Atlantic County Utilities Authority Wastewater Treatment Facility

Size: px
Start display at page:

Download "Atlantic County Utilities Authority Wastewater Treatment Facility"

Transcription

1 Atlantic County Utilities Authority Wastewater Treatment Facility

2 ACUA s Operates a Regional System 40 MGD Activated Sludge Treatment Plant 20 Regional Pumping Stations Ocean Outfall

3 ACUA Regional System Planned and developed in the 1970 s s in response to the contamination of the back bays. Shell fishing was banned in the back bays and intercostals waterways. The ACUA replaced smaller treatment plants in our member communities

4 Original ACUA Regional System Mainland Communities Sommers Point Linwood Northfield Egg Harbor Township Pleasantville Absecon Galloway Township Coastal Communities Longport Margate Ventnor Atlantic City Brigantine

5 ACUA Regional System Expanded in the 1990 s s to provide wastewater services to the Pineland s s designated regional growth areas in Mays Landing, Egg Harbor City and Galloway and Egg Harbor Townships. Coastal Alternative Communities Hamilton Township Egg Harbor City

6 Regional Wastewater System

7 City Island Plant 40 Million Gallons per Day Capacity

8 Wastewater Treatment Wet End Treatment Removal of solids and colloidal solids from wastewater Disinfection of treated effluent Discharge to Ocean Solids End Treatment Solids Thickening Incineration Ash Disposal

9 Influent Sources Pipelines from Collection System Trucked Septic Tank and Storage Tank Wastes

10 Trucked Wastewater Sampling and Testing Screening and Grit Removal

11 Preliminary Treatment Metering Screening for Rags and Debris

12 Primary Treatment Removal of Settleable Solids Water (Primary Effluent) Overflows Weirs Settleable Solids are removed from the bottom of the tank

13 Biological Treatment Removal of Colloidal Solids by Microorganisms

14 Secondary Clarification Treated Water overflows Weirs to the Effluent Equalization basin prior to discharge to the Ocean Biological Solids (microorganisms)settle to bottom and are returned to Aeration Tanks

15 Odor Control Covers on tanks where turbulent conditions exist control odors Odiferous air is removed from covered tanks and buildings and treated through Carbon Columns or Bio Filters

16 Effluent Discharge Treated Wastewater stored in Lagoon prior to Discharge to Ocean Treated Wastewater pumped to 4 mile Effluent Pipeline

17 Effluent Disinfection After Physical and Biological Treatment Sodium Hypochlorite is applied to the wastewater to disinfect the treated effluent prior to discharge to the Ocean.

18 Effluent Discharge After Physical and Biological Treatment and Disinfection flow is pumped over 4 miles to a point 1.5 miles into the Atlantic Ocean

19 What happens to the Solids removed from the Wastewater?

20 Solids Sources Primary Biosolids and Grease from Primary Treatment Wasted Biomass and Grease from Activated Sludge Process Trucked Biosolids and Greases from Outside Sources

21 Solids Thickening Centrifuges with the help of Polymer thicken wasted biological solids Gravity thickens primary solids

22 Solids Blending and Dewatering Thickened Biological Solids and Thickened Primary solids are blended and then Dewatered with Centrifuges

23 Dewatered Biosolids are then Incinerated Excess Incinerator Capacity is utilized by outside customers disposing of their Dewatered Biosolids and Greases

24 Dewatered Biosolids Incineration Dewatered Biosolids and greases are fed to the highly regulated incinerator where it is heated to 1500 degrees F and converted into ash and CO 2

25 How much electricity does it take to operate the Atlantic County Utilities Authority s Treatment Facilities? Approximately 55 Megawatt-hours of Electricity each day. That s equivalent to Approximately 1860 homes...acua s electric bill for last year was over $2.8million.

26 Why Solar and Wind Electric Costs account for over 15% of the Facilities annual Budget. Electric Costs have risen over 33% in the last 3 years. The Wind Turbine and Solar projects will stabilize over 50% of our Electrical Costs for the next 20 years.

27 Windmill Production The Windmills produce electricity only when the wind blows over 7 mph. The windmills only operate at their rated capacity with the wind speed is over 12 mph. Production rates vary as the wind varies. The windmills shut down at wind speeds over 40 mph.

28 Wind Power When the wind is blowing over 12 mph. The ACUA facility is completely powered by the wind.and The windmills can export 4.8 Megawatts to the local electric grid. During calm or gusty weather, when the windmills are not at peak capacity, the facility buys electricity from the local power grid.

