1 GUIDE Electrical Installations for Impressed Current Cathodic Protection Systems December

2 The Canadian Association of Petroleum Producers (CAPP) represents 130 companies that explore for, develop and produce natural gas, natural gas liquids, crude oil, oil sands, and elemental sulphur throughout Canada. CAPP member companies produce more than 95 per cent of Canada s natural gas and crude oil. CAPP also has 150 associate members that provide a wide range of services that support the upstream crude oil and natural gas industry. Together, these members and associate members are an important part of a $120-billion-a-year national industry that affects the livelihoods of more than half a million Canadians. Disclaimer This publication was prepared for the Canadian Association of Petroleum Producers (CAPP) by the CAPP Electrical Safety Subcommittee. While it is believed that the information contained herein is reliable under the conditions and subject to the limitations set out, CAPP and the CAPP Electrical Safety Subcommittee do not guarantee its accuracy. The use of this report or any information contained will be at the user s sole risk, regardless of any fault or negligence of the CAPP Electrical Safety Subcommittee, CAPP or its cofunders. 2100, 350 7Avenue S.W. Calgary, Alberta Canada T2P 3N9 Tel (403) Fax (403) , 235 Water Street St. John s, Newfoundland and Labrador Canada A1C 1B6 Tel (709) Fax (709) communication@capp.ca

3 Overview Impressed Current Cathodic Protection systems are a technique for controlling the corrosion of a metal surface by making that surface the cathode of an electrochemical cell. Impressed Current Cathodic Protection systems are in widespread use at thousands of oil and gas surface production facilities, and serve to prevent failure of piping and other facilities which may lead to uncontrolled release of products, resulting in safety hazards and environmental contamination. This guide is intended to help those designing, installing, inspecting, or maintaining impressed current cathodic protection systems meet minimum regulatory requirements; and it also simultaneously benefits worker safety and reliability of the system. It outlines, from an electrical perspective, design and installation criteria related to impressed current cathodic protection systems, including: codes and standards related to cathodic protection work worker qualification equipment certification connection and splicing methods installations warning signs documentation electrical inspections Although mandatory language is used in this guideline, this guideline as a whole is non-mandatory in nature and is not a regulatory document. The adoption and enforcement of a practice or specification (or parts of it) is for the specific company or organization to determine in light of its own particular operations. However, the user should note that many of the elements of this guideline are also regulatory requirements. Therefore, if a user wishes to deviate from parts of this document, the user must be aware of the relevant minimum regulatory requirements. In addition, use of this guide is not a substitute for knowledge of regulatory requirements and each company and organization is responsible for its own regulatory compliance. The guide has been developed in cooperation with representatives of the cathodic protection industry; corrosion specialists, and electrical technical staff from user companies. This guide is also endorsed by the CAPP Electrical Safety Sub- Committee of the Canadian Association of Petroleum Producers (CAPP). The first edition of the guide has been developed for Alberta. Consideration may be given for other jurisdictions at a later time.

4 Contents Overview... ii 1 Purpose Scope Excluded from the Scope of this Guide Design of Cathodic Protection Systems Work Procedures for Pipes and Vessels Codes and Standards Canadian Electrical Code Section Section Code for Electrical Installations at Oil and Gas Facilities Occupational Health and Safety Code CSA Z662 Oil and Gas Pipeline Systems Canadian Gas Association Recommended Practice OCC NACE RP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems Corporate Standards Worker Qualifications and Equipment Certification Alberta Other Provinces Equipment Certification General Technical Requirements for Connections to Structures Cross-Sectional Area Resistivity Copper Carbon Steel Stainless Steel Contact Surfaces Frost Heave Connection Methods General Carbon Steel Bracket with Servit Post Construction Engineering

5 6.2.3 Applications Pipe Connections Ground Clamp Construction Engineering Applications Thermit Connections Construction Engineering Applications LB Fitting and Plate Connection Construction Engineering Applications Pipe Connections U-Clamp Construction Engineering Applications Splicing and Terminations Splicing Terminations Current Control Systems Current Controllers Electrical Insulation Devices Potential By-Pass Potential Spark Source Installation Installation and Wiring Burial Depth Canadian Electrical Code Requirements Alberta Energy Resources Conservation Board Agricultural Activities Variances Warning Tape Wire Protection Ground Emergence Gasoline Dispenser Stations Oil Field Installations Wire Protection Long Cable Runs Wire Identification Warning Signs Cathodic Protection Warning Signs Electrical Insulation Device Warning Signs Documentation

6 11.1 General Requirements for Drawings Cathodic Protection System Layouts Plot Plan Area Classification Rectifier Schematics and Manuals Electrical Inspection General Accredited Corporations Non-Accredited Corporations References Figures Figure 1: Example of a Servit Post Connection 6-1 Figure 2: Example of a Protective Bracket with Frost Loop or Pigtail Figure 3: Example of a Certified Ground Clamp Connection Figure 4: Example of a Thermit Connection. 6-2 Figure 5: Example of an LB Fitting and Plate Connection 6-3 Figure 6: Example of a Splice Connection 7-1

7 1 Purpose This guide is intended to set minimum electrical safety requirements for impressed current cathodic protection system installations. This guide also identifies work responsibilities and/or restrictions. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 1-1

