1 Control- and Information System for wastewater pumping and distribution in Berlin (LISA = Leit- und Informationssystem Abwasser) Berliner Wasserbetriebe (BWB) Division sewage-works Cicerostraße Berlin
2 Table of contents 1. History 3 2. Sewage-system of the BWB before LISA System and operations Existing operations-optimum 5 3. Central control of the sewage-system Operations-concept Advantages
3 1. History The service and supervision of the Berlin wastewater pumping system has experienced diverse changes in the last 40 years. Since the 1960 s, a pumping-station-renewal-program was implemented in the western part of the city, that intended to automate 55 pumping stations until then operated mainly by hand and to concentrate the control and operations in main pumping stations. With the start of operations of the renewed pumping stations Bln IX in 1998 and Wilmersdorf in 1999 the completion of the program and with it the concentration on seven main pumping stations occupied by personnel (Zhl, Stg, Chb, Wil, Spa, Wit and Krb) was reached. The high stand of the automation-technology (programmable logic controller) as well as the control- and supervision-technology (LSX) allowed for a continuously personnelminimization in the operation of the pumping stations, which was realized in 1996 with the introduction of the new operation- and personnel-structure in the western part of the city. Parallel to this the wastewater pumping system as it was applied in the western part of the city was introduced also in the eastern part of the city after the consolidation of the VEB WAB Berlin with the BWB. The pumping stations of the eastern part were in extremely bad structural and technical conditions and were operated also mainly by hand. Differently to the western part of the city only a few pumping stations were fully renewed and the operation concept changed to inflow operation with deep set intakes and pumps with little astringencies. In order to reduce nevertheless the high costs for personnel a number of pumping stations (e.g. Ros, Buh, Fhg, Hdf, Kht I) have been automated and equipped with telecontrol using the existing buildings and pumps, knowing that this would mean a higher rate of faults and failures. In the eastern part of the city six main pumping stations with their associated pumping stations (Bri, Köp, Lbg, Mit, Mar and Pan) were formed. The mounting of the controland supervision-technology into the main pumping stations was finished with the realisation of the main pumping station Mitte (completion 2000). This included the supervision and telecontrolling of the affiliated automatically working pumping stations. Analogously to the western part of the city a new operations- and personnel-structure was introduced in the eastern part by , which led to a reduction of workplaces. Seven pumping stations (Bln IV, XI, XII, Grü, Joh at, Hgt, Hsch) were left for operation by hand until the renewal, still equipped with old pumping systems. The age-structure of the employees in connection with early retirement plans and partial retirement led to the problem that necessary positions could not be reoccupied with regard to the remaining staff. Unforeseen departures still reinforced this problem
4 2. Sewage-system of the BWB before LISA The operation of the sewage-system was as follows: Under sewage-system the entire system for the sewage disposal is understood. It includes the following components: Sewage-system = Sewer-network incl. storm water tanks Wastewater pumping stations Pressure mains system Wastewater treatment plants Discharge system of wastewater treatment plants 2.1 System and operations The present operations and the current plans can be described as follows: Sewer-network A management of the sewer-network doesn't take place normally for lack of available controls that can be operated. In addition to the existing weir Seestraße it is planned however to build more control-appliances. Because of the lacking sewer management, the sewer-maintenance can be enforced largely independently of the operation of pumping stations, sewer mains network or wastewater treatment plants. Controls of storm water tanks, mainly for emptying and cleaning, are realized by the pumping station personnel. Wastewater pumping stations and pressure mains system Basis of the sewage-distribution through the pumping stations are the controllable, maximum sewage-streams, which are following the demands of the wastewater treatment plants regarding the technical conditions and the treatment limits. For each wastewater treatment plant exists a so called coordinating main pumping station, which ensures the wastewater streams for the treatment plant by close adjustment with the other main pumping stations and the possibilities of the pressure mains system. The fulfilling of the wastewater treatment plant demands is largely guaranteed by the fact, that many pumping stations are able to reach several destinations using different pressure mains. The control of the pumps, that means turn on and turn off of the pumps as well as adjusting the flow of the bigger pumps where possible through speed-control, takes place essentially only as long-distance-hand-control from the responsible main pumping station, provided an intervention is necessary into the normally leveldependent automatic control. For control and supervision are all pumping stations assigned to one of the 13 main pumping stations run by personnel
