1 PETROPAVLOVSK PLC MINEX Russian Mining Club 3 December 2012
2 2 Cautionary and forward-looking statements Some statements contained in this presentation or in documents referred to in it are or may be forward-looking statements. Such statements reflect the Company s current views with respect to future events and are subject to risks, assumptions, uncertainties and other factors beyond the Company s control that could cause actual results to differ from those expressed in such statements. Although the Company believes that such forward-looking statements, which speak only as of the date of this presentation, are reasonable, no assurance can be given that they will prove to be correct. Therefore, you should not place undue reliance on these statements There can be no assurance that the results and events contemplated by the forward-looking statements contained in this presentation will, in fact, occur. The Company will not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events, circumstances or unanticipated events occurring after the date of this presentation, except as required by law or by any appropriate regulatory authority. Nothing in this presentation or in documents referred to in it should be considered as a profit forecast Past performance of the Company or its shares cannot be relied on as a guide to future performance This presentation does not constitute, or form part of or contain any invitation or offer to any person to underwrite, subscribe for, otherwise acquire, or dispose of any shares in Petropavlovsk PLC or advise persons to do so in any jurisdiction, nor shall it, or any part of it, form the basis of or be relied on in any connection with or act as an inducement to enter into any contract or commitment therefore. In particular, this presentation and the information contained herein are not an offer of securities for sale in the United States No reliance may be placed for any purpose whatsoever on the information or opinions contained in this presentation or on its completeness and no liability whatsoever is accepted for any loss howsoever arising from any use of this presentation or its contents or otherwise in connection therewith The development and production plans and estimates set out herein represent the current views of the Company's management. The Company s Board reviews the production estimates on an ongoing basis. All planning is subject to available funding and capital allocation decisions This presentation has been prepared in compliance with English law and English courts will have exclusive jurisdiction over any disputes arising from or connected with this presentation
3 3 What is refractory ore? Mineralised rock resistant to recovery by standard cyanidation adsorption methods Natural Oxidation Process Generally contains sulphide minerals, which encapsulate gold particles, making it difficult for the leach solution to reach the contained gold Oxidation of sulphide minerals is necessary to recover the gold May also contain organic carbon that impedes recovery Takes several million years to free up
4 4 Artificial Oxidation Mineralised rock resistant to recovery by standard cyanidation + carbon adsorption methods Generally contains sulphide minerals, which encapsulate gold particles, making it difficult for the leach solution to reach the contained gold Oxidation of sulphide minerals is necessary to recover the gold May also contain organic carbon that impedes recovery Processing options for refractory ore Crushing + Grinding Concentrate is treated in a pressure vessel in a pure Roas%ng oxygen atmosphere at BIOX high pressure and high temperature Pressure oxida%on ( POX ) POX takes 45 minutes
5 5 Transformation of Pokrovskiy to POX Hub Simplified Pokrovskiy RIP plant flow sheet Addition of POX Crushing + Grinding Non- refractory ore Floata%on concentra%on POX Circuit RIP Doré Gold Bars Tailings Dam Tailings Dam Existing facilities to be integrated into the Pressure Oxidation Hub
6 6 Pokrovskiy POX processing concept PIONEER Flota%on Plant MALOMIR Flota%on Plant Recovery = 86% Concentrate = 240Ktpa Recovery = 88% Concentrate = 330Ktpa THE POKROVSKIY POX HUB Concentrate re- grinding Autoclave oxida%on RIP circuit Doré to refinery POX Plant Recovery = 93% for Malomir + 98% for Pioneer
7 7 Refractory Cost Guidance Less expensive Neutral More expensive Stripping 1 to 1 Limestone Less Dilu)on Fine Grind Not Required Savings on Chemicals Mining Crushing + Grinding Electricity + Oxygen Handling + Transport Compared with Pioneer bulk mining & processing total cash costs Note: weight sizes are not to scale
8 8 Location of the Petropavlovsk POX hub Existing roads Flotation Plant (670km from POX hub) Flotation Plant (40km from POX hub) POX Processing Hub Good infrastructure for development of a regional hub
