August 20, Jeff Horn, Plant Manager - NAES Plum Point Energy Station P.O. Box 567 Osceola, AR Plum Point Energy Station Inspection

Size: px
Start display at page:

Download "August 20, Jeff Horn, Plant Manager - NAES Plum Point Energy Station P.O. Box 567 Osceola, AR Plum Point Energy Station Inspection"

Transcription

1 August 20, 2013 Jeff Horn, Plant Manager - NAES Plum Point Energy Station P.O. Box 567 Osceola, AR RE: Plum Point Energy Station Inspection AFIN: NPDES Permit No.: AR Dear Mr. Horn: On May 22 and 23, 2013, I performed a compliance inspection of the wastewater treatment facility and reconnaissance Landfill (ARG160042) and Industrial (ARR000704) Stormwater inspections in accordance with the provisions of the Federal Clean Water Act, the Arkansas Water and Air Pollution Control Act, and the regulations promulgated thereunder. These inspections revealed the following items: AR Since approximately October 1, 2012, and continuing through May 2013, facility personnel estimate that 43.2 million gallons of water was pumped from the coal pile runoff pond to the river intake water clarifiers thus bypassing the coal pile runoff water treatment plant and Outfall 01D. This bypass was not reported to the Department as required by Part III.B.4 and Part III.D.6. of the permit effective at that time. On December 6, 2011, in a letter to the Department reporting a similar bypass situation, the facility stated that a request for re-circulating/recycling coal pile runoff water was included in the permit renewal application and an engineering study was underway to assess the issues with the coal pile runoff pond and ancillary equipment. On December 15, 2011, the Department responded via letter stating that this request could not be located, however the request would be considered if sufficient information demonstrating compliance with ELGs was submitted. No additional request or information related to this matter was received by the Department. The current permit (effective May 1, 2013) does not contain any provisions for re-circulation/recycling coal pile runoff water and thus the bypass reporting provisions still apply. Additionally, if the facility anticipates the routine need to re-circulate/recycle coal pile runoff water as describe above and in the aforementioned letter, a request for permit modification (including supporting documentation) should be submitted. 2. A portion of the coal pile runoff appears to be overflowing the coal pile runoff collection system and thus does not enter the coal pile runoff pond. Instead, this water is entering the general stormwater conveyance ditches and is carried to the south stormwater pond.

2 Jeff Horn, Plum Point Energy Station Page 2 This was occurring south of the coal pile in the vicinity of the conveyor leading to the plant (Photos 1 & 2). ARG There was an overflow of leachate from the collection ditch on east side of landfill. This bypasses the leachate collection system and violates A.C.A (a)(2) which states, It shall be unlawful for any person to place or cause to be placed any sewage, industrial waste, or other wastes in a location where it is likely to cause pollution of any waters of this State. ARR The facility s site map is in need of updating to match current conditions at the facility and to ensure all items required by Part 4, Item 6.4 of the permit are included. Most notably the directions of stormwater flow appeared to be incomplete. The above items require your immediate attention. Please submit a written response to these findings to the Water Division Inspection Branch of this Department. This response should be mailed to the address at the bottom of the first page of the letter or ed to Water-Inspection-Report@adeq.state.ar.us. This response should contain documentation describing the course of action taken to correct each item noted. This corrective action should be completed as soon as possible, and the written response with all necessary documentation (i.e. photos) is due by September 4, If I can be of any assistance, please contact me at walker@adeq.state.ar.us or ext.-12. Sincerely, Brent L. Walker District 3 Field Inspector Water Division cc: Water Division Enforcement Branch Water Division Permits Branch NPDES Report Page 2

3 ADEQ Water NPDES Inspection AFIN: Permit #: AR Form Approved OMB No UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C NPDES Compliance Inspection Report Section A: National Data System Coding Transaction Code NPDES Yr/Mo/Day Inspec. Type Inspector Fac. Type 1 N A R C 19 S 20 2 Remarks Inspection Work Days Facility Evaluation Rating BI QA Reserved N 72 N Section B: Facility Data Name and Location of Facility Inspected (For industrial users discharging to POTW, also include POTW name and NPDES permit number) Plum Point Energy Station 2732 South CR 623 Osceola, AR Mississippi Co. Name(s) of On-Site Representative(s)/Title(s)/Phone and Fax Number(s) Jaret Sullivan/Environmental Specialist/ Name, Address of Responsible Official/Title/Phone and Fax Number Jeff Horn/Plant Manager - NAES/ Plum Point Energy Station P.O. Box 567 Osceola, AR Entry Time/Date /22/ /23/2013 Exit Time/Date /22/ /23/2013 Yes Contacted No Permit Effective Date 5/1/2013 Permit Expiration Date 4/30/2018 Other Facility Data Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated) S Permit S Flow Measurement U Operations & Maintenance S Sampling S Records/Reports S Self-Monitoring Program S Sludge Handling/Disposal N Pollution Prevention M Facility Site Review N Compliance Schedules N Pretreatment N Multimedia S Effluent/Receiving Waters S Laboratory M Stormwater N Other: The following violations were noted: Section D: Summary of Findings/Comments (Attach additional sheets if necessary) Since approximately October 1, 2012, and continuing through May 2013, facility personnel estimate that 43.2 million gallons of water was pumped from the coal pile runoff pond to the river intake water clarifiers thus bypassing the coal pile runoff water treatment plant and Outfall 01D. This bypass was not reported to the Department as required by Part III.B.4 and Part III.D.6. of the permit effective at that time. A portion of the coal pile runoff appears to be overflowing the coal pile runoff collection system and thus does not enter the coal pile runoff pond. Instead, this water is entering the general stormwater conveyance ditches and is carried to the south stormwater pond. This was occurring south of the coal pile in the vicinity of the conveyor leading to the plant (Photos 1 & 2). See attached letter, report and photos for additional information. Name(s) and Signature(s) of Inspector(s) Brent L. Walker Agency/Office/Telephone/Fax AR Dept. of Environmental Quality-Jonesboro (870) ext. 12/(870) (Fax) Date 8/15/2013 Signature of Reviewer Jason Bolenbaugh Agency/Office/Phone and Fax Numbers ADEQ/ Date 8/20/2013 NPDES Report Page 3

