Microsoft Project study guide
|
|
- Kristina Hopkins
- 6 years ago
- Views:
Transcription
1 Microsoft Project study guide Chap 1 An estimated duration appears with a(n) after the duration. a. pound sign c. question mark b. exclamation point d. red bullet Which of the following tasks in a LAN installation project has a duration that is not flexible? a. wiring the office c. taking new computers out of the boxes b. meetings d. All of the above Durations can be. a. hard or fast c. estimated or firm b. managed or calculated d. determinate or indeterminate Tasks that must be completed before a task can be started are called. a. successors c. precedents b. antecedents d. predecessors. are the people, equipment, or facilities that need to be assigned to a task in order to complete it. a. Resources c. Links b. Utilities d. Indices. A conference room is an example of what? a. task c. linkage b. resource d. risk center. The project is the central person to whom all of the details of the project converge for entry into the project plan. a. secretary c. manager b. supervisor d. lead. The more precise a project s objectives and deliverables, the clearer the becomes. a. estimate c. risk b. duration d. scope. Scope is the condition whereby projects grow and change in unanticipated ways that increase costs, extend deadlines, or otherwise negatively affect the project goal. a. creep c. slide b. slip d. erosion Almost every project and task has implied standards. a. control c. risk b. quality d. benefit
2 In a network diagram, the tasks are on the critical path. a. red c. grey b. blue d. black. Team Planner shows over time. a. tasks and goals c. duration and goals b. resources and work d. tasks and scope The Project window consists of a number of elements that are common to all Windows applications, such as the. a. timescale c. title bar b. View Bar d. All of the above. The bar identifies both the application name and the project name. a. application c. View b. menu d. title. The default view is view. a. Gantt Chart c. Calendar b. Network Diagram d. Timeline. You can find commands such as Resource Usage, Task Usage, and Resource Sheet on the tab. a. File c. View b. Resource d. Task. The presents actual and remaining durations and costs. a. Cost Table c. Summary Table b. Tracking Table d. Variance Table. The small that points down at the bottom of the View Bar indicates that more buttons are available. a. red arrow c. green circle b. black triangle d. blue square Each available displays task, resource, and cost information with varying levels of detail. a. view c. screen b. index d. filter. The bar provides information such as cell mode and status of filters. a. title c. View b. status d. Entry. The provides an overview of the entire project schedule. a. Network diagram c. Timeline b. Task mode column d. Scope diagram
3 The project should be as short and as simple as possible, yet as detailed as necessary to clearly communicate the specific scope, time frame, and budget expectations of management. a. goal c. parameters b. scope d. hierarchy The first step in formally managing a project of any size is to define the project. a. scope c. parameters b. goal d. hierarchy. refers to all the work involved in creating the products of the project and the processes used to create them. a. Efficacy c. Scope b. Control d. Execution Being efficient means doing tasks. a. faster c. with lower costs b. with fewer resources d. All of the above Gaining management agreement to a concise project goal that addresses the issue(s) of is essential for both the project manager and management to stay synchronized with project expectations. a. scope c. budget b. time frame d. All of the above Which of the following is a typical responsibility of the planning process group? a. setting the project goal c. identifying project budget and quality considerations b. identifying the project manager d. entering project tasks, durations, and relationships. Which of the following is a typical responsibility of the initiating process group? a. setting the project goal c. identifying project budget and quality considerations b. identifying the project manager d. entering project tasks, durations, and relationships. Examples of a(n) within a LAN installation include purchasing new equipment and wiring the office. a. task c. process b. execution d. goal
4 Chap 2 If a day of the week such as Monday or Tuesday is edited on the calendar, the day s abbreviation is. a. bold c. underlined b. italicized d. in red If an individual day is edited on the calendar, the day s number is. a. bold c. underlined b. italicized d. in red. The calendars available for a project appear in the Calendar list on the tab of the Task Information dialog box. a. Advanced c. General b. Schedules d. Resources. When you are editing an active cell, what does the active cell look like? a. A dark border surrounds it. c. The cell is 3-D. b. The cell is red. d. All of the above. Pressing the key moves the active cell down one row in the same column. a. Ctrl c. Shift b. Alt d. Enter. The key moves the active cell right one cell. a. Tab c. Ctrl b. Shift d. F5. The keys move the active cell left one cell. a. Ctrl+F5 c. Alt+Enter b. Shift+Tab d. Esc+Enter. The key moves the active cell to the first column in a row. a. Ctrl c. Home b. Insert d. Page Up. The key moves the active cell to the last column in a row. a. Page Down c. Ctrl b. F6 d. End. The keys move the active cell to the first column of the first row. a. Ctrl+Home c. Alt+Home b. Shift+Home d. Esc+Home
