1 Railroaded: Carving up food lands for coal transport in Central Queensland. by Hydrocology Environmental Consulting March 2014

2 This report has been reviewed by Richard Francis, B.E. (Civil), Grad Dip O. R., Consultant - Water Resource Management and Hydrology. Richard's expertise includes operational management of large dams, including water supply and flood mitigation, and in environmental, economic and water related studies using computer modelling of river and storage salinities, and of water resource systems containing dams, hydroelectric works, rivers, and riparian ecosystems. Full review available here: Thanks to Paula Heelan, Erland Howland, Tom Jefferson/Greenpeace for use of Central Queensland images. 2 Railroaded: Carving up food lands for coal transport in Central Queensland.

3 Contents Executive Summary 3 1. Introduction Policy context: Queensland agricultural land conservation Good Quality Agricultural Land Strategic Cropping Land Regional Planning Interest Bill State Planning Policy The Galilee Basin State Development Area The Mackay, Isaac and Whitsunday Region Individual rail proposals within the GBSDA Existing rail Infrastructure Aurizon Central Queensland Integrated Rail Project Adani - North Galilee Basin Rail Project and Carmichael rail GVK Hancock - Alpha Rail Project Waratah Coal Galilee Coal Rail Project Agriculture in the GBSDA Impacts on agricultural land in the GBSDA Queensland floods GBSDA flood impacts Drainage design Average Recurrence Interval Climate change and flooding Conclusion 59 References 62 Appendices 62 Front cover: Top Image: Paula Heelan Middle Image: Lee Hansen Bottom Image: Stock image; Inside cover: Top Image: Paula Heelan Middle Image: Paula Heelan Bottom Image: Paula Heelan Railroaded: Carving up food lands for coal transport in Central Queensland. 3

4 4

5 Executive Summary This report examines one cluster of large-scale rail projects in Central Queensland, proposed to facilitate the shipment of coal from mining in the Galilee Basin, and the damage it threatens to inflict on land and water across productive agricultural landscapes and floodplains. There are five rail lines currently proposed to export coal from the region which encompass over 1400 km of new and upgraded rail infrastructure and directly affect over 120 landholdings. They have the potential to interact and produce significant cumulative impacts, particularly in respect to elevated flood impacts, loss of agricultural productivity and fragmentation of agricultural land. Whilst it has been suggested that only one or two rail lines may eventually be built, two have already been approved and two more are currently seeking an approval. Therefore, the ultimate configuration and the resultant impacts are still extremely uncertain, and that uncertainty itself is causing disruption and stress for landholders and communities. The Qld Government has developed a plan to facilitate and promote railway development for coal mining in the region - the Galilee Basin State Development Area (GBSDA). The SDA is part of a broader Galilee Basin Development Strategy, which proposes a range of measures including discounted water licences and discounted royalty payments for mine proponents, and the provision of water to coal miners from the State reserve. Galilee Basin State Development Area (GBSDA) The proposed State Development Area will give the Queensland Coordinator-General the power to compulsorily acquire any land for railway development across an area greater than 2 million hectares in size. Central Queensland currently produces 9.5% of Queensland's agricultural production and contains a number of the State's largest floodplains. The proposed GBSDA includes some of the State's most productive agricultural land. Under the terms of the State Development Area scheme the Coordinator-General will not support land uses anywhere in the 2M hectare area that are not consistent with rail infrastructure, and landholders may have to apply for permission to continue using the land as they are currently doing. Although cropping and animal husbandry are listed by the scheme as activities that may be consistent, with the railways, farmers may have to pay a fee to apply to continue farming. The Coordinator General has the power to refuse the application with no right of appeal. Above and beyond this concern, is the abiding risk that farmers will be forced into compulsory acquisition and land will be forcibly removed from them by the Government with no requirement for good faith negotiation. The weight of uncertainty alone for these landowners within the GBSDA is enough to drive down land prices and chill beneficial agricultural productivity, let alone expansion. A similar SDA scheme for a coal rail line in the Surat Basin resulted in a reported 30% loss in land values. Image Page 5: Paula Heelan Railroaded: Carving up food lands for coal transport in Central Queensland. 5

6 6

7 GBSDA Precincts There are three precincts proposed within the GBSDA, which map out the areas or corridors most likely to be directly impacted by rail infrastructure. There is a precinct for Mining Services, a West to East Rail Corridor and a South to North Rail Corridor. The precincts intersect 933 different land parcels, and thus represent a major source of uncertainty to a large number of landholders. The precincts cover almost 200,000 hectares of pasture and over 50,000 hectares of potential cropping and horticultural land. They also include over 11,000 hectares of the Bowen Important Agricultural Area. That means that large areas of vital food-producing land are likely to be directly alienated or fragmented, as a result of the GBSDA, with subsequent impacts on food production targets for Queensland. The Queensland Government has set an ambitious target to double food production by However, this commitment is unlikely to ever be met if agricultural land is lost and fragmented due to coal mines and associated rail infrastructure. Flood Risks and Implications There are very substantial flood risks associated with the GBSDA, because the construction of large, elevated rail infrastructure across major floodplains and waterways will substantially change surface water flows and lead to altered flood patterns. The region is highly flood prone. Since 1906, there have been 57 tropical cyclones that have passed within 200 km of the GBSDA and over 500,000 hectares of the GBSDA regularly experiences flooding. The proposed GBSDA precincts cut across 1,680 waterways between the Galilee Basin and Abbot Point. The extent of the floodplain likely to be traversed by rail lines, the density of the drainage and the cyclone frequency in the region, all point to very high flood risks. Therefore, planning for the rail lines should have prioritised precautionary flood avoidance and flood mitigation. However, none of the rail projects proposed for the GBSDA comply with Queensland State Planning Policy 1/03 'Mitigating the Adverse Impacts of Flood, Bushfire and Landslide' or the most recent Australian Rainfall and Runoff Revision for Blockage of Hydraulic Structures by Engineers Australia. Instead, proponents have been allowed to minimise costs by proposing to build structures that are only designed for 1 in 20 year or 1 in 50 year flood events, instead of the larger floods that represent the greatest risks. In fact, the drainage structures that have been approved for one rail proposal are so poorly designed that they are rated as having an 84% chance of failure over their life. Such negligent cost avoidance puts at risk the communities of the region, its infrastructure and agricultural productivity. Image Page 6: TomJefferson/Greenpeace Railroaded: Carving up food lands for coal transport in Central Queensland. 7

8 8

9 The Regional Planning Interests Act The new Queensland Regional Planning Interests Act, which was passed recently, weakens the previous protections provided for agricultural land via the Strategic Cropping Land Act, which is set to be repealed. The Regional Planning Interests Act 2014 does not place any prohibitions on mining in agricultural areas and it does not require an Agricultural Impact Assessment prior to granting Regional Planning Interest Authorities. Despite the GBSDA precincts taking in over 50,000 ha of potential cropping land, the out-dated regional plan that covers the GBSDA area does not identify any 'Priority Agricultural Areas'. Therefore, even the weak measures that apply in the RPI Act for such areas do not apply in this instance. Conclusion The new rail projects proposed for the GBSDA will reduce the area of available high quality farmland in Central Queensland, fragment the agricultural landscape in the region and create significant additional flood impacts for the local communities and agricultural industries. As a result, the contribution to the State s agricultural production is predicted to decline. The continued imbalance in the Government s policy approach, which privileges damaging mining activity and its infrastructure needs over other, long-established land uses in rural Central Queensland is leading to the irreversible loss of good quality land, and jeopardising the food producing future of the state. Without clear and unambiguous statutory protection, agricultural lands and critical water resources that underpin them will continue to be lost to coal mining and its associated infrastructure and the chronic decline of agricultural productivity in Queensland will continue. Image Page 8: Cattle 2014 Erland Howden; Image Page 9: Paula Heelan Railroaded: Carving up food lands for coal transport in Central Queensland. 9

10 1. Introduction Agricultural production contributes an estimated $14.7 billion a year to the Queensland economy. 1 Queensland has the largest area of agricultural land of any Australian state and the highest proportion of land area dedicated to agriculture with about 79%. 2 Queensland agriculture comprises about 30,500 businesses 3 that employ 62,700 people 4 and it is one of the four pillars of the Queensland economy. In spite of increasing global demand for food, and what an Executive Board member of Rabobank, Berry Martin, has warned may be the coming global food crisis, 5 the Queensland agricultural sector is in decline. Deteriorating terms of trade, increasing mechanisation of farming systems and growing demand for non-agricultural land use are putting Queensland farmers under significant pressure. 6 Today, one of the greatest barriers to a sustainable and growing Queensland agricultural industry is competition from the mining sector for land, water and labour. Over the past five years, Queensland agricultural holdings have decreased by three per cent. 7 Over the same period, 120 Mining Lease applications have been lodged covering an area of about 600,000 ha, a fourfold increase in area compared to the previous five years. 8 However, it is not just the coal mines themselves have the potential to compromise Queensland s agricultural productivity, it is transport infrastructure required to move the coal to export terminals. This report examines one cluster of large-scale rail projects in Central Queensland, proposed to facilitate the shipment of coal from mining in the Galilee Basin, and the damage it threatens to inflict on land and water across productive agricultural floodplains. Prior to winning Government, Campbell Newman wrote to the Lock the Gate Alliance promising to protect strategic cropping land from development if it is likely to have a significant, adverse impact on the productive capacity of that land to produce food and fibre in the future But, rather than increasing protection for agricultural land in Queensland, the Newman Government has instead reduced it, most recently with the passing of the Regional Planning Interests Act On 7 November 2013, the Queensland Premier announced the Galilee Basin Development Strategy and a proposal to declare the Galilee Basin State Development Area (GBSDA) within which the Coordinator-General may compulsorily acquire any land. 11 The GBSDA extends over 2 million hectares and some of the State s most productive agricultural land, containing almost 400,000 ha of Class A and B agricultural land and almost 60,000 hectares of potential Strategic Cropping Land (SCL). 1 DAFF, ABS, DEEWR, ABARE, DAFF, ABS, DNRM, See also public statements in national-affairs/campbell-newman-slams-farm-gate-shut-on-miners/ story-fnbsqt8f #; and com.au/news/talking-regional-campbell-newman/ / In accordance with section 82 of the State Development Public Works Organisation Act 10 Railroaded: Carving up food lands for coal transport in Central Queensland.

11 Map 1: Location of Galilee Basin State Development Area There are five rail lines proposed for the GBSDA totalling over 1400 km of new and upgraded rail infrastructure that have the potential to interact and produce significant cumulative impacts, particularly in respect to elevated flood impacts, loss of agricultural productivity and fragmentation of agricultural land. While one company involved in the area, Adani, states in an EIS that, It is likely that only one of these rail lines will proceed, 12 the Alpha Coal Project (Rail) and Waratah Coal Pty Ltd s Galilee Coal Northern Export Facility (Rail) have already been approved by the Queensland Coordinator General and the Federal Environmental Minister, and Adani themselves are seeking Government approval for two more rail lines. Adani s Carmichael Rail Project is awaiting approval and their North Galilee Basin Rail Project has recently exhibited its EIS. The fifth line is proposed by Aurizon, formerly QR National, who is yet to lodge an EIS for its Central Queensland Integrated Rail Project. 13 This report questions the need for the GBSDA and its planned rail links and analyses, assesses and quantifies the potential loss of agricultural land and the impacts that the potential increased flooding that these rail proposals have for the Mackay, Isaac and Whitsunday Region. 12 Carmichael Coal Mine and Rail Project Accessed 26 February 2014 Railroaded: Carving up food lands for coal transport in Central Queensland. 11

12 2. Policy context: Queensland agricultural land conservation 2.1 Good Quality Agricultural Land In 2013, the Queensland Government released the Queensland Agricultural Land Audit in furtherance of the Government's goal of doubling agriculture, fisheries and forestry production by 2040, including a commitment to double food production. 14 The audit was to help guide investment in the agricultural sector and inform decision-making to ensure the best use of Queensland s agricultural land. The stated primary pathway to succeed in doubling food production by 2040 is resource availability, particularly land, water and labour, which is under increasing pressure from an expanding resources sector. 15 Since 1992 in Queensland, the conservation of Good Quality Agricultural Land 16 has been a consideration in planning approvals. 17 Good Quality Agricultural Land (GQAL) is land which is capable of sustainable use for agriculture, with a reasonable level of inputs, and without causing degradation of land or other natural resources. In this context, agricultural land is defined as land used for crop or animal production, but excluding intensive animal uses such as feedlots, piggeries, poultry farms and plant nurseries based on either hydroponics or imported growth media. 18 GQAL is assessed based on agricultural land classification. Class A land is considered to be GQAL in all parts of the State. In areas where agricultural land is scarce, Class B land is also considered GQAL, and better-quality Class C is considered to be GQAL in areas where pastoral industries predominate. 19 GQAL is based on local government areas and is subject to variation. 20 Table 1: Agricultural land classes Class Class A - Crop land Class B - Limited crop land Class C - Pasture land Description Land that is suitable for current and potential crops with limitations to production which range from none to moderate levels. Land that is marginal for current and potential crops due to severe limitations; and suitable for pastures. Engineering and/or agronomic improvements may be required before the land is considered suitable for cropping. Land that is suitable only for improved or native pastures due to limitations which preclude continuous cultivation for crop production; but some areas may tolerate a short period of ground disturbance for pasture establishment. Source: DPI and DHLGP, 1993 Map 2 identifies the GQAL within the Mackay, Isaac and Whitsunday Region, as well as the GBSDA that threatens some of it. 14 DAFF, Queensland Agricultural Land Audit. p9 16 Good quality agricultural land is defined as land that is capable of sustainable use for agriculture, with a reasonable level of inputs, and without causing degradation of land or other natural resources. 17 State of Queensland, DPI and DLGP, DPI and DLGP, Railroaded: Carving up food lands for coal transport in Central Queensland.

13 State Planning Policy 1/92: Development and the Conservation of Agricultural Land requires Queensland decision-makers to be aware of the location and extent of GQAL. Such information is necessary so that provisions for the protection of this land can be included in strategic plans, development control plans (DCPs) and other elements of planning schemes. 21 Map 2: Good Quality Agricultural Land within the Mackay, Isaac and Whitsunday Region 2.2 Strategic Cropping Land The Queensland Government acknowledges that the best cropping land, defined as Strategic Cropping Land, is a finite resource that must be conserved and managed for the longer term. The purpose of defining such land is to allow for planning and approval powers to be used to protect it from developments that would lead to its permanent alienation or diminished productivity. The introduction of the Strategic Cropping Land Act 2011 and subsequent State Planning Policy SPP1/12 Protection of Queensland's strategic cropping land narrowed the scope and definition of the conservation of agricultural land to focus on just that which has a history of cropping in specific coastal regions. It also created a hierarchy of cropping land: land that lies within two mapped Protection Areas is treated differently from land in Management Areas. 21 ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 13

14 The Strategic Cropping Land Act 2011 commenced on 30 January 2012 with objectives to: protect land that is highly suitable for cropping manage the impacts of development on that land preserve the productive capacity of that land for future generations. The Act is supposed to achieve these objectives by: identifying potential SCL providing criteria to decide whether or not land is SCL establishing the protection and management areas creating a process to assess development allowing for conditions to be imposed on development preventing permanent impacts on SCL in protection areas (unless the development is in exceptional circumstances); and requiring mitigation to be paid by developers if SCL is permanently impacted in the management area, or by a development in exceptional circumstances. The SCL trigger map, which indicates potential SCL, was prepared using Class A agricultural land and Versatile Cropping Land data and 1999 Queensland Land Use Mapping Program (QLUMP) data with non-agricultural areas removed. To be validated as Strategic Cropping Land, the lands must pass two tests: a history of cropping (HoC) test and field criteria. A cropping history assessment requires at least three cropping events to have occurred on the property from 1 January 1999 to 31 December The entire property is assessed even if only a portion of the property is mapped as SCL. If the SCL area fails this HoC test, the site does not qualify as SCL and field validation assessment is not required. If the area passes the HoC test, it then has to pass the zonal criteria test, where soil moisture, depth, acidity, slope and rockiness are tested. SCL is divided into five zones (see Table 2) that reflect regional differences in climate, land form and cropping systems. These zones are sub-divided into management areas and protection areas. Over 60 per cent of the GBSDA sits within SCL zones, of which 86 percent is within the largest Western Cropping Zone and a smaller portion in the Coastal Queensland Zone. The Strategic Cropping Land Act has now been repealed by the passing of the Regional Planning Interests Act 2014, on 20 March Table 2: Queensland Strategic Cropping Land zones GBSDA SCL Trigger map in GBSDA SCL Zones Total area (Ha) (Ha) (Ha) COASTAL QUEENSLAND 14,584, ,077 15,547 EASTERN DARLING DOWNS 1,048, GRANITE BELT 181, WESTERN CROPPING 31,916,104 1,077,201 77,825 WET TROPICS 3,090, Total 50,821,182 1,248,278 93,373 Source: DAFF, 2013a 14 Railroaded: Carving up food lands for coal transport in Central Queensland.