5 In addition data are made available also for the coordinating main pumping stations, so that these can fulfil their tasks of wastewater delivery to the wastewater treatment plants. A comprehensive central control does not take place here, with exception of the assigned pumping stations. Some pumping stations, seven before the beginning of LISA, could be operated only by hand in the station and were therefore, as already mentioned, still occupied. The redistribution of the wastewater-streams partially takes place through valve changes initialized by the personnel of the main pumping station, partially however also through personnel of the pressure mains system on the spot in the streets. To the operation-tasks belong beside the control and supervision (operation) also following tasks: - Inspection of the installations - Recording of operation data, which are not yet transferred to the main pumping station - Fault-elimination in the continuous shift work - Cleaning of the suction-areas - Maintenance-tasks that are closely connected with pumping - Preparation of material - Inducement of maintenance of the equipment For this, altogether 544 employees including running of the pressure mains system and personnel of the headquarters were necessary after the alteration of the structure of the subdivision had taken place. Wastewater treatment plants Concerning the treatment of wastewater, the wastewater treatment plants are operated independently of each other in accordance with the inflowing wastewater. The operations are supported by automation-technology and control-systems, which are differently in the plants. - Discharge system of wastewater treatment plants Control-systems in the discharge system are normally not in the responsibility of the BWB, so that the operational activities include mainly the controls of the perfect condition of the discharge system. 2.2 Existing operations-optimum With the existing applied information- and control-strategy in the sewage-system could be reached the following: Sewage-distribution in accordance with the flow with restricted possibility of consideration of the current cleaning-capacity of the wastewater treatment plants. Optimization of the operation efficiency of the single wastewater treatment plant and the single main pumping station group
6 Observance of the critical values, especially of the wastewater quality, and optimization of the technical operation of the single wastewater treatment plant. 3. Central control of the sewage-system A system that further minimizes the expenditure for operation, control and supervision through automation must be found, in view of the decreasing financial resources. In the past mainly the different, historically grown automation-systems prevented a wide-range automation of the sewage-system. With the nowadays available systems including the possibility of creating networks it became significantly easier to realize such a project. 3.1 Operations-concept The central control of the sewage-system means that the operational processes of the system are observed, supervised and operated by personnel in a central control room. With a complex system as given, this can only be achieved for sure by using a process control system, which communicates with the decentralized automation units. Then, presumably such a system is installed; the tasks of the central control room consist essentially of the input of setpoint values for the central or local automation system, the input of control settings and the handling of failure or disruption information. Because of the complexity of the pumping system as well as the necessity to control hundreds of measuring points (e.g. levels, flows, pressure) simultaneously it is not possible to gain synergy effects only by centralisation of controlling and supervising. Furthermore the changing requirements for the system due to reconstruction or damages of mains, maintenance of the sewers or only weather conditions are a challenge for the central system. Therefore new process control schemes and functionalities of the control system for the general survey must be developed using only a limited number of monitors. An integral approach of the sewage-system and the following premises form the basics of the drafted operational concept: The control of the sewage-system takes place comprehensively regarding the treatment-capacities of the various wastewater treatment plants. The central control remains limited at first to the sewer and pumping system. The supervision and control of the sewage drainage and pumping system takes place in a central control room. This way the operational dependences of the single operationareas can be taken into account. The technical and operational structure of this central control room depends on the available technical possibilities at present. For the environmentally sound and economical operation of the entire sewage-system the information of the current treatment capacities has to be available also. Within the complete wastewater system the treatment plants are viewed as almost independent plants however and, like now, will be controlled by means of a local automation system
7 Following principles exist regarding the control of the sewage-system: Superior control- and operation tasks for management of the sewage-system are executed without exception only in the central control room. The reason for this is that all important data for the management of the sewage-system are available for evaluation and assessment. Local automation-tasks are executed decentralized. This is absolutely necessary for time or security-relevant processes. To the conditions of the outstations adapted, decentralized automation systems must be therefore present. Remote plant control by the central control room of the local automation system of a wastewater treatment plant is to be ruled out. The availability of the control- and automation-system must be defined; it is to be viewed in context with the personnel-allocation. For the handling of the control-tasks suitable displays must be created for the pumping procedures, which minimize the previous diverse actions, relieve and shorten the decision making, so that personnel-reduction is possible. Changes of the pressure mains, which are necessary for a save sewage-disposal, - pumping and distribution should become telecontrolled from the central control room also. Another important task of the central control system is the qualified treatment of malfunctions with a ranked alarm-concept respecting the single installations and the central control room. The fault clearing groups and maintenance workers are working in the single installation of any given pumping station directly. Accordingly, elaborate information of