5 The keys move the active cell to the last column of the last row that contains a task name. a. Shift+End c. Alt+End b. Ctrl+End d. Esc+End. Before editing or entering the contents of a cell in the table, you must select it to make it the cell. a. determinant c. constrained b. active d. key. To delete the contents of a task cell, right-click the task cell, and then on the shortcut menu, click. a. Delete c. Clear Contents b. Remove d. Purge Contents The is a small square that appears in the lower corner of a given cell. a. Smart Tag c. row selector b. fill handle d. crosshair pointer. The default unit of measurement for durations is. a. month b. hour c. week d. day refers to clock time rather than working time. a. Concatenated c. Concurrent b. Recurring d. Elapsed. Which of the following is a tab in the Task Information dialog box? a. Resources c. Antecedents b. Successors d. All of the above All of the following are tabs in the Task Information dialog box EXCEPT. a. Custom Fields c. Notes b. Indices d. General You can a task to open its Task Information dialog box. a. click c. double-click b. right-click d. hover over The initial determination about type has significant impact on the calculated start and finish dates for project tasks. a. Constraint c. Resource
6 b. Successor d. Antecedent The calendar is the base calendar used by Project 2010 to schedule new tasks within the project. a. task c. main b. project d. origin The Standard calendar specifies time, the hours during which work can occur. a. standard c. working b. operational d. labor To select noncontiguous days on the calendar, you would click the first day and then press and hold the key while clicking the other days to select them as a group. a. Shift c. Esc b. Alt d. Ctrl Working days appear on the Standard calendar. a. as light gray c. as red b. with gray diagonal lines d. as white Nonworking days appear on the Standard calendar. a. as light gray c. as red b. with gray diagonal lines d. as white Edited working hours appear on the Standard calendar. a. as light gray c. as red b. as white with underlined dates d. as white You should enter non-working holidays. a. at the beginning of the project c. the Saturday before the holiday b. at the end of the project d. no more than 15 days before the holiday
7 Chap 3. When you view the Network Diagram, the critical tasks are automatically displayed in. a. green c. red b. silver d. gold. It is very important for the project manager to information about the critical path throughout the life of the project. a. find c. communicate b. analyze d. All of the above. help you focus your attention on specific aspects of the project based on different criteria. a. Filters c. Summary tasks b. Milestones d. All of the above Which of the following filters out all tasks not currently on the critical path? a. Summary Tasks c. Critical b. Unstarted Tasks d. Major Tasks To remove a filter, click the Filter arrow on the tab, and then choose the [No Filter] option. a. View c. File b. Edit d. Project. Which of the following is a comparison operator? a. greater than or equal to c. NOT b. AND d. Both B and C. AND and OR are examples of operators. a. conditional c. comparison b. algorithmic d. logical. Project 2010 applies default formatting choices, such as for task bars. a. black c. red b. blue d. silver. Manually scheduled tasks have shaded bars. a. red c. blue b. gold d. green To make changes to all of the tasks of one type, you use the dialog box. a. Text Styles c. Formatting b. Global Format d. Font
8 . can provide a visual guide to help you interpret bars in a Gantt chart. a. Baselines c. Benchmarks b. Gridlines d. Layout guides. You can set the interval of Gantt Rows so that they appear. a. below each task c. whatever interval you set b. below every two tasks d. all of the above. The dialog box provides several formatting options for the link lines and bars in a Gantt chart. a. Format c. Styles b. Layout d. Display. The timescale can display tiers simultaneously. a. two c. six b. three d. eleven After the initial data entry process, emphasis often shifts to the because it most clearly identifies the dependencies between the tasks, as well as the critical path. a. Gantt chart c. network diagram b. entry table d. calendar..the primary purpose of the is to clearly illustrate the sequential progression of tasks and the critical path. a. Gantt chart c. Entry table b. calendar d. network diagram The Zoom In button appears on the bar. a. status c. options b. entry d. view You format all of the tasks of one type using the dialog box. a. Box Styles c. Format All b. Task Styles d. Box Layouts Which of the following is a report in the Current category of reports in Project 2010? a. Cash Flow c. Resource Usage b. Slipping Tasks d. Overallocated Resources. Which of the following is a report in the Costs category of reports in Project 2010? a. Milestones c. Earned Value b. Tasks Starting Soon d. Resource Usage
