Francois Rodigari, Director of Water Quality and Environmental Services, SJWC Mike Ambrose, Manager of Regulatory Compliance, EBMUD
|
|
- Susanna Heath
- 5 years ago
- Views:
Transcription
1 Francois Rodigari, Director of Water Quality and Environmental Services, SJWC Mike Ambrose, Manager of Regulatory Compliance, EBMUD
2 Potable water discharges covered by exception in storm water permits Water agencies collaborated with SF RWQCB on Municipal Regional Permit in 2009 Water agencies without storm water systems not listed in the permit
3 EBMUD received ACL Complaint for discharging without a permit in February 2011: January 2010 Main break and repair near Reliez Valley Creek in Lafayette August 2010 Release of 4,200 gallons of chlorinated water to Sausal Creek in Oakland $76,600 fine negotiated to $72,000 Regional Board claimed non-stormwater discharges must have permit under Clean Water Act
4 Eight utilities agreed to share the funding for a Permit Writer Half the cost divided between EBMUD, SFPUC and SJWC Remainder shared between ACWD, California Water Service Company, CCWD, Marin Municipal, and Zone 7 $298,833 estimated total cost Expenditures through August 2013 of $63,000
5 EBMUD entered into a contract with ABAG Seven utilities entered into a funding mechanism contract with EBMUD. ABAG hired the permit writer for the San Francisco Bay Regional Water Quality Control Board
6 SFBRWQCB offered to issue a No Enforcement letter detailing interim guidance that non-permitted dischargers would have to follow. Letter was to address the regulatory uncertainty created for the utilities seeking a permit and provide interim compliance guidelines. Letter was not finalized due to potential compliance differences between letter and eventual permit.
7 SFBRWQCB offered guidance similar to Municipal Regional Permit (MRP) section C.15.b.iii Section C.15.b.iii addresses potable water discharges. Under the MRP potable water discharges are conditionally exempt (from discharge prohibitions) non-stormwater discharges
8 Types of Water: Drinking Water (Potable) Raw Unaltered Water Raw Water Altered to make it Potable Unpolluted Pumped Ground Water Potable Discharges due to Infrastructure Failures That Discharge into: Surface Waters Storm Drain Other Conveyance System that Could Flow into Surface Water
9 Pumped Ground Water from Aquifer Reclamation Programs Pumped Ground Water not Specifically Included Water Discharges or Transfers covered by the Federal Water Transfer Rule
10 Planned Discharges Defined as Routine Operations and Maintenance Activities from: Disinfection of Mains Cleaning of Tanks Distribution System Flushing Reservoir Dewatering Well maintenance including blow offs but not development
11 Unplanned Discharges Leaks Breaks Emergency flushing Overflows
12 Advanced Notification for Planned Discharges: Equal or greater than 250,000 gallons/day Total volume equal or greater than 500,000 gallons Notify the Regional Board and other potentially affected local agencies at least one week in advance.
13 Table 1. Discharge Notification Data 1 Incident Name or Work Order Number 2[a] Water agency, contact name, phone number and address 3[a] Address and nearest cross street of discharge point 4 Reason for discharge or type of discharges 5 Receiving water body(ies) 6 Date(s) of discharge 7 Time of discharge (in military time) 8 Estimated duration of discharge (hours or minutes, as applicable) 9 Estimated volume (gallons) 10 Estimated flow rate (gallons per minute)[b] Monitoring plan for the discharges and receiving water (if receiving water monitoring is infeasible 11 or is not practicable the water purveyor should provide justification) Notes: [a] These items are not part of the MRP notification requirements. [b] The flow unit in the MRP is gallons per day.