29 Windpower Benefits Wind Power is a renewable energy source which will never run out. Wind Power production generates no air or water pollution. The ACUA can purchase wind generated electricity for 7.9 / kwh delivered for the next 20 years. Currently Electrical Grid prices are over 12 / kwh delivered and rising. Estimated $350,000 savings per year.

30 Solar Power The ACUA Solar Farm is the 2 nd largest facility of its type in New Jersey. The Solar Farm consists of over 2800 solar panels. Each solar panel can generate 175 watts of electricity. The Solar Farm is rated at 500 kwatts and should provide over 600,000 kwh annually. Solar Energy is expected to provide 3% of the Facilities Electricity.

31 Solar Power Benefits Solar Power is a renewable energy source which will never run out. Solar Power production generates no air or water pollution. The ACUA owns and operates the Solar Farm. The Total Project cost $3.9 M. Energy Rebates of $1.9 M were obtained from the New Jersey Board of Public Utilities. The solar panels will provide Electricity at rates lower than 5 per kwh for the next 20 years. Anticipated Savings exceed $35,000 per year

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831) FFR MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT PERMIT TO OPERATE 24580 SILVER CLOUD CT., MONTEREY, CA 93940 TELEPHONE (831) 647-9411 FAX (831) 647-8501 15018 OPERATION UNDER THIS PERMIT MUST BE

More information

Wastewater Treatment. Where does wastewater go when it leaves your house?

Wastewater Treatment. Where does wastewater go when it leaves your house? Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage disposals,

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan Oak Orchard Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy.3 a. Wet Weather Operation

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Chapter 5: Treatment Assessment Future Condition

Chapter 5: Treatment Assessment Future Condition 2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Capital Improvement Plan Update:

Capital Improvement Plan Update: Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

Description: D05_100_OVW_015_PlantOverview.htm Plant Overview Durham Plant Overview Last Update: October 30, 2013 Purpose:

Description: D05_100_OVW_015_PlantOverview.htm Plant Overview Durham Plant Overview Last Update: October 30, 2013 Purpose: D05_100_OVW_015_PlantOverview.htm Plant Overview Title: Durham Plant Overview Last Update: October 30, 2013 Purpose: To provide an updated layout of the Durham Advanced Wastewater Treatment Facility while

More information

Primary: Removal of a portion of the suspended solids and organic matter from the wastewater by gravity

Primary: Removal of a portion of the suspended solids and organic matter from the wastewater by gravity 1 Preliminary: Removal of wastewater constituents such as rags, sticks, floatables, grit, and grease that may cause maintenance or operational problems with the subsequent processes Primary: Removal of

More information

LYNN REGIONALWATER PULLITON FACILITY 2 Circle Avenue Lynn, MA Phone: (781)

LYNN REGIONALWATER PULLITON FACILITY 2 Circle Avenue Lynn, MA Phone: (781) LYNN REGIONALWATER PULLITON FACILITY 2 Circle Avenue Lynn, MA 01905-3037 Phone: (781) 592-7048 HISTORY The Lynn Water and Sewer Commission (LWSC) was created in 1982 by the City of Lynn in conjunction

More information

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018 Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties September 13, 2018 Agenda Opening remarks Eileen White, Director of Wastewater

More information

Green City, Clean Waters

Green City, Clean Waters Green City, Clean Waters Facility Concept Plan F o r t h e Southwest Water Pollution Control Plant Consent Order & Agreement Deliverable IV - c City of Philadelphia Combined Sewer Overflow Long Term Control

More information

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT Matthew Valade, P.E. July 25, 2014 Barboe.pptx Presentation Outline Project Background Why Dewater Croton Residuals Offsite?

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates five Wastewater Treatment Plants namely: Adelaide, Greenway, Oxford, Pottersburg

More information

Wastewater Treatment clarifier

Wastewater Treatment clarifier Wastewater Treatment Pretreatment During pretreatment, items would normally be removed that would hinder the further processes of treatment. Items commonly removed include roots, rags, cans, or other large

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

WASTEWATER TREATMENT (1)

WASTEWATER TREATMENT (1) Wastewater Engineering (MSc program) WASTEWATER TREATMENT (1) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 Anaerobic Digester Optimization with Bio-Organic Catalyst NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 Municipal Anaerobic Digester Optimization Program Index! Overview

More information

Wastewater Plant Tour. There Is Gold In Them There Plants

Wastewater Plant Tour. There Is Gold In Them There Plants Wastewater Plant Tour There Is Gold In Them There Plants Why Should I Be Interested In Wastewater Treatment? Every municipality has at least one treatment facility. Many manufactures will have treatment

More information

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers

More information

Liquid Waste Processing. Economic Times

Liquid Waste Processing. Economic Times 60 th Michigan Onsite Wastewater Conference Liquid Waste Processing Growing your Business in Tough Economic Times Thursday, January 13, 2011 1:00 Did anyone read the description of what I am going to be

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

Where does drinking water come from?

