1 10 th edition TEN-YEAR NETWORK DEVELOPMENT PLAN

2 contents Profile...1 Framework of the GRTgaz ten-year network development plan...2 Foreword by the managing director...4 Summary evolution and prospects for the gas market in europe 1.1 A new drop in European consumption in World prices again contrasted in Stabilisation of supplies Uncertainty over long-term demand The European energy policy and its objectives Development of gas infrastructures in Europe Major European infrastructure projects evolution and prospects for the gas market in france 2.1 Diversified supply sources Decreasing consumptions in The role of gas in the energy transition Gas demand forecast Public service obligations in the event of exceptionally cold spells The alternative scenarios for the period up to The transmission offer of GRTgaz Demand for transmission capacity on the GRTgaz network development of the grtgaz transmission network 3.1 Developing the transmission network: process and timelines Project portfolio changes A single marketplace in France in Developments in the North Zone Developments in the South Zone Other development projects Infrastructure to be commissioned over the next three years ( ) Infrastructure commissioned after Forecast capacity development for Meeting of demand for gas in France in annexes annexe 1 annexe 2 annexe 3 Interconnection points: subscription and utilisation rates...72 Determination of the network s commercial capacity...74 Execution of major projects...76 Glossary...78 Flap 1 Map of the GRTgaz network in 2015 Flap 2 Map of the GRTgaz network in 2024

3 map of the grtgaz network in 2015 Dunkirk 570 H 640 B 230 Taisnières 620 Obergailbach North PEG Montoir-de-Bretagne 370 Trading Region South Oltingue Jura TIGF Fos Tonkin Fos Cavaou 410

4 key figures for ,153 km of high-pressure pipelines National network Regional network Balancing zone 3 LNG terminals 1 LNG terminal under construction Network interconnection points 14 underground storage facilities 27 compression stations 1 compression station under construction 583 TWh transported energy i.e. 51 billion cubic metres of which: 392 TWh consumed 78 TWh stored 113 TWh transiting 640 TWh traded at the PEGs Direction of flow of natural gas Firm capacity in GWh/d 129 shippers 802 connected customers including: 17 distribution system operators 12 power generation plants 773 industrial consumers Staff of 2,965 Investments of 663 M Turnover of 2.05 billion

5 _ 1 PROFILE GRTgaz working for a secure and competitive energy supply and forward-looking energy solution GRTgaz is the operator of the high-pressure natural gas transmission network over most of France. It helps to ensure efficient operation of the natural gas system bringing gas to consumers: the industrial facilities directly connected to the transmission network, including gas-fired power plants; the households, communities and enterprises connected to the public distribution networks that in turn are supplied by the transmission network. The GRTgaz network is a major network at the heart of Europe. Connected to the Norwegian, Belgian, and German networks, the Italian network via Switzerland and the Spanish network via TIGF, as well as LNG terminals on the Atlantic and Mediterranean coasts that can be supplied with gas from all over the world, it provides access to diversified sources and facilitates gas trading across Europe. GRTgaz thus contributes to enhancing energy security for France and the rest of Europe, and to the completion of an integrated, efficient and competitive natural gas market. France and Europe have undertaken an energy transition that will have to combine security of supply, competitiveness and sustainability. The gas infrastructures, and in particular the transmission networks, have a key role to play in meeting these challenges and dealing with the development of sustainable energy systems. The aim of GRTgaz is to place its network, its offers and its skills at the service of energy solutions of the future in France, in Europe and worldwide.

6 2 _ FRAMEWORK FOR THE GRTgaz S TEN YEAR NETWORK DEVELOPMENT PLAN framework for the grtgaz s ten year network development plan The Energy Code transposes into French law the European directive setting out the access conditions to the gas infrastructures and the common rules applicable to the national natural gas market. Within this framework, each year GRTgaz draws up a ten-year development plan for its gas transmission network in France (1) and submits it to the Energy Regulation Commission (CRE) for examination. The ten-year GRTgaz plan lies within the framework of the European and French energy policies. It integrates the obligations placed on transmission operators regarding security of supply. It takes into account the expectations and projects of stakeholders at national, regional and European levels. It is based on existing gas supply and demand as well as reasonable forecasts as to medium-term development of gas infrastructures, consumption and international trading. It identifies the main gas transmission infrastructures to be built or enhanced over the next ten years. It lists the investments confirmed or to be made over the next three years. It sets out a provisional planning for all the investments mentioned, making a distinction between projects that have been confirmed and those that have not. The analysis and the projects set out in this document concern mainly the national network. The transmission network is indeed divided up into two units: the national network links the interconnection points with the adjacent transmission networks, natural gas terminals and storage facilities. It consists of pipes with diameters of 600 mm to 1,200 mm, and it features a meshed part in which the gas can flow in both directions: the core network. The investments made on the core network provide potential benefits for all the entry and exit points in the balancing zone concerned (2) ; the regional network carries gas from the national network to the distribution networks and the major industrial consumers, and also to gasfired power plants. It consists of pipes whose diameter is generally less than 600 mm, and other than in specific cases, the gas can only flow in one direction. 1. European directive No. 2009/73/CE and order No dated transposing the directive into French law. 2. In France, a shipper can request transmission of his gas from any entry point to any exit point in a given market zone, within the limits of the capacity subscribed at the various points. His only obligation is that of balancing incoming and outgoing quantities over the gas supply day. In 2014, GRTgaz had two balancing zones: the North zone and the South zone.

7 _ 3 FRAMEWORK FOR THE GRTgaz S TEN YEAR NETWORK DEVELOPMENT PLAN Identification of new projects or new requirements relies on an extensive consultation process: the Gas Consultation in France, the North-West and South regional gas initiatives (GRI (3) ) at a regional level, the work executed under the aegis of the ENTSOG (4) to draw up the regional investment plans (GRIPs) and the Ten Year Network Development Plan (TYNDP) covering the European gas network, of which the fourth edition was published in 2015, together with bilateral discussions with adjacent system operators or project promoters. The CRE collects market opinions, checks that the investment needs are actually covered, and makes sure of the coherence of the national plan with the European ten-year network development plan (TYNDP). It checks execution of the investments covering the first three years, which are binding. Within GRTgaz, the compliance manager (5) checks the correct implementation of the plan. Subject to the competencies assigned specifically to the CRE, his mission, set out by the Energy Code, consists of ensuring that the GRTgaz practices comply with its obligations as an independent transmission network operator (ITO). The development plan takes into account the results of the public consultation made by the CRE in November 2014 and the CRE deliberation dated 17 December 2014 (6). It has been examined jointly in coordination with TIGF. It integrates the elements included in ENTSOG TYNDP together with the elements contributed by the adjacent operators. In this respect, it is useful to point out that a considerable proportion of the structures to be built or enhanced is conditioned by the projects of other operators whose investment decisions have not yet been taken. For projects awaiting a decision as to execution, the financial elements presented are based on estimations and are provided for information purposes only. Taking into account uncertainty related to market and project development in an ever evolving energy context, this document is not binding on GRTgaz beyond its legal obligations regarding execution of the developments envisaged. 3. The Gas Regional Initiative, implemented in 2006 as an intermediate step in the transition from national electricity and gas markets to a single internal energy market. France participates in two of the three regions defined for gas. 4. The European Network of Transmission System Operators for Gas, the association of European gas TSOs. 5. Bertrand Lombard: bertrand.lombard@grtgaz.com. 6. Deliberation of the Energy Regulation Commission dated 17 December 2014 covering examination of the ten-year network development plan and approving the GRTgaz investment programme for 2015.

8 4 _ FOREWORD In many ways, the 2014 economic and gas situation in France reflected that of 2013: consumption fell slightly and low LNG supply required large North-South flows towards the country s South Zone as well as the Iberian Peninsula. Meanwhile, GRTgaz has pursued its efforts, through greater cooperation with adjacent gas infrastructure operators, to optimise THIERRY TROUVÉ, MANAGING DIRECTOR the use of its network. Consequently, at the beginning of 2015, a single Title Transfer Point in the south of France common to the GRTgaz and TIGF Balancing Zones was commissioned. This contractual streamlining, which aims to make the market in the south more flexible, was based on the concept of a Trading Region, a first in Europe. Furthermore, access to the GRTgaz South Zone, which had already been improved thanks to cooperation with Storengy (JTS), was further enhanced by a mechanism that uses Elengy s LNG terminals storage capacity ( circulating gas ) and by new commercial capacity offered at the entry point of the South Zone from Switzerland. Following cost-benefit analysis widely shared with market players, GRTgaz also launched projects to strengthen the network between the north and the south of France, involving the extensive participation of all public authorities. In 2018, France will thereby benefit from a robust gas transmission network that is able to offer French consumers a more secure and competitive supply. After 2020, potential development of GRTgaz network primarily aim to further incorporate south-western markets into central European markets and to offer the latter a better access to LNG from the Atlantic and Mediterranean basin. Most of these projects require a substantial increase in transmission capacity within France and, therefore, major investments in the GRTgaz network. The decision on whether or not to develop this new infrastructure will have to be based on the sustainability of demand and alternative terrestrial or maritime supply solutions. In the light of these factors, most of the adjacent gas infrastructure project promoters have postponed their projects in comparison of last year s plan. Only capacity developments requiring little investment and that are useful and sustainable over the long term, such as the creation of entry capacity at Oltingue, currently have the support of market players. However, the biggest development over the past few months in France is, undoubtedly, the Law on energy transition for green growth (LTECV), which is the outcome of broad consultations with the various stakeholders. This law, which is consistent with European guidelines revised a few months earlier, aims to drastically reduce the volume of fossil fuels and greenhouse gas emissions; it defines goals unfavourable to natural gas. Nevertheless, certain provisions mean that natural gas, a storable source of energy that is also the least polluting fossil fuel, could play a positive role in the area of mobility, the production of electricity due to the intermittent nature of renewables and caps on electricity production from nuclear sources. The emergence of renewable gas enhances the appeal of gas in the light of this outlook. More generally, gas infrastructure and, in particular, the gas transmission network constitute a powerful asset that could benefit the energy transition process. Nevertheless, the place of gas in the energy mix still remains relatively uncertain. So that the gas industry can fully contribute to the development of French energy mix, some orientations that are favourable to gas will have to be confirmed and reflected in all future laws and regulations, particularly the Multi-annual energy programme and new Thermal regulations, which are currently being drafted. Transmission networks have confirmed their central role with regards to facilitating the energy transition process (solidarity of regions, synergies between energy sources) and to strengthening market integration (access to the most competitive and secure energy). The development of the networks, which are very capital intensive, can only be considered in response to a sustained requirement shared by all market players and within a stable regulatory framework. This tenth GRTgaz Ten-year network development plan aims to contribute to discussion by providing an insight into the transmission infrastructure projects that may be envisaged over the next ten years and the challenges to which they respond. I hope you enjoy reading it.

9 _ 5 SUMMARY summary With over 2 billion euros invested over the period, GRTgaz has continued to execute its development programme to increase its interconnection capacities with the adjacent networks, facilitate access to the gas market, and ensure its efficient operation. The forthcoming implementation of the core network reinforcement in the north of France and the link with Belgium will enable gas importation via the fourth French liquefied natural gas terminal in Dunkirk, in late 2015 or early The existing network has also shown its robustness regarding gas transmission, even during very cold spells, while freeing up the capacities necessary to enable shippers to take advantage of the most competitive sources. Because of its geographical situation, France occupies a key strategic position in Europe, and these investments make efficient contributions to security of supply and integration of the European gas markets. The GRTgaz investment programme ties in well with these prospects. By 2018, the simplification of the market organisation in France will lead to creation of an open, competitive single wholesale market.

10 6 _ SUMMARY gas: a credible solution for energy consumption with a small carbon footprint Since 2010, natural gas consumption has slackened off in Europe as a whole, and also in France, under the combined effects of the economic slowdown, competition from coal for generation of electricity, and the progress made in energy efficiency. In 2014, consumption was especially affected by the exceptionally mild climate, with a fall of 16% in France and 11% in Europe as a whole. In Europe, the Energy Union launched in 2015 is aimed at establishing a sustainable energy system that is able to reconcile security of supply and prevention of global warming with economic competitiveness by giving priority to research and innovation. The European Union has set itself the objective of reducing its greenhouse gas emissions by 40% in 2030 as compared with France, for its part, has entered into similar undertakings by aiming at a 30% reduction in is fossil fuel consumption as compared with the 2012 reference level, with adoption of the Law governing Energy Transition for Green Growth (LTECV) in July In this context, natural gas has the advantage of being among the energy sources that emit the lowest levels of CO 2. Abundant, competitive and easy to store, it is in a strong position as regards energy transitions. Development of renewable energy sources (wind power and photovoltaic systems) can be enhanced by careful management of their intermittency; the share of nuclear power could be reduced from 75% to 50% by These two factors could encourage use of gas for electricity generation, instead of oil- or coalfired plants, which emit higher levels of pollution. Development of natural gas in the fields of transport or heating could also help reduce peak demand of electricity requirements and set up an energy mix with a small carbon footprint. Lastly, local production of renewable gas, such as biomethane via methanisation or synthetic methane via Power to Gas, will enable cuts in importation requirements, and hence reduce French energy dependence, while setting up an intelligent bridge between electricity and gas. These evolutions give the transmission network a key role in the French energy system to facilitate solidarity between territories. Whatever the choices made, gas and its infrastructures have a major role to play in the future energy mix. The forecasts as to evolution in demand for gas vary widely over the period covered by the plan, depending on the hypotheses adopted concerning the various development factors. The graphs below show the different scenarios explored by GRTgaz: the reference scenario, which entails falls of about 0.7% per year, and two contrasting alternative scenarios, Less 30 and Diversified Uses. These scenarios illustrate the uncertainties surrounding the long-term levels of gas demand, even though gas remains an essential part of the energy mix in all cases. The Pluriannual Energy Programming system is likely to shed fresh light on the question. To make its contribution to the ongoing discussions, GRTgaz has gone over the hypotheses underpinning these different scenarios in great detail.

11 _ 7 SUMMARY TOTAL CONSUMPTION (TWh) TWh Less 30 scenario (LTE) Diversified Uses scenario AMS2 - DGEC scenario GRTgaz-2015 scenario (reference) GRTgaz-2015 scenario (with development of gas mobility) new transmission infrastructures in europe In spite of the potential erosion in gas consumption in Europe, the falls in production in the North Sea are likely to entail increased importation requirements by As things stand, only Russia and the world LNG market would seem big enough to meet these new requirements. It will be necessary to open up new importation channels - doubling the Nord Stream is a solution that is being examined this year, for example - and adapt the core European network to absorb the new flow configurations that the fall in production will entail. The role of gas in the energy transition constitutes another potential factor of change in uses of gas networks. The flows will have to adapt to diffuse local production of biomethane, while providing solidarity among the territories. Depending on the constraints and ambitions involved, development of gas-fired electricity production could entail an even more flexible, reactive network to meet the peak generation requirements. Over the longer term, development of the infrastructures underpins the European energy policy priorities: reaching full integration of the European market, security of supplies, competitiveness and sustainability. The latest edition of the Network Development Plan (TYNDP ) drawn up by the ENTSOG shows that apart from the most outlying regions (Baltic, south-east and Iberian peninsula), the market integration has already seen considerable progress. The trend is confirmed by the convergence of market prices in north-west Europe. The future developments will be aimed at reducing isolation and reaching a high level of flexibility within the European network to ensure enhanced market integration. The

12 8 _ SUMMARY European Union is encouraging their implementation by setting aside 5 billion euros for development of energy infrastructures between 2014 and 2020, and drawing up a list of the Projects of Common Interest that can claim European backing. The GRTgaz projects, several of which are on that list, contribute to reinforcing the North- South corridor in the west of Europe. the grtgaz development projects 2015 is seeing completion of the facilities necessary to link up the new natural gas terminal in Dunkirk. The terminal is to be put into service in late 2015 or early 2016, and it will provide an annual capacity of 13 bcm for the French and Belgian markets. The work to connect the terminal involved major reinforcement of the network towards the east, with doubling of the Hauts de France pipeline over 174 km, extended by the Arc de Dierrey, a new gas pipeline 308 km in length between Cuvilly and Dierrey, the last part of which is to be put into service in A new exit capacity is also to be created in late 2015 at Alveringem, with commissioning of the Flanders pipeline, which will carry up to 8 bcm of non-odorised gas per year to Belgium. A new entry capacity will then be created from Switzerland and Italy to Oltingue in 2018 to connect the French and Italian markets and reinforce the flows from south to north. The market organisation in France is being simplified at the same time. An initial stage was reached in April 2015 by setting up the TRS, a common market area in southern France, made up of the TIGF and GRTgaz South areas. The process will be completed in 2018 with commissioning of the facilities forming part of the Val de Saône and Gascogne-Midi programmes. These facilities will avoid congestion on the North-South link, thus enabling creation of a single market area for France. New interconnections with Spain and Germany are envisaged for 2021/2022, to further strengthen the North-South corridor for the west of Europe. The projects to increase the regasification capacities at Fos and Montoir, together with development of the underground storage facilities at Manosque, could also entail network reinforcements. Lastly, towards the end of the period covered by the plan, GRTgaz is preparing to adapt its network in order to ensure transmission continuity for customers currently supplied with L-gas (a low calorific value gas) from the Groningen field in the Netherlands, which is nearing the end of its commercial service life. As things stand, a joint analysis with TIGF enables us to ensure that the peak requirements can be met up to the end of the period covered by the plan under all the demand scenarios, taking into account the forecast entry capacities for the French transmission network.

13 _ 9 SUMMARY DEVELOPMENT OF FIRM ENTRY AND EXIT CAPACITY Entry capacity GWh per day 2015 (1) Confirmed Envisaged (2) 2024 (3) Norway (Gasco) Germany Belgium (H gas (4) ) Belgium (B gas (5) ) Spain (via the TIGF network) Switzerland / Italy LNG terminals in the North zone ,340 LNG terminals in the South zone Total 3, ,007 3,415-4,692 Exit capacity GWh per day 2015 Confirmed Envisaged 2023 Belgium Germany Switzerland / Italy Spain (via the TIGF network) Total Creation of a TIGF-GRTgaz Sud trading region on 1/4/ Subject to network reinforcement. 3. The merger of the zones in 2018 could entail further evaluation of capacity. 4. H gas: Gas with a High Calorific Value, usually containing over 90% of methane. 5. L gas: Gas with a Low Calorific Value, from the Netherlands, and distributed in the north of France. This gas can be distinguished by its higher nitrogen content.

14 10 _ 1EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE The mild weather in 2014 amplified the decrease of European gas consumption. It had already slackened since 2011, due to the economic slowdown and strong competition from coal and renewable energy sources for electricity generation. Industrial competitiveness is also affected by gas prices in Europe, which are three times higher than in the USA. The dynamic Asian markets have continued to attract worldwide LNG supply in 2014: LNG deliveries in Europe have been halved since However, the fall in oil prices since August 2014 could well change things. LNG prices have fallen in Asia, following notably the restart of nuclear power plants in Japan and the commissioning of new liquefaction facilities. Thus LNG is arriving in Europe again, leading to lower prices in the South of France and the Iberian Peninsula, a region characterised by its reliance on LNG. In a context in which reduction of greenhouse gas emissions constitutes a priority, evolution of gas demand remain uncertain over the medium term. Nevertheless, Europe will certainly have to increase its importats to make up for the declining production in the North Sea and the Netherlands. New infrastructures will be necessary to secure the importation routes, diversify the supply sources and distribute the new flows in Europe. The launch of the Energy Union should meet these challenges, articulating its action around five themes: security of supply, integration of the internal energy market, energy efficiency, reduction of CO 2 emissions, and research and innovation. In particular, the European Union is to set aside 5.3 billion euros for the construction of energy infrastructures between 2014 and A new list of Projects of Common Interest will thus be drawn up by the end of A new drop in European consumption in Stabilisation of supplies 1.5 The European energy policy and its objectives 1.7 Major European infrastructure projects 1.2 World prices again contrasted in Uncertainty over long-term demand 1.6 Development of gas infrastructures in Europe

15 _ 11 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.1 a new drop in european consumption in 2014 The European Union represents about 12% of worldwide energy consumption. It also accounts for 12% of worldwide natural gas consumption, contributing to a quarter of its primary energy use. In 2014, the consumption of the 28 countries in the European Union fell by 11% to 409 bcm, (not corrected for the climate, source Euro gas), due to the effects of exceptionally mild weather was indeed the warmest year on record in France, in Europe and worldwide. Consumption had already fallen by 10% in 2011, another year showing record warmth. The drop was especially marked in France, where gas is mainly used for heating. Consumption of natural gas also fell due to the effects of the economic slowdown on industrial demand, gains in energy efficiency and competition from coal and renewable energy sources for electricity generation. GAS CONSUMPTION IN 2014* In bcm Evolution Germany % United Kingdom % Italy % France % Netherlands % Spain % Total EU % * Before climatic correction Eurogas ENERGY MIX IN EUROPE European Union (28 countries) France United Kingdom Austria Italy Spain Germany Netherlands Poland 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Coal Oil Gas Nuclear Renewable energy sources Source Eurostat 2013

16 12 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE GLOBAL GAS CONSUMPTION (BCM) bcm 1, North America South and Central America EU 28 Europe other Middle East Asia Pacific Africa BP Statistical review 2015 Elsewhere in the world, gas demand remains dynamic, but it shows signs of slackening. In the USA, it is buoyed up by development of shale gas, which is replacing coal. In Asia, growth in demand is slowing down, with an increase of just 2% in 2014 as compared with 2013, after several years with annual growth of over 5%. The crude oil market is showing the same signs of slowing down, whereas the production offer remains abundant. The price per barrel of crude oil has been halved since August 2014, falling from $110 to $60 per barrel, and staying below the symbolic level of $100 on average for The prices of the other energy sources followed those of crude oil, also showing falls. The drop in oil prices was reflected, with an offset of a few months, in the prices of natural gas and LNG, which are still often indexed on sliding averages of oil product prices. CHANGE IN ENERGY PRICES ON A BASIS OF 100 (JANUARY 2010) Apr July 2010 Oct Apr July 2011 Oct Apr July 2012 Oct Apr July 2013 Oct Apr July 2014 Oct Brent Average price of imported coal in Europe NBP gas Apr July 2015 Oct GRTgaz based on electronic stock exchanges

17 _ 13 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.2 world prices again contrasted in 2014 In recent years, the growth in production of shale gas in the USA, the biggest gas producer in the world in 2014 (7), the drop in consumption in Europe and the strong demand for gas in Asia have led to major price differences between continents. The situation remained unchanged in The spot prices in the USA remained below $4/MMBtu in 2014, three times lower than in Europe. LNG prices in Asia in 2014 stayed at $16/MMBtu, thus attracting most of the worldwide LNG production. However, the first half of 2015 points to fresh changes. The drop in crude oil prices triggered a slump in Asian LNG prices in December 2014, to between $6 and $8/MMbtu. The fall in Asian de- CHANGE IN WHOLESALE GAS PRICES ON THE WORLD'S MAIN MARKETS USD/MBtu LNG Japan cif Average German import price UK Heren NBP US Henry Hub BP Statistical review 2015 CHANGE IN LONG-TERM CONTRACT AND SPOT PRICES IN EUROPE /MWh Feb Apr June 2013 July 2013 Aug Sept Oct Nov Dec Feb Apr June 2014 July 2014 Aug Sept Oct Nov Dec Feb Apr June 2015 PEG North DA PEG South/TRS DA TTF DA ZTP DA NCG DA PSV DA PMI German GRTgaz based on electronic stock exchanges and BAFA (average price of importations in Germany, representative of long-term contracts) 7. BP Statistical review of world energy 2014.