14 1. Discharges Causing Significant or Imminent Harm. Defined as aquatic impacts (fish kills) or when Discharge Might Endanger Public Health or Safety. Discharge Directly into Surface Water Significant Flooding of Roadways and Property Public or Private Infrastructure Damage 2. Discharge of Special Concern. TCR concentration 0.05 mg/l Volume > 50,000 Gallons
15 Significant or Imminent Harm Discharges. Notify as soon as possible but no later than 2 hours after becoming aware of discharge. Notify Cal OES Regional Board Spill Hot Line Other Local Agencies Special Concern Discharges. Notify as soon as possible but no later than 24 hours after becoming aware of discharge Regional Board Submit a report to the Regional Board no later than 5 days after becoming aware of discharge
16 Written (5-Day) Report [a] 1 Same notification data as for planned discharges 2 Description of the discharge and its cause (if known) Discharge duration, including exact dates and times (in military time); if the discharge 3 has not been stopped, report on the anticipated time it is expected to continue 4 Field crew arrival time to assess impacts and implement response/corrective actions 5 Corrective actions implemented 6 Description of adverse impacts observed (if any) 7 Summary of available monitoring results Description of steps taken or planned to reduce, eliminate, and prevent reoccurrence of 8 similar discharge Photographs of any impacts visually observed and site conditions after field crew 9 response operations have been completed [a] Notes: [a] The MRP does not specify the 5-day written report content to this level of detail.
17 Monitor All Planned Discharges Monitor 10% of Unplanned Discharges Water Quality Parameter Benchmark or Numerical Limit? Total Chlorine Residual ph 0.05 mg/l using the field test (Standard Methods 4500-Cl F and G) or equivalent 6.5 to 8.5 Standard Units Turbidity of 50 NTU post-bmps, or limit increase in turbidity above background level as follows: Turbidity Ambient Turbidity (NTU) Maximum Increase (NTU) <50 units 5 units, maximum units 10 units, maximum >100 units 10% of background, maximum
18 Visual Monitoring of the receiving water body when it is safe to do so to document the following: 1. No excessive turbidity 2. No erosion of stream bank and channel 3. No sediment plume. 4. Provide justification if visual monitoring is not feasible. Receiving Water Monitoring if a discharge monitoring result is not within the applicable water quality benchmarks. If receiving water monitoring is not feasible the water purveyor should provide justification.
19 Fortify BMPs used at Discharge Site if benchmarks are not met Annual Compilation of all Discharge Data Annual Reporting to the Regional Board by March 1 Regional Board may require to provide data at any time.
20 Reporting Parameters 1 Incident name or work order number 2 Contact name, phone number and address [a] 3 Address and nearest cross street of discharge point a 4 Reason for discharge 5 Receiving water body 6 Date(s) of discharge Units for Water Quality Parameters 7 Duration of discharge Hours or minutes, as appropriate 8 Estimated volume Gallons 9 Estimated flow rate Gallons per minute [b] 10 Total chlorine residual mg/l 11 ph Standard units Turbidity of receiving water at point of discharge and within 50 to 100 feet upstream and downstream of discharge, if feasible Visual observations to document receiving water conditions for turbidity, sedimentation, or erosion impacts from the discharge NTU Field notes of observations and photographs [a] 14 Description of BMPs implemented, and corrective actions if applicable 15 Date and time of discharge discovery Military time 16 Time water agency was notified Military time 17 Inspector arrival time Military time 18 Responding crew arrival time. Military time
21 Monitoring Requirements (frequency and parameters to be measured) Surveys of Receiving Waters in an Urban Environment Numerical Limits instead of Benchmarks Notification Requirements
22 Monitoring Requirements: Proposed frequency may require additional staffing Monitoring for DO and ph is not necessary. DO monitoring should only be required when dechlorinating agents known to cause oxygen depletion are used. ph does not fluctuate during a potable water discharge. Basis for requiring monitoring throughout the discharge is not understood.
23 Surveys of receiving waters in an urban setting can be very difficult. Storm sewers are not well mapped and receiving waters may be miles away from discharge. Monitoring of receiving waters may be dangerous because of conditions related to weather, time of day, and accessibility.