the current conditions of the single installation must be available or accessible on the spot. Advisably the personnel of the central control room prepare the information for reporting, documentation, archiving as well as administration and accounting of the sewagesystem altogether also. In addition the exchange of information with the supervising authority may be necessary. The availability of current weather-data (precipitation-heights, weather-radar-pictures) on the other hand admits improved prognoses respecting the forthcoming sewage-flows and enables interventions in the sewer- and pressurenetwork in advance, especially with locally restricted precipitation-events. Because of the complexity of the sewage-system, the staff should be supported in his decisions for the sewage-distribution by a model-supported prognosis-system, on the one hand in a technical sense, but on the other hand also concerning the economical operation of the system. This model-supported prognosis-system should only be realized in the second step, however. 3.2 Advantages After the implementation of this program, the following advantages are anticipated: The sewage discharge and wastewater pumping can be operated in an economical optimum
8 Savings regarding energy-use are to be expected. Decrease of mixed sewage outlets of the sewer system into surface-waters through comprehensive control of the sewage-system and optimal utilization of the existing capacities as well as through extensive and readily available data like e.g. radarweather-pictures and levels in the sewer-network. Diminution of the investment-expenses for spare capacities through flexible usage of plants and refined control-systems. Improvement of the information-preparation. Essential reduction of the personnel costs
9 Central management of Berlin waste waters Dr. Carin Sieker Berliner Wasserbetriebe 09. October 2006 Wastewater Works km Sewer network 80% separated sewerage 20% combined sewerage 147 Pumping stations km Force mains network 6 Wastewater treatment plants (incl. 2 operated by contract) m³/d Average treatment m³/d Maximum treatment Seite 3 For Berlin and Brandenburg: Berliner Wasserbetriebe Area of the city 889 km² Inhabitants Employees at BWB Trainees 386 Land Brandenburg Drinking water supply for inhabitants Wastewater treatment for inhabitants Schönerlinde Wansdorf Havelkanal Ruhleben Stahnsdorf Waßmannsdorf Seite 2 Münchehofe Seite
10 Wastewater Pumping System Berlins Bathing Water and Bank Filtration Areas Pumping stations 22 Stormwater tanks 1109 km Pressure mains 147 bathing water Seite 7 Seite 5 bank filtration (water supply) Wansdorf Stahnsdorf Ruhleben < 10 m3/s Inflow Brandenburg: 2,3 0,5 Münchehofe Distribution of Wastewater Waßmannsdorf Schönerlinde 7,2 m3/s 2,6 1,2 Treated Wastewater: 0,6 2-3 during dry weather in Summer Inflow and Emissions [m3/s] Seite 8 Seite 6 6-7
11 Board decision 0kt Implementation of a control and information system for the operation of the wastewater pumping and treatment system in Berlin with following components: - Control system - Optimisation system - Information system LISA Leit eit- und Informations nformationssystem Abwasser Control- and Information System for wastewater pumping and distribution in Berlin Seite 9 Seite 10 Control and Information System Wastewater Implementation Targets Total optimum for wastewater system Economical use of energy Reduction of stormwater overflows Improvement of provision of information Reduction of personnel costs Seite 11 Seite
12 Components of the control system - Super ordinate and centralised control unit - New automatic system (water level-flow-control) Ongoing Measures Increasing the Operational Efficiency Starting point LISA programme 146 pumping stations 13 executive pumping stations with on-site personal organised in shifts upgrading and automation of 44 pumping stations Criteria: daily dry weather flow > 6000 m³/d or max. flow > 100 l/s full automation of the 13 exec. stations one central control room ensuring remote action Seite 13 Seite 15 Components of optimisation An expert system is implemented which supports the operating engineers. It includes model simulation and forecast-data, e.g. weather forecast. Future control of wastewater system BWB-digital-network Water authority Meteorological service Central control room Sewers Pumping Rain tanks station Pressure pipes WWTP River, effluent Repair service Maintenance control order realisation information Seite 14 Seite
13 Future process control system LISA- workstations Archiving and logging (Protokollierung) LSX HPw 1 BWB WAN HPw 13 APw 1 APw 1 APw n APw n Operation and Control Centre Seite 17 Seite 19 Structure of the central control room central control room LISA Regional centre HPw Bln V Regional centre HPw Wil Regional centre HPw Chb I Pumping target Main-WWTP Schönerlinde (WWTP Mhf) Pumping target Main-WWTP Waßmannsdorf (WWTP Stdf) Pumping target Main-WWTP Ruhleben (WWTP Wan) Bln V Köp I Kar Wit Wil Mar I Bri Lbg Stg Zhl Chb I Spa I Bln II Seite 18 Super ordinate and centralised control unit Seite
14 Measures / Investments Reconstruction of machines and electro-technics in selected adapter and main pumping stations Electrification of shut-off valves in roads (in wastewater force mains network) Hard- and software for the superior process control system Upgrading / expansion of the measure and control technics in the wastewater system Project status (2) Since Mai of the former 13 pumping station groups are connected to and controlled by the central control centre, 21 pumping stations presently are under reconstruction, 12 pumping stations are still in the planning phase. 23 Seite 21 Project status (1) In the central control unit the operational test period began in November The control centre and the head quarter for the operation department of the pumping stations and pressure main network were implemented in the building of the main pumping station Bln V, Holzmarktstraße. The personal moved in January Problems and challenges Changes in organisation and infrastructure took place during full operation The documents and information used for planning differed from the on-site situation New requirements and gained experience often changed the project contents and working process Difficulties occurred during the implementation of the new software for the primary control system Operational problems existed with the new pumps with variable speed drive units (partial load operation) Failure of temporary/provisional arranged devices, e.g. pumps during the reconstruction phase have an immediate influence on the discharge situation