18 14 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE mand (restarting of the nuclear power plants in Japan, slowing growth rates in China) and new gas liquefaction capacities in Australia are other factors keeping prices low. In Europe, the spread between spot market prices and long-term contract prices is decreasing. Northwestern marketplaces are tending towards homogeneity, apart from the markets in southwest Europe, PSV in Italy and PEG Sud/TRS. PEG Sud (or Trading Region South since 1 April 2015) saw high overall prices from 2012 to Due to the fall of LNG deliveries in Europe, in particular at Fos and in Spain, the pipelinetransmitted gas flows towards the South of France showed sharp increases, saturating the North- South link in France. The price spreads between GRTgaz s North and South zones, which stood at PEG SOUTH (TRS) / PEG NORTH PRICE DIFFERENTIAL Apr July 2011 /MWh Oct Apr July 2012 Oct Apr July 2013 Oct Apr July 2014 Oct Apr zero in 2011, rose to 1.6/MWh on average in 2012, and 3.5 /MWh in the trading region south The TRS (Trading Region South), the market area common to TIGF and GRTgaz in the South of France, was launched on 1 April The TRS was set up with the aim of enhancing the attractiveness of the French market, by increasing the liquidity and depth of the southern market. Designed within the framework of the European target outlines, this model of market area integration is a first for Europe. In this single market, the gas flows from customers enter and leave via any physical point of the GRTgaz and TIGF networks. Any imbalance between shippers in the Trading Region South are spread between the two GRTgaz Sud and TIGF balancing zones, which continue to exist in the same way as before implementation of the TRS. With the TRS, shippers thus benefit from a simplified system that avoids having to subscribe capacities at the interconnections between the two networks. They no longer have to declare, each day, the quantities that they want to transmit via these capacities. The two French transmission network operators (GRTs) cooperated closely to develop the operating modalities for the joint trading point: GRTgaz deals with transactions for the whole of the new market area and evaluates the physical flows transmitted between the GRTgaz and TIGF networks; TIGF is in charge of calculating the shipper imbalances in the mesh of the two GRTs balancing zones. The principles of the TRS model were validated by the CRE deliberation dated covering the operating rules for the market area common to the GRTgaz Sud and TIGF zones as from 1 April 2015.

19 _ 15 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE The fall in LNG prices noted in Asia at the end of 2014 led to price drops in the Trading Region South, and to enhanced levels of availability for the North-South link. Nonetheless, GRTgaz remains committed to maintaining the steps taken to optimise the capacity made available for shippers, where necessary, and improve gas offer in the South whenever possible. In 2014, the TTF market moved to first place in the classification of European markets in terms of volumes traded, with the British NBP market remaining the biggest physical market. According to an ACER study published early in 2015, only the British hub reaches the objectives of the Gas Target Model, with the TTF as the other market coming closest to them. TOTAL TRADED VOLUMES ON CONTINENTAL HUBS VERSUS NBP Bcm Netherlands (TTF) (Est. netted volumes prior nomination) Belgium (Zeebrugge and ZTP) France (PEG) Austria (CEGH) Netherlands (TTF) Germany (NCG and GASPOOL) Italy (PSV) United Kingdom (NBP) Continental (estimated) IHS Energy, national sources THE MAIN GAS TRADING POINTS IN EUROPE TTF NBP ZEE Gaspool ZTP NCG PEG North CEGH TRS PSV MS-ATR

20 16 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.3 stabilisation of supplies Russia, the biggest supplier for Europe in 2014 Production in the European Union fell by 10% in 2014, mainly due to the limitation in the production capacity of the Groningen field in the Netherlands. The European Union s production nonetheless remains the main source of natural gas in 2014, providing 34% of its supply. The mild weather has quite logically led to major reductions in the volumes imported, in particular from Russia. However, Russia is still the biggest supplier of gas to the European Union, providing 31% of supply, followed by Norway (26%) and Algeria (8%). LNG deliveries to Europe remained stable in 2014 as compared with 2013, after two consecutive years of decline. They were halved between 2011 and 2013, falling from 85 to 45 bcm, with 40 bcm rerouted to Asia. LNG now accounts for just 11% of European supply, with Qatar as the main supplier. The fall in LNG prices in Asia late in 2014 led to a renewed surge of LNG deliveries to Europe, with a 21% increase in deliveries during the first half of 2015 as compared with the first half of GAS SUPPLIES FOR EUROPE In bcm EU production Russia Norway Algeria Qatar Nigeria 7 4 Others Total BP Statistical review 2015 GAS SUPPLIES FOR EUROPE IN 2014 (IN BCM) LNG terminals LNG terminals under construction Supplies via gas pipelines LNG supplies Norway 101 Qatar 23 Algeria 11 Nigeria 4 EU production 132 Russia 121 Other (Trinidad and Tobago, Peru, Norway) 7 Algeria 20 Libya 6 BP Statistical review 2015

21 _ 17 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE Full storage facilities Stored natural gas plays an essential part in ensuring the security and flexibility of the European network, in particular to deal with peak consumption in the winter. However, the reduced price spreads between summer and winter on the spot markets in recent years have had a negative effect on the storage levels. On the contrary, the fears caused by the Ukraine crisis, together with the exceptionally mild weather, led to the replenishment of storage facilities in The fall in crude oil prices late in 2014 led to reductions in gas storage levels during the 2014/2015 winter to fill them up with cheaper gas during the summer of In the light of the decreasing European production, changes in weather patterns and geopolitical tensions such as those between Russia and Ukraine, suitable use of the storage capacity is one of the crucial questions discussed when drawing up the European Strategy for the Security of Energy Supply. REPLENISHMENT LEVELS OF EUROPEAN STORAGE FACILITIES (EU 28) 90 bcm Fev Apr June 2010 July 2010 Aug Sept Oct Nov Dec GSE 2015 STORAGE AND REGASIFICATION CAPACITIES IN EUROPE IN 2014 (IN BCM) ESTONIA LNG terminals LNG terminals under construction Annual regasification capacity in bcm/country SWEDEN LATVIA Annual storage capacity in bcm/country DENMARK EU 28 total LITHUANIA 4 IRELAND UNITED KINGDOM NETHERLANDS 12 BELGIUM 9 LUX. GERMANY 25 CZECH REPUBLIC 3 AUSTRIA 8 POLAND SLOVAKIA 3 HUNGARY 6 UKRAINE SLOVENIA ROMANIA ITALY BULGARIA 17 PORTUGAL SPAIN 4 15 GREECE TURKEY Gie 2015

22 18 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.4 uncertainty over long-term demand In its World Energy Outlook 2014, the IEA confirmed its forecasts concerning a relatively small increase in demand for natural gas in Europe, while revising it further downwards as compared with its own forecasts in Gas consumption has slumped since 2010 due to slower economic growth and competition from coal and renewable energy sources for electricity generation. It is unlikely to return to its historic levels before However, European consumption could rise as from 2020 under the effects of stricter regulations covering emissions of CO 2 and other pollutants, which are likely to hamper use of coal for electricity generation and encourage use of gas as a fuel for public transport systems. According to Eurogas, gas could account for 24% to 30% of European primary energy consumption in 2035, with the share of natural gas in electricity generation representing the main factor of uncertainty. EU GAS CONSUMPTION FORECASTS IN BCM 650 bcm/year AIE 2012 AIE 2013 AIE new policies AIE - World Energy Outlook 2012, 2013, 2014

23 _ 19 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE Over the medium and long term: an acceleration in the importation requirements? According to the IEA, the fall in conventional gas production in Europe, and in particular in the United Kingdom and the Netherlands, will lead to a rise in imports, which could reach about 100 bcm by 2030, i.e. more than twice the consumption in France. Imports, which represented 69% of European supply in 2014, could reach 80% in These new importation requirements could see acceleration. In the Netherlands, following earthquakes in the Groningen region, the Dutch government announced on 23 June 2015 that production from the field, the largest natural gas deposit in Western Europe, would be limited to 33 bcm for the gas year 2015/2016, as against a maximum production of 425 bcm over the period. Further decisions are expected late in Moreover, according to the Norwegian authorities, exports of Norwegian gas to Europe are likely to fall as from 2020, and be reduced from 115 bcm/year to 50 bcm/year by about 2030, unless fresh fields are found and exploited, mainly in the Arctic region. This means that Europe, and the north-west in particular, will have to rely on new gas imports, with Russian gas and LNG the most likely sources. The first signs of a return of LNG in Europe were noted in The trend could well be confirmed with commissioning of new liquefaction capacities in Australia and on the eastern coast of the USA (160 bcm of annual capacity between 2015 and 2018), whereas worldwide demand for LNG is unlikely to exceed +3% per year, due to the slowdown in growth in Asia, the restart of nuclear power plants in Japan and the disappearance of LNG demand in the USA. EVOLUTION OF THE CONVENTIONAL GAS PRODUCTION IN EUROPE bcm/year NL UK DE IT Others TYNDP 2015

24 20 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.5 the european energy policy and its objectives Energy is one of the priorities set by the new European Commission appointed following the European parliament elections in Its new president set out to create a collegial organisation. Energy is thus the prerogative of two members of the Commission: the Vice-president for Energy Union; the Commissioner for Climate Action and Energy. Indeed, the European Union is faced with a double challenge: reaching the objectives that it set itself regarding reductions in CO 2 emissions on the one hand, and maintaining the security of supplies in spite of the unrest in Ukraine and the Middle East on the other hand. This has to be done in a difficult economic context in which the European industrial concerns are losing competitiveness as compared with their American counterparts, who are able to make the most of competitive energy costs as a result of the shale gas revolution. The Member States have adopted a framework of action regarding energy and the climate over the period, in which they have set strict objectives at the scale of the European Union: reducing greenhouse gas emissions by 40% as compared with 1990 before 2030, and increasing to 27% the share of renewable energy sources in the final energy consumption (8). This is the ambition that the European Union will present at the 21 st Conference of parties at the 2015 United Nations Framework Convention on Climate Change in Paris (COP21). Furthermore, the uncertainties raised by the Russia-Ukraine crisis led the Commission to propose on a new European Strategy for the Security of Energy supply (ESSES). Indeed, five EU countries (Finland, Slovakia, Bulgaria, Estonia and Lithuania) are 100% dependent on Russia for their gas imports, and the level stands at 39% objectives for %: share of renewable energy sources 27%: energy savings 40%: reduction in greenhouse gas emissions as compared to 1990 for Europe as a whole. Amongst other things, this reflection is to lead to revision of regulation 994/2010 governing security of supply. These two priorities, lowering CO 2 emissions and security of supply, form the basis of the working programme adopted by the Commission for energy. The programme could be summed up by the communication published on 25 February 2015 COM(2015)80 entitled A Framework Strategy for a Resilient Energy Union with a forward- Looking Climate Change Policy. It sets out the European strategy along five avenues: Energy security, solidarity and trust The Commission is determined to enhance diversification of natural gas supply (sources, suppliers and routes), relying mainly on central Asia and the Mediterranean (e.g. Algeria). The future European fund for strategic investments could thus well be called on. The Commission will also rely on the future strategy for LNG and storage, which was the object of a public consultation during the summer of Lastly, the revision regulation 994/2010 on security of supply is likely to highlight cooperation climate and energy framework, European Commission, January 2014.

25 _ 21 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE between Member States. The Commission s Stress Tests indeed showed that this is a necessary condition for efficient crisis management by the market and the institutions alike. A fully-integrated internal energy market This is based on physical integration of the infrastructures, and also on implementation of a certain number of rules governing use. Regulation 347/2013 on Projects of Common Interest and the corresponding funds participate in development of the infrastructures enabling each European consumer to benefit from secure supplies at competitive prices. Implementation of the network codes is likely to enable efficient, transparent, non-discriminatory use of the infrastructures. In this respect, the ENTSOG has made major contributions to harmonisation of practices by drawing up all the network codes currently planned. The network code on harmonisation of transmission tariffs is the last one that remains to be approved, after being submitted to the ACER for the second time on 31 July Energy efficiency helping to moderate demand The main efforts will be centred on the transport and building sectors, where potential savings are seen as being considerable. In particular, the Commission will put forward a strategy dedicated to heating networks. Concerning transport, the efforts must be centred on development of alternatives to road transport (i.e. rail, waterway and maritime solutions) and to crude oil for road transport. Within this framework, the Commission proposes further measures to the Member States in the Alternative Fuels Infrastructure Directive. Decarbonisation of the economy The Commission continues to make the ETS (Emission Trading System) the cornerstone of its strategy to cut CO 2 emissions. Europe also sets out to become the leader in development of renewable energy sources from a technological standpoint, and also in terms of integration with the market rules. Research, innovation and competitiveness The four main lines of research identified by the European Commission are: development of a new generation of renewable energy sources, intelligent networks, energy efficiency and transport. Enhanced coordination between Member States and the Commission is also expected for development of the CCSR (carbon dioxide capture, storage and recovery) activities and safety in the nuclear power field. The working programme is currently being discussed and further details will be forthcoming. For natural gas, the next steps are as follows: the first forum on infrastructures in Copenhagen on 9 and 10 November; proposal by the Commission in the first quarter of 2016 of a gas package including a proposal to revise regulation 994/2010 on security of supply and the European strategy for LNG and storage. As things stand, it is not certain that these actions will provide enhanced visibility as to the long-term role for gas. The future remains uncertain for the actors in the gas industry, and this weighs on the investment decisions, for which visibility over periods of 30 to 50 years is fundamental. Nonetheless, the transmission infrastructures are more vital than ever for the energy security of Europe, as set out below.

26 22 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.6 development of gas infrastructures in europe Development of gas infrastructures is aimed at securing access to resources, putting an end to the dependency of certain Member States on a single source, widening the range of choices, and facilitating trading between the most competitive sources for the benefit of the end customers. The aim is also to enhance the flexibility of the gas system to meet the requirements of modulated use of gas. In 2013, the European Parliament adopted a regulation concerning guidelines for trans- European energy infrastructures. In the field of gas, four main strategic corridors for Europe are identified, including one that concerns France directly: the North-South corridor for Western Europe, which is aimed at better interconnecting the Iberian peninsula and Italy with the northwest European markets. The regulation also defined Projects of common interest (PCIs) that benefit from accelerated authorisation procedures and incentive measures, and are eligible for European Union financial backing. The ENTSOG Network Development Plan (TYNDP) Within the framework of the implementation of the third energy package, the ENTSOG publishes a Ten Year Network Development Plan (TYN- DP) every two years. This information document takes into account the development plans of each Member State. It is aimed at assessing the adequacy of the scenarios covering supply, demand and infrastructure development in the light of the three pillars of the European energy policy (competitiveness, security of supply and sustainability). Now that regulation 347/2013 on the trans- European energy infrastructures has come into force, the TYNDP also constitutes the initial stage for the selection of PCI projects. For this purpose, the European network model takes into account the balancing zones, the interconnections between zones, the importation capacity (including LNG) and storage facilities. The adequacy between supply and demand is then simulated up to 2035, using several sets of hypotheses as to annual and peak demand, supply and prices per source, and partial or complete execution of the infrastructure development. The results are provided in the form of a dozen or so indicators showing various perspectives of the European energy policy pillars. The latest edition, ENTSOG TYNDP , was published in It sets out a summary of the gas infrastructure projects at the European level, including the GRTgaz Network Development Plan. The extension of the TYNDP time frame from ten to twenty-one years has shed light on structural trends. Although the priority for 2025 is to complete integration of the European market, and its infrastructure component in particular, maintaining diversification of supplies can be seen as a long-term challenge, due to the fast reductions in production of conventional gas in Europe. Finalising integration of the European infrastructures The modelling of the European gas system shows that apart from the most outlying regions (Baltic, south-east and Iberian Peninsula), the level of integration is already high. This result is confirmed by the convergence of market prices along a wide diagonal from the NBP to the PSV. Implementation of the network codes should enable the countries of Central Europe to benefit in full from the existing infrastructures. Although the Iberian Peninsula, and to a lesser extent the south of France, remain heavily dependent on the LNG market, that exposure is not problematic in terms of security of supply, due to the diversification of this type of import. On the other hand, the heavy dependence of the countries in the Baltic region and south-east Europe on Russian gas remains a source of concern for development of these markets and their integration in the rest of Europe.

27 _ 23 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE In these regions, implementation of the network codes will have to be completed by suitable development of the interconnection with the European core network. Maintaining diversification of supplies The integration of the European market expected over the short to medium term will constitute an asset to be maintained. It will be brought under pressure by the swift decline in European gas production, entailing increased levels of imports. As things stand, only Russia and the world LNG market would seem big enough to meet these new requirements, with the corresponding risk of reduced diversification of supplies. A situation of this type could threaten the competitiveness and security of gas supplies for the whole of Europe. Without the assurance of a long-term role for gas in the European energy mix, Europe cannot be seen as a safe enough market in terms of volume to enable its connection to new production zones. If these new imports do materialise, they will entail adaptation of the European core network to enable implementation of new flow outlines. The GRTgaz infrastructure projects of a regional or European nature, set out below in this plan, meet this double challenge. In terms of integration of the European market, the merger of the North and South zones will finalise integration of the French market. The projects involving reinforcement of the interconnections with the adjacent countries form part of the reinforcement of the North-South corridor for Western Europe. A new list of Projects of Common Interest The list of PCIs is drawn up by the European Commission every two years on the basis of proposals put forward by the Regional Initiative Groups (RIGs) and after consultation of the ACER. The European Parliament and the Council have a maximum period of 4 months to approve it or reject it completely. The initial list of PCIs, published in October 2013, was based on a pilot methodology defined by the European Commission. It included 9 projects concerning GRTgaz. They covered: Easter Axis Spain- France interconnection point between Iberian Peninsula and France at Le Perthus (Midcat project); new interconnection between Pitgam (France) and Maldegem (Belgium); interconnection between France and Luxembourg; reverse flow interconnection between Switzerland and France; reinforcement of the French network from South to North - Reverse flow from France to Germany at the Obergailbach/Medelsheim interconnection point; reinforcement of the French network from South to North on the Bourgogne pipeline between Etrez and Voisines (Val de Saône project); reinforcement of the French network from South to North on the east Lyonnais pipeline between Saint-Avit and Etrez (Arc Lyonnais); reinforcement of the French network from South to North on the Arc de Dierrey pipeline between Cuvilly, Dierrey and Voisines; gas pipeline connecting Algeria to Italy (Sardinia) and France (Corsica) (Galsi and Cyréné pipelines). Among these nine projects, two are under construction (interconnection with Belgium and Arc de Dierrey) and two have been confirmed for execution (Val de Saône and entry capacity with Switzerland). Following publication of the TYNDP, a list of the PCIs is currently being updated on the basis of the cost/benefit analysis methodology drawn up by the ENTSOG, and approved by the European Commission and the ACER. Cost/ benefit analyses have been made for each of the projects requesting a PCI label. GRTgaz has proposed renewal of the PCI label for all its projects, apart from those under construction, and addition of the Gascogne-Midi project, in association with TIGF, and the project to convert the L gas network to H gas, in association with Storengy, Fluxys and GrDF. The 2015 list of PCIs is to be published in December 2015.

28 24 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE 1.7 major european infrastructure projects Gas pipelines Numerous importation projects have been brought up and then cancelled in recent years. These projects are aimed mainly at securing supply for Eastern Europe, avoiding the Ukrainian route or reducing the region s dependence on Russian gas. The following projects are currently being examined: Nord Stream has announced doubling of its current capacities of 55 bcm/year. The two pipelines brought into service in 2011 and 2012 carry gas over 1,220 km from Russia to northern Germany via the Baltic Sea. The extra 55 bcm/ year could be put into service in 2019; following cancellation of the South Stream project to import Russian gas via Bulgaria to Austria, late in 2014, new projects have been put forward, in particular Turkish Stream, with a capacity of 63 bcm/year from Russia, via Turkey and the Black Sea, Eastring from Turkey to Slovakia via Bulgaria and Romania, and Tesla through Greece, Macedonia, Serbia and Hungary. A high-level group has been set up in the region (Central and Southern Europe Gas Connectivity, CESEC) to coordinate and facilitate trans-european interconnection projects and diversify sources of supply in the region. In this context, development of the South Corridor constitutes one of the priorities for the European Union. TAP in particular opens up access to resources in Azerbaijan, and, over the longer term, potentially from the Middle East countries via Turkey (Iraq, Iran, Turkmenistan): the Trans Adriatic Pipeline (TAP) will link Turkey and Italy over 800 km, via Albania and Greece, and provide a capacity of 10 bcm/year from Azerbaijan. It was confirmed in 2013, and it is expected to be brought into service in 2020; the Trans Anatolian Natural Gas Pipeline (TANAP) will cross Turkey further upstream, and is likely to be put into service in 2018/2019; GALSI would link Algeria and Italy via Sardinia, providing a capacity of 8 bcm/year, but the investment decision has been postponed several times. LNG terminals In all likelihood, LNG will constitute a major share of Europe s growing import requirements. This prospect could entail investments to guarantee enhanced direct or indirect access to this resource. In this context, there are numerous projects in Europe covering development of regasification and interconnection capacities to enlarge the area in which LNG could be used. a new natural gas terminal has been put into service in Klapeida, Lithuania (5 bcm/year); the Dunkirk LNG terminal under construction on the English Channel should be operational at the end of 2015 with a capacity of 13 bcm/year; other projects involving creation or extension of natural gas terminals are currently being examined, in particular in the zones in which the gas access solutions show little diversification (Adriatic Sea, Black Sea) or on the western and southern seaboards of Europe, mainly in Belgium, France and Italy.

29 _ 25 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN EUROPE MAJOR GAS SUPPLY INFRASTRUCTURE PROJECTS IN EUROPE ESTONIA SWEDEN LATVIA DENMARK Nord Stream LITHUANIA RUSSIA IRELAND BELARUS UNITED KINGDOM NETHERLANDS POLAND GERMANY BELGIUM LUX. CZECH REPUBLIC UKRAINE SLOVAKIA AUSTRIA HUNGARY SLOVENIA ROMANIA ITALY Tesla Eastring BULGARIA Turkish stream SPAIN PORTUGAL TAP GREECE TANAP TURKEY Galsi

30 26 _ 2EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE France is the fourth largest European gas market, with consumption of about 45 bcm (35 bcm within the GRTgaz perimeter in 2014). It imports over 99% of the gas it consumes. Its geographical position gives it the most diversified gas supply in Europe, and trading possibilities on the East-West and North-South axes alike: these are key assets for security of energy supply at national and European levels. In 2014, natural gas represented about 14% of primary energy consumption in France and 21% of final consumption (9). Over the period up to 2024, GRTgaz anticipates a stable consumption, with a decrease of about -0.8% per year in consumption for the residential sectors and about -0.7% per year for industry, compensated by an increase in gas consumption for electricity generation as from Over the longer term, the Law on Energy Transition for Green Growth has set energy consumption levels on a downward path, and in particular carbon-based sources such as natural gas. Nonetheless, development of renewable energy sources for generation of electricity (wind power and photovoltaic systems) and the reduction in the share of electricity generated by nuclear plants from 75% to 50% in 2025 could encourage use of gas for power generation, in particular to deal with the intermittency of generation from renewable energy sources. This would involve encouraging use of gas rather than coal, which is currently cheaper but emits more carbon dioxide. Moreover, transfers from more polluting energy sources to natural gas, especially for mobility, could help to reach a low-carbon energy mix, all the more so if gas becomes renewable (biomethane, synthetic methane). Depending on the hypotheses adopted, three scenarios have been examined. The uncertainty around the evolution of gas demand is illustrated by the wide range covered by these scenario over the period covered by the plan. The main GRTgaz network is sized mainly to meet requirements as to the flexibility necessary to optimise the shippers portfolios of supplies. In this respect, in 2014 the network once again showed its ability to meet increased north-south flow requirements to make up for the drop in LNG supplies to France and the Iberian Peninsula. The entry and exit capacity of the GRTgaz network are still heavily subscribed. Most of them are used at their maximum level at least once a year, thus showing that the network is suitably sized. 2.1 Diversified supply sources 2.2 Decreasing consumptions in The role of gas in the energy transition 2.4 Gas demand forecast 2.5 Public service obligations in the event of exceptionally cold spells 2.6 The alternative scenarios for the period up to The transmission offer of GRTgaz 2.8 Demand for transmission capacity on the GRTgaz network

31 _ 27 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE 2.1 diversified supply sources France currently imports almost all the gas it consumes. To ensure the security of its energy supply, it has developed an active policy to diversify its sources and routes by making the most of its advantageous geography. France is connected by gas pipelines to Norway, Belgium, Luxembourg, Germany, Italy via Switzerland, and Spain via TIGF, so it benefits from several sources of gas in gaseous form. With LNG terminals on the Atlantic and Mediterranean coasts, and in the English Channel in the near future, it can receive LNG from anywhere in the world. France is the only country in Europe that has such diversified gas resources at its direct disposal, so it is ideally placed to ensure security and competitiveness of European gas supplies by providing arbitrage opportunities on the east-west and northsouth axes alike. This situation is further enhanced by powerful, well-situated gas infrastructures at the service of over 11 million customers: the most fully developed transmission network in Europe, 37,000 km; the biggest distribution network in Europe with almost 200,000 km; the third largest regasification capacity, 24 bcm/year; the third largest storage capacity, with a useful volume of over 12 bcm, i.e. 30% of national consumption, which provides a major security margin, helps to meet seasonal variations in consumption, and opens up trading opportunities. In 2014, LNG supplies saw a further fall of 20%, after two consecutive years of decrease, due to the ongoing attraction of Asia. Between 2011 and 2014, the quantities of incoming LNG were FRANCE'S NATURAL GAS SUPPLY BETWEEN 2011 AND 2014 TWh LNG Other, unspecified Russia Netherlands Russia SoeS Source: SOeS, energy balance for France in French primary consumption adjusted for climate conditions.