Where does drinking water come from? Water Quality Where does drinking water come from? When you think about where your drinking water comes from, it's important to consider not just the part of the river or lake that you can see, but the

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy....2 a.

More information

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier Bruce R. Johnson 1 *, Jennifer Phillips 2, Tim Bauer 3, Greg Smith 4, George Smith 5, John Sherlock 6

More information

2018 Wastewater Administrators Conference. Solids Management The Perfect Storm

2018 Wastewater Administrators Conference. Solids Management The Perfect Storm 2018 Wastewater Administrators Conference Solids Management The Perfect Storm January 26, 2018 Majid Khan PhD, Director of Operations, GLWA Dan Alford PE, Director of Engg. & Maint., GLWA Ed Hogan PE,

More information

Wastewater Treatment Works... The Basics

Wastewater Treatment Works... The Basics United States EPA 833-F-98-002 Environmental Protection May 1998 Agency Office of Water (4204) Wastewater Treatment Works... The Basics O ne of the most common forms of pollution control in the United

More information

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T Regarding a Modification to an NPDES Permit To Discharge to Waters of the State of Ohio for the Elyria Wastewater

More information

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Utility Fast Facts Average household uses 107,000 gallons of water each year. 1,851 gallons of water to refine

More information

TAHUNA WASTEWATER TREATMENT PLANT STAGE 2 UPGRADE PROJECT

TAHUNA WASTEWATER TREATMENT PLANT STAGE 2 UPGRADE PROJECT TAHUNA WASTEWATER TREATMENT PLANT STAGE 2 UPGRADE PROJECT Rob Crosbie 1, Humphrey Archer 1 and Brian Turner 2 1. CH2M Beca Ltd (rob.crosbie@beca.com, humphrey.archer@beca.com) 2. Dunedin City Council Abstract

More information

POTW s As An Emergency Option For Dairy Manure Disposal

POTW s As An Emergency Option For Dairy Manure Disposal POTW s As An Emergency Option For Dairy Manure Disposal A POTW s Perspective 2011 Manure Summit February 15 & 16, 2011 Lambeau Field Atrium Chris Stempa, Deputy Utilities Director City of Appleton Wastewater

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

Anaerobic Digester Optimization with Bio-Organic Catalyst

Anaerobic Digester Optimization with Bio-Organic Catalyst Anaerobic Digester Optimization with Bio-Organic Catalyst NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08 2/2/09 1 Municipal Anaerobic Digester Optimization Program

More information

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017 Dealing with Unexpected Wastewater Treatment Plant Disruptions February 16, 2017 Location Map WPCP History Original WPCP constructed on this site in 1928 consisting of primary treatment and chlorination;

More information

GHG Inventory Report February 2018 KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY

GHG Inventory Report February 2018 KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY KENT COUNTY REGIONAL RESOURCE RECOVERY FACILITY 2017 GREENHOUSE GAS (GHG) EMISSION INVENTORY FEBRUARY 2018 1 INTRODUCTION Greenhouse gases (GHG) are believed to contribute to the global warming phenomenon

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC.

CITY OF YUMA WASTEWATER TREATMENT PLANTS. Cactus Moon Education, LLC. CITY OF YUMA WASTEWATER TREATMENT PLANTS Wastewater Purify Processes Environment Influent Landfill Bacterial Micro-organism Biological Clarification Residual Anaerobic Methane Bio-Solids Vocabulary All

More information

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant Proposal by Russia to delete hot sub-spot 18.4 LAND 14/2009, Document 6/3/Rev.1 ATTACHMENT 1. Hot sub-spot name South-West Wastewater Treatment Plant 2. Location Block 2, 123, Volkhonskoye shosse, St.

