1 Energy East Pipeline Linking West with East: An Overview SIMSA Oil & Gas Supply Chain Forum November 2015

2 Forward-looking information This presentation contains certain information that is forward looking and is subject to important risks and uncertainties. The words "anticipate", "expect", "believe", "may", "will", "should", "estimate", "project", "outlook", "forecast", "intend", "target", "plan" or other similar words are used to identify such forward-looking information. Forward-looking statements in this presentation are intended to provide TransCanada security holders and potential investors with information regarding TransCanada and its subsidiaries, including management s assessment of TransCanada s and its subsidiaries future plans and financial outlook. Forward-looking statements in this presentation may include, but are not limited to, statements regarding anticipated business prospects; financial performance of TransCanada and its subsidiaries and affiliates; expectations or projections about strategies and goals for growth and expansion; expected cash flows; expected costs; expected costs for projects under construction; expected schedules for planned projects (including anticipated construction and completion dates); expected regulatory processes and outcomes; expected outcomes with respect to legal proceedings, including arbitration; expected capital expenditures; expected operating and financial results; and expected impact of future commitments and contingent liabilities. These forward-looking statements reflect TransCanada's beliefs and assumptions based on information available at the time the statements were made and as such are not guarantees of future performance. By their nature, forward-looking statements are subject to various assumptions, risks and uncertainties which could cause TransCanada's actual results and achievements to differ materially from the anticipated results or expectations expressed or implied in such statements. Key assumptions on which TransCanada s forward-looking statements are based include, but are not limited to, assumptions about inflation rates, commodity prices and capacity prices; timing of debt issuances and hedging; regulatory decisions and outcomes; arbitration decisions and outcomes; foreign exchange rates; interest rates; tax rates; planned and unplanned outages and utilization of the Company s pipeline and energy assets; asset reliability and integrity; access to capital markets; anticipated construction costs, schedules and completion dates; and acquisitions and divestitures. The risks and uncertainties that could cause actual results or events to differ materially from current expectations include, but are not limited to the ability of TransCanada to successfully implement its strategic initiatives and whether such strategic initiatives will yield the expected benefits; the operating performance of the Company's pipeline and energy assets; the availability and price of energy commodities; amount of capacity payments and revenues from the Company s energy business; regulatory decisions and outcomes; outcomes with respect to legal proceedings, including arbitration; counterparty performance; changes in environmental and other laws and regulations; competitive factors in the pipeline and energy sectors; construction and completion of capital projects; labour, equipment and material costs; access to capital markets; interest and currency exchange rates; weather; technological developments; and economic conditions in North America. Additional information on these and other factors is available in the reports filed by TransCanada with Canadian securities regulators and with the U.S. Securities and Exchange Commission (SEC). Readers are cautioned against placing undue reliance on forward-looking information, which is given as of the date it is expressed in this presentation or otherwise stated, and not to use future-oriented information or financial outlooks for anything other than their intended purpose. TransCanada undertakes no obligation to publicly update or revise any forward-looking information in this presentation or otherwise stated, whether as a result of new information, future events or otherwise, except as required by law. EE4721-TCPL-PR-PN-0281-Energy East Protected- UNCONTROLLED IF PRINTED 2

3 TransCanada is a Trusted Canadian Energy Company One of North America s Largest Natural Gas Pipeline Networks 68,000 km of pipeline 368 Bcf of capacity 14 Bcf/d or 20% of demand Premier Liquids Pipeline System 4,250 km (2,600 mi) of pipeline 530,000 bbl/d or 18% of Western Canadian production Largest Private Sector Power Generator in Canada 19 power plants, 10,900 MW Source: International Energy Agency World Energy Outlook 2014 EE4721-TCPL-PR-PN-0281-Energy East Protected- UNCONTROLLED IF PRINTED 3

4 Energy East: Connecting Canada $12 billion investment required to build Energy East 4,600 km length of 42 pipeline from Alberta to New Brunswick 1.1 million bpd total capacity 14,000 jobs during development & construction $36 billion GDP added to the economy $7 billion additional taxes Q National Energy Board filing amendment 2020 expected startup date EE4721-TCPL-PR-PN-0281-Energy East Protected- UNCONTROLLED IF PRINTED 4

5 Million tons of oil equivalent ENERGY EAST PIPELINE Canada and the World Need Oil Other Renewables Bioenergy Hydro Nuclear Gas Oil Coal Source: International Energy Agency World Energy Outlook

6 Global Oil Reserves by Country 6

7 Energy East at a Glance Batch crude oil pipeline Markets: Eastern Canada, U.S East Coast, U.S. Gulf Coast and global markets Major components of the project: Converting roughly 3,000 km (two-thirds of project length) of existing natural gas pipeline in Saskatchewan, Manitoba and Ontario to an oil pipeline Building 1,600 km of new pipeline primarily in Alberta, eastern Ontario, Québec and New Brunswick to link up with the converted pipe Building associated facilities, pump stations and tank terminals needed to move oil from Alberta and Saskatchewan to refineries in Québec and New Brunswick, including marine facilities for shipping exports to other markets Governed by the National Energy Board (NEB)

8 About Conversion Conversion is the re-purposing of an existing natural gas pipeline for crude oil service: Key elements of pipeline conversion: Integrity: conditioning of the pipeline for new liquid operations Isolation: Removal of existing connections to the natural gas pipeline New Facilities: construction of pump stations, terminals and other crude oil facilities Conversion Expertise and Experience: The Keystone Pipeline System included conversion of more than 800 km of existing TransCanada natural gas pipeline through Saskatchewan and Manitoba Since operations began in 2010, we have safely delivered more than 1 billion barrels of crude oil from Hardisty, Alberta to U.S. refineries