4 ADEQ Water NPDES Inspection AFIN: Permit #: AR SECTION A: PERMIT VERIFICATION PERMIT SATISFACTORILY ADDRESSES OBSERVATIONS DETAILS: S M U NA NE 1. CORRECT NAME AND MAILING ADDRESS OF PERMITTEE: Y N NA NE 2. NOTIFICATION GIVEN TO EPA/STATE OF NEW DIFFERENT OR INCREASED DISCHARGES: Y N NA NE 3. NUMBER AND LOCATION OF DISCHARGE POINTS AS DESCRIBED IN PERMIT: Y N NA NE 4. ALL DISCHARGES ARE PERMITTED: Y N NA NE SECTION B: RECORDKEEPING AND REPORTING EVALUATION RECORDS AND REPORTS MAINTAINED AS REQUIRED BY PERMIT DETAILS: S M U NA NE 1. ANALYTICAL RESULTS CONSISTENT WITH DATA REPORTED ON DMRS: Y N NA NE 2. SAMPLING AND ANALYSES DATA ADEQUATE AND INCLUDE: S M U NA NE a. DATES AND TIME(S) OF SAMPLING: Y N NA NE b. EXACT LOCATION(S) OF SAMPLING: Y N NA NE c. NAME OF INDIVIDUAL PERFORMING SAMPLING: Y N NA NE d. ANALYTICAL METHODS AND TECHNIQUES: Y N NA NE e. RESULTS OF CALIBRATIONS: Y N NA NE f. RESULTS OF ANALYSES: Y N NA NE g. DATES AND TIMES OF ANALYSES: Y N NA NE h. NAME OF PERSON(S) PERFORMING ANALYSES: Y N NA NE 3. LABORATORY EQUIPMENT CALIBRATION AND MAINTENANCE RECORDS ADEQUATE: S M U NA NE 4. PLANT RECORDS INCLUDE SCHEDULES, DATES OF EQUIPMENT MAINTENANCE AND REPAIR: S M U NA NE 5. EFFLUENT LOADINGS CALCULATED USING DAILY EFFLUENT FLOW AND DAILY ANALYTICAL DATA: Y N NA NE SECTION C: OPERATIONS AND MAINTENANCE TREATMENT FACILITY PROPERLY OPERATED AND MAINTAINED S M U NA NE DETAILS: Not all coal pile runoff appears to be directed to the coal pile runoff pond main area of concern is under conveyor south of coal pile; unreported bypass of 01D October 2012 May TREATMENT UNITS PROPERLY OPERATED: S M U NA NE 2. TREATMENT UNITS PROPERLY MAINTAINED: Large amount of coal solids appear to be entering coal pile runoff pond S M U NA NE 3. STANDBY POWER OR OTHER EQUIVALENT PROVIDED: S M U NA NE 4. ADEQUATE ALARM SYSTEM FOR POWER OR EQUIPMENT FAILURES AVAILABLE: S M U NA NE 5. ALL NEEDED TREATMENT UNITS IN SERVICE: S M U NA NE 6. ADEQUATE NUMBER OF QUALIFIED OPERATORS PROVIDED: S M U NA NE 7. SPARE PARTS AND SUPPLIES INVENTORY MAINTAINED: S M U NA NE 8. OPERATION AND MAINTENANCE MANUAL AVAILABLE: Y N NA NE 9. STANDARD OPERATING PROCEDURES AND SCHEDULES ESTABLISHED: Y N NA NE 10. PROCEDURES FOR EMERGENCY TREATMENT CONTROL ESTABLISHED: Y N NA NE 11. HAVE BYPASSES/OVERFLOWS OCCURRED AT THE PLANT OR IN THE COLLECTION SYSTEM IN THE LAST YEAR: 01D ~43.2 MGD Y N NA NE 12. IF SO, HAS THE REGULATORY AGENCY BEEN NOTIFIED: Not reported Y N NA NE 13. HAS CORRECTIVE ACTION BEEN TAKEN TO PREVENT ADDITIONAL BYPASSES/OVERFLOWS: Y N NA NE 14. HAVE ANY HYDRAULIC OVERLOADS OCCURRED AT THE TREATMENT PLANT: Y N NA NE 15. IF SO, DID PERMIT VIOLATIONS OCCUR AS A RESULT: Y N NA NE NPDES Report Page 4

5 ADEQ Water NPDES Inspection AFIN: Permit #: AR SECTION D: SAMPLING PERMITTEE SAMPLING MEETS PERMIT REQUIREMENTS DETAILS: S M U NA NE 1. SAMPLES TAKEN AT SITE(S) SPECIFIED IN PERMIT: Y N NA NE 2. LOCATIONS ADEQUATE FOR REPRESENTATIVE SAMPLES: Y N NA NE 3. FLOW PROPORTIONED SAMPLES OBTAINED WHEN REQUIRED BY PERMIT: Y N NA NE 4. SAMPLING AND ANALYSES COMPLETED ON PARAMETERS SPECIFIED IN PERMIT: Y N NA NE 5. SAMPLING AND ANALYSES PERFORMED AT FREQUENCY SPECIFIED IN PERMIT: Missed 2 TSS for 01B April 2013 NCR to be submitted Y N NA NE 6. SAMPLE COLLECTION PROCEDURES ADEQUATE: Y N NA NE a. SAMPLES REFRIGERATED DURING COMPOSITING: Y N NA NE b. PROPER PRESERVATION TECHNIQUES USED: Y N NA NE c. CONTAINERS AND SAMPLE HOLDING TIMES CONFORM TO 40 CFR 136: Y N NA NE 7. IF MONITORING IS PERFORMED MORE OFTEN THAN REQUIRED ARE RESULTS REPORTED ON THE DMR: Y N NA NE SECTION E: FLOW MEASUREMENT PERMITTEE FLOW MEASUREMENT MEETS PERMIT REQUIREMENTS DETAILS: S M U NA NE 1. PRIMARY FLOW MEASUREMENT DEVICE PROPERLY INSTALLED AND MAINTAINED: TYPE OF DEVICE: Multiple outfalls Y N NA NE 2. FLOW MEASURED AT EACH OUTFALL AS REQUIRED: Y N NA NE 3. SECONDARY INSTRUMENTS (TOTALIZERS, RECORDERS, ETC.) PROPERLY OPERATED AND MAINTAINED: Y N NA NE 4. CALIBRATION FREQUENCY ADEQUATE: Y N NA NE 5. RECORDS MAINTAINED OF CALIBRATION PROCEDURES: Y N NA NE 6. CALIBRATION CHECKS DONE TO ASSURE CONTINUED COMPLIANCE: Y N NA NE 7. FLOW ENTERING DEVICE WELL DISTRIBUTED ACROSS THE CHANNEL AND FREE OF TURBULENCE: Y N NA NE 8. FLOW MEASUREMENT EQUIPMENT ADEQUATE TO HANDLE EXPECTED RANGE OF FLOW RATES: Y N NA NE 9. HEAD MEASURED AT PROPER LOCATION: Y N NA NE SECTION F: LABORATORY PERMITTEE LABORATORY PROCEDURES MEET PERMIT REQUIREMENTS DETAILS: S M U NA NE 1. EPA APPROVED ANALYTICAL PROCEDURES USED (40 CFR FOR LIQUIDS, 503.8(B) FOR SLUDGES) : Y N NA NE 2. IF ALTERNATIVE ANALYTICAL PROCEDURES ARE USED, PROPER APPROVAL HAS BEEN OBTAINED: Y N NA NE 3. SATISFACTORY CALIBRATION AND MAINTENANCE OF INSTRUMENTS AND EQUIPMENT: Y N NA NE 4. QUALITY CONTROL PROCEDURES ADEQUATE: Y N NA NE 5. DUPLICATE SAMPLES ARE ANALYZED >10% OF THE TIME: Y N NA NE 6. SPIKED SAMPLES ARE ANALYZED >10% OF THE TIME: Y N NA NE 7. COMMERCIAL LABORATORY USED: Y N NA NE a. LAB NAME: ETC b. LAB ADDRESS: Memphis, TN c. PARAMETERS PERFORMED: O&G, Acute Toxicity 8. BIOMONITORING PROCEDURES ADEQUATE: Y N NA NE a. PROPER ORGANISMS USED: Y N NA NE b. PROPER DILUTION SERIES FOLLOWED: Y N NA NE c. PROPER TEST METHODS AND DURATION: Y N NA NE d. RETESTS AND/OR TRE PERFORMED AS REQUIRED: Y N NA NE NPDES Report Page 5

