Federal Aviation Administration

Size: px
Start display at page:

Download "Federal Aviation Administration"

Transcription

1 U.S. Department of Transportation Federal Aviation Administration DRAFT Environmental Impact Statement for Proposed Redevelopment and Extension of Runway 9R/27L March 30, 2007 Fort Lauderdale-Hollywood International Airport (FLL) Page 1

2 Agenda Welcome and Introductions Overview of the Draft Environmental Impact Statement (Draft EIS) Question & Answer Session Closing Remarks Page 2

3 Draft EIS Organization Volumes 1 and 2 contain an Executive Summary and eight main document chapters Executive Summary One - History, Background, and Public Involvement Two - The Proposal Three - Purpose and Need Four - Alternatives Five - Affected Environment Six - Environmental Consequences Seven - Cumulative Impacts Eight - List of Preparers and List of Agencies and Persons to Whom Copies are Sent Page 3

4 Draft EIS Organization Volumes 3 through 5 contain 15 appendices A - Agency Streamlining B - Public Involvement C - FAA/Airport Sponsor s Correspondence D - Purpose and Need E - Airfield Planning, Design, & Constructability Review F - Net Benefits Analysis G - Air Quality H - Noise I - Interlocal Agreements and Development Orders J - Land Use GIS Methodology K - Public Resources L - Water Resources M - Biological and Natural Resources N - Hazardous and Waste Materials O - Surface Transportation and Natural Resources and Energy Page 4

5 Role of the FAA FAA is the lead Federal agency responsible for preparation and content of the Draft EIS Draft EIS was prepared pursuant to a proposal presented to the FAA by Broward County, the owner and operator of FLL The Draft EIS was prepared in compliance with National Environmental Policy Act (NEPA) of 1969 Council on Environmental Quality (CEQ) regulations implementing NEPA FAA Order E, Environmental Impacts: Policies and Procedures FAA Order B, NEPA Implementing Instructions for Airport Actions FAA selected a third party contractor, the Landrum & Brown Team, to assist in preparation of the Draft EIS. Page 5

6 Airport Sponsor s Identified Goals and Objectives Enhance capacity to accommodate forecast operations through through 2020 with average annual delay at or below 6 to 10 minutes Decommission use of Runway 13/31 (crosswind) Avoid using Runway 13/31 to address forecast increases in aircraft delays Mitigate noise exposure attributable to proposed improvements by implementing a runway use plan and residential noise mitigation processes Implement residential noise mitigation initiatives in areas not currently eligible under the Airport Improvement Program Page 6

7 Airport Sponsor s Proposed Project - EIS Alternative B1c Expand and elevate Runway 9R/27L to 8,000 feet by150 feet wide Construct new full-length parallel taxiway 75 feet wide on the north side of Runway 9R/27L with separation of 400 feet from 9R/27L Construct an outer dual parallel taxiway separated from the proposed north side parallel taxiway by 276 feet Construct connecting taxiways from the proposed fulllength parallel taxiway to existing taxiways Construct an Instrument Landing System for landings on Runways 9R and 27L Decommission Runway 13/31 Redevelop terminal gates Page 7

8 Connected Actions Close Airport Perimeter Road within the approach to Runway 9R Relocate ASR-9 Acquire all, or a portion of the Wyndham Fort Lauderdale Airport Hotel to the extent a portion of the existing structure is in the RPZ for extended Runway 9R/27L Partial displacement of Jet Center facilities - taxiway is a temporary runway during construction Full displacement of Gulfstream Airways aircraft maintenance facilities - taxiway is a temporary runway during construction Page 8

9 Airport Sponsor s Proposed Project - EIS Alternative B1c Page 9

10 Capacity and Delay Issues at FLL Throughput of the existing airfield is 84 operations per hour The delay threshold for establishing the capacity of FLL is six minutes per operation Airfield capacity needs to accommodate 101 to 107 operations per hour to maintain average delays at 6 minutes or less per operation Page 10

11 Federal Need and Purpose for the Project FAA considered the deficiencies at FLL and their impact on the FAA s purpose of enhancing safety, efficiency, and capacity at both the regional and national level and identified the following needs at FLL: Sufficient airfield capacity to the extent practicable, to accommodate existing and projected air carrier demand at an acceptable level of delay Enhanced and balanced airfield Adequate terminal gate facilities For an alternative to be carried forward for detailed evaluation in the Draft EIS, it must address one or more of these needs. Page 11

12 Range of Alternatives All reasonable, feasible, prudent, and practicable alternatives that might accomplish the objectives of a proposed project must be evaluated. Off-Site Alternatives - Use of Other Airports/Regional Management Alternatives - Development of New Off-Site Airport to Replace FLL - Other Modes of Transportation and/or Telecommunications On-Site Alternatives - Non-Runway Development Alternatives - Other Technologies - Activity or Demand-Management Alternatives - Runway Development Alternatives No Action Alternative Page 12 (always considered under NEPA)

13 Alternatives Screening Analysis Off-site and on-site alternatives that could reasonably increase capacity and reduce delay at FLL were qualitatively assessed Runway development alternatives that could reasonably increase capacity and reduce delay were further evaluated to consider runway length, airfield throughput capacity, constructability, and possible fatal flaws The analysis resulted in a range of reasonable alternatives that could substantially meet the stated purposes and needs for the project at FLL Page 13

