92025

More information

ALTERNATIVE EMISSIONS REDUCTION PLANS AND AUTHORIZATIONS

ALTERNATIVE EMISSIONS REDUCTION PLANS AND AUTHORIZATIONS SUBCHAPTER 11. ALTERNATIVE EMISSIONS REDUCTION PLANS AND AUTHORIZATIONS Section 252:100-11-1. Purpose 252:100-11-2. Definitions 252:100-11-3. Applicability 252:100-11-4. Application for alternative emissions

More information

Workshop BB. Ohio: Major Air Permitting, Regulatory & Compliance Developments. Wednesday, March 28, :00 a.m. to 9:15 p.m.

Workshop BB. Ohio: Major Air Permitting, Regulatory & Compliance Developments. Wednesday, March 28, :00 a.m. to 9:15 p.m. Workshop BB Ohio: Major Air Permitting, Regulatory & Compliance Developments Wednesday, March 28, 2018 8:00 a.m. to 9:15 p.m. Biographical Information Robert F. Hodanbosi, Chief, Division of Air Pollution

More information

Original : 2535 I~ C I i!._ ~iughes, NEarJorie. Froo :

Original : 2535 I~ C I i!._ ~iughes, NEarJorie. Froo : Original : 2535 I~ C I i!._ ~iughes, NEarJorie Froo : Sent : COMAS-MONTALVO, LUlS A [LACOMAS-MONTALVO@`sunocoinc.com] Tuesday, June 27, 2006 3 :59 PM 30 : regcomments@state.pa.us Subject : Proposed Modifications

More information

National Ambient Air Quality Standards, Implementation Plans and Public Participation. Laura McKelvey U.S. EPA

National Ambient Air Quality Standards, Implementation Plans and Public Participation. Laura McKelvey U.S. EPA National Ambient Air Quality Standards, Implementation Plans and Public Participation Laura McKelvey U.S. EPA mckelvey.laura @epa.gov Topics What are the NAAQS? Why are they important? What is the air

More information

THE TITLE V PROGRAM - FREQUENTLY ASKED QUESTIONS

THE TITLE V PROGRAM - FREQUENTLY ASKED QUESTIONS P.O. Box 1677, Oklahoma City, Oklahoma 73101-1677 FACT SHEET THE TITLE V PROGRAM - FREQUENTLY ASKED QUESTIONS This compendium of frequently asked questions and answers concerning the Title V program in

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: FP-T-0152 Date Issued: July 18, 2007 Administrative Permit Amendment: June 11, 2008 This certifies

More information

Environmental Impact Assessment in Western Australia

Environmental Impact Assessment in Western Australia Environmental Impact Assessment in Western Australia Fact Sheet Updated February 2011 An introduction to Environmental Impact Assessment in Western Australia Environmental impact assessment under the Environmental

More information

I. CLEAN AIR ACT 103 AND 105 THE GRANT CARROT. 1. Agencies must be qualified. 3. Maintenance of effort required.

I. CLEAN AIR ACT 103 AND 105 THE GRANT CARROT. 1. Agencies must be qualified. 3. Maintenance of effort required. chapter 5a The Hidden Dimensions of Environmental Law Practice: U.S. EPA s Annual Grant Guidance and Requirements and Guidance Interpreting Regulatory Requirements Charles M. Taylor GT Environmental Westerville,

More information

Workshop S. Clean Air Act Title V Assessing Reasonable Inquiry & Due Diligence. Tuesday, March 22, :30 p.m. to 4:45 p.m.