6 ADEQ Water NPDES Inspection AFIN: Permit #: AR SECTION G: EFFLUENT/RECEIVING WATERS OBSERVATIONS BASED ON VISUAL OBSERVATIONS ONLY S M U NA NE DETAILS: Observation made a sampling location OUTFALL #: OIL SHEEN GREASE TURBIDITY VISIBLE FOAM FLOATING SOLIDS COLOR OTHER 001 None None Low None None Clear -- SECTION H: SLUDGE DISPOSAL SLUDGE DISPOSAL MEETS PERMIT REQUIREMENTS S M U NA NE DETAILS: 1. SLUDGE MANAGEMENT ADEQUATE TO MAINTAIN EFFLUENT QUALITY: S M U NA NE 2. SLUDGE RECORDS MAINTAINED AS REQUIRED BY 40 CFR 503: S M U NA NE 3. FOR LAND APPLIED SLUDGE, TYPE OF LAND APPLIED TO: (E.G., FOREST, AGRICULTURAL, PUBLIC CONTACT SITE): SECTION I: SAMPLING INSPECTION PROCEDURES SAMPLE RESULTS WITHIN PERMIT REQUIREMENTS S M U NA NE DETAILS: 1. SAMPLES OBTAINED THIS INSPECTION: Y N NA NE 2. TYPE OF SAMPLE: GRAB: COMPOSITE: METHOD: FREQUENCY: 3. SAMPLES PRESERVED: Y N NA NE 4. FLOW PROPORTIONED SAMPLES OBTAINED: Y N NA NE 5. SAMPLE OBTAINED FROM FACILITY'S SAMPLING DEVICE: Y N NA NE 6. SAMPLE REPRESENTATIVE OF VOLUME AND NATURE OF DISCHARGE: Y N NA NE 7. SAMPLE SPLIT WITH PERMITTEE: Y N NA NE 8. CHAIN-OF-CUSTODY PROCEDURES EMPLOYED: Y N NA NE 9. SAMPLES COLLECTED IN ACCORDANCE WITH PERMIT: Y N NA NE SECTION J: STORM WATER POLLUTION PREVENTION PLAN STORM WATER MANAGEMENT MEETS PERMIT REQUIREMENTS S M U NA NE DETAILS: Stormwater is covered under a separate permit: ARR SWPPP UPDATED AS NEEDED: DATE OF LAST UPDATE: Y N NA NE 2. SITE MAP INCLUDING ALL DISCHARGES AND SURFACE WATERS: Y N NA NE 3. POLLUTION PREVENTION TEAM IDENTIFIED: Y N NA NE 4. POLLUTION PREVENTION TEAM PROPERLY TRAINED: Y N NA NE 5. LIST OF POTENTIAL POLLUTANT SOURCES: Y N NA NE 6. LIST OF POTENTIAL SOURCES AND PAST SPILLS AND LEAKS: Y N NA NE 7. ALL NON-STORM WATER DISCHARGES ARE AUTHORIZED: Y N NA NE 8. LIST OF STRUCTURAL BMPS: Y N NA NE 9. LIST OF NON-STRUCTURAL BMPS: Y N NA NE 10. BMPS PROPERLY OPERATED AND MAINTAINED: Y N NA NE 11. INSPECTIONS CONDUCTED AS REQUIRED: Y N NA NE NPDES Report Page 6

7 ADEQ Water NPDES Inspection AFIN: Permit #: AR DMR Calculation Check Reporting Period: From To Year Month Day Year Month Day Parameter Checked: TSS Loading Concentration Mass Monthly Mo. Avg./Max - lbs/day Mo. Avg. - mg/l 7-day Avg. - mg/l Reported Value: 123/ Calculated Value: 123/ Permit Value: 525.4/ If calculated value does not equal reported value, explain: Equal NPDES Report Page 7

8 ADEQ Water NPDES Inspection AFIN: Permit #: AR DMR Calculation Check Reporting Period: From To Year Month Day Year Month Day Parameter Checked: ph Loading Concentration Mass Monthly Mo. Avg. - lbs/day Minimum Maximum Reported Value: N/A Calculated Value: N/A Permit Value: N/A If calculated value does not equal reported value, explain: Equal NPDES Report Page 8

9 ADEQ Water NPDES Inspection AFIN: Permit #: AR Water Division Photographic Evidence Sheet Location: Plum Point Energy Station Photographer: Brent Walker Date: 5/22/2013 Time: 1500 Witness: Jaret Sullivan NAES Photo #: 1 Description: Area under coal conveyor to plant (facing west). Photographer: Brent Walker Date: 5/22/2013 Time: 1502 Witness: Jaret Sullivan NAES Photo #: 2 Description: Area under coal conveyor to plant (facing east) portions of this area do not appear to flow back to the coal pile runoff pond. NPDES Report Page 9

10 Form Approved OMB No UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C NPDES Compliance Inspection Report Section A: National Data System Coding Transaction Code NPDES Yr/Mo/Day Inspec. Type Inspector Fac. Type 1 N A R G R 19 S 20 2 Remarks Inspection Work Days Facility Evaluation Rating BI QA Reserved N 71 N 72 N Section B: Facility Data Name and Location of Facility Inspected (For industrial users discharging to POTW, also include POTW name and NPDES permit number) Plum Point Energy Station - Landfill 2732 South CR 623 Osceola, AR Mississippi Co. Name(s) of On-Site Representative(s)/Title(s)/Phone and Fax Number(s) Jaret Sullivan/Environmental Specialist/ Name, Address of Responsible Official/Title/Phone and Fax Number Jeff Horn/Plant Manager - NAES/ Plum Point Energy Station PO Box 567 Osceola, AR Entry Time/Date /22/ /23/2013 Exit Time/Date /22/ /23/2013 Yes Contacted No Permit Effective Date 4/30/2009 Permit Expiration Date 2/28/2015 Other Facility Data Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated) N Permit N Flow Measurement U Operations & Maintenance N Sampling N Records/Reports N Self-Monitoring Program N Sludge Handling/Disposal U Pollution Prevention N Facility Site Review N Compliance Schedules N Pretreatment N Multimedia N Effluent/Receiving Waters N Laboratory U Stormwater N Other: Section D: Summary of Findings/Comments (Attach additional sheets if necessary) This reconnaissance inspection was conducted in conjunction with a CEI of the facility s individual wastewater permit AR There was an overflow of leachate from the collection ditch on east side of landfill. This bypasses the leachate collection system and violates A.C.A (a)(2) Place or cause to be placed any sewage, industrial waste, or other wastes in a location where it is likely to cause pollution of any waters of this State. The above item is addressed in the letter attached to the AR inspection. Additionally, during the course of the inspection the need for minor improvements to the stormwater conveyance ditches were discussed. Due to the large size of the stormwater pond and currently small landfill footprint, the facility has not yet had a stormwater discharge. Name(s) and Signature(s) of Inspector(s) Brent L. Walker Agency/Office/Telephone/Fax AR Dept. of Environmental Quality-Jonesboro (870) ext. 12/(870) (Fax) Date 8/15/2013 Signature of Reviewer Agency/Office/Phone and Fax Numbers ADEQ/ Date 8/20/2013 Jason Bolenbaugh

11 ADEQ Water NPDES Inspection AFIN: Permit #: ARG Water Division Photographic Evidence Sheet Location: Plum Point Energy Station - Landfill Photographer: Brent Walker Date: 5/23/2013 Witness: Jaret Sullivan - NAES Description: Leachate collection ditch along east side of landfill. Photographer: Brent Walker Date: 5/23/2013 Witness: Jaret Sullivan - NAES Description: Closer view of leachate collection ditch above. Time: 1140 Photo #: 1 Time: 1121 Photo #: 2

12 ADEQ Water NPDES Inspection AFIN: Permit #: ARG Water Division Photographic Evidence Sheet Location: Plum Point Energy Station - Landfill Photographer: Brent Walker Date: 5/23/2013 Time: 1126 Witness: Jaret Sullivan - NAES Photo #: 3 Description: View further south of leachate collection ditch in photos 1 & 2. Photographer: Brent Walker Date: 5/23/2013 Time: 1125 Witness: Jaret Sullivan - NAES Photo #: 4 Description: Overflow of leachate from the collection ditch on east side of landfill.

13 ADEQ Water NPDES Inspection AFIN: Permit #: ARG Water Division Photographic Evidence Sheet Location: Plum Point Energy Station - Landfill Photographer: Brent Walker Date: 5/23/2013 Time: 1125 Witness: Jaret Sullivan - NAES Photo #: 5 Description: Closer view of leachate overflow. Photographer: Brent Walker Date: 5/23/2013 Time: 1124 Witness: Jaret Sullivan - NAES Photo #: 6 Description: Overview of area with leachate overflow.