14 Alternatives Assessed for Environmental Impacts Alternative A: Existing Airfield (No Action) Alternative B1: Redevelop and Extend Runway 9R/27L (extend 9R/27L to east / 8,600 feet) Alternative B1b: Redevelop and Extend Runway 9R/27L (extend 9R/27L to east / 8,000 feet) Alternative B1c: Airport Sponsor s Proposed Project (extend 9R/27L to east / 8,000 feet) Alternative B4: New Runway 9R/27L (north of existing 9R/27L / 6,001 feet) Alternative B5: New Runway 9R/27L (south of existing 9R/27L / 7,800 feet) Alternative C1: New Runway 8/26 (north of existing 9L/27R / 7,721 feet) Alternative D1: New Runways 8/26 and 9R/27L (Combination of Alternatives B1b and C1) Alternative D2: New Runways 8/26 and 9R/27L (Combination Alternatives B4 and C1) Page 14

15 Existing Airfield Page 15

16 Alternative A (No Action) Page 16

17 Alternative B1 Page 17

18 Alternative B1b/B1c Alternative B1c - Airport Sponsor s Proposed Project Page 18

19 Alternative B4 Page 19

20 Alternative B5 Page 20

21 Alternative C1 Page 21

22 Alternative D1 Page 22

23 Alternative D2 Page 23

24 Alternatives Analysis (Engineered Materials Arrested System) Alternatives Use of EMAS A (No Action) N/A B1 (extend 9R/27L east / 8,600 ft) No B1b (extend 9R/27L east / 8,000 ft) Yes B1c (extend 9R/27L east / 8,000 ft) Yes B4 (north of existing 9R/27L/ 6,001 ft) Yes B5 (south of existing 9R/27L / 7,800 ft) Yes C1 (north of existing 9L/27R/ 7,721 ft) No D1 (combination of B1b and C1) Yes D2 (combination of B4 and C1) Yes All EMAS beds would be designed to FAA standards in consultation with the Engineered Arresting Systems Corporation, the only manufacturer of EMAS currently approved by FAA. Page 24

25 Preliminary Airspace Analysis Alternatives TERPS Penetration A (No Action) N/A B1 (extend 9R/27L east / 8,600 ft) Yes B1b (extend 9R/27L east / 8,000 ft) Yes B1c (extend 9R/27L east / 8,000 ft) Yes B4 (north of existing 9R/27L/ 6,001 ft) Yes B5 (south of existing 9R/27L / 7,800 ft) Yes C1 (north of existing 9L/27R/ 7,721 ft) Yes D1 (combination of B1b and C1) Yes D2 (combination of B4 and C1) Yes The Wyndham Hotel would penetrate the standard TERPS for Alternative B1 and B5. The Wyndham Hotel and the Gulfstream hangar would penetrate the standard TERPS for Alternative B1b, B1c, and D1. Interstate I-595 and the fuel tank storage facilities would penetrate the TERPS for Alternatives C1, D1, and D2. None of the these penetrations would affect runway length, but could affect approach minimums. Page 25

26 Affected Environment A description of existing environmental conditions in and around FLL Provides a basis of comparison to determine the environmental consequences of the Proposed Project and alternatives Overall Study Area encompasses the communities surrounding FLL and was developed using a composite of projected future 60 Day-Night Average Sound Level (DNL) noise contours Detailed Study Area includes the current FLL land envelope and adjacent areas that may be physically disturbed by construction activities Page 26

27 Environmental Consequences 2012 and 2020 used for analysis years because 2012 is the projected implementation year of the Airport Sponsor s Proposed Project and 2020 represents a future condition after full implementation of the Airport Sponsor s Proposed Project. Analysis of environmental impacts compares the effects of the runway development alternatives to the No Action Alternative for the two analysis years. The Draft EIS analysis is summarized in Table ES-1. This summary of analysis provides operational data, cost benefit information, and potential environmental impacts for the runway development and No Action alternatives. Page 27

28 Summary of Analysis (Operational Benefits) Alternatives Hourly Capacity Delay 2012 Delay A (No Action) 84 B1 (extend 9R/27L east / 8,600 ft) B1b (extend 9R/27L east / 8,000 ft) B1c (extend 9R/27L east / 8,000 ft) B4 B4 (north of existing 9R/27L/ 6,001 ft) (low case) B5 (south of existing 9R/27L / 7,800 ft) C1 (north of existing 9L/27R/ 7,721 ft) D1 (combination of B1b and C1) 128 N/A 1.2 D2 (combination of B4 and C1) 128 N/A 1.5 Hourly capacity takes into consideration actual demand able to use available runways according to aircraft types and runway length characteristics of each alternative. Delay is calculated as average minutes of delay per operation. Alternatives D1 and D2 would not be fully operational by Page 28

29 Summary of Analysis (Benefits / Costs) Alternatives A (No Action) B1 (extend 9R/27L east / 8,600 ft) B1b B1c Total Costs N/A Benefit/Cost Ratio N/A N/A $688,862, (extend 9R/27L east / 8,000 ft) $694,827, (extend 9R/27L east / 8,000 ft) $694,827, B4 B4 (north of existing 9R/27L/ 6,001 ft) (low case) $523,473,675 $523,473,675 B5 (south of existing 9R/27L / 7,800 ft) $707,044, C1 (north of existing 9L/27R/ 7,721 ft) $462,689, D1 (combination of B1b and C1) $1,195,138, D2 (combination of B4 and C1) $995,078, Cost estimates for all alternatives including B1c, the Airport Sponsor s Proposed Project, are in 2006 dollars. Page 29

30 Summary of Analysis (Demand vs. Capacity) FLL Demand vs 6 min Delay 525,000 Alternative D1 500,000 Alternative D2 Annual Aircraft Operations 475,000 Alternatives B1/B1b/B1c/B5 450,000 Alternatives B4/C1 425, ,000 Alternative B4 Low Case 375, , , ,000 Existing Airfield 275, ,000 Years Note: B4 Low Case corresponds to the B4 Runway Sensitivity Analysis capacity numbers. Page 30