8 2 Scope The scope of this cathodic protection guide includes aspects of: electrical design installation maintenance personnel qualification various exemptions for different worker categories as outlined in Appendices A and B 2.1 Excluded from the Scope of this Guide The following subjects are excluded from the scope of this guide: Design of Cathodic Protection Systems The general design of cathodic protection systems is excluded from the scope of this guide, for example: any details with respect to cathodic protection current requirements anode location anode type impressed current control techniques planning which structures to protect and where electrical insulation is required galvanic cathodic protection systems Work Procedures for Pipes and Vessels Work procedures for working on pipes, flanges or fittings where cathodic circuits might be connected or interrupted are excluded from the scope of this guide, for example: use of bonding jumpers and mats use of hot work permits December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 2-2

9 3 Codes and Standards Codes and standards related to the electrical installation aspects of cathodic protection systems include (but are not limited to) those listed below. 3.1 Canadian Electrical Code The objective of the Canadian Electrical Code (Part 1) [1] is to establish safety standards for the installation and maintenance of electrical equipment. Consideration has been given to the prevention of fire and shock hazards, as well as proper maintenance and operation. Its requirements apply for all upstream oil and gas facilities electrical installations, all non-distribution or non-transmission electrical utility electrical installations, and all gas distribution utilities electrical installations in the province Section 80 Section 80 applies to the installation of impressed current cathodic protection systems and is supplemental to, or amendatory of other Canadian Electrical Code sections. Installations must meet the requirements of this section. Some of the specific requirements of this section are discussed in more detail in this document Section Section Current over grounding and bonding conductors warns of objectionable currents in ground wires typically occurring in ground wires of cables leading to instruments in metallic and internally grounded boxes mounted on cathodically protected pipes. Non-metallic boxes, or electrical insulation from the cathodically protected structure, shall be considered where this could be an issue. 3.2 Code for Electrical Installations at Oil and Gas Facilities The Code for Electrical Installations at Oil and Gas Facilities [2] recognizes the area classification drawings of a professional engineer for a specific facility. In the absence of engineered area classification drawings, it establishes the minimum hazardous area classification requirements for any oil and gas facility. When planning and installing cathodic protection systems, the installed equipment must be either rated for the hazardous location, or installed outside of the hazardous location. Installing outside of the hazardous location is always preferred, but when it comes to connections to protected structures (i.e., pipes, vessels, tanks, etc.) this may not be possible. 3.3 Occupational Health and Safety Code The Alberta Occupational Health and Safety Code [3] addresses worker safety in a comprehensive manner. It has content pertaining to general worksite safety and December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 3-3

10 procedures which govern all oilfield work. Some examples of where this code applies to the installation and servicing of cathodic protection systems include: lockout and tag procedures hot work procedures and work in hazardous locations working alone requirements working in the vicinity of power lines 3.4 CSA Z662 Oil and Gas Pipeline Systems CSA Z662 [4] covers design, construction, operation and maintenance of oil and gas industry pipeline systems. Section 9 covers Corrosion Control including electrical interference. 3.5 Canadian Gas Association Recommended Practice OCC Canadian Gas Association Recommended Practice OCC Control of External Corrosion on Buried or Submerged Metallic Piping Systems [5] applies to the control of external corrosion on buried or submerged metallic piping systems. This Recommended Practice is intended as a reference only. It is a company s own responsibility to provide procedures that will satisfy all regulations, and their own requirements for effective, safe, and proactive corrosion control. 3.6 NACE RP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems This document contains a section on installation requirements (Section 8). Many of those requirements are also covered in more depth in this guideline within the context of the Canadian Electrical Code and other oil and gas industry cathodic protection (CP) practices. The NACE RP0169 [6] document also covers design, operations, maintenance, and documentation issues which are outside of the scope of this guideline. 3.7 Corporate Standards Some upstream oil and gas companies may have their own engineering standards outlining cathodic protection installation details and maintenance procedures. Companies (who have accreditations in the electrical discipline) may also have specific variances permitting deviations from the Canadian Electrical Code. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 3-4

11 4 Worker Qualifications and Equipment Certification 4.1 Alberta In Alberta, all electrical work up to and including the direct current (DC) output terminals of a cathodic protection rectifier falls under the Electrician Trade Regulation. [7] This regulation is put in place under the Apprenticeship and Industry Training Act. [8] The Electrician Trade Regulation restricts any type of electrical work to certified electricians. The rationales for this are related to personnel safety (shock), indirect safety issues (e.g. excessive heat, fire), knowledge of electrical engineering principles, and good workmanship. CAPP in conjunction with Alberta Learning, has developed various training courses for non-electricians such as field operators, maintenance staff, and CP technicians. Together with hands-on training (provided by an electrician on the specific equipment), and authorization by the employer, these courses permit nonelectricians to perform limited electrical work scope activities on CP systems: for operators and other field maintenance personnel, these include routine checks of impressed current levels, tap changes, and visual checks for CP technicians, these include basic maintenance on the DC side of the CP rectifier See Appendix A for a brief description of the available exemption courses, and Appendix B for a scope definition diagram for CP technicians. In Alberta, engineering practice is governed by the Engineering, Geological, and Geophysical Professions Act. [9] 4.2 Other Provinces Other provinces have similar acts in place governing electrical work and engineering. 4.3 Equipment Certification All equipment used in the electrical circuit(s) of cathodic protection systems must be certified to Canadian (CSA) Standards by an accredited certification body. The accredited certification bodies (such as the Canadian Standards Association, Underwriter s Laboratories, Entela, etc.) are, in turn, accredited by the Standards Council of Canada. Equipment which is certified to Canadian standards is often referred to as CSA Approved or CSA Certified, but it can also be certified by one of these other accredited certification bodies and is equally acceptable. Information on approved certification organizations, and the recognized markings on equipment, is available from Alberta Municipal Affairs. For the purposes of this document, the terms certified or approved are used, and refer to equipment that is certified by an accredited certification body to Canadian standards. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 4-5