Workshop S. Clean Air Act Title V Assessing Reasonable Inquiry & Due Diligence. Tuesday, March 22, :30 p.m. to 4:45 p.m. Workshop S Clean Air Act Title V Assessing Reasonable Inquiry & Due Diligence Tuesday, March 22, 2016 3:30 p.m. to 4:45 p.m. Biographical Information Don Robin, P.E., HSE Consultant Eli Lilly and Company,

More information

CAIR: A Journey Revisited Part II

CAIR: A Journey Revisited Part II Portfolio Media, Inc. 648 Broadway, Suite 200 New York, NY 10012 www.law360.com Phone: +1 212 537 6331 Fax: +1 212 537 6371 customerservice@portfoliomedia.com CAIR: A Journey Revisited Part II Law360,

More information

NO2, SO2, PM2.5, Oh my!?! Information Session EPA R/S/L Modelers Workshop May 10, 2010

NO2, SO2, PM2.5, Oh my!?! Information Session EPA R/S/L Modelers Workshop May 10, 2010 NO2, SO2, PM2.5, Oh my!?! Information Session EPA R/S/L Modelers Workshop May 10, 2010 Purpose & Outline Provide background and updates on permit modeling processes and technical aspects related to new

More information

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc. COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 PERMIT NO: CONSTRUCTION PERMIT DATE ISSUED: January 7, 2015 ISSUED TO: 13LR2446 Issuance 1

More information

RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION

RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION RULES AND REGULATIONS Title 25 ENVIRONMENTAL PROTECTION ENVIRONMENTAL QUALITY BOARD [25 PA. CODE CHS. 121, 129 AND 139] Surface Coating Processes (RBI #4) The Environmental Quality Board (Board), by this

More information

Criteria Pollutants. Sulfur Dioxide (SO 2 ) Nitrogen Oxides (NOx)

Criteria Pollutants. Sulfur Dioxide (SO 2 ) Nitrogen Oxides (NOx) 1) Sulfur dioxide 2) Nitrogen oxides 3) Carbon monoxide 4) Ozone 5) Particulates 6) Lead Criteria Pollutants Sulfur Dioxide (SO 2 ) SO 2 is a colorless gas that is formed from the combustion of sulfur-containing

More information

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward EMISSION SOURCE (Internal Combustion Engines) Instructions for Form B2-G Form B2-G should be completed for all generators. Make as many copies of the form as necessary. Attach all calculations and assumptions

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 77-17 Page 1 of 7 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

Ground-level ozone, commonly known

Ground-level ozone, commonly known Downwind Ozone: Clearing the Air Theodore L. Garrett Ground-level ozone, commonly known as smog, is produced when nitrogen oxides (NO x ) and other compounds interact in the atmosphere in the presence

More information

An Analysis of EPA s Changes to the Routine Maintenance, Repair and Replacement Exclusion of the New Source Review Program

An Analysis of EPA s Changes to the Routine Maintenance, Repair and Replacement Exclusion of the New Source Review Program An Analysis of EPA s Changes to the Routine Maintenance, Repair and Replacement Exclusion of the New Source Review Program Prepared for the Environmental Commissioners of the New England States by the

More information

Additional Information to Supplement PSD Air Permit Application and State Air Facility Permit Application (# /00004)

Additional Information to Supplement PSD Air Permit Application and State Air Facility Permit Application (# /00004) Stephen Tomasik Project Manager Energy Projects and Management Division of Environmental Permits NYS Department of Environmental Conservation 625 Broadway 4th Floor Albany, New York 122331750 Steven Riva

More information

A PENNSYLVANIA FRAMEWORK OF ACTIONS FOR METHANE REDUCTIONS FROM THE OIL AND GAS SECTOR

A PENNSYLVANIA FRAMEWORK OF ACTIONS FOR METHANE REDUCTIONS FROM THE OIL AND GAS SECTOR A PENNSYLVANIA FRAMEWORK OF ACTIONS FOR METHANE REDUCTIONS FROM THE OIL AND GAS SECTOR INTRODUCTION Methane (CH4) has been identified by the U.S. Environmental Protection Agency (EPA) as the second most

More information

Workshop K. Thursday, July 21, :30 a.m. to noon

Workshop K. Thursday, July 21, :30 a.m. to noon Workshop K Major New Source Review Under the Prevention of Significant Deterioration (PSD) and Nonattainment New Source Review (NNSR) Important Changes in the Rules Thursday, July 21, 2016 10:30 a.m. to

More information

TITLE V COMMERCIAL PRINTING FACILITIES What is Title V?