32 28 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE ORIGIN OF FRANCE'S GAS SUPPLY IN 2014 Norway 2% 28% 38% 9% Netherlands 12% Russia 11% Algeria Qatar Other SoeS 2014 halved, representing only 13% of imports in 2014 as against 28% in These supplies come mainly from Algeria and Qatar. Spot purchases on the Belgian, Dutch or German markets, of gas of indeterminate origin, represent one quarter of the incoming supplies. Norway remains the main supplier of natural gas with 38% of the gross incoming quantities, followed by Russia and the Netherlands. The Norwegian and Dutch supplies constitute half of the supplies arriving in France. The prospects of falls announced for these sources, and the volatility of the flows, confirm the need for infrastructures that are correctly sized, sturdy and flexible. About 9% of the gas imported is type L gas with a low calorific value, coming mainly from the Groningen field in the Netherlands. The deposit has reached an advanced stage of depletion and its exploitation is apparently causing earthquakes. Early in 2014, the Dutch government announced that the export contracts would not be renewed, and production at Groningen is currently limited to the minimum level enabling existing contracts to be met and ensuring security of supply for consumers of L gas. For France, extra quantity of H gas will be necessary to make up for the gradual reduction in its L gas supply as from 2024 and complete phasing out by 2029 at the latest. Taking into account the quantities involved and the subscription of capacity, the GRTgaz transmission network has already sufficient entry capacity for H-gas. However, GRTgaz is attentive to the market, to examine new supply routes or develop existing entry points. 2.2 decreasing consumptions in was a very warm year. The temperatures were mild throughout the usual heating periods (in the winter, spring and autumn). This led to an exceptional fall in gross consumption in 2014 throughout the zones supplied by GRTgaz (-16% as compared with 2013). The fall in gross consumption was mainly supported by the temperature-sensitive sector of public distributions (-19% as compared with 2013). The fall also concerned consumption among industrial customers linked directly to the GRTgaz network (-11% as compared with 2013), some of whom are particularly temperature sensitive (electricity generation, cogeneration, urban heating and the motor vehicle sector). Gas demand for electricity generation was especially slack in 2014: on the one hand, gas prices were not very competitive for electricity generation as compared with those of coal and imported electricity; and on the other

33 _ 29 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE hand, there were no periods of very cold weather requiring electricity generation by gas-fired power plants in In this context of weather temperatures well above normal, consumption corrected for weather effects for the public distribution networks is down (of about -2% as compared with 2013). The temperatures recorded for the first half of 2015 were close to normal, in particular during the winter. Over that period, consumption rose as compared with 2014, but without reaching the levels. The economic context does not show any marked signs of recovery, and the efforts to enhance energy efficiency continue to produce their effects. BREAKDOWN OF CONSUMPTION WITHIN INDUSTRY In the summer of 2015, an increase in gas consumption for electricity generation was noted during spells of very hot weather, leading to an overall rise in gas consumption over a period in which no heating is required and industry slows down for the holidays. Cars - Tyres Chemicals - Oil Agri-food industries Paper 24 Other Electricity - District heating Metallurgy Glass - Non-metallic materials CHANGE IN GROSS NATURAL GAS CONSUMPTION IN THE GRTGAZ ZONE TWh/year Industrial transport clients Public distribution networks Centralised electricity production

34 30 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE 2.3 the role of gas in the energy transition After a year of national discussions on the energy transition, the LTECV law was passed by the French parliament on 22 July The law covers the following main points: bring the proportion of nuclear energy used in electricity generation o 50% by 2025: accompanied by development of renewable energy sources (wind power and photovoltaic systems), this corresponds to a change in the energy mix for electricity generation, in which gas plays an accompanying role; reduce final energy consumption of fossil fuels by 30% by 2030: this measure concerns natural gas, and also products derived from crude oil and coal. Natural gas is recognised as producing the lowest levels of CO 2 emissions among fossil fuels, under equivalent use; ongoing, enhanced efforts to reduce energy consumption through building renovations to make them more energy efficient; further backing for renewable energy sources: in particular for their financing and their economic integration in the energy mix. This hence also concerns development of biomethane; a change in governance: This includes development of a low-carbon strategy (with constitution of scenarios regarding framework energy demand) and implementation of a Pluriannual Energy Programme; for the transport sector: The law aims at reduced energy consumption and diversification of energy sources, with a marked concern as to improving air quality; it suggests accelerating development of alternative energy sources to crude oil, including electric vehicles and also gas-powered vehicles. To help to constitute a low-carbon energy mix, natural gas can play a major part in the following fields: gas-powered mobility: diversifying the transport energy mix to help to absorb local pollution (particles), give vehicles a sufficient range, and reduce CO 2 emissions. Gas is indeed a fuel that is accessible for heavy goods and passenger vehicles (buses, coaches, dustbin lorries, other heavy good vehicles) and light vehicles (light goods vehicles, taxis, car pooling, private vehicles). The technology can also be developed for boats on waterways; gas-fired heating: to reduce the effects of temperature sensitivity for buildings with electric heating systems on electricity generation at peak periods (and hence reduce CO 2 emissions and investments in peak period generation resources and electricity infrastructures). Gas-fired heating for new and renovated housing is energy-efficient; use of gas in industry, where it is useful to keep gas prices competitive when supplying industrial facilities, with the added advantage of cutting emission levels of CO 2 and other pollutants as compared with coal or fuel oil; centralised gas-fired power generation: as a complement to renewable energy sources and nuclear power depending on their evolutions, gas-fired power plants significantly reduce emission levels of CO 2 and other pollutants as compared with coal or fuel oil; gas-fired cogeneration, which enables use of the heat produced during electricity generation: cogeneration is used in industry, service buildings and housing (heating and domestic hot water); renewable gas: biomethane and Power to Gas solutions (synthesised methane made using excess electricity generated by renewable energy sources) will progressively meet an increasing share of demand.

35 _ 31 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE 2.4 gas demand forecast To anticipate demand for gas, GRTgaz evaluates the ten-year trends as to consumption for the consumers connected to its transmission network and to the distribution networks that it serves, per customer typology: residential, services, industry, centralised electricity generation and cogeneration. GRTgaz draws up a reference scenario with a choice of hypotheses in compliance with the probable evolution in the structural, economic and regulatory context. This scenario takes into account the regulations in force, and it includes in particular efforts that are bearable for households and industry in terms of cutting energy consumption and enhancing energy efficiency. In parallel to the reference scenario, GRTgaz puts forward contrasting alternative scenarios illustrating the extreme situations of a low scenario (Green Mix) and a high scenario (Diversified Uses). Reference scenario for the period: Gas consumption will remain stable until 2030 Forecast change in gas demand within the GRTgaz perimeter (hypotheses drawn up in July 2015) TWh 2014 (1) MAGR (2) MAGR Service and residential sector (3) % -1.0% Industrial sector (3) % -0.6% Centralised electricity generation and cogeneration Transmission system operators own consumption % +7.0% Total % 0.4% 1. Actual consumption levels. 2. MAGR: Mean annual growth rate. 3. Excluding cogeneration. COMPARISON OF DEMAND ASSUMPTIONS ESTABLISHED IN 2014 AND Total consumption - GRTgaz zone TWh Residential and tertiary sectors Industrial sector Centralised electricity production and cogeneration GRTgaz 2015 assumptions GRTgaz 2014 assumptions Actual 2006 to 2014

36 32 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE Key assumptions for the period Residential and services: -0.8% per year The implementation of regulations stemming from the recent environmental policies in the energy field (Energy transition, following on from the Energy-climate package and the Grenelle Environment agreements) should translate into lower unit consumption, partly compensated by increases in the numbers of building units available. Indeed, the efficiency of the gas-fired equipment used for heating, cooking and production of domestic hot water are compatible with the energy efficiency standards for new buildings. Since implementation of the 2012 Thermal regulations, the market share for gas in new buildings has risen. For the future thermal regulations, the share of gas in the residential and services energy mix will depend on a calculation of CO 2 emission levels to compare direct use of gas in buildings and equivalent use of electricity. Industry: -0.7% per year This hypothesis takes into account the structural evolution for the main segments of industrial activity (10) and the effects of the successive economic slowdowns (in and since the end of 2011) for some of them. It integrated energy savings, energy substitutions and development of new uses for natural gas, in particular process heat and production of hydrogen. In industry, apart from use of gas in chemicals as a raw material (production of hydrogen, production of fertilisers and other molecules used in basic chemicals), gas is used to produce heat and apply thermal treatments, for which it could be replaced by other energy sources (electricity, coal, crude oil, biomass). The evolution in the market share of gas for these uses hence depends on its environmental performance levels (equipment efficiency - emissions of CO 2 -; emission levels of pollutants - NOx, SOx, particles, etc. -) and on its economic performance levels as compared with those of the other energy sources available. To assess the comparative competitiveness of gas for industrial consumers, it is necessary to complete the aspects directly linked to energy prices by examining the impact of technological, logistics and infrastructure costs, plus the effects of the regulations and the accompanying taxes. Electricity generation: +3.1% per year The hypotheses concerning electricity generation adopted by GRTgaz for the reference scenario are coherent with the RTE data concerning the installed capacity and the quantities of electricity generated over the , as set out in its 2015 forecast. Moving beyond 2020, the hypotheses adopted by GRTgaz are coherent, concerning the installed capacity and the quantities of electricity generated, with those of the New Mix scenario set out in the 2014 RTE forecast. These hypotheses take into account the boost given by the LTECV law, with the reduction in the share of electricity generated by nuclear plants to 50% by 2025 and development of renewable energy sources. In 2015, 13 combined cycle gas turbines (CCGT), representing an installed capacity of about 5.7 GWe, were connected to the GRTgaz network. Open-cycle combustion turbines (CTs) with a combined power rating of about 0.8 GWe are located on three sites (Gennevilliers, Montereau and Vitry-sur-Seine). Over the period, in coherence with the RTE hypotheses, the installed centralised electricity generation capacity will be completed by 10. Motor vehicles and tyres, oil product chemicals, glass and materials, metal production, paper, agri-food.

37 _ 33 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE commissioning two units: a 514 MWe plant at Bouchain (Nord département) is due to be put into service in 2016 and another of 422 MWe at Landivisiau near Brest in After 2020, the RTE New Mix scenario mentions the need for new capacity to ensure the balance of the electricity system by 2030: 7 GWe of peak level resources (which can be generation or consumption-cutting resources) and 4 GWe of semi-basic level resources. GRTgaz has adopted the hypothesis involving construction of 10 combustion turbines with a unit power rating of 150 to 200 MWe between 2023 and 2026, and construction of 7 combined cycle gas turbines between 2025 and 2030, corresponding to 9.4 GWe of installed capacity regarding combined cycle gas turbines by The quantities of electricity generated as calculated by RTE are translated into volumes of gas, considering an efficiency level 53% for combined cycle gas turbines and 40% for combustion turbines. Thus between 2020 and 2025, demand for gas will increase progressively to reach 30 TWh in From 2025 on, with progressive commissioning of 5 or 6 combined cycle gas turbines, the volumes consumed will increase to 90 TWh by For cogeneration systems, after the phase of uncertainty linked to the deadlines for renewal of most of the electricity purchase obligation contracts between 2008 and 2013, GRTgaz had advanced the hypothesis that 1/3 of the installed power as at 2008 would be used on the electricity market, 1/3 renovated and kept under contract, and 1/3 closed. Thus by 2023, cogeneration consumption could remain stable, close to its 2013 level, at almost 30 TWh. GAS-FIRED POWER PLANTS Gas demand for electricity generating units stands at 17.8 TWh in 2015, and then reaches a plateau at 20 TWh/year until From 2020 on, GRTgaz forecasts a fresh rise in gas-fired electricity generation with a gradual return to annual durations of use for the installed electrical capacity capacity of about 4,000 h. Indeed, limitation of the operating durations for oil- and coal-fired plants and development of the share of intermittent renewable energy sources in electricity generation, could progressively lead to enhanced use of gas-fired plants. Implementation in 2017 of a system involving remuneration of electrical capacity made available to meet peak electricity consumption levels should also provide support for gas-fired power plants. 1 Landivisiau Montoir-de-Bretagne 1 Plant in operation on 1 January 2015 Plant planned or under construction Number of groups per site DK6 2 Bouchain 1 1 Émile huchet Pont-sur-Sambre 2 1 Blénod 1 Toul 1 Bayet Combigolfe Martigues Cycofos GRTgaz and RTE

38 34 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE 2.5 public service obligations in the event of exceptionally cold spells As GRTgaz is responsible for strategic infrastructures concerning security of energy supply, it must be able to respond to increases in the volumes of gas transmitted during a cold winter or very low temperatures for three days, which can occur statistically every 50 years (11). GRTgaz has to size its network, and in particular its regional network, to ensure that its delivery and exit capacity is available and sufficient to meet these obligations. The daily consumption called during such cold spells, the 2% peak risk or P2, is evaluated for the past year by extrapolating the winter consumption levels at the extreme temperature using a method known as the winter analysis method. GRTgaz has also consulted the distribution system operators and the industrial consumers directly connected to its network to determine the evolution in their peak consumption levels over the next 5 years (12). After more than 5 years, the evo- FORECAST EVOLUTION IN PEAK GAS DEMAND ON THE GRTgaz NETWORK (Hypotheses drawn up in July 2015) MAGR 2015/ /25 MAGR 2015/ / / / / / / /31 Gas year (1) (TWh) -0.3% 0.4% TOTAL Total P2 (2) (GWh/d) -0.3% -0.1% 3,960 4,030 3,991 3,930 3,909 3,995 Firm P2 (GWh/d) -0.3% -0.1% 3,898 3,968 3,929 3,868 3,847 3,932 Gas year (TWh) -0.7% -1.1% Public distributions Total P2 (GWh/d) -0.8% -1.1% 3,053 3,064 2,950 2,874 2,846 2,592 Firm P2 (GWh/d) -0.8% -1.1% 3,053 3,064 2,950 2,874 2,846 2,592 Gas year (TWh) +0.5% +2.5% Direct customers Total P2 (GWh/d) +1.1% +2.5% ,041 1,056 1,063 1,403 Firm P2 (GWh/d) +1.1% +2.7% ,001 1,341 Gas year (TWh) GRTgaz consumption Total P2 (GWh/d) Firm P2 (GWh/d) From 1 November to the 31 October of the following year. 2. Gas demand during 2% risk cold spells. 11. French order No dated as modified covering public service obligations in the gas sector. 12. In 2014, the period of information covered 3 years, but it has now been extended to 5 years.

39 _ 35 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE COMPARISON OF PEAK DEMAND ASSUMPTIONS ESTABLISHED IN 2014 AND 2015 P2 point in GWh/d FORECAST EVOLUTION IN PEAK GAS SUPPLY REQUIREMENTS ON THE GRTgaz NETWORK (Reference scenario) TOTAL 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1, Total - GRTgaz zone Public distribution networks Industrial clients GRTgaz - July 2015 GRTgaz - July 2014 Historical Aggregated firm P2 (GWh/d) MAGR 2015/ / / / / / / /31-0.3% 3,722 3,789 3,752 3,673 3,694 3,755 Firm P2 (GWh/d) -0.3% 3,898 3,968 3,929 3,847 3,868 3,932 lution is considered as following that of the annual consumption levels by volume established per type of consumer and per sector of activity. In application of article 2-III of the French order dated 16 June 2014 covering methods for determining gas supply obligations, the estimation as to the value of the gas supply obligation for all the suppliers to meet the peak daily consumer requirements is calculated by applying a normative aggregation ratio (95.5%) to the estimated value of daily consumption at peak levels for each of the customers coming under article 4 of the French order dated

40 36 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE 2.6 the alternative scenarios for the period up to 2030 As a complement to the reference scenario, GRTgaz puts forward two alternative scenarios for gas demand up to 2030: a low scenario, entitled Less 30; a high scenario, entitled Diversified Uses. The GRTgaz reference scenario and the alternative scenarios are compared below with the scenario accompanying implementation of the Energy transition: scenario AMS2, ie with further measures 2, proposed by the Directorate general for energy and the climate. This last scenario has been reconstructed on the basis of the public information available. These scenarios illustrate the effect that active measures could have on gas demand over the medium term. Two alternative scenarios for the period up to 2030 The Less 30 scenario low trajectory This scenario considers the effects of the new environmental regulations oriented mainly towards reducing gas consumption levels, and hence constitutes a minimum trajectory for gas demand between 2015 and The objective of cutting fossil fuel consumption by 30% is applied to gas uses without taking into account its enhanced environmental performance as compared with crude oil or coal. The technological and economic efforts are placed at the limits of capacities regarding households and economic and industrial actors, and they would only seem conceivable under application of particularly stringent regulatory constraints. The Less 30 scenario also integrates development of gas as a fuel for transport, and takes into account the objective of limiting the share of electricity generation from nuclear plants to 50% by 2025, together with development of renewable energy sources. The Diversified Uses scenario high trajectory In this scenario, gas resources are more widely available on the market, with a return of LNG flows to Europe and enhanced competitiveness for gas. Gas is used for electricity generation as a complement to renewable energy sources with a longer annual duration of use; its use also progresses in industry and for heating in housing and services buildings as a replacement for energy sources whose environmental and economic balance is less favourable. Active backing is provided for development of gas as a fuel for transport. Similar backing is also provided for development of production and injection of renewable gas, biomethane and Power to Gas. In this way, with diversified uses and resources extended to include renewable gas, gas and its infrastructures make an even bigger contribution to the energy transition and the low-carbon strategy. Scenario AMS2 reference of the DGEC for the Energy transition The Directorate general for energy and the climate (DGEC) coordinates (13) an exercise to model levels of energy consumption and emissions of greenhouse gases and pollutants. The origins of these prospective DGEC scenarios are to be found in the European regulatory obligations (14). Their purpose is to enable evaluation of the impact of the measures linked to the energy transition. Within this framework, three scenarios have been examined by the DGEC: - scenario AME, with existing measures : projection taking into account the effects, in terms of reductions in greenhouse gas emissions, of the policies and measures adopted and implemented before 1 January 2014; 13. With the help of the ADEME, the CGDD, Enerdata, the CITEPA, Energies-Demain, Armines and Seureco. 14. Regulation EU-525/2013: Monitoring and reporting greenhouse gas emissions by the member countries.

41 _ 37 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE - scenarios AMS with further measures 1 and 2: two projections that take into account the effects, in terms of reductions in greenhouse gas emissions, of the policies and measures adopted and implemented to reduce global warming, together with the policies and measures planned for the purpose: for AMS1, this covers measures that can be modelled directly; for AMS2, it involves taking into account, after quantification, all the effects of the regulatory evolutions linked to the energy transition. Scenario AMS2 is the most appropriate for approaching a low scenario for gas. The main objectives modelled in AMS2 are as follows: - reducing greenhouse gas emissions by 40% between 1990 and 2030 ( trajectory compatible with reaching the factor 4 objective by 2050); - reducing final consumption by 20% in 2030 as compared with 2012; - reducing final consumption by 50% in 2050 as compared with 2012; - reducing consumption of fossil fuels by 30% in 2030 as compared with 2012; - reaching 23% of energy from renewable sources in final energy consumption by 2020 and 32% by 2030, including 40% for electricity, 38% of heat consumed, 15% of fuels and 10% of the gas consumed; - reducing the share of electricity generation by nuclear plants to 50% by Comparison of the scenarios: total consumption and peak daily consumption The following graphs show the evolution of annual consumption and peak daily demand for the reference scenario ( ), the alternative scenarios LESS 30 ( ) and Diversified Uses ( ), and scenario AMS2 ( ). The reference scenario is shown with two variants to illustrate with sensitivity development of gas as a fuel for gas mobility: the reference trajectory ( ); and the active trajectory ( ). The graphs show trajectories over the period of the GRTgaz ten-year plan from 2015 to 2024 and they are then extended for information purposes up to TOTAL CONSUMPTION (TWh) 700 TWh PEAK DAILY CONSUMPTION (GWh/d) 5,000 GWh/d 4,500 4,000 3,500 3,000 2, Less 30 scenario (LTE) Diversified Uses scenario GRTgaz-2015 scenario (reference) AMS2 - DGEC scenario GRTgaz-2015 scenario (with development of gas mobility) 2, Less 30 scenario (LTE) Diversified Uses scenario GRTgaz-2015 scenario (reference) WFM2 scenario Diversified usage scenario - without new power plants after 2020 WFM2 scenario - without new power plants after

42 38 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE The peak daily consumption saw a low point in 2014, mainly due to reductions in the electricity generation capacity that were mothballed in 2013 and Total consumption also saw a low point in 2014, due to a fall in consumption for the industrial customers connected directly to the GRTgaz network, not corrected for climate effects, contrary to the consumers linked to the public distribution system fed by the GRTgaz transmission network, corrected for climate effects to view the evolutions independently of climate effects. The four scenarios are spread regularly over the period with the GRTgaz low scenario (Less 30: 400 TWh in 2024), the GRTgaz high scenario (Diversified uses: 483 TWh in 2024), and, between the two, the GRTgaz reference scenario and its variant with enhanced gas-powered mobility (429/433 TWh in 2024). Scenario AMS2 is located below the GRTgaz low scenario, mainly due to a difference in consumption levels for the industry segment. All the scenarios forecast a jump in 2025 corresponding to the cumulative effects of development of gas-fired power generation (linked to the reduction of nuclear energy and to the development of renewable energy sources) and development of use of gas as a transport fuel. Evolution in gas consumption (fossil fuel share) not including electricity generation (15) between 2012 and 2030 GRTgaz reference Diversified uses Less 30 AMS2-21% -10% -27% -43% To compare the evolution in demand for imported gas under these different scenarios as compared with the objectives of the LTECV law, we calculate consumption not including electricity generation, from which we deduct injection of biomethane taken as standing at 10% (which corresponds to the objectives concerning development of renewable energy sources for gas in the LTECV law). The share of gas consumption linked to electricity generation depends on the choices made for the energy mix concerning electricity generation. The GRTgaz reference scenario and the Less 30 scenario are hence close to the energy transition objectives. Scenario AMS2 would seem to have a considerable impact on gas due to its very low trajectory for industry. Comparison of the scenarios: Residential and services sector RESIDENTIAL AND TERTIARY (TWh) 300 TWh Diversified Uses - Residential and Tertiary GRTgaz-2015 (reference) - Residential and Tertiary Less 30 (LTE) - Residential and Tertiary WFM2 - Residential and Tertiary For the residential and services segment, we do not note any marked low points in The effects of the warm weather in 2014 have been erased by the climate correction made to the consumption levels of the public distribution systems, in which almost all the residential and services consumers are to be found. For the GRTgaz reference scenario, the decrease in demand averages -0.8% per year. For the Less 30 and AMS2 scenarios, the trend is twice that size. 15. Taking into account injection of biomethane at a level of 10%.