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates six Wastewater Treatment Plants namely: Greenway, Pottersburg, Vauxhall, Adelaide,

More information

Using Process Optimization and Energy Audits to Reduce Energy Costs

Using Process Optimization and Energy Audits to Reduce Energy Costs Using Process Optimization and Energy Audits to Reduce Energy Costs PNCWA Annual Conference 23 October 2012 Ron Moeller Operations Services Leader Presentation Outline What is a process energy-audit? Energy

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Sanitary and Environmental Engineering I (4 th Year Civil)

Sanitary and Environmental Engineering I (4 th Year Civil) Sanitary and Environmental Engineering I (4 th Year Civil) Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University Wastewater Flow

More information

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX Municipal Wastewater Treatment Plant Site Visit Report Thursday, October 2, 2014 Prepared by: Elora Arana, Environmental Studies student Prepared for: Dr. Heather Wilkinson, Professor BESC 489/411 Texas

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

WEF Residuals and Biosolids Conference 2017

WEF Residuals and Biosolids Conference 2017 Challenges and Opportunities for Approaching Net Zero Energy and Improving Resiliency of a Unique Solids Handling Facility in California Irina Lukicheva, CH2M, Dan Frost, CCCSD, Nitin Goel, CCCSD, Peter

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

Department of Environmental Quality

Department of Environmental Quality EARL WUESTNICK Wastewater Specialist Bruce Lack Certification Specialist Department of Environmental Quality Operator Training and Certification Unit OPERATOR TRAINING AND CERTIFICATION UNIT For More Information

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 To: From: Steve McGowan, P.E., BCEE Project Manager, Malcolm Pirnie, Inc. Eric Wang, P.E. Project Engineer, Malcolm Pirnie, Inc. Date: Subject: August 11, 28 (Final) Madison MSD Project No. 84251 Malcolm

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration

Role of Entrant s Firm. »» Final Design»» Completion of Funding. »» Engineering Services During Applications. »» Plant Startup and Filtration ROLE OF OTHERS For the design focus of the project, key partners included:»» Mortenson Construction, Contractor»» Jacobs, Contract Plant Operator»» Portland Engineering and Controls, I&C The City of The

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

6.2 Umgeni Water Owned Wastewater Works

6.2 Umgeni Water Owned Wastewater Works 6. WASTEWATER 6.1 Overview Umgeni Water owns and operates the Darvill and Ixopo Wastewater Works (WWW), but manages a number of other WWW on behalf of Municipalities. Management contracts are in place

More information

Notice of Preparation

Notice of Preparation Notice of Preparation To: From: County of Sacramento Department of Environmental Review and Assessment 827 7 th Street, Room 220 Sacramento, CA 95814 (916) 874-7914 Contact: Dennis E. Yeast Subject: Notice

More information

The Municipality of North Grenville

The Municipality of North Grenville A solution is required to increase the peak flow capacity of the Kemptville WPCP, a conventional activated sludge process, within a small footprint while maintaining good effluent quality. Location: Kemptville

More information

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

Frequently Asked Questions

Frequently Asked Questions Why is the City doing this project? The wastewater treatment plant at Post Point is designed to remove solids from our sewage so the water can be cleaned before discharging it into Bellingham Bay. Currently

More information

Closing the Gap Reaching for Energy Independence in Water Reclamation

Closing the Gap Reaching for Energy Independence in Water Reclamation Closing the Gap Reaching for Independence in Water Reclamation Graham Juby, P.E. July 27, 2012 Power use in POTWs is growing steadily... more than 25 billion kwh in 2015* * Electrical Power Research Institute

More information

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM APPLICATION INSTRUCTIONS Please print or type. In keeping with the privacy provisions of the Nova Scotia Freedom of Information & Protection

More information

Wet Weather Planning for Wastewater Treatment Plants

Wet Weather Planning for Wastewater Treatment Plants Wet Weather Planning for Wastewater Treatment Plants June 23, 217 Peak Flow Management: Collection vs. Treatment Collection System Peak Flow Management Single 24 hour design storm I/I reduction SSO elimination

More information

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7 th Biennial Meeting of the Lake Erie Millennium Network Status of Lake Erie Management Needs & Research Questions

More information

Wastewater treatment objecives

Wastewater treatment objecives Wastewater treatment objecives Removal of suspended and floatable materials Degradation of biodegradable organics Removal of nutrients Elimination of priority pollutants Elimination of pathogenic organisms

More information

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES Santa Clarita Valley Joint Sewerage System SCVJSS Conveyance System Solids Processing and Biosolids Management CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Black River Wastewater Treatment Plant