9 Which of the following is a report in the Assignments category of reports in Project 2010? a. Overbudget Tasks c. Resource Usage b. Working Days d. To-do List Which of the following report categories allows users to create reports of their own design? a. Assignments c. Workload b. Custom d. All of the above. You can communicate project information by displaying or printing in various graphic views, including all of the following EXCEPT. a. Workload c. Gantt Chart b. Calendar d. Network Diagram are used to disseminate information. a. Reports c. Templates b. Views d. Wizards. The Zoom in lets you get a closer look at any part of the report on the screen. a. bar c. pointer b. tab d. cell Which of the following statements is true? a. The critical path changes if tasks on the critical path are completed behind schedule. b. The critical path changes if tasks on the critical path are completed ahead of schedule. c. Once set, the critical path cannot change. d. Both A and B Float is also called slack. a. total c. critical b. free d. base One way to define the critical path is that it consists of those tasks having a of zero. a. path c. taskpath b. float d. slack
10 Chap 4 costs can be associated with labor costs or material consumable resources. a. Variable c. Budgetary b. Fixed d. Resource Insurance and legal fees are examples of costs associated with a task. a. variable c. linked b. fixed d. budgetary By default, the table is applied to the Resource Sheet. a. Cost c. Entry b. Hyperlink d. Summary A resource is the used to complete the tasks in a project. a. person(s) c. materials b. equipment d. Any of the above is a choice in the Type field in Resource Sheet view. a. Group c. Equipment b. Material d. All of the above In Resource Sheet view, the Entry table s field automatically displays small icons to represent various conditions about the resource. a. Conditions c. Code b. Units d. Indicator In Resource Sheet view, the Entry table s field contains the one-time cost per use for a single resource of the given type. a. Cost/Use c. One-Time Cost b. Single Use d. Accrue At In Resource Sheet view, the Entry table s field determines when the costs associated with a resource will be applied to any task to which it has been assigned. a. Cost/Use c. Calendar b. Accrue d. Std. Rate In Resource Sheet view, the Entry table s field contains any code, number, or abbreviation you want to enter to help identify that resource. a. Identification c. Code b. Abbreviation d. Initials You create the designations used in the field in Resource Sheet view. a. Indicators c. Group b. Type d. All of the above In Resource Sheet view, resources with associated hourly costs are types. a. Work c. Hourly b. Material d. Cost/Use In Resource Sheet view, resources such as supplies are types. a. Work c. Supply b. Material d. Provisional
11 By default, the Max. Units field is. a. 0% c. 100% b. 50% d. 200% If a resource entry represents two people, the Max. Units entry in Resource Sheet view will be. a. 2% c. 100% b. 50% d. 200% In the Std. Rate field in Resource Sheet view, rate entries are costs per. a. hour c. month b. day d. week Three choices are available for the field in Resource Sheet view: Start, Prorated, and End. a. Base Calendar c. Cost/Use b. Accrue d. Std. Rate is the default entry for the Accrue field. a. Standard c. Prorated b. Hourly d. Material is the default calendar choice for the Base field. a. Night Shift c. Base b. 24 Hours d. Standard Which of the following is a tab in the Resource Information dialog box? a. Costs c. Standard b. Finances d. Comments The button in the Resource Information dialog box lets you access a sever for the resource. a. Collaborate c. Windows Account b. Project Server d. Share Information You use the Resource Information dialog box to enter specific details about the resource such as. a. Name c. Initials b. Availability d. All of the above Which of the following is available only in the Resource Information dialog box? a. Cost rate tables c. Code b. Group d. Type For which of the following are grouping options available? a. No Group c. Resource Group b. Complete and Incomplete Resources d. All of the above If one resource is assigned to a task with a duration of 1 day, the total work would be. a. 8 hours c. 1/30 month b. 1/7 week d. Any of the above Total work for a task is initially calculated as the task duration (converted to ) multiplied by the number of resources assigned to that task. a. days c. minutes b. hours d. Weeks
Exam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.
Exam Code:74-343 Number: 74-343 Passing Score: 800 Time Limit: 120 min File Version: 35.4 http://www.gratisexam.com/ Exam Code:74-343 Exam Name:Managing Projects with Microsoft Project 2013 Testinside
More informationDAMELIN CORRESPONDENCE COLLEGE
DAMELIN CORRESPONDENCE COLLEGE DATE: 11 JUNE 2012 TIME: 14H00 16H00 TOTAL: 100 MARKS DURATION: 2 HOURS PASS MARK: 40% THIS EXAMINATION PAPER CONSISTS OF 5 SECTIONS: SECTION A: CONSISTS OF 20 MULTIPLE-CHOICE
More information(Frequently Asked Questions)
(Frequently Asked Questions) Aptech Ltd. Version 1.0 Page 1 of 6 Table of Contents S# Question 1. Why are the Auto Schedule and Manually Schedule Icons Greyed Out in MS 2. How can you create a Timeline
More informationExam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.