9 Energy East in Saskatchewan Pipeline and Facilities Conversion of approx. 623 km of pipeline Potential 60-km lateral pipeline from Cromer, MB to Moosomin Tank Terminal in Saskatchewan 12 pump stations: Clinworth Herbert Caron Regina Grenfell Moosomin Liebenthal Pennant Chaplin Belle Plaine Kendal Whitewood

10 Energy East Pipeline Project: National Benefits Conference Board of Canada assessment of the economic impact of Energy East: During the seven-year development and construction phase ( ) $11.5 billion in additional GDP for the Canadian economy $2.9 billion in tax revenues 13,690 full-time equivalent (FTE) direct and indirect jobs During the first 20 years of operations $24.9 billion in additional GDP for the Canadian economy $4.7 billion in additional tax revenues 3,273 full-time equivalent (FTE) direct and indirect jobs Note: All figures estimated

11 Energy East Pipeline Project: Local Benefits in Saskatchewan During the seven-year development and construction phase ( ) $600 million in additional GDP for the Saskatchewan economy $135 million in tax revenues 763 full-time equivalent (FTE) direct and indirect jobs During the first 20 years of operations $2.14 billion in additional GDP for the Saskatchewan economy $220 million in additional tax revenues 208 full-time equivalent (FTE) direct and indirect jobs 2014 Conference Board of Canada Report Note: All figures estimated

12 Delivering Energy Safely: TransCanada s #1 Priority Pipelines are the safest mode of oil transportation Energy East will be the one of most technologically advanced pipelines ever built 24/7 monitoring system with highly trained staff and satellite technology Safety valves strategically located to minimize impact to safety and environment Extra safety precautions at road, rail and water crossings and near populous areas to minimize stakeholder and environmental impact TransCanada has spent an average of $900 million per year over the last three years on pipeline integrity and preventative maintenance programs Safety is TransCanada s highest priority

13 Energy East: Respecting the Environment ENERGY EAST PIPELINE TransCanada s ongoing goal is to minimize disturbance to the environment Adhere to the strictest environmental guidelines throughout project Mitigate potential impacts during and after construction Preserve important natural and cultural features at each step Conduct extensive environmental studies on fish, wildlife, vegetation and other areas Collaborate with communities while collecting environmental data Re-establish essential characteristics of land after construction

14 Engagement Early engagement with landowners, elected officials, municipalities, emergency responders and aboriginal communities Council meetings offered to all directly affected communities along the route Public open houses and briefings with community leaders 15 open houses in SK to date (450 attendees) Comprehensive mail outs and s project information packages and newsletters Continuous dialogue with the Saskatchewan Association of Rural Municipalities (SARM) and Saskatchewan Urban Municipalities Association (SUMA)

15 Engagement: Saskatchewan Close to 145 affected Saskatchewan municipalities (cities, towns and villages) along the proposed Energy East Pipeline route To date, we have conducted more than 214 briefings and meetings and more than 350 individual contacts with various community leaders, councils and stakeholder groups in Saskatchewan $150,000 in flood relief in 2014 To date, 39 Saskatchewan municipalities have expressed support for Energy East via letters and/or formal resolutions of support We believe in open and truthful dialogue with communities and are committed to earning your support and building strong relationships over the long-term

16 Contracting Strategy TransCanada and Energy East committed to Supplier Diversity and Local Participation including Aboriginal suppliers Energy East in the process of reviewing the Contracting Strategy for the Project Evaluating regional, scope-based contracts to get the best mix of regional contribution, size / scope of contracts, and project management effort for the Project Types of contracts could include EPC, traditional design-bid-build, or other variations Energy East preparing to procure long-lead equipment and materials if required to support project schedule

17 Aboriginal Contracting Established Aboriginal Contracting Program at TransCanada and on Energy East Engaged 30 Aboriginal Communities (First Nation & Metis) in SK 500 Aboriginal businesses in our data base Canada wide EPC / Prime Contractors will be required to include a Local / Aboriginal Plan with their proposals on the Energy East Project Aboriginal Spend (employment, contracting, procurement) to be tracked on the Project Energy East has a dedicated Aboriginal Contracting team $600M Aboriginal Spend (TransCanada to date)

18 Contracting / Procurement Status Initial Solicitations of Interest (SOIs) for major EPC packages issued and evaluated between Q Q Path forward for these packages will be confirmed with the Contracting Strategy Some preliminary material and equipment agreements (MOUs) executed: e.g. Canadoil (fittings), EzeFlow (fittings), GE (motors) Equipment for Pump Stations is currently under review: e.g. E- Shelters, pumps, and motors Environmental and Traditional Knowledge studies are ongoing Timing of long-lead equipment and material procurement under review

19 List of Services: Development and Construction Fabrication Work Structural Piping Spools Land Survey Environmental and Traditional Knowledge Studies Geo-technical Brushing/ Snow Removal Rig Mats Supply Construction Equipment Rental Concrete and Aggregate Supplies Engineering (e.g. regional subcontract) Mechanical, Electrical, Civil work March 25, 2015 Sand Padding Emergency material requirements Construction Consumables/ Office Supplies Fencing/Temporary Lighting Short Term Office Support Field/Construction Labor Fuel Supply Hotel Accommodations Camp Potable Water/Sewage Removal Testing of Concrete, Soil, etc. Trailer Rental Security Services 19

