CNSC Staff Briefing CMD 11-M15 March 30, 2011

Size: px
Start display at page:

Download "CNSC Staff Briefing CMD 11-M15 March 30, 2011"

Transcription

1 CNSC Staff Briefing CMD 11-M15 March 30, 2011

2 CNSC Response CNSC took action immediately to: Activate Emergency Operations Centre on 3 rd floor Slater (11-March) Staff Nuclear Emergency Organization in accordance with CNSC Emergency Response Plan adapted to foreign emergency Create a Japan Executive Team (senior CNSC executives) 24-7 operation w Technical, External Liaison, Communications and Logistics teams Active participation from across CNSC CNSC Staff Briefing CMD 11-M15-2

3 Nuclear Emergency Organization CNSC Staff Briefing CMD 11-M15-3

4 CNSC Role CNSC Role: Evaluate situation and possible outcomes, Provide credible information and advice, Continue to regulate Focus Areas: Impact on Embassy Staff (through DFAIT) Impact on Canadians in Japan (through DFAIT) Impact on Canada (through Public Safety Canada) Impact on Canadian NPPs CNSC Staff Briefing CMD 11-M15-4

5 Federal Government DFAIT Lead for actions in Japan CNSC attend daily meetings/teleconferences CNSC support to Ambassador Public Safety Canada Government Operations Centre (GOC) Lead for Canadian domestic response CNSC Liaison Officer stationed at GOC CNSC provide daily situation reports to GOC Close links between CNSC, Health Canada and Environment Canada Minimum daily meeting or teleconference From staff level to DM level Regular ADM EMC teleconferences CBSA, CFIA, PHAC Support to Provincial Emergency and Health authorities Federal Nuclear Emergency Plan (FNEP) not activated: Coordination by HC CNSC Staff Briefing CMD 11-M15-5

6 International CNSC established links with USA, UK, FRA regulators Daily teleconferences Information exchange and validation IAEA CNSC access to IAEA secure emergency info web site Limited information coming from Japan Canadian mission at IAEA in Vienna (VPERM) Two Canadian experts to Vienna to support IAEA CNSC AECL CNSC Staff Briefing CMD 11-M15-6

7 Overview of Japan Event Reactor Design and Features Chronology of Events Station Photos of Damage Radiation Protection Considerations Updates Arial View of Japan s Dai-ichi NPP March 2011 CNSC Actio ns and Follow-up CNSC Staff Briefing CMD 11-M15-7

8 Reactor Design GE MARK I BWR CNSC Staff Briefing CMD 11-M15-8

9 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Reactor Building Elevation View and Under Construction nuclearsafety.gc.ca Canada CNSC Staff Briefing CMD 11-M15-9

10 Canadian Nuclear Commission canadienne Reactor Safety and Commission Control de sûreté nucléaire Rod Design nuclearsafety.gc.ca Canada CNSC Staff Briefing CMD 11-M15-10

11 GE MARK I BWR Plant System Schematic CNSC Staff Briefing CMD 11-M15-11

12 GE MARK I BWR Fuel Pool CNSC Staff Briefing CMD 11-M15-12

13 Initiating Event The Fukushima nuclear facilities experienced a magnitude 9 earthquake on March 11th centered offshore of the Sendai region, which contains the capital Tokyo Plant designed for magnitude 8.2 earthquake A 9 magnitude quake is 8 times stronger in energy Followed by a significant tsunami of 14m high - more than double station design Over 750 aftershocks since including some as large as magnitude 6.5 CNSC Staff Briefing CMD 11-M15-13

14 Event Chronology Initial Station Response Note: Our understanding of this event will change. It is based on information received to date. The description is general and is not intended as an accurate chronology of events as they occurred. Nuclear reactors were shutdown automatically. Within seconds the control rods were inserted into core and nuclear chain reaction stopped Cooling systems were placed in operation to remove the residual heat. The residual heat load is about 3% of the heat load under normal operating conditions Earthquake resulted in the loss of offsite power (normal supply to plant) Emergency Diesel Generators started and powered station emergency cooling systems CNSC Staff Briefing CMD 11-M15-14

15 Event Chronology Initial Station Response One hour later, the station was struck by the tsunami. The tsunami was larger than what the plant was designed for. The tsunami took out all multiple sets of the backup Emergency Diesel generators Reactor operators were able to utilize emergency battery power to provide power for cooling the core for 8 hours Operators followed abnormal operating procedures and emergency operating procedures CNSC Staff Briefing CMD 11-M15-15