15 Thank you for your attention
WASTEWATER DEPARTMENT CITY OF MANNHEIM
WASTEWATER DEPARTMENT CITY OF MANNHEIM TABLE OF CONTENTS Key dates Locations und employees Organisation Distribution of staff Wastewater charges and expenses Expense distribution Sewage disposal Sewerage
More informationSewage Sludge Treatment in Large Cities Using the Example of Berlin
Sewage Sludge Treatment in Berlin Sewage Sludge Treatment in Large Cities Using the Example of Berlin Ulrike Franzke 1. Introduction...693 2. Locations and treatment methods...694 3. Disposal methods...695
More informationSimplification of dynamic flow routing models using hybrid modelling approaches two case studies
Simplification of dynamic flow routing models using hybrid modelling approaches two case studies P. Rouault 1 *, A. Fischer 2, K. Schroeder 1, E. Pawlowsky-Reusing 3, J. Van Assel 2 1 KompetenzZentrum
More informationHUBER Sewerage Program
WASTE WATER Solutions HUBER Sewerage Program Machines and system solutions for stormwater treatment and sewer system management Combined and Storm Water Treatment Innovative technology and solutions for
More informationTransfer reservoir as a new solution for transfer of stormwater to water receivers
Transfer reservoir as a new solution for transfer of stormwater to water receivers Robert Malmur 1,* 1 Institute of Environmental Engineering, ul. Brzeźnicka 60a, 42-200 zęstochowa, Poland Abstract. With
More informationOvercoming the barriers for Smart Water adoption
Overcoming the barriers for Smart Water adoption Carlos CAMPOS, Chief Operating Officer SUEZ Advanced Solutions May 5 th, 2018 BREAKTHROUGH INNOVATION IN THE WATER BUSINES IN THE XX CENTURY? 2 I 3 I 4
More informationStorm Water and Sanitary Sewer
Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements
More informationModernizing sewers and wastewater systems with new technologies
The Danish action plan for promotion of eco-efficient technologies Danish Lessons Modernizing sewers and wastewater systems with new technologies After continuous problems and challenges with dead fish
More informationSomerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility
Somerset Raritan Valley Sewerage Authority SSO Abatement and Storm Control Treatment Facility Michael Sanders, P.E., Kleinfelder Collection Systems Specialty Conference NEWEA September 12, 2016 Presentation
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationImplementation of a decision support system for global pump station control in Berlin
Implementation of a decision support system for global pump station control in Berlin Réalisation d un système d aide à la décision pour le contrôle global des stations de pompage de Berlin Kai Schroeder*
More informationWhangarei City Wastewater Reticulation: Service Level Improvements
5. Whangarei City Wastewater Reticulation: Service Level Improvements 2011-2019 Reporting Officer: Simon Weston (Group Manager Infrastructure & Services) Date: 29 June 2010 Local Government Act 2002 The
More informationRisk management of urban rain events in a coastal city. The case of Marseille
Risk management of urban rain events in a coastal city The case of Marseille Jean Claude GONDART General Secretary of the municipality of Marseille Dominique LAPLACE Manager engineering department SERAM
More informationA Homeowner s Guide to Evaluating Service Contracts
The Consortium of Institutes for Decentralized Wastewater Treatment A Homeowner s Guide to Evaluating Service Contracts Bruce J. Lesikar 1, Courtney O Neill 2, Nancy Deal 3, George Loomis 4, David Gustafson
More informationWaternamics. Resourcing the world. Veolia s Solution for Intelligent Water Networks
Veolia s Solution for Intelligent Water Networks Resourcing the world VERSION: MAY 2017 Veolia Australia and New Zealand National Office: Level 4, 65 Pirrama Road Pyrmont NSW 2009 Email: nationalanz@veolia.com
More informationControl Strategy Tool for Sewer Networks. Description and Implemention
Control Strategy Tool for Sewer Networks Description and Implemention 2014 PREPARED The European Commission is funding the Collaborative project PREPARED Enabling Change (PREPARED, project number 244232)
More informationAsset information. Summary. Description of the water system
Asset information Summary Two water intakes (Black Birch Stream and Glencoe Stream) with turbidity and flow metering. Five storage tanks (total capacity: 3,030,000 litres untreated, 2,960,000 litres treated),
More information1.0 Introduction / Study Area Authorization Purpose of Study Background 1
Table of Contents 1.0 Introduction / Study Area... 1 1.1 Authorization 1 1.2 Purpose of Study 1 1.3 Background 1 2.0 Existing Wastewater Treatment Lagoon... 2 2.1 Existing Lagoon System 2 3.0 Future Wastewater
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationHUBER Sewerage Program
HUBER Sewerage Program Machines and system solutions for stormwater treatment and sewer system management Equipment and system solutions for application in combined and separated sewer systems Advanced
More informationFROM THE CEO. Sameh Masry
An infrastructure utility Group of Companies specializing in the construction and operation & maintenance of water, power and transport systems. FROM THE CEO Sameh Masry Looking at the development and
More informationPortsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth
www.projectsonline.com water & Sewerage Portsmouth Flood Alleviation Scheme part of Southern s 50m programme of improvements to the sewer network in Portsmouth by Robert McTaggart BEng CEng CIWEM P ortsmouth
More informationMURDOCH RESEARCH REPOSITORY.