43 _ 39 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE In spite of differences in parameterising the evolutions in numbers of buildings and the effects of the efforts to enhance energy efficiency, the trajectories of the Less 30 and AMS2 scenarios are very similar. Over the period, the hypotheses concerning new buildings and renovation work (taking all buildings and all energy sources together) are more moderate in the GRTgaz scenarios as compared with the pro- active values used in scenario AMS2. The consumption trajectory for the Diversified Uses scenario is stable, taking into account more moderate rates of renovation work and a larger share of transfer of the heating and domestic hot water uses from electricity to gas. In this scenario, the existing gas infrastructures cover a shift in consumption levels stemming from a switch to gas from other energy sources. Evolution in demand between 2012 and 2030 in the residential and services sector GRTgaz reference Diversified uses Less 30 AMS2-27% -16% -42% -43% Over the residential and services perimeter, the GRTgaz reference scenario and the Less 30 scenario reach the energy transition objectives. Hypotheses of the different scenarios for new buildings and renovations GRTgaz reference scenario: about 300,000 new housing units built per year; and renovation of almost 250,000 housing units built before 2012 each year; a surface area of about 12 million m² of new service buildings put up each year; and renovation of service buildings at an annual rate of about 22 million m²; renovation brings gains in energy efficiency of 35% for housing units and 15% for services buildings. Less 30 scenario about 355,000 new housing units built per year; and renovation of almost 400,000 housing units built before 2012 each year; a surface area of about 13 million m² of new service buildings put up each year; and renovation of service buildings at an annual rate of about 32 million m²; renovation brings gains in energy efficiency of 35% for housing units and 15% for services buildings Diversified Uses scenario about 300,000 new housing units built per year; and renovation of almost 150,000 housing units built before 2012 each year; a surface area of about 12 million m² of new service buildings put up each year; and renovation of service buildings at an annual rate of about 15 million m²; renovation brings gains in energy efficiency of 35% for housing units and 15% for services buildings. Scenario AMS2 new housing units per year: : 330,000; : 500,000; : 330,000; renovation of all housing units by 2030; a surface area of about 8 million m² of new service buildings put up each year; and renovation of service buildings at an annual rate of about 50 million m²; renovation brings gains in energy efficiency of 45% for housing units and 34% for services buildings.

44 40 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE Comparison of the scenarios: Industry sector Comparison of the scenarios: Electricity generation sector INDUSTRY (TWh) 200 TWh CENTRALISED ELECTRICITY PRODUCTION AND COGENERATION SITES (TWh) 180 TWh Diversified Uses - Industry GRTgaz-2015 (reference) - Industry Less 30 (LTE) - Industry WFM2 - Industry Diversified Uses - CEP + Cogen GRTgaz-2015 (reference) - CEP + Cogen Trend without new construction after 2020 Less 30 (LTE) - CEP + Cogen WFM2 - CEP + Cogen The main difference between the reference scenario and the Less 30 scenario lies in the levels of the efforts as to energy savings and efficiency made by the industrial concerns, and they are in fact fairly close. Indeed, as energy is one of the biggest cost items for industry, energy efficiency often leads to regular optimisation. The Diversified Uses trajectory slows slight growth linked to higher rates of conversion to gas from other energy sources. The AMS2 trajectory for industry is much lower than those of the other scenarios. In spite of a hypothesis as to evolution of value added for industrial production that is more favourable in scenario AMS2 (about +1.5%/year) than in the GRTgaz scenarios (about +0.7%/year), the industrial consumption levels in AMS2 are affected by a higher energy efficiency coefficient (estimated at -1.1%/ year per tonne produced) than that in the GRTgaz scenarios (about -0.3%/year to -0.5%/year). From 2015 to 2020, the profiles of gas consumption for electricity generation in the GRTgaz reference, Less 30 and AMS2 scenarios are coherent with the quantities of electricity generated in the medium term scenario of the RTE forecast. After 2020, GRTgaz proposes a development trajectory for gas-fired electricity generation in which gas demand is coherent with the RTE New Mix scenario. This scenario includes the objective of reducing the share of generation by nuclear plants to 50% in 2025 and development of a large share of renewable energy sources. To adapt the production/demand balance of the electricity network, manageable resources must be developed to accompany the highly intermittent power generation from wind power and photovoltaic systems. GRTgaz has established a hypothesis involving the construction of 10 combustion turbines (CTs) between 2023 and 2026

45 _ 41 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE and 7 combined cycle gas turbines (CCGTs) between 2025 and The CCGTs are used for basic and semi-basic generation and their operation leads to gas consumption in proportion to their duration of use. The CTs are designed for short durations of use at peak periods, and in spite of their numbers, their consumption levels are low. With these hypotheses, we hence observe a sharp rise in gas demand by The Diversified Uses scenario calls on a larger number of CCGTs as from 2025 (8 further CCGTs between 2025 and 2030) and cogeneration is further developed in that scenario. We can note that these hypotheses, which stem from the RTE New Mix scenario, lead to almost doubling the installed capacity of the CCGTs, but this development is accompanied by a reduction in the number of coal-fired plants. For electricity generation, the CO 2 emission factor for gas is close to half that of coal, so doubling the installed capacity would lead to stable levels of CO 2 emissions. GRTgaz also proposes a low trajectory for electricity generation, for information purposes, without any construction of new electricital capacity, under which the installed capacity and the quantities of gas consumed would remain at their 2020 levels until Although in theory this scenario is possible, it would currently seem highly unlikely in the framework of energy transition. Comparison of the scenarios: Gas-powered mobility Compared with the other energy sources available to diversify the energy mix for the transport sector (currently mainly provided by products derived from crude oil), use of gas as a fuel has the following advantages: it enables resorption of local pollution (particles) and helps to reduce CO 2 emissions. It provides sufficient autonomy for vehicles - heavy goods and passenger vehicles (buses, coaches, dustbin lorries, other heavy goods vehicles) and light vehicles (light goods vehicles, taxis, car pooling, private vehicles). The environmental balance is even more favourable if the gas used as a fuel consists of biomethane. Jointly with GrDF, GRTgaz has drawn up two trajectories for gas demand as part of development of gas-powered mobility: a reference trajectory reaching almost 12 TWh in 2030; an active trajectory reaching 35 TWh in GAS MOBILITY (TWh) TWh Diversified Uses scenario GRTgaz-2015 scenario (reference) GRTgaz-2015 scenario (with development of gas mobility) Less 30 scenario (LTE) WFM2 - DGEC scenario The GRTgaz reference scenario has been drawn up using the two gas-powered mobility variants. For the Diversified Uses scenario, we have used the reference trajectory. The LESS 30 scenario uses the active trajectory, as gas used as a fuel is indeed a solution that enables the objectives of the energy transition and a low-carbon mix to be reached overall.

46 42 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE To pilot development in use of gas as a fuel beyond the traditional uses ( back-to-base operating mode), a network of refuelling stations with public access is necessary. This is requested under the Alternative Fuels Infrastructure European directive1 which recommends that each Member State should draw up a plan covering deployment of public refuelling stations for electricity and gas by November Thanks to implementation of industrial partnerships and to internal skills in the fields of engineering and technical expertise concerning compression, GRTgaz accompanies the project stakeholders and helps to boost the activity by promoting an essential network of gas refuelling stations that meet the requirements of all types of vehicles. Emergence of use of gas as a fuel other than for captive fleets would entail a network of about 1,000 stations, or 10% of the current distribution system, accessible to the public and housed for the most part in the existing multi-fuel stations. To make a comparison, other countries in Europe have undertaken active policies: Italy has 850 public stations, Germany has 900 and Switzerland has 140. These refuelling points would be profitable once the number of equivalent light vehicles reaches one million (1,000 light vehicles per station), i.e. ~3% of the vehicles on the roads in France. - examination of Power to gas, with a project under way involving a pilot installation producing synthesised methane by using excess electricity from renewable sources at Fos-sur-Mer in Biomethane activity Local production of biomethane lies well within the dynamics of the energy and ecological transition. It helps to reduce greenhouse gas emissions, recycle waste and reduce our natural gas imports. Biomethane corresponds to biogas that has been treated to meet the required specifications for its injection in the networks. The biogas stems from decomposition of organic waste (household waste, organic farming substances, sludge from sewage treatment plants, etc.). Biomethane can be injected in the transmission network or the distribution system. Biomethane producers can benefit from a regulated purchase price that is guaranteed for 15 years if they inject the gas into the networks. The LTECV law sets the target of increasing the share of renewable energy sources to 10% of the gas consumption in France by The ADEME studies have confirmed the existing po- INJECTED BIOMETHANE (TWh) WITHIN THE GRTGAZ ZONE Renewable gas scenarios Regarding gas demand, the forecasts concerning production of renewable gas complete the overview as to the role of gas infrastructures in the energy transition TWh Added to the favourable environmental properties of natural gas as compared with other fossil fuels, injection of renewable gas further enhances the carbon footprint of gas. GRTgaz is developing two lines of industrial activities: - biomethane, with gradual connection of increasing numbers of biomethane producers in the near future; Biomethane trend scenario - total in GRTgaz zone Biomethane trend scenario - Distribution Biomethane trend scenario - Transmission Biomethane deliberate scenario - total in GRTgaz zone Biomethane deliberate scenario - Distribution Biomethane deliberate scenario - Transmission

47 _ 43 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE tential for development in France. GRTgaz relies on two hypotheses when forecasting injections of biomethane in the gas networks: - a Trend hypothesis 12 TWh injected in France by 2030, including 9 TWh within the GRTgaz perimeter; - an Active hypothesis 30 TWh injected in France by 2030, including 22.5 TWh within the GRTgaz perimeter. By the end of 2015, twenty or so projects will be in service in France, including the Chagny project (Saône et Loire département), which injects about 28 GWh/year in the GRTgaz network. Under the current trend, a boost in activity levels is expected by around Between 2015 and 2018, the trajectory corresponds to the projects identified by the network operators. By 2020, execution of the projects in the portfolio could represent up to 1 TWh/year of biomethane injected in the GRTgaz network. Beyond that date, the trajectories are projected to follow the guidelines drawn up by the ADEME up to Power to gas activity The Power to gas activity enables storage of the quantities of electricity from renewable sources (wind power and photovoltaic systems) when their generation outstrips demand. The underlying principle is that of converting electricity into hydrogen through water electrolysis. The hydrogen is then converted into synthesised methane through association with CO 2 recovery after capture of CO 2 emissions stemming from industrial, farming or electricity generation processes). The synthesised methane produced is by nature a renewable gas. It is injected in the gas networks. Construction of a demonstration plant is scheduled for 2018 at Fos-sur-Mer. By 2030, 100 Power to gas installations could be set up to enable storage of 2.5 to 3 TWhe of renewable surplus electricity. By 2050, development of 1,000 installations could enable storage of almost 25 TWhe of electricity out of a potential surplus of renewable electricity estimated at between 25 and 75 TWhe. 2.7 the transmission offer of grtgaz A dynamic market, satisfied clients The dynamism of the wholesale market has been confirmed with 640 TWh transferred at GRTgaz Title Transfer Points in 2014: up 3.9% on 2013 and a volume that has doubled over a period of four years. GRTgaz clients are satisfied: with the business relationship (95% of clients); with the quality of the transmission and delivery offers and services (92% of clients) satisfaction survey Since the opening of the natural gas market in Europe, consumers have had the right to choose their gas supplier. GRTgaz s mission is to transmit its shippers customers natural gas under the best possible cost, reliability and safety conditions. The company facilitates market access and favours a balance between the offer and demand for gas. For this purpose, in 2008, GRTgaz and TIGF have maintained a continuous dialogue with all market players. A regularly simplified entry/exit model The transmission offer of GRTgaz allows gas shippers to supply industrial sites and public distribution systems connected to the transmission net-

48 44 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE work, to ship gas through France or to carry out transactions with other parties. GRTgaz markets these transmission services: in the form of access capacity at the network s entry and exit points and on the North-South link. In each Zone, shippers may freely inject or withdraw gas for their customer deliveries; in the form of access to a Title Transfer Point (PEG): these points allow shippers to transfer gas, without having to indicate its source or destination, and access a gas trading managed by Powernext. Their only obligation is to balance entries and withdrawals over the gas day. This model guarantees flexible market operations and favours increased competition. GRTgaz NETWORK IN 2015 Montoir North-Atlantic Dunkirk LNG * North-West Gassco Alveringem * PEG North North B Taisnières H Taisnières B North-East Obergailbach Oltingue Fluxys GRTgaz Deutschland Open grid Europe Fluxswiss Towards a single market zone The existence of several entry/exit zones reflects the physical limits of the network and, in some cases, the impossibility of transmitting gas between an entry point in one zone and an exit point in another zone. Thanks to its investments, GRTgaz has reduced its number of balancing zones from four in 2005 to two in After completing the integration of the L-gas Balancing Zone in April 2013, this simplification process continued with the launch of a common marketplace between GRTgaz South and TIGF on 1 April CRE guidelines published in 2014 foresee the creation of a single wholesale market in France by A balancing system modernised in accordance with European rules In 2015, GRTgaz implemented market-oriented balancing systems as foreseen in the European Network Code. Since April 2015, shippers have had access to more information and forecasts on the system s equilibrium level and have had to play a role in maintaining the system s global balance. As from October 2015, market players will be entirely responsible for balancing the GRTgaz system, without any tolerance devices. GRTgaz has developed a service, called ALIZES, that allows the market to benefit from the flexibility permitted for global line-pack. Elengy Operator South-Atlantic Adjacent system operator TIGF Transport Storage Interface Point Network interconnection point Transport LNG Terminal Interface Point Direction of natural gas flow firm capacity in GWh/day Jura Gaznat South-East Fos Elengy Fosmax LNG * as from 1 November 2015 In parallel to this, the transmission offer of GRTgaz will grow at the beginning of 2016 with the creation of a Network Interconnection Point at Alveringem and the connection of a new LNG terminal at Dunkirk. Transparency and fluidity Smart GRTgaz, an online service, is accessible to all and offers clients and prospects comprehen-

49 _ 45 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE sive information so that they may optimise their capacity reservations and ensure their gas portfolio is balanced. It covers all interconnection points: borders, LNG terminals, storage facilities, the North-South link, consumption points, and offers more than 1,000 pieces of data in real time. Thanks to this reference information, Bloomberg and Reuters have chosen Smart GRTgaz to inform their subscribers. Prisma is another example of the measures put in place to create a veritable internal EU gas market. This platform facilitates the transmission of gas between all European marketplaces, while offering the possibility to book joint or bundled capacity online, in accordance with the CAM (16) network code, which will come into force in November It also facilitates access to a secondary market for capacity exchange. A total of 24 Transmission System Operators operate as partners within PRISMA, while 35 offer their products; over 450 shippers are registered. 2.8 demand for transmission capacity on the grtgaz network The volume of gas transmitted by GRTgaz in 2014, a historically warm year, was slightly down on The preponderance of flows from the North to the South was confirmed: another fall in LNG deliveries (between 2011 and 2014, LNG imports dropped by 45%); a substantial fall in LNG imports in Spain, resulting in a significant and regular rise in gas flows towards the TIGF zone and Spain. In light of this situation, transmission levels via the North-South link remain high. This link, which had become saturated, was only relieved at the very end of 2014 with a one-off delivery of LNG in the south of France. Furthermore, entry levels at Taisnières outweighed those at Obergailbach, thereby reflecting the fall in demand for Russian gas. CHANGES IN THE PRINCIPAL FLOWS OF GAS IN 2014 VERSUS 2013 Network interconnection point Transport LNG Terminal Interface Point Direct flow direction: Positive annual variation Negative annual variation Montoir-de-Bretagne -3 TWh Pirineos TIGF +10 TWh Dunkirk -4 TWh North Zone +18 TWh H +47 TWh B -10 TWh Taisnières +14 TWh South Zone Fos Tonkin Obergailbach Oltingue Fos Cavaou -13 TWh -52 TWh +14 TWh Storage site replenishment was a little higher than in 2013 due to a winter-summer price spread that increased over the year. 16. Capacity Allocation Management: network code that concerns the allocation of transmission capacity at the interconnection points.

50 46 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE Gas flow 2014 (TWh) 2013 (TWh) Change 2014/2013 (as a %) Gaseous gas entry Dunkirk % Taisnières H % Taisnières B % Obergailbach % LNG entry Montoir % Fos % North-South link and JTS % Exit Oltingue % Midi % Pirineos (1) % Storage Injection % Withdrawal % 1. Data from TIGF (Larrau + Biriatou up to 30 September 2014). Use of capacity subscribed in 2014 USE OF CAPACITY IN 2014 To supply the French market at the lowest cost, shippers primarily use capacity subscribed on the North-South link, at Dunkirk and at Taisnières. Use of the Midi PIR point and the Oltingue exit point is slightly up while entry levels at Obergailbach and at LNG terminals are down. It is worth noting that almost all Network Interconnection Points (PIR) were used at least once at their maximum capacity. Network interconnection point Transport LNG Terminal Interface Point Direct flow direction AA : annual average DM : daily maximum Montoir-de-Bretagne Dunkirk North Zone AA 86% DM 100% Taisnières AA 94% DM 100% H AA 81% DM 100% B AA 59% DM 100% Obergailbach Oltingue AA 49% DM 100% AA 35% DM 96% AA 7% DM 33% AA 77% DM 100% South Zone Biriatou TIGF Larrau Fos AA 43% DM 88%

51 _ 47 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE LNG: entry levels continue to plummet Since the end of 2011, LNG supplies have continuously fallen as shipments have changed course for more lucrative markets in Asia. In 2014, another 33% fall at Montoir and a 21% fall at Fos confirmed this trend, despite a one-off increase in deliveries to LNG terminals at the end of the year, which was not repeated in France at the beginning of Fall in entry levels at Obergailbach, to the benefit of Taisnières H In 2014, entry levels fell by 52 TWh at Obergailbach and increased by 47 TWh at Taisnières H. This switch reflects the fall in Russian imports due to the mild weather. A fall in entry levels at Dunkirk and Taisnières L Entry levels at Dunkirk fell by 2% in 2014 despite a very high capacity utilisation rate. Work associated with the connection of the Dunkirk LNG terminal reduced availability over the summer. Entry levels at Taisnières L fell by 23% due to the weather, in particular. Gas exit levels: significant increase at Oltingue and Midi The Midi PIR point saw flows towards the TIGF zone increase by 18 TWh, the majority of which continued to Spain (10 TWh) while the rest was used to replenish TIGF storage sites, higher in 2014 than in In 2015, a 35% rise in LNG imports in Spain, compared to the first half of 2014 (from 310 to 420 GWh/d), led to a fall in gas imports from France of almost 25% (from 122 to 94 GWh/d over the same period). Gas exports towards Switzerland and Italy increased by 48% following a rise in prices on the Italian market. Since the end of 2013, prices have risen and returned to 2012 levels. In November 2014, the replenishment level of storage facilities was higher than in November 2013, in anticipation of a significant winter/summer price spread. Furthermore, in the winter of 2013/2014, shippers had found it difficult to strike a balance following an explosion in the North-South price spread, which rose to 16.77/MWh. Shippers therefore preferred to replenish the storage facilities to prepare for a winter (2014/2015) during which LNG would not always be present in the South Zone. PRICE SPREADS BETWEEN PSV (ITALY) AND PEG NORTH LEVEL OF REPLENISHMENT IN GWH (TIGF AND STORENGY) 10 8 /MWh 140, ,000 GWh 6 100, , Apr July 2012 Oct Apr July 2013 Oct Apr July 2014 Oct Apr ,000 40,000 20,000 0 January 2013 February April June July August 2014 September October November December

52 48 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE FOS GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov MONTOIR 450 GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov Average monthly flow Reduced technical capacity 71089,2).0219,5:2) ;(3(</4=942<>)/?0292@@2<4/*2 Entry levels DUNKIRK 700 GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov TAISNIÈRE H 800 GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov Average monthly flow Reduced technical capacity OBERGAILBACH 700 GWh/d TAISNIÈRE B 300 GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov Average monthly flow Reduced technical capacity

53 _ 49 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE MIDI OLTINGUE Exit levels GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov GWh/d July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov Average monthly flow Reduced technical capacity North-South link: less demand in the winter of 2014/2015 Once again, great demand was placed on the North-South link in 2014 with flows from the North to the South increasing by 14 TWh between 2013 and 2014, driven by the rise in deliveries towards Spain and the replenishment of storage sites in the South Zone. Nevertheless, pressure on the link eased at the start of the winter of 2014/2015, allowing a large-scale withdrawal of gas from storage sites in the south and a one-off LNG delivery to Fos during this period. The fall in pressure was also reflected in prices in the South Zone; the difference in price between the South and the North shrank considerably at the beginning of the winter of 2014/2015. THE NORTH-SOUTH LINK AVERAGE MONTHLY PRICES AT PEG NORTH AND PEG SOUTH GWh/d /MWh July Sept. Nov. July Sept. Nov. July Sept. Nov. July Sept. Nov July 2013 Sept Nov July 2014 Sept Nov July 2015 Average monthly flow Reduced technical capacity PEG North PEG South

54 50 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE NUMBER OF DAYS AT MAXIMUM USE ANNUAL AVERAGE UTILISATION RATE OF THE NORTH-SOUTH LINK (AS A %) 100% % 60% 40% 20% Analysis of subscriptions by entry/exit point GRTgaz also uses the entry and exit point subscription rate analysis to determine the capacity development requirements of the network. Over the period , these rates are generally high and stable: on average, more than 90% of the long-term firm capacity offered is already booked for the period Additional short-term firm capacity is offered to provide supplementary market arbitrage possibilities and to facilitate access to the market for new players. improving access to the south zone GRTgaz has taken several measures to improve access to the South Zone and it is working closely with adjacent transmission, storage and LNG terminal operators to release new capacity on the North- South link. Since June 2013, the Joint Transport Storage (JTS) service, designed with Storengy, has provided an additional daily capacity of up to 32 GWh/d, which is auctioned. Thanks to this service, an additional 5.37 TWh was transmitted in Since April 2014, GRTgaz has offered 40 GWh/d in additional firm capacity as a replacement for interruptible capacity. The optimisation of flows between TIGF and GRTgaz allowed an additional firm monthly capacity of 20 GWh/d to be sold in the winter of 2014/2015 and improved the availability of interruptible capacity that had already been sold. For the winter of 2015/2016, GRTgaz has once again auctioned 5 GWh/d of entry capacity in the South Zone out of Switzerland thanks to close cooperation with Swiss network operators, particularly Gaznat. The optimisation of flows between TIGF and GRTgaz must once again allow an additional firm monthly capacity of 20 GWh/d to be sold in the winter of 2015/2016 and improve the availability of interruptible capacity that has already been sold. The JTS service will be repeated once again.