16 Event Chronology Offsite power could not be restored and delays occurred obtaining, connecting portable generators After the batteries ran out, residual heat could not be carried away Reactor temperatures increased and water levels in the reactor decreased, eventually uncovering and overheating the core Hydrogen was produced from metal-water reactions in the reactor (Oxidation of zirconium) Operators vented the reactor to relieve steam pressure - energy (and hydrogen) was releaseded into the primary containment (drywell) causing increased primary containment temperatures and pressures CNSC Staff Briefing CMD 11-M15-16

17 Event Chronology Operators took actions to vent the primary containment to control containment pressure and hydrogen levels. Required to protect the primary containment from failure Primary Containment Venting is through a filtered path that travels through duct work in the secondary containment to an elevated release point on the refuel floor (on top of the reactor building) A hydrogen detonation subsequently occurred while venting the secondary containment. Occurred shortly after and aftershock at the station CNSC Staff Briefing CMD 11-M15-17

18 Event Chronology Hydrogen Explosions CNSC Staff Briefing CMD 11-M15-18

19 Event Chronology As a result of the explosions in units 1 and 3 reactor buildings collapse around the containment At this time the primary containments and reactor pressure vessels are intact After the initial few hours and through the event, severe accident management procedures were initiated Seawater injected into the primary loop Off-site electrical power sources brought on-site Fire hoses used for dousing As pressure builds in the primary containments, operators vent to relieve the pressure and release hydrogen On-site and off-site radiological releases Explosion occurs in unit 2 damage to primary containment is suspected CNSC Staff Briefing CMD 11-M15-19

20 Event Chronology At various times off-site emergency response is taken to evacuate people from the vicinity initially 3 km, subsequently increased to 20 km Authorities recommend sheltering between 20 km and 30 km. Eventually recommend evacuation Fires occurred at various location both in the units and in the spent fuel storage pools Spent fuel storage pools lose cooling Radiation hazard impedes recovery efforts CNSC Staff Briefing CMD 11-M15-20

21 Station Photos of Damage CNSC Staff Briefing CMD 11-M15-21

22 Station Photos of Damage CNSC Staff Briefing CMD 11-M15-22

23 Station Photos of Damage CNSC Staff Briefing CMD 11-M15-23

24 Station Photos of Damage CNSC Staff Briefing CMD 11-M15-24

25 Event Chronology TEPCO continues to try to restore power and reliable cooling Radioactive water increasing in turbine building Environmental radiation levels fluctuating and food controls being implemented Today the situation is. CNSC Staff Briefing CMD 11-M15-25

26 Unit Power (MINeAh) Type of Reaclor BW R-3 BWR4 BWR4 BWR4 Status at time of EQ Core and fuel RPV 8, RCS integrity Containment integrity AC Power Building Water level of R PI! In service - auto shutdown I n service - auto shutdown Damage suspected In service - auto shutdown Outage Pressure of RPV CV Pressure Drywall Water injection to RPV Water injection to CV Spent Fuel Pool Status No information No information

27 Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire nuclearsafety.gc.ca Canada CNSC Staff Briefing CMD 11-M15-27

28 Initial Lessons Learnt from the Fukushima Event We must not underestimate the importance of Capability of the plant to mitigate natural events such as earthquake, flood, tsunami, tornado, fire events Capability of the plant to mitigate combined natural events such as flooding resulting from an earthquake Capability of the plant for station blackout Capability of the plant to mitigate severe accidents including loss of major safety systems (for example, robust power supply for a long term) Effective Severe Accident Management Program Effective emergency planning CNSC Staff Briefing CMD 11-M15-28

29 CNSC Actions Based on Events in Japan We responded to initial lessons learnt: General Nuclear Safety and Control Regulations 12(2) CNSC site staff actions We will verify the effectiveness of defence-in-depth strategy and measures CNSC Staff Briefing CMD 11-M15-29

30 General Nuclear Safety and Control Regulations 12(2) All CANDU licensees requested to reexamine safety cases for: external hazards such as seismic, flooding, fire and extreme weather events measures for prevention and mitigation of severe accidents emergency preparedness Report on implementation plans for shortand long-term measures to address any identified gaps CNSC Staff Briefing CMD 11-M15-30

