M.Geldbach (Shanxi) Flange & Fitting Co., Ltd.

Size: px
Start display at page:

Download "M.Geldbach (Shanxi) Flange & Fitting Co., Ltd."

Transcription

1 M.Geldbach (Shanxi) Flange & Fitting Co., Ltd. Quality Manual (According to GB/T idt ISO9001:2000) Edition: B Status: Issue No.: 06 Issued on:april 20 th, 2003 Implemented on: April 20 th, 2003 Re Edited on : April 20 th,

2 Writers and Editors of Quality Manual Chief Editor: Cui Yongzhe Editors: Cui Yongzhe, Wang Jihui & Wang Haodian Aduited by: Zhang Maode Approved by: Zhang Maoxue 2

3 Preface Geldbach (Shanxi) Flange & Fitting Co., Ltd. is located in Dongliijiang Village, Dingxiang City, which is the home of forging in Shanxi Province. With a registered capital of $400,000, the company is the only solely foreign-owned enterprise in this region. It has established business relations with a number of foreign partners and its products are flanges and forgings of different standards such as American standard, German standard, British standard, Japanese standard and Chinese standard. The company has advanced technology and design. Its products are often praised by our foreign partners. After years of development, our company has developed unique techniques for special-shaped designs and is the pioneer in the field of forging in this region. Both Chinese and foreign advanced technologies are adopted in the production procedures such as forging, turning and drilling, etc. Strict quality management system is also established. According to the current production capacity, the company can produce 500 tons of flanges of different specifications each month. Due to prompt delivery and good quality, our customers are very satisfied with our products. Making use of the advantage of being located in the home of forging, our company is blessed with convenient transportation, advanced telecommunication facility as well as abundant resources of coal, electric power and steel products. Our company is also situated in a very favorable geographic location. Our company provides good after-sale service and efficient services of packing, storing, transporting and delivery. Our principle is customers first and we always try our best to satisfy our customers with the best products and the best service. 3

4 According to the standard of ISO9001:2000, Quality Manual has been drafted and implemented in order to further improve quality management system. It illustrates in detail the obligations, resource management as well as measurement, analysis and improvement of the products. This manual functions both as the document of quality management system of the company and the reference for our customers or the third party certification agencies. After being approved and issued, the manual should still be revised and updated to make it more practical and more comprehensive, and to guarantee the validity of the quality management system of the company. Company address: Lijia Village, Dingxiang County, Shanxi Province Postal code: Tel: Fax: Office in Tianjin: Room 1708 Chuangzhi Building, Xinkai Road, Hedong District, Tianjin Postal Code: Tel: Fax:

5 Contents 0.1 Promulgation order Letter of appointment Organization chart of quality management system Quality guiding principles Quality objectives 4 0.6Table of Organizations for quality management system 5 1. Scope 8 2. Cited documents 8 3. Terminology and definition 8 4. Quality management system General requirements Document requirements Management obligation Management commitment Customer focus Quality guiding principle Plan Obligation, authority and communication Management review Resources management Resources supply Human resources Infrastructure Working environment Product realization 20 5

6 7.1 Plan of product realization Customers-related process Purchase Provision of production and service Management of monitoring and measuring equipment Measurement, analysis and improvement General principles Monitor and measurement Control of unqualified products Data analysis Improvement 30 6

7 0.1 Promulgation order In order to improve the management level, our company has drafted Quality Manual according to the standards of GB/T and basing on the practical situation of our company. Quality Manual has been formulated in order to further improve the quality management system. Quality Manual illustrates quality principles, objectives as well as procedures and requirements of the quality management system of our company. As a regulative document of quality management system, it is the principle that guides the company in establishing and implementing quality management system. It is also the principle that coordinates and standardizes the activities of the employees in following the quality management system. It is also the reference of both quality guarantee and examination by the third party. Quality is the life of an enterprise and quality management is the guiding principle of an enterprise. As the basis of implementing quality management system, Quality Manual aims at ensuring effective operation of quality management system as well as successful realization of quality guiding principles and objectives. After the issuance, all relevant departments and workshops are required to implement this manual strictly. It is hereby ordered General Manager: Zhang Maoxue April 20 th,

8 0.2 Letter of Appointment All relevant departments: In order to effectively implement GB/TI Quality Management System, strengthen leadership on operation of quality management system and to ensure effective operation of quality management system of our company, we have established Standard Implementation Office and have appointed Mr. Li Wei as the management representative, Mr. Wang Haodian as Director of Production Department, and Mr. Zhang Maobin as Director of Standard Implementation Office. The obligations of management representatives include: 1. Establishing and maintaining the process of quality management system; 2. Reporting to the top manager the achievements and requirements for improving the quality management system; 3. Increasing the awareness of customer satisfaction within the whole organization; 4. Outside contact in affairs relevant to quality management system; The employees of the whole company should obey the leadership of the upper level and fulfill the obligations of their posts in order to ensure effective operation of quality management system. General Manager: Zhang Maoxue April 20 th,

9 0.3 Organization Chart of Quality Management System General Manager Deputy General Manager Management Representative Production Department Standard Implementatio n Office Department of Quality Check 9

10 0.4 Quality Guiding Principles Satisfying each customer. Forging top quality flange products Constant improvement Working for multi-wins 0.5 Quality Objectives 90% qualified rate in the first inspection 95% customer satisfaction 100% timely delivery General Manager: Zhang Maoxue April 20 th,

11 0.6 Table of Organizations for Quality Management System (I) General Management Department Standard Manager Representative Implementation Production of Quality (Sales) (Production) Office Department Check Standard No. Processes 4 Quality management system 4.1 General requirements 4.2 Document requirements General principles Quality Manual Document management Record management 5 Management obligations 5.1 Management commitment 5.2 Customers 11

12 focus 5.3 Quality guiding 5.4 Plan principles Quality objectives Plan on quality management system 5.5 Obligation, authority and communicatio n Obligation and authority Management Representativ es Internal communicatio n 5.6 Management review General principles Examination input Examination output 12

13 Remark: Chief Key Relevance Table of Organizations for Quality Management System (II) Standard No. Standard Processes General Manager (sales) Management Representativ e (production) Standard Implement ation Office Producti on Departm ent Departme nt of Quality Check 6 Resources management 6.1 Provision of resources 6.2 Human resources General principles Capability, awareness and training 6.3 Infrastructure 6.4 Working environment 7 Product realization 7.1 Plan on product realization 7.2 Customer-related process Verification of product-related requirements Review of product-related 13