24 Proposals have been made to set numerical limit for Total Chlorine Residual, ph, and Turbidity The Water Board is not required to incorporate numerical limit(s) in the permit If the Water Board pursues numerical limit these must be derived from available BMP performance data. These data are not available at this time. Field MLs for the numeric limits have not been scientifically derived and therefore violations could be issued for false positives.
25 Notification requirements involving: Public Outreach Plan Public Participation Program (First Responder) Signage to inform the public of the nature of the discharge Hotline or website updates would be onerous and are not warranted for low threat discharges.
26 Issue draft multi regional permit (Tentative Order) for public review: late February (45 day review period) Public comments due: mid April Finalize permit for adoption by SWRCB: mid May through June Consider permit for adoption by SWRCB: After June (probably in July) In Region 2, monthly meetings with water agencies stakeholder group are being conducted as draft permit is being prepared, through permit adoption and onward
27 Actively Work with Regulators to Convey that: Planned potable water discharges are performed to protect public health Utilities strive to minimize unplanned discharges, respond with a priority to restore service, and protect public health & safety. If numerical limits are set they must be based on achievable and measurable goals. MLs for numerical limits must be scientifically derived.
28 Protect Receiving Water Quality by: Dechlorinating Sediment control Erosion control Permit to potentially require the development of a BMPs Plan
29 BMPs Plan to Include the Following Elements: Communications Plan (internal and external) Public Outreach Plan BMP Objective Standard Operating Procedures for control and monitoring of TRC, ph, and Turbidity. Standard Operating Procedures for Receiving Water Monitoring Training Procedures and Records Identification of Responsible Person for Planned and Unplanned Discharges
30 Suggested BMPs Include BMPs Outlined in the AWWA Cal Nevada 2005 BMP Manual and include: Dechlorination Solutions Drain Inlet Protection Erosion Control
31 Standard gravel bags with protective fabric over Inlet
32 Planned Discharge from Main Replacement. Trash Pump in perforated 5 gallon bucket over gravel bed with plastic sheeting to protect trench sides.
33 In-line dechlorination to three racks trailer with bag filters.
34 Tanks for dechlorinating superchlorinated (250 ppm TCR) water for discharge to sewer at 50gpm
35 Dechlorination Mechanism for Overflows (up to 100,000 gallons at 1mg/L TCR
36 Rigid DI Insert
37 Sediment Bags
38 Water utilities are in the business of delivering safe and pleasant drinking water Water utilities consider themselves environmental stewards Potable water discharges can be mitigated but are unavoidable Potable water discharges are low threat discharges Utilities want a permit that protects the environment, but is reasonable
Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5
Potable Water Discharges NPDES Permit Update for Regions 2, 4 and 5 Francois Rodigari, Director of Water Quality and Environmental Services SFPUC Annual Technology Transfer Workshop 11/13/2013 Originally
More informationSANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM
SANTA CLARA VALLEY URBAN RUNOFF POLLUTION PREVENTION PROGRAM Water Utility Operation and Maintenance Discharge Model Pollution Prevention Plan (WUDPPP) Revised By: C15b Water Utility AHTG Management Committee
More informationBMP FACT SHEET DF-1 HOA Annual Self-Certification Report
PURPOSE: Public and privately owned and maintained stormwater conveyance systems collect and transport urban runoff and storm water that may contain certain pollutants. These pollutants may accumulate
More informationMeWUA Presentation February 7, 2018
MeWUA Presentation February 7, 2018 Development of this BMP Manual is directed at two groups: 1. Those water systems that currently have either part or all of their system within an MS4 community 2. All
More informationPractical Guidance to Manage Drinking Water System Releases CA-NV AWWA Annual Fall Conference 2014, Reno October 21, 2014
Practical Guidance to Manage Drinking Water System Releases CA-NV AWWA Annual Fall Conference 2014, Reno October 21, 2014 Presented by Marian J. Gonzalez OUTLINE Drinking Water System Releases Concerns
More informationStep 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.
Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is
More informationEric Agnew, Environmental Investigator TCEQ Region 4
Eric Agnew, Environmental Investigator TCEQ Region 4 TCEQ Region 4 Map TCEQ Mission Statement The Texas Commission on Environmental Quality strives to protect our state's public health and natural resources
More informationHistory of Surface Water Regulation and Best Management Practices Implementation for Drinking Water System Releases
History of Surface Water Regulation and Best Management Practices Implementation for Drinking Water System Releases CA-NV Section, AWWA Fall Conference 2014 Golden State Water Company Dino Orbiso Senior
More informationStormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities. Olmsted County Environmental Resources Department
Stormwater Pollution Prevention Training For Olmsted County Solid Waste Facilities Olmsted County Environmental Resources Department October 2011 Why? This stormwater training program was developed to
More informationIV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY
IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to
More informationCentral San Overflow Response. Maintenance Supervisor
Central San Overflow Response Dante Marchetti Maintenance Supervisor April 23, 2009 The cities we serve Alamo Clyde Parts of Concord Danville Lafayette Parts of Martinez Moraga Orinda Pacheco Pleasant
More informationWhitewater River Region SWMP Appendix L
Whitewater River Region SWMP Appendix L BMPs for Firefighting Agency Activities January 2015 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies
More informationAPPENDIX G Fire BMPs
APPENDIX G Fire BMPs BEST MANAGEMENT PRACTICES Plan for URBAN RUNOFF MANAGEMENT PARTICIPATING RIVERSIDE COUNTY FIRE FIGHTING AGENCIES City of Corona Fire Department City of Hemet Fire Department City of
More informationCity of Grand Junction Illicit Discharge Detection and Elimination Manual
City of Grand Junction Illicit Discharge Detection and Elimination Manual A. IDDE Program Goals The goal of the Illicit Discharge Detection and Elimination (IDDE) Program is, to the maximum extent practicable,
More informationBMPs: Best Management Practices are water pollution control practices.
11.30 EROSION AND SEDIMENT CONTROL ENTIRE SPECIFICATION IS AN ADDITION BELOW The Contractor s attention is directed to Section 20, Erosion Control and Highway Planting, Section 7-1.01G, Water Pollution,
More informationCHAPTER 5. NPDES PHASE II EVALUATION
CHAPTER 5. NPDES PHASE II EVALUATION A Stormwater Management Program for Medford was developed and submitted to the DEQ to meet requirements of the NPDES Phase II program. Phase II regulations require
More informationContractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector
Contractors, Illicit Discharges, & Best Management Practices Chris Allen Stormwater Inspector What is an Illicit Discharge? Georgetown County Stormwater Ordinance defines an Illicit Discharge as: Any activity
More informationSSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter
Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some
More informationSTORMWATER MANAGEMENT PROGRAM. Table of Contents
STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public
More informationStormwater Regulatory Landscape at Construction Sites
Stormwater Regulatory Landscape at Construction Sites Peter Schultze Allen EOA, Inc. Construction Inspection Workshop May 6, 2015 Outline of Presentation Regulatory Background Current Municipal Regional
More informationTOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW
TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW Land development projects and other land use conversions, and their associated changes to land cover, permanently alter the hydrologic response of local watersheds
More informationFish Kill from Hyper-Chlorinated
Fish Kill from Hyper-Chlorinated Line Flush A Tale of Illicit Discharge Detection and Elimination! Matthew Hendrix, CPESC Stormwater Specialist City of Denton Watershed Protection Timeline of Events 940-484-SPIL
More informationAuburn and Lewiston s Hydrant Flushing Considerations
Auburn and Lewiston s Hydrant Flushing Considerations The Drainage System Drainage is not the sewer we often think of, but it is an underground system of pipes that maintains our quality of life. Drainage
More informationEngineering Department
Engineering Department Stormwater Mission: To provide for the efficient and effective cleaning and repair of the stormwater collection system and implement the federally mandated Stormwater Pollution Prevention
More informationTraining Program Background
Training Program Background The purpose of this presentation is to provide guidance for identifying and tracing illicit non-stormwater discharges into the City of St. Petersburg s separate stormwater sewer
More informationThe Village of Wellington NPDES Guidance/Reference Document
The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the
More informationG. HYDROLOGY Existing Conditions
G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached
More informationSECTION STORMWATER POLLUTION PREVENTION
PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02133 STORMWATER POLLUTION PREVENTION A. Prohibit illicit discharge (non-rainwater) into the storm drain system. B. Construct any and all necessary systems to
More informationBeth Baldwin Watershed Management Planning Specialist Contra Costa Clean Water Program April 30, 2015
Beth Baldwin Watershed Management Planning Specialist Contra Costa Clean Water Program April 30, 2015 Reissuance of Municipal Regional Permit (MRP) Current MRP Expired November 30, 2014 Received Letter
More informationAppendix E - Element 6: (Overflow Emergency Response Plan) APPENDIX E Element 6 (Overflow Emergency Response Plan) Supporting Documents
APPENDIX E Element 6 (Overflow Emergency Response Plan) Supporting Documents 1. Overflow Emergency Response Plan 2. List of Contacts for Overflow Emergency Response Plan 3. Procedures for Estimating the
More informationRevised Total Coliform Rule (RTCR) Level 1 Assessment Form
Revised Total Coliform Rule (RTCR) Level 1 Assessment Form Public Water System (PWS) Information PWS Name: Assessment Trigger Date: Completion Date: PWS ID: Level 1 Assessment Information Both the Level
More informationWelcome The purpose of this information is to give you an opportunity to:
Welcome The purpose of this information is to give you an opportunity to: Learn how the Ada County Highway District (ACHD) is meeting requirements and milestones in our Phase II Stormwater Management Plan,
More informationCalifornia Hazardous Materials Spill / Release Notification Guidance
California Hazardous Materials Spill / Release Notification Guidance To Report all significant releases or threatened releases of hazardous materials: First Call: 9-1-1 (or local emergency response agency)
More informationStormwater Management Regulation & Implementation Overview
Stormwater Management Regulation & Implementation Overview Green/Duwamish Watershed Stormwater Strategy Workshop May 4, 2016 Rachel McCrea, Water Quality Program Brief Regulatory Context: Foundation concepts
More informationTABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...
TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed
More informationCITY OF MANASSAS NPDES PHASE II STORMWATER PERMIT VSMP SMALL MS4 PROGRAM PLAN MINIMUM MEASURES AND BEST MANAGEMENT PRACTICES
Public education Publish an article that addresses stormwater issues such as recycling, yard waste collection, hazardous waste handling, and illegal discharges Publish at least 2 articles a year in a local
More information3.10 Hydrology and Water Quality. Environmental Setting
3.10 Hydrology and Water Quality This section describes the potential hydrology and water quality impacts associated with the proposed changes to the approved project. Environmental Setting This section
More informationThe Stormwater Management Plan
Introduction The University of Alabama has been issued a National Pollutant Discharge Elimination System (NPDES) permit for stormwater discharges from regulated small municipal separate storm sewer systems
More informationA Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June
A Primer on Stormwater Management, your Facility and the Chesapeake Bay Tom Schueler Chesapeake Stormwater Network June 5. 2017 Key Themes Why do we need to be concerned about Stormwater? What are all
More informationOffice of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 07/2016)
STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than
More informationSTORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No
STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total
More informationCity of Tacoma Stormwater Management Program Assessment. Attachment B3
City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness
More informationPart 2.0 Non-Numeric Effluent Limitations
2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf
More informationHome Remodeling Projects
Should your project require a Standard Urban Stormwater Mitigation Plan (SUSMP), please see the City of Pomona s Standard Urban Stormwater Mitigation Plan (SUSMP) Pamphlet Best Management Practices For
More informationAlmonte Sanitary District. Sanitary Sewer Overflow Response Plan. Revision No. 2
Almonte Sanitary District Sanitary Sewer Overflow Response Plan Revision No. 2 Prepared by: Water andenvironment Revised: August 2009 Original: October 2008 Sanitary Sewer Overflow Response Plan Table
More informationIllicit Discharge Detection and Elimination How to Conduct an Investigation
Illicit Discharge Detection and Elimination How to Conduct an Investigation Nick Ajluni Environmental Inspector II City of San José Watershed Enforcement May 26, 2016 Topics Pre Field Preparation Equipment
More informationNebraska Department of Environmental Quality
Reuel Anderson and Travis Porter Reuel Anderson and Travis Porter Nebraska Department of Environmental Quality Federal Water Pollution Control Act Amendments(1972) Established the core of the program
More informationMarch 20, Via electronic mail to RE: Bay Area MS4 Trash Load Reduction Plans (2012) Dear Mr.