31 CNSC Site Staff Actions Inspections of Power Reactors: Seismic Readiness of Secondary Control Room/seismic route Availability of manuals and procedures Fire Confirmation of minimum shift complement monitoring Arrangements for off-site support Backup power availability and condition Hydrogen Igniters Routine testing to confirm availability CNSC Staff Briefing CMD 11-M15-31

32 CNSC Site Staff Actions (2) Inspections of (irradiated) Spent Fuel Bays: Readiness of components and equipment Provision/availability of makeup water and heat sinks Verification of alarms on flow, temperature, and stack release CNSC Staff Briefing CMD 11-M15-32

33 Defence-in-Depth Strategy and Measures In addition to steps already taken, we will verify the effectiveness of defence-in depth strategy and measures implemented to assure: Prevention of abnormal operation and failures Control of abnormal operation and detection of failures Control of accidents within the design basis Control of severe plant conditions - prevention of accident progression and mitigation of consequences of severe accidents Mitigation of radiological consequences of significant releases of radioactive materials CNSC Staff Briefing CMD 11-M15-33

34 Conclusion The scale of earthquake and resulting tsunami of Fukushima is not credible for Canadian site CNSC requires that reactor designs consider all natural events (such as earthquake, tsunami, flooding, tornado) as design basis events appropriate to the site Designs are required to consider combined events (for example, flooding resulting from an earthquake) as design basis events CNSC Staff Briefing CMD 11-M15-34

35 Conclusion (2) Station blackout, one of the worst consequences of these common-cause events must be considered by Licensees CNSC requires that severe accident management guidelines be in place and that licensee s review their emergency preparedness Detailed lessons learnt from the Fukushima event will be considered for the design and operation of all Canadian nuclear power plants Implementing these lessons must be undertaken and a Leadership Team has been established co-chaired by the DG- DPRR and DG-DAA CNSC Staff Briefing CMD 11-M15-35

36 CNSC Staff Briefing CMD 11-M15-36

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria CNSC Fukushima Task Force E-doc 3743877 July 2011 Executive Summary In response to the March 11, 2011 accident at the Fukushima Daiichi Nuclear Power Plant (NPP), the CNSC convened a Task Force to evaluate

More information

Japanese Nuclear Accident And U.S. Response. Ellen Anderson Senior Project Manager Radiation Safety & Environmental Protection May 20, 2011

Japanese Nuclear Accident And U.S. Response. Ellen Anderson Senior Project Manager Radiation Safety & Environmental Protection May 20, 2011 Japanese Nuclear Accident And U.S. Response Ellen Anderson Senior Project Manager Radiation Safety & Environmental Protection May 20, 2011 Overview Introduction to NEI Fukushima Daiichi The Events Environmental

More information

Nuclear Safety in Light of Fukushima. Andrew C. Kadak, Ph.D. Council of State Governments June 19, 2012

Nuclear Safety in Light of Fukushima. Andrew C. Kadak, Ph.D. Council of State Governments June 19, 2012 Nuclear Safety in Light of Fukushima Andrew C. Kadak, Ph.D. Council of State Governments June 19, 2012 Background Former Professor of the Practice in the MIT Nuclear Science and Engineering Department

More information

Nuclear Accident in Japan: NRC Early Protective Action Recommendations

Nuclear Accident in Japan: NRC Early Protective Action Recommendations Nuclear Accident in Japan: NRC Early Protective Action Recommendations National Radiological Emergency Preparedness Conference April 18, 2011 Patricia A. Milligan, CHP Senior Technical Advisor for Preparedness

More information

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of

More information

Overview of Fukushima accident. Nov. 9, 2011 Orland, Florida

Overview of Fukushima accident. Nov. 9, 2011 Orland, Florida Overview of Fukushima accident Nov. 9, 2011 Orland, Florida Nuclear Power Plants in Japan Japan Nuclear Japan Energy Nuclear Energy Safety Safety Organization Japan Atomic Industrial Forum, Inc. -Tohoku

More information

Deconstructing the Nuclear Accident at the Fukushima-Daiichi Plant: What Went Wrong and What are the Prospects of Recovery?