12 Exceptions to the certification requirements are possible for equipment types for which Canadian certification test standards are not available. Examples in the cathodic protection trade where these exceptions are needed include standalone variable and fixed resistors (which may only have a component certification); or engineered connections to structures. This document identifies when engineering involvement for the design of a piece of equipment is required. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 4-6

13 5 General Technical Requirements for Connections to Structures 5.1 Cross-Sectional Area Rated rectifier current capacity and mechanical strength requirements will govern the minimum required wire cross-section. The ampacity of the selected copper wire cross- section will determine the minimum current rating of all components used in the current path. Canadian Electrical Code Table D5 Strandings for Building Wires and Cables may be used for cross-sectional area conversions from AWG to mm Resistivity Resistivity is a property related to the electrical resistance of a material and is independent of the geometry of the specimen. It is, however, sensitive to the temperature and composition of the material. Using resistivity, the resistance for a wire of given material, length, cross-sectional area, and at a given temperature, can be computed using the formula [10]: R = ρ l / A where R = resistance in ohms ρ = resistivity in ohm-metres l = length in metres, and A = cross-sectional area in square-metres Copper The resistivity of pure copper is x 10-8 *m at 20 ο C [10] Carbon Steel Some carbon steels have approximately 10 times the resistivity of copper, depending upon the alloy and temperature. Therefore, for the same length of steel or copper conductor, the cross-section of any carbon steel component or structure in the current path has to be at least 10 times the cross-section of the copper conductor to have similar resistance, and thus produce comparable I 2 R (heating) losses, and comparable operating temperatures. This guide uses this ten-times rule-of-thumb for sizing carbon steel connections to structures. If smaller carbon steel cross-sections are to be used, then further engineering analysis will be required. This is outside of the scope of this guide. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 5-7

14 5.2.3 Stainless Steel Stainless steel has approximately 44 times the resistivity of copper. Therefore, the cross-section of any stainless steel construction piece in the current path has to be at least 44 times that of the copper wire used in the installation. If smaller stainless steel cross-sections are to be used, then further engineering analysis will be required. This is outside of the scope of this guide. 5.3 Contact Surfaces All electrical connections require good metal-to-metal contact (i.e. paint-, rust-, and grease-free; with buff surfaces). For atmospheric connections, consideration shall be given to protecting the metallic connection in corrosive environments (e.g.: salt, H 2 S, condensation, etc.) through the use of anti-corrosion paint. 5.4 Frost Heave Frost heave may cause the cathodic protection wiring and the protected structure to move relative to one another. Sufficient slack may prevent separation of the wire from the structure. For example, the wire can be coiled in a flexible loop in the air (this is also known as a pigtail ). December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 5-8

15 6 Connection Methods 6.1 General Visible open wire connections are preferred over hidden connections. Visible connections allow visual inspections for solid contact, corrosion, or frost heave damage. All cathodic protection wires above grade have to be mechanically protected and/or protected by location. 6.2 Carbon Steel Bracket with Servit Post Construction Various constructions may be used, but some of the main features include: Servit post (certified); see Figure 1 Pigtail wire in air to allow frost heave movement; see Figure 2 Bracket to protect wire; see Figure 2 Anti-corrosion paint application to prevent atmospheric corrosion Engineering Figure 1: Example of a Servit Post Connection Engineering is not required if the carbon steel bracket s cross-section is at least 10 times that of the copper wire Applications Cathodic protection wire shall be protected from mechanical damage by location (see Figure 2). They may be used in the following locations: wellheads and flow lines, with a hole for the flange bolt tanks (welded or bolted) vessels (at the shoe) pipes buildings and structures 6.3 Pipe Connections Ground Clamp Construction Off-the-shelf certified ground clamps, for example a Burndy GAR clamp. See Figure 3. Figure 2: Example of a Protective Bracket with Frost Loop or Pigtail December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 6-1

16 6.3.2 Engineering Engineering is not required when used within the approved current rating of the wire and clamp Applications Certified ground clamp connections are suitable for: connection directly to uncoated, cleaned pipe underground installations with reapplied coating equivalent to the pipeline coating 6.4 Thermit Connections Construction Figure 3: Example of a Certified Ground Clamp Connection Thermal bonding process kit. See Figure Engineering No electrical engineering is required, but there are potential metallurgical concerns, e.g. hardness in sour service. Charge sizes and wire sizes shall follow industry and operating company recommended practices or standards. Also, safe work procedures must be applied when making the connection. Figure 4: Example of a Thermit Connection In all cases, the ampacity of the connection must be adequate Applications Thermit connections are only suitable for: connection directly to uncoated, cleaned, ferrous pipe with adequate wall thickness (wall thickness must be confirmed at the thermit location) underground installations with reapplied coating equivalent to the pipeline coating 6.5 LB Fitting and Plate Connection Construction The flat plate bracket is not a certified component, so the design shall be engineered. The LB fitting is only for external mechanical protection of the wire. See Figure 5. A disadvantage of this design is that the wire connection is not readily visible. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 6-2