Exam Code:74-343 Number: 74-343 Passing Score: 800 Time Limit: 120 min File Version: 35.4 http://www.gratisexam.com/ Exam Code:74-343 Exam Name:Managing Projects with Microsoft Project 2013 Examsoon QUESTION
More informationManaging Projects with MS Project 2010
Aptech Ltd. Version 1.0 Page 1 of 13 Table of Contents A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Aptech Ltd. Version 1.0 Page 2 of 13 Accrual Actuals Allocation Assignment Assignmenttimephased
More informationMICROSOFT PROJECT. Global Information Systems
Global Information Systems MICROSOFT PROJECT This manual is not a complete discussion of project management, but you need to be familiar with some of the basic terms and concepts that are used in most
More informationWelcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course
Welcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course Administration Evacuation Timings, meals and facilities Mobile phones and emails Introductions
More informationitaskx 3 Project Management User Manual
itaskx 3 Project Management User Manual GET STARTED Basics Recommended workflow Views in itaskx Adjust project options Set working time for the project-calendar 2 Unit 1 Project management basics Learn
More informationMS Project 2007 Overview Table of Contents
Table of Contents Microsoft Project Overview... 1 Terminology... 1 Starting Microsoft Project... 2 Projects on the Web... 2 Toolbars... 2 View Bar... 2 Views... 3 Setting Up the Project... 3 Identifying
More informationThe Museum Project. 1. Creating the Project
1. Creating the Project The Museum Project You have just come out of a meeting in which you have been given the task to plan and manage a project for the local museum. In the meeting you were told that
More informationMicrosoft Project 2013 Core Essentials
Microsoft Project 2013 Core Essentials 2092; 3 days; Instructor-led Course Description This in-depth training course presents the skills that students need to get the most out of Microsoft Project 2013.
More informationMicrosoft Project 2016
General Description Learning Outcomes Prerequisites Topic Sheets Methodology Formats Available The skills and knowledge acquired in this course are sufficient for the learner to be able to use Microsoft
More informationProject 2003 Intermediate
Microsoft Application Series Project 2003 Intermediate Best STL Courses never cancelled: guaranteed Last minute rescheduling 24 months access to Microsoft trainers 12+ months schedule UK wide delivery
More informationYour easy, colorful, SEE-HOW guide! Plain&Simple. Microsoft Project Ben Howard
Your easy, colorful, SEE-HOW guide! Plain&Simple Microsoft Project 03 Ben Howard Published with the authorization of Microsoft Corporation by O Reilly Media, Inc. 005 Gravenstein Highway North Sebastopol,
More informationIndex. Symbols # (pound signs), 110, 386 % Work Complete field, xxv, _ (underscore), 365
Index Symbols # (pound signs), 110, 386 % Work Complete field, xxv, 113 14 _ (underscore), 365 A abbreviations for durations, 37 accessing practice files, 34 accrual, 485 actual plans, 344 50 actuals collecting
More informationMicrosoft Project Tips & Tricks. Project Solutions Group, Inc.
Microsoft Project Tips & Tricks Project Solutions Group, Inc. Objectives Formatting & Printing Gantt Charts Leveling Resources Calculating Costs & Pricing Information Collecting & Entering Project Actuals
More informationUpravljanje softverskim projektima
8/80 rule A general guideline regarding the estimation of task duration. ask durations between 8 hours (or one day) and 80 hours (10 working days, or two weeks) are generally sized to a manageable duration.
More informationMicrosoft Office Project 2010 Basic Course 01: Getting Started
Microsoft Office Project 2010 Basic Course 01: Getting Started Slide 1 Topic A Project Management Concepts Slide 2 Project Constraints Slide 3 Phases of Project Management The initial Phase Initiating
More informationMICROSOFT PROJECT PLAN PROCEDURE
COMPANY NAME MICROSOFT PROJECT PLAN PROCEDURE Table of Contents Revision History... iii 1. Introduction... 1 1.1. Purpose... 1 1.2. Objectives... 1 2. Procedure Description... 1 2.1. Overview... 1 2.2.
More informationThe Basics 7. Introduction 8 Project Management 9 What s New? 10 Version Comparison 12 The Gantt Chart 14 Getting Help 15 Summary 16
Contents Contents 1 2 3 4 The Basics 7 Introduction 8 Project Management 9 What s New? 10 Version Comparison 12 The Gantt Chart 14 Getting Help 15 Summary 16 User Interface 17 User Interface 18 File 20
More informationChapter 7 at a Glance
Change how tasks are related to each other, page 123 Apply constraints to control when tasks can start or stop, page 131 Enter percent work complete per task, page xx, View the project s critical path
More informationContents at a Glance COPYRIGHTED MATERIAL
Contents at a Glance Introduction...1 Book I: Project Management...7 Chapter 1: A Project Management Overview...9 Chapter 2: The Ins and Outs of Using Project...21 Chapter 3: Just What Tasks Should You
More informationEmbarking new Project
Embarking new Project Go to file, select new. This will open a screen for blank project click ok. You can now enter your project information viz. start date, finish date and also how would you like to