Deconstructing the Nuclear Accident at the Fukushima-Daiichi Plant: What Went Wrong and What are the Prospects of Recovery? Deconstructing the Nuclear Accident at the Fukushima-Daiichi Plant: What Went Wrong and What are the Prospects of Recovery? Goldschmidt Conference 2011 Fukushima Review Session Prague, Czech Republic Edward

More information

Lessons from Fukushima

Lessons from Fukushima Connecting the Dots on Energy Issues May 16, 2011 Vol. 4 Issue 6 1111 19 th St. NW Suite 406 Washington, DC 20036 tel: 202-461-2360 fax: 202-461-2379 secureenergy.org Lessons from Fukushima SUMMARY Even

More information

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 Follow up prepared at 4pm of March 23 in Japan Yoshiaki Oka Waseda university Recovery action is in progress. The presentation

More information

FUKUSHIMA DAIICHI NPP EVENT AND ASSOCIATED RADIOACTIVE SOURCE TERM CNSC S INITIAL RESPONSE

FUKUSHIMA DAIICHI NPP EVENT AND ASSOCIATED RADIOACTIVE SOURCE TERM CNSC S INITIAL RESPONSE 2011 WNU SUMMER INSTITUTE AUGUST 10 - CHRIST CHURH, OXFORD, UK FUKUSHIMA DAIICHI NPP EVENT AND ASSOCIATED RADIOACTIVE SOURCE TERM CNSC S INITIAL RESPONSE Prepared by: CNSC Staff Presented by: Dr. Ali El-Jaby

More information

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General Directorate of Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU

More information

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 Follow up prepared at 4pm of March 23, revised 1pm of March 31 Yoshiaki Oka Waseda university Recovery action is in progress.

More information

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU

More information

Presentation Outline. Basic Reactor Physics and Boiling Water Design Sequence of Events Consequences and Mitigation Conclusions and Lessons Learned

Presentation Outline. Basic Reactor Physics and Boiling Water Design Sequence of Events Consequences and Mitigation Conclusions and Lessons Learned Response of the Fukushima Dai-ichi Nuclear Plant to the March 11, 2011 Earthquake in Japan Dr. George Flanagan Oak Ridge National Laboratory Presented to the EERI/NEC Meeting April 12, 2012 Presentation

More information

Severe Accident Progression Without Operator Action

Severe Accident Progression Without Operator Action DAA Technical Assessment Review of the Moderator Subcooling Requirements Model Severe Accident Progression Without Operator Action Facility: Darlington Classification: October 2015 Executive summary After

More information

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared

More information

IAEA International Conference on Topical Issues in Nuclear Installation Safety

IAEA International Conference on Topical Issues in Nuclear Installation Safety IAEA International Conference on Topical Issues in Nuclear Installation Safety Guidance on the Implementation of Modifications to Mitigate Beyond Design Basis Accidents Fred Dermarkar Vice President Engineering

More information

IAEA-J4-TM TM for Evaluation of Design Safety

IAEA-J4-TM TM for Evaluation of Design Safety Canadian Nuclear Utility Principles for Beyond Design Basis Accidents IAEA-J4-TM-46463 TM for Evaluation of Design Safety Mark R Knutson P Eng. Director of Fukushima Projects Ontario Power Generation Overview

More information

Post-Fukushima Assessment of the AP1000 Plant

Post-Fukushima Assessment of the AP1000 Plant ABSTRACT Post-Fukushima Assessment of the AP1000 Plant Ernesto Boronat de Ferrater Westinghouse Electric Company, LLC Padilla 17-3 Planta 28006, Madrid, Spain boronae@westinghouse.com Bryan N. Friedman,

More information

The Fukushima Daiichi Nuclear Power Station Accident

The Fukushima Daiichi Nuclear Power Station Accident The Fukushima Daiichi Nuclear Power Station Accident Tomomi Matsunaga Kansai Electric Power Company Cooperation with JEPIC (Japan an Electric Power Information Center) Nuclear Power Plants in Japan 2 1

More information

Japanese Nuclear Accident And U.S. Response. April 15, 2011

Japanese Nuclear Accident And U.S. Response. April 15, 2011 Japanese Nuclear Accident And U.S. Response April 15, 2011 Nuclear Energy in Japan 54 operating nuclear reactors (49 gigawatts) Two nuclear plants under construction Tokyo Electric Power Co. produces 27%

More information

Copyright 2016 ThinkReliability. How a Reactor Works

Copyright 2016 ThinkReliability. How a Reactor Works Cause Mapping Problem Solving Incident Investigation Root Cause Analysis Risk Mitigation Root Cause Analysis Case Study Angela Griffith, P.E. webinars@thinkreliability.com www.thinkreliability.com Office

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety

More information

The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations

The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations March 31, 2011 Tokyo Electric Power Company Tohoku Pacific Ocean Earthquake Time: 2:46 pm on Fri, March 11, 2011. Place:

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

An overview of what happened at Fukushima NPPs

An overview of what happened at Fukushima NPPs An overview of what happened at Fukushima NPPs Per F. Peterson Professor and Chair Department of Nuclear Engineering University of California, Berkeley 2011 PEER Annual Meeting Hotel Shattuck Berkeley

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Fukushima-Daiichi - a radiochemical view of the evolving situation in Summer 2011.