9 9 A world class team of experts Valery Alekseev Group Head of Engineering and Construction Prof. Schneerson Director of Gidrometallurgiya R&D Centre Dr Sergey Ryakhovskiy Group Head of Metallurgy Viktor Federov Head of R&D Evgeniy Kudrin Technical Director of POX Hub Strong history of timely project delivery Responsible for construction of 5 mines + 7 plant expansions for Petropavlovsk International experience Authoritative expert in the field of autoclave technology 50+ years of experience Extensive experience working on POX projects incl. Nadezhdinskiy (Norilsk Nickel) Credited with 65 inventions 30+ years of experience Lead design + oversaw commissioning of all Group process facilities 12+ years of project management in ferrous and non-ferrous sectors Strong track record of managing + delivering logistically challenging + complex development projects 20+ years of experience of working in refractory ore processing Formerly Deputy Director for Production and Operations at Nadezhdinskiy POX Plant (Norilsk Nickel)
10 Our experienced partner: Outotec Outotec is an industry leader in minerals and metals processing technology Commissioned to provide project management services, including: - Detailed technical design of the POX plant - Equipment selection - Oversight of equipment manufacturing process - Installation - Commissioning Regular inspections to ensure all manufacture schedules are up-to-date Guarantee of throughput and designed processing regimes Outotec s experience includes: (1) - Design and commissioning of 4 base metal plants with autoclave technology - Designed and commissioning of hundreds of flotation lines around the world 10 (1) Includes experience when Outotec was a part of Outokumpu
11 11 The Blagoveschensk pilot POX plant First and only one of its kind in Russia, built Allows for extensive testing and optimisation of a full range of operational parameters (temperature, pressure, flow rate) - Used to train personnel Replicates industrial scale plant including automation and control systems - Exactly replicates processes and controls to be used at the future plant - Accurate prediction of recoveries, reagent consumption and operating costs - Complete understanding of the process before operations commence Scaled process replication = de-risked technology - Brings confidence to the POX plant design laboratory test work replicate conditions in industrial production The only pilot scale autoclave in Russia Unique pilot test plant = in depth simulation, project de-risked
12 12 Our very own POX plant, the only one of its kind in Russia
13 13 A Petropavlovsk autoclave vessel
14 14 Why is refractory ore the future of gold mining? The world is running out of easily treatable ore - Exploration is failing to balance out depletion of non-refractory ore - Approximately ¾ of Russia s reserves are refractory or partly refractory in nature, incl. Russia s largest gold deposit, Sukhoi Log A gradual shift towards refractory ore processing - Barrick Gold, Newmont Mining, Newcrest Mining, Agnico Eagles Refractory ore processing technologies have been successfully employed for decades around the world - First plant for base metals launched 1952, first gold POX plant launched 1985 (McLaughlin, USA) Kittila processing complex Autoclaves at Pueblo Viejo
15 15 Location of the Petropavlovsk POX hub Existing roads Flotation Plant (670km from POX hub) Flotation Plant (40km from POX hub) POX Processing Hub Good infrastructure for development of a regional hub
16 Presentation to The Natural Resources Forum 30 October 2012 Q&A 16
The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors.
The Industrial Application of Ultrafiltation and Reverse Osmosis for the Recovery of Cu, Ag and CN from Gold Leach Liquors. A.J. Monhemius Anglo Asian Mining plc 1 Disclaimer The information in this document
More information23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited
23 July 2013 2013 Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited ("IRC"), the Group ) today issues its Trading Update for
More informationGreat Western Scoping Study Update & Onsite Gold Processing
ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its
More informationFlotation and Leaching at Anglo Asian Mining s Gedabek Gold and Copper Mine in Azerbaijan. A.J. Monhemius, F. Hedjazi & H.
Flotation and Leaching at Anglo Asian Mining s Gedabek Gold and Copper Mine in Azerbaijan A.J. Monhemius, F. Hedjazi & H. Saeedi Ali Presentation at World Gold, COM 2017, Vancouver, August 2017 Disclaimer
More informationFor personal use only
Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast
More informationFIRST MAJESTIC SILVER CORP.
FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail:
More informationBrett Fletcher Executive General Manager PNG & Indonesian Operations
Hidden Valley Brett Fletcher Executive General Manager PNG & Indonesian Operations Disclaimer Forward Looking Statement These materials include forward looking statements. Often, but not always, forward
More informationFor personal use only
Positive Scoping Study: Aphrodite Gold Project 9 February 2012 Company Announcements Office Australian Securities Exchange Limited Positive Scoping Study for Aphrodite Gold Project Potential to Become
More informationThe Albion Process at the GPM Gold Project The success of a technology
The Albion Process at the GPM Gold Project The success of a technology Paul Voigt, Glencore Technology (paul.voigt@glencore.com.au) David Walker, Core Resources (dwalker@coreresources.com.au) CIM Conference
More informationBoardroom Radio presents. March Toyota Tsusho. Kasbah Resources Limited
Boardroom Radio presents March 12 2012 Toyota Tsusho Kasbah Resources Limited 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information
More informationDuluth Metals Provides Metallurgical Update on Twin Metals Minnesota Project
Duluth Metals Provides Metallurgical Update on Twin Metals Minnesota Project Positive results from various metallurgical options considered for the Twin Metals Minnesota Project Good metal recoveries to
More informationFor personal use only
Sandfire Resources NL ABN 55 105 154 185 Level 2, 31 Ventnor Ave, West Perth Western Australia 6005 Phone: +61 8 6430 3800 Fax: +61 8 6430 3849 Email: info@sandfire.com.au Web: www.sandfire.com.au ASX/Media
More informationFirst Chalcopyrite Copper Concentrate Leaching using Albion Process TM Technology. Glenn Stieper
First Chalcopyrite Copper Concentrate Leaching using Albion Process TM Technology Glenn Stieper BACKGROUND Glencore has an operating plant, Sable Zinc, in Zambia that was being un-utilised due to the lack
More informationHard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX
Hard Creek Nickel Emerging Giant Turnagain Nickel Project Ed Beswick P Eng. HNC:TSX www.hardcreeknickel.com Minerals North Conference April 2010 Cautionary Statement The information contained in this presentation
More informationMETATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY
March 7, 2011 Symbol: TSX V-CKG NR1-2011 METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY Chesapeake Gold Corp. ( Chesapeake ) is pleased to announce the results
More informationNewmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase
NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)
More informationFinancial results for the 6 months to 30 June 2008
28 August 2008 Financial results for the 6 months to 30 June 2008 During the June half 2008, PanAust emerged as a significant producer of copper gold concentrate in Southeast Asia. Activities during the
More informationOrezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion
Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion November 19, 2018, Orezone Gold Corporation (TSXV: ORE) ( Orezone or the Company ) is pleased to provide
More informationINTEGRA RESOURCES COMMENCES METALLURGICAL TESTWORK PROGRAM AT THE DELAMAR GOLD-SILVER PROJECT
1050 400 Burrard Street Vancouver, British Columbia, Canada V6C 3A6 Email: chris@integraresources.com FOR IMMEDIATE RELEASE September 6, 2018 TSXV:ITR ; OTCQX: IRRZF www.integraresources.com INTEGRA RESOURCES
More informationFor personal use only
7 August 2012 ASX: PAN Gidgee Gold Project Scoping Study Key Highlights Gold Production estimated at 606,000oz of gold over an initial seven years, average annual production of 87,000oz Operating Cash
More informationWindimurra Vanadium Plant Project Update. Investor Presentation August 2011
Windimurra Vanadium Plant Project Update Investor Presentation August 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation
More informationT S X : R M X N Y S E. M K T : R B Y
T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,
More informationINVESTOR PRESENTATION Keith Allaun Executive Chairman
INVESTOR PRESENTATION Keith Allaun Executive Chairman P O W E R H O U S E E N E R G Y INTRODUCTION AIM listed PowerHouse Energy Group plc has fully commissioned its new G3-UHt Gasification System (G3 System)
More informationFor personal use only
ASX Announcement 2 December 2013 Positive scoping study confirms economic viability of Bird-in-Hand Gold Project HIGHLIGHTS Scoping Study confirms technical and economic viability of the Birdin-Hand Gold
More informationFor personal use only
2 May 2018 ASX Announcement METALLURGICAL TESTWORK CONFIRMS WILUNA TRANSITIONAL RESERVES AMENABLE TO PROCESSING THROUGH THE EXISTING WILUNA CIL PLANT Highlights Expansion PFS published in Aug 17 includes
More informationMetals Exploration PLC. Runruno Gold-Molybdenum Project. Positive Scoping / Pre-Feasibility Study Results
3 November 2008 Metals Exploration PLC Runruno Gold-Molybdenum Project Positive Scoping / Pre-Feasibility Study Results 183,000 ozs gold, 1.7m lbs moly per annum at US$285 /oz gold net Metals Exploration
More informationBald Hill Delivers Excellent Metallurgical Test Work Results
6 September 2017 Bald Hill Delivers Excellent Metallurgical Test Work Results Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to announce encouraging
More informationThe materials used herein and this presentation (collectively, the Presentation ) have been prepared by PT Agincourt Resources (the Company ) solely
The materials used herein and this presentation (collectively, the Presentation ) have been prepared by PT Agincourt Resources (the Company ) solely for use at presentations to be held during August 2016.