14 requirements Communication with customers 7.4 Purchase Purchasing process Purchase information Verification of product purchase 7.5 Provision of production and service Provision management of production and service Verification of production and service process Remark: Chief Key Relevance 14

15 Function Distribution Table of Organizations for Quality Management System (III) Standard Standard Processes No. General Manage r (sales) Management Representative (production) Standard Implementation Office Production Department Department of Quality Check Identification and traceability Product protection Management of monitoring 7.6 and measurement equipment Measurement, 8 analysis and improvement General principles Monitor and measurement Customer satisfaction 15

16 Internal examination Process monitoring and measurement Product monitoring and measurement Control on unqualified products 8.4 Data analysis 8.5 Improvement Improvement Corrective measures Precautions Remark: Chief Key Relevance 16

17 Requirements of Quality Management System 1. Scope 1.1 General principles The Quality Manual of the company was drafted according to ISO standard, the requirements of the relevant law and regulations. It is based on the features of our products and the customers requirements. The manual elaborates on the quality guiding principles and the quality objectives of the company. It also regulates obligations in terms of quality and describes requirements of quality management system. Internally, it regulates the activities of the employees for quality management; externally, it shows the quality management capability of the company, realizes the goal of customers focus and wins the trust from our customers. 1.2 Scope of application It is applicable to products covered by quality management system of our company as well as different functional departments that participate in quality control activities. Our flange series are well-developed products and they follow the following standards: HG Steel pipe flange HG Board welded steel pipe flange HG Hubbed welded steel pipe flange HG Hubbed butt welded steel pipe flange HG Threaded steel pipe flange HG Technical condition of steel pipe flange HG Pressure of steel pipe flange So design or development is no longer required; besides, there is no customers property. Therefore, 7.3 for design and development and for customers property as required by GB/TI quality management 17

18 system are deleted. 2. Cited documents GB/TI Quality Management System Basics and Terminology GB/TI Quality Management System Requirements 3. Terminology and definition This standard adopts GB/TI Quality Management System Basics and Terminology. 4. Quality management system 4.1 General requirements According to this standard, which covers management, resources as well as production and examination of products, we have established quality management system and have drafted Quality Manual and Procedure Document as required by quality management system. The company must: a. The company should identify process, which is required by quality management system, and formulate relevant procedure document; b. The company should verify the methods of process control as well as the order and relationship between different processes, and manage the process through identification, verification, monitor and analysis; c. In order to ensure effective operation and control of the verified process, the company should set up relevant principles and methods; d. The company should obtain necessary resources and information in order to support process operation and monitor; e. In order to achieve the goal of the plan and maintain constant improvement, the company must carry out necessary monitoring and measurements; f. The company should adopt necessary measures in order to achieve these plans and the constant improvement of the process; g. The company should make sure to control the outsourcing process, which may have impact on product conformity to the standard, and make 18

19 identifications in management system. Due to the features of our company, two processes may have impact on product conformity to the requirements which are chemical examination of raw materials and entrusted outsourcing of. Outsourcing control: 1. Verification and review on the qualification of the contractor: 1) Whether the contractor is a legal enterprise and has gone through legal procedures; 2) Chemical examination on raw materials, technical qualifications of outsourcing personnel, and qualified chemical examination and processing equipment; 2. Standard of product quality 1) The standards implemented by laboratory (national standard and the standard of the industry, etc.), and the actual operation level; 2) The standards implemented by outsourcing companies (national standard, industry standard or national standard), and the actual operation level; 3. Acceptance standard: According to the contract, report of chemical examination and products processed by outsourcing companies should be examined. Besides, the outsourcing processing products should be 100% examined and accepted one by one. 4. Delivery date: 4.1 Whether the product can be delivered timely according to the contract and whether the price is reasonable. Monitor and control on outsourcing process should be conducted according to the above mentioned principles in order to ensure that the outsourcing products meet the quality requirements of the contract and records should be made. 19

20 The company must manage the process according to requirements of the standard. 4.2 Document requirements General principles Quality guiding principles and quality objectives of the company: a. Quality guiding principles and quality objectives of the company; b. Quality Manual; c. Procedure documents required by the company according to the standard; d. Formulating documents including operation instruction to ensure effective planning, operation and control of the process; e. The company must keep record which is required by the standard Quality Manual Quality Manual of the company includes: a. The products covered by quality management system; b. All the products of the company follow the standard technologies as well as national standard, industry standard, enterprise standard, American standard, British standard, German standard, Japanese standard, Italian standard and French standard. c. The document procedures include: 1) Procedure of document control Q/MG-B ) Procedure of quality record control Q/MG-B ) Procedure of information communication control Q/MG-B ) Procedure of management and examination control Q/MG-B ) Procedure of production and service control Q/MG-B ) Procedure of control on the survey of customers satisfaction Q/MG-B ) Procedure of control on internal quality examination Q/MG-B ) Procedure of control on product monitor and measurement Q/MG-B ) Procedure of control on unqualified products Q/MG-B ) Procedure of control on correction and precautions Q/MG-B

21 d. The order of the processes and their relationships are regulated as the followings: 1) The company must establish concrete methods on the management and control of the supporting processes which include management obligations, resource management, measurement, analysis and improvement, etc. 2) For the order of the processes and their relationships, concrete methods should be defined according to the plan during the process of product realization. Quality Manual is approved, issued and modified by the General Manager according to document control procedure of Q/MG-B Document control Document is the basis of operation and improvement of quality management system. Document Control Procedure Q/MG-B is established and implemented in order to strengthen document management. a. Obligation The General Manager is responsible for the approval of Quality Manual and Procedure Document ; the management representative is responsible for the review of Quality Manual and Procedure Document ; the Standard Implementation Office is responsible for the drafting and management of Quality Manual and Procedure Document as well as identification and control of the documents from other sources and management of documents that should be kept for a long term. b. Control requirements 1. According to the regulation, approval procedures should be handled before the document is issued. Effectiveness should be confirmed before using the documents of other sources and the documents of laws and regulations relevant to the quality system. Effective seals should be stamped on them and their issuance should be controlled; 2. Ensure that valid edition of the document is obtained in the operating venue of quality management system; 21