55 _ 51 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE Firm capacity subscriptions for gaseous gas entry points For , long-term capacity has been fully subscribed at Dunkirk; 90% of long-term capacity has been subscribed at Taisnières L, This high subscription rate is normal in light of the specific nature of these points (importing of Norwegian gas and the only entry point for L-gas delivery). At Taisnières H and Obergailbach, 30 GWh/d of additional capacity was offered throughout most of the winter, as foreseen in the network code related to congestion management. At the Midi PIR point, from TIGF towards GRTgaz, capacity increases made in 2013 in both directions met requirements. With subscription rates of around 80%, they allowed the GRTgaz South Zone and the TIGF zone to merge in April 2015 while managing the risk of structural congestion. GASEOUS GAS ENTRY POINTS 120% 100% 80% 60% 40% 20% Dunkirk Taisnières H Taisnières B Obergailbach Midi TIGF towards GRTgaz EXIT POINTS 120% 100% 80% 60% 40% 20% Oltingue Alveringhem Midi GRTgaz towards TIGF

56 52 _ EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE Firm capacity subscriptions for LNG entry points At the Montoir and Fos entry points, long-term subscription rates reach, on average, almost 90%. At the new Dunkirk LNG entry point, reserved capacity totals 250 GWh/d. Firm capacity subscriptions for exit points At Oltingue, capacity has been fully subscribed. At Alveringem, the long-term subscription rate is around 80%. At the Midi PIR point, from GRTgaz towards TIGF, the highly seasonal nature of the link is reflected in subscription rates of close to 80% in the winter and 50% in the summer. Capacity subscriptions for the North- South link Firm capacity for the North-South link was increased to 270 GWh/d as from April 2014 by converting interruptible capacity to firm capacity, thanks to recent adjustments to the network. In 2014, 40 GWh/d was set aside for large industrial consumers of gas. During auctions on the Prisma platform, demand substantially exceeded supply, creating an auction premium. GRTgaz responded to this demand by launching the JTS service and by creating entry capacity at PIR Jura, which provides access to the South Zone from Switzerland, thereby relieving the North-South link during the winter. As from the winter of 2014/2015, the North- South link utilisation rate has fallen significantly. Due to these changes, the 2015 auctions were far less successful: the premiums were far lower than those of 2014 and, for the first time since 2011, some lots at quarterly auctions were not sold. The JTS service subscription rate has also fallen since the winter of 2014/2015 and quarterly auctions for entry capacity at PIR Jura did not give rise to any allocations. Injection/withdrawal capacity subscriptions for underground storage facilities Storage capacity served by GRTgaz is marketed every year by the operator, Storengy. GRTgaz allocates the corresponding injection and withdrawal capacity on the transmission network automatically. The introduction of monthly capacity products in 2013 and of quarterly products in 2014 lets storage clients adjust the allocation of transmission capacity in accordance with the short-term services offered by the storage operator. High winter/summer price spread forecasts and the balancing difficulties encountered the previous winter following the explosion in the North- South price spread helped improve the replenishment rate at the end of the summer of In 2015, this trend was reversed and, excluding new regulatory storage obligations placed on suppliers, demand for storage in France fell once again.

57 _ 53 EVOLUTION AND PROSPECTS FOR THE GAS MARKET IN FRANCE FIRM CAPACITY SUBSCRIPTIONS ON THE NORTH-SOUTH LINK IN THE SUMMER OF GWh/d 27 GWh/d 98 GWh/d 126 GWh/d 126 GWh/d GWh/d 65 GWh/d 46.5 GWh/d 41 GWh/d 61.5 GWh/d 26 GWh/d 74 GWh/d 38 GWh/d 131 GWh/d 104 GWh/j 77.5 GWh/d 40 GWh/d 01/04/ /04/ /10/ /04/ /10/ /10/ /10/ /10/2018 Available Reserved capacity 2015 auctions (annual and quarterly) Short-term OSP Long-term OSP Large gas consumer OSP 2014 auctions (annual and quarterly) FIRM CAPACITY PRICE ON THE NORTH-SOUTH LINK 270 GWh/d 3.90/MWh 0.57/MWh 0.72/MWh 3.54/MWh 2.96/MWh 0.84/MWh 2.39/MWh 0.84/MWh 1.81/MWh 0.57/MWh 01/04/ /04/ /10/ /10/ /10/ /10/ /10/2018 Available 2015 quarterly auction tariff 2015 annual auction tariff 2014 quarterly auction tariff 2014 annual auction tariff Regulated tariff

58 54 _ 3DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK The shale gas revolution, the Fukushima disaster, the Ukrainian crisis and the collapse in oil prices are all events with global reverberations that have shaken the European gas market over the past few years. Gas prices, sources and directions of flow in Europe have constantly changed. Such volatility supports the need for large entry and exit capacity and a robust and flexible core network to guarantee, regardless of the circumstances, security of supply and access to the most competitive gas. Shippers must be able to choose between sources of gas without being too restricted by the network s physical limits. In the longer term, additional imports that are required to make up for the fall in European production will also give rise to new flows within Europe and, most probably, new transmission infrastructure. At the same time, gas consumption in and around 2030 is very uncertain due to the introduction of new energy policies in Europe, and in France, that aim to lower greenhouse gas emissions. It is therefore even more difficult to assess the suitability of new investments. It is in this context that GRTgaz network development projects should be seen. With regards to current projects, at the end of 2015, the new LNG terminal at Dunkirk and the transmission network infrastructure on which it depends will be commissioned. New exit capacity will also be created at the end of 2015 at Alveringem with the commissioning of the Flanders pipeline, which will allow non-odorised gas to be transmitted towards Belgium. New entry capacity will be created from Switzerland and Italy at Oltingue in 2018 to connect the French and Italian marketplaces and to strength South-North flows. Simplification of the French market is also taking place at the same time. The first step was taken in April 2015 with the introduction of the TRS, a common marketplace for the south of France. It will be completed in 2018 with the commissioning of infrastructures under the Val de Saône and Gascogne-Midi projects. These infrastructures, designed to ease congestion on the North-South link, will allow a single marketplace to be created in France. In 2021/2022, new interconnection points with Spain and Germany are envisaged to strengthen the North-South corridor in the west of Europe. Projects to increase regasification capacity at Fos and at Montoir are also envisaged in order to supply LNG to the centre of Europe. During the plan s lifetime, developments on the GRTgaz network will have to be considered to ensure continuity of supply for clients supplied with L-gas and, if necessary, to respond to energy transition challenges (biomethane, generation of electricity from natural gas, Power to Gas). 3.1 Developing the transmission network: processes and timelines 3.2 Project portfolio changes 3.3 A single marketplace in France in Developments in the North Zone 3.5 Developments in the South Zone 3.6 Other development projects 3.7 Infrastructure to be commissioned over the next three years ( ) 3.8 Infrastructure commissioned after Forecast capacity development for Meeting of demand for gas in France in 2024

59 _ 55 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.1 developing the transmission network: processes and timelines Analysing demand and changes in demand lets GRTgaz identify the infrastructure that is required to: develop trading capacity with adjacent operators: shippers, LNG terminal operators, storage site operators, biomethane producers; adapt the network to variations in supplies and flow configurations; respond to changes sought for the organisation of the market, with the eventual creation of a single balancing zone; respond to changes in consumption, particularly those related to the use of combined cycle power plants (17), which require significant levels of intraday flexibility. The development of the regional network is mainly based on the coverage of transmission requirements at the time of peak demand. The development of the national network depends on changes in capacity requirements at zone entry/exit points. In order to create new capacity, structures that connect to adjacent infrastructure have to be built or strengthened and the core network has to be strengthened so it can transmit the additional flows of gas from any of a given zone s entry points to any of its exit points. In most cases, strengthening one core network structure meets the needs of several capacity development projects. The strengthening schedule therefore depends on the project that triggers the schedule. In some cases, the strengthening of the core network can be a gradual process, as illustrated by the developments on the North-South link. Discussions with shippers and adjacent operators allow GRTgaz to measure development requirements and schedule core network investments. A change in their schedule can also cause GRTgaz to adjust its programme accordingly. Projects can also be affected by regulatory changes, world energy market developments and their impact on shippers, consumers and investors. MACRO PLAN FOR THE COMPLETION OF MAJOR TRANSMISSION PROJECTS Year Y Y+1 Y+2 Y+3 Y+4 Y+5 Y+6 Compression Pipeline without public debate Pipeline with public debate Technical studies Consultation and administrative and public procedures prior to authorisation Works 17. A CCPP uses around 20 GWh/d (20 million KWh), i.e. the equivalent of the winter consumption of a city with 200,000 inhabitants.

60 56 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.2 project portfolio changes GRTgaz invested 663 million euros in 2014 to upgrade and expand its transmission network, optimise its robustness and flexibility, and increase its capacity with adjacent networks. Commissioned infrastructure The infrastructure that has been commissioned will allow the new LNG terminal at Dunkirk to be connected and capacity with Belgium and Spain to be increased, in compliance with commitments made to the market: In the case of Spain, the commissioning of the new compressor and interconnection station at Chazelles (Charente) helped increase capacity at Port-de-Larrau from 110 GWh/d to 165 GWh/d in the direction, France to Spain, and from 110 GWh/d to 165 GWh/d in the direction, Spain to France. The station received 48 m in funding from the European Union. By the end of 2015, infrastructure that will connect the LNG terminal at Dunkirk and that will create an exit towards Belgium will be commissioned: transmission line between Cuvilly and Dierrey; Clipon, Pitgam, Cuvilly, Ourcq and Dierrey interconnection stations; Flanders pipeline between Pitgam and Alveringem; Hondshoote metering station on the Belgian border. Ongoing projects GRTgaz continues its work on confirmed projects, namely. Arc de Dierrey is under construction on the Dierrey Voisines section. Following the decision made by the CRE on to retain the Val de Saône + Gascogne- Midi solution to create a single marketplace in France by 2018 and discussions on 25 September 2015 on the incentive regulation mechanism applied to this solution. The decision to make these investments was made by GRTgaz. In light of this strategy, the commissioning of Eridan was postponed until 2021/2022 in order to coincide with entry capacity development projects in the south of France. The Eridan project s Declaration of public interest and Ministerial authorisation for construction and operation were issued on 5 January Furthermore, it was decided that 100 GWh of capacity from Switzerland towards France would be created at Oltingue. Studies under way and projects pending a decision Discussions with stakeholders have allowed us to confirm most of the projects identified in the previous plan, although their implementation dates may have been pushed back: development of the Montoir and Fos-sur-Mer LNG terminals; development of the Manosque storage site; capacity increase between France and Spain to the east of the Pyrenees (Midcat project); creation of capacity from France towards Germany. Projects on hold Other projects were suspended by their promoters. Fos Faster put an end to its plans for a new LNG terminal at Fos-sur-Mer. Creos suspended its interconnection project with France.

61 _ 57 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.3 a single marketplace in france in 2018 The CRE intends to pursue the simplification of the transmission market in France, while remaining consistent with the projected organisation of the European gas market. It asked GRTgaz and TIGF to create a single marketplace in the south on 1 April The CRE s goal is to establish a single marketplace in France by 2018 by merging the North and South Zones, and therefore recommends the execution of the Val de Saône and Gascogne-Midi projects. Development of marketplaces in France GRTgaz has consistently invested to reduce the number of balancing zones (from seven to three since 2003) and thereby facilitate the use of the network and the integration of the French network into the European system. The significant price spread between the North and South Zones and the outcome of the spring 2014 auction on the North-South link illustrate the physical congestion that exists between the northern and the southern parts of the GRTgaz network. The CRE and market players wish to continue their efforts to simplify the French market structure with a view to setting up a single marketplace in France, while remaining consistent with the projected organisation of the European gas market. Creation of a single marketplace in France In 2011, the study entrusted to KEMA demonstrated that the merger of the GRTgaz North and South market zones based on the Arc de Dierrey and Eridan projects would imply the need for contractual mechanisms that were potentially very expensive. In 2012, GRTgaz considered an approach that would combine investments and contractual mechanisms. In addition to the Arc de Dierrey and Eridan projects, the Val de Saône project, which involves looping the Burgundy pipeline between Voisines (Yonne) and Etrez (Ain), stood out as the most efficient solution to ease congestion and limit the use of contractual tools. The CRE took this information into account when it declared itself in favour of the creation of a single PEG based on the Val de Saône project, following discussions on 19 July In accordance with these discussions, and to confirm this strategy, the CRE asked the firm, Pöyry, SUPPLY AND CONGESTION IN CASE OF LOW LNG DELIVERIES Trading Region South The first stage of this process involves the creation of a shared PEG at the GRTgaz South and TIGF balancing zones. In response to the CRE s request, the two French transmission operators took steps in order to launch this new marketplace on 1 April As of this date, capacity at the interconnection between GRTgaz and TIGF is no longer marketed and shippers can no longer call for capacity on the PIR Midi point. GRTgaz and TIGF manage the physical interconnection with their consumption forecasts. The creation of Trading Region South has not required any additional physical changes to the network. Montoir-de-Bretagne Pirineos Transit zone Dunkirk Zone lacking gas Collection zone Taisnières Fos Oltingue South-East Obergailbach

62 58 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK to conduct a comparative cost-benefit analysis in the second half of 2013 on different investment solutions for the creation of a single PEG. The analysis confirmed the validity of the Val de Saône project. It also identified a more economical alternative to the Eridan project given the creation of a single PEG: the undertaking of the Gascogne-Midi project, which would involve consolidation work on the GRTgaz and the TIGF networks. Such consolidation works were mapped out to cover a series of flow configurations shared with the market, particularly the hypothesis of an entry flow at Dunkirk similar to the current subscription level. The natural gas offer at the single PEG will be capable of meeting the shippers usual requirements, as envisaged in the Pöyry study. Exceptional systems will have to be put into place when the flow configurations depart from the initial assumptions. The Pöyry study concluded that the creation of a single PEG would generate benefits for the French and Iberian markets under all market scenarios in which LNG is not less expensive for a long period than gaseous gas delivered by pipeline. These benefits are even greater than the investment costs in the event LNG becomes more expensive than gaseous gas. This scenario calls for large transmission capacities from the North to the South, which led to the identification of the most efficient consolidation works to transmit large volumes of gas collected at interconnection points in the North towards the South. This solution involves: looping the Burgundy pipeline between the Voisines and Etrez stations (Val de Saône project), which allows transit operations to be developed in the east, the shortest route between the collection zone in the north and the zone to be supplied in the south; strengthening the West-East route in the south (Gascogne-Midi project), which opens up the south-east by creating an additional supply line from the west. Following the public consultation process undertaken in February and 2014, the CRE confirmed the decision to create a single marketplace by 2018 on It retained the investment plan for the Val de Saône and Gascogne- Midi projects. On 25 September 2014, it defined the incentive regulation mechanisms applied to these two projects. The Val de Saône project The project involves looping the Burgundy pipeline (ND 1200) over a distance of 189 km between Voisines and Etrez, and boosting the capacity of the compressor station at Etrez by installing a third 9 MW compressor, and adjusting the interconnections at Etrez, Palleau and Voisines accordingly. GRTgaz launched this project s appraisal studies as early as July The public debate was held in the last quarter of 2013 and ended with a favourable recommendation from the National public debate commission. The gas transmission authorisation application was filed in July The public enquiry was held in the summer of 2015 and gave rise to a small number of remarks. The CRE conducted an audit on the project s technical choices, costs and timelines in June The preliminary studies estimated the cost of the project at around 740 million. The teams at GRTgaz and the project s stakeholders are working to ensure all of the project s infrastructure is commissioned by 1 November In October 2013, the Val de Saône project was recognised as a Project of common interest (PCI) by

63 _ 59 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK the European Commission. The French and Spanish regulators decided to allocate the cost of the project to the French market alone. In order to relieve the burden of this investment on French users, the project was awarded funding capped at 74 m by the European Union. The final investment decision was made by GRTgaz on 7 September This project was recognised as a PCI by the European Union in The Gascogne-Midi project The project will supply the PACA (Provence, Alps and Côte d Azur) region in the south-east of France by creating a backhaul flow from TIGF to GRTgaz through the Midi pipeline. On the TIGF network, the project entails the partial looping of the Gascogne pipeline over a distance of 60 km between Lussagnet and Barran and alterations to the Barbaira station. On the GRTgaz network, the Cruzy (Hérault) and Saint-Martin-de-Crau (Bouches du Rhône) stations will be adapted to operate the Midi pipeline in a backhaul direction. CREATION OF A SINGLE MARKETPLACE IN FRANCE Network interconnection point LNG terminal In progress Gascogne pipeline Gascogne Midi Voisines Midi pipeline Cruzy Barbaira Palleau The provisional budget is 152 million for TIGF and 21 million for GRTgaz; commissioning is scheduled for This project is a PCI candidate. Val de Saône Etrez Saint-Martinde-Crau 3.4 developments in the north zone In the north, the French network imports gas from Norway at Dunkirk and has entry capacity for H-gas and for L-gas from Belgium at Taisnières. In 2015, a new LNG terminal shall be commissioned at Dunkirk and a new exit point towards Belgium shall be created at Alveringem to boost the integration of the French, Belgian and north European markets. The Arc-de-Dierrey core network project will accommodate this new terminal s capacity and streamline the circulation of gas in the North Zone. Connecting the new Dunkirk terminal (2015) With a capacity of 13 bcm/year, this terminal should be operational by the end of Its connection to the network requires the following work: the creation of a 900 mm-diameter linking pipeline over a distance of 17 km between the terminal and the Pitgam compressor station (North); this pipeline will carry non-odorised gas;

64 60 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK the looping of the Hauts-de-France pipeline between Nédon (Pas-de-Calais) and Cuvilly (Oise) with a 1,200 mm-diameter pipeline over a distance of 123 km and alterations to the interconnection stations of Pitgam, Cuvilly, Ourcq and Dierrey (Aube); the creation of the first section of the Arc de Dierrey over a distance of 180 km between Cuvilly and Dierrey; the commissioning of a second section between Dierrey and Voisines in late This infrastructure will increase entry capacity from the Dunkirk zone towards PEG North and Belgium via the new Network Interconnection Point at Alveringem by 520 GWh/d. Except for the transmission line between Dierrey and Voisines, which is in the process of being built, all of the infrastructure will be commissioned before the end of 2015 so that the Dunkirk LNG terminal may be launched on to the market. The decision in favour of this connection work was taken on 30 December The investment approved by the CRE totals 1,185 million. The core-network developments associated with this project (Arc de Dierrey) and the increase in entry CONNECTION OF THE DUNKIRK LNG TERMINAL AND CREATION OF EXIT CAPACITY TOWARDS BELGIUM Montoir-de-Bretagne Dunkirk Pitgam Hauts de France II Ourcq Alveringem Cuvilly Arc de Dierrey Taisnières Dierrey Voisines Obergailbach Oltingue capacity at Taisnières H (commissioned in 2013) were awarded 104 million in funding by the European Union under the European energy programme for recovery. The Arc-de-Dierrey project was identified in 2013 as a PCI by the European Union and is not a candidate for the renewal of this label. Belgium: creating exit capacity at Alveringem (2015) Before the construction of the new LNG terminal at Dunkirk, GRTgaz was unable to export gas to Belgium. In France and Spain, gas odorisation, which is mandatory on distribution system to identify leaks, is carried out centrally at the transmission network s entry point, while in most European countries, including Belgium and Germany, it is carried outjust upstream the distribution network. GRTgaz does not, therefore, sell firm exit capacity towards this country. The new Dunkirk LNG terminal, by bringing non-odorised gas close to the Belgian border, will allow firm capacity to be sold from France towards Belgium. A new interconnection point, dedicated to non-odorised gas, will be created close to Alveringem. In 2010, GRTgaz and Fluxys launched a joint market consultation process to assess requirements. The outcome of the non-binding phase led them to offer the following for the binding phase: at Alveringem, exit capacity from the GRTgaz network and entry capacity on the Fluxys network allocated in a coordinated fashion and marketed by GRTgaz and Fluxys, respectively; at the Dunkirk terminal, entry capacity on the Fluxys network, marketed by Fluxys thanks to a transmission service contract with GRTgaz. Network interconnection point LNG terminal In progress TIGF Fos Tonkin Fos Cavaou The consultation phase ended in 2012 with a decision to allocate 100 GWh/d in firm capacity from PEG North towards Belgium over the first two years and 166 to 219 GWh/d in firm capacity from the terminal towards Belgium depending on the year in question.

65 _ 61 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK On the French side, the completion of this new interconnection required: modifications to the Pitgam interconnection; the creation of the Flanders pipeline, approximately 25 km in length, to transmit nonodorised gas between the Pitgam station and the Alveringem interconnection point. In Belgium, Fluxys built a 75 km pipeline between Alveringem and Maldegem. GRTgaz has invested approximately 86 m. This infrastructure will be commissioned in November This project was recognised as a PCI by the European Union in Switzerland / Italy: creating entry capacity at Oltingue (2018) This South-North capacity development project between Italy, Switzerland and France is being carried out in close cooperation with the adjacent operators. It had been under consideration for several years and regularly requested by shippers since In 2010, FluxSwiss launched a market consultation process to assess the demand for transmission capacity from Italy towards France, which resulted in the booking of capacity. At the beginning of 2015, it decided to make the investments necessary. For its part, Snam Rete Gas decided to invest in its transmission network so as to be able to export more than 400 GWh/d towards Switzerland to supply France and Germany. In order to improve the connection between the French and Italian markets, GRTgaz decided in 2015, with the support of market players and the regulator, to make the investments necessary to permit backhaul flows and create an entry capacity of 100 GWh/d, which may be increased to 200 GWh/d. The work consists of the alteration of Oltingue station, which is the interconnection point with Switzerland, and of Morelmaison station so as to reverse the direction of the gas flow on this section at a cost of around 15 m. Capacity should be made available in 2018, at a time when exit capacity towards Italy and transit capacity via Switzerland are delivered. By creating a new entry point in France, this project provides access to new sources of gas from Libya, Algeria (by pipeline) and Azerbaijan. The Trans Adriatic Pipeline (TAP) will supply 10 bcm of Azeri gas to Italy in 2019/2020; this project lends weight to the creation of backhaul capacity from Italy to France. This project also connects the PEG North and PSV marketplaces in both directions, thereby creating new trading opportunities between these markets. This project was identified as a PCI by the European Union in 2013 and is a candidate for the renewal of this label. Germany: creating exit capacity at Obergailbach (2022) As part of the reinforcement of the North-South Corridor in the west of Europe, GRTgaz is studying the creation of 100 GWh/d in firm exit capacity towards Germany at Obergailbach. This could fulfil the need for natural gas entries in western Germany, as identified in the German development plan regarding the replacement of L-gas. To create this capacity, the following work is envisaged: the looping of all or part of the North-East pipeline between Morelmaison (Vosges) and Voisines; the restructuring of interconnection points at Voisines, Morelmaison and, if necessary, Obergailbach; the installation of a compressor station at Cheppy (Meuse); an increase in compression at Voisines and Dierrey. In the absence of a clear request from German market operators and due to the time required to build the above-mentioned infrastructure, the project was postponed from 2021 to 2022.

66 62 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK DEVELOPMENT OF INTERCONNECTIONS WITH GERMANY AND ITALY Network interconnection point LNG terminal In progress Under consideration Montoir-de-Bretagne Dunkirk Alveringem Dierrey Cheppy Single market France Taisnières Morelmaison Voisines North-East pipeline Oltingue Obergailbach will be used to assess the conditions under which this process would be rolled out on the national network. Prior to this experiment, the investment necessary to decentralise odorisation and create exit capacity towards Germany had been put at approximately 600 million at the project identification stage. In addition to this experiment, GRTgaz is also exploring alternative solutions, such as the installation of a deodorisation unit on the North-East pipeline. Pirineos TIGF Fos Tonkin Fos Cavaou This project (creation of capacity from France towards Germany, including the harmonisation of odorisation practices) was identified as a PCI in 2013 by the European Union and is a candidate for the renewal of this label. Luxembourg: increasing exit capacity The creation of exit capacity towards Germany also depends on the harmonisation of odorisation practices between France and Germany. As explained previously, France cannot export odorised gas towards Germany as German transmission operators do not accept it, except in the case of force majeure. This question is considered under the Network Code on Interoperability, approved by ACER and the European Commission. The Code states that if different practices hinder cross-border trade, operators will have to reach an agreement to remove the barriers to such trade. If no agreement is reached, the non-odorisation of gas will be the solution retained. The purpose of the Odicee project is to clarify this problem. The solution that is currently being considered is the decentralisation of gas odorisation on the GRTgaz network. In order to assess the safety, reliability and cost of the technical solutions envisaged, GRTgaz launched a pilot project, which is still in progress, in 2015 on two sites, Etroeungt (North) and Bas Lieu (North). These stations add, at the distribution network s entry point, odour to a gas that has already been odorised. The results To respond to the expected growth of Luxembourgian consumption and to meet requirements laid down in security of supply regulations, Creos Luxembourg asked GRTgaz to examine the laying of a pipeline between the Lorraine pipeline and Luxembourg, which would have increased transit capacity from France. The investment was estimated at 72 million in 2012 for an exit capacity of 40 GWh/d. The two operators launched a joint market consultation process, which was completed in However, there was no confirmed interest for the capacity put forward. As Luxembourg was moving towards the Belgian market to create the BeLux market on 1 October 2015, CREOS decided to abandon this project in September Supporting the development of the Montoir terminal (2021) Elengy plans to increase the capacity of the LNG terminal of Montoir-de-Bretagne from 10 bcm to 16.5 bcm in A market consultation process (non-binding phase) is in progress.