20 List of Services: Operations To support TransCanada operations and maintenance activities, external contractors will be required for the following services: Picker & Crane Operators Vacuum Truck Operators Technical Trades General Labourers Vegetation Control Snow Plowing Brush Control Hydrovac Operators Back hoe Operators Aerial Patrol Aircraft with pilots Pigging crews Welders NDE inspection crews Rig mat crews Geotechnical Environmental Consultants Security March 25,

21 Project Timeline Q2 2013: Launch of engagement program October 2014: Initial NEB regulatory application filing April 2015: Decision to revisit Quebec marine terminal options Q4 2015: File amended application with NEB 2017/2018: Construction and conversion begins (pending regulatory approval) 2020 Commissioning and in-service to Quebec and New Brunswick : Ongoing community engagement and consultation - listening and adapting

22 Register to work on Energy East How to access Vendor Portal for Registration: Contractor, Supplier and Vendor Registration Form By completing the Registration Form, your company s information will be retained and referenced for upcoming work. You do not need to complete this form on any additional TransCanada websites. TransCanada requires that certain goods and services be pre-qualified before contracts are put in place to ensure the safety and quality of the work being performed or goods being obtained. By completing this form you will also be subscribed to our Contractor, Supplier and Vendor Communications List. 22

23 Energy East: Ways to Get Involved Be vocal and help correct misinformation when you hear it Visit energyeastpipeline.com to learn the facts Join the Energy East Action Network action.energyeastpipeline.com Pass a municipal council resolution in support of Energy East Send a letter in support of Energy East to the National Energy Board (NEB)

24

Supplier Engagement October 4, 2018

Supplier Engagement October 4, 2018 Supplier Engagement October 4, 2018 TransCanada Company Overview One of North America s Largest Natural Gas Pipeline Networks 91,500 km (56,900 mi) of pipeline 23 bcf/d; ~25% of continental demand Premier

More information

Energy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014

Energy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014 Energy East Pipeline Project Overview Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014 TransCanada: Leading North American Energy Infrastructure Company ENERGY EAST

More information

Energy East Pipeline. The Right Choice ACPA 2016 AGM. Sept. 8, 2016

Energy East Pipeline. The Right Choice ACPA 2016 AGM. Sept. 8, 2016 Energy East Pipeline The Right Choice ACPA 2016 AGM Sept. 8, 2016 Energy East: Connecting Canada $15.7 billion investment required to build Energy East 4,500 km length of 42 pipeline from Alberta to New

More information

Fredericton, New Brunswick Community Panel Session. National Energy Board August 15, 2016

Fredericton, New Brunswick Community Panel Session. National Energy Board August 15, 2016 Fredericton, New Brunswick Community Panel Session National Energy Board August 15, 2016 1 What is Energy East? $15.7 billion* 100% privately financed project 4,500 km length of pipeline from Alberta to

More information

Ecommerce Essentials for North American Oil & Gas. Janice Hamilton, Manager Supply Chain Systems and Processes

Ecommerce Essentials for North American Oil & Gas. Janice Hamilton, Manager Supply Chain Systems and Processes Ecommerce Essentials for North American Oil & Gas Janice Hamilton, Manager Supply Chain Systems and Processes Forward-Looking Information This presentation includes certain forward looking information

More information

Saint John, New Brunswick Community Panel Session. National Energy Board August 8, 2016

Saint John, New Brunswick Community Panel Session. National Energy Board August 8, 2016 Saint John, New Brunswick Community Panel Session National Energy Board August 8, 2016 1 What is Energy East? $15.7 billion* 100% privately financed project 4,500 km length of pipeline from Alberta to

More information

Ontario Energy Network Meeting Energy Demand and Improving Environmental Performance: A Balanced Approach

Ontario Energy Network Meeting Energy Demand and Improving Environmental Performance: A Balanced Approach Ontario Energy Network Meeting Energy Demand and Improving Environmental Performance: A Balanced Approach December 6, 2011 Hal Kvisle President and CEO (Retired) TransCanada Corporation Forward-Looking

More information

The Appalachian Basin

The Appalachian Basin The Appalachian Basin Jason Hamil Director of U.S. Natural Gas Projects Forward-Looking Information This presentation includes certain forward looking information to help current and potential investors

More information

ENERGY & OUR BUSINESS AT A GLANCE OCTOBER 2017 COMMITMENT

ENERGY & OUR BUSINESS AT A GLANCE OCTOBER 2017 COMMITMENT ENERGY & OUR BUSINESS AT A GLANCE OCTOBER 2017 COMMITMENT TRANSCANADA TODAY October 2017 Natural Gas Pipeline In Development/Construction Liquids Pipeline In Development/Construction Natural Gas Storage

More information

Life In The Heartland Sturgeon Refinery Update. October 27 th, 2014

Life In The Heartland Sturgeon Refinery Update. October 27 th, 2014 Life In The Heartland Sturgeon Refinery Update October 27 th, 2014 Certain information set forth in this document contains forward-looking statements including management's assessment of future plans and

More information

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Note to Investors This presentation contains certain forward-looking statements, including projected future

More information

Keystone Projects Overview

Keystone Projects Overview Keystone Projects Overview TransCanada Assets Wholly Owned Natural Gas Pipeline Partially Owned Natural Gas Pipeline Natural Gas Pipeline Under Construction Natural Gas Pipeline In Development Natural

More information

Annual General Meeting Calgary, Alberta. June 21, 2017

Annual General Meeting Calgary, Alberta. June 21, 2017 Annual General Meeting Calgary, Alberta June 21, 2017 Disclaimer Forward-looking information Certain information included in this presentation may constitute forward-looking information within the meaning