17 Note: the use of the LB fitting does not make this device certified for the hazardous area it is used in. In any event, certification is not available for this type of connection Engineering Engineering is required, including a check for I 2 R losses and adequate ampacity Applications LB fitting and plate connections are suitable for connection to: well heads flanges 6.6 Pipe Connections U-Clamp Figure 5: Example of an LB Fitting and Plate Connection Construction There are other cost effective, but non-certified mechanical connection devices available, such as U-clamps and U-bolt clamps Engineering Engineering is required, including a check for I 2 R losses and adequate ampacity: since the clamps are built as mechanical fastening devices, their contact surface and current carrying capabilities are not tested or approved the engineering review has to ensure adequate contact surface and ampacity Applications U-clamps are suitable for: connection directly to uncoated, cleaned pipe underground installations with reapplied coating equivalent to the pipeline coating December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 6-3

18 7 Splicing and Terminations 7.1 Splicing See Figure 6. Examples include split bolt or high pressure compression fittings. Splices shall: be suitable for direct burial for underground installations be waterproof have equivalent, or superior, integrity compared to the original conductor Figure 6: Example of a Splice Connection 7.2 Terminations Terminations (other than underground connections to structures) shall be: above grade or accessible suitable for the location they are installed in mechanically reliable and secure Note: There are no additional requirements beyond these for terminations in Class I Zone 2 or Division 2 locations. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 7-4

19 8 Current Control Systems 8.1 Current Controllers Since current controllers create heat, they shall be mounted outside of hazardous locations. 8.2 Electrical Insulation Devices Electrical insulation devices are intended to prevent current from passing between specific structures (electrical insulation kits, dielectric unions) Potential By-Pass Accidental or unintended bypasses can defeat or degrade cathodic protection, or create arcing or sparking hazards in unexpected locations. Do not inadvertently bypass electrical insulation devices. Be aware of forgotten tools, jumpers, damaged or removed electrical insulation devices, thermal insulation cladding, glycol or electric heat tracing, electrical grounding systems, instrumentation lines, and any other potential parallel path Potential Spark Source Many connections are in hazardous locations, so accidental shorting of flanges may lead to sparks, and a fire or explosion hazard. Warning signs shall be used at the locations of electrical insulation devices (see section 10.2). Flange shielding, for example taping or other external shielding, is recommended. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 8-5

20 9 Installation 9.1 Installation and Wiring Electrical installation and wiring shall comply with the Canadian Electrical Code Part 1 C22.1 [1]. 9.2 Burial Depth Codes, standards, and factors to be considered: Canadian Electrical Code Requirements The Canadian Electrical Code has burial depth requirements in two sections: Section (Table 53) 900 mm burial below vehicular traffic 600 mm burial below non-vehicular traffic this rule is intended mainly for power cables where a significant shock, spark, or arc flash hazard can exist Section burial not less than 450 mm (if unprotected) burial not less than 200 mm in raceway or protected Follow Section , when no variance for burial depth is in place (see Section 9.2.4) Alberta Energy Resources Conservation Board The Alberta Energy Resources Conservation Board administers the Alberta Pipeline Act [11] and regulations which has requirements governing ground disturbance activities: procedures are required at depths of more than 300 mm companies may have more stringent rules Agricultural Activities Local plowing activities may require deeper burial depth than required in the Canadian Electrical Code Variances Corporations accredited under the Alberta Safety Codes Act [12] may opt for a Canadian Electrical Code variance allowing burial depth of less than Canadian Electrical Code requirements. Some variances currently allow for a ground-grid wire depth of typically 300 mm. This may be extended to include cathodic protection wiring as well. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 9-6

21 9.2.5 Warning Tape Warning tape, buried 150 mm above the cathodic protection cable, shall be used. 9.3 Wire Protection Ground Emergence Gasoline Dispenser Stations The requirements mentioned in the Canadian Electrical Code sections CEC (3)(a) conduit, and CEC (3)(b) seals apply only to conduit installations where hazardous vapours can migrate from a hazardous location (gasoline dispensing equipment) to another location (nonhazardous). It is assumed that conduit is run all the way between the hazardous and non-hazardous locations. When only a conduit sleeve riser is used, a seal is not required since migration to a general purpose location is not possible, as the conduit does not run all the way back to the non-hazardous location. The conduit sleeve riser is only intended to protect the vertical section of conductor, and extends into the ground only far enough to ensure conductor protection and adequate support Oil Field Installations Accepted wire protection methods for directly buried wires include: conduit sleeve (metal or PVC) for risers, planking or concrete protection by location 9.4 Wire Protection Long Cable Runs As a good practice, underground cable warning signs may be placed every 300 m, or as appropriate, depending upon site requirements. 9.5 Wire Identification The following techniques are used to ensure proper identification of wires: anode wires shall be black wires for protected structures shall be any colour except black; they are often white markers shall be permanent and legible wire tags (optional) should be referenced in drawings so that circuits/conductors can be identified colour coding and/or markers can be used where needed December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 9-7

22 10 Warning Signs 10.1 Cathodic Protection Warning Signs Refer to Canadian Electrical Code Section for further details about warning sign requirements, for example, warning signs are required: for cathodically protected structures on disconnect means at entrances to tanks or vessels with impressed cathodically protected immersed internal surfaces (Section (5)) 10.2 Electrical Insulation Device Warning Signs Warning signs shall be installed near the locations of electrical insulation devices. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 10-8