67 _ 63 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK DEVELOPMENT OF REGASIFICATION CAPACITY AT MONTOIR DE BRETAGNE and a pipeline would have to be installed between Chémery (Loir-et-Cher) and Dierrey. Dunkirk Alveringem Taisnières Cherré Dierrey Auvers-le-Hamon Nozay Montoir-de-Bretagne Chémery Single market France Maine pipeline Obergailbach Oltingue Maintaining supply for L-gas consumers The L-gas supplied to the GRTgaz network comes from the Groningue deposit in the Netherlands. This deposit has now entered a phase of rapid depletion and its exploitation could cause earthquakes. The Dutch government announced in early 2014 that export contracts would not be renewed. GRTgaz must therefore be prepared for a gradual fall in its L-gas supply from 2024 and a complete halt in 2029, at the latest. Network interconnection point LNG terminal In progress Under consideration TIGF Fos Tonkin Fos Cavaou In order to accommodate this capacity, the Auvers-le-Hamon compressor station would have to be adapted, the Maine pipeline would have to be looped with a 1050-ND pipeline between Nozay (Loire-Atlantique) and Cherré (Maine et Loire), The number of customers currently supplied in L-gas is 1.3 million. The conversion of this zone to H-gas could take place between 2021 and Research on the implementation of this conversion process is being conducted in conjunction with GrDF and Storengy, under the auspices of the public authorities. At this stage, the adaptation of each consumer s installation is envisaged. GrDF would undertake the conversion work by geographical area. During the conversion period, GRTgaz would adapt its network to guarantee the transmission of both L-gas and H-gas. 3.5 developments in the south zone Trading Region South, operated by GRTgaz and TIGF, is supplied by the Fos Tonkin and Fos Cavaou LNG terminals at Fos-sur-Mer and has interconnection capacity with the North Zone of GRTgaz at the North- South link, and with Spain through the TIGF network at the virtual interconnection point, PIRINEOS. The Val de Saône and Gascogne-Midi infrastructure development project will significantly increase the flow of gas from the North to the South as from 2018, thereby permitting the creation of a single marketplace in France. In the opposite direction, however, the network s ability to accommodate significant additional flows in the south is restricted by the limited capacity of the Saint-Martin-de-Crau Etrez pipeline. Any project that aims to increase capacity in the south of the South Zone would therefore require, depending on the project s needs, all or part of this pipeline to be strengthened, including and first of all, the looping of the Rhône pipeline.

68 64 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK The Eridan project: looping of the Rhône pipeline The Eridan project will loop the Rhône pipeline by building a 220 km pipeline between the interconnection stations of Saint-Martin-de-Crau and Saint-Avit (Drôme), which will be adapted, and close to the Tersanne storage facility. This infrastructure, which was decided in 2011 and is scheduled to be commissioned in 2016, aims to boost the capacity of LNG delivered at the LNG terminals at Fos and transmitted to the North, to facilitate the merger of the GRTgaz North and South Zones and to increase intra-day flexibility in the south of the South Zone. The investment, estimated at 484 m, was approved by CRE. The cost of the project is now estimated at 620 m, following detailed studies and a public discussion in Following CRE discussions on , the project is no longer retained for the merger of the North and South Zones. However, it is necessary for any project requiring the development of the North-South Corridor, such as the development of capacity from Spain (Midcat project) or from the Fos LNG terminals. On 27 October 2014, the project was declared to be in the public interest and GRTgaz received ministerial authorisation to construct and operate the pipeline on 5 January Once the requirements have been confirmed, Eridan may be completed within five years. This project is a PCI candidate. Supporting future increases in capacity: the Arc Lyonnais project The Arc Lyonnais project consists of looping the pipeline between Saint-Avit and Etrez to support capacity increases in the south of the South Zone superior to the capacity served by the Eridan project (around 120 GWh/d). These requirements could be met by undertaking one major project or several development projects from among the following: new LNG regasification capacity at Fos, new withdrawal capacity at the Manosque storage facility, new interconnection capacity with Spain (Midcat project). Public discussions on this project were held in conjunction with those of the Val de Saône project at the end of The preliminary studies will be carried out as soon as the project schedule for the commissioning of the works is clearer. This project is a PCI candidate. Supporting the development of the Manosque storage facility (2019 and 2020) Géométhane plans to renovate the Manosque storage facility (Alpes-de-Haute-Provence) and to increase its injection capacity in 2019 and its withdrawal capacity in Increasing the withdrawal capacity of this storage site could require: alterations to the interconnection stations at Saint-Martin-de-Crau and Etrez; the boosting of compression at Saint-Martin-de- Crau. Supporting the development of the Fos Cavaou terminal (2021) Fosmax LNG plans to increase the capacity of the Fos Cavaou terminal up to 16.5 bcm by Following a public consultation process in the spring of 2013, Fosmax LNG is still studying its project. This development could require: adaptations to the Saint-Martin-de-Crau interconnection point; the looping of the Rhône pipeline between Saint- Martin-de-Crau and Saint-Avit (Eridan project) the looping of Est Lyonnais; depending on the project s requirements, increased compression at Saint-Martin-de-Crau (Bouches-du-Rhône), Saint-Avit and Palleau; the completion of the looping of the Beauce pipeline via the Perche pipeline over a distance of 63 km between Cherré and Saint-Arnoult-des-Bois. This project is a PCI candidate.

69 Eridan _ 65 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK Elengy no longer mentions the development plan of the Fos Tonkin LNG terminal, whose capacity remains at 3 bcm per year. TIGF and Spain Increasing capacity (2013 and 2015) Following consultations undertaken in 2009 and 2010, interconnection capacity between France and Spain was boosted in both directions. In 2013, capacity at Port de Larrau rose from 110 to 165 GWh/d in the direction, Spain to France, and from 100 to 176 GWh/d in the direction, France to Spain, thanks in particular to the commissioning of a new compressor station at Chazelles. This project received 48 m in funding from the European Union and a budget of 99 m approved by the CRE. In 2015, capacity increased from 5 to 60 GWh/d in the direction, Spain to France, at Biriatou. In the direction, France to Spain, new interruptible capacity is also available. These developments will increase the Spain-France interconnection rate to 27% of Spanish consumption. DEVELOPMENT OF INTERCONNECTION POINTS WITH SPAIN AND REGASIFICATION AT FOS-SUR-MER Montoir-de-Bretagne St-Arnoult-des-Bois Cherré Pirineos TIGF Perche pipeline Single market France Lyonnais pipeline Montpellier Network interconnection point LNG terminal In progress In study phase Under consideration Palleau Etrez Saint-Avit Saint-Martin-de-Crau On , at a summit on electricity and gas interconnections in Madrid between Portugal, Spain and France, these three countries agreed to study the strengthening of connections between the Iberian Peninsula and Europe s energy markets. A high-level group was therefore formed for this purpose under the aegis of the European Commission and the competent French, Portuguese and Spanish authorities. In parallel, in 2015, the European Commission launched a study on the benefits, cost and feasibility of new interconnection points; the study s findings for gas are expected to be released in December Creating an interconnection point to the east of the Pyrenees (2022) The Midcat project (Midi-Catalonia) would develop the North-South corridor by creating a new interconnection point to the east of the Pyrenees. This project is part of the Ten Year Network Development Plan (TYNDP) carried out by ENTSOG and part of the joint regional investment programme of Portugal, Spain and France (GRIP South). It would create an additional capacity of 230 GWh/d in the direction, Spain to France, and 80 GWh/d in the direction, France to Spain. To make this possible, the following work on the GRTgaz network would have to be considered: - the looping of the Rhône pipeline between Saint- Martin-de-Crau and Saint-Avit (Eridan project); - the looping of the Arc Lyonnais; - if necessary, expansion of the compressor stations located between Saint-Martin-de-Crau and Voisines; - the creation of a new compressor station at Montpellier (Hérault); - the completion of the looping of the Beauce pipeline via the Perche pipeline over a distance of 63 km between Cherré and Saint-Arnoultdes-Bois. This project was identified in 2013 as a PCI by the European Union and is a candidate for the renewal of this label.

70 66 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.6 other development projects Development projects related to storage facilities In the light of the very poor economic climate, Storengy decided to put all of its development projects in the North and South Zones on hold, including the commissioning of Hauterives (Drôme). The only envisaged change is the connection of an additional cavity in Etrez, without reinforcement of the network identified at this stage. Permitting the injection of biomethane into the natural gas network According to ADEME, between 12 and 30 TWh of biomethane could be injected into the networks by It would require the construction of 500 to 1,400 injection sites, around 15% of which would be built on the GRTgaz network. To date, GRTgaz has signed 16 study agreements. As from 2016, between three and five projects should be confirmed each year. For the producer, an injection site on the transmission network comprises a methanisation, treatment and compression unit. GRTgaz then connects the producer to the regional network through a spur pipeline and an injection station that has the following main functions: monitoring of the characteristics of the gas, metering and odorisation. In the event the production of injected biomethane exceeds the network s local consumption (GRTgaz distribution, regional coverage), the equipment (compression, control valve, etc.) that allows the bi-directional circulation of flows on the gas networks would have to be adapted and installed locally to permit a backhaul that would return surplus gas to the network upstream of the usual flow. This function would maximise the injection of biomethane into the distribution system. One or two installations of this kind could be built over the plan s lifetime. Currently, backhaul from the GRTgaz regional network to the main transmission network is not authorised due to constraints imposed on storage installations. Permitting the production of electricity with natural gas According to RTE forecasts (updated in 2015), no gas-fired power plants, except for the Bouchain and Landivisiau plants, will be built in The only network development project planned for this period and associated with the connection of these new plants is the strengthening of the regional network in the south of Brittany (111 km between Pleyben and Plumergat). For 2030, regarding New Mix and Diversification scenarios, RTE foresaw in 2014 the construction of new Combined Cycle Plants (around 4 GW) and new Combustion Turbine Generators (around 2 GW) (while considering that half of the peak requirements identified would be met through additional load shedding and half by new types of gas-fired CTGs). These hypotheses indicate that, overall, the number of plants connected to the gas network in 2030 will be double the number it is today. Compared to the gas network in the UK and Italy, for example, this volume remains modest. Guaranteeing continuity of supply for these new facilities should not bring about major changes to the network. Nevertheless, depending on the location and size of the future Combined Cycle Plant/CTG projects, it may be necessary to strengthen the regional network. Depending on how the new facilities are used (semi-base and peak production during the day or production that complements intermittent supplies from renewables), the volume of gas consumed by these plants may vary significantly throughout the day. Intra-day flexibility developed on the network following the recent implementation of infrastructure shall fully or partly respond to these changes in consumption. Nevertheless, this subject will have to be assessed in more detail with the electricity transport network operator in light of the hypotheses retained following the application of the law on energy transition for green growth (LTECV).

71 _ 67 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.7 infrastructure to be commissioned over the next three years ( ) All infrastructure to be commissioned between 2015 and 2017 was approved and scheduled in the GRTgaz financing plan. The Board of Directors has approved the budget for its completion. These facilities, linked to the connection of the Dunkirk LNG terminal and the development of capacity with Belgium, are described hereafter: Capacity demand spurring consolidation Infrastructure to be adapted or built Commissioning Decision status Connection of the Dunkirk LNG terminal Create exit capacity towards Belgium Clipon pipeline (19 km, ND 900) Looping of the Hauts-de-France pipeline from Nédon to Cuvilly (123 km, ND 1200) Arc de Dierrey between Cuvilly and Dierrey (180 km, ND 1200) Adaptation of the Pitgam, Cuvilly and Dierrey interconnections, and creation of the Ourcq interconnection Flanders pipeline In progress In progress Fluidity of the North Zone following the increase in capacity at Dunkirk and Taisnières H Arc de Dierrey between Dierrey and Voisines (120 km, ND 1200) Adaptation of the Voisines interconnection 2016 In progress 3.8 infrastructure commissioned after 2017 The Val de Saône and Gascogne-Midi projects, necessary for the merger of the North and South Zones of GRTgaz and the creation of a single trading point in France, were approved by the regulator on The Val de Saône project was given the go-ahead on 7 September 2015 by GRTgaz. The creation of entry capacity at Oltingue was approved by the CRE on 17 December 2014 and was given the go-ahead by GRTgaz on 24 July The decision to proceed with the other projects will be taken when: market interest has been confirmed; the decision on the completion of adjacent infrastructure, if applicable, has been taken; financing is secured; the investment has been approved by the CRE. To establish the schedule of works to be completed, GRTgaz takes into account the information provided by the operators of adjacent infrastructure regarding the capacity to be developed and the commissioning dates sought. The infrastructure to be built or adapted, in particular for the core network, depends on the order of arrival and the extent of the requirements for an increase in entry or exit capacity in the relevant market zone. The facilities indicated below will be reviewed if the demand-for-capacity schedule is modified. Given this uncertainty, only preliminary design studies have been conducted for the most distant deadlines. More in-depth analyses will complete the initial studies once requirements have been clarified, at which time a need to adapt other facilities may be identified.

72 68 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK Capacity demand spurring consolidation Increase entry capacity from Switzerland Merge Zones Increase entry capacity from the storage facilities at Manosque Extend the Fos Cavaou LNG terminal Increase entry capacity from the Montoir terminal (+ 4 bcm/year) Increase interconnection capacity between France and Spain Create exit capacity towards Germany Infrastructure to be adapted or built Adaptation of the Oltingue and Morelmaison interconnection stations Val de Saône project: Looping of the Burgundy pipeline between Voisines and Etrez (186 km, ND 1200) Adaptation of the Voisines, Palleau and Etrez interconnection stations Increase in compression at Etrez (+ 9 MW) Gascogne-Midi project: Adaptation of the Cruzy and Saint-Martin-de-Crau stations Adaptation of the Saint-Martin-de-Crau interconnection point If applicable, increase in compression at Saint-Martin-de-Crau Eridan: looping of the Rhône pipeline, (220 km, ND 1200) and adaptation of the Saint-Avit and Saint-Martin-de-Crau interconnections points If applicable, looping of the Arc Lyonnais and adaptation of the compressor stations at Saint-Avit and Etrez Reinforcement of the Saint-Martin-de-Crau compressor station If applicable, reinforcement of the Saint-Avit and Palleau compressor stations If applicable, completion of the looping of the Beauce pipeline via the Perche pipeline over a distance of 63 km between Cherré and Saint-Arnoult-des-Bois Adaptation of the compressor station at Auvers-le-Hamon Looping of the Maine pipeline and reinforcement of the Cherré compressor station, if applicable If applicable, creation of a pipeline between Chémery and Dierrey Eridan: looping of the Rhône pipeline, (220 km, ND 1200) and adaptation of the Saint-Avit and Saint-Martin-de-Crau interconnections points If applicable, looping of the Arc Lyonnais and adaptation of the compressor stations at Saint-Avit and Etrez Reinforcement of the Saint-Martin-de-Crau compressor station If applicable, reinforcement of the Saint-Avit and Palleau compressor stations If applicable, completion of the looping of the Beauce pipeline via the Perche pipeline over a distance of 63 km between Cherré and Saint-Arnoult-des-Bois Creation of a compressor station in Montpellier Installation of a deodorisation unit on the North-East pipeline or decentralised odorisation (Odicée project) If applicable, adaptation of the Obergailbach interconnection point Looping of the Morelmaison Voisines pipeline Adaptation of the Morelmaison and Voisines interconnection points If applicable, a new compressor station at Cheppy If applicable, increase in compression at Dierrey Commissioning Decision status 2018 Decided 2018 Decided 2019/2020 Waiting for the promoter s decision 2021 Waiting for the promoter s decision 2021 Waiting for the promoter s decision 2022 Under discussion: go-ahead based on benefits generated for Europe 2022 Pilot project in progress

73 _ 69 DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.9 forecast capacity development for As on 1 January in GWh/d Beyond (1) NORTH ZONE Entry capacity 2,660 3,180 3,180 3,180 Norway - Dunkirk PIR Belgium - Taisnières H PIR Belgium - Taisnières L PIR Germany - Obergailbach PIR Switzerland/Italy - Oltingue PIR 100 (2) LNG - Montoir PITM LNG - Dunkirk (Dunkirk PITM towards North Zone and Dunkirk towards Belgium) South Zone to North Zone Merger (3) Exit capacity Switzerland/Italy - Oltingue PIR Switzerland - Jura PIR Belgium - (Alveringem PIR and Dunkirk towards Belgium) Germany - Obergailbach PIR 100 North Zone to South Zone Merger (3) SOUTH ZONE Entry capacity LNG - Fos PITM ,160 TIGF (Midi PIR) towards South Zone 255 (4) North Zone to South Zone Merger (3) Exit capacity Towards TIGF (Midi PIR) from South Zone 395 (4) South Zone to North Zone Merger (3) 1. Capacity could be reassessed after the zones are merged. 2. Type of capacity to be defined in accordance with the capacity offered at Obergailbach. 3. In practice, the infrastructure planned as part of the merger will not create any South-to-North capacity. However, the analysis of the flows forecast on the network for this period as part of the merger studies does not identify any scenarios with significant South-to-North flows which would exceed the network s current capacity in this direction. 4. Creation of a TIGF - GRTgaz South trading region on 01/04/2015.

74 70 _ DEVELOPMENT OF THE GRTgaz TRANSMISSION NETWORK 3.10 meeting of demand for gas in france in 2024 The French gas system benefits from a level of flexibility and resilience that guarantees the country s continuity of supply, including during cold peaks, in compliance with the constraints defined at European level by regulation 994/2010 regarding security of supply and public service obligations enshrined in French law. In order to comply with obligations regarding the coverage of cold peaks, various additional analyses and tests are carried out by GRTgaz and ENT- SOG on different geographic and time scales. For the short term, every year at the start of winter, GRTgaz analyses coverage of peak demand and of the gas balance, more generally, in accordance with storage site levels, the severity of the winter and the latest import trends. ENTSOG carries out a similar analysis at a European level through the Winter Supply Outlook. For the year, 2024, the P2 firm point is estimated at a maximum of 4,476 GWh/d (4,126 GWh/d on the GRTgaz network in 2014 under the Diversified Uses scenario and 350 GWh/d on the TIGF network). Possible transit flows of up to 695 GWh/d towards Switzerland, Spain and Belgium must also be added. At this time and including the projects that have been decided, total firm entry capacity will rise to 3,615 GWh/d. Assuming that the replenishment of the storage sites is equivalent to that of the winter of 2015/2016, the network has a margin of more than 20% of peak demand. The country s gas infrastructure therefore offers enough flexibility to cover peak demand. Nevertheless, security of supply will depend on the actions of suppliers, which are responsible on a daily basis for balancing their client portfolio over the winter and at the time of peak demand. In light of this, European and national regulations must ensure that the market provides a satisfactory level of security. Over the longer-term and on a European level, ENTSOG assesses every two years in the TYNDP the adequacy between supply, demand and European infrastructure. This assessment considers crisis scenarios such as peak demand or the loss of a supply source or route. The 2015 report illustrates the French network s ability to respond to such scenarios. The report s findings corroborate the risk analyses conducted by GRTgaz and France as part of the implementation of regulation 994/2010. Regarding infrastructure This subject is covered by criterion N-1 in regulation 994/2010. This indicator measures the capacity that is available to cover peak demand in the event the main infrastructure fails: N Existing and decided >120% >120% infrastructure % With other projects >120% >120% The commissioning of the Dunkirk LNG terminal and of the second stage of development with Spain will allow France to significantly increase its margin of resilience in light of regulation 994/2010. Regarding availability of supply This subject is covered by the Remaining Flexibility indicator, which measures the availability of gas at the time of peak demand with or without the loss of a supply route in Europe. Remaining Flexibility excluding loss Existing and decided infrastructure With other projects >20% >20% >20% >20% >20%

75 _ 71 4 APPENDIX Appendix 1 Interconnection points: subscription and utilisation rates Appendix 2 Determination of the network s commercial capacity Appendix 3 Execution of major projects

76 72 _ APPENDIX APPENDIX 1 interconnection points: subscription and utilisation rates Midi PIR TIGF/Spain FROM TIGF 700 GWh/d Sept Sept Sept Sept Sept Sept Subscriptions Available Share reserved for the short term Technical capacity TOWARDS TIGF July 2009 Oct Apr July 2010 Oct Apr July 2011 Oct Apr Apr GWh/d July 2012 Oct Apr July 2013 Oct Apr July 2014 Oct Subscriptions Available Share reserved for the short term Technical capacity Taisnières H and L from Belgium TAISNIÈRE H 700 GWh/d Sept Sept Sept Sept Sept Sept Sept Subscriptions Available Share reserved for the short term Technical capacity TAISNIÈRE B 700 GWh/d July 2012 Apr Oct July 2015 Apr Oct Oct July 2018 Apr Oct July 2021 Apr Oct Subscriptions Available Share reserved for the short term Technical capacity Dunkirk from Norway Obergailbach from Germany GWh/d 2013 Sept Sept Sept Sept Sept Sept Sept GWh/d Subscriptions Available Share reserved for the short term Technical capacity Subscriptions Available Share reserved for the short term Technical capacity

77 _ 73 APPENDIX Oltingue towards Switzerland and Italy GWh/d 2011 Aug Oct Dec July 2014 Feb Sept Apr Nov June Aug Oct Dec July 2021 Feb Sept Apr Nov June 2024 Subscriptions Available Share reserved for the short term Technical capacity North-South link TOWARDS THE SOUTH 700 GWh/d July July July July July July July July 2018 Subscriptions Available Share reserved for the short term Technical capacity TOWARDS THE NORTH 700 GWh/j GWh/d July July July July July July July July 2018 Subscriptions Available Share reserved for the short term Technical capacity Storage sites INJECTION WITHDRAWAL 2,500 2,000 GWh/d 2,500 2,000 GWh/d 1,500 1,500 1, July 2012 Sept South-Atlantic interruptible North-Atlantic interruptible South-East Nov July 2013 Sept Nov South-Atlantic firm North-West North-East July 2014 Sept Nov July 2015 Sept Nov North-Atlantic firm North L 1, July 2012 Sept South-Atlantic interruptible North-Atlantic interruptible South-East Nov July 2013 Sept Nov South-Atlantic firm North-West North-East July 2014 Sept Nov July 2015 Sept Nov North-Atlantic firm North L

78 74 _ APPENDIX ANNEXE 2 determination of the network s commercial capacity GRTgaz markets gas transmission in the form of: firm capacity whose utilisation is guaranteed in a contract with the shipper under normal network operating conditions for the subscription period; interruptible capacity, the utilisation of which is not guaranteed. If all the firm and interruptible capacity that GRTgaz offers is used, the system becomes saturated. Any increase in the transmission capacity of the GRTgaz network therefore requires additional investment. Method used to determine capacity The capacity which can be marketed on the various points of the network is intertwined. Capacity is determined by analysing scenarios that are likely to create network bottlenecks. The firm capacity adopted is the maximum capacity that does not produce bottlenecks under standard conditions of network use. The same approach is used to determine the infrastructure construction work necessary to increase capacity. The determination of capacity depends on the network s characteristics The modelling process used to determine the capacity of a network depends on several parameters, in particular the technical characteristics of the infrastructure, the network s operating constraints and the quality of the gas transmitted. Technical characteristics of the infrastructure The transmission network primarily consists of pipelines and compressor or interconnection stations. The technical characteristics of this infrastructure are already known for existing and approved facilities, or are provisional for new infrastructure projects. The technical characteristics of the pipelines that influence the network s capacity are the diameter, maximum safe pressure (MSP), length and roughness. Load losses in the pipeline (namely, the fall in pressure that occurs as the gas is transmitted through the structure) depend on these characteristics. As a result, the capacity of a transmission network is directly linked to the load losses generated in the pipes. The compressor stations raise the pressure of the natural gas in the pipes. The technical characteristics of the compressor stations are primarily their power, the maximum and minimum flows they can compress, and their compression rate limits (the ratio between downstream and upstream pressure). The characteristics of other network infrastructure, such as the regulation valves that generate specific load losses, also affect capacity. Operating constraints The operating constraints result from the minimum pressure levels that are required at different points on the network to allow the gas to be transmitted and delivered. They are determined to allow GRTgaz to meet the following obligations: its public service obligations with regards to supplying the distribution networks; its contractual obligations under the connection agreements signed with each of its industrial clients. The heating value of natural gas The physical capacity of a transmission system is expressed in volume flow rate (m 3 ), whereas trading between shippers and/or consumers is conducted in terms of energy (Wh). In order to market capacity that is consistent with the needs of its customers, GRTgaz makes assumptions about the calorific value of the gas entering the network based on the flows observed at each entry point.