MURDOCH RESEARCH REPOSITORY This is the author s final version of the work, as accepted for publication following peer review but without the publisher s layout or pagination. http://researchrepository.murdoch.edu.au/20967/
More informationFLOOD RISK PREVENTION IN BARCELONA
FLOOD RISK PREVENTION IN BARCELONA Water and land resilience: building the future of the Metropolitan Area 4 July 2016 Milan Environment and Urban Services Urban Ecology Contents 1. Introduction 2. Flood
More informationGENERAL MAINTENANCE AND REPAIR
IS BASEMENT FLOODING A COMMON PROBLEM? Basement flooding is unfortunately a common occurrence in many parts of Canada. Basement flooding related insurance claims in Canada are estimated to be in the order
More informationPeople s Republic of China: Nanjing Qinhuai River Environmental Improvement Project
Draft Design and Monitoring Framework Project Number: 37603 December 2006 People s Republic of China: Nanjing Qinhuai River Environmental Improvement Project A design and monitoring framework is an active
More information2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law
ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver
More information13. High Rate Filtration Process
13.High Rate Filtration Process N. Horie 1, M.Kabata 2, K.Sano 3, S.Kanamori 4 Director, Chief Researcher,Senior Researcher 3, Researcher 4 First Research Department Japan Institute of Wastewater Engineering
More informationSPILL PREVENTION & RESPONSE
Revision Page: Page 1 of 13 Purpose The purpose of this plan is to document spill prevention and response requirements. Each HOUSTON, INC work site will develop a spill prevention and response plan based
More informationThe operator stated that the rollers in one of the drum filters was recently replaced.
vember 30, 2017 Hon. Carolyn Price, Supervisor Town of Windsor 124 Main Street Windsor, NY 13865 Re: West Windsor Sewer District Dear Supervisor Price: On vember 17, 2017, Department staff inspected the
More informationMilwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by
Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers
More informationA quantitative study on the effectiveness of a flexible sewerage system for disaster prevention environment issues
Urban Water II 279 A quantitative study on the effectiveness of a flexible sewerage system for disaster prevention environment issues H. Shirayanagi 1 & Y. Kitamura 2 1 Nara Prefectural Government, Japan
More informationHomeowner's guide to evaluating service contracts
B-6171 10-08 Onsite wastewater treatment systems Figure 1: A septic tank and soil absorption field system. Homeowner's guide to evaluating service contracts Bruce J. Lesikar, Courtney O'Neill, Nancy Deal,
More informationBrief description, overall objective and project objectives with indicators
Jordan: Sewage Disposal Greater Irbid I Ex post evaluation report OECD sector 14020 / Water supply and sanitation large systems BMZ project ID 1992 66 180 BMZ Project-ID and related training measure Project-executing
More informationPROJECT RECOMMENDATION
4 th Street-Douglas Sewer This project includes replacement of failing sections of sewer mains, manhole reconstruction or replacement, clean-outs, and service lateral repairs in Fourth Street, Douglas.