More informationScheduling Work at IPSC
Scheduling Work at IPSC Overview The purpose of this document is to describe and lay out the specific steps for how Work Orders will be scheduled in Maximo at IPSC. In general, Work Orders will be planned
More informationMICROSOFT PROJECT 2007 Level 1
Microsoft Project 2007 Level 1 Contents MICROSOFT PROJECT 2007 Level 1 WWP Learning and Development Page 1 Microsoft Project 2007 Level 1 Contents CONTENTS PREFACE - PROJECT MANAGEMENT BASICS... 5 Project
More information"Charting the Course to Your Success!" MOC Microsoft Project 2010 Exam Prep Bootcamp. Course Summary
Course Summary Description This three-day instructor-led course provides students with the knowledge and skills to master Microsoft Project 2010 and pass the 70-178 MCTS exam. Objectives At the end of
More informationPROJECT ECDL level 2
PROJECT 2013 ECDL level 2 Abstract Written for the new Project 2013 ECDL course run at the Open Centre 3 Humphrey Street Swansea. To book your place call Wendy on 01792 422 616 Howard Kirkman howard@giakonda.com
More informationMicrosoft Project 2013 Training
Microsoft Project 2013 Training Project Tasks Tables Charts Forms Resources Tables Charts Forms Task Ribbon > Properties Grouping > Display Task Details * This allows you to view the Task Form pane so
More informationMICROSOFT PROJECT 2010 Level 1
MICROSOFT PROJECT 2010 Level 1 Microsoft Project 2010 Level 1 Contents CONTENTS PREFACE - PROJECT MANAGEMENT BASICS... 5 Project Management Overview... 6 Project Definition Techniques... 7 Project Planning
More informationSchedule Management User Guide
Schedule Management User Guide Version 18 October 2018 Contents About This Guide... 7 Schedule Overview... 7 Create a Project for Schedule Management... 7 Project Templates Overview... 8 Add a Project
More informationImagine this: If you create a hundred tasks and leave their default constraints
Chapter 6 Timing Is Everything In This Chapter Discovering how dependency links affect timing Reviewing the different kinds of dependency relationships Allowing for lag and lead time Creating dependency
More informationPlan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology
Plan Your Work, Work Your Plan Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology Agenda Understand what a project is Understand the basics of
More informationForecast Scheduling Microsoft Project Online 2018
Forecast Scheduling Microsoft Project Online 2018 Best Practices for Real-World Projects Eric Uyttewaal, PMP President ProjectPro Corporation Published by ProjectPro Corporation Preface Publishing Notice
More informationLEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES
LEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES LEARNING RESOURCE CENTRE July 2015 Table of Contents -----------------------------------------------------------------------------------------------------------------------------------
More informationMICROSOFT PROJECT 2007 Level 1
Microsoft Project 2007 Level 1 Contents MICROSOFT PROJECT 2007 Level 1 WWP Training Limited Page 1 Microsoft Project 2007 Level 1 Contents CONTENTS PREFACE - PROJECT MANAGEMENT BASICS... 5 Project Management
More informationProject Management LAB
Project Management LAB Marek Ł. Michalski, PhD, MBA Faculty of Management AGH University of Science and Technology www.agh.edu.pl/mlmichal rev. 2013.03.07 Project Management System With a good project
More informationUser Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved
User Guidance Manual Last updated in December 2011 for use with ADePT Design Manager version 1.3 2011 Adept Management Ltd. All rights reserved CHAPTER 1: INTRODUCTION... 1 1.1 Welcome to ADePT... 1 1.2
More informationMicrosoft Excel or Microsoft Project? Why Microsoft Office Project 2007 is Easier and More Effective for Managing Projects
Microsoft Excel or Microsoft Project? Why Microsoft Office Project 2007 is Easier and More Effective for Managing Projects Summary: Using the right tool gives project managers a distinct advantage when
More informationMSP How to guide session 3 (Updating)
MSP How to guide session 3 (Updating) 1. Introduction Some people think planning ends once they gain agreement and pin up the schedule on the wall. On larger projects the schedule follows a defined update
More informationRiskyProject Lite 7. Getting Started Guide. Intaver Institute Inc. Project Risk Management Software.
RiskyProject Lite 7 Project Risk Management Software Getting Started Guide Intaver Institute Inc. www.intaver.com email: info@intaver.com Chapter 1: Introduction to RiskyProject 3 What is RiskyProject?
More informationP6 Instructors Sample Presentation
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 to 8.4 Professional and Optional Client 3 day training course PMI REP No 3001 Course Number PP6 Page 2 Page 4 Administration Evacuation
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Copyright Eastwood Harris Pty Ltd IMPORTANT POINTS FOR
More informationP6 Version 8.2 to 8.4 EPPM Web Power Sample Point Slide Show
THIS SLIDE REQUIRES NEW PICTURE Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 8.4 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Administration Evacuation
More informationAdministration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by.
Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones
More informationSample book with one chapter
99 Tricks and Traps for Microsoft Project 2013, 2016 & 2019 The Casual User s Survival Guide By Paul E Harris of Eastwood Harris Pty Ltd Copyright 2019 by Eastwood Harris Pty Ltd. No part of this publication
More informationRiskyProject Professional 7
RiskyProject Professional 7 Project Risk Management Software Getting Started Guide Intaver Institute 2 Chapter 1: Introduction to RiskyProject Intaver Institute What is RiskyProject? RiskyProject is advanced
More informationQ&As. Managing Projects with Microsoft Project Pass Microsoft Exam with 100% Guarantee
74-343 Q&As Managing Projects with Microsoft Project 2013 Pass Microsoft 74-343 Exam with 100% Guarantee Free Download Real Questions & Answers PDF and VCE file from: 100% Passing Guarantee 100% Money
More informationProject Management Courses
"A well planned project will give results exactly as planned." Project Management Courses Professional Development Training has a specialised division of Project Management experts that will tailor the
More informationMS Project Professional 2007 Schedule Leveling: Tips & Tricks. By Lloyd C. Miller III, PMP
MS Project Professional 2007 Schedule Leveling: Tips & Tricks By Lloyd C. Miller III, PMP Agenda What, Where, When & Why Understanding the Options Considering Different Views / Reports Tips & Tricks 2
More informationWhat's New - Task Planning
What's New - Task Planning by Dale Howard and Gary Chefetz With this chapter, teach yourself how to use Microsoft Project 2010 s new manual scheduling feature. This self-paced study guide includes hands-on
More informationPlaner ET 2011 professional. Programming time-location Economic planning
Planer ET 2011 professional Programming time-location Economic planning Planer ET 2011 standar (for Studies Departments) Time-Location Diagram Import from Microsoft Project and Primavera Project Management
More informationMicrosoft Managing Projects with Microsoft Project
Microsoft 70-343 Managing Projects with Microsoft Project 2013 http://killexams.com/exam-detail/70-343 A. Enter a status date for the task. B. Enter 0 in remaining duration. C. Reschedule uncompleted work
More informationDIGITAL VERSION. Microsoft EXCEL Level 2 TRAINER APPROVED
DIGITAL VERSION Microsoft EXCEL 2013 Level 2 TRAINER APPROVED Module 4 Displaying Data Graphically Module Objectives Creating Charts and Graphs Modifying and Formatting Charts Advanced Charting Features
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 & 8.2 Professional and Optional Client 3 day training course SAMPLE SLIDE SHOW
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 & 8.2 Professional and Optional Client 3 day training course SAMPLE SLIDE SHOW PMI REP No 3001 Course Number PP6 Page 2 Page 4 Administration
More informationUltimate Study Guide: Foundations Microsoft Project Dale A. Howard Gary L. Chefetz
Ultimate Study Guide: Foundations Microsoft Project 2010 Dale A. Howard Gary L. Chefetz Ultimate Study Guide: Foundations Microsoft Project 2010 Copyright 2010 Chefetz LLC dba MSProjectExperts Publisher:
More informationMastering Microsoft Project 2010
Course 50413B: Mastering Microsoft Project 2010 Page 1 of 10 Mastering Microsoft Project 2010 Course 50413B: 2 days; Instructor-Led About this Course This two-day instructor-led course provides students
More informationP6 Instructors Sample Presentation
NEW PICKIE REQUIRED Administration Evacuation procedure Facilities, timings and meals Mobile phones & Emails Introductions: Your name, The types of projects you are involved in, Your experience in scheduling
More informationVersion Comparison. Getting Started Project Planning. Feature Key:
Version Comparison Version Comparison The table below introduces the new features of 2010 and Project. It also shows features initially included in previous versions that have been improved in Project
More informationIPECC C ONSULTANTS Course Title: Primavera Enterprise 6.0. Primavera Enterprise. Project Management, Training & Contract Workforce
Primavera Enterprise 6.0 IPECC C ONSULTANTS Project Management, Training & Contract Workforce Course Title: Primavera Enterprise 6.0 VIRTUAL WORKSHOP PRIMAVERA ENTERPRISE 6.0 IPECC Consultants has found
More information(Really) Understanding Microsoft Project
2019 (Really) Understanding Microsoft Project Ron Winter, PSP, FAACE Schedule Analyzer Software 1 Ron Winter, PSP, FAACE Bachelor of Science in Engineering Construction Scheduler US Air Force Navigator
More informationUsing Enterprise etime
Using Enterprise etime Handout Manual Appendix Automatic Data Processing, Inc. Roseland V11090972216ET61 2009 ADP, Inc. Appendix Using Hyperfind Queries with QuickNavs When your ADP representative sets
More informationA Xymphonic Systems White Paper Anyplan Product Overview
A Xymphonic Systems White Paper Anyplan Product Overview http://anyplan.co Page 1 2014 Xymphonic Systems AS Contents Contents... 2 Introduction... 2 Who Uses Anyplan?... 3 Common Features, Common Resources...