Fukushima-Daiichi - a radiochemical view of the evolving situation in Summer 2011. Fukushima-Daiichi - a radiochemical view of the evolving situation in Summer 2011. Kath Morris. Research Centre for Radwaste and Decommissioning The University of Manchester With thanks to Dr Edward Blandford,

More information

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011

TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 TEPCO s Nuclear Power Plants suffered from big earthquake of March 11,2011 Follow up prepared at 4pm of March 23, revised April 13 Yoshiaki Oka Waseda university Recovery action is in progress. The presentation

More information

Technical Volume 1 Description and Context of the Accident. R. Jammal P. Vincze

Technical Volume 1 Description and Context of the Accident. R. Jammal P. Vincze Technical Volume 1 Description and Context of the Accident R. Jammal P. Vincze Table of Contents Introduction Contents of Technical Volume 1 1.1. Summary of the accident 1.2. Context within which the accident

More information

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident Ryodai NAKAI Japan Atomic Energy Agency Contents Introduction Japanese Government Report to the IAEA

More information

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S) Loss of Ultimate Heat Sink ANS AESJ AESJ Fukushima Symposium, March h4, 2012 Hisashi Ninokata, Tokyo Institute of Technology Available ultimate heat sinks at 1F1~3 1F1 (Fukushima Dai ichi Unit 1) Sea water

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Fukushima Daiichi Disaster. Facts and lessons learned. July Takashi Shoji Programme Director of WANO

Fukushima Daiichi Disaster. Facts and lessons learned. July Takashi Shoji Programme Director of WANO Fukushima Daiichi Disaster Facts and lessons learned July 13 2011 Takashi Shoji Programme Director of WANO 7/12/2011 1 Earthquake occurrence and automatic shut-down of nuclear reactors The Tohoku Pacific

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Nuclear Accident at Fukushima #1Nuclear Power Station

Nuclear Accident at Fukushima #1Nuclear Power Station Nuclear Accident at Fukushima #1Nuclear Power Station By Prof. Dr. Yoichi Fuji-ie, Representative Director of Nuclear Salon Fuji-ie 1. Brief Observation of Fukushima#1 Nuclear Accident On March 11 2011,

More information

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011 THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY Edwin Lyman Union of Concerned Scientists May 26, 2011 The accident: many unknowns Many of the details of the Fukushima Daiichi accident are still

More information

CNSC Evaluation of Plant-Specific SAMG

CNSC Evaluation of Plant-Specific SAMG CNSC Evaluation of Plant-Specific SAMG Quanmin Lei IAEA Technical Meeting on Verification and Validation of SAMG Vienna, Austria December 12-14, 2016 e-docs # 5104918 nuclearsafety.gc.ca Outline Summarize

More information

Post-Fukushima Actions in Korea

Post-Fukushima Actions in Korea Post-Fukushima Actions in Korea IAEA TWG-LWR Vienna, June 18-20, 2013 Presented by Jong-Tae Seo 1. Impacts on National Energy Policy and NPP Plan 2. Actions Taken after Fukushima Accident 3. Findings and

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Fukushima Dai-ichi. Short overview of 11 March 2011 accidents and considerations. 3 rd EMUG Meeting ENEA Bologna April 2011

Fukushima Dai-ichi. Short overview of 11 March 2011 accidents and considerations. 3 rd EMUG Meeting ENEA Bologna April 2011 Fukushima Dai-ichi Short overview of 11 March 2011 accidents and considerations Marco Sangiorgi - ENEA 3 rd EMUG Meeting ENEA Bologna 11-12 April 2011 NPPs affected by Earthquake NPPs affected by Earthquake

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Enhancing Nuclear Regulation in the Post-Fukushima World

Enhancing Nuclear Regulation in the Post-Fukushima World Enhancing Nuclear Regulation in the Post-Fukushima World Robert Lojk Regulatory Program Director Directorate of Power Reactor Regulation Canadian Nuclear Safety Commission Presentation to the 2012 INPRO