More informationAvailability of CSO Control and Flood Control of Real-Time
Availability of CSO Control and Flood Control of Real-Time Control System in Urban Pumping Station Kiyohito Kuno 1, Tadao Suzuki 1* 1 Bureau of Sewerage, Tokyo Metropolitan Government *To whom correspondence
More informationONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008
ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the
More informationOPERATIONAL DECISION SUPPORT SYSTEM
OPERATIONAL DECISION SUPPORT SYSTEM APPLIED TO THE LISBON COMBINED SEWER SYSTEM: THE CASE OF AN EXTREME RAINFALL EVENT Nuno Pimentel 1, Pedro Póvoa 1 and José Saldanha Matos 2 1 R&D Department, Águas de
More informationCHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA
CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)
More information9-1. Wet-weather high-speed wastewater filtration system
9-1.Wet-weather high-speed wastewater filtration system N. Horie 1, M.Kabata 2, K.Sano 3, S.Kanamori 4 Director, Chief Researcher,Senior Researcher 3, Researcher 4 First Research Department Japan Institute
More information2015 Annual Report. Magic Lake Estates Water and Sewer Services Annual General Meeting August 13, 2016
2015 Annual Report Magic Lake Estates Water and Sewer Services Annual General Meeting August 13, 2016 Malcolm Cowley, P.Eng. Manager, Infrastructure Engineering Presentation Overview Purpose of the Annual
More informationAquatronics. Course 6: Energy optimization in water supply and wastewater treatment systems Course 7: Fundamentals of closed-loop control technology
Aquatronics By 2030, 47% of the world s population is expected to live in regions without access to safe drinking water. This already applies to 900 million people today, which makes ensuring a stable
More informationBefore the Southland Regional Council (Environment Southland) Hearing Commissioners
Before the Southland Regional Council (Environment Southland) Hearing Commissioners Under In the matter of the Resource Management Act 1991 (RMA) the proposed Southland Water and Land Plan (pswlp) Evidence
More informationAPPENDIX 14. Inflow and Infiltration in the CRD
APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and
More informationSTANDARD SUMMARY PROJECT FICHE: PROJECT PL Project Title: Waste Water Treatment Plant "FORDON" in Bydgoszcz Sub-programme: Environment
STANDARD SUMMARY PROJECT FICHE: PROJECT PL9806.04 Project Title: Waste Water Treatment Plant "FORDON" in Bydgoszcz Sub-programme: Environment Location: Bydgoszcz Objectives: Construction of a mechanical
More informationPublic Sewer System Informational Meeting
Public Sewer System Informational Meeting May 22, 2018 History Previous Studies 1998 Sewer District #1 1999 Village of Leicester Sewer Study 2002 Mount Morris Main Street Sewer 2002 Sewer District #1 2017
More informationTunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions
City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles
More informationRECOMMENDATION PREVIOUS REPORTS PERTINENT TO THIS MATTER STRATEGIC PLAN
TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 21, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES & CITY ENGINEER WASTEWATER
More informationHydroSelf flushing system
Basics of HydroSelf flushing system in rectangular tanks, round tanks and tunnel sewers Dipl.-Ing. Joerg Steinhardt Dipl.-Ing. Bernhard Hommer September 2006 HydroSelf flushing system Basics of wave flusher
More informationWater / Wastewater Fund
WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services
More informationPalmerston North City Council Policy
Palmerston North City Council Policy PRESSURE SEWER S YSTEMS POLICY - DRAFT SEPTEMBER 2018 Oasis 8384024 Palmerston North City Council Pressure Sewer Systems Policy September 2018 1 Introduction... 3 2
More informationDesign of a district water and wastewater system under the concepts of DESAR and water metabolism
Design of a district water and wastewater system under the concepts of DESAR and water metabolism Prof. Xiaochang C Wang Xi an University of Architecture and Technology, Xi an China Outlines Introduction
More informationIncentives to installing a functioning FOG Control Ordinance And Use of an Easy-to-Install Ultrasonic Remote Interceptor Monitoring Device
Incentives to installing a functioning FOG Control Ordinance And Use of an Easy-to-Install Ultrasonic Remote Interceptor Monitoring Device FOG Problems Business/Loss of Profits - Immediate financial burden
More informationWater / Wastewater Fund
WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services
More informationSewer Pipe Management and Maintenance. Tokyo Metropolitan Government Bureau of Sewerage, Pipeline Management Section
Sewer Pipe Management and Maintenance Tokyo Metropolitan Government Bureau of Sewerage, Pipeline Management Section Outline Management and maintenance Sewerage in Tokyo (23 Wards) General Sewer Facilities
More informationRosemount Custody Transfer System. Accuracy driven profit
Rosemount Custody Transfer System Accuracy driven profit Built on Emerson s existing and widely used Overflow Control technology, the new Rosemount Custody Transfer System is the most accurate and reliable
More informationVerification of the combined sewage system simulation model based on the example of the city of Głogów
Verification of the combined sewage system simulation model based on the example of the city of Głogów Ireneusz Nowogoński 1,*, and Ewa Ogiołda 1 1 University of Zielona Góra, Faculty of Civil Engineering,
More informationEXISTING SEPTIC SYSTEM INSPECTION REPORT CONNECTICUT RECOMMENDED MINIMUM
PROPERTY INFORMATION Address Type of Dwelling or Use EXISTING SEPTIC SYSTEM INSPECTION REPORT CONNECTICUT RECOMMENDED MINIMUM Town Date CLIENT INFORMATION Name Mailing Address Town State Agent Name Send
More informationWhat is a stormwater utility fee?