14 Form Approved OMB No UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C NPDES Compliance Inspection Report Section A: National Data System Coding Transaction Code NPDES Yr/Mo/Day Inspec. Type Inspector Fac. Type 1 N A R R R 19 S 20 2 Remarks Inspection Work Days Facility Evaluation Rating BI QA Reserved N 71 N 72 N Section B: Facility Data Name and Location of Facility Inspected (For industrial users discharging to POTW, also include POTW name and NPDES permit number) Plum Point Energy Station 2732 South CR 623 Osceola, AR Mississippi Co. Name(s) of On-Site Representative(s)/Title(s)/Phone and Fax Number(s) Jaret Sullivan/Environmental Specialist/ Name, Address of Responsible Official/Title/Phone and Fax Number Jeff Horn/Plant Manager - NAES/ Plum Point Energy Station P.O. Box 567 Osceola, AR Entry Time/Date /22/ /23/2013 Exit Time/Date /22/ /23/2013 Yes Contacted No Permit Effective Date 6/2/2011 Permit Expiration Date 6/30/2014 Other Facility Data Section C: Areas Evaluated During Inspection (S = Satisfactory, M = Marginal, U = Unsatisfactory, N = Not Evaluated) S Permit N Flow Measurement M Operations & Maintenance N Sampling M Records/Reports N Self-Monitoring Program N Sludge Handling/Disposal N Pollution Prevention N Facility Site Review N Compliance Schedules N Pretreatment N Multimedia N Effluent/Receiving Waters N Laboratory M Stormwater N Other: Section D: Summary of Findings/Comments (Attach additional sheets if necessary) This reconnaissance inspection was conducted in conjunction with a CEI of the facility s individual wastewater permit AR Overall industrial stormwater practices appeared satisfactory. The facility s site map was in need of updating to match current conditions at the facility and to ensure all items required by Part 4, Item 6.4 of the permit are included. Most notably, the directions of stormwater flow appeared to be incomplete. The above item is addressed in the letter attached to the AR inspection. Name(s) and Signature(s) of Inspector(s) Brent L. Walker Agency/Office/Telephone/Fax AR Dept. of Environmental Quality-Jonesboro (870) ext. 12/(870) (Fax) Date 8/15//2013 Signature of Reviewer Agency/Office/Phone and Fax Numbers ADEQ/ Date 8/20/2013 Jason Bolenbaugh

15 Bolenbaugh, Jason From: Sent: To: Cc: Subject: Reiber, Loretta Tuesday, August 13, :35 AM Walker, Brent; Fuller, Kim Bolenbaugh, Jason RE: Plum Point Energy Station AR It looks right to me. From: Walker, Brent Sent: Monday, August 12, :33 PM To: Fuller, Kim; Reiber, Loretta Cc: Bolenbaugh, Jason Subject: RE: Plum Point Energy Station AR Kim and Loretta Will you take a look at this letter (specifically the first violation related to the unreported bypass) and let me know if permits has any questions/comments/suggestions before we send it to the permittee. Thanks, Brent Brent L. Walker District 3 Field Inspector Water Division - Jonesboro Field Office Arkansas Department of Environmental Quality ext.-12 walker@adeq.state.ar.us From: Fuller, Kim Sent: Tuesday, June 04, :08 AM To: Reiber, Loretta; Bolenbaugh, Jason; Walker, Brent; Bailey, John Subject: RE: Plum Point Energy Station AR Brent, If it is ok, I would like for Permit Branch to review your inspection report before it is sent to the facility. I would like John and Mo to be aware of the issues before anything is formally submitted to the facility. Thanks! Kimberly A. Fuller, P.E. NPDES Engineer Supervisor ADEQ, Water Division Phone: (501) From: Reiber, Loretta Sent: Tuesday, June 04, :02 AM To: Bolenbaugh, Jason; Walker, Brent Cc: Fuller, Kim Subject: RE: Plum Point Energy Station AR Brent, 1

16 I looked at SWEPCO s Turk Plant at Kim s suggestion since this issue had arisen with that facility. Turk is allowed to route water from the coal pile runoff/low volume wastewater pond to the makeup water pond. That stream has been designated as Internal Outfall 201 and contains limits for TSS and O & G based on the ELGs and the combined waste stream formula. The makeup water pond then goes through a pretreatment system before being used in the cooling water system. I think we should handle this in the manner that we put it into the Turk NPDES Permit. The permittee should have submitted a request along with the information requested in the Department letter dated 12/15/2011. Since it was not submitted and they said that an engineering study was underway to assess the issues the facility has seen with the coal pile runoff pond, I assumed that they decided not to do it. It is my opinion that they should modify the permit if they want to keep doing this. The last paragraph of the Department s 12/15/2011 letter explains this. Since Plum Point constructed a WWTP to specifically treat the coal pile runoff, I have concerns that they wouldn t be able to meet the ELG based limits without treating the runoff. Loretta From: Reiber, Loretta Sent: Thursday, May 30, :34 PM To: Bolenbaugh, Jason; Bailey, John Cc: Fuller, Kim; Walker, Brent Subject: RE: Plum Point Energy Station AR I e mailed Kim my thoughts on this yesterday afternoon. I don t know if she s had time to review my e mail yet. From: Bolenbaugh, Jason Sent: Thursday, May 30, :35 AM To: Bailey, John Cc: Fuller, Kim; Walker, Brent; Reiber, Loretta Subject: RE: Plum Point Energy Station AR John, Brent is preparing to draft his inspection report for Plum Point Entergy Station but is waiting to hear back from your group whether or not the treatment/recycling of the coal pile runoff waste through alternate outfalls has been approved by Permits. Can someone let him know the current standing regarding this? Thanks, Jason Bolenbaugh Inspection Branch Manager ADEQ Water Division Phone: bolenbaugh@adeq.state.ar.us From: Walker, Brent Sent: Tuesday, May 28, :15 PM To: Reiber, Loretta Cc: Bailey, John; Fuller, Kim; Bolenbaugh, Jason Subject: Plum Point Energy Station AR

17 Loretta As we discussed via telephone earlier this morning, I performed an inspection of the Plum Point Entergy Station (AR ) in Osceola on Wednesday and Thursday of last week and noted the following: The treatment unit for the coal pile runoff pond has been out of service for an extended period of time (several months) and thus they have not discharged from Internal Outfall 01D in They have placed an auxiliary pump in the southwest corner of the coal pile runoff pond and have been routing this water to the west intake water clarifier where it is then treated and used for cooling tower makeup water and demineralized water. Ultimately this water is discharged through Internal Outfall 01A or 01B and then to the river through 001. This appears to be nearly identical to the bypass conditions reported in the attached letter from 12/6/2011, and the Department s response on 12/15/2011. Due to the requirements for both cooling tower makeup water and demineralized water, I am certain this water is being treated to more stringent levels than required by 01D, but this is not being formally demonstrated. It was my understanding that a provision for treating/recycling the coal pile runoff water in this manner was going to be incorporated into the new permit which became effective this month, but I don t see any reference to it. Additionally, the last comments I see in the database regarding this matter are those in the Department s 12/15/2011 response above stating the request to incorporate this change could not be located in the renewal application. To the best of my knowledge, no notification was given to the Department regarding this current situation. Should notification have been given by the permittee? How do you suggestion I handle this matter? Thanks, Brent Brent L. Walker District 3 Field Inspector Water Division - Jonesboro Field Office Arkansas Department of Environmental Quality ext.-12 walker@adeq.state.ar.us 3