15 Under the SCL Act, temporary impacts are defined as those that prevent cropping for up to 50 years, at which point the soil resource and landform will be restored to its former SCL status. The impact on the soil resource and landforms needs to be able to be restored to pre-existing condition and soil health. Permanent impacts disturb cropping activities for 50 years or more and may not facilitate restoration of land to its former SCL status. Activities that permanently impact on Strategic Cropping Land are only prohibited in the Protection Areas. Elsewhere, if a mining company is going to permanently remove or damage cropping land, they pay a mitigation fee or enter into a mitigation deed. A mitigation deed may include of a combination of activities to address the loss of the productive capacity and a payment to the mitigation fund. Mitigation costs for activities that have permanent impacts are calculated based on the Strategic Cropping Land Regulation The Galilee Basin State Development Areas falls within both the Central Highlands Isaac subregion of Western Cropping zone and the Mackay Whitsunday subregion of the Central Queensland Coast Cropping Zones. The prescribed Mitigation fees are $4,750 per hectare for the Central Highlands Isaac subregion and $15,000 per hectare for the Mackay Whitsunday subregion Regional Planning Interests Act The Newman Government has now passed the Regional Planning Interests Act which further erodes both the definition and scope of agricultural land conservation in Queensland to include only Priority Agricultural Areas which are defined as an area used for a priority agricultural land use. The minimal protections in place for cropping land will be lost, as the new Bill repeals the Strategic Cropping Land Act. Criticism of this new law centres on the replacement of the agricultural land protection mechanisms of the Strategic Cropping Land Act with a system that has as its purpose the management of impacts of resource activities, and co-existence of resource activities with agricultural activities, and does not anywhere propose protections or prohibitions. 24 While the Act preserves strategic cropping land as a regional interest (Section 7 (c)), there is nothing in the purposes of the law now which empowers it to protect and preserve matters and areas of regional interest, including priority agricultural areas and strategic cropping land or delineate areas that are off-limits to mining and its associated infrastructure. The Priority Agricultural Areas, identified in new regional plans, are limited in extent and neither the Regional Plans nor the Regional Planning Interests Act prohibit coal mining and gas extraction in Priority Agricultural Areas, within 2km of residential areas and growth areas, or within critical water resources. The Bill also fails to provide for an agricultural impact assessment before awarding Regional Planning Interest Authorities. It has been reported that the Regional Plan Priority Agricultural Areas mapped within the Darling Downs represent less than half of the current cropping area and only about 40 per cent of that in Central Queensland. Critics of the Darling Downs Regional Plan claim the priority land uses do not include improved grazing areas, such as dry land cropping or the water infrastructure essential to operating irrigated agriculture. 25 The Act will provide coal mining and gas extraction with an easy approval pathway in areas of agricultural production. Without clear and unambiguous statutory protection, agricultural lands and critical water resources that underpin them will continue to be lost to coal mining and its associated infrastructure and the chronic decline of agricultural productivity in Queensland will continue. For the areas affected by the Galilee Basin State Development Area the situation is even worse: there are no priority agricultural areas mapped in the entire region, because the current regional plan pre-dates this latest terminology Regulation 10, Strategic Cropping Land Regulation 2011 (Qld) 23 accessed 26 February The purposes of the new Bill are outlined in Section DSIP, Railroaded: Carving up food lands for coal transport in Central Queensland. 15

16 2.4 State Planning Policy Until December 2013, when the State Planning Policy 27 (SPP) was introduced, Local Government planning assessments for agricultural land were dealt with under State Planning Policy 1/92 (Development and The Conservation of Agricultural Land) Order. 28 The new SPP promotes and optimises agricultural development opportunities and enables increased agricultural production in these areas. The SPP protects productive agricultural land and maintains or enhances land condition and the biophysical resources by avoiding fragmentation of Class A or Class B land into lot sizes inconsistent with the current or potential agricultural use, and avoids locating non-agricultural development on or adjacent to such land. The SPP only, however, applies to Local Government decisions. Unfortunately for Queensland s agricultural productivity, if a project is declared a coordinated project by the Coordinator-General under the State Development and Public Works Organisation Act 1971 (SDPWO Act), as many coal mines and all of their associated railways are, the SPP does not apply. For the vast majority of extractive industry and the massive infrastructure schemes that threaten valuable farmland in Queensland, the policy that is supposed to protect productive food land does not apply. Queensland s good, versatile, and productive agricultural land will, therefore, continue to be lost, degraded and fragmented. 3. The Galilee Basin State Development Area The State Development and Public Works Organisation Act 1971 allows for regulation to declare any part of Queensland to be a State Development Area (SDA) 29 within which the Coordinator-General may acquire land for the primary purpose for which the SDA was declared or any incidental purpose. 30 If land is compulsorily acquired in an SDA, the owner of the land is compensated in accordance with the process in the Acquisition of Land Act On 7 November 2013, the Queensland Premier, Campbell Newman announced the Galilee Basin Development Strategy under which the declaration of a Galilee Basin State Development Area (GBSDA) has been proposed. As shown in Map 2, the GBSDA extends over 20,000 square kilometres and captures some of the State s most productive agricultural land. There are three precincts proposed for the GBSDA Scheme: a precinct for Mining Services, a West to East Rail corridor and South to North Rail Corridor (see Map 3). For the rail Precincts, land uses inconsistent with future rail infrastructure will not be given approval (GBSDA Scheme 13-14). Cropping and animal husbandry are listed for both rail corridors as uses that may be consistent with the preferred land use intent, as long as the current farming and grazing does not alienate land within the precinct for the identified consistent uses that is, coal export railways and their associated infrastructure. 31 The South to North Rail Precinct is to accommodate future rail infrastructure and associated activities in the Galilee Basin. Once the preferred rail corridor alignment has been identified other rail corridor alignment options will not be supported. The South to North Rail Precinct can accommodate two distinct new rail alignments from the southern end of the Galilee Basin and a third from northern Galilee. Two of these alignments join up south of Collinsville, where one joins the existing rail alignment to Abbot Point and a second proceeds to Abbot Point to the west of the existing line (see Map 3). It would appear that all the current rail alignment proposals can be accommodated within the Precinct, with the exception of the section of GVK Hancock s Alpha alignment north west from Collinsville, where the proposal lies well outside of the GBSDA boundary, but has status as a Priority Infrastructure Facility and so can utilise compulsory acquisition anyway. 27 DSDIP, 2013, p Section Section QCG, 2014, p14 16 Railroaded: Carving up food lands for coal transport in Central Queensland.

17 The Queensland Coordinator General proposes that rail infrastructure within both the West to East and South to North Corridor Precinct is to minimise impacts on existing infrastructure including road, rail, electrical, water and telecommunications, but no mention is made of minimising impacts on agriculture either through fragmentation of GQAL or SCL or through exacerbated flood impacts. 32 Under section 14 of the draft GBSDA Scheme, landholders and others with interest in land affected by the scheme must apply in writing to the Coordinator General to continue making use of the land. This may be granted, as long as they had approval to use the land in that way before the SDA comes into effect, and as long as the SDA scheme doesn t state another use for the land in question. To make such an application, they must pay a fee, and provide documentation demonstrating that the use they want to make of the land was permitted prior to the SDA coming into effect. The Coordinator General has the power to refuse the application, with no right of appeal. Map 3: Proposed Galilee Basin State Development Area Precincts The precise details of the actions that the Queensland Government proposes to take to facilitate development within this corridor are not yet clear, but the draft State Development Area Strategy, which was placed on public exhibition in early 2014, outlines a range of potential measures, including discounted water licences, discounted royalties, Government facilitation of industry cooperation and compulsory acquisition of land in the SDA. 32 QCG, 2014, pp13-14 Railroaded: Carving up food lands for coal transport in Central Queensland. 17

18 During the period that the Galilee Basin State Development Area has been on public exhibition, residents of Merinda and Collinsville have expressed concern about the impact of compulsory acquisition on their communities, and the State Government responded to this concern by announcing the residential areas in those towns would not be subject to compulsory acquisition for the railways. 33 This is no doubt cold comfort for those townspeople whose livelihoods depend on the broader agricultural industry of the region, because no such commitment has been made about important agricultural areas. The last major coal haulage railway for which the Queensland Government facilitated compulsory acquisition has stalled indefinitely thanks to the withdrawal of a major partner, and the timeline for constructing the line is now unknown. The Surat Basin Infrastructure Corridor State Development Area (SDA) was declared on 24 November 2011, allowing the Coordinator-General to regulate land uses in the corridor and acquire the land, or an interest in land, within the SDA to establish the infrastructure corridor. The Queensland Government is now offering to make ex-gratia payments of $10,000 each to 36 landholders in the area to make amends for the uncertainty they have faced, with the Deputy Premier quoted saying, This is a unique situation where property owners have been dealing with uncertainty for seven years and may continue to do so due to being within a declared State Development Area. 34 Landowners and their representatives, however, indicated that this sum falls woefully short of the 30% loss in land values they have suffered as a result of the proposed rail line, and the hundreds of hours they spent grappling with the process. 35 Despite this fiasco, the Government appears intent on following a similar strategy with landholders in the Mackay, Isaac and Whitsunday Region. It is worth noting, too, that the proponent of the Alpha Coal project has had the power to request compulsory acquisition since October 2010, when the project was designated an Infrastructure Facility of Significance, and yet the project has still not begun work. There is no reason to believe that the declaration of this SDA, to facilitate high risk, high capital coal mine proposals during a period when the coal industry is in downturn, will end any differently to the Surat Basin fiasco, and it will again be the agricultural communities, and the soft infrastructure that supports them, that will be the losers. 3.1 The Mackay, Isaac and Whitsunday Region The Region most affected by the GBSDA is the Mackay, Isaac and Whitsunday Region. The agricultural land resources, rivers and existing railways are shown in Map 4, as is the area of the region that is captured by the GBSDA. The Regional Plan for the region recognises that, Strategic Cropping Land and Good Quality Agricultural Land is a valuable asset to be recognised and protected. Alienation and loss of this resource through fragmentation, urban development, mining or other high impact development will not be supported, unless there is an overriding need in the public interest for the proposed use, and there are no alternative locations available. 36 (See Maps 5 to 8 and Map 16 for areas of SCL and GQAL with the MIW Region). Is there an overriding need in the public interest to alienate and sterilise this agricultural land to open the Galilee Basin for coal production and build railways to ship that coal? 33 Deputy Premier Jeff Seeney. 4 March Media Release Urban areas in North Queensland towns shielded from rail corridor 34 Deputy Premier, Minister for State Development, Infrastructure and Planning, Quoted in Penelope Arthur, 12 December Wandoan s rail woe. Queensland Country Life. 36 Queensland Department of State Development, Infrastructure and Planning, 2012, p Railroaded: Carving up food lands for coal transport in Central Queensland.

19 Map 4: Regional context: mines, rail and agricultural land Grazing is the predominant land use in the area (98% of Burdekin Catchment- see Map 4), followed by irrigated sugarcane in the Bowen area. Broadly indicative figures for average annual gross value of production are: cropping (mainly sugar and horticulture) around $450 million; livestock (mainly beef cattle) around $170 million. 37 Grazing properties are typically large (30,000 hectares, herd of cattle) while agricultural enterprises tend to be a lot smaller (119 hectares for sugar cane and 39 hectares for horticulture crops). 38 As shown in Map 5, within the region, there are three concentrated areas that are dedicated to cropping: The GBSDA is proposed to overlap with three distinct areas of GQAL. One, near Bowen (see Map 6) is identified as Important Agricultural Area in the Queensland Agricultural Audit. The second surrounds the township of Collinsville (see Map 7). The final area is west of Moranbah in the Mistake Creek Catchment (see Map 8). 37 Beare et al., ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 19

20 Map 5: Location of detail maps The Whitsunday area, including the Lower Burdekin and Don River deltas (Map 6) is one of the highest yielding sugarcane producing areas in Australia with around 40,000 ha of land under cane. 39 The subregion supports a multimillion dollar horticulture industry, predominantly within the Bowen area, which supplies a significant proportion of Queensland s tomatoes, capsicum, green beans and sweet corn, as well as high-quality mangoes Charlesworth et al., State of Queensland, 2012, p36 20 Railroaded: Carving up food lands for coal transport in Central Queensland.

21 Map 6: Agricultural land in the Lower Burdekin and Don River delta, near Bowen It is estimated by the Burdekin Dry Tropics Board (2005) that around 6,400 ha of cotton and grain crops are irrigated in the Belyando River catchment with about half of this area located in the Mistake Creek sub-catchment (See Map 8). This irrigation tends to occur in alluvial plains adjacent to the main stems of the river or its larger tributaries. 41 Within the Mistake Creek sub-catchment, farmland under irrigation most commonly produces cotton. Forage, maize, cereal crop and pasture are currently the most commonly irrigated crops. While there is some pressure to expand irrigated agriculture, financial constraints within the farming industry may inhibit such development Burdekin Dry Tropics Board, ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 21

22 Map 7: Important agricultural land near Collinsville The Region is experiencing significant economic growth, with an average growth rate of 5.5 per cent per annum compared to a state average of 2.3 per cent. Agricultural activities in the region contribute 9.5 per cent of Queensland s total agricultural production DSDIP, 2012, p Railroaded: Carving up food lands for coal transport in Central Queensland.

23 Map 8: Agricultural land in the Mistake Creek subcatchment Individual rail proposals within the GBSDA As shown in Table 3, the five rail proposals within the Galilee Basin State Development Area are at different stages in the planning process. Table 3: Rail proposals in the Galilee Basin State Development Area Proponent Name of project Length (km) Stage Adani Mining Pty Ltd Carmichael Coal Mine and Rail Project 189 Supplementary EIS Adani Mining Pty Ltd North Galilee Basin Rail Project 303 EIS Aurizon Holdings Limited Central Queensland Integrated Rail Project undefined Terms of reference for EIS GVK Hancock Coal Alpha Coal Project 495 Approved Waratah Coal Pty Ltd Galilee Coal Project (Northern Export Facility) 453 Approved Total 1440 Source: Rail proponent EIS documents Railroaded: Carving up food lands for coal transport in Central Queensland. 23

24 Map 9: Railway proposals in the GBSDA There are five rail lines proposed for the GBSDA, as shown in Map 9, and these have the potential to interact to produce a cumulative impact. GVK Hancock Coal s Alpha Coal Project (Rail) and Waratah Coal s Galilee Coal Northern Export Facility (Rail) have been given government approval and Adani s Carmichael Rail and North Galilee Rail Project are awaiting approval. Aurizon s Central Queensland Integrated Rail Project is yet to submit detailed assessments. Adani has stated in the EIS for the Carmichael project that, It is likely that only one of these rail lines will proceed. 44 Adani also admit in their EIS that the additional trains associated with the [Carmichael] Project (Mine) production can be accommodated on the existing rail network in conjunction with the Project (Rail), subject to planned capacity upgrades proposed by [Aurizon] 45 And yet, the company is still proposing two of the five railway lines that are the subject of this report. We are not able to determine which or how many of these five projects will proceed to being built, and this leaves the agricultural producers of the region in confusion and anxiety about the future of their farms and livelihoods. What is clear, though, is that the Queensland Government is going out of its way to facilitate and encourage their development as hastily as possible. 44 Adani Mining Pty Ltd, 2013c, p25 45 Adani Mining Pty Ltd, 2013c, p30 24 Railroaded: Carving up food lands for coal transport in Central Queensland.

25 3.2.1 Existing rail Infrastructure Aurizon s existing Goonyella System services more than 30 coal mines in the northern and central areas of the Bowen Basin. The nearest point of this existing railway system to Adani s proposed Carmichael Rail Project is the Blair Athol Branch near Moranbah, as shown in Map 10. The now-completed Goonyella to Abbot Point expansion project has linked the previously separated Newlands and Goonyella Rail systems and increased the capacity of rail haulage to Abbot Point coal terminal to 50mtpa. After the completion of Aurizon s Goonyella Rail Expansion Project, which is currently under construction, the Goonyella System will have coal haulage capacity to Hay Point and Dalrymple Bay Coal terminals near Mackay of 140mtpa, making it the single largest export coal rail network in the country. 47 Map 10: Existing rail system Aurizon Central Queensland Integrated Rail Project Aurizon has lodged an interim advice statement for their Central Integrated Rail Project with the aim of integrating a rail network from the Galilee Basin to the coal ports in the east, in particular Abbot Point, and further expand access to Abbot Point for the expanding and new mines in the Bowen Basin. Aurizon has seen an opportunity to connect new narrow gauge rail infrastructure from the Galilee Basin to its existing Central Queensland Coal Network, and maintain its nearmonopoly on coal rail haulage in Queensland. 46 Adani Mining Pty Ltd, 2013d, p70 47 For the current status of the Goonyella Rail Expansion Project, see Railroaded: Carving up food lands for coal transport in Central Queensland. 25

26 Map 11: Aurizon Central Queensland Integrated Rail Project The greenfield rail in this project comprises three sections: Diamond Creek to Newlands Junction (See Map 11) Central Galilee to Diamond Creek this section is proposed to follow an alignment that is broadly consistent with one of the proposals from Adani (See Map 12) South Galilee to Galilee Junction this section is proposed to follow an alignment that is broadly consistent with that proposed by Waratah Coal The proposal is to upgrade the existing line From Newlands Junction to Abbot Point, passing through Collinsville (see Map 11). This proposal was declared by the Queensland Government to be a significant project on 27 January The proposal was determined to be a controlled action requiring an EIS for assessment under the Federal Environment Protection and Biodiversity Conservation Act on 19 April Railroaded: Carving up food lands for coal transport in Central Queensland.

27 More recently, Aurizon has signed an agreement with GVK Hancock Coal to enter into negotiation about buying half of Hancock Coal Infrastructure Pty Ltd, the company developing the Alpha rail proposal and the T3 coal terminal at Abbot Point, and develop a Galilee Basin rail line together. Aurizon s statement upon signing that agreement notes that The proposed new rail solution would be located within the Queensland Government s preferred rail corridors for the development of the Galilee Basin as defined under Queensland Government policy announced in June 2012, and is intended to align with Government policy on shared infrastructure and open access. 48 Though this agreement implies that it is the approved Alpha rail line that will be developed together by these companies, Aurizon has not withdrawn their own, separate, narrow gauge Galilee rail project Adani - North Galilee Basin Rail Project and Carmichael rail As part of their Carmichael project, Adani proposed to develop a privately-owned narrow gauge rail line connecting with the existing Aurizon rail infrastructure to the coal terminal facilities at the Port of Abbot Point and the Dudgeon Point expansion at Hay Point, south of Mackay. The rail line was proposed to transport 60 million tonne per annum of thermal coal from its Carmichael mine in the north Galilee Basin approximately 160 km north-west of Clermont in Central Queensland for 90 years - the stated approximate mine operating life. 49 The Rail Project proposes to connect the Mine to the existing Goonyella and Newlands rail systems and includes a 120 km dual gauge portion from the mine site running west to east to Diamond Creek and a 69 km narrow gauge portion running east from Diamond Creek connecting to the Goonyella rail system south of Moranbah. Adani Mining Pty Ltd (Adani) also proposes the construction and operation of the North Galilee Basin Rail Project (NGBR Project), a multi-user, standard gauge, greenfield rail line that will transport coal from mines proposed in the northern Galilee Basin to the Port of Abbot Point with a 32.5 tonne axel load. The NGBR Project is approximately 300 km long and connects the proposed Carmichael Coal Mine and Rail Project s east-west rail corridor, approximately 70 km east of the proposed Carmichael Coal Mine in the vicinity of Mistake Creek, to the Abbot Point coal terminals. The NGBR Project will have an operational capacity of up to 100 million tonnes per annum (mtpa) of coal product expected to be sourced from both Adani and third-party mines in the northern Galilee Basin Aurizon The Supplementary EIS for the Carmichael mine has revised the expected life of the mine down from 90 years to 60 years. However, the more recent EIS for the North Galilee Basin Rail project still states that Carmichael will operate for 90 years. Such discrepancies and inconsistencies are common in the environmental assessment documents for the Galilee Basin coal mines and associated infrastructure. 50 GHD, 2013a, p1 Railroaded: Carving up food lands for coal transport in Central Queensland. 27

28 Map 12: Adani North Galilee Basin Rail and Carmichael Rail Adani has considered developing or utilising a consolidated corridor with Waratah Coal s proposed China First Project, or GVK Hancock Coal s proposed Alpha Coal Project, both of which include proposals for standard gauge rail infrastructure. However, according to Adani, uncertain development timeframes and the identification of a more direct rail route has left Adani with limited potential for co-use of these railways. 51 Adani s original rail proposal, the Carmichael Coal Mine and Rail Project, proposed to connect to the existing Aurizon narrow gauge network in the Goonyella and Newlands system. This would require Aurizon to develop an alignment between Newlands Junction and Diamond Creek and upgrade the existing alignment from Newlands Junction to Abbot Point. In the EIS for the North Galilee Basin Rail Project, Adani complains that this would constrain the speed and scale of their export enterprise, because the Aurizon systems are narrow gauge, having a much lower axle load with limited capacity for upgrade, all of which combined would act to increase coal prices and reduce the cost competitiveness of Galilee Basin coal in the global market. 52 Adani states that, uncertainty with regard to Aurizon s development timelines in addition to the above technical aspects, has led them to propose the much shorter and direct route to Abbott Point, standard gauge, NGBR Project. This implies that the company no longer wishes to pursue the Carmichael Rail project, but that proposal has not formally been withdrawn. Their reference to Abbot Point as the Port to which coal mined from their Carmichael project would be shipped also implies that they have abandoned the idea of shipping coal through the huge new Dudgeon Point coal terminal, proposed to be built near Hay Point, but again, this proposal has also not been formally withdrawn. 51 GHD, 2013a, p 3 52 ibid 53 ibid 28 Railroaded: Carving up food lands for coal transport in Central Queensland.