What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville
More informationWorld Class Control Rooms. Secure, cost-effective and flexible WEY Solutions
World Class Control Rooms Secure, cost-effective and flexible WEY Solutions Tailor-made solutions of unsurpassed quality With a Control Room Solution from WEY, Operations/IT Managers, Operators and Users
More informationBusiness Plan: Wastewater Removal and Stormwater Management
Business Plan: Wastewater Removal and Stormwater Management How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with
More informationModule 2 : System of Sanitation. Lecture 2 : System of Sanitation
1 P age Module 2 : System of Sanitation Lecture 2 : System of Sanitation 2 P age 2.1 BACKGROUND For safe disposal of the sewage generated from a locality efficient collection, conveyance, adequate treatment
More informationSTEERING COMMITTEE MEETING #6
STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table
More informationDecision Support for managing substance flows within the Berlin water cycle under climate change conditions
Decision Support for managing substance flows within the Berlin water cycle under climate change conditions M. Rustler 1, D. Scharffetter², A. Lompa 1, T. Taute³, A. Sperlich², R. Gnirss², G. Grützmacher
More informationWater, Wastewater and Refuse
Water, Wastewater and Refuse - 116 - Wastewater KEY FACTS Council operates and maintains: 17 wastewater systems 16 wastewater treatment plants (11 ponds, 4 activated sludge plants) 333 kilometres of sewer
More informationAppendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM
Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address
More informationSmart Stormwater Harvesting Management with Next Generation Smart Metering
Smart Stormwater Harvesting Management with Next Generation Smart Metering Guenter Hauber-Davidson, Managing Director, WaterGroup Pty Ltd, ghd@watergroup.com.au Allison Balberg, WaterGroup Abstract A large
More informationSTORMWATER OPERATION AND MAINTENANCE AGREEMENT
STORMWATER OPERATION AND MAINTENANCE AGREEMENT Project Name: Town Project Number: PIN Number: Mail after recording to: Town of Mooresville Development Services Department Stormwater Program Specialist
More informationModelling a Combined Sewage and Stormwater Flood Detention Basin
Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip
More information: Performance for Customers
Table 1 Overall performance assessment (OPA) planned outputs - water Block A Water supply - levels of service Line 1 Inadequate Pressure - Properties below reference level at end of year The total number
More informationSANITARY SEWER BACKUP
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
More informationSSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter
Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some
More informationInnovative testing of advanced PLCs of sewage water pumping stations
Innovative testing of advanced PLCs of sewage water pumping stations Ivo Pothof, Kees Kooij Industrial Flow Technology, WL Delft Hydraulics P.O. Box 177 2600 MH Delft, The Netherlands ivo.pothof@wldelft.nl,
More informationNEW SOLUTIONS AND UPDATES FOR THE BAY PARK SEWAGE TREATMENT PLANT TO SAVE THE WESTERN BAYS
NEW SOLUTIONS AND UPDATES FOR THE BAY PARK SEWAGE TREATMENT PLANT TO SAVE THE WESTERN BAYS JUNE 27, 2017 BRIAN SCHNEIDER NASSAU COUNTY DEPARTMENT OF PUBLIC WORKS NASSAU COUNTY NITROGEN REDUCTION INITIATIVES
More informationIDS Pipeline Automation Reliable and cost-effective Solutions
IDS Pipeline Automation Reliable and cost-effective Solutions Our Solutions Standardised or Individual Thecostefficiencyofapipelinesystemisdeterminedby avarietyoffactors.ontheonehand,itmustbeusedto thebestpossiblecapacity,anddowntimesmustbeavoided.ontheotherhand,thesystemrequirescontinuous
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 1999 SESSION LAW HOUSE BILL 1602
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 1999 SESSION LAW 2000-70 HOUSE BILL 1602 AN ACT TO CLARIFY THAT STORMWATER UTILITY FEES MAY BE USED TO FUND ALL COSTS OF STORMWATER MANAGEMENT PROGRAMS, AS RECOMMENDED
More informationHorizon 2020 Steering Committee Water and Wastewater Master Plan Overview
Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview August 11, 2014 Let s Look at the Numbers Water System 2 - Raw Water Sources Clinton Reservoir Kansas River 2 - Water Treatment
More informationGERMAN ATV-DVWK RULES AND STANDARDS. STANDARD ATV-DVWK-A 157E Sewer System Structures
GERMAN ATV-DVWK RULES AND STANDARDS STANDARD ATV-DVWK-A 157E Sewer System Structures GERMAN ATV-DVWK RULES AND STANDARDS STANDARD ATV-DVWK-A 157E Sewer System Structures ISBN 978-3-937758-46-6 Publisher/Marketing:
More informationRULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM
RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER 0400-46-01 PRIORITY RANKING SYSTEM TABLE OF CONTENTS 0400-46-01-.01 Priority Ranking System: General 0400-46-01-.03
More informationMartinborough Wastewater Treatment Plant - Operation & Maintenance Manual
Martinborough Wastewater Treatment Plant - Operation & Maintenance Manual South Wairarapa District Council March 2014 Working Draft Martinborough Wastewater Treatment Plant - Operation & Maintenance Manual
More informationTHE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT
THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL
More informationSummary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2
Summary of LAE ONTARIO 1. Requiring SPC approval: LO SEW 3 LO FUEL 2 2. Information (editorial, revised, new): LO G 1 (revised) LO NGS 1 (revised) LO G 2 (revised) LO SEW 2 (revised) LO G 6 (revised) LO
More informationFindlay Performs. As of September 30, 2018 (unless otherwise noted)
Findlay Performs Findlay Performs connects the performance of City departments to the City s Strategic Plan. Our Journey framework is a map for the City s overall direction and lays out our Vital Few Objectives.