22 3. Documents should be duly reviewed. Ineffective and invalid documents should be removed in order to avoid misuse; 4. Reviews are required for the documents which need modification and demolition because of invalidity. Marks should be made on the invalid documents which should be removed timely; 5. The departments and individuals using the documents should keep them clean and tidy. Scribbling is not allowed Record control Formulated and implemented by the company, Procedure on Quality Record Control Q/MG-B is for the management of quality record in order to ensure its completeness and validity. It should be well kept so that it can provide evidence to effective operation of products, which conforms to requirements and quality management system. a. Obligations The Standard Implementation Office is responsible for the management and implementation of quality record control; Production Department and Quality Department are responsible for filling in information and keeping quality record. b. Control requirements 1. Effective control of identification, storage, fastening, protection, lending, preservation period and disposal of quality record; 2. Quality record should be numbered with appropriate tables; 3. Quality record should be clear and standard. The content should be authentic, accurate and complete. It should be kept according to different categories by the department responsible for filling in information for effective searching; 4. Quality record should not be lost or damaged; 5. Quality record should be kept according to regulated period; 6. Record is an important evidence of system operation. All the departments and the employees should keep a clear record and no altering or scribbling is allowed; 22

23 5. Management obligations 5.1 Management commitment The General Manager should establish and implement quality management system through the following activities and provide evidence to commitment of making constant improvement on its effectiveness: a. The General Manager should convey to all employees of the company the importance of satisfying customers and of following the laws and regulations; 1) The General Manager should establish the quality awareness and fully understand that customer satisfaction is the basic requirement; 2) The General Manager should fully understand that the quality awareness by all employees of the company is the guarantee of product quality; 3) The General Manager should establish quality awareness among all employees and ask them to actively participate in activities that are relevant to quality improvement through various ways, such as training and conference, etc. b. The General Manager should establish quality guiding principles of the company and strictly implement the principles; c. The General Manager should determine quality objectives; d. The General Manager should be responsible for organizing and preside over the management review; e. The General Manager should determine the company s demand for resources 5.2 Customer focus The success of company depends on the awareness of customer satisfaction at the present and future time and even goes beyond this. The General Manager should do the followings with the purpose of realizing customer satisfaction: a. Confirmation of demand and expectation of the customers 23

24 1) Knowing the customers demand and expectation through market survey prediction or direct contact with customers; 2) Please refer to Procedure of Information Communication Control Q/MG-B b. The customers demand and expectation should be transformed into requirements, which include the requirements on product, process and quality management system. The customers will be satisfied only when their demand and expectations are fully met. c. Meet the need for change: 1) The company must follow the law, the regulations, and the compulsory standards of both the state and the industry; 2) The customers expectations and demand as well as the compulsory standards of both the state and the industry might be revised from time to time. Therefore, the requirements of the company being transformed and the already established quality management system should also be updated timely. 5.3 Quality guiding principles The General Manager is responsible for formulating and issuing the quality guiding principles. Through different forms of publicity, the quality guiding principles should satisfy customers and be understood by employees. It should be kept appropriate through management and review. Quality management system of the company should agree with quality guiding principles and conform to general operating principles of the company. Quality guiding principles of the company include: Satisfy every customer. Forging the best quality products of flange Making constant improvements Working for multi-wins 24

25 5.4 Plan Quality objectives The General Manager should define quality objectives for the company under the framework of quality guiding principles in order to make constant improvements on quality. Quality objectives demonstrate the quality guiding principles. Quality objectives display the requirements for the leading products of the company. Quality objectives should be carried out level after level and should also be constantly improved according to customers demands. Quality objectives of the company are: 90% product qualification rate in the first check. 95% customer satisfaction. 100% timely delivery Plan on quality management system Under the framework of quality guiding principles of the company, relevant plan on quality management system should be made. a. Time needed for planning quality management system. The company should make plans on quality management system under the following circumstances: 1) Establishing quality management system according to quality guiding principles; 2) When there are great changes in guiding principles, objectives and organizations of the company; 3) When there are great changes in resources distribution of the company and the market situation; 4) Based on the result of management review. b. The content of the plan on quality management system 1) Ensure that the quality management system is appropriate. In procedure document, relevant regulations should be made on input and output of confirmation process; 2) Identify the resource distribution in the established process; 3) Realizing the quality objectives and meet the process expectation in order to 25

26 maintain integrity of quality management system. c. Drafting, approval and issuance of the document on quality management system; The plan on quality management system should be formulated by Standard Implementation Office as document, reviewed by the management representative and distributed to the relevant departments as controlled document after being approved by the General Manager. 5.5 Obligation, authority and communication Obligation and authority The organizations should be set up according to the management and production of the company and should be established after the approval of the General Manager. Its obligation and authority are as the followings: a. General Manager 1) The General Manager should direct daily work of the company and inform the employees of the requirements and the importance of meeting customers demand as well as following the laws and regulations; 2) The General Manager should define quality guiding principles, quality objectives and quality commitment of the company; 3) The General Manager should appoint the management representative; 4) The General Manager should be responsible for planning quality management system of the company and define structures and obligations for the relevant departments; 5) The General Manager should approve Quality Manual and Procedure Document. 6) The General Manager should be in charge of the management review; 7) The General Manager should ensure resources distribution which is necessary for the operation of quality management system; 8) The General Manager should clearly define authority, which is undertaken by the management representative, Standard Implementation Office, Department of Quality Check and Production Department, and guide and coordinate work among persons in charge; 26

27 9) The General Manager should be responsible for the approval of Sales Contract ; 10) The General Manager should ensure an appropriate communication process within the organization and ensure communication for the sake of an effective quality management system. 11) The General Manager should keep record of customer files; 12) The General Manager should keep record of reviews both and the contracts; 13) The General Manager should implement and fulfill quality guiding principles, quality objectives and quality commitment of the company; 14) The General Manager should be responsible for collecting information about products; 15) The General Manager should be responsible for enquiry, signing contracts or making orders including modification to those documents; 16) The General Manager should collect, arrange and handle feedbacks from customers and handle complaints from customers; 17) The General Manager should conduct survey on customers satisfaction and the conformity of products; 18) The General Manager should keep necessary record according to the relevant regulation. b. Management representative 1) The management representative should ensure the implementation and smooth operation of quality management system; 2) The management representative is responsible for evaluation with the department, report to the General Manager the achievements of quality management system and the need for further improvement; 3) The management representative should increase the awareness customer satisfaction within the department; 4) The management representative should be responsible for external contact relevant to quality management system; 27