March 20, 2012 Mr. John Muller, Chair Attn: Mr. Dale Bowyer San Francisco Regional Water Quality Control Board 1515 Clay Street, Suite 1400 Oakland, CA 94590 Via electronic mail to dbowyer@waterboards.ca.gov
More informationCity of Waukegan, Illinois
City of Waukegan, Illinois NPDES Phase II Stormwater Program Stormwater Pollution Prevention Plan Public Works Facility July 2011 City of Waukegan, Illinois Stormwater Pollution Prevention Plan for the
More informationRainy Season Preparation & Storm Channel Maintenance
Rainy Season Preparation & Storm Channel Maintenance City Efforts Thorough Review of the storm water system Documentation of system conditions Now part of selection criteria or maintenance Full public
More informationCITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION
CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION Community Development Department 949 E 2 nd Ave Durango, CO 81301 (970) 375-4810 fax (970) 375-4848 Contact Information City of Durango
More informationRichardson Bay Sanitary District. Sanitary Sewer Overflow Response Plan. Revision No. 2
Richardson Bay Sanitary District Sanitary Sewer Overflow Response Plan Revision No. 2 Prepared by: Water andenvironment Revised: August 2009 Original: October 2008 Sanitary Sewer Overflow Response Plan
More informationSTORM WATER MANAGEMENT STANDARDS DRAFT
STORM WATER MANAGEMENT STANDARDS 1. Storm Water Management Plans (SWMP) - All development activity that is required to have a permit for land disturbing shall have an approved Storm Water Management Plan
More informationStormwater Management Program
Stormwater Management Program Revised March 2012 For Use In NPDES Phase II Implementation for Secondary Permittees. Stormwater Management Program Table of Contents Introduction... 3 CDID #1 Background...
More informationTamalpais Community Services District. Sanitary Sewer Overflow Response Plan. Revision No. 2
Tamalpais Community Services District Sanitary Sewer Overflow Response Plan Revision No. 2 Prepared by: Water andenvironment Revised: August 2009 Original: October 2008 Sanitary Sewer Overflow Response
More informationCity of Texarkana, Arkansas. Storm Water Pollution
City of Texarkana, Arkansas Storm Water Pollution STORM WATER GUIDE What is Storm Water Pollution? Stormwater can provide a toxic discharge which can enter into a lake, river or coastal water system. As
More informationStormwater Pollution Prevention Training Arlington Public Schools August 8, 2014
Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014 Diana Handy AC DES OSEM Overview Stormwater 101 Regulations / Permits Stormwater Pollution Illicit Discharges Pollution
More informationAlmonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on 08/28/06
Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on 08/28/06 EXECUTIVE SUMMARY: This Sewer System Management Plan (SSMP) has been prepared in compliance
More informationSewerage Agency of Southern Marin. Sanitary Sewer Overflow Response Plan. Revision No. 2
Sewerage Agency of Southern Marin Sanitary Sewer Overflow Response Plan Revision No. 2 Prepared by: Water andenvironment Revised: August 2009 Original: October 2008 Sanitary Sewer Overflow Response Plan
More informationGuidelines for Erosion & Sediment Control (ESC) Bylaw
Economic Development & Planning Services Community Sustainability Guidelines for Erosion & Sediment Control (ESC) Bylaw For development sites that are exempted from the ESC Submission Requirements Community
More informationStormwater. General Awareness Training
Stormwater General Awareness Training Water Regulatory History 1972 Congress enacts Clean Water Act Regulates wastewater pollution 1987 Congress amends Clean Water Act Stormwater pollution regulation added
More informationWater and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan
Water and Environment Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan December 11, 2006 Presentation Outline Purpose of IRWM Planning Status of Plan
More informationNina Ruiz. Tim, If either you or Nina have any further questions please feel free to contact me. Thank you.