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of The Securities Exchange Act of 1934 October 14, 2016 Date of Report (Date

More information

AN ECONOMIC ANALYSIS OF TRANSCANADA S ENERGY EAST PIPELINE PROJECT

AN ECONOMIC ANALYSIS OF TRANSCANADA S ENERGY EAST PIPELINE PROJECT Study No. 140 CANADIAN ENERGY RESEARCH INSTITUTE AN ECONOMIC ANALYSIS OF TRANSCANADA S ENERGY EAST PIPELINE PROJECT Canadian Energy Research Institute Relevant Independent Objective AN ECONOMIC ANALYSIS

More information

Kitimat LNG Pacific Trail Pipeline

Kitimat LNG Pacific Trail Pipeline Kitimat LNG Pacific Trail Pipeline Premier s B.C. Natural Resource Forum Rod Maier, Chevron Canada Limited January 23, 2014 Cautionary Statement CAUTIONARY STATEMENT RELEVANT TO FORWARD-LOOKING INFORMATION

More information

Air & Waste Management Association - (CPANS) September 7, 2012

Air & Waste Management Association - (CPANS) September 7, 2012 Air & Waste Management Association - (CPANS) September 7, 2012 Canadian Crude Oil Exports By Destination Non-US 1% US West Coast US Mid-Continent 74% 9% US East Coast 8% US Gulf Coast 7% 2 Source: NEB

More information

Portland Natural Gas Transmission System. NGA 2017 Regional Market Trends Forum

Portland Natural Gas Transmission System. NGA 2017 Regional Market Trends Forum Portland Natural Gas Transmission System NGA 2017 Regional Market Trends Forum May 4, 2017 Forward Looking Statement Forward-Looking Information This presentation may contain certain information that is

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest THANK YOU for attending this Open House We want to hear from you www.nextbridge.ca Purpose of the Open House We are here to provide you

More information

BC Metis Federation AGM Burnaby. Trans Mountain Expansion Project October 1, 2017 Phil Symington & Troy Schwab

BC Metis Federation AGM Burnaby. Trans Mountain Expansion Project October 1, 2017 Phil Symington & Troy Schwab BC Metis Federation AGM Burnaby Trans Mountain Expansion Project October 1, 2017 Phil Symington & Troy Schwab Current Pipeline Current capacity 47.7 million litres or 300,000 barrels capacity per day 34,000

More information

PBF Energy (NYSE: PBF) & PBF Logistics (NYSE: PBFX)

PBF Energy (NYSE: PBF) & PBF Logistics (NYSE: PBFX) PBF Energy (NYSE: PBF) & PBF Logistics (NYSE: PBFX) Wells Fargo Energy Symposium December 2014 Safe Harbor Statements This presentation contains forward-looking statements made by PBF Energy Inc. and PBF

More information

CANADA S NEXT INTERMEDIATE GOLD PRODUCER. Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013

CANADA S NEXT INTERMEDIATE GOLD PRODUCER. Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013 CANADA S NEXT INTERMEDIATE GOLD PRODUCER 1 Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013 Forward Looking Information This presentation contains certain

More information

PBF Energy. State College, PA. North East Association of Rail Shippers Fall Conference. October 1, 2014

PBF Energy. State College, PA. North East Association of Rail Shippers Fall Conference. October 1, 2014 PBF Energy North East Association of Rail Shippers Fall Conference State College, PA October 1, 2014 Safe Harbor Statements This presentation contains forward-looking statements made by PBF Energy Inc.

More information

LNG Projects Development of the Future

LNG Projects Development of the Future LNG Projects Development of the Future Gastech, 7 th of April 2017 Hilary Mercer VP Integrated Gas Projects and Executive Director Prelude 1 Definitions & cautionary note The companies in which Royal Dutch

More information

Economic Pathways Partnership. Ryan McFadden and Annie Korver July 21, 2017 Edmonton, Alberta

Economic Pathways Partnership. Ryan McFadden and Annie Korver July 21, 2017 Edmonton, Alberta Economic Pathways Partnership Ryan McFadden and Annie Korver July 21, 2017 Edmonton, Alberta Trans Mountain Pipeline 60 Years of History 2 TRANS MOUNTAIN EXPANSION PROJECT OVERVIEW 3 Trans Mountain Pipeline

More information

Notice of Intent to Prepare an Environmental Impact Statement for the. Proposed Upland Pipeline in Williams, Mountrail, and Burke Counties,

Notice of Intent to Prepare an Environmental Impact Statement for the. Proposed Upland Pipeline in Williams, Mountrail, and Burke Counties, This document is scheduled to be published in the Federal Register on 04/15/2016 and available online at http://federalregister.gov/a/2016-08638, and on FDsys.gov Billing Code: 4710-09 DEPARTMENT OF STATE

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of The Securities Exchange Act of 1934 March 7, 2018 Date of Report (Date

More information

TransCanada Pipelines The Company and Its Projects. BC Metis Industry Forum May 10, 2014 Vancouver, B.C.