31 Summary of Analysis (Noise Impacts) Alternatives Residential Dwelling Units (Population) A (No Action) 12 (33) 696 (1,772) B1 (extend 9R/27L east / 8,600 ft) 632 (1,538) 1,046 (2,447) B1b (extend 9R/27L east / 8,000 ft) 652 (1,593) 1,051 (2,472) B1c (extend 9R/27L east / 8,000 ft) 118 (285) 1,051 (2,472) B4 (north of existing 9R/27L/ 6,001 ft) 372 (973) 477 (1,492) B5 (south of existing 9R/27L / 7,800 ft) 840 (1,928) 1,260 (4,235) C1 (north of existing 9L/27R/ 7,721 ft) 28 (71) 285 (717) D1 (combination of B1b and C1) N/A 801 (1,926) D2 (combination of B4 and C1) N/A 303 (789) Only B1c, Airport Sponsors Proposed Project, includes noise abatement operational procedures provided by Broward County as specified in Interlocal Agreements. Noise mitigation will be discussed in the Final EIS for the FAA s Preferred Alternative. Alternatives D1 and D2 would not be fully operational by Page 31

32 Summary of Analysis (Compatible Land Uses) Page 32 Direct Property Impacts Alternatives B1, B1b, B1c, B4, B5, D1, and D2 would require the acquisition of all or a portion of the Wyndham Fort Lauderdale Airport Hotel. No other off-airport property would be directly impacted by these alternatives. Acquisitions or relocations would be conducted in compliance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act. Land Use / Zoning Changes - Existing comprehensive plans for jurisdictions within the Study Area were reviewed to determine reasonable consistency with land use plans of public agencies responsible for development in the area. None of the runway development alternatives would require land use or zoning changes and all would be considered consistent with land use and comprehensive plans.

33 Summary of Analysis (No Significant Impacts) There are no significant environmental impacts for the following categories for all alternatives: Noise Sensitive Facilities (includes schools, churches, nursing homes, and libraries within 65+ DNL noise contour) Historic, Architectural, Archeological, Cultural Resources Section 4(f) Lands Hazardous and Solid Waste Coastal Resources Socioeconomic, Environmental Justice, and Children s Health and Safety Issues Secondary (Induced) and Infrastructure Light Emissions and Visual Impacts Natural Resources and Energy Construction Page 33

34 Summary of Analysis (Impacts Would Not Exceed FAA Thresholds) Impacts would not exceed FAA thresholds of significance for the following categories for all alternatives: Air Quality - Impacts would not exceed the National Ambient Air Quality Standards (NAAQS) Water Quality Impacts would not exceed regulatory standards because Best Management Practices (BMPs) in place at the airport are considered to be sufficient to ensure that concentrations of pollutants of concern would not exceed applicable regulatory criteria Page 34

35 Summary of Analysis (Wetlands, Floodplains) Wetlands - Unavoidable impacts to wetlands would occur with any of the runway development alternatives. Impacts would vary by alternative and be mitigated in accordance with regulatory requirements. Floodplains - The 100-year floodplain would be encroached upon by any of the runway development alternatives, but this would not result in a loss of natural or beneficial floodplain values. Any loss of floodplain storage would be compensated for through airfield stormwater management system design. Page 35

36 Summary of Analysis (Fish, Wildlife, and Plants) Federally-Listed Species and Critical Habitants None of the runway development alternatives are likely to adversely affect Federally-listed endangered or threatened species, or species of special concern. State-Listed Species - None of the runway development alternatives are likely to adversely affect state-listed endangered or threatened species, or species of special concern. Essential Fish Habitat None of the runway development alternatives would significantly impact Essential Fish Habitat. Page 36

37 Next Steps Page 37 FAA Public Hearing May 1, 2007 on Draft EIS FAA reviews comments on Draft EIS and prepares responses for inclusion in the Final EIS FAA issues Final EIS which identifies FAA s Preferred Alternative and any potential mitigation FAA issues findings in a Record of Decision (ROD)

38 FAA Public Workshop & Hearing May 1st Tuesday Greater Fort Lauderdale/Broward County Convention Center 1950 Eisenhower Boulevard, Fort Lauderdale Workshop: Ballroom D 4:00 p.m. to 8:00 p.m. -Court Reporter will be available at the Workshop from 4:00 p.m. to 6:00 p.m. to accept individual oral comments Hearing: Ballroom A 6:00 p.m. -Full transcripts will be taken at the Hearing for the Administrative Record Page 38

39 Submit Written Comments to: Virginia Lane FAA Environmental Specialist Fort Lauderdale-Hollywood International Airport EIS FAA Orlando Airports District Office 5950 Hazeltine National Drive Orlando, FL PHONE: FAX: Page 39

FINAL EXECUTIVE SUMMARY

FINAL EXECUTIVE SUMMARY EXECUTIVE SUMMARY ES.1 ES.1.1 INTRODUCTION The Federal Aviation Administration (FAA) has prepared this Environmental Impact Statement (EIS) to analyze and disclose the potential environmental impacts resulting

More information

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING

TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require

More information

Agency Scoping. May 31, :00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport

Agency Scoping. May 31, :00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport Agency Scoping Meeting 10:00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport Presented to: CMH EIS Agencies By: FAA Consultant, Landrum & Brown Date: Agenda I. History,

More information

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview CLT Charlotte Douglas International Airport Environmental Impact Statement Scoping Overview What is the National Environmental Policy Act (NEPA)? Patrick Schneider NEPA is a federal statute that requires

More information

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview

CLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview CLT Charlotte Douglas International Airport Environmental Impact Statement Scoping Overview What is the National Environmental Policy Act (NEPA)? Patrick Schneider NEPA is a federal statute that requires