29 The expected cost of the operation and maintenance of the NGBR Project is claimed by Adani to be in the order of $2.50 per tonne and they expect operation of the NGBR Project to coincide with completion of construction and commencement of production from the Carmichael mine, currently expected to begin 2016 and continue for 90 years GVK Hancock - Alpha Rail Project The approved Alpha Coal Project includes construction of a 495 km rail line 55 to transport coal from the Alpha coal mine, 50 km north of the township of Alpha, to Abbot Point. The rail line proposes to transport up 60mtpa of coal on a single standard gauge track and service both of GVK Hancock s approved Galilee Basin mines, Alpha and Kevin s Corner, as well as other customers to whom GVK Hancock Coal have promised access, such as QCoal, with whom GVK Hancock Coal signed an MOU in December 2012, promising to allow QCoal to utilise 20mtpa of GVK Hancock s 60mtpa rail capacity. 56 Map 13: GVK Hancock Alpha coal rail project 54 GHD, 2013b. p35 55 Hancock Prospecting Pty Ltd, 2011e., p1 56 See GVK Hancock press statement 11 December Australia_for_c_2c41a488b3b94f9d867f39f pdf Railroaded: Carving up food lands for coal transport in Central Queensland. 29

30 The Project footprint comprises an easement of 495km long and 500m wide as well as a series of laydown areas and construction nodes, local construction access tracks and local maintenance access tracks. 57 In October 2013, the Queensland government declared the Alpha mine and rail project, and the related Kevin s Corner mine, a prescribed project under the State Development Public Works Organisation Act. 58 This gives the Coordinator General the power to issue orders to speed up administrative process, or to assume responsibility for assessing and making a decision on a project, in place of another decision-maker. The Alpha project has also been, since October 2010, a declared Infrastructure Facility of Significance which also gives the private company building the project power to apply to compulsorily acquire land for it. 59 All of this facilitation and red-tape cutting by the Queensland Government has not managed to bring the project forward speedily, indicating that the delays being experienced may have their origin in the sentiment of the coal and financial markets, which no amount of compulsory acquisition can coerce Waratah Coal Galilee Coal Rail Project Waratah Coal proposes a greenfield standard gauge railway about 468km from the Galilee Basin to the port of Abbot Point to support 25,000 tonne wagons. The easement is expected to be 60 to 80m wide and include rail and a service road. The rail alignment was increased from its original 60mtpa to 400mtpa design capacity. According to Waratah Coal, the increase was instigated by concerns from community and government regarding the environmental and social impact of multiple rail alignments from the Galilee Basin. 61 The 400mtpa capacity line would, according to Waratah, mean one 3.2km long train travelling at 80km per hour loaded, or 100km per hour empty, every 22 minutes for 300 days of the year. 62 Image Page 30: Paula Heelan 57 Hancock Prospecting, 2010e, p6 58 See the list of Queensland s prescribed projects here; 59 See the list of Queensland s Infrastructure Facilities of Significance here; 60 Waratah Coal, 2011a, p3 61 op cit, p4 62 op cit, p10 Railroaded: Carving up food lands for coal transport in Central Queensland. 30

31 Map 14: Waratah Coal Galilee Coal Project The rail component of the project includes two 8 km long rail loops linking the two rail loading stations at the mine to the rail line and a 468km single track to the Abbot Point State Development Area. 63 Waratah anticipated initial coal handing capacity of the proposed rail to allow for 60 million tonnes per annum but expected this to escalate up to 400 Mtpa over a year period, including up to sixteen passing Ioops and nine bridge crossings of major rivers op cit, p14 64 ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 31

32 4. Agriculture in the GBSDA The GBSDA extends over 20,000 square kilometres and some of the State s most productive agricultural land, containing almost 400,000 ha of Class A and B agricultural land and almost 60,000 ha of potential Strategic Cropping Land (SCL). Pastoral farming is undertaken across the GBSDA area, with small areas of cropping to provide cattle fodder. Many properties comprise a mix of productive grazing land used for finishing cattle prior to market sale, and less productive land used for general grazing. 65 As shown in Map 15 and Table 4, the GBSDA intersects with close to 400,000 ha of Class A and B Good Quality Agricultural Land and almost 60,000 ha of potential Strategic Cropping Land (SCL). Table 6 shows the agricultural importance of the areas within the GBSDA as it covers more than 1.8 million hectares of grazing land, 57,870ha of which is categorised as high quality, 400,000 ha of potential agricultural land, almost all of which has been classified by the Agricultural Land Audit as potential intensive livestock production. Table 6 also shows that the GBSDA includes over 250,000 ha of potential annual horticulture, 80,000 ha of potential perennial horticulture and 72,000 ha of potential cropping land, and almost 60,000 of a mapped Important Agricultural Area near Bowen. In addition, as shown in Table 6, the State Development Area captures over half a million hectares of land on four floodplains. Table 6 shows the GBSDA precincts crossing over 1680 waterways between the Galilee Basin and Abbot Point, all of which will require drainage works potentially exacerbating flood impacts. The impacts the rail lines would have on flooding and hazards in these lands are discussed in Section 5 of this report. Table 4: Mapped Agricultural land class A and B polygons intersecting with GBSDA Agricultural Land Category Descriptor Area - Ha A A1 : Crop land - broad acre and horticultural 252,439 B B : Limited crop land 131,779 B B/C: Mix of class B and class C land 7,141 TOTAL 391,359 Source: DAFF, 201. Note: Intersecting polygons include those that extend outside of the GBSDA. I.e. this total is somewhat greater than the ALA land within the GBSDA. 65 Adani Mining, 2013a, p21 32 Railroaded: Carving up food lands for coal transport in Central Queensland.

33 Map 15: Agricultural Potential within the GBSDA Table 6 summarises, not just the area of agricultural land captured by the State Development Area, but the lands that fall within the proposed GBSDA precincts in which rail projects are likely to be built. The table shows that the North to South railway precinct includes 12,040 ha of land that was originally identified in the Strategic Cropping Land trigger map, but that 10,567ha of this land has now been found to be not Strategic Cropping Land through the history of cropping invalidation process outlined in Section 2.2 of this report. In order to qualify for protection, all land in the Strategic Cropping land trigger map must go through such a validation decision. In these and all other cases, the decisions was made to invalidate the Strategic Cropping Land, on the basis of its lack of cropping history. In other words, 87% of the land in the precincts that had been identified as Strategic Cropping Land has now been assessed out of existence. Table 6 also shows that the proposed GBSDA precincts could sterilise almost 200,000 ha of pasture, over 50,000 ha of which has been identified as potential intensive livestock production, as well as 11,000 ha of the Bowen Important Agricultural Area. The proposed precincts will also sterilise over 50,000 ha of potential cropping and horticulture land. Railroaded: Carving up food lands for coal transport in Central Queensland. 33

34 Flood plains 66 Don River 7,926 1, Table 6: Agricultural land within GBSDA proposed precincts Area in GBSDA ha GBSDA TOTAL 2,109,001 South to North West to East Mining Services South North Corridor Precinct 213, ,515 West to East Corridor Precinct 6,245 6,245 Mining Services Precinct 31,565 31,565 TOTAL 251, ,515 6,245 31,565 Existing grazing land Lower Burdekin River 3, Suttor River 541,557 32,851 3,326 9,839 Bowen River 27,417 6, TOTAL 579,966 40,631 3,326 9,839 Category Low 1,080,470 96,026 1,298 10,941 Medium 751,178 64,768 4,945 20,407 High 57, TOTAL 1,889, ,320 6,243 31,349 ALA Important Agricultural Land 67 59,402 11, Agricultural Potential Potential Annual Horticulture ,985 25, ,871 Potential Perennial Horticulture 69 82,434 13, Potential Cropping 70 72,427 14, TOTAL 413,847 53, ,543 Livestock Potential Potential intensive livestock ,231 46,125 3,237 8,871 Strategic Cropping Land Original trigger map 72 93,373 12, Excised from trigger map -1, Invalidated by cropping history test 73-32,863-10, TOTAL 58,677 1,146 An analysis of the intersection of the GBSDA proposed precincts with land parcels and station boundaries has revealed that they will intersect at least 933 distinct identified land parcels. A full breakdown of the precincts against stations and land parcels is provided in Appendix Identified by the ALA on the basis of advice from regional and industry experts and from synthesis of maps and information on current and potential use of land for the range of agricultural land uses considered by the audit. 68 land of agricultural land class A and class B with slope less than 8 per cent and April to October rainfall less than 500 mm. 69 land of agricultural land class A and class B with slope less than 15 per cent and April to October rainfall less than 500 mm. Excludes land that has cracking clay soils. 70 land of Agricultural Land Class (ALC) A with slope less than 8 per cent and mean annual rainfall greater than 450 mm for 7 out of 10 years. 71 includes land of agricultural land class A and class B (and class C1 where it is within 10 km of current cropping) with slope less than or equal to 8 per cent. 72 Class A Agricultural Land and Versatile Cropping Land data and 1999 Queensland Land Use Mapping Program (QLUMP) data identified as production from agriculture or plantations. 73 Validation decisions for applications submitted under Section 40 of the Strategic Cropping Land Act 2011 (SCL Act). Under the SCL Act, a validation application can be made to confirm whether an area of land is or is not SCL. In these and all other cases, decisions were made to invalidate SCLs. 34 Railroaded: Carving up food lands for coal transport in Central Queensland.

35 4.1 Impacts on agricultural land in the GBSDA The rail projects proposed for the GBSDA will reduce the area of available agricultural land and fragment the agricultural landscape in the region. Table 8 summarises the size and scale of the railways for which detailed information was available, as well as the area of good quality agricultural land affected by each. Proponents of some railways admit that fragmentation and intrusion of agricultural property, Good Quality Agricultural Land (GQAL) and loss of Strategic Cropping Land (SCL) is an unavoidable cumulative impact of rail construction. 74 These impacts on the agricultural productivity of the region should have been of paramount importance in the selection of a rail corridor, but this has not always been the case. Rather, it would appear that construction and operating costs have been the overriding factor in most alignments selected by proponents. Though some have claimed to and appear in some case to have taken agricultural land into consideration as a constraint in choosing their alignment, the cumulative loss of good quality agricultural land could be substantial and the Queensland Government has stated its intention to facilitate compulsory acquisition of this land. Table 8: Details of proposed rail alignments and their impacts on agricultural land Proponent Project Capacity Mtpa Length km Width m Total ha No. of properties GQAL ha Waratah China First ?? GVK Hancock Alpha Adani Carmichael Adani NGBR Aurizon CQIR Total Source: Rail proponent s EIS documents Waratah Coal was so unconcerned with the impact its Galilee China First Project railway would have on agricultural land it didn t even include them in the EIS for the project. Waratah claims that due to the large number of parcels falling across the entire study area (over 6,400), the treatment of minimising property severance was considered to [sic] detailed for the initial overall assessment. Waratah assumed that the majority of the properties affected along the rail corridor will be beef cattle stations and agriculture pastures 75 implying, perhaps, that pasture and grazing was not an enterprise worthy of assessment compared to something as important as a coal export project. The company admitted, however, that construction of the railway corridor will result in a number of unavoidable impacts on the various land uses that exist across the study area. 76 Queensland Department of Employment, Economic Development and Innovation submitted to Waratah that the EIS had failed to adequately address the impacts on agricultural land use and good quality agricultural land. 77 Queensland's Department of Environment and Resource Management (now the Department of Environment and Heritage Protection) likewise submitted that the soil and land suitability assessment had not been conducted to an acceptable level of detail 78. Waratah s response was to engage a consultant to prepare a thinly-detailed report that downplayed the scale of the impact: the rail alignment runs through approximately 21 km of Class A or B agricultural land (just under 5% of the length) and the rail corridor intercepts 74 Adani Mining, 2013c, p12 75 Waratah Coal, 2011e, p35 76 op cit, p Waratah Coal Pty Ltd, 2013g, p ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 35

36 Image Page 36: 2014 Erland Howden 36 Railroaded: Carving up food lands for coal transport in Central Queensland.

37 Railroaded: Carving up food lands for coal transport in Central Queensland. 37

38 SCL for about 2.5km (about 0.5% of its length). 79 Despite being forced to admit that, Construction of linear infrastructure can fragment agriculturally productive soils characteristic of GQAL or Strategic Cropping Land, 80 no area calculation of affected agricultural land was provided. As a demonstration of the silence of the Queensland Government on the loss and fragmentation of agricultural lands in Central Queensland as a result of the expanding mining industry, in the 267 pages of the Queensland Coordinator-General s evaluation report on Waratah s Galilee Coal Project the word agriculture appears five times and cropping just eight. The 398 page Coordinator-General s report on the Alpha Coal Project mentions agriculture nine times and cropping or crops only twice, though GVK Hancock at least included an agricultural land assessment in their EIS documents. 81 The GVK Hancock rail project will result in direct sterilisation of about 2,200 ha of Good Quality Agricultural Land (GQAL) and a further 800 ha of other agricultural land. 82 GVK Hancock identify the significance of the overall cumulative loss of GQAL as moderate in contrast to losing the opportunity to exploit and export Galilee Basin coal and low in relation to overall economic impact, as the proposed new land use will offset the economic losses of farmers. 83 GVK Hancock claims that for a large number of properties, the area of direct impact is minimal when compared with the total area of land held by the landholder and consulted with landholders to avoid or minimise the fragmentation of important finishing paddocks, along with areas of property infrastructure and improvements, such as cattle yards and dams. 84 GVK Hancock s Alpha rail project will cross 38 properties, a number of which have multiple parcels of land directly impacted. The corridor width will generally be 60m, allowing space for the railway line infrastructure, maintenance roads and passing loops. Land acquisition is expected to be by easement in almost all cases. In their original EIS, GVK Hancock proposed that landholders would retain overall title to the land and agree to GVK Hancock s use of the land within an easement for purposes relating to the Project with the possibility of special conditions and compensation payments. 85 The company admits that the rail line will have an impact on paddock use and access across these properties: Most landowners use purpose built cattle laneways to efficiently move stock from various sections of their properties to central cattle yards. The Project may cross these laneways thus impacting on the ability of cattle to be moved efficiently; however they will be re-instated as part of compensation. 86 Like GVK Hancock, Adani did undertake some assessment of land impacts for their projects. The proposed NGBR corridor traverses a total of 64 properties, more than half of which are freehold lots. 87 Development of the NGBR Project will directly impact approximately 3,248 ha of land across these 64 properties resulting in a permanent land use change for impacted areas. The NGBR proposal intersects a total of 1,669 ha of land classified as GQAL, Class A, B and C1. Within this area, 1,264 ha of GQAL will become sterilised due to the final rail corridor and permanent ancillary infrastructure and a further 405 ha will be sterilised due to temporary ancillary infrastructure. 88 Adani completed a desktop assessment to assess the potential SCL that will be lost to their Northern Galilee Basin rail line, including cropping history. A soil survey is yet to be undertaken or management plans prepared. 89 The company claims they will minimise impacts to areas of GQAL and SCL intersected by the final rail corridor. 90 Adani notes in their assessment that compensation packages relating to the permanent loss of land are the subject of ongoing discussion and negotiations with affected landholders. 91 One property, Birralee, contains 17 ha of triggered SCL which has passed the History of Cropping Assessment test, 92 12ha within the final rail corridor, and 5ha within the temporary ancillary infrastructure footprint Waratah Coal, p19 80 Waratah Coal, 2012, p QCG, Hancock Prospecting, 2010f, p32 83 op cit, p35 84 Hancock Prospecting, 2010c, p11 85 op cit, p10 86 op cit, p12 87 GHD, 2013f. p5 88 GHD, 2013a, p 9 89 op cit, p9 90 GHD, 2013b, p36 91 GHD, 2013c. p40 92 GHD, 2013a, p9 93 op cit, p42 38 Railroaded: Carving up food lands for coal transport in Central Queensland.