TITLE V COMMERCIAL PRINTING FACILITIES What is Title V? TITLE V COMMERCIAL PRINTING FACILITIES What is Title V? Title V of the Federal Clean Air Act Amendments of 1990 (CAAA) required development of permit programs that would require major sources of air emissions

More information

Workshop EE. Chemical Inventory Reporting Centralizing Calculations to Enhance Compliance. Wednesday, March 28, :00 a.m. to 9:15 p.m.

Workshop EE. Chemical Inventory Reporting Centralizing Calculations to Enhance Compliance. Wednesday, March 28, :00 a.m. to 9:15 p.m. Workshop EE Chemical Inventory Reporting Centralizing Calculations to Enhance Compliance Wednesday, March 28, 2018 8:00 a.m. to 9:15 p.m. Biographical Information Patrik H. Eskandari, Environmental Engineer

More information

MINNESOTA POLLUTION CONTROL AGENCY STATEMENT OF NEED AND REASONABLENESS (SONAR)

MINNESOTA POLLUTION CONTROL AGENCY STATEMENT OF NEED AND REASONABLENESS (SONAR) MINNESOTA POLLUTION CONTROL AGENCY STATEMENT OF NEED AND REASONABLENESS (SONAR) Proposed Amendments to Rules Governing Air Emissions Permits, Minnesota Rules (Minn. R.) Chapters 7005, 7007 - Greenhouse

More information

MPCA Air Quality Permits Guide

MPCA Air Quality Permits Guide MPCA Air Quality Permits Guide Part 3 Making Changes Prepared by: Air Quality Staff Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155 March 1994 Revised September 1998 Printed on

More information

November 5, Department of Environmental Quality

November 5, Department of Environmental Quality November 5, 2015 North Carolina Division of Air Quality Update 2015 Air Quality Forum Mecklenburg County Air Quality Land Use & Environmental Services Agency November 5, 2014 Randy Strait North Carolina

More information

Draft 10/28/13. Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013

Draft 10/28/13. Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013 Guidance for 1-Hour SO 2 Nonattainment Area SIP Submissions October 2013 i TABLE OF CONTENTS Preface... Page iii I. Purpose... Page 1 II. Background.... Page 1 A. Roles of the EPA and Air Agencies B. How

More information

EPA EMISSION RULES - BOILERS

EPA EMISSION RULES - BOILERS EPA EMISSION RULES - BOILERS WHAT S NEXT FOR OWNER AND OPERATORS? On March 21, 2011 the U.S. Environmental Protection Agency published three rules regarding air emission standards in the Federal Register.

More information

Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation

Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation Implementation of the National Ambient Air Quality Standards (NAAQS): Opportunities for Public Participation EPA Environmental Justice Training Research Triangle Park, NC March 18, 2014 Rich Damberg U.S.

More information

Overview of EPA s Clean Power Plan. Presented by Brandy D. Olson, JD Director, Legal & Regulatory Services Muscatine Power & Water

Overview of EPA s Clean Power Plan. Presented by Brandy D. Olson, JD Director, Legal & Regulatory Services Muscatine Power & Water Overview of EPA s Clean Power Plan Presented by Brandy D. Olson, JD Director, Legal & Regulatory Services Muscatine Power & Water Disclaimer The opinions expressed in this presentation are my own and do

More information

STATE OF WISCONSIN CIRCUIT COURT MARATHON DANE COUNTY Branch

STATE OF WISCONSIN CIRCUIT COURT MARATHON DANE COUNTY Branch STATE OF WISCONSIN CIRCUIT COURT MARATHON DANE COUNTY Branch SAVE OUR AIR RESOURCES, PAUL SCHWANTES, and ROBERT HUGHES Case No.: Petitioners, Case Code: 30607 vs. Administrative Agency Review WISCONSIN