28 5) The management representative should keep and manage the record made by the employees according to the relevant rules. c. Deputy manager 1) The deputy manager should participate in formulating and implementing the quality guiding principles, quality objectives and quality commitment of the company; 2) The deputy manager should implement quality guiding principles, quality objectives, quality commitment and the relevant quality standards and specifications of the company; 3) The deputy manager should approve and implement the plan on equipment repair, in order to ensure the smooth operation of the equipment; 4) The deputy manager should provide guidance to Production Department on the production, implement regulations on equipment management, and guarantee the quality of spare parts, accessories and equipment maintenance; 5) The deputy manager should keep record of the review and take care of the contracts; 6) The deputy manager should draw up purchase plan on goods and materials according to contracts. After the approval by the General Manager, the deputy manager should guarantee balanced supply in terms of quality and quantity; 7) The deputy manager is responsible for the approval and supervision on the quality of raw materials in order to guarantee that purchase materials conform to technical standard and requirements standards; 8) The deputy manager is responsible for selecting and evaluating suppliers. 9) The deputy manager should keep good record according to the relevant regulations. 10) The deputy manager should evaluate the internal quality system; d. Director of Production Department 1) The director of Production Department should implement quality guiding principles and quality objectives of the company. He should also specify 28

29 quality objectives of the company to the quality objectives of the workshop. 2) The director of Production Department is responsible for fulfilling management obligations of the work group and make production plans, prepare raw materials for the production and guarantee the completion of production plan according to the requirements defined in the contract. The director of Department of Production should also be responsible for safe production, provide guidance and management on quality production, and be responsible for the quality of the products; 3) The director of Production Department should organize and coordinate different work groups to produce according to different standards, including national standard, American standard, British standard, French standard, German standard, Italian standard and Japanese standard and keep record. 4) The products should be checked by the worker himself, by each other and it should also has special check and record should be kept according to Procedure of Production and Service Control. 5) The director of Production Department is responsible for implementing Facility Management System ; He should also make plans on equipment repair and make sure that the plan is implemented; 6) The director of Production Department should conduct evaluation on internal quality system; 7) The director of Production Department should keep and manage the record made by the employees according to the relevant regulation. 8) The director of Production Department should provide training for workers of the workshop to improve their skills. 9) The director of Production Department should carefully mark the products and keep good record. e. Director of Standard Implementation Office 1) The director of Standard Implementation Office is responsible for people selection and arrangement, for defining obligations and requirements for the relevant posts, for the supervision and implementation of the training plan as well as evaluation of the training result; 29

30 2) The director of Standard Implementation Office is responsible for the implementation of Procedure of Control on Documents and Materials, for the timely drafting, review, approval, distribution, utilization, modification, second approval, marking, retrieval and demolishment of documents and materials; 3) The director of Standard Implementation Office is responsible for the management of personnel files, documents and materials (including internal and outsourcing documents) of the company; 4) The director of Standard Implementation Office is responsible for organizing the revision work on Quality Manual and the documents of quality management system as well as making annual plans on quality work; 5) The director of Standard Implementation Office is responsible for the internal evaluation of the company, collection of the review input and the drafting of review report; 6) The director of Standard Implementation Office is responsible for the managing the documents of quality management system and quality record; 7) The director of Standard Implementation Office is responsible for receiving visitors and handling telephone calls; 8) The director of Standard Implementation Office is responsible for managing daily affairs in the office; 9) The director of Standard Implementation Office should keep good record and manage the record made by employees according to relevant regulations; 10) The director of Standard Implementation Office is responsible for drafting bidding report. f. Department of Quality Check 1) Department of Quality Check is responsible for quality check and control of all products in the whole process from purchase to product delivery; 2) Department of Quality Check is responsible for the inspection and experiment of raw materials, semi-finished goods and finished products 30

31 according to relevant standards and regulations. It should also keep good record and mark on products according to the regulation, provide timely the accurate and reliable data after the inspection, know the quality status so as to guarantee traceability; 3) Department of Quality Check should assist the management representative and participate in the analysis and handling of serious quality accidents; 4) Department of Quality Check is responsible for measuring and monitoring the whole process of production. If potential danger is found, the Department of Quality Check should report in time to the management representative and give suggestions on handling the problem; Management representative See 5.5.1b) Management representative Internal communication a. The company should ensure smooth communication between different levels and departments in terms of process, quality requirements, quality objectives and implementation of quality management system in order to achieve mutual understanding, mutual trust and to call for participation by all employees. b. Information concerning quality management system can be shared in many ways such as briefing, conference and document, etc. 5.6 Management review General principles The General Manager is in responsible for the review. The Standard Implementation Office is responsible for organizing the review. The review should ensure that quality management system is adequate, comprehensive and effective. Evaluations must be carried out in Management review in terms of modifications and requirements of the quality management system, quality guiding principles and quality objectives of the company. a. Plan on management review 31

32 Management review should be conducted at least once a year. The interval between two reviews should not exceed one year. It could be carried out based on the result of internal evaluation or when necessary; 1) The Standard Implementation Office should make management review plan half a month before the management review and report to the management representative for review and the General Manager for approval. 2) The plans mainly include: time of review, purpose of review, reviewers, basis of review and content of review: b. The frequency of management review can be increased under one of the following circumstances 1) In time of great changes in organization, scope of products and resources distribution in the company; 2) In time of serious quality accidents, customers' complaints caused by serious quality accidents, or frequent constant complaints; When there are great changes in laws, regulations, standard and other requirements; 3) When there are great changes in the market demand; 4) Before the review by the second and third parties; 5) In time of serious non-conformity during quality check Input of management review Input of management review should include the current achievements and the possible improvements. a. The result of review: the result of review on quality management system by the first and second parties; b. Feedback from customers: The result of customer satisfaction and the result of communication with customers; c. Process achievement and product conformity including process, product monitor, measurement and result; d. Precautionary measures and corrections including the corrections and 32

33 precautionary measures on the non-conformed items during the internal review or in the daily work, and the monitor result of its effectiveness. e. The effectiveness of tracing and implementing the previous management reviews; f. Various changes that may have impact on quality management system: such as the change of internal and external environment, the change of laws and regulations, and the development of new techniques, new technologies and new equipment, etc.; g. Suggestions for improvement: such as suggestions for the adequacy and effectiveness of the quality management system, quality guiding principles and quality objectives Output of management review a. The decision and measures of management review output; 1) Improvements on the effectiveness of Quality management system and its process: including review on quality guiding principles, quality objectives, organizations and process control; 2) Improvements on products demanded by customers: evaluation on the conformity of products; 3) Resources demand, etc. b. After the review meeting, the Standard Implementation Office should summarize the output result of the management review, write a report of management review and distribute the report to the relevant departments after being reviewed by the management representative and approved by the General Manager. The output of management review this time can be used as input of management review of next time; c. The Standard Implementation Office should trace and verify the implementation of improvements, corrections and precautionary measures. d. The modification after the review should follow Q/MB document control procedure. e. The management of relevant record of the review: 33