39 Map 16: Important agricultural land in the GBSDA Though the company has stated that it will pursue voluntary land access agreements or acquisition, it has also indicated its intention to pursue compulsory acquisition, an avenue that the new Galilee Basin State Development Area indicates the Government will facilitate. Similarly, Adani s Carmichael Rail Project will fragment properties and affect stock movements, maintenance and access tracks, and decrease land values, usability and access to water on severed parcels. 94 The company s mapping indicates that, based on a 95m corridor, the Carmichael rail project will impact approximately 1,334 ha of GQAL. The company points out that 54 per cent of this is Class C1 land or pasture land classified as suitable only for improved or native pastures, but that means that 46 percent, or 613ha, is Class A or B land. 95 Adani claims that the potential impacts on GQAL have been avoided and minimised through route selection whereby GQAL constraints were considered, and that the Project alignment largely avoids land mapped as being Class A GQAL and attempts to traverse the outer extremes of Class B mapped areas to avoid and minimise fragmentation. Adani go on the say that, Potential impacts on strategic cropping land have been avoided and minimised through route selection and that Where mapped strategic cropping land is unable to be avoided, the route selection process has considered (amongst other environmental, social, cultural, economic and technical constraints), the placement of the rail corridor such that it traverses around or as close as possible to, the edges of polygons to minimise fragmentation. 97 Nevertheless, the assessment documents acknowledge that 120km of the Carmichael rail corridor traverses the western extent of the strategic cropping land Management Area in the western cropping zone, 98 capturing 155ha of land in the Strategic Cropping Land trigger map Adani Mining, 2013a, p2 95 Adani Mining Pty Ltd, 2012a, p54 96 op cit, p47 97 op cit, p56 98 Adani Mining Pty Ltd, 2012a, p47 99 Adani Mining Pty Ltd, 2013f, p iv Railroaded: Carving up food lands for coal transport in Central Queensland. 39

40 Many of the properties affected by Adani s Carmichael rail alignment are large landholdings, with the smaller landholdings tending to be near Moranbah. Adani claims that the alignment tends to follow property boundaries along these smaller landholdings, reducing the potential land fragmentation. The alignment traverses 11 leasehold properties and 10 freehold properties, while quarry developments affect five properties and these are predominantly grazing or pastoral properties. 100 Some landholders will have their property (or properties) split by projects which will, for some, necessitate new property management practices, during both construction and operation. Potential negative impacts on landholders and amenity include noise, dust, disrupted operations and increased fire risk, and the sterilisation of land for future use for food production. 101 The company notes that the SCL Act offers alternatives to deal with strategic cropping land and while financial contribution commensurate with the area of impact on all mapped potential strategic cropping land is a common and reasonable management approach to minimise potential strategic cropping land impacts, measures to further avoid or minimise potential impacts, rather than having to pay compensation, include developing and agreeing a soil survey methodology with the Department of Natural Resources and Mines to determine the actual presence of strategic cropping land prior to construction. 102 Adani appear to be saying that assessing SCL out of existence is a common and reasonable management approach to minimise potential strategic cropping land impacts. Nevertheless, a HoC assessment was undertaken on the six properties containing SCL in the Carmichael rail corridor: Avon Downs, Lambing Lagoon, Myra, Wentworth, Rugby and Rugby Run. 103 The assessment determined that only two of these properties contain SCL: Avon Downs (53.5 ha of SCL) and Lambing Lagoon (19.3 ha of SCL). 104 Adani have elected to accept the SCL trigger mapping for both Avon Downs and Lambing Lagoon, and will enter into discussions with the Department of Natural Resources and Mines (DNRM) prior to submitting the protection decision application. 105 No field verification of SCL is proposed to be undertaken. 106 Details on the impact type (permanent or temporary) will have some bearing on total mitigation fee and rehabilitation requirements 107 and a Deed of Agreement will be established between Adani and the Department of Agricultural, Fisheries and Forestry (DAFF) to facilitate mitigation of this loss. 108 Of course, the repeal of the Strategic Cropping Land Act has saved them from having to make even this minimalist amends for the loss of this land. It is our contention that the Galilee Basin State Development Area and the Regional Planning Interest Act 2014 are inconsistent with Queensland s aspiration to double agricultural production by A slew of laws, plans and policies and a clutter of different approaches to categorising land as good quality agricultural land, strategic cropping land, and priority agricultural areas cannot disguise the abject failure of the current Government to develop policy that protects and promotes food lands and agricultural enterprises. If agricultural production really were a priority for the Government, there would be an unambiguous prohibition of development that sterilises food producing land, instead, the reverse is the case, more and more land is being lost in the Government s enthusiasm for mining development. Under the measures foreshadowed by the Galilee Basin State Development Area, 252,439ha of Class A good quality agricultural land will be available for compulsory acquisition by the state or a private foreign company and its use as food producing land potentially lost forever. Moreover, the Galilee Basin Development Strategy proposes making water available to the mine proponents from the State reserve, and allowing them a discount on water licences that agricultural enterprises are required to pay for. The continued imbalance in the Government s policy approach, which privileges damaging mining activity and its infrastructure needs over other, long-established land uses in rural Central Queensland is leading to the irreversible loss of good quality land, and jeopardising the food producing future of the state. 100 Adani Mining, 2013a, p Adani Mining, 2013c, p Adani Mining Pty Ltd, 2012b, p Adani Mining Pty Ltd, 2013f, p4 104 Adani Mining Pty Ltd, 2013f, pv 105 ibid 106 Adani Mining, 2013a, p Adani Mining Pty Ltd, 2013f, piv 108 Adani Mining, 2013a, p57 40 Railroaded: Carving up food lands for coal transport in Central Queensland.

41 5. Queensland floods Queensland has one of the most naturally variable climates in the world and its climate is projected to become more variable and extreme in the future, potentially affecting the frequency or severity of natural hazards, particularly floods. Map 18 shows the five rail proposals in the Galilee Basin State Development Area and the floodplains traversed by them. Assessments produced so far for the rail projects have had mixed degrees of attention to detail about the potential impacts of flooding on surrounding farmland, and the degree to which the railways will exacerbate or alter flooding effects in the region. The variable rainfall and relatively flat topography over most of the GBSDA area can result in localised and widespread flooding in floodplains throughout the length of the catchments during rainfall events of more than 200 mm over a 48 hour period. Flooding generally occurs during summer months as a result of heavy rainfalls caused by tropical lows and rain depressions generated from cyclones crossing the north eastern Queensland coastline. 109 Map 17: Screen shot from BOM Tracks of East Australian Tropical Cyclones Based on historical data, a total of 57 tropical cyclones have passed within 200 km of the North Galilee Basin Rail Project study area since 1906, as shown in Map These cyclones mostly reached intensities of Category 1 to Category 3, however, most developed into a low by the time they made landfall. One of the most powerful tropical cyclones recorded in Queensland was Yasi, a Category 5 cyclone, which made landfall near Mission Beach more than 200 km north of Abbot Point. 111 In January and February 2008, Cyclone Helen caused significant rainfalls throughout the region. These falls resulted in a number of the rivers and creeks in the region overtopping their banks, including the Bogie River. Flooding occurred at a number of isolated sites along Bogie River between Charters Towers and Clermont, which includes areas in the vicinity of the proposed railways. This type of event is characteristic of the region where intense rainfall can result in localised flooding of a number of the river and creek systems. Similar conditions were observed in March 2010 following Cyclone Ului that traversed directly over Collinsville as a Category One system Waratah Coal, 2011c, p BOM, 2013a 111 BOM, 2013b 112 Waratah Coal, 2011c, p369 Railroaded: Carving up food lands for coal transport in Central Queensland. 41

42 Map 18: Proposed rail lines and floodplains Queensland s State Planning Policy 1/03 Mitigating the Adverse Impacts of Flood, Bushfire and Landslide sets out the State s interest in ensuring that the natural hazards of flood, bushfire, and landslide are adequately considered when making decisions about development, and addresses development issues associated with minimising the potential adverse impacts of flood, bushfire and landslide. 113 The SPP 1/03 requires the identification of natural hazard management areas. A natural hazard management area for flood is land inundated by a Defined Flood Event (DFE) and identified in a planning scheme. Section A3.2 of SPP 1/03 states, The Queensland Government s position is that, generally, the appropriate flood event for determining a natural hazard management area (flood) is the 1% Annual Exceedance Probability (AEP) flood. However, it may be appropriate to adopt a different DFE depending on the circumstances of individual localities. This is a matter that should be reviewed when preparing or undertaking relevant amendments to a planning scheme. Section A4.2 sets out the SPP Guidelines on how outcomes should be achieved for development to be compatible with floods: Railroaded: Carving up food lands for coal transport in Central Queensland.

43 1. Development maintains the safety of people on the development site from all floods up to and including the DFE. 2. development does not result in adverse impacts on people s safety or the capacity to use land within the floodplain. 3. Development minimises the potential damage from flooding to property on the development site. 4. Public safety and the environment are not adversely affected by the detrimental impacts of floodwater on hazardous materials manufactured or stored in bulk. 5. essential services infrastructure (e.g. on-site electricity, gas, water supply, sewerage and telecommunications) maintains its function during a DFE. This report maintains that none of the rail corridor projects proposed for the GBSDA comply with Queensland State Planning Policy 1/03. Of course, as a measure taken under the State Development Public Works Organisation Act, the policies of the Sustainable Planning Act do not apply to these projects. And yet, it is curious that the Government should adopt less stringent hazard reduction and assessment measures for major pieces of infrastructure that have extensive impacts along a 500km long corridor than are applied to local government when making decisions about building sheds on the same floodplains. 5.1 GBSDA flood impacts The construction of multiple rail lines in the region has the potential to create significant flood impacts and fragment and diminish valuable farmland. If all five duplicate rail lines are built from the Galilee Basin to Abbot Point and Hay Point, the cumulative impacts would be unacceptable. However, it is generally agreed, including among GBSDA rail project proponents, that it is unlikely all these proposals will be completed. The Queensland Government in 2012 stated its preference for two rail lines to be built, one north-south line, for which a combined project between GVK Hancock Coal and Aurizon appears the favoured contender, and an east-west line, which will presumably be one of the Adani projects. Nevertheless, any one of the five proposals will have an impact on existing and potential agricultural productivity, due to the fragmentation of land use and the numerous crossings of roads, stock routes and waterways that a new rail line will need to make. As many extensive floodplains are crossed by the GBSDA, as shown in Map 18, the intensification of flood impacts is unavoidable. Should any one of these projects proceed to completion, substantial mitigation of flood impacts and significant compensation provisions would be required before landholders affected by them can be satisfied. Land owners along the railway line have repeatedly voiced concerns about the impact the lines will have on flood regimes, and have engaged in detailed analysis of the assessment documents for the Alpha rail line particularly. This has forced some companies to promise to address these concerns and yet, our investigations indicate that there is still a great deal of risk involved with the construction of these railways, and the proponents have not been made to locate them away from floodplains or design them according to best practise and precautionary guidelines. As shown in Map 18, four major Central Queensland river systems are crossed by the GBSDA the Bogie River, the Bowen River, the Suttor River and the Belyando River, all in the greater Burdekin catchment. Twelve major dams and weirs occur along the four major Queensland Rivers that are crossed by the GBSDA QCG, p107 Railroaded: Carving up food lands for coal transport in Central Queensland. 43

44 Table 9: Stream crossings by rail projects by steam order (Strahler 1957) Stream GVK Hancock Waratah China Adani Carmichael GBSDA precincts Aurizon CQIR Adani NGBR Total Order Alpha Rail First Rail Rail Totals Source: GeoScience Australia, :100,000 drainage network of Queensland. Licensed under Creative Commons - Attribution 3.0 Australia Note: Aurizon CQIR includes existing rail corridor Table 9 is an analysis we have undertaken of stream crossings, using the available rail alignment data and Geosciences Australia drainage data. Adani s Carmichael Rail Project assessment documents state that the proposed rail alignment crosses twelve major waterways and 76 minor waterways. The waterway crossings will be either bridges or culverts or a combination of both, depending on the predicted depth of the water, but will predominantly be culvert only. 115 The company s NGBR Project would require an astounding 567 waterway crossings, of which require special consideration under the Queensland Water Act (2000) and Fisheries Act (1994). 117 It would also cross seven national stock routes. 118 The entire 307km of the NGBR corridor is proposed to be fenced: the single mitigation measure to protect adjacent stock is a four-strand barbed wire fence, with the added possibility of some exit-only gate mechanisms that allow stock to escape the rail corridor. 119 Most of the length of the GBSDA is flood-prone, with nine floods experienced in the Burdekin catchment in the 50 years from 1958 to 2009, 120 and five major and 11 medium flood events experienced in the Don River Catchment in the 40 years since GVK Hancock Coal, however, claimed in the original EIS for the Alpha rail line that, The risk to the overland flow and flood impact of the rail line was classified in the EIS as insignificant. 121 While GVK Hancock claimed that its proposed Alpha rail project was not expected to contribute significantly to cumulative impacts on surface water resources 122 the company did identify the broad potential impacts to surface water from the construction and operation phases of the Project: increased sediment load in runoff; stormwater discharge and flow redirection; construction water use; and hydraulic impacts. GVK Hancock concluded, however, that With design, construction and operation measures in place, impacts on water resources are not expected Adani Mining, 2013a, p GHD, 2013b, p GHD, 2013h, p Hancock Prospecting, 2010b, Table Hancock Prospecting, 2010b, p Hancock Prospecting, 2010d, p2 118 GHD, 2013b, p GHD, 2013b, p Hancock Prospecting, 2010b, Table Railroaded: Carving up food lands for coal transport in Central Queensland.

45 Adani claims in its EIS for the North Galilee Rail Project that though the project has the potential to alter the characteristics of the flooding regime within the study area the extent of these changes in the vicinity of existing infrastructure (including homesteads and roads) is predicted to be within acceptable levels 124. This indicates a disregard of the impacts that floods have on pasture and cropland, which may be far away from homesteads and roads, but nevertheless constitute the livelihood of agricultural and rural industries in the productive floodplains of Central Queensland. Adani admits elsewhere that the construction and operation of their Carmichael rail project may alter overland water flow and increase flood height and duration. Afflux has the potential to impact pasture species and facilitate weed invasion. Afflux may also erode or otherwise degrade soil. Infrastructure across a floodplain like roads and farm tracks may be severed or degraded by flooding. 125 It is these impacts on farmland and grazing land that may dramatically alter the character of the region if these rail lines go ahead. Waratah Coal admits that It is likely that the filling within the floodplain required for the creation of the railway embankment and the crossings of the major waterways and associated infrastructure will impact on flood behaviour. 126 Waratah identifies these impacts as including scour in the immediate area of the crossing locations and changes to flood afflux levels both upstream and downstream of the rail crossing as a result of either the railway embankment or impacts associated with drainage structure design Drainage design Australian Rainfall and Runoff (ARR) is a national guideline document for the estimation of design flood characteristics in Australia, published by Engineers Australia. The current 1987/1999 Edition is now being revised. The revision process includes 21 research projects, which have been designed to fill knowledge gaps that have arisen since the 1987 edition. It is therefore curious that this important guideline document does not appear in any of the reference tables of any of the assessment documents for rail projects in the GBSDA. The design of adequate drainage to avoid the serious consequences of magnifying flood impacts is complex and any transport corridor that proposes to cross such vast floodplains as does the GBSDA needs careful consideration. Operation of the NGBR Project for example requires 567 waterway crossings structures summarised in Table 10 that have the potential to impact existing surface water flows and hydrology and indeed existing flood inundation durations. Table 10: Adani s NGBRP waterway crossings and proposed works Total Waterway Crossings 567 Watercourses 196 Bridge Structures 17 Drainage Structures (Pipe and Box Culverts) 170 Diversions 9 Drainage Features 371 Drainage Structures (Pipe and Box Culverts) 371 As discussed above, in the Burdekin River catchment rapid runoff and channel floodplain configuration lead to very fast flood-wave speeds that have been calculated up to 4.34 m s 1, or about 14.4km per hour. 128 Flood water levels fall quickly, by metres in a single day, and flow is diverted away from raised areas of the river bed into subchannels GHD, 2013a, p Adani Mining Pty Ltd, 2013d, p Waratah Coal, 2011c, p ibid 128 Alexander et al, ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 45

46 Adani s Hydrology and Hydraulics Report for their North Galilee Rail Project proposes a design methodology for scour protection for abutments and piers based on the average flow velocity of 2.5 m/sec in bridge openings. Further, the outlet velocity for culverts is proposed to be restricted to 2.5 m/s for the design flood event protection with a factored velocity & flow in the range & 2.6 to 2.9 m/s. 130 While this is in accordance with Austroads (1994) Waterways Design Manual for scour protection, 131 it fails to take into account the high flood flow velocities experienced in the Region and will therefore likely not meet Adani s stated flood inundation duration criteria. 132 In the absence of a nationally recognised drainage design guideline for railways, the Queensland Coordinator General recommended that Waratah Coal have regard to procedures in the Department of Transport and Main Roads Road Drainage Design Manual and best practice railway design for cross drainage design criteria and conform to the design criteria set by the Coordinator-General for the Alpha Coal Project. 133 Condition 19 of Appendix 4 of the Queensland Coordinator-General s report for the Alpha project purports to satisfy the community that flood impacts associated with the rail line on lands, improvements and infrastructure will be assessed and rectified by the proponent, guaranteed via a bond. 134 Unfortunately, the bond sought for damage audits and compensation from the proponent is a mere $200,000 and the investigation and rectification of any damage is limited to 500m from the rail line. 135 Any damage inflicted beyond that point will not even be looked at by the company, let alone rectified or compensated for. This will do little to satisfy community and landowner concerns that the additional flood impacts that the rail line may cause to their lands, infrastructure and livelihoods will be adequately compensated for by the rail proponent. Most of the issues that landowners have had with the proposals for the Galilee Basin railways have not been adequately addressed in any modelling or analyses to date. These include the possibility that rail lines will block stock from reaching dry ground in times of flood, unknown impacts on surrounding lands caused by floodwater overtopping rail lines, the rail line blocking floodwater from filling dams, thereby depriving stock of water, and the likelihood of blocked culvert pipes causing impacts during floods and potential cumulative impacts of the duplication of rail lines. 136 Image Page 46: TomJefferson/Greenpeace 130 GHD, 2013h, p ibid 132 op cit, p GHD, 2013f, p QCG, 2012, p op cit, p QCG, 2012, p15 46 Railroaded: Carving up food lands for coal transport in Central Queensland.

47 Drain blockages The EIS for Adani s NGBR project discusses possible hazards that might be associated with the occurrence of an extreme rainfall event. One hazard is described as: Severe wet weather event resulting in significant stormwater runoffs/ flows. The likelihood of this event occurring is described as Likely and the potential impacts are described as: Moderate. These impacts include: The embankment has the potential to be damaged by water flowing over the embankment. Blocked relief drainage due to debris. A major rain event could flood and washout the rail infrastructure resulting in disruption to transport of coal. 137 In our view, this would appear to the reasonable observer to be a Severe event rather than a Moderate one, as an artificial flood would be created upstream of the embankment at a level equivalent to that of a 1 in 100 year flood plus a margin for the depth of water over the line. The EIS is silent on these hazards to landholders and therefore offers no remedy to compensate landholders for any potential losses associated with overtopping of the railway line. None of the four proponents of rail lines in the GBSDA have adequately addressed the impact of blocked culverts by flood debris and the impacts associated with drainage failures. No matter how sophisticated the flood modelling, without accepting that culverts and drainage structures block with debris during floods, they are of little value in interpreting flood behaviour. Experience indicates that there is a high probability that culvert and bridge openings will block during large storm events. 138 Blockage in drainage systems can cause significant problems such as increasing water levels, inundating neighbouring properties, overtopping roads or railways, damaging infrastructure and increasing maintenance costs. 139 Floodplains generate materials representative of the catchment geology, such as boulders, cobbles and gravels. A range of finer sediment types can be sourced from all land uses. As this material is mobilised and transported downstream it either passes through hydraulic structures that it encounters, or it does not. When it does not pass through a structure, it may cause a blockage of that structure and a subsequent modification of the hydraulic capacity of that structure. When severe, this blockage has the ability to divert flow to areas that are not usually subject to flooding, and can significantly alter flood levels and flow paths in the vicinity of the structure. The subsequent risk to life from structure blockage is considerable, as is the damage diverted flow can cause. Blockage is a concern at all scales of structures from minor inlets in urban drainage systems up to large culverts and bridges. 140 Engineers Australia s Australian Rainfall And Runoff Revision Project described the guidance provided by existing guidelines and manuals as incomplete, inconsistent and unclear, and says that, as a result, designers and managers of drainage infrastructure are unsure of the most appropriate approach to adopt for the treatment of blockage and it is therefore likely that designs may be insufficient. The likelihood and impacts of blockages can in some cases be reduced through appropriate planning and design of hydraulic structures. However, these impacts can only be mitigated if drainage structures are of sufficient capacity to cope with the anticipated debris. 141 In all structures, consideration should be given to maintenance procedures, even without an allowance for blockage. However because blockage increases the requirement for maintenance, it is especially important when considering this factor. Appropriate consideration must therefore be given to how maintenance personnel gain safe access for inspection and maintenance purposes, including safe machinery access to remove debris blockages GHD, 2013i, p5 138 Rigby et al., Engineers Australia, Engineers Australia, op cit, p ibid Railroaded: Carving up food lands for coal transport in Central Queensland. 47