23 11 Documentation 11.1 General Requirements for Drawings All drawings typical for an electrical installation, as listed below, shall be supplied. The cathodic protection service provider and owner s electrical representative need to communicate in order to make provision for the CP installation design in the site electrical drawings. A management of change process should be in place to update drawings and related documentation over the life of the facility Cathodic Protection System Layouts Cathodic protection system layouts shall show: power source load centre and circuit assignment external disconnect location cathodic protection panel location installation details other typical data 11.3 Plot Plan The plot plan shall identify: routing from power source location of cathodic protection panels anode bed and anode panel locations underground and above ground cable routing location of connections to structures electrical insulation kit locations other equipment such as current control stations 11.4 Area Classification Unless certified for the location, cathodic protection equipment shall be installed outside of hazardous areas. Therefore the site hazardous area classification drawing shall be referenced when planning the location of cathodic protection equipment and the layout of cathodic protection installations Rectifier Schematics and Manuals Rectifier schematics and manuals shall be: accurate in good condition suitably stored December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 11-1

24 12 Electrical Inspection 12.1 General In principle, all cathodic protection installations are governed by Canadian Electrical Code requirements and are subject to government regulated code compliance inspections Accredited Corporations Accredited corporations have their own electrical Safety Codes Officers inspecting the electrical aspects of cathodic protection installations for Canadian Electrical Code compliance Non-Accredited Corporations Non-accredited corporations shall ensure that permits are taken out with the authority having jurisdiction for all cathodic protection installations. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 12-2

25 13 References [1] C , Canadian Electrical Code, Part I; Canadian Standards Association, Mississauga, Ontario, Canada; [2] Code for Electrical Installations at Oil and Gas Facilities; Safety Codes Council of Alberta; Edmonton, Alberta, Canada; [3] Occupational Health and Safety Code; Government of Alberta - Human Resources and Employment; Edmonton, Alberta, Canada; [4] CSA Standard CAN/CSA-662, Oil and Gas Pipeline Systems; Canadian Standards Association, Mississauga, Ontario, Canada; [5] Corrosion Control Subcommittee; 2005; Canadian Gas Association Recommended Practice OCC Control of External Corrosion on Buried or Submerged Metallic Piping Systems; Canadian Gas Association; Ottawa, Ontario, Canada; info@cga.ca [6] NACE Standard RP0169: Control of External Corrosion on Underground or Submerged Metallic Pipeline Systems; National Association of Corrosion Engineers (NACE International); Houston, Texas, USA; [7] Consolidated November 3, 2006; Alberta Regulation 274/2000: Electrician Trade Regulation; Government of Alberta - Advanced Education and Technology; Edmonton, Alberta, Canada; [8] Consolidated January 17, 2006; Alberta Regulation 274/2000: Apprenticeship and Industry Training Act; Government of Alberta - Advanced Education and Technology; Edmonton, Alberta, Canada; [9] Chapter E-11.1, Revised Statutes of Alberta, 2000; The Engineering, Geological, and Geophysical Professions Act; Government of Alberta; Edmonton, Alberta, Canada; [10] Dorf, Richard C.; 1993; The Electrical Engineering Handbook; CRC Press, Boca Raton, Florida, USA; pp. 5-6, [11] Chapter P-15, Revised Statutes of Alberta, 2000; Pipeline Act; Government of Alberta; Edmonton, Alberta, Canada; [12] Chapter S-1, Revised Statutes of Alberta, 2000; Safety Codes Act; Government of Alberta; Edmonton, Alberta, Canada; December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page 13-3

26 Appendix A Electrical Qualifications Training for Work on Cathodic Protection Equipment A.1 Safe Electrical Work with Cathodic Protection Equipment After an incident in 2004 the cathodic protection service industry, in cooperation with the CAPP Electrical Safety Subcommittee, started a process to improve the Cathodic Protection industry s safe work practices. To assist the cathodic protection industry and operating companies there are various courses available, to meet their electrical safety needs. A.2 Electrical Maintenance for Non-Electricians Course This course was developed in the late 1990 s to allow operators (non-electricians) employed by small oil companies to safely perform several very limited scope electrical work tasks. This course is offered by an oil and gas industry training organization called Enform. The scope of cathodic protection work allowed (after passing the course exam, equipment specific training by an electrician, and employer authorization) includes: taking current readings visual checks fuse changes tap adjustments A.3 Reading and Adjusting Rectifiers for Facility Operations Personnel Course ( One-Day Field Operator Basic Readings Course ) A CP service provider, has developed a one-day course for their customers field operations personnel. This course allows field operations personnel to be able to take basic current readings and make minor adjustments to ensure that their rectifiers are working properly in between scheduled CP technician visits. This course has been developed under the supervision of the CAPP Electrical Safety Subcommittee. The scope of cathodic protection work allowed after passing this course, being trained on the specific equipment by an electrician, and being authorized by their employer is: Isolation, lockout/tag, and de-energization verification current readings fuse changes tap changer adjustments visual checks A.4 Electrical Cathodic Protection Work Course for Non-Electricians Course ( CP Technician Course ) A detailed course was developed by a CP service provider for the cathodic protection industry and approved by Apprenticeship and Industry Training and the Alberta Provincial Apprenticeship Committee (PAC). This course is currently offered in compliance with an Alberta Apprenticeship and Industry Training authorization. Scope of Work includes: Isolation and lockout/tagout Routine servicing and maintenance on the DC side of the system July 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page A- i