34 1) Management of review plan 2) Documents for review prepared by different departments 3) Minute of the review 4) Report of management review It should follow Procedure of Control on Quality Record Q/MB Resource management 6.1 Provision of resources The General Manager is responsible for the process decided by the quality management system, and ensure timely provision of resources. a. The General Manager should collect information about resource distribution and conduct timely review of resource distribution, making reasonable plans for resource distribution, optimize resource distribution, and ensure the possibility of further improvements of the quality management system. All this is based on the change of the market. b. The change of customers demand may lead to requirements for different resources; therefore, the company should meet customers demand according to the requirements for different resources and even strengthen customers satisfaction. 6.2 Human resources General principles The General Manager is responsible for the distribution of human resources of the company. Through training and other effective measures, the Standard Implementation Office should enable the human resources of the company to reach appropriate technical level in order to be better qualified for their work Capability, awareness and training a. Different departments should bring up requirements to people of different posts in terms of capability, awareness and training; b. The Standard Implementation Office is responsible for making annual training plans and meeting the demand through effective measures; c. The Standard Implementation Office is responsible for evaluating the 34

35 effectiveness of the training through test, practical operation and evaluation and daily work, etc.; d. In order to guarantee that the employees can realize the importance of their posts and their work, the Standard Implementation Office should popularize the concept of professionalism among the employees and the awareness of training for quality improvement; e. The Standard Implementation Office is responsible for keeping the record concerning education, experience and technical training of the employees. 6.3 Infrastructure The company determines, provides and maintains infrastructure which is needed for product conformity. a. Infrastructure includes: 1) Offices of different departments and relevant facilities; 2) Supporting services such as water and electricity, etc.; 3) Providing hardware and software of production. b. Management of infrastructure: 1) The Production Department purchases infrastructure according to purchase plan to meet the demand of quality: 2) Regular maintenance is required for the infrastructure to ensure the safety and smooth operation of the infrastructure; 6.4 Working environment Appropriate working environment is required and Environmental Protection Law must be strictly followed: a. The internal and external environment must be kept clean and tidy: raw materials, semi-finished products and finished products must be placed in good order and roads must be unobstructed; b. Appropriate factory buildings or sites suitable for the type and quantity of the products are required for treatment, processing and storage of raw materials; c. Facilities are required for lighting, ventilation, anticorrosion, dust-proof, 35

36 cleansing, sewage discharge as well as waste disposal; d. Equipment should be arranged to meet the requirements of the technique to ensure the most efficient operation of the equipment; e. The equipment for storage, transportation and disassembly must be safe; f. Offices must be clean to ensure a good working environment; g. Professionalism and teamwork are required either in workshops or offices to create a positive image of the enterprise. 7. Product realization 7.1 Plan of product realization a. Obligations: The deputy Manager of the company is responsible for planning product realization; b. Planning time; 1) Customers have specific requirements about products as defined in the contract,; 2) Introduction of new products c. The content of plan 1) Quality objectives and requirements should be determined according to specific product, items or contract; 2) The process and sub-process established according to specific products, items or contract should be able to identify the key process and activity, regulate channels for the process and activity designed, and evaluate these channels and keep record. 3) Identify and provide the resources required by the abovementioned process, divide operation stages, assign job obligations and authorities, and coordinate relationships. 4) Verification concerning the process should be confirmed; verification and acceptance standard should be confirmed; the important and key features of the process and products should be monitored and measured; some outputs of special process should be verified and confirmed according to requirements of output. 36

37 5) The quality record about process and product conformity should be kept. 7.2 Customer-related process The General Manager is responsible for customer-related processes Defining the product-related requirements The products of our company strictly follow the following quality standards HG Steel pipe flange HG Board welded steel pipe flange HG Hubbed welded steel pipe flange HG Hubbed butt welded steel pipe flange HG Threaded steel pipe flange HG Steel pipe flange cover HG Technical condition of steel pipe flange The company should define requirements concerning product quality, delivery, supporting services and price according to customers intention; Commitments should be made on those not required by customers but required for products; Be aware of the laws and regulations related to the products. Besides strictly following national and regional standards, the company should also strictly follow the contract Review related product requirements a. Before the contract is signed, relevant departments should review the contract according to the requirements of identified customers and the additional requirements of the company. b. The product review should be conducted before the contract is signed in order to ensure that: 1) Requirements for products are determined (including the requirements of customers and the additional requirements of the company) 2) The contract or quotation which are different from the previous descriptions should be settled. 3) The company is capable of meeting the requirement agreed; 37

38 4) If there are changes in requirements for products, the concerning departments should ensure that relevant documents are modified and relevant personnel know the modification. If necessary, the modified parts should also be reviewed; 5) Record should be kept on the review result and the measures decided after the review Communication with customers a. The product selling means delivery of products. In the process of sales, products should be introduced to customers through certain channels. Relevant enquiries and questions from the customers should also be answered; b. If necessary, inform the customers of the implementation of the contract. The relevant departments Changes should be timely informed of any changes in terms of product requirements so that consensus with customers could be reached through negotiation; c. After the product is sold, feedback from the customers and product information should be collected. Complaints from customers should be properly handled so that survey on customer satisfaction can be fulfilled: The control process of customer satisfaction survey Q/MG-B d. Keep record of the abovementioned information 7.4 Purchase Purchasing process Product purchasing is an important part of the final product of the company. The deputy manager is responsible for this process. a. Categorization of purchased materials 1) Important materials: The materials which are the main or key parts of the final products and may directly affect utilization or safety of the final product. 2) General materials: auxiliary materials making up the final products. b. Evaluation of suppliers 1) Evaluate and select qualified suppliers according to technical requirements 38

39 and production, and keep record of those qualified suppliers; 2) The long-term suppliers for important materials should provide necessary written documents to show their quality; 3) Suppliers for general materials will be listed as qualified suppliers after their samples being examined and approved by directors of Operation Department; 4) If there are serious quality problem in the suppliers, their qualification of supply should be cancelled; 5) Tracing reexamination should be conducted on qualified suppliers every year. If it cannot meet the requirement of regulation, the qualification of the suppliers should be cancelled; c. The company should establish principles of selection, evaluation and reevaluation, evaluation result and maintain record of any necessary measures caused by evaluation. d. Purchase plan: The Assistant Manager should draw up purchase plan and implement purchase according to production and stocks situation; e. Purchasing: 1) The deputy manager should select suppliers from the list of qualified suppliers and purchase according to purchasing plan; 2) During purchasing period, contract should be signed to confirm name, specification, quantity, quality requirements, acceptance conditions, breaches and delivery time Purchase information a. Purchase document 1) Quality requirements on the main products (direct citations of relevant standards or specifications are acceptable); 2) Acceptance requirements of the main products; 3) Other requirements (such as price, quantity, delivery, etc.) b. Requirements should be made about suppliers products concerning procedure, process, equipment and personnel (such as the requirements for product, processing, equipment and personnel and entrusted examination 39