TransCanada Pipelines The Company and Its Projects. BC Metis Industry Forum May 10, 2014 Vancouver, B.C. TransCanada Pipelines The Company and Its Projects BC Metis Industry Forum May 10, 2014 Vancouver, B.C. TransCanada Corporation (TSX/NYSE: TRP) TransCanada is a leading North American energy infrastructure

More information

Original Plan Phase 1 - Work progress (cumulative) 90% 94% 95% 97% 97% 99%

Original Plan Phase 1 - Work progress (cumulative) 90% 94% 95% 97% 97% 99% CANADIAN NATURAL RESOURCES LIMITED ANNOUNCES FIRST QUARTER 2008 UPDATE ON THE PROGRESS OF THE HORIZON OIL SANDS PROJECT CALGARY, ALBERTA APRIL 30, 2008 FOR IMMEDIATE RELEASE Canadian Natural Resources

More information

Plant Ratcliffe Update

Plant Ratcliffe Update Plant Ratcliffe Update Ed Day President & CEO, Mississippi Power Company Penny Manuel EVP, Engineering and Construction Cautionary Note Regarding Forward-Looking Statements Certain information contained

More information

Call for Proposals 007 Proposal Submission Form Standard Component

Call for Proposals 007 Proposal Submission Form Standard Component Call for Proposals 007 Proposal Submission Form Standard Component BIDDER INFORMATION AND STATISTICS Bidder Information 1) Provide the name of the Bidder (generally, the company name). If the Bidder is

More information

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away James Cairns Vice President, Petroleum and Chemicals Upgrading Crude by Rail Capacity Summit February 26-27, 2013 Houston, TX FORWARD-LOOKING

More information

Cautionary Note Regarding Forward-Looking Statements

Cautionary Note Regarding Forward-Looking Statements Second Quarter 2012 Earnings Conference Call July 25, 2012 1 Cautionary Note Regarding Forward-Looking Statements Certain information contained in this presentation ti is forward-looking information based

More information

Little Bow ASP Project Update

Little Bow ASP Project Update Project Update October, 2013 WWW.ZARGON.CA Advisory Forward-Looking Information Forward-Looking Statements - This presentation offers our assessment of Zargon's future plans and operations as at September

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

More information

2017 Annual Shareholder Meeting June 1, 2017

2017 Annual Shareholder Meeting June 1, 2017 2017 Annual Shareholder Meeting June 1, 2017 Forward Looking Statements Certain statements in this presentation, other than purely historical information, are forward-looking statements within the meaning

More information

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of The Securities Exchange Act of 1934 November 10, 2016 Date of Report (Date

More information

FROM RAILROAD COMMISSIONER RYAN SITTON

FROM RAILROAD COMMISSIONER RYAN SITTON 2018 E N E R G Y M A R K E T O U T L O O K FROM RAILROAD COMMISSIONER RYAN SITTON TABLE OF CONTENTS 2018 ENERGY MARKET OUTLOOK Summing up the analysis contained in this report in a few sentences, my prediction

More information

Research Projects as of March 27, 2018

Research Projects as of March 27, 2018 2017-2018 Research Projects as of March 27, 2018 CARBON MANAGEMENT IMPACTS ON ELECTRICITY MARKETS IN CANADA This project is designed to gain insights into challenges and opportunities carbon management

More information

TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section

TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section TransCanada s Proposed North Montney Mainline Project Aitken Creek Section and Kahta Section Peace River Regional District Council Presentation July 25 th, 2013 TransCanada Corporation (TSX/NYSE: TRP)

More information

DTE Energy s Utility Growth Strategy. Gerard Anderson President & COO April 6, 2006

DTE Energy s Utility Growth Strategy. Gerard Anderson President & COO April 6, 2006 DTE Energy s Utility Growth Strategy Gerard Anderson President & COO April 6, 2006 Safe Harbor Statement The information contained herein is as of the date of this presentation. DTE Energy expressly disclaims

More information

Chart Industries, Inc.

Chart Industries, Inc. Chart Industries, Inc. Piper Jaffray August 14, 2014 Disclosure Forward-Looking Statements: This presentation includes forward-looking statements within the meaning of the Private Securities Litigation

More information

Tab 2 Index November 30, 2018

Tab 2 Index November 30, 2018 CENTRA GAS MANITOBA INC. 0/0 GENERAL RATE APPLICATION OVERVIEW OF THE APPLICATION Tab Index November 0, 0 0 0 INDEX.0 Overview of Tab.... Corporate Overview and Vision..... Centra s Profile..... Centra

More information

Investor Presentation February PKD (NYSE) Rig 273 Alaska

Investor Presentation February PKD (NYSE) Rig 273 Alaska Investor Presentation February 08 PKD (NYSE) Rig 73 Alaska Forward-Looking Statements Caution The following presentation contains certain statements that may be deemed to be forwardlooking statements within

More information

PBF Logistics LP (NYSE: PBFX)

PBF Logistics LP (NYSE: PBFX) PBF Logistics LP (NYSE: PBFX) Credit Suisse MLP and Energy Logistics Conference June 24, 2015 Safe Harbor Statements This presentation contains forward-looking statements made by PBF Logistics LP, PBF

More information

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway Toronto: April 5, 2012: AuRico Gold Inc. (TSX:AUQ) (NYSE:AUQ), ( AuRico, AuRico Gold or the Company ) is pleased to provide

More information

Investor Presentation. October 2014

Investor Presentation. October 2014 Investor Presentation October 2014 Forward-Looking Statements This presentation may include certain information that is forward-looking information under applicable Canadian securities laws and forward-looking

More information

On Escape Bangladesh Limited

On Escape Bangladesh Limited Welcome to the presentation On Escape Bangladesh Limited 1 About Escape Bangladesh Limited Escape Bangladesh Ltd. has been involved in providing construction, oil & Gas and power sector Project Support

More information

EE4721-TCPL-PR-PN-0257 Energy East Protected UNCONTROLLED IF PRINTED. Energy East Conversion Overview