27 Like-for-like component replacement on the DC side of the system Installation and maintenance of DC conductors connecting to protected structures As with an apprenticeship, there are a minimum number of hours of directly supervised hands on work required before the CP Technician can work independently. CP Technicians with this exemption are required to carry a certification card. July 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page B- ii

28 Appendix B Work Responsibilities or Restrictions for Cathodic Protection Systems from a Trade Perspective July 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page B- i

29 B.1 Trades Scope Diagram The following diagram delineates the boundaries between electrician and cathodic protection technician work scopes. Note: Per the Electrician Trade Regulation, an electrician can legally work on the DC side of the rectifier system and beyond the DC terminals on the output of the rectifier, but it is recommended that electricians only do this with CP industry cathodic protection equipment and trades practices training. December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page B-ii

30 Work Responsibilities or Restrictions from a Trade Perspective Breaker Panel (remote) Installation and Maintenance by Certified Electrician Local Disconnect Switch Internal Breaker Transformer Tap Changer Rectifier Maintenance by AIT Certified CP Technician Current Controller DC Output Installation and Maintenance by CP Service Provider Anode Structure Wellhead Pipeline December 2008 Electrical Installations for Impressed Current Cathodic Protection Systems Page B-iii

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 8 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and bonding Rule 10-102 Grounding electrodes Replacing metal water service lines

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Tester Written Exam Exam Preparation Guide March 2018 Copyright 2017 by NACE International Institute. All rights reserved. Exam Preparation

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Technologist (CP3) Essay Exam Exam Preparation Guide March 2018 Copyright 2016 by NACE International Institute. All rights reserved.

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin March 2014 CEC-10 [rev-8] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

CONSTRUCTION SPECIFICATION FOR GROUNDING

CONSTRUCTION SPECIFICATION FOR GROUNDING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Corrosion is defined in different ways, but the usual interpretation of the term is an attack on a metallic material by reaction with its

Corrosion is defined in different ways, but the usual interpretation of the term is an attack on a metallic material by reaction with its Corrosion is defined in different ways, but the usual interpretation of the term is an attack on a metallic material by reaction with its environment. Corrosion of metallic materials can be divided into

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Specialist (CP 4) Essay Exam Exam Preparation Guide March 2018 Copyright 2016 by NACE International Institute. All rights reserved.

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 7 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 2 General rules Administrative The Safety Codes Act and associated regulations, supplemented

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

CATHODIC PROTECTION SPECIFICATION

CATHODIC PROTECTION SPECIFICATION CATHODIC PROTECTION SPECIFICATION AUTOMATICALLY CONTROLLED IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM w/vertical ANODE SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS A. SCOPE The cathodic protection design/install

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin January 2014 CEC-2 [rev-8] Page 1 of 8 SUBJECT: Section 2 General Rules CANADIAN ELECTRICAL CODE Administrative Rules The Safety Codes Act and associated regulations

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL WARNING Before digging or trenching... Call 811 Indiana Underground Protection Service 1-800-382-5544 AVOID BURIED POWER CABLES 4901 East Park 30 Drive P.O.

More information

APPLICATION NOTE 6. Use of Decouplers for AC Voltage Mitigation. PART 2: DESIGN CONSIDERATIONS

APPLICATION NOTE 6. Use of Decouplers for AC Voltage Mitigation.   PART 2: DESIGN CONSIDERATIONS APPLICATION NOTE 6 Use of Decouplers for AC Voltage Mitigation Introduction AC voltage mitigation is primarily of concern when cathodically protected pipelines are adjacent to electric power distribution

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Part 1: On-land pipelines

Part 1: On-land pipelines Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 15589-1 Second edition 2015-03-01 Petroleum, petrochemical and natural gas industries Cathodic protection of pipeline systems Part 1: On-land pipelines

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and

Bulletin Grounding and bonding of solar photovoltaic systems Rules , , , and Bulletin 64-2-0 Grounding and bonding of solar photovoltaic systems Rules 64-064, 64-066, 64-068, 64-070 and 64-222 Scope (1) Introduction (2) Grounding of solar photovoltaic system output, ac grounding

More information

Lockout Tagout Program

Lockout Tagout Program SCOPE AND APPLICATION The lockout/tagout standard covers the servicing and maintenance of machines and equipment in which the unexpected energization or startup of the machines or equipment, or release

More information

1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010

1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010 Subdivision Requirements Manual Page 1 of 7 PART I - GENERAL 1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010 1.2 Scope of Work.1 Work under this section, in coordination with

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS TORONTO TRANSPORTATION January 2012 TS 804 CABLES TABLE OF CONTENTS 1. DRAWINGS TTD 804.001 TTD 804.002 TTD 804.003 TTD 804.005 TTD 804.006 TTD 804.007 TTD 804.010 TTD 804.015 TTD 804.020 TTD 804.025 TTD

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012

More information

DIVISION 16. Electrical Specifications

DIVISION 16. Electrical Specifications DIVISION 16 Electrical Specifications 16.1 General - Provide all electrical materials and methods as shown on the Drawings, as specified herein, and as needed for a complete and proper installation, including

More information

ABSTRACT EXECUTIVE SUMMARY

ABSTRACT EXECUTIVE SUMMARY MIE TALK August 2016 Compiled by: Schalk J. P. Kruger ABSTRACT Corrosion is a major issue in industrial plant processes especially where any part of the structure is submerged in ground or water. The management

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Corrosion Control using Cathodic Protection for Prefabricated Buried Steel Pump Stations1