40 etc.); c. The quality management system required; d. The deputy manager should take care of the purchasing document of the company including purchasing plan, purchasing contract and attachments, etc.; e. The general manager will decide whether the purchasing document needs to be approved before it is distributed Verification of purchased products Through inspection, qualified purchased products should be stored in the warehouse; 7.5 Provision of production and service Control on production and service The production and service control procedures (Q/MG-B ), which is set up and implemented by the company, is designed to regulate the production of products, validation of process, preservation, release and delivery of products, identification, traceability and management of the complaints of customers concerning the quality of products. a. Responsibilities 1. Production department is responsible for setting up production plan, organizing and coordinating the production process in accordance with the contract. Deputy Manager is responsible for the examination and approval of the production plan 2. Production department is responsible for production, validation, identification and traceability control of the products b. Production and service control c. Production plan Deputy Manager sets up the production plan of the company according to the provisions of contract and production capability of the company. The 40

41 production plan is then delivered to the subordinate departments to be implemented. 1. Important processes: processes which impose direct impact on the quality, feature, reliability and cost of the finished product include forging and machine processing. 2. The use of suitable production facilities and equipment 3. The availability of proper work environment 4. The implementation of monitoring of the production process: HG HG HG HG HG HG HG Steel Pipe Flange Welding Plate Steel Pipe Flange Hubbed Welding Steel Pipe Flange Hubbed Welding Neckflange Steel Pipe Flange Threaded Steel Pipe Flange Steel Pipe Blind Flange Steel Pipe Flange Techniques conditions 5. Provide proper monitor and measurement equipment. Self-inspection, mutual-inspection and special inspection shall be conscientiously conducted Identification of product and traceability control. Stipulate the ways of identification and dynamic identification of products. 6. Preservation of products. Processes including package, storage, handling and delivery shall prevent the damage and spoilage of products. 7. Carry out customer satisfaction survey regularly 8. Cope with the complaints of customer after investigation and then inform the customer d. Related documents Environmental Protection Law 41

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality? Factory s Quality Assurance Ability 1 Responsibilities and Resources 1.1 Responsibilities a) Have the responsibilities and interrelation of various personnel involved in quality activities been defined?

More information

Giza Cable Industries. Quality & Occupational Health and Safety Manual ISO 9001 : 2008 & OHSAS : 2007

Giza Cable Industries. Quality & Occupational Health and Safety Manual ISO 9001 : 2008 & OHSAS : 2007 Page 1 of 38 Giza Cable Industries ISO 9001 : 2008 & OHSAS 18001 : 2007 Page 2 of 38 Distribution Policy Authority Copy No Chairman Projects and Procurement General Manager Factories General Manager Senior

More information

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is

More information

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA 7949 Silverton, Suite 924 San Diego, CA 92126 USA This document is approved for use Copy Holder Copy Holder: President Copy Number: 1 Scope: This Covers the activities and functions performed by operating

More information

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE AEROSPACE STANDARD AS9003 Issued 2001-10 Revised 2012-07 REV. A Superseding AS9003 (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE This standard

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449 Quality Manual Power Engineering & Manufacturing Inc 1463 94th Lane NE Blaine Minnesota MN 55449 COVER PAGE PD 0002 rev. 3 Section QM 01 Page 1 of 17 This document is approved for use Manual Contents Section

More information

FUNDAMENTALS OF SAFETY MANAGEMENT SYSTEMS IN NUCLEAR POWER PLANTS

FUNDAMENTALS OF SAFETY MANAGEMENT SYSTEMS IN NUCLEAR POWER PLANTS FUNDAMENTALS OF SAFETY MANAGEMENT SYSTEMS IN NUCLEAR POWER PLANTS June 2004 CONTENTS 1 Preface 1 2 General 2 2.1 Aim of the 'Fundamentals' 2 2.2 Procedure for preparing the 'Fundamentals' 2 2.2.1 State

More information

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents Table of Contents 1.0 Welcome to Crystalfontz... 3 2.0 About the Crystalfontz Business Systems Manual... 4 3.0 Terms and Conditions... 5 4.0 Context of the Organization... 6 4.1. Understanding the Organization

More information

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL ISO 22000:2005 Quality Manual QUALITY MANUAL ISO 22000:2005 Food Safety Management HACCPEuropa Publications 2012 Table of Contents Introduction...

More information

Everest Engineering Works ISO REVISION DATE ISSUE

Everest Engineering Works ISO REVISION DATE ISSUE Page 1 of 28 QUALITY MANAGEMENT MANUAL ISSUED BY : MANAGEMENT REPRESENTATIVE (MR) ISSUED TO : ALL AUTHORIZED BY : Proprietor OFFICE & FACTORY G/3,Sudama Industrial Estate,Dharam Kanta, Mira-Bhayndar Road,

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM SIAD Macchine Impianti, the Company leader of SIAD Group's Engineering Pag. 1 di 20 Contents INTRODUCTION... 4 FOREWORD... 4 1. SCOPE... 5 2. REFERENCES...

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,

More information

Analysis and Countermeasures on Product Quality Inspection Management in the Quality Management System of Research in Universities

Analysis and Countermeasures on Product Quality Inspection Management in the Quality Management System of Research in Universities Higher Education of Social Science Vol. 7, No. 2, 2014, pp. 103-107 DOI: 10.3968/5560 ISSN 1927-0232 [Print] ISSN 1927-0240 [Online] www.cscanada.net www.cscanada.org Analysis and Countermeasures on Product

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS ISO 22000:2005 Standard Food Safety Management System INTERNATIONAL STANDARDS REGISTRATIONS 3.1 FOOD SAFETY concept that food will not cause harm to the consumer when it is prepared and/or eaten according

More information

Quality Systems Manual Rev. NC Issued July 9 / 2018

Quality Systems Manual Rev. NC Issued July 9 / 2018 NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction

More information

UNI EN ISO 22000:2005 STANDARD CHECK-LIST

UNI EN ISO 22000:2005 STANDARD CHECK-LIST RINA AUDIT CHECKLIST (Nr.... of...) Audit of the Food Safety Management System Company Production site: Audit type: Preaudit: Stage 1 Stage 2: Surveillance: Recertification: Other:. Report Nr. Date: Auditor:

More information

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History

More information

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY Quality, Health, Safety & Environmental Integrated Management System Manual HAZARD : An object, physical effect, or condition with potential to

More information

Announcement of the Ministry of Agriculture of People's Republic of. China. No. 2570

Announcement of the Ministry of Agriculture of People's Republic of. China. No. 2570 Announcement of the Ministry of Agriculture of People's Republic of China No. 2570 The Rules on Evaluation of Pesticide Registration Testing Institutes and the Code Pesticide Registration Testing Quality

More information

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls

More information

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation RECYCLING INDUSTRY OPERATING STANDARD Prepared for ISRI Services Corporation NOT FOR DISTRIBUTION FOR PERRY JOHNSON REGISTRARS, INC. ONLY: LICENSED COPY #2REVISED MARCH 2006 CONTENTS RIOS GLOSSARY... I

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

QHSEM. Quality, Environmental & Occupational Health and Safety Manual

QHSEM. Quality, Environmental & Occupational Health and Safety Manual BIDI STEEL Quality, Environmental & Page 1 of Quality, Environmental & Occupational Health and Safety Manual QHSEM Copy No. ( 1 ) BIDI STEEL Quality, Environmental & Page 2 of MANUAL APPROVAL Document

More information

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No TITLE: EECTIVE DATE: 09/18/2014 External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No Yes PROPRIETARY DOCUMENT No TABLE O CONTENTS QUALITY POLICY

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012 Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z540.3-2006, ISO/IEC17025 ISO10012 Date: 8-Sep-17 Page 1 of 19 Table of Contents 1. Quality manual presentation 1.1 Control of the manual 1.2 Distribution

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies

Guidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document

More information

ISO 9001:2015. Quality Management System. Manual

ISO 9001:2015. Quality Management System. Manual ISO 9001:2015 Quality Management System Manual Introduction Company has made the Strategic Business Decision to develop and implement an effective Quality Management Systems (QMS) across all areas of the

More information

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM   SYSTEM KARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM WWW.SYSTEMKARAN.COM 1 www.systemkaran.org Foreword... 5 Introduction... 6 0.1 General... 6 0.2 Process approach... 6 0.3 Relationship

More information

QUALITY MANUAL BAGLIETTO S.R.L.

QUALITY MANUAL BAGLIETTO S.R.L. 2013 BAGLIETTO S.R.L. PAG. 2 OF 28 Head office and factory: Via Castelgazzo 11 15067 Novi Ligure (Al) Tel. +39 0143 318000 COPY CHECKED COPY NOT CHECKED ASSIGNS : DATE : 01/11/13 4 UPDATE COMPANY DATA

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Quality management systems Requirements Systèmes de management de la qualité Exigences Fourth edition 2008-11-15 Reference number ISO 9001:2008(E) ISO 2008 PDF disclaimer

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005 SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005 WWW.SYSTEMKARAN.ORG 1 www.systemkaran.org Foreword... 6 Introduction... 7 Food safety management systems Requirements

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

QUALITY ASSURANCE MANUAL CHAPTER COVER. PAG # 1 of 1 REVISION DATE 05/27/2014 FLUID FILTRATION MANUFACTURING CORPORATION UNCONTROLLED COPY

QUALITY ASSURANCE MANUAL CHAPTER COVER. PAG # 1 of 1 REVISION DATE 05/27/2014 FLUID FILTRATION MANUFACTURING CORPORATION UNCONTROLLED COPY COVER 1 of 1 UNCONTROLLED COPY 1. 1 of 3 1. SCOPE OF APPLICATION 1.1 General This manual establishes requirements for FLUID FILTRATION Quality Assurance System. The system has been designed to provide

More information

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU ISO 9001:2015, ISO 80079-34 and ATEX/IECEX Directive 2014/34/EU Reason for Revisions and Sections Affected: INITIAL RELEASE Rev. A Revision B / 6.24.2014 Added: PR-02-0005 to Procedure Table Section: 2.0,

More information

Quality Management System Manual

Quality Management System Manual 19240 144 th Ave NE, ldg 2 Woodinville, WA 98072 (425) 487-0672 FAX (425) 487-4669 Quality Management System Manual Approvals Name Title Initial Name Title Initial Lisa Tiffany President On File Dan McDrummond

More information

Operating and Maintenance Manual. for. HADEF locking device for monorail trolleys

Operating and Maintenance Manual. for. HADEF locking device for monorail trolleys 5.52.653.99.0.1 Edition 08/2000/gr GB Operating and Maintenance Manual for HADEF locking device for monorail trolleys Subject to changes. 1 HADEF Contents page 1 General Information 3 2 Product Description

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY 1050 Day Hill Road Windsor, Connecticut 06095-4728 Telephone (860) 688-0888 Fax (860) 285-8514 SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY POTENTIAL SUPPLIER INITIAL SURVEY ON-SITE EXISTING SUPPLIER

More information

PRODUCT CERTIFICATION REQUIREMENTS

PRODUCT CERTIFICATION REQUIREMENTS PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with

More information

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005 ISO 22000:2005 UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005 Structure 10.0 Objectives 10.1 Introduction 10.2 Clause-wise Explanation of the Standard 10.2.1 Clause 1: Scope 10.2.2 Clause 2: Normative

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

ISO9001 QUALITY POLICY MANUAL

ISO9001 QUALITY POLICY MANUAL 1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...

More information

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.