79 _ 75 APPENDIX An offer designed to reflect network utilisation assumptions GRTgaz also bases its offer on network utilisation assumptions in order to market capacity that meets the needs of the market. The capacities are interdependent and sometimes competing. GRTgaz favours the most useful capacities. Breakdown of flows The gas flows on the network depend on the utilisation of capacity subscribed at entry and exit points, the level of consumption and the use of storage sites. Certain entry points are used in preference to others depending on the market situation and the arbitrage decisions made between the different sources of supply. GRTgaz takes many supply scenarios into account with different weather conditions to evaluate gas flows and configure its offer accordingly. Such assumptions or flow scenarios are made using data on past flows and expected trends. They cover a wide array of weather conditions, from cold peaks (18) to the minimum consumption levels typically observed in August, as well as the utilisation of underground storage facilities according to temperatures and demand for natural gas. Special situations The examination of different potential supply strategies, some of which are outside of the assumptions that are considered to be realistic and acceptable, leads GRTgaz to identify limiting conditions of operation ( CLER ). When a limiting condition of operation is reached, the network is congested and minimum flows are required at the entry points and beyond the congested point. The principal conditions concern land entry points in the north of France (congestion in the north and west-east directions) and the transmission of natural gas to the south-east of France (congestion in the south-east direction). These special conditions are shared with the market, notably through the Winter Outlook, which has been published by GRTgaz at the time of each gas winter period since For example, west-east congestion is shown below. EXAMPLE: THE OBERGAILBACH MINIMUM Network interconnection point LNG terminals Storage site Compression station Saturated infrastructure Dunkirk Taisnières Obergailbach Operating conditions Montoir-de-Bretagne Oltingue The determination of capacity is carried out for normal operating conditions and based on gas flow breakdown assumptions that are considered to be realistic and acceptable and on the full availability of the facilities. Pirineos TIGF Fos Tonkin Fos Cavaou The validity framework for the firm capacity GRTgaz offers allows each shipper to fulfil its public service obligations (19), notably through underground storage withdrawals in winter and injections in summer. Above a level of consumption corresponding to a cold temperature, the increase in gas flows from the network s other entry points (with the exception of Fos), combined with maximum use of the North-South link, causes a network bottleneck in the west-east direction. In such a case, Obergailbach must be topped up to supply the eastern part of the network. 18. A period of extremely low temperatures over three consecutive days, as occurs statistically once every fifty years: decree No of on public service obligations in the gas sector. 19. Decrees No and No of 21 August 2006 on access to underground natural gas storage sites.

80 76 _ APPENDIX APPENDIX 3 execution of major projects GRTgaz is committed to building relationships of trust with all local stakeholders to ensure the successful integration of the transmission network throughout France by favouring the emergence of solutions that are shared and adapted to each case. Determining the route with the least impact Gas pipeline projects are subject to detailed studies in order to identify the best possible solutions. The impact study is conducted by a third-party expert in consultation with local authorities, associations and interested parties to identify all potential consequences for the environment and to define the best way to avoid, limit and make up for these consequences. An active consultation policy Information is given to all of the interested parties very early on in the process at formal and informal meetings. Such dialogue has taken on a new dimension with the public discussions organised by the National public debate commission for several recent projects. Thanks to these discussions, GRTgaz teams get to hear other opinions, which allow useful adjustments to be made to the projects. At the end of these discussions and once the studies have been completed, the route chosen becomes the subject of a public inquiry, which allows further adjustments to be made to cater for local factors. As much as possible, GRTgaz strives to meet the expectations expressed and to provide guarantees in terms of the ecological, agricultural and socio-economic impact on the areas crossed. A charter sets out the company s territorial commitments as part of a proactive approach specific to each project. Ensuring safety Regulatory obligations regarding safety and the environment have a significant influence on investments. GRTgaz applies a rigorous management process to ensure industrial safety and security on the transmission network. Each project is the subject of a safety study that results in enhanced protection measures, if necessary: thicker pipes, protective slabs and specific monitoring equipment. The pipes are made out of steel and welds are inspected using radiography or ultrasound. An insulating cover and cathodic protection system protect pipes from corrosion. On the worksites, a Safety Passport is given to all participating contractors. Safety Trophies are also awarded in partnership with the Construction and public works organisation for risk prevention (OP- PBTP) in recognition of high performance. Identifying and enhancing our archaeological heritage GRTgaz has entered into a partnership with the National institute for preventive archaeological research (Inrap) to meet two goals: to prepare archaeological fieldwork far ahead of construction work in order to allow enough time for research without delaying major projects and to make the most of archaeological discoveries. Protecting agriculture A total of 90% of pipeline routes are located in rural areas. GRTgaz has signed a national agreement with the Federation of farming trade unions (FNSEA) and Chambers of agriculture, detailing its commitments and its subsidy and compensation scheme. The aim is to minimise the impact of works on farmland, to preserve the quality of the soil and to guarantee the restoration of the land crossed:

81 _ 77 APPENDIX pre-sorted soil layers are put back in place, ditches and slopes are re-graded, and fences and drainage are restored. Respecting the environment and favouring biodiversity Promoting biodiversity is a major part of the sustainable development policy of GRTgaz, whose commitment is recognised by the National strategy for biodiversity label. Ecologists are involved in the very early stages of routing to establish inventories and then throughout the work and restoration phases. As a founding member of the Linear infrastructure and biodiversity club, GRTgaz has entered into partnership agreements with the Federation of regional parks of France, the National museum of natural history and Natureparif to ensure best practices are implemented during the laying of pipes and the maintenance of easement perimeters. The ecological management of sensitive and forest areas allows rare species to thrive. GRTgaz is also dedicated to the promotion of our natural heritage. It has joined the Biodiversity fund (FDB) to support the completion of a biodiversity atlas. It contributes to the creation, planning and maintenance of paths under a partnership with the French ramblers federation. Minimising the impact of the facilities Above-ground facilities are integrated into their environment as best as possible. The technical options that emit the least amount of CO 2 are favoured. GRTgaz replaces old compressors in its stations with high efficiency electro-compressors or turbo-compressors. Since 2005, this programme has led to a ten-fold reduction in nitrogen dioxide (NOx) emissions and a 47% reduction in carbon dioxide (CO 2 ) emissions. Network operation schemes are optimised to continuously reduce the network s motive power, currently restricted to 0.5% of transmitted energy. GRTgaz also uses innovative processes to limit the venting of gas during maintenance and repair work. Gas booster, which recovers and re-injects gas into the network via a mobile compressor, is a case in point. Optimising the economic benefits The impact of worksites on the regional economy and job market is significant for many sectors: materials, clearing, earth-moving, civil engineering, transport, construction, landscaping, hotels, restaurants and convenience stores, etc. GRTgaz works with the Chambers of commerce and industry and state job centres to involve local businesses and people who are looking for work in its worksites. pavillon vert : an illustration of the commitment of grtgaz to its sensitive sites Pavillon Vert illustrates GRTgaz s desire to abide by sustainable development principles when managing its sensitive worksites: safety on the site and in the immediate vicinity, actions to promote employment and local economic benefits, high-quality information and relationships with partners and residents; economical use of water and energy, anti-pollution measures, limitations on site machine traffic; compliance with the project schedule, optimised guarantees so as to limit the impact on gas consumers, customer satisfaction. Flown on the building site, the Pavillon Vert flag is raised or lowered according to the results of internal and external audits performed by specialist firms at the beginning, middle and end of the work on the site.

82 78 _ GLOSSARY GLOSSARY Backhaul Capacity: capacity on the National network that allows the shipper to carry out nominations in the opposite direction to the main flow direction when gas can only flow in one direction. Balancing Zone: a group of Entry Points, Delivery Points and Title Transfer Points within which the shipper must ensure that gas is balanced. There are two Balancing Zones: the North Zone and the South Zone. The North Zone is split between Balancing Sections H and L. Client: the ultimate consumer of natural gas. Conditions of Delivery: GRTgaz obligations regarding the physical characteristics of the natural gas that it delivers (pressure, temperature, etc.). Connection contract: the contract between GRTgaz and a client that specifies the conditions under which connection infrastructure will be constructed, operated and maintained, and the Conditions of Delivery. Connection Facilities: Connections and Delivery Points that link a user site or a Distribution Network to the Transmission Network. Connection: a transmission structure that connects the Transmission Network and one or more Delivery Stations; it is solely or mainly used to supply a Client or a Distribution Network. A connection is a part of the network. Consumer Delivery Point: The point at which gas is delivered to a consumer that is connected to the Transmission Network. Each Consumer Delivery Point is connected to a single Exit Zone. Conversion Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to delivering in the form of L- or H-gas and to withdrawing simultaneously in the form of H- or L-gas. Cumulative Imbalance: the sum of the shipper s residual Daily Imbalances after consideration of the purchase and sale of volumes that exceed the Daily Imbalance tolerance and the mid-range of cumulative imbalances. Daily Capacity: the maximum quantity of energy that GRTgaz commits itself to withdrawing, transmitting or delivering every day. Daily Imbalance: the difference between the sum of the quantities injected and withdrawn by the shipper every day, for each Balancing Zone and for each type of gas in the North Zone. Delivery Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to delivering to a Consumer Delivery Point, a Transport Distribution Interface Point or a Network Interconnection Point. Delivery Point: the point at which GRTgaz supplies a recipient with all or part of the gas specified in the Transmission Contract. Each Delivery Point is connected to a single Balancing Zone. Delivery Station: a facility located at the very end of the Transmission Network which meters, regulates and reduces the pressure of gas delivered to a consumer or a Distribution Network. Distribution Network: medium- or low-pressure pipelines that supply gas to consumers that are not directly connected to the National network or to a Regional Network. Entry Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to withdrawing every day at a given Entry Point. Entry Point: the point at which the shipper supplies GRTgaz with all or part of the gas specified in the Transmission Contract. Each Entry Point is connected to a single Balancing Zone.

83 _ 79 GLOSSARY Exit Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to delivering every day to all Delivery Points connected to one given Exit Zone, at one given Network Interconnection Point, or at one given Transport Storage Interface Point. Exit Zone: a group of Consumer Delivery Points, Regional Network interconnection points and Transport Distribution Interface Points for which an Exit Capacity has been defined on the National network. Each Exit Zone is connected to a single Balancing Zone. Firm Capacity: capacity whose utilisation the operator is able to guarantee at any time throughout the subscription period under normal operating conditions. H-gas: natural gas with a high calorific value. Hourly Delivery Capacity: the maximum quantity of energy, expressed in MWh (GCV) per hour, that the operator commits itself to supplying every hour to a Consumer Delivery Point. Interruptible Capacity: capacity whose utilisation the operator is not able to guarantee at any time throughout the subscription period. L-gas: natural gas with a low calorific value. Link Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to transmitting every day to a link between two Balancing Zones. Link: an oriented pair of Balancing Zones on which a Link Capacity is defined. LNG Terminal: a facility that receives, stores and regasifies Liquefied Natural Gas (LNG) and injects it into the main regasified LNG network. National network: high-pressure, large-diameter transmission infrastructure that connects the interconnection points to the neighbouring Transmission Networks, storage sites and LNG terminals; the Regional Networks, certain industrial consumers and the Distribution Networks are connected to the National network. Network Interconnection Point (PIR): a physical or notional interface point between the Transmission Networks of two operators. Regional network interconnection point (PIRR): a physical or notional point on the GRTgaz Regional Network that interconnects with the adjacent operator s Transmission Network. Regional Network: high-pressure transmission infrastructure that supplies gas from the National network to consumers or Distribution Networks that are not directly connected to the National network. Regional Transmission Capacity: the maximum quantity of energy, expressed in MWh (GCV) per day, that GRTgaz commits itself to transmitting on the Regional Network as far as a Consumer Delivery Point, a Transport Distribution Interface Point, or a Network Interconnection Point. Releasable Capacity: firm capacity that the shipper commits itself to releasing at any time to GRTgaz upon the latter s request. Shipper: a party that enters into a Transmission Contract with GRTgaz. The shipper is, depending on the circumstances, the eligible client, the supplier or their instructing party, as defined in article 2 of the Law of 3 January Storage Site: a facility that is used to store natural gas in the summer, when consumption is low, and release it in the winter, when consumption is high.

84 80 _ GLOSSARY Title Transfer Point (PEG): a virtual point connected to a Balancing Zone where a shipper can transfer gas to another shipper. Transmission Contract: the contract between GRTgaz and a shipper that lays down the conditions under which GRTgaz commits itself to withdrawing quantities of gas provided by the shipper at one or more Entry Points or Title Transfer Points and to delivering quantities of gas with the same energy content at one or more Delivery Points or Title Transfer Points. Transmission Network: high-pressure transmission infrastructure that supplies gas to directly-connected industrial consumers and to Distribution Networks; the Transmission Network consists of the National network and Regional Networks. Transport Distribution Interface Point (PITD): a physical or notional interface point between a Transmission Network and a Distribution Network. Transport Storage Interface Point (PITS): a physical or notional interface point between a Transmission Network and a storage group.

85 conversion of gas units 1 Kwh 1 GJ 1 therm 1 MBTU 1 m 3 of natural gas 1 barrel oil equivalent (boe) 1 ton oil equivalent (toe) 1 Kwh GJ Therm MBTU m 3 of natural gas barrel oil equivalent (boe) 1 ton oil equivalent (toe) 1, , , useful links

86 National network Regional network Balancing zone LNG terminals Network interconnection points Underground storage facilities Compression stations Compression stations under construction map of the grtgaz network in 2024 Direction of flow of natural gas Firm capacity in GWh/d (to be confirmed as part of the implementation of the single market place for France) Project in implementation phase Project in study phase Project under consideration 520 Dunkirk H 640 B 230 Taisnières Obergailbach Montoir-de-Bretagne Single market France Oltingue Jura TIGF Fos Tonkin Fos Cavaou

87 HEAD OFFICE Immeuble Bora 6, rue Raoul Nordling Bois-Colombes Cedex 0033 (0) GRTgaz - SEINE VALLEY 26, rue de Calais Paris Cedex (0) GRTgaz - ATLANTIC COAST AND CENTRE 10, quai Émile Cormerais BP St-Herblain 0033 (0) GRTgaz - RHONE VALLEY AND THE MEDITERRANEAN 33, rue Pétrequin BP Lyon Cedex (0) GRTgaz - NORTH-EAST 24, quai Sainte Catherine Nancy 0033 (0) GRTgaz - ENGINEERING Immeuble Delage 7, rue du 19 mars Gennevilliers Cedex 0033 (0) GRTgaz is a limited liability company with capital of Its head office is located at 6, rue Raoul-Nordling Bois-Colombes, and its business registration number is RCS Nanterre Media Library reference number: 2RTB0216 ISSN No. pending Design and production: créapix Illustrations: Lucie Bertrand - Photos credits: GRTgaz / Philippe Dureuil, Hubert Mouillade Ce document a été réalisé par un imprimeur éco-responsable sur du papier FSC November 2015

88 GRTgaz operates the high-pressure natural gas transmission network that covers most of France. With more than 32,000 km of pipeline and 26 compressor stations, the GRTgaz network is the longest in Europe and one of the most interconnected. In 2013, GRTgaz invested 777 million to ensure the transmission of natural gas under the best possible conditions of safety and fluidity, as well as to enhance security of supply in France and in Europe, while providing access to diverse sources of supply. GRTgaz has around 3,000 employees. Our goal at GRTgaz is to place our network, our offer and our expertise at the service of energy solutions with a future in France, in Europe and around the world. HEAD OFFICE Immeuble BORA 6, rue Raoul Nordling Bois-Colombes Cedex Tel.: 0033 (0)

Winter Review 2017/2018

Winter Review 2017/2018 Winter Review 2017/2018 OCTOBER 2018 Contents Executive Summary... 2 1. Introduction... 3 2. Gas Prices and Quantities at European hubs... 5 3. Demand... 6 3.1. European seasonal gas demand... 6 3.2. Electricity

More information

Main developments in the gas and electricity markets in France in Commission de Régulation de l Energie (CRE) 31 st July 2013

Main developments in the gas and electricity markets in France in Commission de Régulation de l Energie (CRE) 31 st July 2013 Main developments in the gas and electricity markets in France in 2012 Commission de Régulation de l Energie (CRE) 31 st July 2013 1. Major Developments for the regulator in 2012 The year 2012 was marked

More information

ENERGY PRIORITIES FOR EUROPE

ENERGY PRIORITIES FOR EUROPE ENERGY PRIORITIES FOR EUROPE Presentation of J.M. Barroso, President of the European Commission, to the European Council of 4 February 2011 Contents 1 I. Why energy policy matters II. Why we need to act

More information

Outlook on economic viability of gas-fired power generation Session: Price formation and contractual trends

Outlook on economic viability of gas-fired power generation Session: Price formation and contractual trends Outlook on economic viability of gas-fired power generation Session: Price formation and contractual trends Gabrielle Seeling-Hochmuth Head of Gas Strategy Vattenfall EMART Energy 2012 21 November 2012

More information

North West Europe Gas System Performance Report

North West Europe Gas System Performance Report Aurora Energy Research Limited. All rights reserved. North West Europe Gas System Performance Report April Executive Summary. Gas prices: A warmer April than in 7 in most of NW Europe caused consumption

More information

Wholesale market functioning: GTM1 criteria. 2 nd ACER Workshop on Gas Target Model review and update 19 March 2014

Wholesale market functioning: GTM1 criteria. 2 nd ACER Workshop on Gas Target Model review and update 19 March 2014 Wholesale market functioning: GTM1 criteria 2 nd ACER Workshop on Gas Target Model review and update 19 March 2014 Agenda GTM1 criteria Results on member state level Discussion 2 GTM1 criteria Results

More information

Development statement on GRTgaz s transmission system

Development statement on GRTgaz s transmission system Development statement on GRTgaz s transmission system 2010-2019 Contents Framework of the development statement and its evolution Changes in demand Highlights 2010 Capacity provision schedule Development

More information

gas 2O18 Analysis and Forecasts to 2O23

gas 2O18 Analysis and Forecasts to 2O23 Market Report Series gas 2O18 Analysis and Forecasts to 2O23 executive summary INTERNATIONAL ENERGY AGENCY The IEA examines the full spectrum of energy issues including oil, gas and coal supply and demand,

More information

North West Europe Gas System Performance Report

North West Europe Gas System Performance Report Aurora Energy Research Limited. All rights reserved. North West Europe Gas System Performance Report March Executive Summary. Gas prices: Continued cold weather drove prices to record highs in the first

More information

THE MEDITERRANEAN GATEWAY TO ENERGY UNION What strategy on power and gas?

THE MEDITERRANEAN GATEWAY TO ENERGY UNION What strategy on power and gas? THE MEDITERRANEAN GATEWAY TO ENERGY UNION What strategy on power and gas? Panel MEDITERRANEAN GAS CORRIDOR Prof. Valeria Termini Full Professor of Economics University of Roma Tre Commissioner - The Italian

More information

European Economic and Social Committee OPINION

European Economic and Social Committee OPINION European Economic and Social Committee TEN/589 An EU strategy for liquefied natural gas and gas storage OPINION of the European Economic and Social Committee on the Communication from the Commission to

More information

Highlights. Figure 1. World Marketed Energy Consumption by Region,

Highlights. Figure 1. World Marketed Energy Consumption by Region, Highlights World energy consumption is projected to increase by 71 percent from 3 to 23. Fossil fuels continue to supply much of the energy used worldwide, and oil remains the dominant energy source. In

More information

European gas demand and import scenarios: can we connect the future to the present?

European gas demand and import scenarios: can we connect the future to the present? European gas demand and import scenarios: can we connect the future to the present? Professor Jonathan Stern, Chairman and Senior Research Fellow OIES Gas Programme GAC Seminar on Scenarios and Forecasts,

More information

EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION

EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION Nathalie Zavidovique Infrastructure Strategy GDF SUEZ Paris, Nov. 30th 2012 Contents 1. GDF SUEZ profile 2. What does security

More information

Gas Target Model. Electricity and Gas Interactions Workshop. Keelin O Brien 3 rd July 2014

Gas Target Model. Electricity and Gas Interactions Workshop. Keelin O Brien 3 rd July 2014 Gas Target Model Electricity and Gas Interactions Workshop Keelin O Brien 3 rd July 2014 Madrid Forum Observations Review of work on revision of GTM noted Welcomed considerations of closer coordination

More information

2009 Changing the scene

2009 Changing the scene 2009 Changing the scene Gas demand in Europe and in other major economies is weakening Industrial demand strongly affected by the economic crisis Demand in the power generation sector suffers from relatively

More information

Towards 2020 and beyond

Towards 2020 and beyond Towards 2020 and beyond Gas Infrastructures in the EU Milosz Momot DG Energy: Unit B1 Internal Energy Market - Networks & Regional Initiatives Krakow, 24 May 2012 Energy Agenda.2050: What Role for Gas?.2020:

More information

TRF & PEG news. Prices and liquidity of the. Price and liquidity focus p.2-3. Network flows and limits. 2 days of red alert*, i.e.

TRF & PEG news. Prices and liquidity of the. Price and liquidity focus p.2-3. Network flows and limits. 2 days of red alert*, i.e. TRF & PEG news + + SPRING ISSUE: WINTER REVIEW AND PROSPECTS FOR THE SUMMER The first winter of operation of the Trading Region France was particularly positive: the results in terms of price and liquidity

More information

WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010

WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010 About EWEA EWEA is the voice of the wind industry actively promoting the utilisation of wind power in Europe and worldwide. EWEA members from over 4 countries include 2 companies, organisations, and research

More information

THE DYNAMICS of LNG INDUSTRY. Prof. Valeria Termini AEEGSI Commissioner - MEDREG Vice President

THE DYNAMICS of LNG INDUSTRY. Prof. Valeria Termini AEEGSI Commissioner - MEDREG Vice President THE DYNAMICS of LNG INDUSTRY Prof. Valeria Termini AEEGSI Commissioner - MEDREG Vice President INDEX I. NEW GLOBAL TRENDS II. LNG INDUSTRY: the game changers III. IN EUROPE IV. THE MEDITERRANEAN CONTEXT

More information

Gas Regional Investment Plan South Region

Gas Regional Investment Plan South Region Gas Regional Investment Plan South Region Second Edition Stakeholders Consultation GRIP WS 26 November 2013 Table of content 1.Perimeter / objectives 2.Content 1. Analysis of the Demand in the South region

More information

Present: Philippe DE LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Catherine EDWIGE and Michel THIOLLIERE commissioners.

Present: Philippe DE LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Catherine EDWIGE and Michel THIOLLIERE commissioners. Deliberation Paris, 7 May 2014 Deliberation of the French Energy Regulatory Commission dated 7 May 2014 setting out guidelines for the creation of a single marketplace in France by 2018 Present: Philippe

More information

[LNG MARKET ANALYSIS ] 1. LNG Market Analysis

[LNG MARKET ANALYSIS ] 1. LNG Market Analysis [LNG MARKET ANALYSIS ] 1 LNG Market Analysis LNG Market Analysis Volume: 23 rd March 2018 [LNG MARKET ANALYSIS ] 2 LNG Price Assessment and Natural Gas 12 th 23 rd March 2018 LNG Analysis Global LNG prices

More information

Long-term Market Analysis Nordics and Europe Executive summary

Long-term Market Analysis Nordics and Europe Executive summary Long-term Market Analysis Nordics and Europe 2018 2040 Executive summary 1 December 2018 Europe is set to develop a low carbon power system with significant contribution from renewable energy sources.

More information

Workshop on the EU Directives and legally binding obligations in the area of sustainable energy under the Energy Community Treaty.