More information

Understanding Energy: Emergency Preparedness for Nuclear in the US

Understanding Energy: Emergency Preparedness for Nuclear in the US Understanding Energy: Emergency Preparedness for Nuclear in the US Kimberly Cook, General Manager, Plant Operations Waterford 3 Nuclear Facility Novenber 16, 2011 Tsunami Initiates Nuclear On March 11

More information

Lessons Learned from the Fukushima Daiichi Nuclear Power Plant Accident

Lessons Learned from the Fukushima Daiichi Nuclear Power Plant Accident Lessons Learned from the Fukushima Daiichi Nuclear Power Plant Accident Nuclear Energy Safety Symposium Academy of Science of South Africa October 13, 2011 Hideki Nariai Professor Emeritus of the University

More information

Tohoku Pacific Earthquake and the seismic damage to the NPSs

Tohoku Pacific Earthquake and the seismic damage to the NPSs Tohoku Pacific Earthquake and the seismic damage to the NPSs As of 15:30 March 30th, 2011 (JST) Ministry of Economy, Trade and industry Earthquake and automatic shut-down of nuclear reactors The Tohoku

More information

ELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident

ELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident s Response to the Fukushima Dai-ichi Nuclear Accident Rio de Janeiro, July 3 rd, 2012 Paulo Vieira First Actions Taken by Eletronuclear Establishment of a Corporate Working group Follow up of the event,

More information

Lessons Learned from the Fukushima Dai-ichi Accident and Responses in New Regulatory Requirements

Lessons Learned from the Fukushima Dai-ichi Accident and Responses in New Regulatory Requirements International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant, Vienna, Austria March 17, 2014 Lessons Learned from the Fukushima

More information

OPG s Response to Fukushima Event- Update

OPG s Response to Fukushima Event- Update OPG s Response to Fukushima Event- Update Darlington and Pickering Joint Community Advisory Committee Meeting- January 21, 2014 Mark Knutson- Director- Fukushima Support Tho-Dien Le- Projects Design Manager-

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

PREVENTION POSSIBILITY OF NUCLEAR POWER REACTOR MELTDOWN BY USE OF HEAT PIPES FOR PASSIVE COOLING OF SPENT FUEL

PREVENTION POSSIBILITY OF NUCLEAR POWER REACTOR MELTDOWN BY USE OF HEAT PIPES FOR PASSIVE COOLING OF SPENT FUEL Frontiers in Heat Pipes Available at www.thermalfluidscentral.org PREVENTION POSSIBILITY OF NUCLEAR POWER REACTOR MELTDOWN BY USE OF HEAT PIPES FOR PASSIVE COOLING OF SPENT FUEL Masataka Mochizuki *, Thang

More information

Implementation of the EU stress test in European nuclear power plants

Implementation of the EU stress test in European nuclear power plants Implementation of the EU stress test in European nuclear power plants Dr. Cord-Henrich Lefhalm Nuclear Regulation and Licensing RWE Power AG Essen, Germany RWE Power 15.10.2012 PAGE 1 The Fukushima nuclear

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

The Fukushima Daiichi Incident

The Fukushima Daiichi Incident The data and information contained herein are provided solely for informational purposes. None of the information or data is intended by AREVA to be a representation or a warranty of any kind, expressed

More information

TERM TASK FORCE. Presented to: Waste Management Symposia By: Dr. Charles L. Miller. Phoenix, AZ. Fukushima Daiichi NRC Near Term Task Force 1

TERM TASK FORCE. Presented to: Waste Management Symposia By: Dr. Charles L. Miller. Phoenix, AZ. Fukushima Daiichi NRC Near Term Task Force 1 FUKUSHIMA DAIICHI NRC NEAR TERM TASK FORCE Presented to: Waste Management Symposia By: Dr. Charles L. Miller Phoenix, AZ 1 NRC RESPONSE Monitoring Mode Japan site team Information gathering Near Term Task

More information

OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania

OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica 16 th of May 2012 Nuclear 2012 Pitesti, Romania 1 PREAMBLE On 25 March, 2011, European Council decided that nuclear

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Nuclear energy - four months after Fukushima

Nuclear energy - four months after Fukushima Institut»Jožef Stefan«Odsek za reaktorsko tehniko Nuclear energy - four months after Fukushima Iztok Tiselj "Jožef Stefan Institute", Reactor Engineering Division & Chair of Nuclear Engineering, Faculty

More information

POST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS

POST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS HLG_p(2011-16)_85 POST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS This document is intended to provide guidance for the European Nuclear Regulators

More information

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Technical and Regulatory Issues Facing Nuclear Power Plants: Leveraging Global Experience June 1 2, 2016 Chicago, IL Dr.