48 Four modes of blockage have been identified: Progressive build-up of sediment, scoured from upstream bed and banks, in the barrel of the culvert. This blockage typically developed from the bottom up, and in cases of partial blockage, only the lower part of the culvert was affected. Initial blockage by large items of floating vegetation, such as trees or parts of trees. This material then provides support for smaller vegetation, such as shrubs and grasses. Vegetation debris came from collapsing banks or adjacent overbank areas, and typically blocked the culvert from the top down. More abrupt blockage by urban materials, including refuse, building materials, fences and sheds, which are swept into streams by overland flows and by streams breaking their banks. less common circumstances where a large item, such as a motor vehicle or shipping container suddenly and totally blocks the culvert opening. Larger items such as the shipping container are even able to block the larger openings of bridges. Waratah admit in its EIS that for waterways crossed by their rail proposal that are well defined with significant flooding depths and velocities such as the Elliott, Bogie, Bowen, Upper Suttor Rivers and Pelican Creek, some impact on peak flow rates during flooding events will occur if significant debris build up results in partial blockage of the structure during a flooding event. The company admits that blockage of the bridge structures is likely to occur to some extent given the surrounding natural environments at many of these crossings and that blockages of bridges can also lead to increased flood levels upstream, and impacts on the timing of floodplain peaks within the overall drainage basins. 143 Waratah states that the impact for these crossings is dependent on the incorporated flow capacity of each structure, and the extent of earth embankment encroachment into the floodplains. 144 They go on to say that it is likely that increased scour potential will occur around and through the area around the culvert and increased water levels (and depths) upstream of the railway will occur, with a reduced water level downstream of the embankment. Accordingly, impacts on flow transference will occur, possibly resulting in reduced peak flow rates downstream of the rail embankments. 145 This may impact on timing of peak flood levels in regions further downstream in the respective drainage sub basins. 146 In major storms it is not uncommon for structures to back up flow to the point that an overland flow path develops, causing flows contained within one stream to divert away from their previous alignment. This diverted flow may eventually return to the same stream or discharge into an adjacent stream. Blockages have the potential to increase both the frequency of occurrence and magnitude of such diverted flows. 147 Even small blockages can create diversions that would not exist (even in major events) and can considerably change flood behaviour. 148 Engineers Australia suggest that to minimise the potential for 100% debris blockage of a culvert at water crossings, the minimum desirable cell height is 3m, and the minimum desirable cell width is 5m, which are significantly smaller than the dimensions recommended for Wollongong, where a minimum dimension of 6 m has been suggested. 149 In contrast to this recommendation from Engineers Australia, Adani s Hydrology and Hydraulics Report for the North Galilee Rail project proposes that engineered culverts have minimum internal opening of just 900mm. 150 This size would be inadequate in any situation but is grossly insufficient in an area of such flooding intensity as the Burdekin and Don River catchments. Clearly, poor analysis and planning in this instance could lead to poor disaster management, and it will be the landholders and communities of the floodplain that will feel the effects of this failure. Adani proposes a combination of bridges, pipe culverts, and box culverts for their crossings. Bridges are proposed at locations with design flow rate greater than or equal to 250m3/s, major culverts at locations with design flow rate greater than or equal to 50m3/s and minor 143 Waratah Coal, 2011a, p Waratah Coal, 2011a, p ibid 146 ibid 147 Rigby and Silveri, ibid 149 Engineers Australia, 2009, p GHD,2013h, p33 48 Railroaded: Carving up food lands for coal transport in Central Queensland.

49 culverts for locations with design flow rate less than 50m3/s. 151 As discussed above, floods of the Burdekin rise abruptly, reaching peak discharges of up to 40,000 m3s in less than 24 hours and they can maintain peak flow for up to a few days, and then recede exponentially. 152 Sediment transport measured during a flood peak of 11,155 m 3 s 1 in February and March 2000 found that about tonnes of suspended sediment and tonnes of bedload was estimated to have been transported past the sample site during the event. Bedload transport rate and changes in channel shape were greatest several days after peak discharge. 153 Blockage by sediment typically occurs both in the culvert entrance and along the barrel of the culvert, whereas the other three blockage modes typically block the entrance only. 154 Sedimentation within culverts may be managed using one or more of the following activities: formation of an instream sedimentation pond upstream of the culvert; formation of a multi-cell culvert with variable invert levels such that the profile of the base slab simulates the natural cross section of the channel; installation of sediment training walls on the culvert inlet. Sediment training walls reduce the risk of sedimentation of the outer cells by restricting minor flows to just one or two cells. 155 It is strongly recommended that GBSDA rail proponents design drainage structures in accordance with the Australian Rainfall & Runoff Revision Project 11: Blockage of Hydraulic Structures, since it is clear that the current approach is not commensurate with the scale and risk of floods in the Burdekin catchment. Flooding inundation duration Most affected landowners stated in submissions on the Alpha rail proposal that they would not accept the validity of GVK Hancock s flood model unless it reproduced known historical flood behaviour. In other words, they wanted assurance that the model that GVK Hancock was using to analyse the flood risks and impacts of their project, and the Government was using to assess those impacts and evaluate the project, actually matched the known flood history of the area. The Queensland Coordinator General dismissed these concerns, stating that ground-truthing and rerunning the models where they do not replicate historical data would be expensive and time consuming. 156 Instead, a condition of approval was imposed that further flood modelling validation be undertaken during the detailed design phase. 157 While GVK Hancock has set a design criteria that flood inundation duration over existing infrastructure and assets should not exceed 20% of existing flood duration conditions during the 50 year ARI design event, 158 no actual flood inundation duration modelling has been completed so there is no way of knowing if this criteria can and will be met. Adani s Hydrology Project Design Criteria for the North Galilee Project similarly stipulates that, Any increase in duration (modelled) of flooding inundation is not to exceed an average across the modelled extent of 72 hours or 20% (whichever is greater) of existing inundation durations during the 50 year ARI event. This is unless specific circumstances where inundation durations post-development can be tolerated in conjunction with landholder agreement (our emphasis) 159. None of the proposed rail projects have undertaken flood inundation duration modelling. These will only be undertaken at the detailed design phase. 160 It is unacceptable that such important modelling is left until after public consultations have been completed with affected landholders and approvals given for construction. Landholders should rightly be concerned that flood inundation duration caused by any of the rail alignments can meet stated design criteria and will be accurately described in any modelling undertaken by the proponents. 151 GHD, 2013b, p Fielding, and Alexander, Amos et al, Rigby et al, Engineers Australia, 2009, p QCG, 2012, p ibid 158 ibid 159 Adani Mining Pty Ltd, 2013d, p Adani Mining Pty Ltd, 2013e, p21 and 23 Railroaded: Carving up food lands for coal transport in Central Queensland. 49

50 Afflux Afflux is the rise in the water level immediately upstream of and due to a natural or artificial obstruction. Another definition is the maximum difference in water level, at a location upstream of the structure, if the structure were removed. Adani admits that introducing permanent drainage infrastructure along or across an existing waterway will alter existing drainage patterns in the short-term, leading to temporary changes in afflux upstream of the flow path. 161 Designing afflux criteria is a balance between cost and effectiveness. In Adani s words: achieving afflux design criteria is a process that seeks to achieve a balance between minimising the impacts of afflux and achieving a practical and cost effective design. Some amount of afflux is unavoidable due to the proposed structures, and infrastructure assets in the floodplain such as roads and farm tracks, will most likely be affected by any increased depth and duration of flooding. 162 GVK Hancock s EIS initially proposed afflux to be limited to 1.5m from the rail line, which the Queensland Coordinator General concluded was excessive and had the potential to cause significant upstream impacts, changes to overland flow directions, high velocities through culverts, erosion downstream of culverts and very high potential for wash-out of the embankment when overtopped. 163 The Queensland Coordinator General suggested that the culvert outlet velocities of 5m/s implied a high afflux that would require significant downstream erosion protection. 164 Submissions to the GVK Hancock s Alpha Coal Project highlighted several deficiencies in the original design criteria maximum values for culvert outlet velocity, and culvert and bridge design afflux suggesting that those outlined are too high and would result in the following: Potential excessive scour through and downstream of the structure - high velocities will require extensive rock protection; Potential decrease in flood immunity of structures upstream of the alignment; Potential changes in flood flow patterns and flooding behaviour across floodplains; Potential extensive damage to railway formation (washouts) when overtopping occurs during a flood event that exceeds the design event, because of the large differences in headwater and tailwater at the time of overtopping. 165 The landholders recommended maximum culvert outlet velocity and afflux of 3m/s and 0.5 m respectively. 166 The Queensland Coordinator General requested a detailed floodplain study which resulted in a revised design that incorporated sufficient cross-drainage infrastructure to achieve a maximum projected afflux of 0.5m, even though a theoretical maximum of 0.3m was achievable. The revised design criteria meets the criteria set for it, that there be no major increases in area of inundation of no more than three day duration and maximum velocity of 1.5m/s for erodible soils; 1.2 times existing velocities at bridge outlets and 2.5m/s at culvert outlets. 167 According to the Coordinator General s report, the maximum 0.5m afflux can be adjusted in limited circumstances and, confirmation that the design criteria will actually be met will not be known until a more detailed review of the proposed cross drainage is made during the design stage. 168 Despite the project being approved and apparently going ahead, the affected landholders still have no certainty about the degree of afflux and flow-on impact this will have in their land and businesses. 161 GHD, 2013d, p GHD, 2013d, p QCG, 201 2, p ibid 165 QCG, 2012, p ibid 167 ibid 168 ibid 50 Railroaded: Carving up food lands for coal transport in Central Queensland.

51 Adani s Hydology and Hydraulic Report suggests that, With the recommended waterway drainage structures, afflux levels adjacent to the proposed railway generally meet the maximum design criteria of 0.5m. Afflux and velocity results for the post development case meet the nominated design criteria requirements at all critical locations. It has been shown that the use of drainage structures along the proposed railway can mitigate its hydraulic impacts to acceptable level. 169 As for the Alpha and Adani rail projects, a number of submissions were received from landowners and community groups during Waratah s EIS public consultation stage concerned that the rail line would exacerbate flooding impacts particularly for upstream landowners. These concerns typically centred on: increased extent of flood inundation through afflux (increase in flood height arising from a reduced waterway area at the railway cross drainage structure); the rail line blocking access for stock in reaching high ground during flooding events. prolonged inundation times changes in connectivity to overland flow patterns that may adversely impact property management and the filling of farm dams. 170 While Waratah has set an upper limit on afflux at 0.5 m, they haven t even set a limit for extended inundation times which, as the Coordinator General pointed out, is likely to be a sensitive issue for landowners where valued pasture or agricultural lands are involved 171. Despite this failure, this project, too, has achieved approval from the Queensland Coordinator General. The engineering designs for all the proposed rail projects fail to take into account any potential cumulative impacts of afflux associated with Queensland Rail or road drainage within close proximity to the proposed rail line or blocked drainage works. The most important details of flood mitigation for these major rail projects have been left out of assessment documents, with promises that they will be investigated at the detailed design stage, once approvals have been provided, 172 a situation that hardly instils confidence that the Government is ensuring the future of the agricultural industries of Central Queensland is being given as much attention as the future of the coal industry. 169 GHD, 2013h, p QCG, 2013, p QCG, 2013, p Hancock Coal, 2011e, p3 Railroaded: Carving up food lands for coal transport in Central Queensland. 51

52 Image Page 52: Paula Heelan 52 Railroaded: Carving up food lands for coal transport in Central Queensland.

53 Railroaded: Carving up food lands for coal transport in Central Queensland. 53

54 5.1.2 Average Recurrence Interval The companies involved in proposing the Galilee Basin rail lines are not planning to withstand the kinds of major flooding events that will almost certainly be visited upon the areas impacted by the rail lines over the life of the infrastructure. An Average Return Interval (ARI) is the average length of time between two floods of a given size or larger. Another name for ARI is the return period. A one-in-100 year flood would be expected to occur, on average, once in every 100 years. Contrary to popular understanding, an ARI tells us how likely a flood is, but says nothing about when it will actually come. Thus a 1-in-100 year flood might occur this year, next year, several times or not at all during our lifetime. But, on average, it will occur once every 100 years. 173 Of greater concern is the Queensland Coordinator General s recommendation to GVK Hancock that prior to construction a report be submitted setting out flood passage and drainage associated with the railway for flood inundation duration and culvert velocities for 50 year ARI events comparing current and developed conditions. 174 These detailed designs should be inherent to the assessment documents lodged for approval and any drainage criteria should provide at least one in 100 ARI flood immunity. Indeed, the approved drainage design criteria for GVK Hancock prescribes only 1:20 ARI flooding for minor culverts, scour protection, unlined diversion and cut-off drains. 175 As shown in Table 11, Adani proposes providing different levels of flood immunity for different infrastructure. Adani proposes to provide a 1:100 ARI immunity against the rail being overtopped by floodwaters, but only a 1:50 ARI flood immunity for everything else, including major road inundation and not even then if an appropriate statutory body specifies some other level. Similarly, their drainage design is proposed to be for 50 year ARI flows for major bridges and culverts, isolated minor culverts and diversional drainage, but for other minor culverts and longitudinal drainage only a 20 year ARI flow of <50m/s is proposed. 176 For minor roads, only a 1:10 ARI immunity is provided for, which is meaningless. Table 11: Adani's design criteria for avoiding flood impacts on infrastructure Design Aspect Lowest edge of formation level Top of rail Major road crossings Minor road crossings Design Criteria 50 year ARI plus 300mm 100 year ARI flood immunity 50 year ARI flood immunity or as specified as appropriate statutory body 10 year ARI flood immunity or as specified as appropriate statutory body Source: Adani Mining Pty Ltd, 2013g, p18 Adani s Hydrology and Hydraulic Report for the North Galilee Rail Project suggests that about 371 minor drainage features will be required. If half of these are isolated and therefore designed for 50 year ARI flood, 180 minor culverts will be installed that are only designed for a one in 20 year ARI flood. The theoretical failure rate of any one of these culverts over the 90 year lifetime of the project is about 800 or 10 times a year. There is a 40% chance over any ten year period, and a 64% chance over any 20 year period, that the design flood (1:20 ARI) will be exceeded. 173 José, QCG, p Calibre, 2011a. b, c and d, p GHD, 2013h, p Railroaded: Carving up food lands for coal transport in Central Queensland.

55 Table 12: Catchment sizes and NGBRP waterway classification and the number of proposed crossings Catchment size Classification Waterways Water courses Drainage features <=25km 2 Minor >25km<=100km 2 Moderate >100km 2 Major TOTAL Source: GHD, 2013h, p19 Adani propose installing 16 bridges and major culverts designed to withstand one in 50 year ARI flood levels. 177 The failure rate of any one of these culverts over the 90 year lifetime of the Carmichael mine will be about 30 times, or about once every 3 years. The chance of the design flood of ARI of 1 in 50 being exceeded during the life of the project (90 years) is 84%. These are not odds that inspire confidence in the drainage design protecting the community, assets infrastructure and farm productivity. Similarly, GVK Hancock s drainage structures are only required to provide a 1 in 50 year flood immunity to the top of the rail formation for major drainage lines and 1 in 20 year immunity for minor drainage lines. 178 GVK Hancock s Drainage Report estimates that over the 30 year life of Alpha and Kevin s Corner mines, there is a 45 per cent chance that the 50 year flood ARI will be exceeded and a 78 percent chance that the 20 year flood ARI will be exceeded. 179 Waratah state that they will design culverts sufficient to prevent over topping in a one in 50 year ARI peak flow outside of floodplains and a 1 in 100 year API for culverts placed within floodplains 180, and maximum velocities at bridges are designed not to exceed existing velocity by more than 20% 181. Waratah advises that the adopted cross drainage design approach is consistent with the DTMR Road Drainage Design Manual. 182 Drainage design for rail lines must provide flood immunity for at least a 1:100 ARI flood. The high failure rates inherent in drainage features designed for less than 1:100 ARI floods will of course not necessarily lead to adverse loss by landholders, the community or the State of Queensland, but will significantly increase the risk that major flood damage will occur as the design flood is exceeded. None of the assessment documents for GBSDA rail proposals detail adverse effects due to the railway at flood levels greater than the 1 in 100 year ARI and all are silent on possible additional damage caused by railway infrastructure raising flood levels during these high floods. There is no mention of landholders being offered compensation for these additional costs. Condition 19 of GVK Hancock s Alpha Rail approval seeks a $200,000 bond for damage audits and compensation but the investigation and rectification of any damage is limited to 500m from the rail line. 177 GHD, 2013b, p QCG, 2012, p Hancock Coal, 2011e, p8 180 Waratah Coal, 2011a, p Waratah Coal Pty Ltd, 2013k, Table 2.1, p8 182 QCG, 2013, p88 Railroaded: Carving up food lands for coal transport in Central Queensland. 55

56 Despite adopting design criteria that will not withstand major flooding events, none of the current rail proponents provide any information about what would happen if the design flood is exceeded or culverts are blocked by flood debris. Questions that need to be answered include: Does the culvert wash out? Is the rail embankment overtopped and breached? Are fences at risk because of the higher water velocities? Are farm access tracks closed for longer times? What happens to landholder s stock? And will inundation periods be long enough to destroy pastures? These events and the costs associated with them will increase significantly if the current designs for hydraulic structures are retained and flood return periods are reduced by climate change Climate change and flooding The Queensland EPA Guidelines for preparing a Climate Change Impact Statement (CCIS) includes predicted impacts on Queensland infrastructure including: include: An average annual temperature rise of up to 4.5C. A potential increase in intensity of extreme rainfall events. Changes in relative humidity and potential evaporation of 7% to 15% A sea level rise of 30 cm by A 10% increase in cyclone intensity and frequency. An increase in storm surge of.5m in the 1-in-100 year event An increase in frequency and intensity of storms. 183 Queensland s Inland Flood Study proposed that Queensland local governments work into their planning a climate change factor for 5% increased rainfall intensity per degree of warming, and suggested that they plan for 2 degrees of warming by 2050, and 3 degrees by 2070, 184 at which point, some proponents of Galilee Basin mines and rail lines still claim they are expecting to be hauling coal to port for sale. There is no recognition in the Environmental Impact Statements of the rail lines of individual proponents, or in the Galilee Basin State Development Area Scheme that the Government or the companies understand that they should be planning for a 15% increase in rainfall intensity, and the inundation of their special schemes. GVK Hancock Coal s assessment of the impact of changing climactic conditions on their rail line concludes that, the design standards utilised for the Project have sufficiently considered any potential impacts and that no specific mitigation or management measures are required. 185 This could not be further from the truth. 183 Hancock Prospecting, 2010g Table 3-5, p DERM Hancock Prospecting, 2010g p GHD, 2013i, p5 56 Railroaded: Carving up food lands for coal transport in Central Queensland.