More information

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN

More information

WELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING

WELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING TIER 2 EIS MEETING December 3, 2003 WELCOME TO THE FEDERAL AVIATION ADMINSTRATION MEETING Slide 1 The Federal Aviation Administration would like to welcome you here and thank you for participating in today

More information

Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015

Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015 Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015 Awareness of the Master Plan Recommendations (Proposed Action) Understanding of the Environmental Assessment (EA) purpose and content

More information

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects Agenda Public Event #2

More information

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County

More information

Manhattan Regional Airport Draft Environmental Assessment. Table of Contents

Manhattan Regional Airport Draft Environmental Assessment. Table of Contents Table of Contents Page 1 PURPOSE AND NEED... 1-1 1.1 Background Information...1-1 1.2 Activity Forecasts...1-2 1.3 Purpose and Need...1-2 1.3.1 RSA and ROFA...1-3 1.3.2 Crosswind Runway...1-3 1.3.3 Parallel

More information

PUBLIC INFORMATION MEETING SUMMARY

PUBLIC INFORMATION MEETING SUMMARY PUBLIC INFORMATION MEETING SUMMARY Project: Environmental Assessment (EA) & Environmental Impact Evaluation (EIE) for Obstruction Removal Bradley International Airport (BDL) Location: Windsor Locks High

More information

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order Updates on FAA Order 1050.1F Rhonda Solomon March 3, 2015 Airports Conference 2015 Agenda Communicate FAA Order 1050.1 Updates Educate attendees on the changes to FAA Order 1050.1 1 1 Overview of NEPA

More information

Airport Master Plan Update June 14, 2017

Airport Master Plan Update June 14, 2017 Airport Master Plan Update June 14, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

4 EXISTING AND FORECAST NOISE EXPOSURE MAPS

4 EXISTING AND FORECAST NOISE EXPOSURE MAPS Updated 14 C.F.R. Part 150 Noise Exposure Maps page 53 4 EXISTING AND FORECAST NOISE EXPOSURE MAPS 4.1 Introduction As discussed in Section 1.3.1, the most fundamental elements of the NEMs submission are

More information

SUMMARY S.1 ENVIRONMENTAL REVIEW PROCESS TUCSON INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

SUMMARY S.1 ENVIRONMENTAL REVIEW PROCESS TUCSON INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT SUMMARY The Federal Aviation Administration (FAA), as lead federal agency, along with the United States Air Force (USAF), and the National Guard Bureau (NGB) have prepared this Environmental Impact Statement

More information

Hartford Brainard Airport (HFD) Environmental Assessment for Tree Obstruction Removal

Hartford Brainard Airport (HFD) Environmental Assessment for Tree Obstruction Removal Hartford Brainard Airport (HFD) Environmental Assessment for Tree Obstruction Removal Draft Environmental Assessment Report for Hartford Brainard Airport December 2016 Project Background The Environmental

More information

CHAPTER 8: ENVIRONMENTAL OVERVIEW

CHAPTER 8: ENVIRONMENTAL OVERVIEW CHAPTER 8: ENVIRONMENTAL OVERVIEW Introduction FAA Advisory Circular 150/5070-6B, Airport Master Plans identifies an environmental review as one of the elements of effective planning. The purpose behind

More information

Future Noise Contour

Future Noise Contour The area within each 5 db noise exposure contour is shown in Table 5-2, Area Exposed to Various Noise Levels 2008 Proposed Action. The 65 Day-Night Average Sound Levels (DNL) of the 2008 Proposed Action

More information

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES 5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (16 U.S.C. Section 470(f)) protects properties that

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK BURKE LAKEFRONT AIRPORT ENVIRONMENTAL ASSESSMENT FINAL TABLE OF CONTENTS PAGE CHAPTER ONE PROPOSED ACTION 1.1 Introduction...

More information

Environmental Clearance and Next Year s Grant. Los Angeles Airport District Office. Presented by: Brenda Pérez George Buley David Cushing

Environmental Clearance and Next Year s Grant. Los Angeles Airport District Office. Presented by: Brenda Pérez George Buley David Cushing Environmental Clearance and Next Year s Grant Presented by: Los Angeles Airport District Office Brenda Pérez George Buley David Cushing ACA Conference - September 2017 Presentation Agenda Consideration

More information

SUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE

SUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE SUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE February 13, 2018 Item No. 9B Meeting Date: February 13, 2018 1 Briefing Overview Background Existing conditions Long-term vision Planning update Phased approach

More information

Public Workshop #9. October 11, 2016

Public Workshop #9. October 11, 2016 Public Workshop #9 October 11, 2016 Agenda Master Plan Status Preferred Alternative Environmental Considerations Vision 2040 Next Steps Master Plan Status Alternatives exploration and evaluation Environmental

More information

ENVIRONMENTAL IMPACT STATEMENT (EIS)

ENVIRONMENTAL IMPACT STATEMENT (EIS) (EIS) FOR THE PROPOSED AIRFIELD SAFETY ENHANCEMENT PROJECT AND LAND TRANSACTIONS AT TUCSON INTERNATIONAL AIRPORT Scoping Meeting Package September 22, 2016 Tucson Executive Terminal (At the base of the

More information

What s a NEPA? Modern Environmental Planning in the United States. Vanasse Hangen Brustlin, Inc.