More information

Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety

Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety Canadian National Report May 2012 Canada s Report to the Second Extraordinary Meeting of the Convention

More information

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements Sorin Holostencu IAEA Technical Meeting on Operational Experience with Implementation of Post-Fukushima Actions in Nuclear Power Plants,

More information

ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR

ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR Antoine VERDIER Business Development Manager BULATOM Varna / June 4 th, 2014 An AREVA and MHI Company Introduction ATMEA Company

More information

IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant

IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant Enhancements to Severe Accident Management Guidelines to Address

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Chapter 3 Accident of Fukushima Daiichi Nuclear Power Plant: Sequences, Fission Products Released, Lessons Learned

Chapter 3 Accident of Fukushima Daiichi Nuclear Power Plant: Sequences, Fission Products Released, Lessons Learned Chapter 3 Accident of Fukushima Daiichi Nuclear Power Plant: Sequences, Fission Products Released, Lessons Learned Jun Sugimoto Abstract The nuclear accident that occurred at the Fukushima Daiichi Nuclear

More information

Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs

Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs RAHUL PORWAL Atomic Energy Regulatory Board Mumbai, INDIA Outline Introduction AERB Safety Review Methodology Safety Observations

More information

ASSESSMENTS OF SWEDISH NUCLEAR POWER PLANT IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT

ASSESSMENTS OF SWEDISH NUCLEAR POWER PLANT IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT ASSESSMENTS OF SWEDISH NUCLEAR POWER PLANT IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT Lovisa Wallin-Caldwell Outline Introduction Swedish nuclear power plants Swedish nuclear power regulation Back-fitting

More information

Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead

Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead 12 April, 2016 Yasuhiro SHIMIZU Secretary-General, Nuclear Regulation Authority (NRA), Japan Contents 1. Actions

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Attachment XI-1. I. Emergency Safety Measures, etc.

Attachment XI-1. I. Emergency Safety Measures, etc. Specific Countermeasures in Japan Based on the Lessons Learnt from the Accident at Fukushima Dai-ichi Nuclear Power Station of Tokyo Electric Power Co. Inc. I. Emergency Safety Measures, etc. 1. Emergency

More information

New Safety Standards (SA) Outline (Draft) For Public Comment

New Safety Standards (SA) Outline (Draft) For Public Comment Provisional Translation (Feb.7,2013 Rev.0) February 6, 2013 New Safety Standards (SA) Outline (Draft) For Public Comment 0 February 6, 2013 New Safety Standards (SA) Outline (Draft) Table of Contents Foreword

More information

Post Fukushima Safety Margins

Post Fukushima Safety Margins Post Fukushima Safety Margins Nuclear Codes and Standards Workshop Prague, Czech Republic July 7, 2014 Bryan Erler P.E. Chair Task Group on Design Basis and Response to Severe Accident and Vice President,

More information

Information on the implications of the Fukushima Nuclear Accident

Information on the implications of the Fukushima Nuclear Accident Information on the implications of the Fukushima Nuclear Accident The National Nuclear Laboratory and the Dalton Nuclear Institute at The University of Manchester offer the following information in support

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima Mohammad Modarres Professor of Nuclear Engineering Department of Mechanical Engineering University

More information

STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT

STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT Frank Nuzzo IAEA Nuclear Power Engineering f.nuzzo@iaea.org ENSREG High Level Requirements Following the extreme events

More information

Frequently Asked Questions: Japanese Nuclear Energy Situation

Frequently Asked Questions: Japanese Nuclear Energy Situation NUCLEAR ENERGY INSTITUTE Frequently Asked Questions: Japanese Nuclear Energy Situation 1. What will be the impact of the Fukushima Daiichi accident on the U.S. nuclear program? It is premature to draw

More information

The Nuclear Crisis in Japan

The Nuclear Crisis in Japan The Nuclear Crisis in Japan March 21, 2011 Daniel Okimoto Alan Hanson Kate Marvel The Fukushima Daiichi Incident 1. Plant Design 2. Accident Progression 3. Radiological releases 4. Spent fuel pools " Fukushima