57 GVK Hancock s Drainage Report admits that over the 30 year life of Alpha and Kevin s Corner mines risks are likely to be greater due to the possible impacts due to projected climate change, but no evidence is presented of where they have made allowances for these addition al impacts in the design of projects or the mitigation of impacts. While Adani discusses the impact of climate change in general terms in various chapters of the EIS, the Hydrology and Hydraulics Report for the North Galilee Rail Project makes clear that no allowance have been made for the impact that climate change will have on storm and flood intensities over the 90 year lifetime of the rail project. Instead, they assert that, Qualitative measures of consequence were developed based on the risk criteria 186 whatever that means. For flood immunity criteria to be determined and design elements such as culvert opening sizes, bridge spans, height of the rail embankments, inundation periods and afflux levels to be determined, historic data must be modified to incorporate projected climate change impacts. It does not appear that Adani have incorporated climate change impacts into these calculations for their North Galilee Rail project, despite their intention for the project to continue operating into the next century. If this is the case, all the hydrologic modeling, flood modelling, and concept hydraulic design of bridges, culverts, and rail embankments detailed in the EIS needs to be reworked to enable the best estimate of what landholders can expect over the next 90 years, not what might have happened if the railway had been built in previous years. A new design will expose landholders to a new suite of risks. Sunflower Image: Paula Heelan Railroaded: Carving up food lands for coal transport in Central Queensland. 57

58 Image Page 58: Paula Heelan 58

59 6. Conclusion Queensland has one of the most naturally variable climates in the world, and it is projected to become more variable and extreme in the future, potentially affecting the frequency or severity of natural hazards, particularly floods. With 57 tropical cyclones having passed within 200 km of the GBSDA area since 1906, the planning behind the GBSDA and the railway in it should have prioritised flood mitigation. None of the rail projects, however, proposed for the GBSDA comply with Queensland State Planning Policy 1/03 or the most recent Australian Rainfall and Runoff Revision for Blockage of Hydraulic Structures by Engineers Australia. The GBSDA includes over half a million hectares of land that regularly experiences flooding. The proposed GBSDA precincts cut across 1680 waterways between the Galilee Basin and Abbot Point. Any railways built there would require substantial drainage works to mitigate flood impacts exacerbated by elevate rail lines that cross these waterways and floodplains. The potential impacts these rail lines would have on flooding is therefore significant and should have been the subject of substantial precautionary flood avoidance. Instead, proponents have been allowed to minimise costs by only providing flood immunity to one in 50 year floods and for culverts in smaller catchments, one in 20 year. Such negligent cost avoidance puts at risk the communities of the region, its infrastructure and agricultural productivity. For the mine with the theoretical longest life, Carmichael, the failure rate for any one of their culverts will be about once every 3 years. The chance of the design flood of ARI of 1 in 50 being exceeded during the life of the project is 84 per cent. For minor waterways, proposed to be designed to withstand only a one in 20 year flood, the potential failure rate of any one of their culverts is 10 times a year and there is a 40 per cent chance over any ten year period, and a 64 per cent chance over any 20 year period, that the design flood will be exceeded. Even for the rail lines servicing mines with shorter lifetimes, there is a 45 per cent chance that the 50 year flood ARI will be exceeded and a 78 percent chance that the 20 year flood ARI will be exceeded. 187 These events and the costs associated with them will increase significantly if the current designs for hydraulic structures are retained and flood return periods are reduced by climate change. None of the rail proposals detail the adverse effects that may eventuate at flood levels greater than the 1 in 100 year ARI and all are silent on possible additional damage caused by railway infrastructure raising flood levels during these high floods. There is no mention of landholders being offered compensation for these additional costs. Although Hancock s Alpha Rail approval recommends a $200,000 bond for damage audits and compensation, the investigation and rectification of any damage is limited to 500m from the rail line. The costs and extent of flood damage potentially caused by rail infrastructure is likely to be orders of magnitude greater. The potential impacts on the region s agricultural productivity should have been of paramount importance in the selection of rail corridor and its drainage and flood immunity design. Though some proponents have claimed to have taken agricultural land into consideration as a constraint in choosing their alignment, it is clear that construction and operating costs have been the overriding factor in most alignments and the flood designs selected. The significance of the loss of thousands of hectares of Good Quality Agricultural Land and important cropping and horticulture areas is deemed by rail proponents as moderate and the economic impact low. Waratah Coal was so unconcerned with the impact its Galilee China First Project railway would have on agricultural land it didn t even include them in the EIS for the project. Relevant Queensland Government 187 Hancock Coal, 2011e, p8 Railroaded: Carving up food lands for coal transport in Central Queensland. 59

60 Departments intervened to complain that the assessments failed to adequately address the impacts and had not been conducted to an acceptable level of detail. 188 In response, in its 267 page evaluation report of Waratah s Galilee Coal Project, the Queensland Coordinator-General s mentions the word agriculture five times and cropping just eight. The 398 page Coordinator-General s report on the Alpha Coal Project mentions agriculture nine times and cropping or crops only twice. 189 About half the area of the proposed GBSDA precincts for rail alignments is mapped as either potential cropping, perennial and annual horticulture and intensive livestock production, including over 10,000 ha of mapped Important Agricultural Area and 12,000 hectares of potential Strategic Cropping Land. And yet, this important farmland can be excised, assessed and invalidated out of existence through a process designed to remove obstacles to mining while providing lip service to agricultural land conservation. Having already been subjected to this process, the area of the region still in the Strategic Cropping Land trigger map is reduced to just 1,146 hectares, which can then be further reduced through soil analysis. Once reduced to almost nothing, mining companies will be able to mitigate the loss by paying a fee between $4750 per and $15,000 per hectare -- a financial contribution commensurate with the area of impact land that is a common and reasonable management approach to minimise potential strategic cropping land impacts. 190 The Galilee Basin State Development Area scheme proposes that rail infrastructure within the proposed rail precincts of the GBSDA should minimise impacts on existing infrastructure, but no mention is made of minimising impacts on the almost 220,000 hectares of productive farmland within the precincts, which will be sterilised, fragmented or impacted by exacerbated flooding. Under the terms of the State Development Area scheme, the Coordinator-General will not support land uses anywhere in the area that are not inconsistent with rail infrastructure, and landholders will have to apply for permission to continue using the land as they are currently doing. Although cropping and animal husbandry are listed by the scheme as activities that may be consistent, with the railways, farmers will have to pay a fee to apply to continue farming as long as they had approval to use the land in such a way before the SDA comes into effect. The Coordinator General has the power to refuse the application with no right of appeal. The weight of uncertainty alone for these landowners within the GBSDA is enough to drive down land prices and chill beneficial agricultural productivity, let alone expansion. A similar scheme in the Surat Basin resulted in a reported 30% loss in land values. 191 Despite this fiasco, the Newman Government appears intent on following a similar strategy with landholders in the Mackay, Isaac and Whitsunday Region. After many years of promises by successive state Governments of assistance in addressing the decline of Queensland agricultural productivity, the Newman Government is set to deliver another hammer blow. If all five duplicate rail lines are built from the Galilee Basin to Abbot Point, the cumulative impacts would be unacceptable, but even one new rail alignment in addition to that of Aurizon s existing line poses an unacceptable impact, under the circumstances. Rather than helping fulfil its promise of achieving a doubling of agricultural productivity and food production by 2040, the Queensland Government has stated its intention to facilitate the loss of prime agricultural land in Central Queensland by compulsory acquisition and has bent over backwards to accommodate coal companies demands for favours, handouts and easy regulatory approval pathways. The Government has even promised free or discounted water permits and lower royalty payments for the 188 Hancock Coal, 2011e, p8 189 QCG, Adani Mining Pty Ltd, 2012b, p Quoted in Penelope Arthur, 12 December Wandoan s rail woe. Queensland Country Life. 60 Railroaded: Carving up food lands for coal transport in Central Queensland.

61 first company to jump in and develop in the Galilee Basin. The continued imbalance in the Government s policy approach, which privileges damaging mining activity and its infrastructure needs over other, long-established land uses in rural Central Queensland is leading to the irreversible loss of good quality land, and diminishing rather that expanding the state s food production ability. Despite its being one of the four pillars of the Queensland economy, agricultural production has been in decline in Queensland for decades. Farmers have recently had reason for hope this may at last be turned around after their State Government recognised the greatest barriers to addressing agricultures decline by a sustainable by recognising the competition from the mining sector for land, water and labour. However, the promise of doubling agriculture, fisheries and forestry production by 2040, including a commitment to double food production, can never be met while ever agricultural land is being lost and fragmented. The new rail projects proposed for the GBSDA will reduce the area of available high quality farmland in Queensland, fragment the agricultural landscape in the Region and create significant additional flood impacts for the local communities and agricultural industries. As a result, the contribution to the State s agricultural production is predicted to decline. The Regional Plan for the Mackay-Whitsunday-Isaac region claims that the alienation, loss or fragmentation of good quality agricultural land will not be supported unless there is an overriding need in the public interest for the proposed use, and there are no alternative locations available. In whose interest is it then to alienate and sterilise productive farmland to build railways to export coal to Asia? This does not appear to be a question the State Government is asking. Image Page 61: Paula Heelan Railroaded: Carving up food lands for coal transport in Central Queensland. 61

62 References ABS - Australian Bureau of Statistics, Land Management and Farming in Australia, res ABARE Australian Bureau of Agriculture and Resource Economics, Avoiding a global food crisis. ABARE accessed 5 March Pages/media-releases/2014/avoiding-a-global-food-crisis.aspx. Adani Mining Pty Ltd, 2012a. Carmichael Coal Mine and Rail Project EIS, Report by GHD for Adani Mining Pty Ltd. Volume 3 Section 4 Land. Adani Mining Pty Ltd, 2012b. Carmichael Coal Mine and Rail Project EIS, Report by GHD for Adani Mining Pty Ltd. Volume 3 Section 4 Land. Adani Mining Pty Ltd, 2012c. Carmichael Coal Mine and Rail Project EIS, Report by GHD for Adani Mining Pty Ltd. Volume 3 Section 6 Water Resources. Adani Mining Pty Ltd, 2012d. Carmichael Coal Mine and Rail Project EIS. Section 82 Carmichael Coal Mine and Rail Project. Adani Mining, 2013a. Carmichael Coal Mine and Rail Project SEIS, Report by GHD for Adani Mining Pty Ltd. Volume 3. Rail Studies. Adani Mining Pty Ltd, 2013b. Carmichael Coal Mine and Rail Project SEIS, Report by GHD for Adani Mining Pty Ltd. Volume 1. Project Wide Studies. Adani Mining, 2013c. Carmichael Coal Mine and Rail Project SEIS, Report by GHD for Adani Mining Pty Ltd.Volume 1 Section 8 Cumulative Impacts. Adani Mining Pty Ltd, 2013d. Carmichael Coal Mine and Rail Project SEIS Volume 3 Section 4 Land. Adani Mining Pty Ltd, 2013e. Carmichael Coal Mine and Rail Project SEIS, Report by GHD for Adani Mining Pty Ltd. Volume 3. Rail Studies. Section 6. Water Resources. Adani Mining Pty Ltd, 2013f. Carmichael Coal Mine and Rail Project SEIS, Report by GHD for Adani Mining Pty Ltd. Appendix T1. Strategic Cropping Land Assessment. Adani Mining Pty Ltd, 2013g. Carmichael Coal Mine and Rail Project SEIS Appendix s1b. Hydrology and Hydraulics Design Criteria. Report by Calibre Operations Pty. September Adani Mining Pty Ltd, 2013h. Carmichael Coal Mine and Rail Project SEIS, Report for Rail Soil Survey Methodology 24 July Adani Mining Pty Ltd, 2013i. Carmichael Coal Mine and Rail Project SEIS. Front End Engineering Design Report RAIL December Alexander, J, Fielding C. and Pocock, G., Flood behaviour of the Burdekin River, tropical north Queensland, Australia. Geological Society, London, Special Publications 1999, v. 163, p Amos, K., Alexander, J., Horn, A., Pocock, G., and Fielding, C., Supply limited sediment transport in a high-discharge event of the tropical Burdekin River, North Queensland, Australia. Sedimentology. Volume 51, Issue 1, pages , February Aurizon, Media Release Aurizon and GVK Hancock proposed development Railroaded: Carving up food lands for coal transport in Central Queensland.

63 March Hancock-proposed-development.aspx. Beare, S., Bell, R., Blias, R., Gooday, P., Heaney, A., Hooper, S., et al., Natural resource management in the Burdekin River Catchment: Integrated assessment of resource management at the catchment scale- a case study (No. ereport 03, 18). Canberra: ABARE Burdekin Dry Tropics Board, 2005, Burdekin Dry Tropics Natural Resource Management Plan ( ) May BoM - Bureau of Meteorology, 2011a Flood Warning System for the Burdekin River, accessed 15 March, 2014 from burdekin.shtml BoM - Bureau of Meteorology, 2013a, Tropical Cyclone Information, accessed 15 March, 2014 from BoM -Bureau of Meteorology, 2013b, Severe Tropical Cyclone Yasi, accessed 15 March, 2014 from Charlesworth, P. B., et al. "Healthy crop and healthy groundwater: Sugarcane in the Burdekin delta." Proc Nat Conf Irrig Assoc Aust May. Vol Calibre, 2011a. Alpha Coal Project Rail Detailed Floodplain Study Suttor River/ Eaglefield Creek Revision Calibre, 2011b. Alpha Coal Project Rail Detailed Floodplain Study Suttor River/ Eaglefield Creek; Calibre, 2011c. Alpha Coal Project Rail Detailed Floodplain Study Logan Creek/ Brown Mistake Creek; Calibre, 2011d. Alpha Coal Project Rail Detailed Floodplain Study Diamond Creek. DAFF - Queensland Department of Agriculture, Fisheries and Forestry, Queensland Agricultural Land Audit. : - Queensland agricultural land class A and B Queensland. State of Queensland, Licensed under a Creative Commons - Attribution 3.0 Australia licence DAFF - Queensland Department of Agriculture, Fisheries and Forestry. 2013a. Agricultural Land Audit Region boundaries Queensland. environment/queensland-agricultural-land-audit. Licensed under a Creative Commons - Attribution 3.0 Australia licence DAFF - Queensland Department of Agriculture, Fisheries and Forestry, 2013b. Agricultural land audit - current pasture production - Mackay Isaac and Whitsunday. Licensed under a Creative Commons - Attribution 3.0 Australia licence DPI and DHLGP - Department of Primary Industry (DPI) and Department of Housing, Local Government and Planning (DLGP), 1993, Planning Guidelines: The Identification of Good Quality Agricultural Land, Queensland Government, Brisbane. gov.au/environment/land/soil/soil-data/land-evaluation/. DNRM -Queensland Department of Natural Resources and Mines, April 2013 Mining Leases data file. April Railroaded: Carving up food lands for coal transport in Central Queensland. 63

64 DSDIP Queensland Department of State Development, Infrastructure and Planning, Mackay, Isaac and Whitsunday Regional Plan. resources/plan/miw/miw-regional-plan.pdf accessed 20/02/14. DSDIP - Queensland Department of State Development, Infrastructure and Planning, State Planning Policy December 2013, accessed 11 March 14. DEEWR - Australian Government, Department of Education, Employment and Workplace Relations Australian Jobs p ContentUpload/Docs/australianjobs2013.pdf DERM Queensland Department of Environment and Resource Management Increasing Queensland s Resilience to inland flooding in a changing climate: final report on the Inland Flooding Study. Engineers Australia, Australian Rainfall And Runoff Revision Project 11: Blockage Of Hydraulic Structures Stage 1 Report November Fielding, C. and Alexander, J., Sedimentology of the Upper Burdekin River of North Queensland, Australia an example of a tropical, variable discharge river Terra Nova. Volume 8, Issue 5, pages , September GeoScience Australia, :100,000 drainage network of Queensland. Licensed under Creative Commons - Attribution 3.0 Australia. GHD, 2013a. GHD, 2013b. North Galilee Basin Rail, Report for Adani Mining Pty Ltd. Volume. Chapter 2 Project Description GHD, 2013c. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume, Chapter 3 Land and Tenure. GHD, 2013d. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 1, Chapter 9 Water Resources. GHD, 2013e. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 1, Chapter 19 Cumulative Impacts. GHD, 2013f. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 2, Appendix C Land Use and Tenure. GHD, 2013g. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 2, Appendix R. Land Acquisition Protocol. GHD, 2013h. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 2, Appendix H2. Hydrology and Hydraulics. GHD, 2013i. North Galilee Rail Project EIS. Report for Adani Mining Pty Ltd. Volume 1, Chapter 17 Climate and Natural Hazards Hancock Prospecting, 2010a. Alpha Coal Project EIS. Volume 3. Section 1. Introduction. Hancock Prospecting, 2010b. Alpha Coal Project EIS. Volume 3. Section 2. Project Description. Hancock Prospecting, 2010c. Alpha Coal Project EIS. Volume 3. Section 6. Land Use and Tenure. Hancock Prospecting, 2010d. Alpha Coal Project EIS. Volume 3. Section 11. Surface Water. 64 Railroaded: Carving up food lands for coal transport in Central Queensland.