18 Bolenbaugh, Jason From: Sent: To: Cc: Subject: Fuller, Kim Tuesday, August 13, :50 AM Reiber, Loretta; Walker, Brent Bolenbaugh, Jason RE: Plum Point Energy Station AR I agree with Loretta. Kimberly A. Fuller, P.E. NPDES Engineer Supervisor ADEQ, Water Division Phone: (501) From: Reiber, Loretta Sent: Tuesday, August 13, :35 AM To: Walker, Brent; Fuller, Kim Cc: Bolenbaugh, Jason Subject: RE: Plum Point Energy Station AR It looks right to me. From: Walker, Brent Sent: Monday, August 12, :33 PM To: Fuller, Kim; Reiber, Loretta Cc: Bolenbaugh, Jason Subject: RE: Plum Point Energy Station AR Kim and Loretta Will you take a look at this letter (specifically the first violation related to the unreported bypass) and let me know if permits has any questions/comments/suggestions before we send it to the permittee. Thanks, Brent Brent L. Walker District 3 Field Inspector Water Division - Jonesboro Field Office Arkansas Department of Environmental Quality ext.-12 walker@adeq.state.ar.us From: Fuller, Kim Sent: Tuesday, June 04, :08 AM To: Reiber, Loretta; Bolenbaugh, Jason; Walker, Brent; Bailey, John Subject: RE: Plum Point Energy Station AR Brent, If it is ok, I would like for Permit Branch to review your inspection report before it is sent to the facility. I would like John and Mo to be aware of the issues before anything is formally submitted to the facility. Thanks! 1

19 Kimberly A. Fuller, P.E. NPDES Engineer Supervisor ADEQ, Water Division Phone: (501) From: Reiber, Loretta Sent: Tuesday, June 04, :02 AM To: Bolenbaugh, Jason; Walker, Brent Cc: Fuller, Kim Subject: RE: Plum Point Energy Station AR Brent, I looked at SWEPCO s Turk Plant at Kim s suggestion since this issue had arisen with that facility. Turk is allowed to route water from the coal pile runoff/low volume wastewater pond to the makeup water pond. That stream has been designated as Internal Outfall 201 and contains limits for TSS and O & G based on the ELGs and the combined waste stream formula. The makeup water pond then goes through a pretreatment system before being used in the cooling water system. I think we should handle this in the manner that we put it into the Turk NPDES Permit. The permittee should have submitted a request along with the information requested in the Department letter dated 12/15/2011. Since it was not submitted and they said that an engineering study was underway to assess the issues the facility has seen with the coal pile runoff pond, I assumed that they decided not to do it. It is my opinion that they should modify the permit if they want to keep doing this. The last paragraph of the Department s 12/15/2011 letter explains this. Since Plum Point constructed a WWTP to specifically treat the coal pile runoff, I have concerns that they wouldn t be able to meet the ELG based limits without treating the runoff. Loretta From: Reiber, Loretta Sent: Thursday, May 30, :34 PM To: Bolenbaugh, Jason; Bailey, John Cc: Fuller, Kim; Walker, Brent Subject: RE: Plum Point Energy Station AR I e mailed Kim my thoughts on this yesterday afternoon. I don t know if she s had time to review my e mail yet. From: Bolenbaugh, Jason Sent: Thursday, May 30, :35 AM To: Bailey, John Cc: Fuller, Kim; Walker, Brent; Reiber, Loretta Subject: RE: Plum Point Energy Station AR John, Brent is preparing to draft his inspection report for Plum Point Entergy Station but is waiting to hear back from your group whether or not the treatment/recycling of the coal pile runoff waste through alternate outfalls has been approved by Permits. Can someone let him know the current standing regarding this? Thanks, 2

20 Jason Bolenbaugh Inspection Branch Manager ADEQ Water Division Phone: From: Walker, Brent Sent: Tuesday, May 28, :15 PM To: Reiber, Loretta Cc: Bailey, John; Fuller, Kim; Bolenbaugh, Jason Subject: Plum Point Energy Station AR Loretta As we discussed via telephone earlier this morning, I performed an inspection of the Plum Point Entergy Station (AR ) in Osceola on Wednesday and Thursday of last week and noted the following: The treatment unit for the coal pile runoff pond has been out of service for an extended period of time (several months) and thus they have not discharged from Internal Outfall 01D in They have placed an auxiliary pump in the southwest corner of the coal pile runoff pond and have been routing this water to the west intake water clarifier where it is then treated and used for cooling tower makeup water and demineralized water. Ultimately this water is discharged through Internal Outfall 01A or 01B and then to the river through 001. This appears to be nearly identical to the bypass conditions reported in the attached letter from 12/6/2011, and the Department s response on 12/15/2011. Due to the requirements for both cooling tower makeup water and demineralized water, I am certain this water is being treated to more stringent levels than required by 01D, but this is not being formally demonstrated. It was my understanding that a provision for treating/recycling the coal pile runoff water in this manner was going to be incorporated into the new permit which became effective this month, but I don t see any reference to it. Additionally, the last comments I see in the database regarding this matter are those in the Department s 12/15/2011 response above stating the request to incorporate this change could not be located in the renewal application. To the best of my knowledge, no notification was given to the Department regarding this current situation. Should notification have been given by the permittee? How do you suggestion I handle this matter? Thanks, Brent Brent L. Walker District 3 Field Inspector Water Division - Jonesboro Field Office Arkansas Department of Environmental Quality ext.-12 walker@adeq.state.ar.us 3

21 Bolenbaugh, Jason From: Sent: To: Cc: Subject: Attachments: Jaret Sullivan Wednesday, September 04, :16 PM Water-Inspection-Report; Walker, Brent Jeff Horn; Greg Cook; Kellee Fletcher; Hambrook, Lauren; Berner, Pamela AFIN ; Plum Point Inspection Response AFIN Response pdf; PPES SWPPP Updated.pdf Please see the attached response to the May, 2013 inspection of Plum Point Energy Station, AFIN If there are any further comments or questions, please let me know. Thank you, Jaret Jaret Sullivan Environmental Specialist Plum Point Energy Station

22

23

24 NORTH PLANT OUTFALL 001 MISSISSIPPI RIVER Sodium Hypochlorite Tank COAL PILE PERIMETER CONCRETE SWALE WASTEWATER COLLECTION POND AMMONIA STORAGE TANK LIME SILO FLY ASH SILO TO WASTEWATER COLLECTION WATER TREATMENT FUEL OIL TANK FUEL PUMPS HYDROGEN STORAGE STORMWATER POND #2 BENETECH FEED AREA COAL RUNOFF POND (TO WASTEWATER TREATMENT BUILDING) SULFURIC ACID STORAGE TANK FUELING STATION STORMWATER POND SPILLWAY STORMWATER POND #1 LEGEND: OUTFALL SW-2 DRAINAGE AREA FOR SW-1 COAL ROTARY CAR DUMPER OUTFALL SW-1 DRAINAGE AREA FOR SW-2 DRAINAGE ARE FOR WATERS DIRECTED TO WASTE WATER COLLECTION SYSTEM SOLID WASTE LANDFILL EQPT MAINTENANCE BUILDING POTENTIAL POLLUTION SOURCE AREA IMPERVIOUS AREAS OVERLAND FLOW DIRECTION DRAINAGE SWALE TOTAL PROPERTY AREA = 340 ACRES 09/04/2013

25 October 1, 2013 Jeff Horn Plum Point Energy Station P.O. Box 567 Osceola, AR RE: Plum Point Energy Station Inspection Response Permit No.: AR , ARG and ARR000704, AFIN: Dear Mr. Horn: I have reviewed the response pertaining to my inspections of the Plum Point Energy Station. The information provided sufficiently addresses the violations referenced in my inspection reports. At this time the Department has no further comment concerning these particular inspections. Acceptance of this response by the Department does not preclude any future enforcement action deemed necessary at this site or any other site. If we need further information concerning this matter, we will contact you. Thank you for your attention to this matter. Should you have any questions, feel free to contact me at ext.-12 or you may me at walker@adeq.state.ar.us. Sincerely, Brent L. Walker District 3 Field Inspector Water Division