More information

Tohoku Pacific Earthquake and the seismic damage to the NPSs

Tohoku Pacific Earthquake and the seismic damage to the NPSs Tohoku Pacific Earthquake and the seismic damage to the NPSs As of 8:00am April 5th, 2011 (JST) Ministry of Economy, Trade and industry Earthquake and automatic shut-down of nuclear reactors The Tohoku

More information

Outline of New Safety Standard (Design Basis) (DRAFT) For Public Comment

Outline of New Safety Standard (Design Basis) (DRAFT) For Public Comment Provisional Translation (Feb.13,2013 Rev.0) February 6, 2013 Outline of New Safety Standard (Design Basis) (DRAFT) For Public Comment 0 February 6, 2013 Outline of New Safety Standard (Design Basis) (DRAFT)

More information

Information on Status of Nuclear Power Plants in Fukushima

Information on Status of Nuclear Power Plants in Fukushima Information on Status of Nuclear Power Plants in Fukushima Japan Atomic Industrial Forum, Inc. Policy on information and compilation This JAIF-compiled information chart represents the situation, phenomena,

More information

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements Hitachi Review Vol. 62 (2013), No. 1 75 Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements Masayoshi Matsuura Kohei Hisamochi Shinichiro Sato Kumiaki

More information

Approach to Practical Elimination in Finland

Approach to Practical Elimination in Finland Approach to Practical Elimination in Finland M-L. Järvinen, N. Lahtinen and T. Routamo International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water

More information

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL Post Fukushima actions in India Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL 14 th Meeting of IAEA-TWG on advance technologies, IAEA, Vienna, June 18-20, 2013 Presentation

More information

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN N.MUGHAL Email: nasir.mughal@pnra.org F.MANSOOR J.AKHTAR Abstract In the aftermath

More information

The Fukushima Daiichi Incident Dr. Matthias Braun - 19 May p.1

The Fukushima Daiichi Incident Dr. Matthias Braun - 19 May p.1 Dr. Matthias Braun - 19 May 2011 - p.1 The Fukushima Daiichi Incident 1. Plant Design 2. Accident Progression 3. Radiological releases 4. Spent fuel pools 5. Sources of Information Matthias Braun PEPA4-G,

More information

Plant Information Management In Canada

Plant Information Management In Canada Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Plant Information Management In Canada Presentation to the IAEA Technical Meeting on Plant Information Model (PIM) Robert Lojk

More information

Fukushima Event PCTRAN Analysis. Dr. LI-Chi Cliff Po. Dr. LI-Chi Cliff Po. March 25, 2011

Fukushima Event PCTRAN Analysis. Dr. LI-Chi Cliff Po. Dr. LI-Chi Cliff Po. March 25, 2011 Fukushima Event PCTRAN Analysis Dr. LI-Chi Cliff Po Fukushima Event PCTRAN Analysis Dr. LI-Chi Cliff Po 1. Description of Event March 25, 2011 The earthquake caused instant loss of offsite power. The scale-9

More information

Tsunami PRA Standard Development by Atomic Energy Society Japan (AESJ) (4) Unresolved Issues and Future Works

Tsunami PRA Standard Development by Atomic Energy Society Japan (AESJ) (4) Unresolved Issues and Future Works Tsunami PRA Standard Development by Atomic Energy Society Japan (AESJ) (4) Unresolved Issues and Future Works Akira Yamaguchi a*, Yukihiro Kirimoto b, Katsumi Ebisawa c a Osaka University, Osaka, Japan

More information

Nuclear Power after Fukushima

Nuclear Power after Fukushima Nuclear Power after Fukushima Michael Corradini American Nuclear Society President: http://ans.org UW Energy Institute Chair: http://www.energy.wisc.edu 1 ANS Special Committee on Fukushima The special

More information

24 MARCH :00 UTC. Incident and Emergency Centre

24 MARCH :00 UTC. Incident and Emergency Centre 24 MARCH 2011 17:00 UTC Incident and Emergency Centre Subject: Status of the Fukushima Daiichi nuclear power plant The Incident and Emergency Centre (IEC) is continuing to monitor the status of the nuclear

More information

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work. Cross reference table of ENSREG and Extraordinary CNS recommendations and national actions 1(16) 2.1 European guidance on assessment of natural hazards and margins The peer review Board recommends that

More information

Ontario Power Generation Questions and Answers

Ontario Power Generation Questions and Answers Ontario Power Generation Questions and Answers Natural Disasters Could a similar earthquake or tsunami happen in Ontario? No. Ontario s reactors are at two sites on Lake Ontario and one site on Lake Huron

More information