65 Hancock Prospecting, 2010e. Alpha Coal Project Rail EIS. Volume 3. Appendix G2. Surface Water. Hancock Prospecting, 2010f. Alpha Coal Project Rail EIS. Volume 3. Appendix G. Cumulative Impacts. Hancock Prospecting, 2010f. Alpha Coal Project Rail EIS. Volume 3. Appendix G. Cumulative Impacts. Hancock Prospecting, 2010g. Alpha Coal Project EIS. Volume 3. Section 3. Climate and Climate Change. Hancock Coal, 2011a. Alpha Coal Project SEIS. Volume 1. Chapter 1 Introduction. Hancock Coal, 2011b. Alpha Coal Project SEIS. Volume 1. Chapter 2 Amendments to Project Description. Hancock Coal, 2011c. Alpha Coal Project SEIS. Volume 1. Section 5. Comments and Responses Rail. Hancock Coal, 2011d. Alpha Coal Project SEIS. Volume 2 Appendix H - Review of Floodplain Environmental Impacts. Hancock Coal, 2011e. Alpha Coal Project SEIS. Volume 2. Appendix Y. Railway Corridor BFS Drainage Engineering Report. José, P. (1993), Stream hydrology: An introduction for ecologists, by Nancy D. Gordon, Thomas A. McMahon and Brian L. Finlayson, John Wiley, Chichester, ISBN Aquatic Conserv: Mar. Freshw. Ecosyst., 3: 69. Queensland Deputy Premier and Minister for State Development, Infrastructure and Planning, Media Release. Ex-gratia payments to land owners for rail uncertainty 11 December exgratia-payments-to-land-owners-for-rail-uncertainty. Penelope Arthur, 12 December Wandoan s rail woe Queensland Country Life QCG, Queensland Coordinator General, Alpha Coal Project Coordinator- General s Evaluation Report on the environmental impact statement May QCG - Queensland Coordinator General, 2013.Evaluation of environmental impacts rail Galilee Coal Project (Northern Export Facility): Coordinator-General s evaluation report on the environmental impact statement. QCG - Queensland Coordinator General, Proposed Galilee Basin State Development Area: Draft Development. Scheme. resources/plan/cg/galilee-basin/draft-development-scheme-galilee-basin.pdf. Accessed 16/3/14 Rigby, E.H. and Silveri, P., The Impact of Blockages on Flood Behaviour in the Wollongong Storm of August Conference on Hydraulics in Civil Engineering, Hobart November Rigby, E. H., Boyd, M. J., Roso, S., Silveri, P., & Davis, A., Causes and Effects of Culvert Blockage during Large Storms. In ASCE Conf. Proc (Vol. 112, p. 298). State of Queensland, State Planning Policy 1/92 Development and the Conservation of Agricultural Land. accessed 26 February State of Queensland, Mackay, Isaac and Whitsunday Regional Plan. Railroaded: Carving up food lands for coal transport in Central Queensland. 65

66 dsdip.qld.gov.au/resources/plan/miw/miw-regional-plan.pdf. Accessed 16/3/14 Waratah Coal, 2011a. Galilee Coal Project EIS. Volume 3 Rail, Chapter 1 Project Description. Waratah Coal, 2011b. Galilee Coal Project EIS. Volume 3 Rail, Chapter 3 Land. Waratah Coal, 2011c. Galilee Coal Project EIS. Volume 3 Rail, Chapter 9 Surface Water Resources. Waratah Coal, 2011d. Galilee Coal Project EIS. Volume 3 Rail, Chapter 18 Hazards and Emergency Management. Waratah Coal, 2011e. Galilee Coal Project EIS. Volume 5 Appendices. Appendix 5 Rail selection. Galilee Basin. Railway Strategic Planning Study 50km to 1.5km Quantm Corridor Analysis. Waratah Coal, 2011f. Galilee Coal Project EIS. Volume 5 Appendices. Appendix 6 Geology, Soilsand Landforms. Waratah Coal, 2011g. Galilee Coal Project EIS. Volume 5 Appendices. Appendix 15. Surface Water Assessment. Waratah Coal, Galilee Coal Project EIS. Volume 2 - Appendix 7 - Galilee Coal Soil and Land Suitability Study. Waratah Coal Pty Ltd, 2013a. Galilee Coal Project SEIS. Volume 1 -PA R T A - Introduction & Revised Executive Summary. Waratah Coal Pty Ltd, 2013b. Galilee Coal Project SEIS. Volume 1 -Part B - EIS Errata. Waratah Coal Pty Ltd, 2013c. Galilee Coal Project SEIS. Volume 1 Part C. Issue Responses. Waratah Coal Pty Ltd, 2013d. Galilee Coal Project SEIS. Volume 1 - Part C. Submissions Responses 0A - Project Description. Waratah Coal Pty Ltd, 2013e. Galilee Coal Project SEIS. Volume 1 - Part C 0B -Project Approvals. Waratah Coal Pty Ltd, 2013f. Galilee Coal Project SEIS. Volume 1 - Part C 01 - Climate & Climate Change Adaptation. Waratah Coal Pty Ltd, 2013g. Galilee Coal Project SEIS. Volume 1 - Part C 02 Land. Waratah Coal Pty Ltd, 2013h. Galilee Coal Project SEIS. Volume 1 - Part C 04 - Water Resources. Waratah Coal Pty Ltd, 2013i. Galilee Coal Project SEIS. Volume 1 - Part C 16 - Hazard & Risk. Waratah Coal Pty Ltd, 2013j. Galilee Coal Project SEIS. Volume 1 - Part C 17 - Cumulative Impacts. Waratah Coal Pty Ltd, 2013k. Galilee Coal Project SEIS. Volume 2 - Appendix 27 - Rail Corridor Cross Drainage Technical Report Image on Page 67: 2014 Erland Howden 66 Railroaded: Carving up food lands for coal transport in Central Queensland.

67 Railroaded: Carving up food lands for coal transport in Central Queensland. 67

68 Appendix 1: Privately held land parcels within GBSDA precincts by Local Government Area Note: More than one lot parcels are attributable to each Station see table below for number and area attributed to each Station Barcaldine Shire Station land parcels within GBSDA Precincts Precinct Station name Number of parcels Hectares South to North Rail Corridor Precinct SURBITON 1 7,818 South to North Rail Corridor Precinct FORRESTER 2 2,024 SURBITON South to North Rail Corridor Precinct SOUTH 2 12,505 Total 5 22,347 Isaac Shire Station land parcels within GBSDA Precincts Precinct Station name Number of parcels Hectares South to North Rail Corridor Precinct AVON DOWNS 3 3,921 South to North Rail Corridor Precinct BERESFORD 2 1,608 South to North Rail Corridor Precinct BOREAS South to North Rail Corridor Precinct DISNEY 4 5,855 Mining Services Precinct DOOYNE 2 1,075 South to North Rail Corridor Precinct DURDHAM South to North Rail Corridor Precinct EAGLEFIELD 2 1,153 West to East Rail Corridor Precinct ELGIN DOWNS STUD 1 1,144 South to North Rail Corridor Precinct EMIN South to North Rail Corridor Precinct FRANKFIELD 4 5,118 South to North Rail Corridor Precinct GUNJULLA South to North Rail Corridor Precinct KHARTOUM South to North Rail Corridor Precinct LAGLAN 2 1,485 Mining Services Precinct MORAY DOWNS 8 29,704 South to North Rail Corridor Precinct OLD TWIN HILLS 7 1,423 South to North Rail Corridor Precinct ROSSMORE 2 1,767 South to North Rail Corridor Precinct SAINT ALBANS 3 1,872 South to North Rail Corridor Precinct SURBITON 1 0 South to North Rail Corridor Precinct URELLA South to North Rail Corridor Precinct WAMINDA South to North Rail Corridor Precinct WILLESLEY Total 55 60,323 Railroaded: Carving up food lands for coal transport in Central Queensland. 68

69 Whitsunday Shire Station land parcels within GBSDA Precincts Precinct Station name Number of parcels Hectares South to North Rail Corridor Precinct ABERDEEN South to North Rail Corridor Precinct AVON DOWNS South to North Rail Corridor Precinct BIRRALEE 7 10,401 South to North Rail Corridor Precinct CERITO 5 13,497 South to North Rail Corridor Precinct CORRIEVAHN 2 2,386 South to North Rail Corridor Precinct GLENALPINE 3 4,838 South to North Rail Corridor Precinct GUNJULLA South to North Rail Corridor Precinct MOUNT LOOKOUT HOLDING 5 4,914 South to North Rail Corridor Precinct PINANG 2 1,369 South to North Rail Corridor Precinct STRATHMORE 4 5,782 South to North Rail Corridor Precinct VERBENA South to North Rail Corridor Precinct WARRIGAL 1 2,173 South to North Rail Corridor Precinct WEETALABA NORTH South to North Rail Corridor Precinct WEETALABA SOUTH Total 43 48,292 Railroaded: Carving up food lands for coal transport in Central Queensland. 69

70 Back Cover: Top Image: 2014 Erland Howden; Middle Image: Paula Heelan Bottom Image: 2014 Erland Howden; 70 Railroaded: Carving up food lands for coal transport in Central Queensland.

71 71 Railroaded: Carving up food lands for coal transport in Central Queensland.

Galilee Basin Overview

Galilee Basin Overview Galilee Basin Overview Ellie Smith Lock the Gate Alliance Central Queensland Macmines China Stone Currently completing EIS Adani Carmichael SEIS Complete Awaiting State and Federal decisions NGBR EIS currently

More information

Chapter 22 Conclusion and recommendations

Chapter 22 Conclusion and recommendations Chapter 22 Conclusion and recommendations November 2013 Table of contents 22. Conclusion and recommendations... 22-1 22.1 Purpose of this chapter... 22-1 22.2 Rationale for NGBR Project... 22-1 22.3 Economic

More information

7. Community Consultation

7. Community Consultation 7. Community Consultation This section provides a summary of the public consultation process implemented for the Project, incorporating the Mine and Rail aspects. The consultation process has been undertaken

More information

Welcome to ICN s. accessing resources seminar. David Roberts ICN National Sector Manager - Mining

Welcome to ICN s. accessing resources seminar. David Roberts ICN National Sector Manager - Mining Welcome to ICN s accessing resources seminar David Roberts ICN National Sector Manager - Mining 2013 FORMULA 1 ROLEX AUSTRALIAN GRAND PRIX Wednesday 13 March 2013, 1.00pm 6.30pm Agenda Overview of the

More information

Hydrology & Hydraulic Design Criteria

Hydrology & Hydraulic Design Criteria Hydrology and Hydraulics Design Criteria Page No: i CONTENTS 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Document Purpose...3 1.3 Definitions...3 1.4 Codes and Standards...3 2.0 DESIGN CRITERIA...3 2.1

More information

Issues Paper. Planning requirements for the establishment of large packing sheds in rural areas on agricultural land

Issues Paper. Planning requirements for the establishment of large packing sheds in rural areas on agricultural land The united voice of intensive agriculture QUEENSLAND FARMERS FEDERATION Primary Producers House, Level 3, 183 North Quay, Brisbane QLD 4000 PO Box 12009 George Street, Brisbane QLD 4003 qfarmers@qff.org.au

More information

Key Environmental Constraints Affecting Queensland Agriculture

Key Environmental Constraints Affecting Queensland Agriculture Key Environmental Constraints Affecting Queensland Agriculture March 2012 AgForce Queensland Industrial Union of Employers ABN 21 241 679 171 First Floor, 183 North Quay, Brisbane, Qld, 4000 PO Box 13186,

More information

Committee Secretary Senate Standing Committees on Environment and Communications PO Box 6100 Parliament House Canberra ACT 2600

Committee Secretary Senate Standing Committees on Environment and Communications PO Box 6100 Parliament House Canberra ACT 2600 Committee Secretary Senate Standing Committees on Environment and Communications PO Box 6100 Parliament House Canberra ACT 2600 ec.sen@aph.gov.au 15 December 2017 Dear Committee Secretary, RE: Submission

More information

Adani Australia Lessons and Opportunities

Adani Australia Lessons and Opportunities Adani Australia Lessons and Opportunities Hamish Manzi, Head of Environment & Sustainability Source: NQBP. 1 Presentation Outline 1. The Adani Business in India 2. The Adani Business in Australia 3. Opportunities

More information

Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes

Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes 31 May 2013 Contents Executive Summary... 3 1 Introduction... 5 1.1 Project Background... 6 1.1.1 Bowen Basin Coal Growth Project...

More information

The Coalition s Policy

The Coalition s Policy The Coalition s Policy Key Commitments Water infrastructure is essential to population growth, sustainable communities, jobs, productivity, and stronger economic outcomes. Every community and industry

More information

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT May 2017 1 CONTENTS Part 1: The new Biodiversity Offsets Scheme 5 What is the Biodiversity Offsets Scheme? 6 Step 1: The proponent determines if the

More information

7 May Proposed Action: Alpha North Coal Mine Project Reference Number: 2018/8189

7 May Proposed Action: Alpha North Coal Mine Project Reference Number: 2018/8189 7 May 2018 Referrals Gateway Environment Assessment Branch Department of the Environment GPO Box 787 Canberra ACT 2601 By email: epbc.referrals@environment.gov.au Proposed Action: Alpha North Coal Mine

More information

Abbot Point Expansion The Challenges

Abbot Point Expansion The Challenges Abbot Point Expansion The Challenges Jeff Stewart-Harris North Queensland Bulk Ports Corporation March 2014 Port of Abbot Point 2012-13 Throughput 17.7 mt 201 bulk carriers Abbot Point Facts Closest community

More information

3.5 Hydrology & Hydraulics

3.5 Hydrology & Hydraulics 3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)

More information

NORTH STAR TO NSW/QLD BORDER PROJECT STUDY AREA SELECTION REPORT

NORTH STAR TO NSW/QLD BORDER PROJECT STUDY AREA SELECTION REPORT The Australian Government s priority freight rail project NORTH STAR TO NSW/QLD BORDER PROJECT STUDY AREA SELECTION REPORT MAY 2018 Document Control Client: Project: Document title: Australian Rail Track

More information

Contents. Attachments

Contents. Attachments User guide Contents 1.0 Introduction... 1 2.0 Planning scheme structure... 2 3.0 Types of development and categories of development and categories of assessment... 2 4.0 Determining the category of development

More information

National Farmers Federation

National Farmers Federation National Farmers Federation Submission to the Annual Wage Review 2010-11 18 March 2011 Page 1 Contents 1. INTRODUCTION... 3 2. ECONOMIC ANALYSIS... 5 3. WEATHER EVENTS... 6 4. MINIMUM WAGES FRAMEWORK...

More information

Planning Institute of Australia 27 March Strategic cropping land. Peter Burton. General Manager Land Management and Use DERM

Planning Institute of Australia 27 March Strategic cropping land. Peter Burton. General Manager Land Management and Use DERM Planning Institute of Australia 27 March 2012 Strategic cropping land Peter Burton General Manager Land Management and Use DERM Milestones of the Strategic Cropping Land Act 2011 Passed on 1 December 2011

More information

FACT SHEET Land and Property

FACT SHEET Land and Property FACT SHEET Land and Property Introduction Glencore Coal Assets Australia (GCAA) is part of the broader Glencore group, one of the world s largest global diversified natural resource companies. GCAA is

More information

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT

SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT SUBMISSION NUMBER 13 SUNWATER BYERWEN COAL PTY LTD BYERWEN COAL PROJECT AIEIS for the 13. SUBMISSION NUMBER 13 SUNWATER 13.1 Issue Number 13.1 Section 3.2 of the Byerwen Coal project Terms of Reference

More information

Horticultural Development within the Peel-Harvey Coastal Plain Catchment

Horticultural Development within the Peel-Harvey Coastal Plain Catchment Local Planning Policy Horticultural Development within the Peel-Harvey Coastal Plain Catchment Introduction The expansion of in-ground horticulture in Peel-Harvey Coastal Catchment Area (Coastal Catchment

More information

Draft State Planning Policy Road and Rail Noise

Draft State Planning Policy Road and Rail Noise Submission December 2017 Draft State Planning Policy 5.4 - Road and Rail Noise Submission to the Western Australian Planning Commission Contact Caroline Cherry C.Cherry@cmewa.com The Chamber of Minerals

More information

BENGALLA Mining Company. Contamination Assessment

BENGALLA Mining Company. Contamination Assessment BENGALLA Mining Company U Contamination Assessment U CONTINUATION OF BENGALLA MINE PRELIMINARY CONTAMINATION ASSESSMENT Prepared by: HANSEN BAILEY 6 / 127 129 John Street SINGLETON NSW 2330 July 2013 For:

More information

Analysis of Woody Vegetation Clearing Rates in Queensland. Supplementary report to Land cover change in Queensland

Analysis of Woody Vegetation Clearing Rates in Queensland. Supplementary report to Land cover change in Queensland Analysis of Woody Vegetation Clearing Rates in Queensland Supplementary report to Land cover change in Queensland 2008 09 Prepared by: Vegetation Management Department of Environment and Resource Management

More information

Carmichael Coal Mine and Rail Project SEIS. Report for Draft Social Impact Management Plan

Carmichael Coal Mine and Rail Project SEIS. Report for Draft Social Impact Management Plan Carmichael Coal Mine and Rail Project SEIS Report for Draft Social Impact Management Plan 1 April 2014 This Carmichael Coal Mine and Rail Project SEIS: Social Impact Management Plan (the Report) has been

More information

Section 1 General Information

Section 1 General Information Section 1 General Information Terminal 0 Environmental Impact Statement Abbot Point Coal Terminal 0 EIS Adani Section 1 General Information 1.1 Objective and Scope This Environmental Impact Statement (EIS)

More information

ENVIRONMENTAL IMPACT STATEMENT

ENVIRONMENTAL IMPACT STATEMENT RED HILL MINING LEASE ENVIRONMENTAL IMPACT STATEMENT Section 02 Project Rationale and Alternatives Section 02 Project Rationale and Alternatives 2.1 Project Rationale 2.1.1 Project Need The Red Hill Mining

More information

B-triple Road Network. NFF Submission

B-triple Road Network. NFF Submission B-triple Road Network NFF Submission August 2007 Table of Contents The National Farmers Federation... 3 Introduction... 3 B-triple Network Expansion Needs... 4 North South-Railway... 4 Grain Lines... 4

More information

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks

Understanding the State Planning Policy July 2017 Changes to state interest statements, policies and assessment benchmarks Understanding the State Planning Policy July 2017 Changes to state statements, policies and assessment benchmarks This fact sheet outlines the key policy changes to the state statements, policies and assessment

More information

Summary of submissions to SDLs Issues Paper

Summary of submissions to SDLs Issues Paper MURRAY-DARLING BASIN AUTHORITY Summary of submissions to SDLs Issues Paper Introduction In November 2009 the MDBA released a discussion paper inviting comments on issues around developing sustainable diversion

More information

Adani Mining Pty Ltd Report for Carmichael Coal Mine and Rail Project. Land Use D-RP November Revision 3

Adani Mining Pty Ltd Report for Carmichael Coal Mine and Rail Project. Land Use D-RP November Revision 3 Adani Mining Pty Ltd Report for Carmichael Coal Mine and Rail Project 15 November 2012 Revision 3 This Carmichael Coal Mine and Rail Project: Mine Land Use ( the Report ) has been prepared by GHD Pty Ltd

More information

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector

Industrial land demand forecasting for supply chain business supporting Queensland s resources sector Industrial land demand forecasting for supply chain business supporting Queensland s resources sector Queensland is the focus of major developments in the resources sector, creating huge potential for

More information

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24 IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24 ABSTRACT Description This case describes a series of legislative and policy developments which were undertaken to reform the water sector in

More information

Safe and Sustainable Water Management

Safe and Sustainable Water Management Carmichael ine Project Safe and Sustainable Water anagement Just like every other Australian mine, the Carmichael ine is strictly regulated to ensure it uses water safely and responsibly. The source of

More information

National Ecosystems and Landscapes Restoration Program of El Salvador

National Ecosystems and Landscapes Restoration Program of El Salvador National Ecosystems and Landscapes Restoration Program of El Salvador Rationale/Background Ecosystem restoration and degraded lands rehabilitation are necessary measures to reverse the high degree of environmental

More information

QUEENSLAND PRODUCTIVITY COMMISSION

QUEENSLAND PRODUCTIVITY COMMISSION QUEENSLAND PRODUCTIVITY COMMISSION RESPONSE TO ISSUES PAPER ELECTRICITY PRICING IN QUEENSLAND 16 NOVEMBER 2015 Queensland Farmers Federation Ltd. A.C.N. 055 764 488 A.B.N. 44 055 764 488 PO Box 12009 George

More information

Adani Appendix E11 Indigenous Social and Economic Impact Assessment

Adani Appendix E11 Indigenous Social and Economic Impact Assessment Adani Appendix E11 Indigenous Social and Economic Impact Assessment Terminal 0 Environmental Impact Statement Abbot Point Coal Terminal 0 EIS Adani ADANI ABBOT POINT TERMINAL PTY LTD ABBOT BPOINT COAL

More information

Taroborah Coal Project. Environmental Impact Statement. Section 2 Project Needs and Alternatives. Prepared for: Shenhuo International Group Pty Ltd

Taroborah Coal Project. Environmental Impact Statement. Section 2 Project Needs and Alternatives. Prepared for: Shenhuo International Group Pty Ltd Taroborah Coal Project Environmental Impact Statement Section 2 Project Needs and Alternatives Prepared for: Shenhuo International Group Pty Ltd Chapter 2 Table of Contents 2.0 PROJECT NEEDS AND ALTERNATIVES...