What s a NEPA? Modern Environmental Planning in the United States. Vanasse Hangen Brustlin, Inc. What s a NEPA? Modern Environmental Planning in the United States November 5, 2009 MIT Airport Planning Class Marla Engel, AICP Principal, Airports Planning Vanasse Hangen Brustlin, Inc. Modern Environmental

More information

Washington Dulles International Airport EXECUTIVE SUMMARY

Washington Dulles International Airport EXECUTIVE SUMMARY EXECUTIVE SUMMARY The events of September 11, 2001 and the economic uncertainties facing commercial aviation have affected the timing of the Proposed Action. The Metropolitan Washington Airports Authority

More information

Defining & Completing the Planning Process

Defining & Completing the Planning Process Defining & Completing the Process How Sets the Stage for Project Development Presented to: By: Gina Mitchell, AICP Date: November 5, 2014 AirTAP: Airport Project Development Process - From Idea to Award

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: Federal Project#: Project Number: 0029-002-135, D624, P101 Project Type: Construction UPC: 77383 Charge Number: Route Number: 29 Route Type:

More information

SUMMARY S.1 ENVIRONMENTAL REVIEW PROCESS TUCSON INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT FINAL

SUMMARY S.1 ENVIRONMENTAL REVIEW PROCESS TUCSON INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT FINAL SUMMARY The Federal Aviation Administration (FAA), as lead federal agency, along with the United States Air Force (USAF), and the National Guard Bureau (NGB) have prepared this Environmental Impact Statement

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative Open Houses Monday, June 24 6 7 PM: Open House 7 8 PM: Presentation & Q/A City of Atlanta Old Council Chambers Atlanta City Hall 55 Trinity Avenue Atlanta, GA 30303 Tuesday,

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative Technical Advisory Committee (TAC) Meeting June 11 th, 2013 Introductions Purpose of Today s Meeting Project Review Preliminary Environmental Findings Next Steps Project Status

More information

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT EXECUTIVE SUMMARY ES.1 BACKGROUND The purpose of this Draft Environmental Report (DEIR) is the implementation of improvement projects at Charles M. Schulz Sonoma County Airport (the Airport). The improvement

More information

CHAPTER 2 THE PROPOSED ACTION

CHAPTER 2 THE PROPOSED ACTION CHAPTER 2 THE PROPOSED ACTION 2.0 INTRODUCTION The proposed action(s) must ensure that the Afton Lincoln County Airport complies with minimum FAA and WYDOT design recommendations for a parallel taxiway

More information

Northern Branch Corridor CLC Meeting. June 30, 2008

Northern Branch Corridor CLC Meeting. June 30, 2008 Northern Branch Corridor CLC Meeting June 30, 2008 Agenda Introductions Project Status Environmental Process Technical Findings Capital Costs Next Steps Break Out Areas Introductions Project Status Preliminary

More information

National Geospatial-Intelligence Agency (NGA) NEXT NGA WEST (N2W) Draft Environmental Impact Statement (DEIS)

National Geospatial-Intelligence Agency (NGA) NEXT NGA WEST (N2W) Draft Environmental Impact Statement (DEIS) National Geospatial-Intelligence Agency (NGA) NEXT NGA WEST (N2W) Draft Environmental Impact Statement (DEIS) NGA NEEDS A NEW CAMPUS NGA needs a modern campus for high-tech missions The current facility

More information

August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred Alternatives

August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred Alternatives Lake Elmo Airport Environmental Assessment (EA)/ Environmental Assessment (EAW) Worksheet August 8, 2017 Community Engagement Panel Meeting #3 Alternatives Evaluation Process & Identification of Preferred

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

The existing land use surrounding North Perry Airport can be described as follows:

The existing land use surrounding North Perry Airport can be described as follows: 7.1 INTRODUCTION This land use evaluation will accomplish the following: Identify existing and future land uses in the Airport environs; Document existing land use, future land use, and zoning around the

More information

Oakland International Airport Airport Perimeter Dike Improvement

Oakland International Airport Airport Perimeter Dike Improvement Oakland International Airport Airport Perimeter Dike Improvement Environmental Assessment and Initial Study Public Scoping Workshop January 13, 2011 5:30 to 6:30 PM Oakland International Airport, Terminal

More information

9 OTHER CONSIDERATIONS REQUIRED BY NEPA

9 OTHER CONSIDERATIONS REQUIRED BY NEPA 9 OTHER CONSIDERATIONS REQUIRED BY NEPA 9.1 CONSISTENCY WITH OTHER FEDERAL, STATE, AND LOCAL LAWS, PLANS, POLICIES, AND REGULATIONS In accordance with 40 Code of Federal Regulations (CFR) section 1502.16(c),

More information

APPENDIX A. NEPA Assessment Checklist

APPENDIX A. NEPA Assessment Checklist APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

Chapter IV - Alternatives

Chapter IV - Alternatives Chapter IV - Alternatives The purpose of this chapter is to identify and evaluate alternatives for the future development of T. F. Green Airport that address the needs identified in Chapter III, Demand/Capacity

More information

University Corridor Draft Environmental Impact Statement (DEIS)

University Corridor Draft Environmental Impact Statement (DEIS) University Corridor Draft Environmental Impact Statement (DEIS) Public Meetings/Open Houses August 13, 27 August 14, 27 5: pm to 7: pm 5: pm to 7: pm Holiday Inn Select- Greenway* Wheeler Avenue Baptist

More information

Final Environmental Assessment Cuyahoga County Airport (CGF)

Final Environmental Assessment Cuyahoga County Airport (CGF) Final Environmental Assessment Cuyahoga County Airport (CGF) Report prepared by May 6, 2015 Preface The National Environmental Policy Act (NEPA) of 1969 requires that federal agencies identify and consider

More information

Land Use Analysis. Introduction. Methodology. Existing Land Use Analysis/Existing Noise Contours, 2004

Land Use Analysis. Introduction. Methodology. Existing Land Use Analysis/Existing Noise Contours, 2004 DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER E LAND USE ANALYSIS Analysis Introduction This section of the FAR Part 150 Noise Compatibility Study for