More information

Beaver Machine. Quality Manual

Beaver Machine. Quality Manual Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal

More information

A Division of Research Products Corporation

A Division of Research Products Corporation A Division of Research Products Corporation Quality Manual ISO 9001:2008 Table of Contents Page Number Approvals 2 Table of Contents 3 Revision History 4 Distribution List - Controlled Copies 5 Introduction,

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Continental Steel & Tube Co. Quality Manual

Continental Steel & Tube Co. Quality Manual 312 SE 22 nd Street Fort Lauderdale, FL 33316 Mailing address P.O. Box 030040 Fort Lauderdale, FL 33303-0040 954-332-2290 Fax 954-332-2296 info@continentalsteel.com www.continentalsteel.com Introduction

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008 EXPRESS CONTRACTING SERVICES PTY LTD TRADING AS GOLDEN BROWN CLEANING SERVICES Unit 8/217 Mickleham Road Tullamarine VIC 3043 www.goldenbrown.com.au

More information

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi

Quality Management in Construction Projects 6. Dr. Nabil El Sawalhi Quality Management in Construction Projects 6 Dr. Nabil El Sawalhi 1 Integrated Quality Management A quality system is a framework for quality management. It embraces: The organizational structure, procedure,

More information

4. Quality Management System 4.1 GENERAL REQUIREMENTS

4. Quality Management System 4.1 GENERAL REQUIREMENTS Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark an 0 in each box where functions /departments are referenced. As each function/department is

More information

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page

More information

Railroad Friction Products Corporation

Railroad Friction Products Corporation Railroad Friction Products Corporation Our Quality Philosophy: "At Railroad Friction Products Corporation we will consistently provide products that meet and exceed customer and regulatory requirements

More information

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100 N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual

More information

OPERATIONS MANUAL ISO 9001 Quality Management System

OPERATIONS MANUAL ISO 9001 Quality Management System OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,

More information

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer) Quality Manual ISSUED JANUARY 2004 Approved By: January 12, 2004 (President & Chief Executive Officer) (Date) Quality Policy To be the industrial control industry's most preferred supplier of sensor integration

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 PDF disclaimer

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

PRQ 7.4/A QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL

PRQ 7.4/A QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL 1 di 13 QUALITY REQUIREMENTS FOR SUPPLIERS OF ELETTROMIL INTERNAL DISTRIBUTION First issue M. Milic M. Milic S. Milic Rev. Data Description PREP VER APPR INDEX 1.PURPOSE...3 2. APPLICABILITY...3 3. REFERENCES.3

More information

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale.

Integrated Manual. Quality, Occupational Health & Safety and Environment. Code of Document: Issue No: Date of the next review: Eng. A.F. Kahale. Name of Document: Integrated Manual Code of Document: IM Issue No: 03 Date of Issue: 15.01.2012 Date of the next review: 15.01.2015 Controlled copy number: Uncontrolled Prepared by Reviewed by Approved

More information

Quality Manual Template ISO 9001:2015 Quality Management System

Quality Manual Template ISO 9001:2015 Quality Management System Quality Manual Template Table of Contents 1 INTRODUCTION... 5 2 QUALITY MANAGEMENT PRINCIPLES... 6 3 REFERENCES & DEFINITIONS... 6 4 CONTEXT OF THE ORGANIZATION... 8 4.1 ORGANIZATIONAL CONTEXT... 8 4.2

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people. Title: AS9100D Quality Manual Revision Date.: 05/04/2018 Page 1 of 22 The Quality Policy of Monroe Engineering is defined in the following statement: Monroe Engineering is committed to customer satisfaction;

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

Agru America, Inc. Quality & Environmental Management Manual Agru America, Inc.

Agru America, Inc. Quality & Environmental Management Manual Agru America, Inc. Quality & Environmental Management Manual This quality management manual gives a general overview of the Quality Management System at AGRU America, Inc This quality management manual is the literary property

More information

Implementation Detailed-Rules for China Compulsory Certification

Implementation Detailed-Rules for China Compulsory Certification Translated English: CQC-C1109:2014 www.chinesestandard.net Sales@ChineseStandard.net Serial No.: CQC-C1109:2014 Implementation Detailed-Rules for China Compulsory Certification Automotive interiors 汽车内饰件

More information

JONES LANG LASALLE LIMITED PROPERTY MANAGEMENT DEPARTMENT

JONES LANG LASALLE LIMITED PROPERTY MANAGEMENT DEPARTMENT JONES LANG LASALLE LIMITED PROPERTY MANAGEMENT DEPARTMENT Environmental Management Manual Environmental Management Manual Issue No. : 3 Revision : D Release Date : 5 July 2012 Prepared by : Date : 3 July

More information

Texas International Oilfield Tools, Ltd.

Texas International Oilfield Tools, Ltd. Originated by: J. Tuttle Texas International Oilfield Tools, Ltd. QUALITY SYSTEM MANUAL Revision Date: May 26, 2010 Number: QSM000 Subject: Texas International Quality System Revision: A 1.0 INTRODUCTION

More information

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and

More information

ABENGOA INABENSA ABENGOA INABENSA. General Operating Procedure POG Page 2 of 9. Translation control table. Revision: 02

ABENGOA INABENSA ABENGOA INABENSA. General Operating Procedure POG Page 2 of 9. Translation control table. Revision: 02 Page 2 of 9 Translation control table General Operating Procedure Revision: E00 Date: 21.08.15 Translated by: Adrienne Chaballe Revised by: María Dolores Cubiles Pérez Title: The only version of this document

More information

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS April 2017 (Effective June 1, 2017) PREFACE The attached accreditation criteria have been issued to provide all interested

More information

UPGRADE ASSESSMENT CHECKLIST

UPGRADE ASSESSMENT CHECKLIST Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information

Quality Manual. AARD Spring & Stamping Quality Manual

Quality Manual. AARD Spring & Stamping Quality Manual Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator

More information

PCA ELECTRONICS, INC. Quality Manual

PCA ELECTRONICS, INC. Quality Manual PCA ELECTRONICS, INC. Conforms to ISO 9001:2015 (c) 2018 PCA Electronics, Inc.; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

Quality Manual. Section A: Table of Contents. Texas Pipe & Supply Co.

Quality Manual. Section A: Table of Contents. Texas Pipe & Supply Co. Section A: Table of Contents Section Number Section Title A Table of Contents B Revision History C Introduction D Quality Policy and Objectives E Organizational Chart F Distribution List 1 Scope 3 Terms

More information

Quality System Manual

Quality System Manual Page:1 of 20 Quality System Page:2 of 20 1 About this This manual was developed and is maintained by the Arrow Manufacturing Company Management Representative. Requests for changes should be submitted

More information

UR Startup Inc. ISO Audit Checklist. conducted for. Conducted on (Date and Time) 02 Aug :06 PM. Inspected by Andy Dion

UR Startup Inc. ISO Audit Checklist. conducted for. Conducted on (Date and Time) 02 Aug :06 PM. Inspected by Andy Dion ISO 22000 Audit Checklist conducted for UR Startup Inc. Conducted on (Date and Time) 02 Aug 2018 03:06 PM Inspected by Andy Dion Location Chemin de sous le Clos 16 1232 Confignon Switzerland (46.1758650103172,

More information

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL E L E C T R O N I C C O N N E C T O R S IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL CONTENTS Section Title Related Procedure 1. Introduction & Company Profile 2. Policy & Objectives 3. Definitions 4. Quality

More information