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: El Cajon Energy, LLC Title V Application Number: APCD2011-APP-001657 Facility ID: Equipment Address: APCD2009-SITE-06554 222 N. Johnson Ave. Facility

More information

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R04-OAR ; FRL Region 4]

ENVIRONMENTAL PROTECTION AGENCY. 40 CFR Part 52. [EPA-R04-OAR ; FRL Region 4] This document is scheduled to be published in the Federal Register on 02/05/2016 and available online at http://federalregister.gov/a/2016-02303, and on FDsys.gov 6560-50-P ENVIRONMENTAL PROTECTION AGENCY

More information

Answers to our Viewers Questions

Answers to our Viewers Questions On a March 18, 2014 webcast, a panel of senior US Latham & Watkins lawyers from our Environmental Department provided an overview of recent key developments related to hydraulic fracturing. Presented below

More information

2013 National Ambient Air Quality Standard (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas

2013 National Ambient Air Quality Standard (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas 2013 National Ambient Air Quality Standard (NAAQS) for Fine Particulate Matter (PM2.5): Designating Nonattainment Areas Robert Esworthy Specialist in Environmental Policy December 23, 2015 Congressional

More information

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131 A.6 Boilers The following are Minnesota Standards of Performance for Indirect Heating Equipment (Minn. R. 7011.0500-7011.0553) New boilers: construction, modification, or reconstruction commenced after

More information

REGULATING GREENHOUSE GASES: PSD FOR GHGS

REGULATING GREENHOUSE GASES: PSD FOR GHGS REGULATING GREENHOUSE GASES: PSD FOR GHGS Change picture on Slide Master Troutman Sanders LLP / Trinity Consultants January 27, 2011 PRESENTED BY Margaret Claiborne Campbell Charles S. Carter Troutman

More information

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr Department of the Environment COMAR 26.11.09 Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr October 30, 2013 Topics Covered Standards,

More information

ECONOMIC IMPACTS ASSOCIATED WITH AIR QUALITY

ECONOMIC IMPACTS ASSOCIATED WITH AIR QUALITY ECONOMIC IMPACTS ASSOCIATED WITH AIR QUALITY Regions As The Building Blocks of The Global Economy May 28, 2008 Chris Klaus Senior Program Manager North Central Texas Council of Governments ECONOMIC IMPACTS

More information

Major NSR Reform - Discussion Group. Items to Cover. NSR Meeting Schedule. Ohio EPA DAPC December 16, 2003

Major NSR Reform - Discussion Group. Items to Cover. NSR Meeting Schedule. Ohio EPA DAPC December 16, 2003 Major NSR Reform - Discussion Group Ohio EPA DAPC December 16, 2003 1 Items to Cover Introductions Purpose of group/meetings Ground rules Schedule Background information Equipment Replacement Rule Review

More information

Huber Engineered Woods, LLC, TV Page 1 of 7

Huber Engineered Woods, LLC, TV Page 1 of 7 Facility Name: Huber Engineered Woods, LLC City: Commerce County: Jackson AIRS #: 04-13-157-00014 Application #: 23530 Date SIP Application Received: Date Title V Application Received: Permit No: 2493-157-0014-V-03-2

More information

EPA Enforcement Organizational Structure

EPA Enforcement Organizational Structure EPA Enforcement Organizational Structure Administrator Regional Offices OECA Program Offices OCFET OC OCE Other OECA Offices CID Legal Counsel NEIC Other Air Water Special Litigation Waste & Chemical Enforcement

More information

502(b)(10) Permit for Part 70 Source

502(b)(10) Permit for Part 70 Source 502(b)(10) Permit for Part 70 Source Permit Attachment No.: 2075-139-0002-V-03-1 Effective Date: November 9, 2015 Facility Name: Mailing Address: Parent/Holding Company: 862 West Ridge Road Gainesville,