More informationMicrosoft Project 2010 Project Essentials Planning, Communicating, Tracking
Infinite Possibilities - Measurable Results Microsoft Project 2010 Project Essentials Planning, Communicating, Tracking Robert Happy, PMP, MCT, MCTS Project Management Practice Inc. www.pm-practice.com
More informationP6 Analytics Reference Manual
P6 Analytics Reference Manual Release 3.2 December 2013 Contents Getting Started... 7 About P6 Analytics... 7 Prerequisites to Use Analytics... 8 About Analyses... 9 About... 9 About Dashboards... 10
More informationSchedule Editor for Supervisors of Non-Exempt Employees
Schedule Editor for Supervisors of Non-Exempt Employees Using Schedule Editor Table of Contents Accessing Schedule Editor... 5 CalTime Home Screen for Supervisors... 5 Schedule Editor s Tabs... 5 Schedule
More informationConstructionOnline Scheduling Getting Started Guide. ConstructionOnline is presented by UDA Technologies
ConstructionOnline Scheduling Getting Started Guide ConstructionOnline is presented by UDA Technologies. www.udatechnologies.com 1.800.700.8321 ConstructionOnline Scheduling Whether you re managing two
More informationMICROSOFT PROJECT 2002(XP) AND 2003 LEVEL 1
MICROSOFT PROJECT 2002(XP) AND 2003 LEVEL 1 Welcome! Thank you for choosing WWP as your learning and development provider. We hope that your programme today will be a stimulating, informative and rewarding
More informationHow to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional
How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional Session ID: 10686 Prepared by: Raquel Shohet, PSP Vice President Hill International, Inc. How to Develop, Manage
More informationAPS Basic Set Up. Learn how to set up a basic APS scenario in beas Manufacturing
APS Basic Set Up Learn how to set up a basic APS scenario in beas Manufacturing Boyum Solutions IT A/S Beas tutorials TABLE OF CONTENTS 1. INTRODUCTION... 3 2. PROCESS... 3 2.1. Master Data Tab... 5 2.2.
More informationDRM DISPATCHER USER MANUAL
DRM DISPATCHER USER MANUAL Overview: DRM Dispatcher provides support for creating and managing service appointments. This document describes the DRM Dispatcher Dashboard and how to use it to manage your
More informationProject Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2
Primavera Essential Course Contents: 1. Overview Describe the Primavera modules Explain the difference between global and project-specific data Project Portfolio Management Defining the Enterprise Project
More informationMicrosoft Office Project 2007, Managing Projects
Microsoft Office Project 2007, Managing Projects Course Number: 5927A Course Length: 3 Days Course Overview This three-day instructor-led course provides students with the knowledge and skills to build,
More informationKeyedIn Projects Project Manager User Guide
KeyedIn Projects Project Manager User Guide Version 2.0 July 27, 2012 Project Manager User Guide 1 2012 KeyedIn Solutions, Inc. Welcome to the Project Manager User Guide. This user guide will provide you
More informationContents Getting Started... 7 Sample Dashboards... 12
P6 Analytics Reference Manual Release 3.4 September 2014 Contents Getting Started... 7 About P6 Analytics... 7 Prerequisites to Use Analytics... 8 About Analyses... 9 About... 9 About Dashboards... 10
More informationtechnical tips and tricks
technical tips and tricks Detailed assignment editing Document author: Produced by: Andy Jessop Project Learning International Limited The tips and tricks below are taken from Project Mentor, the smart
More informationPP 1: Display Stock/Requirements List
PP 1: Display Stock/Requirements List Exercise Use the SAP Easy Access Menu to display the Stock/Requirements List. Time 5 min Task Review the material status of your Deluxe Touring bike (finished good)
More information1. A/an is a mathematical statement that calculates a value. 2. Create a cell reference in a formula by typing in the cell name or
Question 1 of 20 : Select the best answer for the question. 1. A/an is a mathematical statement that calculates a value. A. argument B. function C. order of operations D. formula Question 2 of 20 : Select
More informationPREVIEWING NETPOINT 5 AND USER-REQUESTED FEATURES SERGIO PONCE DE LEON SEVE PONCE DE LEON
PREVIEWING NETPOINT 5 AND USER-REQUESTED FEATURES SERGIO PONCE DE LEON SEVE PONCE DE LEON Sergio Ponce de Leon Design & Product Manager Seve Ponce de Leon Design & QA Manager Seve Ponce de Leon and Sergio
More informationSoftware Application: Information System Elements
Software Application: Information System Elements Project Scheduling Basics Working With Resources Fine Tuning the Project Managing the Project Project Presentations Project Management in Information Technology
More informationScheduler Book Mode User Guide Version 4.81
Scheduler Book Mode User Guide Version 4.81 Contents Introduction...2 Scheduler Active Tab...2 Appointment Colors and Markings...2 Setting Book Mode...3 Active Tab Options...3 Active Tab Use...3 Active
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course PMI REP No 3001 Course Number PP6 Administration Evacuation Timings and meals Facilities Mobile
More informationProject Scheduler for Smart Project Management XLGantt User Manual
Project Scheduler for Smart Project Management XLGantt User Manual Version 1.1.0 http://xlworks.net/ Jun 6, 2017 Contents XLGantt Update History -------------------------------------------------------------
More informationModule 5 Timesheet. Step by Step Guide PSA Suite Basic for CRM Timesheet calendar view 5.2 Timer 5.3 Timesheet by line
Step by Step Guide PSA Suite Basic for CRM 2013 Module 5 5.1 calendar view 5.2 Timer 5.3 by line PSA Suite Basic CRM 2013: V1.0 1 Module 5. Contents TIMESHEET CALENDAR VIEW... 5 INTRODUCTION... 5 1. Objectives...