Corrosion Control using Cathodic Protection for Prefabricated Buried Steel Pump Stations1 Corrosion Control using Cathodic Protection for Prefabricated Buried Steel Pump Stations1 Jeff Schramuk NACE CP Specialist #7695, CP Solutions, Inc. Abstract Municipal water and sewer utilities can face

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

CODE OF PRACTICE. Fatigue Management in the Canada Newfoundland and Labrador Offshore Petroleum Industry. January, 2018

CODE OF PRACTICE. Fatigue Management in the Canada Newfoundland and Labrador Offshore Petroleum Industry. January, 2018 CODE OF PRACTICE Fatigue Management in the Canada Newfoundland and Labrador Offshore Petroleum Industry January, 2018 Publication Number: 2018-0008 Review by November, 2022 The Canadian Association of

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 611 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES TABLE OF CONTENTS 611.01 SCOPE 611.02 REFERENCES 611.03 DEFINITIONS

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3023 LOCKOUT / TAGOUT PROGRAM Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL WARNING Before digging or trenching... Call Indiana Underground Protection Service 1-800-382-5544 AVOID BURIED POWER CABLES CONTENTS Page # 100-200 OR 400 AMP

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 52 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING.

4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING. 4. POINTS ON SWITCH AND CIRCUIT BREAKER PLATFORM GROUNDING. 4.1 All equipment (i.e., switches, breakers, control cabinets, etc.) inside switchyards or substations which require operations by workers must

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide labor, materials, equipment, and incidentals as shown, specified, and

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015

More information

MATERIAL SPECIFICATION FOR STEEL TRUSS BRACKETS

MATERIAL SPECIFICATION FOR STEEL TRUSS BRACKETS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 2426 NOVEMBER 2017 MATERIAL SPECIFICATION FOR STEEL TRUSS BRACKETS TABLE OF CONTENTS 2426.01 SCOPE 2426.02 REFERENCES 2426.03 DEFINITIONS - Not Used

More information

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 2434 November 2016 MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR UNDERPASS LIGHTING TABLE OF CONTENTS 2434.01 SCOPE 2434.02 REFERENCES

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

LOCKOUT / TAGOUT PROGRAM

LOCKOUT / TAGOUT PROGRAM Page: Page 1 of 11 Purpose The purpose of this program is to establish procedures for affixing appropriate lockout/tagout equipment to energy isolating devices and to otherwise disable machines or equipment

More information

Apprenticeship and Industry Training

Apprenticeship and Industry Training Apprenticeship and Industry Training Cathodic Protection Technician Competency Profile 21013 (2013) ALBERTA ENTERPRISE AND ADVANCED EDUCATION Cathodic protection technician: competency profile ISBN 978-1-4601-0702-7

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 623 JANUARY 1990 CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT 623.01 SCOPE 623.02 REFERENCES 623.05 MATERIALS TABLE OF CONTENTS 623.05.01

More information

MATERIAL STANDARD FOR CABLES AND WIRES

MATERIAL STANDARD FOR CABLES AND WIRES MATERIAL STANDARD FOR CABLES AND WIRES CONTENTS : PAGE No. 1. SCOPE... 2 2. SERVICE CONDITIONS... 2 3. REFERENCES AND STANDARDS... 2 4. UNITS... 3 5. CABLE DESIGN AND CONSTRUCTION... 3 5.1 Applicable Cable

More information

Earthing in electrical network purpose, methods and measurement

Earthing in electrical network purpose, methods and measurement Earthing in electrical network purpose, methods and measurement Earth / Ground Conductive ground whose electrical potential at each point is set equal to zero, It is a conductor which provides a low impedance

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

LOCKOUT TAGOUT SAFETY PROGRAM

LOCKOUT TAGOUT SAFETY PROGRAM 1. PURPOSE To establish procedures for affixing appropriate lockout/tagout equipment to energy isolating devices and to otherwise disable machines or equipment to prevent unexpected energization, start

More information

CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador

CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador March 2017 2017-0023 The Canadian Association of Petroleum Producers

More information

IOM3 Underground Seminar. Health and Safety Laboratory Buxton. 27 May 2010

IOM3 Underground Seminar. Health and Safety Laboratory Buxton. 27 May 2010 IOM3 Underground Seminar Health and Safety Laboratory Buxton 27 May 2010 Applications and Limitations of Cathodic Protection within Plants Dave Harvey CEng, FICorr Engineering Manager Pipeline Maintenance

More information

Lockout/Tagout Procedures

Lockout/Tagout Procedures Lockout/Tagout Procedures Policy 303.14 1 Introduction 1.1 This procedure establishes the minimum requirements for the lockout and/or tagout of electrical disconnects, liquid, gas and steam valves, hydraulic/pneumatic

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 25 05 26 GROUNDING AND BONDING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model)

STANDARD SPECIFICATION EARTH GROUNDING Section (Straight Shaft Model) STANDARD SPECIFICATION EARTH GROUNDING Section 16000 (Straight Shaft Model) PART 1 - GENERAL 1.01 DESCRIPTION A. Related Work Specified Elsewhere: 1. Electrical General Provisions ( Section xxx) 2. Basic

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin March 2014 CEC-12 [rev-6] Page 1 of 6 CANADIAN ELECTRICAL CODE SUBJECT: Section 12 Wiring Methods Conductors General Insulation Thickness on Conductors Used in Ungrounded