More information

Understanding the NAAQS and the Designation Process

Understanding the NAAQS and the Designation Process Understanding the NAAQS and the Designation Process Shawn Seals Senior Environmental Manager Office of Air Quality Indiana Department of Environmental Management (IDEM) September 21, 2016 1 Presentation

More information

Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP. March 5, 2015

Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP. March 5, 2015 Spotlight on Animal Health Business Operations: A Legal Update Husch Blackwell LLP March 5, 2015 Environmental Compliance, Planning and Management Systems I. Introduction A. Manufacturers and distributors,

More information

Northeast Ohio NAAQS Nonattainment Factsheet Covering the counties of Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage and Summit

Northeast Ohio NAAQS Nonattainment Factsheet Covering the counties of Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage and Summit 215 November 2 1 5 Northeast Ohio NAAQS Nonattainment Factsheet Covering the counties of Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage and Summit 1 Northeast Ohio NAAQS Nonattainment Factsheet

More information

Proper Implementation of the National Ambient Air Quality Standards Through the State Implementation Plan Process

Proper Implementation of the National Ambient Air Quality Standards Through the State Implementation Plan Process Proper Implementation of the National Ambient Air Quality Standards Through the State Implementation Plan Process Congress designed the Clean Air Act (CAA or Act) with two principal mechanisms for assuring

More information

THE TITLE V PROGRAM - GUIDANCE

THE TITLE V PROGRAM - GUIDANCE P.O. Box 1677 Oklahoma City, Oklahoma 73101-1677 THE TITLE V PROGRAM - GUIDANCE This guidance is a compendium of frequently asked questions and answers concerning the Title V program in Oklahoma designed

More information

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr

SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES. Policy No Draft Div Pol Yr SANTA BARBARA COUNTY AIR POLLUTION CONTROL DISTRICT POLICIES AND PROCEDURES Policy No. 6100.042.2016 Draft Div Pol Yr Supersedes No. 6100.042.1994 Final x Div Pol Yr Date: August 25, 2016 Pages 11 Topic:

More information

Air Report. Project Information PPTA/LAP. Traffic Data I-495 NORTHERN SECTION SHOULDER USE. Project Number: , C501, P101 UPC:

Air Report. Project Information PPTA/LAP. Traffic Data I-495 NORTHERN SECTION SHOULDER USE. Project Number: , C501, P101 UPC: Air Report Project Information Project Name: I-495 NORTHERN SECTION SHOULDER USE Project Number: 0495-029-123, C501, P101 UPC: 105130 Route Number: 495 Project Limit - From: South of Old Dominion Drive

More information

NJDEP Comments on STAPPA/ALAPCO/WESTAR List of Issues to be Addressed in the PSD Reform Initiative

NJDEP Comments on STAPPA/ALAPCO/WESTAR List of Issues to be Addressed in the PSD Reform Initiative Alan Dresser New Jersey DEP, Bureau of Air Quality Evaluation 12/9/04 NJDEP Comments on STAPPA/ALAPCO/WESTAR List of Issues to be Addressed in the PSD Reform Initiative Emission Inventory Issues General

More information

APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY

APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY APPENDIX E EMISSIONS ESTIMATE FOR GENERAL CONFORMITY Environmental and Planning Consultants 440 Park Avenue South, 7th Floor New York, New York 10016 tel: 212-696-0670 fax: 212-213-3191 www.akrf.com Memorandum

More information

Texas v. United States Environmental Protection Agency

Texas v. United States Environmental Protection Agency Public Land and Resources Law Review Volume 0 Fall 2012 Case Summaries Texas v. United States Environmental Protection Agency Ali Guio University of Montana School of Law, ali.guio@umontana.edu Follow

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009 Department of Environmental Quality State of Utah GARY R. HERBERT Governor Amanda Smith Executive Director DIVISION OF AIR QUALITY Cheryl Heying Director GREG BELL Lieutenant Governor DAQE-AN0141510002-09