1. The facility had several thermometers which had not been calibrated in over a year.

1. The facility had several thermometers which had not been calibrated in over a year. May 25, 2010 Mr. Larry Waldrop El Dorado Water-South Plant P.O. Box 1587 El Dorado, AR 71731 RE: Compliance Inspection AFIN: 70-00341 NPDES Permit No.: AR0033723 Dear Mr. Waldrop: On 5/12/2010, I performed

More information

September 26, RE: Waste Water Treatment System. Dear Mr. Starks:

September 26, RE: Waste Water Treatment System. Dear Mr. Starks: September 26, 2008 Leon Starks, Director of Maintenance Arkansas Department of Correction East Arkansas Regional Unit 7800 Correction Circle Pine Bluff, Arkansas 71603 RE: Waste Water Treatment System

More information

NPDES Permit No: AR , Routine Compliance Inspection

NPDES Permit No: AR , Routine Compliance Inspection May 26, 2009 Dallas Ray Goad, Superintendent City Of Bradford 308 B, W. Walnut St Bradford, AR 72020 AFIN: 73-00072 NPDES Permit No: AR0050911, Routine Compliance Inspection Dear Mr. Goad: On May 20, 2009,

More information

ADEQ Water NPDES Inspection AFIN: «AFIN» Permit #: «Permit_»

ADEQ Water NPDES Inspection AFIN: «AFIN» Permit #: «Permit_» November 5, 2009 Mr. Charles Clark, Vice President Smackover, AR 71762 RE: Compliance Inspection AFIN: 70-00039 NPDES Permit No.: AR0000591 Dear Mr. Clark: On 10/15/2009, I performed an inspection of the

More information

James Ferrell 10/3/07 Page 2

James Ferrell 10/3/07 Page 2 October 15, 2007 James Ferrell 103 Sandal Court Hot Springs, Arkansas 71913 RE: Construction Site at 5552 Central Avenue NPDES Permit No.: ARR150000 Dear Mr. Ferrell: On October 8, 2007,, I performed a

More information

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY ARKASAS DEPARTMET OF EVIROMETAL QUALITY MEMORADUM TO: Eric Fleming, Technical Assistance Manager THRU: Dale Washam, Inspector Supervisor FROM:, District Field Inspector DATE: December 16, 2008 SUBJECT:

More information

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted. January 13, 2014 Mr. Joe Stewart, General Manager Valley View Golf Course, L.L.C. Washington County Property Improvements District #5 11520 Clubhouse Parkway Farmington, Arkansas 72730 RE: Reconnaissance

More information

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1 March 2, 2012 Mr. John R. Reynolds Dan Reynolds Company P. O. Box 457 Camden, AR 71701 RE: AFIN: 52-00598 Permit Tracking No.: 0487-WG-SW-1 Dear Mr. Reynolds: On, February 28, 2012, Chris Voss, ADEQ Inspector,

More information

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421 November 22, 2013 Tony Childers, President Custom Wood Recycling, Inc. P.O. Box 9 Centerville, AR 72833 RE: Custom Wood Recycling, Inc. Inspection (Yell Co) AFIN: 75-00315 Permit No.: AR0051195 and ARR000421

More information

If I can be of any assistance, please contact me at or (501)

If I can be of any assistance, please contact me at or (501) January 19, 2016 James Travis, Mill Manager West Fraser, Inc. PO Box 39 Mansfield, AR 72944 RE: Mansfield, a Division of West Fraser, Inc. Inspection (Scott Co) AFIN: 64-00049 NPDES Permit No.: AR0048232

More information

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1 April 7, 2010 Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas 72718 RE: Cave Springs Wastewater Treatment Plant #1 AFIN: 04-01642 Permit #: 4893-WR-1 Dear Mayor Reeves: On March

More information

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co)

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co) February 17, 2015 Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX 75230 RE: Fouke # D-3 SWD System Inspection (Miller Co) AFIN: 46-00279 State Permit No.: 0572-WG-SW-2 Dear Mr. Myhre:

More information

If you have any questions please contact Richard Healey, Enforcement Branch Manager, at or

If you have any questions please contact Richard Healey, Enforcement Branch Manager, at or CERTIFIED MAIL: 9489 0090 0027 6022 2427 07 October 25, 2017 Pat Sanders, Property Owner Route 1 Box 238 Western Grove, AR 72685 RE: Reconnaissance Inspection (Newton County) AFIN: 51-00000 NPDES Permit

More information

July 7, Jason Barnes, Facilities and ESH Manager Facilities and ESH manager Baxter Healthcare Corporation Mountain Home, AR 72653

July 7, Jason Barnes, Facilities and ESH Manager Facilities and ESH manager Baxter Healthcare Corporation Mountain Home, AR 72653 July 7, 2015 Jason Barnes, Facilities and ESH Manager Facilities and ESH manager Baxter Healthcare Corporation Mountain Home, AR 72653 RE: Baxter Healthcare-Mt. Home Inspection (Baxter Co) AFIN: 03-00002

More information

RE: AFIN: Permit No.: 5025-W

RE: AFIN: Permit No.: 5025-W October 28, 2009 Billy Staton Terra Renewal Services, Inc. P.O. Box 3036 Russellville, AR 72811 RE: AFIN: 60-04274 Permit No.: 5025-W Dear Mr. Staton: On October 23, 2009, Eric Fleming and I performed

More information

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County October 8, 2010 Mr. Jimmy Johnson, Engineer City of Fort Smith Utilities Department 3900 Kelley Highway Fort Smith, AR 72904 RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

More information

The Solution to Pollution is Dilution

The Solution to Pollution is Dilution The Solution to Pollution is Dilution The cornerstone of surface water quality protection in the United States gave EPA the authority to implement pollution control programs and... established the basic

More information

August 17, Robert E. Miller Quick Lay Pipe, LL Highway 71 South Fort Smith, AR RE: Complaint Investigation. Dear Mr.

August 17, Robert E. Miller Quick Lay Pipe, LL Highway 71 South Fort Smith, AR RE: Complaint Investigation. Dear Mr. August 17, 2009 Robert E. Miller Quick Lay Pipe, LL 11432 Highway 71 South Fort Smith, AR 72916 RE: Complaint Investigation Dear Mr. Miller: On August 13, 2009, I performed an investigation of your facility

More information

Arkansas Department of Environmental Quality NPDES PERMIT APPLICATION FORM 1

Arkansas Department of Environmental Quality NPDES PERMIT APPLICATION FORM 1 Arkansas Department of Environmental Quality NPDES PERMIT APPLICATION FORM 1 INSTRUCTIONS: 1. This form should be typed or printed in ink. If insufficient space is available to address any item, please

More information

RE: AFIN: PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway Co.

RE: AFIN: PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway Co. January 4, 2013 Billy Staton Terra Renewal, LLC 201 South Denver, Suite B Russellville, AR 72811 RE: AFIN: 15-00605 PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway

More information

Turk Wastewater Outfall Discussion

Turk Wastewater Outfall Discussion Turk Wastewater Outfall Discussion ADEQ s permit writer for the John W. Turk, Jr. (Turk) Plant NPDES permit recently indicated that he is contemplating designation of four internal outfalls for the purpose

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

DEQ. rn^sx. National Pollutant Discharge Elimination System

DEQ. rn^sx. National Pollutant Discharge Elimination System rn^sx National Pollutant Discharge Elimination System PERMIT EVALUATION AND FACT SHEET DEQ State of Oregon Department of Environmental Quality March 18,2004 Oregon Department of Environmental Quality Western

More information

Pretreatment Streamlining Rule

Pretreatment Streamlining Rule Pretreatment Guidance 2 Final Pretreatment Streamlining Rule Statutory references: ORC 6111.03(Q) and 6111.042 Rule references: OAC 3745-3; 40 CFR 403 Ohio EPA, Division of Surface Water Revision 0, October

More information

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment.