EE4721-TCPL-PR-PN-0257 Energy East Protected UNCONTROLLED IF PRINTED. Energy East Conversion Overview Energy East Conversion Overview What is Energy East? The Energy East Pipeline is a 4,600-kilometre project that will carry approximately 1.1 million barrels of crude oil per day from Alberta and Saskatchewan

More information

Second Quarter and Half Year 2018 Financial Highlights. Walldorf, Germany Thursday, July 19, 2018

Second Quarter and Half Year 2018 Financial Highlights. Walldorf, Germany Thursday, July 19, 2018 Second Quarter and Half Year 2018 Financial Highlights Walldorf, Germany Thursday, July 19, 2018 Safe Harbor Statement Any statements contained in this document that are not historical facts are forward-looking

More information

Chevron Australasia Overview

Chevron Australasia Overview Chevron Australasia Overview Roy Krzywosinski, Managing Director June 2011 Cautionary Statement CAUTIONARY STATEMENTS RELEVANT TO FORWARD-LOOKING INFORMATION FOR THE PURPOSE OF SAFE HARBOR PROVISIONS OF

More information

Macquarie Capital 2009 Global Infrastructure Conference. Kevin DeNicola Senior Vice President and CFO

Macquarie Capital 2009 Global Infrastructure Conference. Kevin DeNicola Senior Vice President and CFO Macquarie Capital 2009 Global Infrastructure Conference Kevin DeNicola Senior Vice President and CFO June 5, 2009 Forward-Looking Statements This presentation contains forward-looking statements. All statements

More information

PNGTS Continent to Coast Expansion Project. New England Council February 24, 2015

PNGTS Continent to Coast Expansion Project. New England Council February 24, 2015 Continent to Coast Expansion Project New England Council February 24, 2015 Forward Looking Statement Forward-Looking Information This presentation may contain certain information that is forward-looking

More information

TransCanada Power Market Update February 2018

TransCanada Power Market Update February 2018 Forward Prices Table TransCanada Flat 7x24 ($/MWh) AB - 6x16 On Peak ($/MWh) AB - Off-Peak ($/MWh) AECO Gas ($/GJ) Heat Rate BOM $37.5 $44.25 $29.25 $1.85 2.3 March $38. $44.46 $29.64 $1.45 26.2 BOY $6.3

More information

NATIONAL ENERGY BOARD

NATIONAL ENERGY BOARD NATIONAL ENERGY BOARD IN THE MATTER OF the National Energy Board Act, being Chapter N-7 of the Revised Statutes of Canada, as amended, and the Regulations made thereunder; AND IN THE MATTER of an Application

More information

Imperial s Sarnia Products Pipeline

Imperial s Sarnia Products Pipeline Imperial s Sarnia Products Pipeline Waterdown to Finch Project Community Information Session Imperial s Waterdown to Finch Project Important infrastructure to the Greater Toronto and Hamilton Area (GTHA).

More information

Fourth Quarter 2013 Earnings Conference Call. January 29, 2014

Fourth Quarter 2013 Earnings Conference Call. January 29, 2014 Fourth Quarter 2013 Earnings Conference Call January 29, 2014 Cautionary Note Regarding Forward-Looking Statements 2 Certain information contained in this presentation is forward-looking information based

More information

Hands-on Sustainability in Madagascar: Ambatovy s experience

Hands-on Sustainability in Madagascar: Ambatovy s experience Hands-on Sustainability in Madagascar: Ambatovy s experience 8 th Risk Mitigation and CSR Seminar October 16, 2012 Mark Sitter Sherritt International Corporation 1 FORWARD-LOOKING STATEMENTS This presentation

More information

Ontario s Climate Change Strategy The Move towards Cap & Trade. Karl Johannson Senior Vice President, Canadian Power TransCanada Corporation

Ontario s Climate Change Strategy The Move towards Cap & Trade. Karl Johannson Senior Vice President, Canadian Power TransCanada Corporation Ontario s Climate Change Strategy The Move towards Cap & Trade Karl Johannson Senior Vice President, Canadian Power TransCanada Corporation Forward-Looking Information This presentation may contain certain

More information

Fourth Quarter 2014 Earnings Conference Call. February 4, 2015

Fourth Quarter 2014 Earnings Conference Call. February 4, 2015 Fourth Quarter 2014 Earnings Conference Call February 4, 2015 Cautionary Note Regarding Forward-Looking Statements Certain information contained in this presentation is forward looking information based

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

Atlantic Link: An Update. June 6, 2017

Atlantic Link: An Update. June 6, 2017 Atlantic Link: An Update June 6, 2017 About Emera Publicly traded (TSX: EMA); approximately CDN$29 billion in assets Constructing the 500 MW Maritime Link a 170-kilometre subsea HVdc cable between Newfoundland

More information

Imperial s Sarnia Products Pipeline Mississauga, Ontario. Credit River Valley Project

Imperial s Sarnia Products Pipeline Mississauga, Ontario. Credit River Valley Project Imperial s Sarnia Products Pipeline Mississauga, Ontario Credit River Valley Project Preventative pipeline maintenance in Mississauga s Credit River Valley Imperial s Sarnia Products Pipeline (SPPL) carries

More information

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION

HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION HAMBURGER HAFEN UND LOGISTIK AG COMPANY PRESENTATION CHEUVREUX GERMAN CORPORATE CONFERENCE FRANKFURT, 20 JANUARY 2010 Hamburger Hafen und Logistik AG DISCLAIMER The facts and information contained herein

More information

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary.