Nina Ruiz From: Sent: To: Cc: Subject: Attachments: John Chavez Thursday, February 15, 20184:02 PM 'tcrawford@bbawater.com' Nina Ruiz Low Risk Discharge to Land 7.2017 revision.pdf Low Risk Discharge to
More informationSTORMWATER UTILITY ANNUAL REPORT
CITY OF ARVADA 2002 STORMWATER UTILITY ANNUAL REPORT Produced by the City of Arvada Public Works Department March 2003 CALENDAR YEAR 2002 CITY OF ARVADA S STORMWATER UTILITY ANNUAL REPORT As of 2002, the
More informationMINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014
MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of
More informationSECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION
SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul
More information20. UTILITIES AND SERVICE SYSTEMS
June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.
More informationVILLAGE OF LIONS BAY DRINKING WATER QUALITY ANNUAL REPORT
VILLAGE OF LIONS BAY DRINKING WATER QUALITY ANNUAL REPORT FY 2014 TABLE OF CONTENTS Contents INTRODUCTION 1 GENERAL DESCRIPTION 2 LICENSES 2 SOURCE WATER 3 ISSUES 3 CHALLENGES 3 TESTING & RESULTS 4 WATER
More informationWhitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities
Whitewater River Region SWMP APPENDIX L June 2009 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies for management of Urban Runoff in the Whitewater
More informationWATER POLLUTION CONTROL PLANT
WATER POLLUTION CONTROL PLANT Welcome to the Sunnyvale Water Pollution Control Plant For 60 years, Sunnyvale s Water Pollution Control Plant has worked tirelessly 24 hours a day and 7 days a week. Rain
More information3F. Hydrology and Water Quality
This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts
More informationMUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM
MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) STORMWATER MANAGEMENT PROGRAM Last Update February 2018 Table of Contents Table of Contents... 2 I. PUBLIC EDUCATION AND OUTREACH PROGRAM... 3... 3 Educational
More informationChapter 3 Previous Studies
Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the
More informationS.O.P. No. HMD
Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT
More informationPlaza and Sidewalk Cleaning
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Pollutants on sidewalks and other pedestrian traffic areas and plazas are typically due to littering and vehicle use. This
More informationHudson Valley Community College Policy to Prohibit Illicit Discharges, Activities and Connections to Separate Storm Sewer System.
Hudson Valley Community College Policy to Prohibit Illicit Discharges, Activities and Connections to Separate Storm Sewer System November 12, 2007 SECTION 1 PURPOSE/INTENT The purpose of this Policy is
More information6.13 Utilities and Service Systems
6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are
More informationUtilizing a No-Discharge Flushing Truck
Utilizing a No-Discharge Flushing Truck Successes and Challenges in San Jose Dr. Susan K. Willis, Water Quality Superintendent Casey Claborn, Water Quality Engineer What is a NO-DES Truck? A replacement,
More informationStorm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping
DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping August 20, 2015 APWA Mid-Atlantic Lunch-n-Learn Agenda
More informationDRINKING WATER SYSTEM. Summary Report toronto.ca/water
DRINKING WATER SYSTEM Summary Report 2017 toronto.ca/water R.C. Harris WTP 2017 Summary Report 2017 Summary Report Toronto (R.C. Harris) Water Treatment Plant Contents: 1.0 General Overview 2.0 System
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationJim Bertolacini WDNR Storm Water Program Coordinator 608/
Jim Bertolacini WDNR Storm Water Program Coordinator 608/264-8971 Jim.bertolacini@wisconsin.gov This document is intended solely as guidance, and does not contain any mandatory requirements except where
More informationFF-8 MINOR CONSTRUCTION
FF-8 MINOR CONSTRUCTION The matrix below identifies required activity-specific Minimum Designated Best Management Practices (BMPs) and Pollution Prevention Methods (PPMs) for Municipal Minor Construction
More informationCITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:
CITY OF CHICO Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Address: Building Permit Number: What is this document for? The City s Phase II MS4 NPDES General
More informationCity of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects
Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Name: Page intentionally left blank. - 2 - What is this document for? The City s Phase II MS4 NPDES General Permit
More informationSurface Water. Solutions for a better world
1 Surface Water Solutions for a better world Our Surface Water Services Expertise Growing worldwide awareness of water scarcity has encouraged water preservation programs, better irrigation techniques
More informationMS4 NPDES Permit Stormwater Management Plan for Clackamas County Service District No. 1 and the City of Happy Valley.