More information

Integrating ADAir Mixer Technology to Optimize System Performance with DSI Applications

Integrating ADAir Mixer Technology to Optimize System Performance with DSI Applications An ADA-ES, Inc. White Paper Integrating ADAir Mixer Technology to Optimize System Performance with DSI Applications By Constance Senior, Vice President Technology Cody Wilson, Product Manager May 10, 2016

More information

o62. Honeywell m Additional RACT Requirements for June 27, 2014

o62. Honeywell m Additional RACT Requirements for June 27, 2014 o62. Honeywell Honeywell 101 Columbia Rd. Morristown, NJ 07962 June 27, 2014 Via Electronic and Overnight Mail Environmental Quality Board Rachel Carson State Office Building 16th Floor 400 Market Street

More information

The Minnesota Pollution Control Agency intends to adopt the above described rules. We plan to

The Minnesota Pollution Control Agency intends to adopt the above described rules. We plan to This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/sonar/sonar.asp July 6, 2012

More information

Pretreatment Streamlining Rule

Pretreatment Streamlining Rule Pretreatment Guidance 2 Final Pretreatment Streamlining Rule Statutory references: ORC 6111.03(Q) and 6111.042 Rule references: OAC 3745-3; 40 CFR 403 Ohio EPA, Division of Surface Water Revision 0, October

More information

DFW SIP Development Update and Oil & Gas Inventory Follow-Up

DFW SIP Development Update and Oil & Gas Inventory Follow-Up DFW SIP Development Update and Oil & Gas Inventory Follow-Up Air Quality Division Heather Evans, Michael Ege, Chris Kite Air Quality Technical Information Meeting Arlington, Texas April 17, 2014 Air Quality

More information

EEOC Pay Equity Enforcement

EEOC Pay Equity Enforcement EEOC Pay Equity Enforcement January 24, 2013 Paul C. Evans Blair J. Robinson www.morganlewis.com Agenda EEOC Strategic Enforcement Plan Enforcing equal pay laws EEOC Investigations and Enforcement Investigative

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 17, 2015 PERMIT TO INSTALL A

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. September 17, 2015 PERMIT TO INSTALL A MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION September 17, 2015 PERMIT TO INSTALL 177-14A ISSUED TO Shannon Precision Fastener, LLC LOCATED AT 4425 Purks Road Auburn Hills, Michigan

More information

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan

PUBLIC PARTICIPATION DOCUMENTS For Holland Board of Public Works Holland, Michigan STATE OF MICHIGAN Rick Snyder, Governor DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION CONSTITUTION HALL 525 WEST ALLEGAN STREET P.O. BOX 30260 LANSING, MICHIGAN 48909-7760 www.michigan.gov/air

More information

PRIMARY OR ALTERNATIVE OPERATING SCENARIO

PRIMARY OR ALTERNATIVE OPERATING SCENARIO EMISSION SOURCE (Fuel Combustion Source) Instructions for Form B2 Form B2 should be completed for all fuel combustion emission sources (e.g., generators, boilers, burn-off ovens, bakeon ovens, bakery ovens,

More information

The National Rural Electric Cooperative Association

The National Rural Electric Cooperative Association The National Rural Electric Cooperative Association Comments on State Guidelines for Greenhouse Gas Emissions from Existing Electric Utility Generating Units Advance notice of proposed rulemaking Submitted

More information

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011 FROM: HQ AFCESA/CEO 139 Barnes Drive, Suite 1 Tyndall AFB FL 32403-5319 SUBJECT: Engineering Technical Letter

More information

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Boiler MACT & Related Rules Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Clean Air Act Rules Recently Finalized National Emissions Standard for Hazardous Air

More information

FLSA Rule Proposal Could Make Millions Eligible for Overtime

FLSA Rule Proposal Could Make Millions Eligible for Overtime A new federal wage regulation proposed by the Department of Labor raises salary thresholds in a way that significantly expands the number of employees who must be paid time and a half for overtime. Here

More information