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov Michael R. Pence Governor

More information

AFIN: PDS #: LABORATORY

AFIN: PDS #: LABORATORY NAME: Van Buren, City of WWTP - Main LOCATION: 1401 Port Road CITY: Van Buren NAME: / TITLE Steve Dufresne / COMPANY: Van Buren Municipal Utilities MAILING ADDRESS: PO Drawer 1269 CITY, STATE, ZIP: Van

More information

REGULATION NO. 62 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL COMMISSION REGULATIONS FOR EFFLUENT LIMITATIONS

REGULATION NO. 62 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL COMMISSION REGULATIONS FOR EFFLUENT LIMITATIONS REGULATION NO. 62 COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL COMMISSION REGULATIONS FOR EFFLUENT LIMITATIONS ADOPTED: March 18, 1975 FORMAT CHANGED: January 4, 1977 AMENDED:

More information

Maryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD

Maryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD Maryland Department of Environment Water Management Administration Program 1800 Washington Blvd, Baltimore, MD 21230 410-537-3510 AI ID: 13670 Inspector: Brenden Hogan Site Name: Quarantine Road Municipal

More information

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT. Program Tracked under NPDES Permit Number: AR

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT. Program Tracked under NPDES Permit Number: AR Page 1 of 13 ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Name of Municipality: City of Fort Smith AFIN Number: 66-00226 NPDES Permit Number(s): AR0021750

More information

August 6, James McClung, Owner JM Oilfield Services 4 Melody Lane Quitman, AR RE: Complaint. Dear Mr. McClung:

August 6, James McClung, Owner JM Oilfield Services 4 Melody Lane Quitman, AR RE: Complaint. Dear Mr. McClung: August 6, 2009 James McClung, Owner 4 Melody Lane Quitman, AR 72131 RE: Complaint Dear Mr. McClung: On July 31, 2009 I performed an investigation of your facility in response to a complaint. The complaint

More information

RE: Quarterly Inspection; AFIN Permit Number 0289-S3T-R3

RE: Quarterly Inspection; AFIN Permit Number 0289-S3T-R3 Document ID 090997 May 27, 2016 JAN SMITH PROGRAM DIRECTOR WHITE RIVER REGIONAL SOLID WASTE MGMT DISTRICT PO BOX 2396 BATESVILLE AR 72503 RE: Quarterly Inspection; AFIN 73-00029 Permit Number 0289-S3T-R3

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

Quarterly Inspection; AFIN ; Permit Number 0225-S1-R5.

Quarterly Inspection; AFIN ; Permit Number 0225-S1-R5. Document ID 088827 February 1, 2016 Ms. Wendy Jackson Ozark Ridge Landfill, Inc. 10140 Ozark Ridge Access Lane Danville, AR 72833 RE: Quarterly Inspection; AFIN 75-00046; Permit Number 0225-S1-R5. Dear

More information

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS

GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS GUIDELINES FOR PREPARATION OF CAPACITY ANALYSIS REPORTS Florida Department of Environmental Regulation July 1992 TABLE OF CONTENTS PURPOSE AND APPLICABILITY................... 1 Purpose............................

More information

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018 NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, 2017 - SEPTEMBER 30, 2018 Introduction This document serves as the Pennsylvania Department of Environmental Protection

More information

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity Maryland Department of the Environment 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity Stormwater Permit Background The Clean Water Act (CWA or the Act) establishes a

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE STORM WATER PLAN (SWP) GUIDANCE TEMPLATE Name of Facility: Address: Phone Number: Date: INTRODUCTION This Storm Water Plan (SWP) is written in accordance with the State of Delaware Regulations Governing

More information

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009 Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,

More information

ADEQ. Site Visit Report. Date of Site Visit: August 9,2012. Facility Name: Hot Spring Power Company. Permit Numbers: AR

ADEQ. Site Visit Report. Date of Site Visit: August 9,2012. Facility Name: Hot Spring Power Company. Permit Numbers: AR Date of Site Visit: August 9,2012 Facility Name: Hot Spring Power Company Permit Numbers: AR0049611 Site Visit Report Front Gate Coordinates: Latitude: 34 25' 48"; Longitude: 92 50' 03" Names and Numbers

More information

314 CMR: DIVISION OF WATER POLLUTION CONTROL

314 CMR: DIVISION OF WATER POLLUTION CONTROL 314 CMR 12.00: OPERATION AND MAINTENANCE AND PRETREATMENT STANDARDS FOR WASTEWATER TREATMENT WORKS AND INDIRECT DISCHARGERS Section 12.01: Purpose 12.02: Definitions 12.03: Operation of Treatment Works

More information

Quarterly Inspection; AFIN ; Permit Number 0002-SWTP-R2

Quarterly Inspection; AFIN ; Permit Number 0002-SWTP-R2 Document ID 086858 September 29, 2015 Mr. Roger Davis Davis Rubber 1600 East 15th St. Little Rock, Arkansas 72202 RE: Quarterly Inspection; AFIN 60-01145; Permit Number 0002-SWTP-R2 Dear Mr. Davis: On

More information

Caterpillar Inc. North Little Rock is applying for coverage under the NPDES General Permit ARROOOOOO for stormwater discharge.

Caterpillar Inc. North Little Rock is applying for coverage under the NPDES General Permit ARROOOOOO for stormwater discharge. WLB&L CITERPILLAR. Justin R. Ganschow 9201 Faulkner Lake Rd., AR 72117 Office: (501)228-2764 Ganschow_Justin_R@cat.com Arkansas Department of Environmental Quality Permits Branch, Water Division 5301 Northshore

More information

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE

More information

MUNICIPAL WASTEWATER PERMITS

MUNICIPAL WASTEWATER PERMITS MUNICIPAL WASTEWATER PERMITS TCEQ Water Quality & Stormwater Seminar September 17, 2014 Dex Dean & Becca Moore 512-239-4671 APPLICATION FORMS 10053-inst 10053 10054 Instructions for Completing the Domestic

More information

Knowledge, Skills Abilities -- Gap Analysis Tool

Knowledge, Skills Abilities -- Gap Analysis Tool Environmental Compliance Inspector Grade I 101. Use, as directed, appropriate sampling locations, equipment and procedures; collect representative samples in accordance with the District's quality assurance

More information

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions MPCA use only White-MPCA Canary-Site copy Delta record Project Name / Location MN R100001-C000 Stormwater

More information

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS 4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS 4.1 EXISTING UNPERMITTED INDUSTRIAL USERS Within 60 calendar days after the effective date of this SUO, or at such time when the participant ties into the Authority's

More information

Operations Report. September 10, 2015

Operations Report. September 10, 2015 Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow

More information

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy

More information

Richland County Industrial and High Risk Runoff Program. Alan Trim BP Barber

Richland County Industrial and High Risk Runoff Program. Alan Trim BP Barber Richland County Industrial and High Risk Runoff Program Alan Trim Industrial and High Risk Runoff Program Program Components: Richland County Storm Water Ordinance. Industrial and High Risk Facility Database.