More information

Office of Commercial Space Transportation; Notice of Intent to Prepare an

Office of Commercial Space Transportation; Notice of Intent to Prepare an This document is scheduled to be published in the Federal Register on 04/10/2012 and available online at http://federalregister.gov/a/2012-08556, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

vi Figures viii Summary S.1

vi Figures viii Summary S.1 Contents Contents iii Tables vi Figures viii Summary S.1 Chapter 1: Purpose and Need Project History A.1 Project Description A.2 Project Purpose A.5 Transportation Need A.6 Highway Capacity and Congestion

More information

KANSAS CITY AVIATION DEPARTMENT. Chapter Five AIRPORT PLANS

KANSAS CITY AVIATION DEPARTMENT. Chapter Five AIRPORT PLANS KANSAS CITY AVIATION DEPARTMENT Chapter Five AIRPORT PLANS AIRPORT PLANs The alternatives discussed in the previous section were reviewed by the Federal Aviation Administration (FAA), Kansas City Aviation

More information

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process Introduction This document provides a brief overview of the policy and procedures that govern the environmental evaluation process that the Tennessee Department of Transportation (TDOT) must follow for

More information

Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project

Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project State Clearinghouse No. 2009091094 Los Angeles County Metropolitan Transportation Authority

More information

AGENDA Tuesday, September 29, 2015

AGENDA Tuesday, September 29, 2015 9/24/15 Page 1 of 1 GRAND COUNTY COUNCIL SPECIAL MEETING ADMINISTRATIVE WORKSHOP Grand County Council Chambers 125 East Center Street, Moab, Utah AGENDA Tuesday, September 29, 2015 9:00 a.m. WORKSHOP Call

More information

Noise Compatibility Program Update

Noise Compatibility Program Update Table of Contents 1.0 Introduction Pg. 1 2.0 Purpose and Need Pg. 1 3.0 Airport Environs Pg. 1 4.0 Land Use Compatibility Pg. 1 5.0 Study Methodology Pg. 2 6.0 2008 Existing Baseline Pg. 2 Noise Exposure

More information

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment

Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment March 3rd, 2015 Runway Protection Zones: Incompatible Land Use Alternatives Analysis & Risk Assessment Matt Lee Vice President Landrum & Brown Cincinnati, OH Cody Meyer Consultant Landrum & Brown Cincinnati,

More information

AND 2019 NOISE EXPOSURE MAPS WITH EXISTING NOISE COMPATIBILITY PROGRAM

AND 2019 NOISE EXPOSURE MAPS WITH EXISTING NOISE COMPATIBILITY PROGRAM 2014 and 2019 Noise Exposure Maps and Revised Noise Compatibility Program page 93 5 2014 AND 2019 NOISE EXPOSURE MAPS WITH EXISTING NOISE COMPATIBILITY PROGRAM The fundamental noise elements of an Noise

More information

Work Breakdown Structure Element Dictionary Preliminary Engineering

Work Breakdown Structure Element Dictionary Preliminary Engineering Element Name Initiation PE 3.1 Initiation includes the implementation of the project s funding and notification of the consultant or in-house design staff to commence work, the Kickoff Meeting with the

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

SEATTLE-TACOMA INTERNATIONAL AIRPORT SUSTAINABLE AIRPORT MASTER PLAN NEAR TERM PROJECTS

SEATTLE-TACOMA INTERNATIONAL AIRPORT SUSTAINABLE AIRPORT MASTER PLAN NEAR TERM PROJECTS SEATTLE-TACOMA INTERNATIONAL AIRPORT SUSTAINABLE AIRPORT MASTER PLAN NEAR TERM PROJECTS ENVIRONMENTAL REVIEW PROCESS Scoping Information Packet Prepared by: Landrum & Brown, Inc. for: Port of Seattle Seattle,

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

Final Environmental Assessment for the Long Term Airport Development at the Louis Armstrong New Orleans International Airport

Final Environmental Assessment for the Long Term Airport Development at the Louis Armstrong New Orleans International Airport Final Environmental Assessment for the Long Term Airport Development at the Louis Armstrong New Orleans International Airport Prepared for the: The New Orleans Aviation Board (NOAB) and U.S. Department

More information

Purpose of the Public Hearing

Purpose of the Public Hearing www.virginiadot.org Public Hearings Interstate 66 - Outside the Beltway Tier 1 Draft Environmental Impact Statement From U.S. Route 15 To I-495 Prince William and Fairfax Counties Wednesday, March 13,

More information

Public Workshop and Hearing

Public Workshop and Hearing Public Workshop and Hearing LAX Runway 6R-24L Runway Safety Area (RSA) Improvements Project Tuesday, April 14, 2015 Public Workshop: 5:00 p.m. to 7:00 p.m. Public Hearing: 6:00 p.m. to 7:00 p.m. Flight

More information

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal

actions and approvals by the Federal Aviation Administration ( FAA) and the Federal METROPOLITAN AIRPORTS COMMISSION In re MSP 2020 Improvements Final Environmental Assessment/Environmental Assessment Worksheet, Adequacy Determination, and Negative Declaration on the Need for an Environmental

More information

EXECUTIVE SUMMARY Draft Environmental Impact Statement (EIS)

EXECUTIVE SUMMARY Draft Environmental Impact Statement (EIS) Draft Environmental Impact Statement (EIS) KC-46A Main Operating Base #4 (MOB 4) Beddown Headquarters Air Mobility Command November 2017 ABBREVIATIONS AND ACRONYMS AFB AMC CEQ CFR DOD EIS JB MDL KC-10

More information

L.G. Hanscom Field, Aviation Facility Improvements Project

L.G. Hanscom Field, Aviation Facility Improvements Project FEDERAL AVIATION ADMINISTRATION DRAFT ENVIRONMENTAL ASSESSMENT L.G. Hanscom Field, Aviation Facility Improvements Project Bedford, Massachusetts Prepared by: Massachusetts Port Authority and April 13,