More information

Catchment Water Quality Protection

Catchment Water Quality Protection Catchment Water Quality Protection Policy and Guidelines for Planning Permit Applications & Government Planning Initiatives Final31 Oct 2013 Policy Coliban Water s vision is to contribute to improving

More information

Submission. Specific concerns - Missing Information

Submission. Specific concerns - Missing Information Submission As an Ecologist/Environmental Scientist working on the NSW Far North Coast in both local government and private consulting over the past 20 years, I provide the following comments and recommendations

More information

ATTACHMENT 2. Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION

ATTACHMENT 2. Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION ATTACHMENT 2 Aquifer Interference Policy Considerations and Water Licensing COWAL GOLD OPERATIONS MINE LIFE MODIFICATION Environmental Assessment 2016 TABLE OF CONTENTS A2 AQUIFER INTERFERENCE POLICY CONSIDERATIONS

More information

AGRICULTURAL IMPACT STUDY: PROPOSED ESKOM POWER STATION IN THE WITBANK GEOGRAPHICAL AREA

AGRICULTURAL IMPACT STUDY: PROPOSED ESKOM POWER STATION IN THE WITBANK GEOGRAPHICAL AREA AGRICULTURAL IMPACT STUDY: PROPOSED ESKOM POWER STATION IN THE WITBANK GEOGRAPHICAL AREA A.J.JORDAAN University of the Free State September 2006 1 1 Introduction Trade-offs between industry, agriculture

More information

Vegetation Management and Other Legislation Amendment Bill 2018

Vegetation Management and Other Legislation Amendment Bill 2018 Vegetation Management and Other Legislation Amendment Bill 2018 Creevey Russell Lawyers Submission to the State Development Natural Resources and Agricultural Industry Development Committee March 2018

More information

Review of the Town Planning Regulations 1967 and the Model Scheme Text Discussion Paper (May 2009)

Review of the Town Planning Regulations 1967 and the Model Scheme Text Discussion Paper (May 2009) Our Ref: PIA Policy Model Scheme Text Your Ref: Submission: Review of TP Regulations and MST 29 July 2009 Executive Director Strategic Policy and Management Department of Planning and Infrastructure Albert

More information

Strong and Sustainable Resource Communities

Strong and Sustainable Resource Communities Strong and Sustainable Resource Communities Foreword Strong and Sustainable Resource Communities Since the 2012 election, the modern Labor Party has committed itself to reconnecting with Queenslanders.

More information

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013

LEPs and SEPPs. Planning, Development & Heritage. Local environmental plans (LEPs) Last updated: January 2013 Planning, Development & Heritage LEPs and SEPPs Last updated: January 2013 These Fact Sheets are a guide only and are no substitute for legal advice. To request free initial legal advice on an environmental

More information

Regulatory Impact Statement: Overview of required information

Regulatory Impact Statement: Overview of required information Regulatory Impact Statement: Overview of required information Regulatory Impact Statement Regulations deeming joint irrigation/hydroelectricity generation projects as network utility operations Agency

More information

Two major schemes have been proposed, the Mt Beckford Scheme at Hughenden and the O Connell Creek Scheme at Richmond.

Two major schemes have been proposed, the Mt Beckford Scheme at Hughenden and the O Connell Creek Scheme at Richmond. CUMMINGS ECONOMICS 38 Grafton St (PO Box 2148) CAIRNS Q 4870 ABN 99 734 489 175 Tel 07 4031 2888 Fax 07 4031 1108 Email cummings@cummings.net.au Website : www.cummings.net.au Ref: J2156 FLINDERS RIVER

More information

DAF Agriculture Overview. Adam West Regional Director 9 October 2017

DAF Agriculture Overview. Adam West Regional Director 9 October 2017 DAF Agriculture Overview Adam West Regional Director 9 October 2017 The Mighty Burdekin A significant area of the State, with a catchment area of ~130,000 km 2 One of Australia s largest rivers by peak

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

Overview and key environmental issues

Overview and key environmental issues Blue Mountains Draft Local Environmental Plan 2013 1 Information Sheet 4 Overview and key environmental issues Use this document in conjunction with Information Sheet 5: SUBMISSION WRITING GUIDE AND SUMMARY

More information

Submission to the Queensland Competition Authority Aquaculture. Regulation in Queensland. Draft report July 2014.

Submission to the Queensland Competition Authority Aquaculture. Regulation in Queensland. Draft report July 2014. Submission to the Queensland Competition Authority Aquaculture Regulation in Queensland Draft report July 2014. Submission by the City of Gold Coast to the Queensland Competition Authority s Aquaculture

More information

Inquiry into Infrastructure Planning and Procurement

Inquiry into Infrastructure Planning and Procurement Inquiry into Infrastructure Planning and Procurement Submission to the House of Representatives Standing Committee on Infrastructure and Communications Civil Contractors Federation (WA Branch) Submission

More information

Morton West, Dacland. Hydrology / Stormwater Management Report Permit Application

Morton West, Dacland. Hydrology / Stormwater Management Report Permit Application Morton West, Dacland Hydrology / Stormwater Management Report Permit Application February 2014 Document history Revision: Revision no. Author/s R01 Jonathon McLean Approved Jonathon McLean Distribution:

More information

Te Mania Sub-Catchment Action Plan

Te Mania Sub-Catchment Action Plan Te Mania Sub-Catchment Action Plan 2012 The Te Mania Sub-Catchment Action Plan is one of a series produced for the sub-catchments surrounding the Tauranga Harbour. The aim of this action plan is to provide

More information

INTERNATIONAL COTTON ADVISORY COMMITTEE. Abidjan, Ivory Coast 2 6 December 2018 AUSTRALIAN COUNTRY REPORT

INTERNATIONAL COTTON ADVISORY COMMITTEE. Abidjan, Ivory Coast 2 6 December 2018 AUSTRALIAN COUNTRY REPORT INTERNATIONAL COTTON ADVISORY COMMITTEE 77 th PLENARY MEETING "Cotton Challenges: Smart and Sustainable Solutions" Abidjan, Ivory Coast 2 6 December 2018 AUSTRALIAN COUNTRY REPORT Prepared by the Australian

More information

Submission Guide: Ecologically Sustainable Development

Submission Guide: Ecologically Sustainable Development Submission Guide: Ecologically Sustainable Development A guide for making submissions on the NSW biodiversity reforms The biodiversity reforms will help deliver ecologically sustainable development in

More information

6 IMPACT ASSESSMENT METHOD

6 IMPACT ASSESSMENT METHOD 6 IMPACT ASSESSMENT METHOD ENTER HERE BACK TO CONTENTS 6 Impact Assessment Method This chapter outlines the methods employed within the EIS specialist technical studies to undertake an assessment of potential

More information

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin Bowen Gas Project EIS Community Information Sessions June 2012 Arrow s Moranbah Compression Station Bowen Basin TODAY S AGENDA Arrow Energy Overview Arrow Energy Activities Bowen Gas Project Environmental

More information

Melbourne VIC 3124 AUSTRALIA 2 Environmental Flows Team. Melbourne Water Melbourne VIC 3002 AUSTRALIA

Melbourne VIC 3124 AUSTRALIA 2 Environmental Flows Team. Melbourne Water Melbourne VIC 3002 AUSTRALIA The importance of estimating stock and domestic water use in the context of a water constrained future Lessons from the Woori Yallock catchment, Victoria C. Larsen 1, D. Wallis 1, M. Toulmin 1 and S. Gaskill

More information

NSW Farmers Association Review of the Port Terminal Access (Bulk Wheat) Code January 2018

NSW Farmers Association Review of the Port Terminal Access (Bulk Wheat) Code January 2018 NSW Farmers Association Review of the Port Terminal Access (Bulk Wheat) Code January 2018 In brief Agriculture in New South Wales contributes $15.4 billion to the state s economy; The sector directly employs

More information

UNION COUNTY AGRICULTURAL DEVELOPMENT COUNCIL COMPREHENSIVE PLAN. Union County is in the northwestern part of Kentucky. Union County is bounded on the

UNION COUNTY AGRICULTURAL DEVELOPMENT COUNCIL COMPREHENSIVE PLAN. Union County is in the northwestern part of Kentucky. Union County is bounded on the UNION COUNTY AGRICULTURAL DEVELOPMENT COUNCIL COMPREHENSIVE PLAN Overview of County Union County is in the northwestern part of Kentucky. Union County is bounded on the north and west by the Ohio River,

More information

SECTION 3: Water, Wetlands and Waterways

SECTION 3: Water, Wetlands and Waterways SECTION 3: Water, Wetlands and Waterways KEY PRIORITY To ensure protection of water quality and quantity for use by residents, the commercial sector and ecosystems, through integrated consultation, planning,

More information

MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN

MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN Tuesday, 15 July 2008 MEDIA RESPONSE THE WHITSUNDAY COAST GUARDIAN Please attribute the below responses to QER Director of Corporate Affairs Simon Eldridge Questions re Proserpine Shale Oil 1) What exactly

More information

Wallerberdina Station site

Wallerberdina Station site JULY 2018 Wallerberdina Station site study Site characterisation studies at Wallerberdina Station completed Located around 30 kilometres north-west of Hawker is Wallerberdina Station, one of three sites

More information

COAL AND COAL SEAM GAS REGULATION

COAL AND COAL SEAM GAS REGULATION COAL AND COAL SEAM GAS REGULATION The Australian Government protects water resources from the impacts of coal and coal seam gas development through the water trigger provisions of the Environment Protection

More information

2018 SA ELECTION ENVIRONMENTAL LAW REFORM PRIORITIES PAPER

2018 SA ELECTION ENVIRONMENTAL LAW REFORM PRIORITIES PAPER 2018 SA ELECTION ENVIRONMENTAL LAW REFORM PRIORITIES PAPER INTRODUCTION This paper sets out the law reform priorities for South Australia as identified by the state s leading non-government environmental

More information

Biodiversity Certification: what it is, how it works

Biodiversity Certification: what it is, how it works Biodiversity Certification: what it is, how it works Nari Sahukar Senior Policy & Law Reform Solicitor, EDO NSW Leumeah, 16 November 2017 About EDO NSW: Community legal centre Independent from Government

More information

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS

GLOUCESTER COAL QUARTERLY REPORT PERIOD ENDED 31 DECEMBER 2011 HIGHLIGHTS GLOUCESTER COAL QUARTERLY REPORT HIGHLIGHTS 5 years LTI free at Stratford CHPP Record coal mining at Gloucester Basin s Duralie mine Middlemount rail project commissioned ahead of expectations Mining activities

More information

Coal Seam Gas Water Management

Coal Seam Gas Water Management Coal Seam Gas Water Management Response to 2012 Draft Policy 30 November 2012 AgForce Queensland Industrial Union of Employers ABN 21 241 679 171 First Floor, 183 North Quay, Brisbane, Qld, 4000 PO Box

More information

Chapter 8 Natural Resources

Chapter 8 Natural Resources Chapter 8 Natural Resources 127-134 8.1 Introduction 8.2 Extractives Industry 8.3 Forestry 8.4 Fishing / Aquaculture 8.1 Introduction Kerry has a number of naturally occurring resources that contribute

More information

Appendix G Revised commitments

Appendix G Revised commitments Appendix G Revised commitments April 2014 s The table below provides a summary of all commitments identified in the NGBR Project Environmental Impact Statement (EIS) and Additional information to the Environmental

More information

ENVIRONMENTAL IMPACT STATEMENT

ENVIRONMENTAL IMPACT STATEMENT RED HILL MINING LEASE ENVIRONMENTAL IMPACT STATEMENT Section 21 Cumulative Impacts Section 21 Cumulative Impacts 21.1 Introduction 21.1.1 Objective The objective of the cumulative impact assessment was

More information

9. IMPACT ASSESSMENT METHOD

9. IMPACT ASSESSMENT METHOD 9. IMPACT ASSESSMENT METHOD This chapter describes the methods used by technical specialists to undertake the assessment of impacts of the construction, operation and maintenance, and decommissioning activities

More information

Far North Queensland Ports Corporation Limited PORT OF MOURILYAN

Far North Queensland Ports Corporation Limited PORT OF MOURILYAN Far North Queensland Ports Corporation Limited PORT OF MOURILYAN LAND USE STRATEGY August 2009 Contents 1.0 INTRODUCTION...1 1.1 The Port of Mourilyan... 1 1.2 Strategic Port Land... 1 1.3 About the Land

More information

ATTACHMENT 2 COMMUNITY INFORMATION

ATTACHMENT 2 COMMUNITY INFORMATION ATTACHMENT 2 COMMUNITY INFORMATION Wilpinjong Coal Wilpinjong s 75W modification November, 2012 The Wilpinjong Coal Mine is located in the developing western coalfields of NSW and produces a high quality

More information

ARROW BOWEN PIPELINE PROJECT

ARROW BOWEN PIPELINE PROJECT ARROW BOWEN PIPELINE PROJECT APPENDIX A7 REGULATORY APPROVALS Arrow Bowen Pipeline Project Arrow Bowen Pipeline Project THIS PAGE INTENTIONALLY LEFT BLANK APPENDIX A9: REGULATORY APPROVALS Approval / permit

More information

Environmental Impact Statement Surat Gas Project

Environmental Impact Statement Surat Gas Project 2. PROJECT APPROVALS This chapter details the principal approvals required by Arrow to construct, operate and decommission the including the role that the environmental impact statement (EIS) plays within

More information

S e c t i o n S u b d i vision

S e c t i o n S u b d i vision S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned

More information

Baseline Capacity Assessment Report Public Release 2016 Aurizon Network Baseline Capacity Assessment Report / Aurizon Network

Baseline Capacity Assessment Report Public Release 2016 Aurizon Network Baseline Capacity Assessment Report / Aurizon Network Baseline Assessment Report Public Release 2016 Aurizon Network 1 Document Control Disclaimer While all reasonable endeavours have been exercised to ensure all information used and contained in this document

More information

The Queensland Coastal Plan

The Queensland Coastal Plan The Queensland Coastal Plan The practical implications for planners AUGUST 2011 Matthew Schneider Humphreys Reynolds Perkins Planning Consultants Purpose 1 Provide an overview of how the Queensland Coastal

More information

The Coordinator-General. Alpha Coal Project. Coordinator-General s Evaluation Report on the environmental impact statement

The Coordinator-General. Alpha Coal Project. Coordinator-General s Evaluation Report on the environmental impact statement The Coordinator-General Alpha Coal Project Coordinator-General s Evaluation Report on the environmental impact statement May 2012 State of Queensland. Published by Queensland Government, May 2012, 111

More information

Arrow Energy. Surat operational update. July 2016

Arrow Energy. Surat operational update. July 2016 Surat operational July 2016 Why we are here today Provide an to the community on Arrow s operational activities over the past 24 months Approval stages for the Surat Gas Project Upcoming survey activities

More information

Submission to the Murray Darling Basin Authority (Proposed Basin Plan)

Submission to the Murray Darling Basin Authority (Proposed Basin Plan) Submission to the Murray Darling Basin Authority (Proposed Basin Plan) April 2012 Tim Whetstone MP, Member for Chaffey 13 Kay Ave Berri SA 5343 Introduction I support a Basin Plan that delivers a balanced

More information

SUPPLY CHAIN PERSPECTIVE

SUPPLY CHAIN PERSPECTIVE SUPPLY CHAIN PERSPECTIVE LIVESTOCK/MEAT Overview 1234 Queensland has Australia s largest beef cattle herd and is the nation s largest producer and exporter of beef. Historically, beef comprises approximately

More information

Response to the Murray-Darling Basin Royal Commission Report 31/01/2019

Response to the Murray-Darling Basin Royal Commission Report 31/01/2019 Response to the Murray-Darling Basin Royal Commission Report 31/01/2019 State and Federal governments must be held to account for their actions to deliver the Murray- Darling Basin Plan and the billions

More information

Certainty in uncertainty: navigating environmental impact assessment regulatory processes

Certainty in uncertainty: navigating environmental impact assessment regulatory processes Certainty in uncertainty: navigating environmental impact assessment regulatory processes Geraldine Squires Principal Impact Assessment Manager, CEnvP IA Specialist, GHD Pty Ltd There is increased pressure

More information

Illawarra Business Chamber/Illawarra First. Submission on NSW Draft Freight and Ports Plan

Illawarra Business Chamber/Illawarra First. Submission on NSW Draft Freight and Ports Plan Illawarra Business Chamber/Illawarra First Submission on NSW Draft Freight and Ports Plan Illawarra Business Chamber A division of the NSW Business Chamber Level 1, 87-89 Market Street WOLLONGONG NSW 2500

More information

Options for an Indigenous Economic Water Fund (IEWF)

Options for an Indigenous Economic Water Fund (IEWF) University of Colorado Law School Colorado Law Scholarly Commons Indigenous Water Justice Symposium ( June 6) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics 6-6-2016 Options for an Indigenous

More information

COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS

COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS Welcome to the sixth annual Cotton Australia Cotton Annual 1 Australian Cotton Bale = 227kg 1 Hectare Approx 2 rugby = football fields Cotton Australia annually

More information

Australian Dairy Industry

Australian Dairy Industry Australian Dairy Industry Represented by Australian Dairy Industry Council Inc. Response to Inquiry into Australia s legislative regulatory and policy framework for unconventional gas mining 15 March 2016

More information

Native Title Act 1993

Native Title Act 1993 APPENDIX A2: Regulatory approvals Table 1: Regulatory approvals Approval / permit type Commonwealth approvals Permission to intervene in matters where traditional cultural heritage interests are considered

More information

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012.

Commencement Date. This section applies to all land under Newcastle Local Environmental Plan 2012. 5.03 Tree Management Amendment history Version Number Date Adopted by Council Commencement Date 1 15/11/2011 15/06/2012 New Amendment Details Savings provisions Any development application lodged but not

More information

Brisbane River Catchment Flood Study overview

Brisbane River Catchment Flood Study overview Brisbane River Catchment Flood Study overview Brisbane River Catchment Flood Study overview Floods can and do occur in the Brisbane River catchment. The Queensland Government, local councils and the community

More information

BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT

BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT 1 July 08 BC IRON COMMITS TO FEASIBILITY STUDY ON NULLAGINE IRON ORE PROJECT POSITIVE SCOPING STUDY UNDERPINS MOVE TO FAST-TRACK DEVELOPMENT HIGHLIGHTS Scoping Study completed on 3Mtpa DSO operation from

More information

Sustainable Wildlife Enterprises

Sustainable Wildlife Enterprises Sustainable Wildlife Enterprises Can the commercial value of wildlife act as an incentive for landholders to restore on-farm habitat? This brochure describes how organisations and individuals are taking

More information

COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS

COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS COTTON AUSTRALIAN COTTON INDUSTRY STATISTICS Welcome to the 2016 Cotton Australia Cotton Annual Cotton Australia annually collates data for key areas affecting cotton production in Australia: crop size,

More information

QUEENSLAND ELECTION 2017

QUEENSLAND ELECTION 2017 QUEENSLAND ELECTION 2017 Protecting our Reef and Oceans How do the party policies compare? An independent assessment of the parties policies by the Australian Marine Conservation Society About us The Australian

More information