More informationIntegrated Catchment Modelling
Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration
More informationAI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS
AI-05-CCTV INSPECTION OF EXISTING PIPELINES PRIOR TO OTHER WORKS Ver.1 Date: October 2014 1. SCOPE This section covers the inspection of existing sewer and stormwater pipelines before and after the construction
More informationAppendix C Regulatory Aspects
Appendix C Regulatory Aspects APPENDIX C NUMERICAL PERFORMANCE DESCRIPTIONS OF DEVICES ACHIEVING STANDARDS FOR PROTECTING AMENITY USES This Appendix provides numerical information about the performance
More informationPublic Information Centre No. 1
Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation
More informationIntegrated Urban Water Resources Management in Sri Lanka Background, Issues and Training Needs
Integrated Urban Water Resources Management in Sri Lanka Background, Issues and Training Needs N.T.S. WIJESEKERA Department of Civil Engineering University of Moratuwa, Moratuwa, Sri Lanka SRI LANKA The
More informationWastewater Discharge Reduction Plan June 2016
Wastewater Discharge Reduction Plan June 2016 Version 3 1 TABLE OF CONTENTS Our Plan on a Page 3 Section 1 Plan Framework 4 1.1 Background 5 1.2 What s the problem? 6 What causes the problem? 6 What s
More informationBEUMER palletizing technology: quick, gentle and safe stacking.
Conveying technology Loading technology Palletizing technology Packaging technology Sorting and distribution technology BEUMER palletizing technology: quick, gentle and safe stacking. BEUMER palletizing
More informationSECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities
Water Sector Improvement Program (RRP PAL 44031) SECTOR ASSESSMENT: WATER AND SANITATION Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Anticipated water supply shortfall by 2010.
More informationMCBERNS ZC SERIES ODOUR FILTERS STANDARD SPECIFICATION
MCBERNS ZC SERIES ODOUR FILTERS STANDARD SPECIFICATION 1 INTRODUCTION The McBerns ZC series odour filters are designed for sewage pump stations, trunk sewerage systems, storage tanks, sewer air release
More informationSummary of the diploma thesis. "Feasibility study on wastewater disposal in the rural county of Galati (Rumania)" by Hanna Möller
Summary of the diploma thesis "Feasibility study on wastewater disposal in the rural county of Galati (Rumania)" by Hanna Möller Table of contents Introduction... 3 Description of the current situation...
More informationExhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas
Exhibit A Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas Intent and Purpose The City of Lawrence has begun a Rapid Inflow and Infiltration (I/I) Reduction Program.
More informationProcess Automation Upgrade of the Gilder Creek WWTP: Results
Process Automation Upgrade of the Gilder Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Scott Whitmore, P.E. CDM Smith, Maitland, Florida Sothorn Khel, P.E. MR
More informationBusiness Plan Summary
Owner: 2012-2016 Business Plan Summary Program Environmental Services Service grouping Wastewater & Treatment Service Wastewater Removal and Storm Water Management Type Public Service Ron Standish, Director,
More informationConstruction of first wastewater treatment plant in Kosovo: an EU pilot project
Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street
More informationNumerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area
Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Kenji KAWAIKE* and Hajime NAKAGAWA* *Disaster Prevention Research Institute, Kyoto University (Received:
More informationTITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
250-RICR-150-10-4 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 150 WATER RESOURCES SUBCHAPTER 10 - WASTEWATER & STORMWATER PART 4 Rules and Regulations for the Operation and Maintenance of
More informationHydraulic Modeling of Deep Tunnel Provides Cost Savings
5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection
More information