Workshop on the EU Directives and legally binding obligations in the area of sustainable energy under the Energy Community Treaty. Workshop on the EU Directives and legally binding obligations in the area of sustainable energy under the Energy Community Treaty EU energy policy Vidmantas Jankauskas Energy regulatory expert Tbilisi,

More information

Edgardo Curcio President AIEE

Edgardo Curcio President AIEE Edgardo Curcio President AIEE The First National Conference on Liquefied Natural Gas for Transports - Italy and the Mediterranean Sea April 11, 2013 What is LNG? The LNG (Liquefied Natural Gas) is a fluid

More information

The new Energy Policy. Jean-Arnold Vinois Head of Unit Energy Policy and Security of Supply Directorate General for Energy and Transport

The new Energy Policy. Jean-Arnold Vinois Head of Unit Energy Policy and Security of Supply Directorate General for Energy and Transport The new Energy Policy Jean-Arnold Vinois Head of Unit Energy Policy and Security of Supply Directorate General for Energy and Transport 1 The 3 challenges Sustainable Development Competitiveness FULLY

More information

European Gas Market in 2017: State and Perspectives

European Gas Market in 2017: State and Perspectives European Gas Market in 2017: State and Perspectives Sergei Komlev Head of Contract Structuring and Price Formation Directorate Gazprom Export Oil & Gas Forum, Thompson Reuters Moscow, December 14, 2017

More information

Winter Outlook

Winter Outlook Winter Outlook 2016-2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that results from the use or processing of the information contained herein, in particular

More information

Eeekonomics: BEG/CEE UT Annual Meeting. Commentary: European Live Issues, Post recession Demand. European gas demand post Fukushima Outline

Eeekonomics: BEG/CEE UT Annual Meeting. Commentary: European Live Issues, Post recession Demand. European gas demand post Fukushima Outline Gas Research Programme ENERGY STUDIES Natural G Eeekonomics: BEG/CEE UT Annual Meeting Houston, 7 December 2011 Commentary: European Live Issues, Post recession Demand Dr Anouk Honore Senior Research Fellow

More information

Background paper. Electricity production from wind and solar photovoltaic power in the EU

Background paper. Electricity production from wind and solar photovoltaic power in the EU Background paper Electricity production from wind and solar photovoltaic power in the EU February 2018 1 The 2009 Lisbon Treaty gave the European Union (EU) the authority to develop an energy policy containing

More information

GAS REGIONAL INVESTMENT PLAN GRIP South MAIN REPORT

GAS REGIONAL INVESTMENT PLAN GRIP South MAIN REPORT GAS REGIONAL INVESTMENT PLAN 213 222 GRIP South MAIN REPORT Table of Content FOREWORD 4 EXECUTIVE SUMMARY 5 1 INTRODUCTION 6 1.1 Preamble... 7 1.2 Objectives and Content of the Report... 8 2 GENERAL CONTEXT

More information

Winter Outlook

Winter Outlook Winter Outlook 2016-2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that should result from the use or processing of any of the information herein, in particular

More information

Southern Corridor Gas Regional Investment Plan

Southern Corridor Gas Regional Investment Plan Southern Corridor Gas Regional Investment Plan 2014-2023 Joseph Florentin New Projects Dept. Manager (SC GRIP coordinator) 9th TYNDP / CBA Workshop Vienna, 26 June 2014 The Southern Corridor Region 2 10

More information

Stress tests: The role of LNG to improve regional SoS in Europe. Christophe Poillion Chairman of the Task Force on Security of Supply

Stress tests: The role of LNG to improve regional SoS in Europe. Christophe Poillion Chairman of the Task Force on Security of Supply Stress tests: The role of LNG to improve regional SoS in Europe Christophe Poillion Chairman of the Task Force on Security of Supply CEER workshop Madrid, 17 th March 2015 The Contribution of Infrastructure

More information

Winter Outlook Released 24 October 2017

Winter Outlook Released 24 October 2017 Released 24 October 2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that should result from the use or processing of any of the information herein, in particular

More information

Gas Markets Events faced during Winter 2016/2017. A EURELECTRIC background paper

Gas Markets Events faced during Winter 2016/2017. A EURELECTRIC background paper Gas Markets Events faced during Winter 2016/2017 A EURELECTRIC background paper March 2017 EURELECTRIC is the voice of the electricity industry in Europe. We speak for more than 3,500 companies in power

More information

The geopolitics of new energy realities

The geopolitics of new energy realities The changing dynamics of global energy markets: The geopolitics of new energy realities Tom Howes DG European Commission Target: a low carbon-economy by 2050 100% 100% 80% Power Sector Current policy 80%

More information

European Gas Markets

European Gas Markets European Gas Markets Globalisation; Commoditisation; Demand Destruction Pierre Noël EPRG, University of Cambridge GDF Suez Brussels, 8 February 212 EPRG, University of Cambridge Economic & social science

More information

3 rd ACER Gas Target Model Workshop. 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014

3 rd ACER Gas Target Model Workshop. 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014 3 rd ACER Gas Target Model Workshop 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014 1 6. Enhancing upstream competition and security of supply Dennis Hesseling Head of ACER Gas Department 3 rd ACER

More information

European Gas Price, Volatility & Security of Supply

European Gas Price, Volatility & Security of Supply European Gas Price, Volatility & Security of Supply Dr. Ashna Rahman Head of Analytics & Consulting (EMEA) September, 213. 213 Platts, McGraw Hill Financial. All rights reserved. Key Points European gas

More information

SECURE Potential Threats for EU Gas Security

SECURE Potential Threats for EU Gas Security SECURE Potential Threats for EU Gas Security Agenda Overall EU gas supply situation SoS from an external point of view Long term supply Coordination of gas markets SoS from an internal point of view Internal/external

More information

European perspective on regional market integration

European perspective on regional market integration European perspective on regional market integration Dennis Hesseling, Head of the Gas Department 8 th Baltic Gas Market Forum, 15 November 2018, Helsinki Outline.Level of EU market integration.regional

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, XXX COM(2016) 49/2 COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS on

More information

A decade of oil demand

A decade of oil demand A decade of oil demand World oil demand Eni has recently published the thirteenth edition of the 2014 World Oil and Gas Review, the annual statistical review on the world oil and gas market and the refining

More information

Introduction to medium term reports Based on the most recent data available 5 years outlook is important for policy making Natural gas and renewables

Introduction to medium term reports Based on the most recent data available 5 years outlook is important for policy making Natural gas and renewables IEA Medium-Term Market Reports IEEJ Seminar Tokyo, 20 September 2012 Didier Houssin Director, Energy Markets and Security International Energy Agency OECD/IEA 2011 Introduction to medium term reports Based

More information

PGC B Strategy - Triennium November 18 20, 2014 Bratislava. By: Ashkan Esmaeilifar

PGC B Strategy - Triennium November 18 20, 2014 Bratislava. By: Ashkan Esmaeilifar 1 PGC B Strategy - Triennium 2012 2015 November 18 20, 2014 Bratislava By: Ashkan Esmaeilifar 2 COUNTRY PROFILE Area (km 2 ): 49,035 Population: 5,379,000 Capital: Bratislava Member of OECD, WTO, NATO,

More information

Gas Markets Globalization: Perspectives and Limits

Gas Markets Globalization: Perspectives and Limits Gas Markets Globalization: Perspectives and Limits By: Sid Ahmed Hamdani, Senior Business Analyst, Sonatrach, Algeria Date:04 June 2012 Venue: Kuala Lumpur Towards Gas Market Globalization? Increasing

More information

European gas price evolution and supply challenges

European gas price evolution and supply challenges European gas price evolution and supply challenges Ben Wetherall Head of Gas ICIS Israel Energy and Business Convention 3-4 Nov 2014 Agenda European demand and price evolution Supply and challenges Turkish

More information

Page 2 of 68. ENTSOG Union-wide SoS simulation report

Page 2 of 68. ENTSOG Union-wide SoS simulation report SoS SIMULATION REPORT 2017 ENTSOG Union-Wide Security of Simulation Report ENTSOG A FAIR PARTNER TO ALL! Page 2 of 68 ENTSOG Union-wide SoS simulation report Union-wide simulation of gas supply and infrastructure

More information

Sea freight data indicate weak import demand both in US and EU27. Data on inland road and rail freight indicate weak domestic activity

Sea freight data indicate weak import demand both in US and EU27. Data on inland road and rail freight indicate weak domestic activity Statistics Brief Global Trade and Transport July 2013 Global Freight Volumes Indicate Increasing Dependency on -led Growth The latest update of global freight data collected by the International Transport

More information

3 rd ACER Gas Target Model Workshop. 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014

3 rd ACER Gas Target Model Workshop. 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014 3 rd ACER Gas Target Model Workshop 3 rd ACER TITRE GTM workshop, Brussels, 15 May 2014 1 3. Functioning wholesale gas markets Objective and criteria Walter Boltz ACER BoR Vice-Chair and ACER Gas Working

More information

European Gas Contracts: Will Oil-Indexation Persist?

European Gas Contracts: Will Oil-Indexation Persist? European Gas Contracts: Will Oil-Indexation Persist? Howard V Rogers Senior Research Fellow, OIES Natural Gas Programme BIEE Seminar Gas Outlook Winter 2011 and Beyond 10th October 2011 OIES Natural Gas

More information

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures Decision Deliberation of the French Regulatory Commission of Energy of 19 March 2015 deciding on the evolution of the tariffs for the use of natural gas transmission networks as of 1 April 2015 Present

More information

2010 Winter Outlook & a future view

2010 Winter Outlook & a future view 2010 Winter Outlook & a future view Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Presentation

More information

EUROPEAN ENERGY MARKET:

EUROPEAN ENERGY MARKET: EUROPEAN ENERGY MARKET: RE-DESIGNING THE FRAMEWORK The Cyprus-EU Presidency Summit Cyprus Energy Regulatory Authority George Shammas Chairman October 8 th -9 th, Nicosia Email:info@cera.org.cy website:www.cera.org.cy

More information

Part I COMMISSION STAFF WORKING DOCUMENT. Energy Markets in the European Union in Accompanying the document

Part I COMMISSION STAFF WORKING DOCUMENT. Energy Markets in the European Union in Accompanying the document EUROPEAN COMMISSION Brussels, XXX SWD(2012) 368 Part I COMMISSION STAFF WORKING DOCUMENT Energy Markets in the European Union in 2011 Accompanying the document COMMUNICATION FROM THE COMMISSION TO THE

More information

Winter Supply Outlook 2016/2017 & Winter Review 2015/2016

Winter Supply Outlook 2016/2017 & Winter Review 2015/2016 Rev_3 Winter Supply Outlook 2016/2017 & Winter Review 2015/2016 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894 5101; info@entsog.eu www.entsog.eu, VAT No. BE0822

More information

Designing gas markets for the future, better for consumers and simpler for producers

Designing gas markets for the future, better for consumers and simpler for producers Designing gas markets for the future, better for consumers and simpler for producers If we have reached a tipping point for gas, the next phase needs a different market design, especially for contributions

More information

An overview of the European Energy Markets

An overview of the European Energy Markets An overview of the European Energy Markets The European energy markets remain very unsettled Despite positive achievements, many challenges have to be overcome at COP21 conference Utilities financial performances

More information

Wind energy in Europe markets

Wind energy in Europe markets Wind energy in Europe markets Turkish Wind Energy Congress (TWEC 2012), 7 November 2012, Istanbul Christian Kjaer CEO European Wind Energy Association (EWEA) More than 600 members from almost 60 countries

More information

LNG Market Outlook and Development Pierre Cotin. 3 rd Annual LNG Shipping Forum 2013, Lillestrøm, 6 June 2013

LNG Market Outlook and Development Pierre Cotin. 3 rd Annual LNG Shipping Forum 2013, Lillestrøm, 6 June 2013 LNG Market Outlook and Development Pierre Cotin 3 rd Annual LNG Shipping Forum 2013, Lillestrøm, 6 June 2013 Who we are GLE is one of the three columns of GIE (Gas Infrastructure Europe), the European

More information

Hydrogen Would Prefer Russian Pipeline Gas

Hydrogen Would Prefer Russian Pipeline Gas Hydrogen Would Prefer Russian Pipeline Gas Sergei Komlev Head of Contract Structuring and Price Formation Directorate Gazprom Export* 26th meeting of the EU-Russia Gas Advisory Council s Work Stream on

More information

European pricing dynamics

European pricing dynamics OXFORD INSTITUTE FOR FOR ENERGY STUDIES Natural Gas Research Programme European pricing dynamics Dr. Thierry Bros Senior Research Fellow Flame Amsterdam 11 May 2017 Main steps of European gas 1986: Privatisation

More information

Infrastructure endowment

Infrastructure endowment Infrastructure endowment Most public investment in Member States as well as that supported by the Structural Funds goes on infrastructure. An adequate endowment of infrastructure is a necessary, but not

More information

The future of gas. Berlin, February 1 st snam.it

The future of gas. Berlin, February 1 st snam.it The future of gas Berlin, February 1 st 2018 snam.it A new report dedicated to natural gas Will gas achieve its strong projected growth path? 2 bcm The growth of natural gas is expected to continue to

More information

Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF

Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF DELIBERATION NO 2018-072 Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF Present: Jean-François CARENCO,

More information

Changes in Dynamics and Pricing of LNG in the Atlantic Basin

Changes in Dynamics and Pricing of LNG in the Atlantic Basin Changes in Dynamics and Pricing of LNG in the Atlantic Basin Andrew Williamson Head of LNG Supply, Commercial Operations & Trading Vienna, 29 January 2018 OMV Gas & Power Agenda Changes in Dynamics and

More information

Global Wind Energy Market Report. Wind Energy Industry Grows at Steady Pace, Adds Over 8,000 MW in 2003

Global Wind Energy Market Report. Wind Energy Industry Grows at Steady Pace, Adds Over 8,000 MW in 2003 Global Wind Energy Market Report Wind Energy Industry Grows at Steady Pace, Adds Over 8,000 MW in 2003 World Growth Cumulative global wind energy generating capacity topped 39,000 megawatts (MW) and reached

More information

The prospects for LNG in the Danube Region

The prospects for LNG in the Danube Region The prospects for LNG in the Danube Region Dr. Péter Kaderják, Director Danube Region Stakeholder Seminar Brussels, May 26, 2016 Expected outcomes (Ulm, October, 2015) Conclusions to contribution to the

More information

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS Energy Week, Vaasa, Finland, 16.03.2016 Ioanna Mersinia, Attorney in Law (LL.M.) Contents EU Energy Law / 3 rd Energy Package (2009):

More information

Slovenia. Key issues. General overview

Slovenia. Key issues. General overview Slovenia Key issues Further strengthening of the power grid is needed to ensure the reliable and safe operation of the national electricity system. Planned investments in additional cross-border capacity

More information

Press Conference Background GAS EXPORT AND ENHANCING RELIABILITY OF GAS SUPPLIES TO EUROPE June 9, 2015 GAS SALES

Press Conference Background GAS EXPORT AND ENHANCING RELIABILITY OF GAS SUPPLIES TO EUROPE June 9, 2015 GAS SALES Press Conference Background GAS EXPORT AND ENHANCING RELIABILITY OF GAS SUPPLIES TO EUROPE June 9, 2015 GAS SALES In 2014 Gazprom Group sold 159.4 of gas worth RUB 1,801.2 billion beyond the FSU. Western

More information

The Dynamic Energy Landscape: Geopolitical Implications of the Changing Energy Economy

The Dynamic Energy Landscape: Geopolitical Implications of the Changing Energy Economy North America switches from being a net importer of energy to a net exporter this year Source: BP Energy Outlook 2015 Source: US Energy Information Administration, April 2015 The United States is ranked

More information

Lecture 12. LNG Markets

Lecture 12. LNG Markets Lecture 12 LNG Markets Data from BP Statistical Review of World Energy 1991 to 2016 Slide 1 LNG Demand LNG demand is expected to grow from China, India and Europe in particular. Currently biggest importer

More information

CRE consultation on the implementation of regulated access to underground gas storage in France

CRE consultation on the implementation of regulated access to underground gas storage in France CRE consultation on the implementation of regulated access to underground gas storage in France n EFET response 23 January 2018 The European Federation of Energy Traders (EFET) thanks CRE for the opportunity

More information

[LNG MARKET ANALYSIS ] 1. LNG Market Analysis

[LNG MARKET ANALYSIS ] 1. LNG Market Analysis [LNG MARKET ANALYSIS ] 1 LNG Market Analysis LNG Market Analysis Volume: 6 th April 2018 [LNG MARKET ANALYSIS ] 2 LNG and Natural Gas Price Assessment 26 th March 6 th April 2018 LNG Analysis Global LNG

More information

Incremental Capacity. Overview of initiated INC projects after demand assessment phase October 2017

Incremental Capacity. Overview of initiated INC projects after demand assessment phase October 2017 4 October 2017 Incremental Capacity Overview of initiated INC projects after demand assessment phase 2017 Jan Vitovský Subject Manager, Capacity, ENTSOG INC process - 1 st initiation in April 2017 Network

More information

Energy and CO 2 emissions in the OECD

Energy and CO 2 emissions in the OECD Energy and CO 2 emissions in the OECD With detailed supply and demand data up to 216 1 1. Data based on the 218 preliminary editions of the IEA World energy balances, and the IEA CO 2 Emissions from fuel

More information

Overview: National coal phase-out announcements in Europe

Overview: National coal phase-out announcements in Europe Overview: National coal phase-out announcements in Europe Status as of June 2018 Many national governments have their intention to phase out coal. A total of 40.38 gigawatts (GW) of coal power capacity,

More information

Russian Pipeline Gas: Problem or Part of the Solution?

Russian Pipeline Gas: Problem or Part of the Solution? Russian Pipeline Gas: Problem or Part of the Solution? Sergei Komlev Head of Contract Structuring and Price Formation Directorate Gazprom Export* Flame, Amsterdam, May 14, 2018 *Views expressed in this

More information

Providing a secure natural gas supply for Europe

Providing a secure natural gas supply for Europe International Association of Oil and Gas Producers Providing a secure natural gas supply for Europe 3rd South East Europe Energy Dialogue on 18-19 June Who are OGP? International Association of Oil & Gas

More information

Interest for a TSO to develop its activities in the Southern Corridor. September 2012

Interest for a TSO to develop its activities in the Southern Corridor. September 2012 Interest for a TSO to develop its activities in the Southern Corridor September 2012 1 GRTgaz owns, operates and maintains the longest transmission network in Europe 3,062 employees as of December 2011

More information

Feasability study of the merger of GRTgaz North and GRTgaz South zones

Feasability study of the merger of GRTgaz North and GRTgaz South zones Feasability study of the merger of GRTgaz North and GRTgaz South zones Pierre-Laurent Lucille 1 Market design changes in France 330 TWh 170 TWh? 500 TWh 460 TWh North merger completed in 2009 Investments

More information

Energy & Climate Change ENYGF 2015

Energy & Climate Change ENYGF 2015 Energy & Climate Change ENYGF 2015 Ellina Levina Environment & Climate Change Unit Sustainable Energy Policy and Technology, IEA 22 June 2015 29 Member Countries: Australia, Japan, Korea, New Zealand,

More information

LNG Markets in Transition : Will East meet West?

LNG Markets in Transition : Will East meet West? LNG Markets in Transition : Will East meet West? Jean-Marc Hosanski World Conference Tokyo, June 2nd, 2003 WOC 10 Thank you Mister Chairman, Ladies and Gentlemen, Distinguished Guests, My objective today

More information

2 ENERGY TECHNOLOGY RD&D BUDGETS: OVERVIEW (2017 edition) Released in October 2017. The IEA energy RD&D data collection and the analysis presented in this paper were performed by Remi Gigoux under the

More information

Groningen Production Cap and European gas (& electricity) markets

Groningen Production Cap and European gas (& electricity) markets Groningen Production Cap and European gas (& electricity) markets Kong Chyong, Research Associate & Director of Energy Policy Forum EPRG, Cambridge Judge Business School, University of Cambridge EPRG Winter

More information

Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel Belgium

Commission européenne, B-1049 Bruxelles / Europese Commissie, B-1049 Brussel Belgium DISCLAIMER: This report prepared by the Market Observatory for Energy of the European Commission aims at enhancing public access to information about prices of natural gas in the Members States of the

More information

, Vienna Platts Gas Supply and Infrastructure Conference

, Vienna Platts Gas Supply and Infrastructure Conference 1 The Gas Target Model: The European gas market 2014 and beyond Walter Boltz Executive Director E-Control Austria, Vice Chair of ACER s Regulatory Board Agenda Gas in context to European energy policies

More information

COMPARATIVE ANALYSIS OF MONTHLY REPORTS ON THE OIL MARKET

COMPARATIVE ANALYSIS OF MONTHLY REPORTS ON THE OIL MARKET COMPARATIVE ANALYSIS OF MONTHLY REPORTS ON THE OIL MARKET AN INTERNATIONAL ENERGY FORUM PUBLICATION APRIL 2018 RIYADH, SAUDI ARABIA APRIL 2018 SUMMARY FINDINGS FROM A COMPARISON OF DATA AND FORECAST ON

More information

energy in figures Energy

energy in figures Energy EU energy in figures Statistical pocketbook 2015 Energy This publication does not involve the European Commission in liability of any kind. Europe Direct is a service to help you find answers to your questions

More information

GIE ANNUAL CONFERENCE. EUROPEAN GAS MARKET IN A GLOBAL CONTEXT SUPPLY/PRICE OUTLOOK May 2013 Andrew Morris

GIE ANNUAL CONFERENCE. EUROPEAN GAS MARKET IN A GLOBAL CONTEXT SUPPLY/PRICE OUTLOOK May 2013 Andrew Morris GIE ANNUAL CONFERENCE EUROPEAN GAS MARKET IN A GLOBAL CONTEXT SUPPLY/PRICE OUTLOOK 2020 24 May 2013 Andrew Morris AGENDA 1. Demand and Supply 2. Prices 3. Flexibility 4. Conclusion COPYRIGHT PÖYRY GIE

More information

Winter Outlook 2009/10. 8 th October 2009 Peter Parsons

Winter Outlook 2009/10. 8 th October 2009 Peter Parsons Winter Outlook 29/1 8 th October 29 Peter Parsons Agenda Winters 28/9 & 29/1 Gas Demand Gas Supply Electricity Demand Electricity Supply 28/9 Overview Winter 28/9 characterised by: Periods of cold weather,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.3.2007 SEC(2007) 363 COMMISSION STAFF WORKING DOCUMENT Annex to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 'Towards

More information

Electricity and heat statistics

Electricity and heat statistics Electricity and heat statistics Statistics Explained Data extracted in June 2018. Planned article update: June 2019. Gross electricity production by fuel, GWh, EU-28, 2000-2016Source: Eurostat (nrg105a)

More information

Consumption of energy

Consumption of energy Consumption of energy Statistics Explained Data extracted in June 2017. Most recent data: Further Eurostat information, Main tables and Database. This article will be merged in September 2018 to the article

More information

Gas Markets in 2015: Outlook and Challenges

Gas Markets in 2015: Outlook and Challenges The 418th Forum on Research Work Gas Markets in 2015: Outlook and Challenges December 19, 2014 Tetsuo Morikawa The Institute of Energy Economics, Japan Natural Gas Demand in Major Regions Natural Gas Demand

More information

PES ESSENTIAL: EPIA REPORT. Market outlook:

PES ESSENTIAL: EPIA REPORT. Market outlook: PES ESSENTIAL: EPIA REPORT Market outlook: 2015 The European Photovoltaic Industry Association s annual report on the global market outlook for photovoltaics is always a welcome addition to PES, and this

More information

State of the Energy Union 2015 COMMISSION STAFF WORKING DOCUMENT. on the European Energy Security Strategy

State of the Energy Union 2015 COMMISSION STAFF WORKING DOCUMENT. on the European Energy Security Strategy EUROPEAN COMMISSION Brussels, 18.11.2015 SWD(2015) 404 final State of the Energy Union 2015 COMMISSION STAFF WORKING DOCUMENT on the European Energy Security Strategy EN EN 1. Introduction Energy security

More information