MS4 NPDES Permit Stormwater Management Plan for Clackamas County Service District No. 1 and the City of Happy Valley April 27, 2012 1 SWMP Overview Component #1 Illicit Discharge Detection and Elimination
More informationPriority Margin Unit Conceptual Model Development
Priority Margin Unit Conceptual Model Development Oversight group: Proposed by: PCB Workgroup Jay Davis, SFEI Funding Options 1) Funding recommended by TRC for 2016: $40,000 2) Another viable funding option:
More informationEPA s 1990 Phase I and 1999 Phase II Stormwater Regulations
EPA s 1990 Phase I and 1999 Phase II Stormwater Regulations Green Country Stormwater Alliance Employee Training Workshop September 10, 2013 Tulsa Technology Center, Broken Arrow 1 NPDES Program Overview
More informationCity of Los Altos Sanitary Sewer Management Plan
City of Los Altos Sanitary Sewer Management Plan TABLE OF CONTENTS INTRODUCTION...1 SSMP Requirement Background... 1 Document Organization...1 City Service Area and Sewer System... 2 ELEMENT 1: GOALS...1-1
More informationCITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE
CITY OF BLACK DIAMOND STORMWATER MANAGEMENT PROGRAM PLAN (SWMP PLAN) 2019 UPDATE PREPARED BY Public Works Department CITY OF BLACK DIAMOND PO BOX 599 BLACK DIAMOND, WA 98010 (360) 886-5700 City of Black
More informationPOLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:
POLLUTION PREVENTION TEAM MEMBER ROSTER Worksheet #1 Leader: Responsibilities: Office Phone: Members: (1) Responsibilities: Office Phone: (2) Responsibilities: Office Phone: (3) Responsibilities: Office
More informationGeorge Hild Hild & Associates, Inc. River Falls, WI
George Hild Hild & Associates, Inc. River Falls, WI Permitting and Enforcement The Dynamics are Changing! New developments: EPA proposal entitled Effluent Limitation Guidelines and Standards for the Construction
More informationBaltimore City Department of Public Works
Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water
More informationSECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES
SECTION 11 PART I STORMWATER QUALITY PROTECTION CONTENTS Page 11-1 Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES 11-2 Stormwater Pollution Prevention Plan (SWPPP) 11-3 11-3 Erosion and Sediment
More informationHonorable Mayor and Members of the City Council. Watershed Management Plan and Measure M Recommendations
Community Environmental Advisory Commission To: From: Honorable Mayor and Members of the City Council Community Environmental Advisory Commission Submitted by: Laura August, Chairperson, CEAC Subject:
More informationCity of Robbinsdale, Minnesota Storm Water Pollution Prevention Plan (SWPPP)
City of Robbinsdale, Minnesota Storm Water Pollution Prevention Plan (SWPPP) 2006-2010 Adopted by City Council April 15, 2003 Amended for re-issuance of permit May 2006 Introduction The City of Robbinsdale
More information