Black River Wastewater Treatment Plant Black River Wastewater Treatment Plant Energy Challenges Within An Aging Plant Alex Berki & Joseph Carbonaro City of Lorain, Ohio Background Built as a Primary Treatment Facility in 1955 with a design

More information

WWTP Energy Audits Provide System-Wide View to Reducing Energy and Optimizing Processes

WWTP Energy Audits Provide System-Wide View to Reducing Energy and Optimizing Processes WWTP Energy Audits Provide System-Wide View to Reducing Energy and Optimizing Processes Jane Atkinson, AECOM Anthony Fiore, NYC Mayor s Office of Sustainability Rob Pape, AECOM 2016 JOINT ENERGY CONFERENCE

More information

Chapter 9: Alternative Analysis

Chapter 9: Alternative Analysis Chapter 9: Alternative Analysis 9.1 Introduction The development and evaluation of alternatives are key elements in the facilities planning process. The purpose of this chapter is to evaluate alternatives

More information

East Coast P Removal Technology Performance Summary

East Coast P Removal Technology Performance Summary East Coast P Removal Technology Performance Summary Charles B. Bott Hampton Roads Sanitation District NonReactive Phosphorus Workshop Spokane, Washington August 11 12, 2009 Acknowledgements Numerous slides

More information

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.

City of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C. City of Hudson Columbia County, New York Wastewater Treatment Plant Improvements Facility Plan Prepared By: Delaware Engineering, P.C. 28 Madison Avenue Extension Albany, New York 12203 (Phone) 518-452-1290

More information

Willful waste makes woeful want? Greening of the recycling practices of wastewater at the Hoosic Water Quality District, Williamstown, MA.

Willful waste makes woeful want? Greening of the recycling practices of wastewater at the Hoosic Water Quality District, Williamstown, MA. Willful waste makes woeful want? Greening of the recycling practices of wastewater at the Hoosic Water Quality District, Williamstown, MA. Zara Currimjee ENVI 215 - Renewable Energy and Sustainable Campus

More information

Conceptual Design for a Future Wastewater Treatment Plant

Conceptual Design for a Future Wastewater Treatment Plant Wastewater Master Plan DWSD Project No. CS-1314 Conceptual Design for a Future Wastewater Treatment Plant Technical Memorandum Original Date: April 1, 2003 Revision Date: September 2003 Author: CDM Table

More information

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006

Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: Issue Date: October 23, 2006 Client: City of Pontiac Project Name: Regional WWTP Feasibility Location: Pontiac, MI Project Number: 13649553 Issue Date: October 23, 2006 Subject: WWTP Condition Assessment Auburn Plant 1. Grit Removal:

More information

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS

Managing the Largest Extended Wet Weather Event on Record at TRA CRWS Managing the Largest Extended Wet Weather Event on Record at TRA CRWS April 21, 2016 Julia J. Hunt Trinity River Authority of Texas David R. Jackson, P.E., BCEE Freese and Nichols, Inc. TRA CRWS Treatment

More information

Center Sanitation District

Center Sanitation District EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency STATE OF MINNESOTA Minnesota Pollution Control Agency MUNICIPAL DIVISION PUBLIC NOTICE OF INTENT TO REISSUE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)/ STATE

More information

ES.1 Solids Master Planning Background and Goals

ES.1 Solids Master Planning Background and Goals Executive Summary The Arlington County Water Pollution Control Plant (WPCP) treats incoming wastewater flows for residents, businesses, and government agencies in the Arlington County sewer service area

More information

By way of background, Earl reviewed the bigger picture of the work underway at the plant.

By way of background, Earl reviewed the bigger picture of the work underway at the plant. Ann Arbor Wastewater Treatment Plant Meeting Summary Public Meeting: Odor Control Study June 15, 2006 Attendees Thirteen members of the public (representing 10 Ann Arbor and Ann Arbor Township households)

More information

Industrial Services.

Industrial Services. Industrial Services www.hcr-llc.com HCR provides sludge removal and waste minimization services with expertise in the full suite of dewatering services, customized to accomplish each customer s specific

More information

Module 1: Introduction to Wastewater Treatment Answer Key

Module 1: Introduction to Wastewater Treatment Answer Key Module 1: Introduction to Wastewater Treatment Answer Key What are some examples of different interest s various audiences may have? Officials of regulatory agencies or other operators would want to be

More information