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

VITALink 2-Hour Fire Resistive Circuit Integrity Cable with Hose Stream

VITALink 2-Hour Fire Resistive Circuit Integrity Cable with Hose Stream VITALink 2-Hour Fire Resistive Circuit Integrity Cable with Hose Stream INSTALLATION GUIDE For 18,16,14 & 12 AWG 2-Hour Rated Fire Resistive Applications UL 105 C Listed Type FPLR-CI-LS, CMR-CI-LS, CL3R-CI-LS

More information

Stanford University Facilities Design Guidelines SECTION CATHODIC PROTECTION. B. Section : Site Restoration and Rehabilitation

Stanford University Facilities Design Guidelines SECTION CATHODIC PROTECTION. B. Section : Site Restoration and Rehabilitation SECTION 13 47 13 CATHODIC PROTECTION PART 1 GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR shall design, furnish and install all materials and equipment and provide all labor necessary to complete the work

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes.

SERVICES CHAPTER 35. wire. For all other installations, the rating of the ungrounded conductors shall be not less than 60 amperes. CHAPTER 35 SERVICES SECTION E3501 GENERAL SERVICES E3501.1 Scope. This chapter covers service conductors and equipment for the control and protection of services and their installation requirements. E3501.2

More information

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and

THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16 ( the Act ) and TECHNICAL STANDARDS & SAFETY AUTHORITY 14 th Floor, Centre Tower 3300 Bloor Street West Toronto, Ontario Canada M8X 2X4 IN THE MATTER OF: THE TECHNICAL STANDARDS AND SAFETY ACT, 2000, S.O. 2000, c. 16

More information

Impressed Current Cathodic Protection Installation

Impressed Current Cathodic Protection Installation Impressed Current Cathodic Protection Installation Period 3 Advanced Corrosion Course 2017 February 21-23, 2017 Nathan Wood - BGL Asset Services, LLC 1 Course Objective To familiarize corrosion personnel

More information

Installation of CSST Gas Piping Systems

Installation of CSST Gas Piping Systems (What Inspectors Need To Know) May 2016 Conventional Arc-Resistant CSST Product Standard National Standard ANSI LC-1 Performance-based standard Listed system installed in accordance with manufacturer s

More information

CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI-GLARE SCREEN

CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI-GLARE SCREEN ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 791 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR EXPANDED METAL ANTI-GLARE SCREEN TABLE OF CONTENTS 791.01 SCOPE 791.02 REFERENCES 791.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS

More information

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013.

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013. PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 26 0519 A. Single conductor building wire. B. Metal-clad cable. C. Wiring connectors. D. Electrical tape. E. Wire pulling lubricant. F. Cable ties. 1.2 RELATED

More information

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sections 5-100 through 5-105 of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sec. 5-100. Adoption of published code. There is hereby adopted

More information

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING This is Schedule G of the District of Peachland Subdivision and Development Servicing Bylaw No. 1230, July,

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES 7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,

More information

Safety Directive FATIGUE MANAGEMENT CODE OF PRACTICE

Safety Directive FATIGUE MANAGEMENT CODE OF PRACTICE Canada - Nova Scotia Offshore Petroleum Board 8th Floor TD Centre, 1791 Barrington Street, Halifax, Nova Scotia B3J 3K9 Tel (902)422-5588 Fax (902)422-1799 www.cnsopb.ns.ca Safety Directive FATIGUE MANAGEMENT

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS SaskPower Electrical Inspections BULLETIN 01-2017 February 15, 2017 TO: LICENSED ELECTRICAL CONTRACTORS ELECTRICAL CONSULTANTS AND ENGINEERS SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS,

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas

Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Bulletin 37835A Revision E Introduction This document specifies typical foundation characteristics, designs,

More information

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015 Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015 Lockout / Tagout CONTENTS I. PURPOSE II. SCOPE III. DEFINITIONS

More information

SECTION LIGHTNING PROTECTION SYSTEM

SECTION LIGHTNING PROTECTION SYSTEM SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION MEDIUM-VOLTAGE CABLES PART 1 GENERAL

SECTION MEDIUM-VOLTAGE CABLES PART 1 GENERAL SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 GENERAL 1.1 SECTION INCLUDES A. Medium voltage cable. B. Cable terminations. C. This specification describes single conductor EPR (Ethylene-propylene-rubber)

More information

Refining Corrosion Technologist NACE-RCT-001

Refining Corrosion Technologist NACE-RCT-001 Refining Corrosion Technologist NACE-RCT-001 NACE Cathodic Protection Technologist (CP3) Written Exam Exam Preparation Guide March 2018 Copyright 2016 by NACE International Institute. All rights reserved.

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 617 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES TABLE OF CONTENTS 617.01 SCOPE 617.02 REFERENCES 617.03 DEFINITIONS

More information

SECTION SIGNAL SYSTEMS MISCELLANEOUS PRODUCTS

SECTION SIGNAL SYSTEMS MISCELLANEOUS PRODUCTS SECTION 18360 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for miscellaneous components and products for signal systems. 1.02 REFERENCE STANDARDS A. American National Standards Institute

More information

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 )

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 ) Scope This document covers the installation and inspection requirements for Street and that are installed and maintained within the jurisdiction of the Nova Scotia Power Incorporated (NSPI) inspection

More information

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality.

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality. ELECTRICAL INSPECTION BULLETIN (Effective 2012-10-01) Rule 30-1000 Installation and Inspection Requirements for Street and Roadway Lighting Systems Scope This document covers the installation and inspection

More information