More informationForward Looking Statement
Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation
More informationASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington
ASX and Media Release: 20 September 2016 ASX Code: WRM Initial mining review demonstrates potential upside at Mt Carrington ASX Code: WRM Issued Securities Shares: 441.3 million Options: 100.5 million
More informationFirst Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter
New York AG October 15, 2018 Toronto FR Frankfurt FMV First Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter Vancouver, BC, Canada - First Majestic Silver Corp. ("First
More informationFirst Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter
New York AG October 15, 2018 Toronto FR Frankfurt FMV First Majestic Produces a Record 6.7 Million Silver Equivalent Ounces in Third Quarter Vancouver, BC, Canada - First Majestic Silver Corp. ("First
More information930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:
930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT
More informationBan Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum
ASX ANNOUNCEMENT 29 March 2010 Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum PanAust is pleased to announce that the Board of Directors
More informationAVINO SILVER & GOLD MINES LTD.
April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES
More informationIN MINING & MINERAL PROCESSING
index The following topics are discussed in this document: 1. Introduction 2. Gold Extraction & Processing 3. Cyanide Leaching 4. CIL & CIP 5. Bioleaching 6. Autoclaves 7. Solvent Extraction introduction
More informationCAUTIONARY INFORMATION
CAUTIONARY INFORMATION This presentation contains forward-looking information which may include, but is not limited to, statements with respect to the future financial or operating performance of American
More informationAfrican Barrick Gold plc (the Company or ABG ) North Mara Update
African Barrick Gold plc (the Company or ABG ) LONDON, (September 30 th, 2011) North Mara Update ABG, together with its majority shareholder, Barrick Gold Corporation ( Barrick ), have undertaken a series
More informationJUNE 2018 QUARTERLY ACTIVITIES REPORT
31 July 2018 JUNE 2018 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Baobab Expansion Project Feasibility Study due in the fourth quarter of 2018 Processing test work continues with positive results Gadde Bissik
More informationArgonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year
Argonaut Gold Announces Q1 Production of 30,963 Gold Equivalent Ounces, an Increase of 4% Over Prior Year Drilling commences at San Agustín with 11,200 metres (116 holes) completed to date Toronto, Ontario
More informationTHE CESL PROCESS: SUCCESSFUL REFINING OF A COMPLEX COPPER SULPHIDE CONCENTRATE
THE CESL PROCESS: SUCCESSFUL REFINING OF A COMPLEX COPPER SULPHIDE CONCENTRATE GLENN BARR AND WILLY GRIEVE 1 INTRODUCTION Cominco Engineering Services Ltd. (CESL) is a wholly - owned subsidiary of Cominco
More informationAGM - Lorena Gold Project
AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors
More informationGum Creek Gold Project Free Milling Scoping Study
18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average
More informationQ Quarterly Activities Report. Shaun Verner Managing Director & CEO 30 July 2018
Q2 2018 Quarterly Activities Report Shaun Verner Managing Director & CEO 30 July 2018 Disclaimer This presentation is for information purposes only. Neither this presentation nor the information contained
More informationFor personal use only
Q2 2018 Quarterly Activities Report Shaun Verner Managing Director & CEO 30 July 2018 Disclaimer This presentation is for information purposes only. Neither this presentation nor the information contained
More informationT S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015
T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation
More informationNEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS
NEWS RELEASE GOLDEN QUEEN ANNOUNCES 2016 PRELIMINARY OPERATING RESULTS VANCOUVER, BRITISH COLUMBIA February 14, 2017 - Golden Queen Mining Co. Ltd. (TSX:GQM; OTCQX:GQMNF) (the Company or Golden Queen )
More informationMacquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018
Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer M a y 2018 Disclaimer Forward looking statements This presentation has been prepared by OZ Minerals Limited (OZ Minerals) and
More informationFor personal use only
ABN 79 106 879 690 30 August 2016 The Manager Companies ASX Limited 20 Bridge Street Sydney NSW 2000 (11 pages by email) Updated Internal Scoping Study Delivers Positive Results (ASX: AUK) The Directors
More informationFor personal use only
9 December 2011 Bass Metals Confirms Commercial Robustness of Hellyer Gold Project (HGP) HIGHLIGHTS: A study on tailings treatment options confirms HGP as a robust project utilising the Albion Process
More informationIndium facility at the Auby smelter
Indium facility at the Auby smelter 20 September 2012 Xavier Constant Technology Manager, Auby smelter Important Notice This presentation has been prepared by the management of Nyrstar NV (the "Company").
More informationFor personal use only
Malachite Resources Limited ABN 86 075 613 268 ASX Announcement ASX Code: MAR 12 March 2012 LORENA GOLD PROJECT - UPDATE Summary Malachite s commitment to establish a gold mining and production plant at
More informationFor personal use only
ASX Announcement 19 December 2014 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) ASX CODE BLK
More informationSA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015
SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 Disclaimer This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides
More informationFocused on delivery of high-value metals critical to energy revolution. Annual General Meeting 20 November 2018
Focused on delivery of high-value metals critical to energy revolution Annual General Meeting 20 November 2018 Important Information Forward Looking Statement This presentation may contain certain statements
More informationINNOVACIÓN EN PLANTAS HIDRO- METALÚRGICAS
1º SEMINARIO INTERNACIONAL INNOVACIÓN EN PLANTAS HIDRO- METALÚRGICAS 1º INTERNATIONAL SEMINAR: INNOVATION IN HYDROMETALLURGICAL PLANTS A sustainable hydrometallurgical process to develop copper deposits
More informationBase Metals Capability Profile
Base Metals Capability Profile About DRA Over more than 30 years, the DRA Group (DRA) has established itself globally as a first tier supplier of engineering and project management services. We work with
More informationAFC Energy plc AGM Presentation. 25 April 2017
AFC Energy plc AGM Presentation 25 April 2017 1 Disclaimer This presentation has been prepared by AFC Energy plc (the Company ). By attending this presentation and/or reviewing the slides you agree to
More informationFOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR
FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR AZARGA METALS ANNOUNCES POSITIVE, INDEPENDENT, PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT HIGHLIGHTS: Positive PEA result achieved
More informationPATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014
BEER & CO - SECOND ANNUAL TIN CONFERENCE WEDNESDAY, 5 NOVEMBER, 2014 PATRICK SCOTT - DIRECTOR SCOTT@AUSTRALIA.ROHSTOFF.DE Disclaimer This presentation has been prepared by and issued by Tin International
More informationFor personal use only
18 November 2014 ASX Announcement PanTerra Gold Limited ASX: PGI GOLD HEDGE PROGRAM ADJUSTED - PROJECT LOAN REDUCED PanTerra Gold Limited (ASX: PGI) (PanTerra Gold or the Company ), advises that it has
More informationRosneft the Leader of the Russian Oil Industry. Eduard Khudainatov President of Rosneft New York, April 18, 2012
Rosneft the Leader of the Russian Oil Industry Eduard Khudainatov President of Rosneft New York, April 18, 2012 Post-IPO Dynamics (2006-2011) Reserve replacement Well above the industry average Discovery
More informationHOCHSCHILD MINING Bank of America Merrill Lynch Global Metals, Mining & Steel Conference May 2013
HOCHSCHILD MINING Bank of America Merrill Lynch Global Metals, Mining & Steel Conference 14-16 May 2013 DISCLAIMER Some statements contained in this presentation or in documents referred to in it are or
More informationSte De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:
April 25, 2012 Ste. 3083 595 Burrard Street Vancouver, BC V7X 1L3 Tel: 604 566 9080 Fax: 604 566 9081 Ste. 560 999 De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: 514.289.1183 Fax: 514.289.1188 TSX Venture
More informationFor personal use only
ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical
More informationLowering the Threshold for Refractory Gold Deposits with New Biooxidation Technologies
Presented at MINExpo International '96, Las Vegas, NV, September 11, 1996 Lowering the Threshold for Refractory Gold Deposits with New Biooxidation Technologies Desmond P. Kearns, President & CEO John
More informationCompany Presentation Iggy Tan Managing Director
Company Presentation Iggy Tan Managing Director To be a world leading producer of high purity alumina (HPA) Our vision Sapphire - natural form of high purity alumina (HPA) Formed by mother nature like
More informationHydrometallurgical Options to Add Value to Copper Projects and Operations
Hydrometallurgical Options to Add Value to Copper Projects and Operations Peter Rohner Core Resources, Brisbane www.coreresources.com.au 24 th March 2010 Company Overview Highlights Specialist services:
More information121 MINING INVESTMENT CONFERENCE HONG KONG
ASX / MEDIA RELEASE 23 April 2018 121 MINING INVESTMENT CONFERENCE HONG KONG St George Mining Limited (ASX: SGQ) ( St George or the Company ) is participating at the 121 Mining Investment Conference in
More informationAustralia s New Nickel
Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra
More informationCOMPLETION OF PROCESS TESTWORK STUDIES
ASX Release 7 February 2018 Agrimin Limited ABN 15 122 162 396 ASX Code: AMN 2C Loch Street Nedlands, Western Australia 6009 T: +61 8 9389 5363 E: admin@agrimin.com.au W: www.agrimin.com.au COMPLETION
More informationOJSC Polyus Gold. The Board approves the first stage of construction of Natalka mine
OJSC Polyus Gold The Board approves the first stage of construction of Natalka mine Cautionary statements The information contained herein has been prepared using information available to Polyus Gold Group
More informationFor personal use only
28 November 2017 Corporate Details Ordinary Shares: 780,917,069 Market Capitalisation: ~$156 million Cash and bullion at 30 September 2017: ~$20.1 million Debt: NIL ASX Code: MOY Board of Directors Greg
More information#Disrupt Mining: Integrated Extraction and Recovery System for Complex. Ores and Wastes"
#Disrupt Mining: Integrated Extraction and Recovery System for Complex Ores and Wastes" The Process. Supplemental Information The proposed integrated process covers both extraction and recovery of many
More informationCEO Presentation Annual General Meeting. November 2016
CEO Presentation Annual General Meeting November 2016 On track to commence bauxite production in Q2 2017 Disclaimer Statements & material contained in this presentation, particularly those regarding possible
More informationExploration Update and Review of Gold Ore Reserves and Mineral Resources
5 March2018 Exploration Update and Review of Ore Reserves and Mineral Resources Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries, the Group ) is pleased to announce an
More informationUnderground Ore Reserve growth at Prominent Hill extends mine life to 2030
12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved
More informationAVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY
ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 avino.com January 16, 2018 AVINO ANNOUNCES FOURTH QUARTER AND
More informationASX ANNOUNCEMENT 12 MAY 2016
ASX ANNOUNCEMENT 12 MAY 2016 FÄBOLIDEN METALLURGICAL TEST WORK IMPROVES RECOVERY LEVELS Dragon Mining Limited (ASX:DRA) ( Dragon Mining or the Company ) is pleased to announce that the second phase of
More informationLITHIUM & BATTERY METALS KORAB RESOURCES LIMITED. For personal use only. Perth, Western Australia March 2018
LITHIUM & BATTERY METALS Perth, Western Australia 21-22 March 2018 KORAB RESOURCES LIMITED Andrej K. Karpinski Executive Chairman Tel: (08) 9474 6166 How Green is Green? 1 21 Why all the Fuss? 2 21 Why
More informationZincOx Resources plc. Corporate Overview