More information

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012 : CR 3 (Excelsior Boulevard) WELCOME November 1, 2012 Highway Traffic Noise Facts & FAQs Why is traffic noise analyzed? In 1972, US Congress passed legislation to provide mitigation for exterior highway

More information

EXECUTIVE SUMMARY Final Environmental Impact Statement (EIS)

EXECUTIVE SUMMARY Final Environmental Impact Statement (EIS) Final Environmental Impact Statement (EIS) KC-46A Main Operating Base #4 (MOB 4) Beddown Headquarters Air Mobility Command June 2018 ABBREVIATIONS AND ACRONYMS AFB AMC CEQ CFR DOD EIS JB MDL KC-10 KC-135

More information

FINDING OF NO SIGNIFICANT IMPACT FOR ESTABLISHMENT OF MERIDIAN 2 MILITARY OPERATIONS AREA (MOA) AT NAVAL AIR STATION (NAS) MERIDIAN, MISSISSIPPI

FINDING OF NO SIGNIFICANT IMPACT FOR ESTABLISHMENT OF MERIDIAN 2 MILITARY OPERATIONS AREA (MOA) AT NAVAL AIR STATION (NAS) MERIDIAN, MISSISSIPPI DEPARTMENT OF THE NAVY UNITED STATES FLEET FORCES Pursuant to Council of Environmental Quality Regulations (40 Code of Federal Regulations Parts 1500 1508) implementing the procedural provisions of the

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION

DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF ARKANSAS Application Number: 2014-00083-1 Date: December 22, 2014 Comments Due: January 16, 2015 TO WHOM

More information

FINAL ENVIRONMENTAL ASSESSMENT. and FINDING OF NO SIGNIFICANT IMPACT. Initiation of Turbojet Service. Friedman Memorial Airport. for the.

FINAL ENVIRONMENTAL ASSESSMENT. and FINDING OF NO SIGNIFICANT IMPACT. Initiation of Turbojet Service. Friedman Memorial Airport. for the. FINAL ENVIRONMENTAL ASSESSMENT and FINDING OF NO SIGNIFICANT IMPACT for the Initiation of Turbojet Service for Friedman Memorial Airport Hailey, Idaho October 2012 Prepared for: U.S. Department of Transportation

More information

FINDING OF NO SIGNIFICANT IMPACT AND RECORD of DECISION

FINDING OF NO SIGNIFICANT IMPACT AND RECORD of DECISION DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION ORLANDO AIRPORTS DISTRICT OFFICE SOUTHERN REGION AIRPORTS DIVISION FINDING OF NO SIGNIFICANT IMPACT AND RECORD of DECISION AIRGLADES AIRPORT

More information

Update on the Draft EIR on the Proposed Airport Master Plan

Update on the Draft EIR on the Proposed Airport Master Plan 1 Update on the Draft EIR on the Proposed Airport Master Plan 1. Summary of Process to Date (Slides 3-4) 2. Proposed Project (Slides 5-8) 3. EIR Alternative (Slides 9-10) 4. Comparison of Differences between

More information

CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA

CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA April 2015 Draft Table of Contents CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA Table of Contents CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA... I ACRONYMS AND ABBREVIATIONS... II 6.1

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Western Technical Operations Anchorage, Alaska

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Western Technical Operations Anchorage, Alaska U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Western Technical Operations Anchorage, Alaska FINDING OF NO SIGNIFICANT IMPACT AND FINAL ENVIRONMENTAL ASSESSMENT RELOCATION OF THE AIRPORT

More information

Boston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES

Boston Overflight Noise Study. Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES March 8, 2004 Project Consultant Phase 1 Scope of Services 3/8/2004 TABLE OF CONTENTS INTRODUCTION... 2 1 STUDY DESIGN... 3 2 PROJECT MANAGEMENT... 4 2.1 Project

More information

Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas

Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas Introduction The Federal Highway Administration (FHWA) has determined,

More information

The ATP that follows is recommended to be used for all phases of the FLL RSIP beginning June 1, The ATP describes the following:

The ATP that follows is recommended to be used for all phases of the FLL RSIP beginning June 1, The ATP describes the following: The following includes information to the support Noise Mitigation Program Assistance for Phase III of the Fort Lauderdale-Hollywood International Airport (FLL) Voluntary Residential Sound Insulation Program

More information

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing Project Reston Avenue to Jarrett Valley Drive Public Hearing Nicholas J. Roper, P.E. District Project Development Engineer Email: nicholas.roper@vdot.virginia.gov Phone: (703)259-1953 Agenda 7:00-7:15

More information

11 Joint Development Regulatory Context and Methodology

11 Joint Development Regulatory Context and Methodology 11 Joint Development This chapter describes the long-term direct and potential indirect impacts, and short-term direct and potential indirect impacts, of the proposed METRO Blue Line Light Rail Transit

More information

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET

ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET ENVIRONMENTAL IMPACT STATEMENT CLEVELAND HARBOR, CUYAHOGA COUNTY, OHIO DREDGED MATERIAL MANAGEMENT PLAN PUBLIC SCOPING INFORMATION PACKET March 16, 2006 ANNOUNCEMENT OF PUBLIC SCOPING MEETINGS The U.S.