More information

The City of Grand Forks Industrial Pretreatment Program

The City of Grand Forks Industrial Pretreatment Program The City of Grand Forks Industrial Pretreatment Program Background Environmental Protection Agency (EPA) was created in December 1970 through a Presidential Executive Order. The Clean Water Act passed

More information

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Page 1 of 15 AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of the Federal Clean Water Act, as amended, (33 U.S.C. 1251 et seq.;

More information

Stormwater Construction General Permit CGP-2013

Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Stormwater Outreach for Regional Municipalities MS4 Statewide Summit June 18, 2013 Prepared by Chris Henninger

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Environmental Plans and Procedures

Environmental Plans and Procedures REDI ROCK Environmental Plans and Procedures OMM and SWPPP Permit # VAG110327 900 N Bayard Ave. Waynesboro, Va. 22980 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and material

More information

Permitting of Wastewater Discharges from Biodiesel Production Facilities in Colorado

Permitting of Wastewater Discharges from Biodiesel Production Facilities in Colorado Permitting of Wastewater Discharges from Biodiesel Production Facilities in Colorado Presentation at A Biodiesel CO-OPS Conference Strategies for Community-Based Biodiesel Groups http://www.collectivebiodiesel.org/

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS Statutory authority: N.J.S.A. 13:1B-3 et seq., 13:1D-1 et seq., 13:1E-1 et seq., 26-2C-1 et seq.,

More information

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY STATE OF COLORADO GENERAL PERMIT APPLICATION Updated 11/04 STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY This application is for use by all stormwater dischargers engaged in construction

More information

Missouri Department of Natural Resources

Missouri Department of Natural Resources Missouri Department of Natural Resources PUBLIC NOTICE DRAFT MISSOURI STATE OPERATING PERMIT DATE: January 2, 2015 In accordance with the state Clean Water Law, Chapter 644, RSMo, Missouri Clean Water

More information

County: City: State: Zip: Phone#: Person Permit Issued To: Farm Physical Address: Phone#:

County: City: State: Zip: Phone#: Person Permit Issued To: Farm Physical Address: Phone#: PROGRAM YEAR 2011 GEORGIA DEPARTMENT OF AGRICULTURE LIVESTOCK/POULTRY FIELD FORCES AFO/CAFO INSPECTIONS NPDES D S CL GENERAL INFORMATION: Inspector's Name: Inspector's Number: GDA Est #: Landowner's Name:

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

BASELINE REPORT FOR NON-RESIDENTIAL ESTABLISHMENTS: Survey for Wastewater Discharge Permit

BASELINE REPORT FOR NON-RESIDENTIAL ESTABLISHMENTS: Survey for Wastewater Discharge Permit BASELINE REPORT FOR NON-RESIDENTIAL ESTABLISHMENTS: Survey for Wastewater Discharge Permit THIS SPACE FOR OFFICE USE ONLY SECTION A - GENERAL INFORMATION A.1 Company name, mailing address and telephone

More information

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters NPDES PUBLIC NOTICE Application for National Pollutant Discharge Elimination System (NPDES) to Discharge to State Waters Southwest Regional Office: Regional Clean Water Program Manager, 400 Waterfront

More information

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters NPDES PUBLIC NOTICE Application for National Pollutant Discharge Elimination System (NPDES) to Discharge to State Waters Southwest Regional Office: Regional Water Management Program Manager, 400 Waterfront

More information

Form 2L - Land Application of Industrial Wastewater and/or Sludge

Form 2L - Land Application of Industrial Wastewater and/or Sludge Return to: Oklahoma Department of Environmental Quality Industrial Permits Section Water Quality Division 707. N. Robinson P.O. Box 1677 Oklahoma City, OK 73101-1677 Revised July 2016 Oklahoma DEQ Application

More information

STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE

STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE DRAFT NCS000573 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION

More information

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water Illinois EPA update to DuPage County Watershed Management Section Bureau of Water Amy Walkenbach Coordinator, Financial and Technical Assistance Program, Bureau of Water, Illinois EPA Amy.walkenbach@illinois.gov

More information

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning The strategy outlined in this guidance document is intended to supplement existing requirements. Nothing in the strategy shall affect regulatory requirements. The information herein is not an adjudication

More information

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012 State of Georgia Department of Natural Resources Environmental Protection Division For official use only NOTICE OF INTENT NOI - Version 2012 For Coverage Under NPDES General Permit GAR050000 (2012 IGP)

More information

Application for Renewal Industrial Wastewater Discharge Permit

Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal Industrial Wastewater Discharge Permit An Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted to the Industrial Pretreatment office

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information

The Village of Wellington NPDES Guidance/Reference Document

The Village of Wellington NPDES Guidance/Reference Document The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the

More information

Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015

Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015 Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015 EPA Industrial User Permitting Guidance Manual 833-R-12-001, September 2012 Update of the September 1989 manual Control Mechanisms

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

15-MM & 16-MA NOI and SWPPP Overview

15-MM & 16-MA NOI and SWPPP Overview Maryland Department of the Environment 15-MM & 16-MA NOI and SWPPP Overview General Permit for Mineral Mines, Concrete and Asphalt Plants (15MM / NPDES MDG49) and General Permit for Marinas (16MA / NPDES

More information

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN:

LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO S3N AFIN: LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO. 0303-S3N AFIN: 47-00461 OCTOBER 14, 2016 LANDFILL CLOSURE PLAN PLUM POINT ENERGY STATION CLASS 3N CCR LANDFILL PERMIT NO.

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

Phillips 66 Company 4101 Post Road Trainer, PA

Phillips 66 Company 4101 Post Road Trainer, PA COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Barnett, Mary Thursday, February 19, :00 PM Reiber, Loretta RE: NPDES AR Hydrogen_Peroxide_20-60.pdf; P16413-USA.pdf

Barnett, Mary Thursday, February 19, :00 PM Reiber, Loretta RE: NPDES AR Hydrogen_Peroxide_20-60.pdf; P16413-USA.pdf Reiber, Loretta From: Sent: To: Subject: Attachments: Barnett, Mary Thursday, February 19, 2015 12:00 PM Reiber, Loretta RE: NPDES AR0035823 Hydrogen_Peroxide_20-60.pdf; P16413-USA.pdf Loretta, Based on

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England

Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England Development and Implementation of an Industrial Facility Stormwater Pollution Prevention Program in New England NEWEA 2015 Annual Conference Technical Session 18 January 27, 2015 Introductions Charlie

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

Nevada Department of Transportation (NDOT)

Nevada Department of Transportation (NDOT) Nevada Department of Transportation (NDOT) Stormwater Pollution Prevention Plan (SWPPP) Template for Construction Activities NDOT STORMWATER COMPLIANCE & ENFORCEMENT Table of Contents Page # STORM WATER

More information

NPDES Electronic Reporting Rule 40 CFR 127

NPDES Electronic Reporting Rule 40 CFR 127 NPDES Electronic Reporting Rule 40 CFR 127 August 2, 2016 EPA/RVIPA 32 nd Annual Pretreatment Workshop Frisco, Texas Jan Marie Pickrel US EPA, Office of Wastewater Management Rebecca Villalba Texas Commission

More information

AK Steel Corp 9227 Centre Point Drive West Chester, OH 45069

AK Steel Corp 9227 Centre Point Drive West Chester, OH 45069 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

More information

Existing System Evaluation Report for Onsite Wastewater Systems

Existing System Evaluation Report for Onsite Wastewater Systems Existing System Evaluation Report for Onsite Wastewater Systems State of Oregon Department of Environmental Quality Onsite Program 165 East 7 th Avenue, Suite 100 Eugene, Oregon 97401 For more information,

More information

2008 ANNUAL ENGINEERING INSPECTION REPORT

2008 ANNUAL ENGINEERING INSPECTION REPORT 2008 ANNUAL ENGINEERING INSPECTION REPORT EMS Class 3T Landfill Permit #0269-S3T-R1 PREPARED FOR: Eaton-Moery Environmental Services 1784 Hwy. 1 North Wynne, Arkansas 72396 PREPARED BY: Fields & Associates,

More information

APPENDIX G Fire BMPs

APPENDIX G Fire BMPs APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois Storm Water Pollution Prevention Plan Wastewater Treatment Facility and Streets & Parks Facility Village of Fox River Grove, Illinois Village of Fox River Grove, Illinois Storm Water Pollution Prevention

More information

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E.

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Learning Objectives Course participants shall be able to: Recognize basic permit elements Recognize the need