ZincOx Resources plc Corporate Overview May 2012 Where there s Muck there s Brass Disclaimer This document is for informational purposes only and must not be used or relied upon for the purposes of making
More informationRegulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina
Regulus Announces that Preliminary Metallurgical Results Indicate Good Gold Recovery is Achievable at the Rio Grande Cu-Au-Ag Project, Argentina December 6, 2011, (Waterdown, Ontario) Regulus Resources
More informationAeon Metals Limited HIGHLIGHTS
ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension
More informationFor personal use only
ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal
More informationVALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE
VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward
More informationFor personal use only
Corporate Details Ordinary Shares: 795,237,123 Market Capitalisation: ~$180 million Cash, bullion and available financing facilities at 31 December 2018: $18.2 million Debt at 31 December 2018: $5 million
More informationEvaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood
Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering
More informationChallenging times, winning strategies Vancouver 8 th May 2008 PWC 21 st Global Forest & Paper industry Conference
Challenging times, winning strategies Vancouver 8 th May 2008 PWC 21 st Global Forest & Paper industry Conference Disclaimer Some statements contained in this presentation or in documents referred to in
More informationIMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS
IMPROVING EFFICIENCIES: THE ROLE OF PROCESS AUDITS MINE AFRICA BREAKFAST, PDAC 2015 Mike Hallewell B.Sc., C.Eng. Business Development Manager COMMITMENT TO SERVICING AFRICA s NEEDS Mines in Africa SGS
More informationNOLANS REVIEW COMPLETED DELIVERING SIGNIFICANT COST AND OPERATIONAL BENEFITS
ASX RELEASE 28 June 2016 ASX: ARU NOLANS REVIEW COMPLETED DELIVERING SIGNIFICANT COST AND OPERATIONAL BENEFITS Extensive work programs identify substantial operational and cost efficiencies at Nolans Rare
More informationAustralian gold producer 90, ,000 CY19
Australian gold producer 90,000-100,000 CY19 Rising grades, rising production +100,000ozpa targeted production New discoveries driving growth ------------------------------------------- February 2019 Corporate
More informationTowards Minimum Impact Concentrators. PhD (Chem) Eija Saari Basf Innovation Day, Sept 13-14, 2018 Ludwigshafen
Towards Minimum Impact Concentrators PhD (Chem) Eija Saari Basf Innovation Day, Sept 13-14, 2018 Ludwigshafen Outotec - a process technology company 2 Minerals Processing Industry Will Face a Paradigm
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 5th September, 2012 Old Pirate Metallurgical Test-Work delivers Exceptional Gold Recovery (up to 97.3%) from Two Different Gravity Methods ABM Resources NL ( ABM
More informationNIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014
NIUMINCO GROUP LIMITED PNG MINING & PETROLEUM INVESTMENT CONFERENCE DECEMBER 2014 Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any
More informationCopper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017
Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to
More informationForward Looking Statements Forward Looking
MINERALS NORTH 2009 Forward Looking Statements Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements
More informationForecast Financial Information And Pro Forma Financial Information In Relation To The Proposed Transaction And Withdrawal Of Cautionary
DRDGOLD LIMITED (Incorporated in the Republic of South Africa) (Registration number 1895/000926/06) JSE share code: DRD ISIN: ZAE000058723 NYSE trading symbol: DRD ( DRDGOLD or the Company ) Forecast Financial
More informationRavenswood Expansion Project Update
11 July 2018 Ravenswood Expansion Project Update Highlights AISC down, mine life extended, all required approvals received Significant enhancements have been made to Ravenswood Expansion Project All required
More informationKanowna Belle Pre-Oxidation Project
Kanowna Belle Pre-Oxidation Project Kanowna Belle Processing Kanowna Belle treats both free milling and refractory ores with the free milling material being sourced predominantly from the East Kundana
More information