More informationUser Guide. Introduction. What s in this guide
User Guide TimeForce Advanced Scheduling is the affordable employee scheduling system that lets you schedule your employees via the Internet. It also gives your employees the ability to view and print
More informationPSA for Microsoft Dynamics Timesheet 5.2 Timesheet (Line) 5.3 Instant Time Entry 5.4 Expenses 5.5 PSA Suite Portal (Time & Expense entry)
Step by Step Guide PSA for Microsoft Dynamics 365 Module 5 Timesheet 5.1 Timesheet 5.2 Timesheet (Line) 5.3 Instant Time Entry 5.4 Expenses 5.5 PSA Suite Portal (Time & Expense entry) PSA (Business Performance
More information1Z
1Z0-567 Passing Score: 800 Time Limit: 0 min Exam A QUESTION 1 Identify the true statement regarding Activity Step templates. A. Activity % complete must be Physical when using Activity Step templates.
More informationMicrosoft Project 2010 Core Essentials
Infinite Possibilities - Measurable Results Microsoft Project 2010 Core Essentials Robert Happy, PMP, MCT, MCTS Project Management Practice Inc. (PMPI) www.pmpractice.com Who Is Robert Happy, PMP, MCTS,
More informationManaging Projects with Microsoft Project Server 2010
Managing Projects with Microsoft Project Server 2010 Duration: 4 Days Course Code: GK2597 Delivery Method: Company Event Overview: Learn to take project management to the next level using Microsoft Project
More informationCAREER PATHWAY PERFORMANCE MANAGEMENT SYSTEM EMPLOYEE USER GUIDE
CAREER PATHWAY PERFORMANCE MANAGEMENT SYSTEM EMPLOYEE USER GUIDE TABLE OF CONTENTS Process and System Information... 2 Performance Management Process... 2 Accessing Career Pathway... 2 Goals, Competencies,
More informationKRONOS EMPLOYEE TRAINING GUIDE
KRONOS EMPLOYEE TRAINING GUIDE C o n t e n t s Navigating Through Workforce Central... Lesson 1 Timecard Edits... Lesson 2 Approvals... Lesson 3 Reporting... Lesson 4 Editing & Scheduling PTO... Lesson
More informationCustomizing the Gantt chart View
In this lab, you will learn how to: Customize a Gantt chart view. LAB # 9 Formatting and Sharing Your Plan Customizing the Gantt chart View The Gantt chart became a standard way of visualizing project
More informationP3 to P6 Professional Migration Guide
P3 to P6 Professional Migration Guide 15 R2 September 2015 Contents Welcome to P6 Professional... 5 About this Guide... 5 What is P6 Professional?... 6 New Environment - Same Processes... 7 Roles and
More informationKronos Workforce Timekeeper. Time and Attendence System Computer Training Manual
Kronos Workforce Timekeeper Time and Attendence System Computer Training Manual Prepared by: Amelia Griggs, Information Management 6/14/2005 Table of Contents: A. Introduction...4 Punch to Payroll Process
More informationWelcome to the Project Manager guide
Contents Getting around... 3 Creating a new project... 4 Selecting an existing project... 6 Dashboards... 6 Project planning... 9 Project roles... 9 Gantt view... 11 Adding a task in Gantt view... 12 Parent
More information3-Day Oracle Primavera P6 Professional Fundamentals - Training Outline -
3-Day Oracle Primavera P6 Professional Fundamentals - Training Outline - PREPARED BY: Jessica Summers Virtual Training Coordinator PPM Global Services, Inc. P: 1-800-746-4029 x 310 F: 1-800-746-4029 E:
More informationRisk Management User Guide
Risk Management User Guide Version 17 December 2017 Contents About This Guide... 5 Risk Overview... 5 Creating Projects for Risk Management... 5 Project Templates Overview... 5 Add a Project Template...
More informationTime & Expenses: Timesheet
Time & Expenses: Timesheet 1 1. Lab Objectives After completing this lab, you will be able to: Book hours in your timesheet via Outlook retrieval Book hours in your timesheet manually Book expenses via
More informationNotice: Falsification of timesheets, whether submitting or approving, can be grounds for immediate termination.
Employee Functions Time & Attendance Experience the Workforce system from the employee perspective. Learn Workforce navigation fundamentals and functions related to reporting time, activities, and absences
More informationRiskyProject Lite 7. User s Guide. Intaver Institute Inc. Project Risk Management Software.
RiskyProject Lite 7 Project Risk Management Software User s Guide Intaver Institute Inc. www.intaver.com email: info@intaver.com 2 COPYRIGHT Copyright 2017 Intaver Institute. All rights reserved. The information
More information