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary. ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK Executive Summary ST98 www.aer.ca EXECUTIVE SUMMARY The Alberta Energy Regulator (AER) ensures the safe, efficient, orderly, and environmentally

More information

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary.

ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK. Executive Summary. ST98: 2018 ALBERTA S ENERGY RESERVES & SUPPLY/DEMAND OUTLOOK Executive Summary ST98 www.aer.ca EXECUTIVE SUMMARY The Alberta Energy Regulator (AER) ensures the safe, efficient, orderly, and environmentally

More information

(TSX: AUQ) (NYSE: AUQ)

(TSX: AUQ) (NYSE: AUQ) AuRico Gold Announces a New Gold-Copper Porphyry Discovery at the Kemess Project; Initial Resource Estimate Expected in Early 2015 Hole KH-14-04 intersects 768 metres of 0.442 g/t Au and 0.392% Cu Toronto:

More information

Chevron: A Focused Leader in Heavy Oil

Chevron: A Focused Leader in Heavy Oil Chevron: A Focused Leader in Heavy Oil Gary Luquette President, North America Exploration and Production May 5, 2008 JPMorgan Annual Energy Symposium: Heavy Oil Cautionary Statement CAUTIONARY STATEMENTS

More information

UPDATE ON THE ECONOMIC IMPACTS OF THE CANADIAN DAIRY INDUSTRY IN 2015

UPDATE ON THE ECONOMIC IMPACTS OF THE CANADIAN DAIRY INDUSTRY IN 2015 UPDATE ON THE ECONOMIC IMPACTS OF THE CANADIAN DAIRY INDUSTRY IN 2015 Prepared for Dairy Farmers of Canada July 2016 Siège social : 825, rue Raoul-Jobin, Québec (Québec) Canada, G1N 1S6 Montréal : 201-1097,

More information

Pivotal Energy Development. Dana Grams President, Pivotal Energy Development

Pivotal Energy Development. Dana Grams President, Pivotal Energy Development Pivotal Energy Development Dana Grams President, Pivotal Energy Development 1 Forward-Looking Statements Statements in this presentation that are not historical facts, including statements regarding our

More information

Coralie Carter Sculley

Coralie Carter Sculley Coralie Carter Sculley NGA Regional Market Trends Forum May 5, 2017 Forward-Looking Statements / Non-GAAP Financial Measures This presentation includes forward-looking statements within the meaning of

More information

Meadow Creek West. Project overview:

Meadow Creek West. Project overview: Project overview: Meadow Creek West will be a steam assisted gravity drainage (SAGD) oil sands development in northeast Alberta. Meadow Creek West is an additional phase to our Meadow Creek project and

More information

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward

More information

ROYAL DUTCH SHELL PLC LNG CANADA FINAL INVESTMENT DECISION

ROYAL DUTCH SHELL PLC LNG CANADA FINAL INVESTMENT DECISION OCTOBER 2 ND 2018 ROYAL DUTCH SHELL PLC WEBCAST TO MEDIA AND ANALYSTS BY JESSICA UHL, CHIEF FINANCIAL OFFICER OF ROYAL DUTCH SHELL PLC, MAARTEN WETSELAAR, INTEGRATED GAS AND NEW ENERGIES DIRECTOR OF ROYAL

More information

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including

More information

PROFESSIONAL AFFILIATIONS

PROFESSIONAL AFFILIATIONS CURTIS W. FOSTER Mr. Foster, a Senior Principal with Long International, has a background that spans over 35 years of involvement in design, construction, and dispute resolution on over US$5 billion of

More information

Alaska LNG Concept Information. Alaska LNG. Overview. October

Alaska LNG Concept Information. Alaska LNG. Overview. October Overview October December 3, 2013 Project Overview Project Team BP, ConocoPhillips, ExxonMobil and TransCanada are working together to progress an project: 300+ people involved in project planning and

More information

Cautionary Note Regarding Forward-Looking Statements

Cautionary Note Regarding Forward-Looking Statements Third Quarter 2012 Earnings Conference Call November 5, 2012 1 Cautionary Note Regarding Forward-Looking Statements Certain information contained in this presentation ti is forward-looking information

More information

NEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS

NEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS NEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS VANCOUVER, BRITISH COLUMBIA February 14, 2017 - Golden Queen Mining Co. Ltd. (TSX:GQM; OTCQX:GQMNF) (the Company or Golden Queen )

More information

Appendix A. Project Description

Appendix A. Project Description Appendix A Project Description I. Project Summary 1. The proposed Jordan Cove LNG export terminal ( Jordan Cove ) is a facility designed to produce and export liquefied natural gas ( LNG ). Jordan Cove

More information

Cold Lake expansion project

Cold Lake expansion project Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing

More information

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE

AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE AMERICAS SILVER CORPORATION PROVIDES THIRD QUARTER PRODUCTION RESULTS AND SAN RAFAEL PROJECT UPDATE TORONTO, ONTARIO October 24, 2016 Americas Silver Corporation (TSX:USA) (OTCQX:USAPF) ( Americas Silver

More information

REFINING THE FUTURE SHIPPER PANEL. DAN GORDON, EVP Delek US

REFINING THE FUTURE SHIPPER PANEL. DAN GORDON, EVP Delek US REFINING THE FUTURE SHIPPER PANEL DAN GORDON, EVP Delek US Safe Harbor Provision Delek US Holdings, Inc. ( Delek US ) and Delek Logistics Partners, LP ( Delek Logistics ; collectively with Delek US, defined