More information

DAVISON ARMY AIRFIELD HAZARDOUS TREE REMOVAL ENVIRONMENTAL ASSESSMENT

DAVISON ARMY AIRFIELD HAZARDOUS TREE REMOVAL ENVIRONMENTAL ASSESSMENT DAVISON ARMY AIRFIELD HAZARDOUS TREE REMOVAL ENVIRONMENTAL ASSESSMENT U.S. ARMY GARRISON FORT BELVOIR VIRGINIA OCTOBER 2016 DAVISON ARMY AIRFIELD HAZARDOUS TREE REMOVAL ENVIRONMENTAL ASSESSMENT U.S. ARMY

More information

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS FINAL ENVIRONMENTAL IMPACT REPORT SDCRAA # EIR-06-01 State Clearinghouse No. 2005091105 CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS Lead Agency: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY

More information

RUNWAY 4-22 MODIFICATIONS

RUNWAY 4-22 MODIFICATIONS RONALD REAGAN WASHINGTON NATIONAL AIRPORT (DCA) RUNWAY 4-22 MODIFICATIONS ENVIRONMENTAL ASSESSMENT AND FEDERAL CONSISTENCY CERTIFICATION Prepared for: Metropolitan Washington Airports Authority One Aviation

More information

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas

PUBLIC HEARING US 69 WIDENING. Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas PUBLIC HEARING US 69 WIDENING Phase 1 (IH-10 to LNVA Canal) Phase 2 (LNVA Canal to Tram Road) Jefferson County, Texas CSJs: 0065-07-062 and 0200-11-095 Footer Text Thursday, April 26, 2018 Date ELECTED

More information

Raleigh Executive Jetport Master Plan Update SEPT 27, 2017

Raleigh Executive Jetport Master Plan Update SEPT 27, 2017 Raleigh Executive Jetport Master Plan Update SEPT 27, 2017 Presentation Outline 1. Master Plan Purpose 2. Master Plan Process 3. Public Involvement Plan 4. Project Schedule Presentation Outline 1. Master

More information

STAFF REPORT Dania Pointe 035-MP-15

STAFF REPORT Dania Pointe 035-MP-15 Page 1 of 14 STAFF REPORT Dania Pointe 035-MP-15 A request to revise the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward County

More information

6 Other Considerations Required by NEPA

6 Other Considerations Required by NEPA 6 6.1 Consistency with Other Federal, State, and Local Laws, Plans, Policies, and Regulations In accordance with 40 Code of Federal Regulations section 1502.16(c), analysis of environmental consequences

More information

Massachusetts Port Authority April 4, :00pm MEPA Scoping Meeting. Multi-Purpose Room 10 Mudge Way Bedford, MA 01730

Massachusetts Port Authority April 4, :00pm MEPA Scoping Meeting. Multi-Purpose Room 10 Mudge Way Bedford, MA 01730 2012 L.G. Hanscom Field Environmental Status and Planning Report (ESPR) Scope Massachusetts Port Authority April 4, 2012 6:00pm MEPA Scoping Meeting Bedford Town Hall Multi-Purpose Room 10 Mudge Way Bedford,

More information

SECTION 8 ENVIRONMENTAL OVERVIEW

SECTION 8 ENVIRONMENTAL OVERVIEW SECTION 8 ENVIRONMENTAL OVERVIEW The purpose of this environmental overview is to characterize the potential environmental impacts associated with the Preferred Development Plan. This overview is based

More information

Appendix. Sample EA/EIS Scope of Work

Appendix. Sample EA/EIS Scope of Work Appendix K Sample EA/EIS Scope of Work EA/EIS Sample Scope of Work The purpose of this Scope of Work (SOW) is to prepare an EA document pursuant to the National Environmental Policy Act (NEPA) to analyze

More information

DRAFT Subject to Modifications

DRAFT Subject to Modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5I From: Date: Subject: Staff July 16, 2010 Council Meeting Intergovernmental Coordination and Review Log The

More information

Pullman-Moscow Regional Airport

Pullman-Moscow Regional Airport FINAL ENVIRONMENTAL ASSESSMENT Environmental Assessment to Comply with FAA Design Standards, Meet Runway Length Requirements, Improve All-Weather Reliability, and Terminal Improvements Pullman-Moscow Regional

More information

Transportation Committee Meeting date: January 11, 2016 For the Metropolitan Council meeting of January 13, 2016

Transportation Committee Meeting date: January 11, 2016 For the Metropolitan Council meeting of January 13, 2016 Business Item No. 2016-7 SW Transportation Committee Meeting date: January 11, 2016 For the Metropolitan Council meeting of January 13, 2016 Subject: Review of Metropolitan s Commission 2016-2022 Capital

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Indirect and Cumulative Effects

Indirect and Cumulative Effects Chapter 21: Indirect and Cumulative Effects 21-1 INTRODUCTION The federal Council on Environmental Quality s (CEQ) regulations implementing the procedural provisions of the National Environmental Policy

More information

Chapter 2 Table of Contents 2.1 PROJECT DEVELOPMENT PROCESS

Chapter 2 Table of Contents 2.1 PROJECT DEVELOPMENT PROCESS Chapter 2 Table of Contents Section Page 2.1 PROJECT DEVELOPMENT PROCESS... 2.2 Activity No. 1: Planning... 2.2 Activity No. 2: Identification of Appropriate Level of NEPA Compliance....2.2 Activity No.

More information

CONTENTS FIGURES TABLES

CONTENTS FIGURES TABLES CONTENTS Land Use Planning... 5-1 Regional Setting... 5-1 5.1.1 Economic Development... 5-2 5.1.2 Local Land Use and Zoning... 5-2 Typical Land Use Compatibility Concerns... 5-5 5.2.1 Safety-Related Concerns...

More information

Environmental Considerations: Renewable and Conventional Power Plant Siting

Environmental Considerations: Renewable and Conventional Power Plant Siting Environmental Considerations: Renewable and Conventional Power Plant Siting 2 Environmental Considerations Acronym Glossary BLM Bureau of Land Management CatEx Categorical Exclusion CAA Clean Air Act CEQ

More information