More information

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011

North American Midstream Infrastructure Through 2035 A Secure Energy Future. Press Briefing June 28, 2011 North American Midstream Infrastructure Through 2035 A Secure Energy Future Press Briefing June 28, 2011 Disclaimer This presentation presents views of ICF International and the INGAA Foundation. The presentation

More information

GLOBAL SUPPLY CHAIN F I N A N C I A L C O M M U N I T Y P R E S E N T A T I O N M A Y 2 2,

GLOBAL SUPPLY CHAIN F I N A N C I A L C O M M U N I T Y P R E S E N T A T I O N M A Y 2 2, GLOBAL SUPPLY CHAIN JOEL BAXTER PRESIDENT & GENERAL MANAGER Forward-Looking Statement The presentations today will contain certain forward-looking statements," within the meaning of the federal securities

More information

Potash Supply Overview

Potash Supply Overview Potash Supply Overview Garth Moore President, PCS Potash Forward-Looking Statements This presentation contains forward-looking statements or forward-looking information (forward-looking statements). These

More information

Disclaimer. Confidential. Property of GNL Québec Inc All rights reserved.

Disclaimer. Confidential. Property of GNL Québec Inc All rights reserved. June 2017 Disclaimer - The material contained in this presentation is intended to be general background information on the Énergie Saguenay Project being developed by GNL Québec Inc., a wholly owned subsidiary

More information

ISA Calgary. September 26, 2013

ISA Calgary. September 26, 2013 ISA Calgary September 26, 2013 Canada s leading integrated energy company Focused on profitable growth and returning cash to shareholders The Suncor Advantage Largest reserves in the oil sands (1) Integrated

More information

Community Liaison Committee Meeting #1 Wednesday, March 25, 2015

Community Liaison Committee Meeting #1 Wednesday, March 25, 2015 TransCanada s Napanee Generating Station (NGS) Community Liaison Committee Meeting #1 Wednesday, March 25, 2015 1 Meeting Agenda Greetings Introduction of CLC Members Who is TransCanada? Napanee Generating

More information

Industry Perspectives on Oil and Gas Development in Canada s Arctic: Opportunities and Challenges

Industry Perspectives on Oil and Gas Development in Canada s Arctic: Opportunities and Challenges Industry Perspectives on Oil and Gas Development in Canada s Arctic: Opportunities and Challenges Paul Barnes, Manager - Atlantic Canada & Arctic Presentation to Nunavut Oil and Gas Summit Iqaluit, Nunavut

More information

Executive Summary. A literature review focusing on the potential issues associated with the exploration and extraction of petroleum;

Executive Summary. A literature review focusing on the potential issues associated with the exploration and extraction of petroleum; March 2016 Executive Summary Portrait of current and projected economic activity in the Quebec hydrocarbons sector by the Fédération des chambres de commerce du Québec (FCCQ) Pierre Emmanuel Paradis, AppEco

More information

New Zealand Energy Corp.

New Zealand Energy Corp. New Zealand Energy Corp. Investor Business Update November 2016 CAUTIONARY NOTES FORWARD-LOOKING INFORMATION This document contains certain forward-looking information and forward-looking statements within

More information

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018

OZ Minerals Update. Geoff Deans, Group Manager Social Performance. A modern mining company 29 AUGUST 2018 OZ Minerals Update Geoff Deans, Group Manager Social Performance 29 AUGUST 2018 A modern mining company Disclaimer This presentation has been prepared by OZ Minerals Limited (OZ Minerals) and consists

More information

Drilling Inside Municipal Boundaries What are the Issues?

Drilling Inside Municipal Boundaries What are the Issues? Drilling Inside Municipal Boundaries What are the Issues? SACPA October 3, 2013 Goldenkey Penny Project Reference S Presenters S David Hill S Tim Robillard S Representatives of Goldenkey s Penny Project

More information

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012 01 STONY MOUNTAIN PIPELINE Laricina will develop and follow an environmental protection plan that meets or exceeds

More information

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012 BUILDING CANADA S LARGEST GOLD MINE Production Early 2013 1 Mining Ready Summit October 23, 2012 Forward Looking Information This presentation contains certain forward-looking information as defined in

More information

Kinder Morgan Trans Mountain Expansion Project Spread 6

Kinder Morgan Trans Mountain Expansion Project Spread 6 Kinder Morgan Trans Mountain Expansion Project Spread 6 SA ENERGY GROUP INTRODUCTION 50/50 General Partnership between Robert B. Somerville and Aecon Utilities Combine the strength of two very successful

More information

ESTIMATING THE COST OF PIPELINE TRANSPORTATION IN CANADA Eugène Karangwa, Transport Canada

ESTIMATING THE COST OF PIPELINE TRANSPORTATION IN CANADA Eugène Karangwa, Transport Canada ESTIMATING THE COST OF PIPELINE TRANSPORTATION IN CANADA, Transport Canada INTRODUCTION Pipeline transportation is an important sector in the Canadian economy. Canada is a major energy producer in the

More information

MIC Overview of the MIC Hawaii Segment

MIC Overview of the MIC Hawaii Segment MIC Overview of the MIC Hawaii Segment December 2017 1 1. The contents of this presentation reflect financial and operating information through the period ended September 30, 2017, as reported on the Company

More information

Export Demand for Propane and Butane Platts 7 th Annual NGLs Conference

Export Demand for Propane and Butane Platts 7 th Annual NGLs Conference Export Demand for Propane and Butane Platts 7 th Annual NGLs Conference October 31, 2017 Forward - Looking Information This presentation contains forward-looking statements and forward-looking information

More information