AUSTROADS REVIEW OF PERFORMANCE CONTRACTS: THE POTENTIAL BENEFITS OF PERFORMANCE CONTRACTS. Paul Hardy Opus International Consultants

Size: px
Start display at page:

Download "AUSTROADS REVIEW OF PERFORMANCE CONTRACTS: THE POTENTIAL BENEFITS OF PERFORMANCE CONTRACTS. Paul Hardy Opus International Consultants"

Transcription

1 AUSTROADS REVIEW OF PERFORMANCE CONTRACTS: THE POTENTIAL BENEFITS OF PERFORMANCE CONTRACTS Paul Hardy Opus International Consultants ABSTRACT The author is a highway maintenance manager with a particular interest in procurement methods. Prior to coming to New Zealand in 1995 he was involved in maintenance of trunk roads and motorways in the UK. In New Zealand he has been involved in the management of the Nelson State Highway network and has also assisted to prepare contractor lead tenders for highway maintenance management contracts in Australia and Scotland. He has recently been involved in a review of performance contracts as a project for Austroads. The paper draws on the author s experience gained via this project and his involvement in tendering 2 PSMC contracts in Western Australia. The paper examines the potential benefits of adopting a performance contract approach. It offers the authors opinion on the feasibility of achieving these benefits and the practicality of measuring them. Paul Hardy Opus International Consultants Ltd Nelson Office, 4 th Floor Civic House, 106 Trafalgar Street Private Bag 36, Nelson Tel (03) Fax ( paul.hardy@opus.co.nz Page 1

2 1 INTRODUCTION 1.1 THE CHANGING ROLES OF ROAD AUTHORITIES Over the past 10 years or so Road Authorities (RAs) around the world have undergone significant changes. In many instances this has meant a redefinition of their role. Whereas previously they were providers of services, including design, construction and maintenance, with expertise in carrying out these functions, they are increasingly becoming asset managers and the purchasers of services. The levels of traditional technical skills required in the design, construction and maintenance of road networks has been replaced in many RAs with expertise in asset management and procurement of the outcomes desired by their customers. For these RAs their role is evolving from that of expert supplier to informed purchaser. 1.2 EVOLUTION OF CONTRACTS Evolution of contracts used to procure road construction and maintenance has occurred as a result of various changes in Government policies, in particular the outsourcing of technical and construction activities. Many RAs have adopted forms of performance contracts and specifications to the extent that some form of performance contracts or specifications have been used by RAs in most parts of the developed world. This has been particularly the case in New Zealand and Australia were 11 performance specified maintenance contracts have been let over the last 6 years. Despite this there is no common understanding of what is meant by, and what can realistically be achieved by, a performance contract. 1.3 AUSTROADS PROJECT In response to this Austroads commissioned a project to facilitate a common understanding between Austroads member authorities and industry of what is meant by, and what can realistically be achieved through, performance contracts. Specifically the project looked at: The potential benefits of performance contracts The applicability of performance indicators and models Experience to date with performance contracts This paper comments upon the first element, the potential benefits. It draws heavily upon the research undertaken for the study but reflects the author s opinion on the findings. Page 2

3 2 CONTEXT To define the context, within which performance contracts are used, a model of the hierarchical needs of a typical road authority is shown below, figure 1. This model will be used to explain the drivers behind the adoption of performance contracts. Customer Satisfaction High Level Outcomes Customer Satisfaction: is the ultimate objective of any RA. High Level Outcomes: look to identify the broad social, economic and environmental outcomes required and are generally reflected in the RAs mission statements in such term as the provision of a safe and efficient network in an environmentally acceptable manner Network Level Outcomes. Network Level Outcomes: are a means of defining how the high level outcomes are translated into actions on the road network and reflect customer expectations of the road network. These are the outcomes currently measured by most RAs e.g. Austroads National Performance Indicators measure outcomes at this level. Outputs Inputs Figure 1: Road Authorities Hierarchy of Needs Outputs : are the elements of work that contribute towards achieving an outcome, for example areas of rehabilitation, reseal etc. Outputs deal with when thing get done. Inputs: are the means by which the outputs are delivered. They are governed by technical specifications and may dictate work method, material specifications etc. Inputs deal with what gets done and how. 2.1 ROAD AUTHORITIES HIERARCHY OF NEEDS Figure 1, illustrates the linkage between individual tasks (inputs) and their overall objective to provide a road network that meets the needs of their customers. Increasingly, RAs are endeavouring to align their contracts with their higher-level goals, i.e. the outcomes they wish to provide to their customers. Performance contracts are in part driven by a desire to focus on the higher level needs rather than the means of achieving them and to allow suppliers increased freedom to determine how to achieve the desired outcomes. To explain this we need to consider how various current road maintenance contracts align with the model above. Page 3

4 2.2 THE CONTRACT CONTINUUM A range of contract types is currently used for the procurement of road maintenance. This model can be used to allow the incremental changes of moving from one contract type to another to be considered in context. Moving left to right across the continuum, the contract type focuses increasingly upon the higher levels of the hierarchy of needs i.e. there is an increasing focus on the outcome rather than the means of achieving it. Implicit in this is the notion that greater focus on the customer s expectations is achieved. The benefits of performance contracts rely upon the premise that as you moving to the right along the contract continuum there is a progressive increase in the value achieved. Input Driven Output Driven Outcome Driven What & How When Customer Expectations Inputs Outputs Network Level Outcomes High Level Outcomes Customer Satisfaction Figure 2: The Contract Continuum Maintenance contracts align with the three drivers shown as follows: Input driven contracts; focus on what needs to be done and how. They typically provide detailed methodologies for each task by the use of method specifications and payment is made on the individual inputs provided i.e. labour and plant by the hour and materials by quantity. They rely the contract managers to decide the treatments and scope of works required. Examples of input driven contract include in houseservice agreements with direct labour organisations Output driven contracts; focus on when thing need to be done. They generally comprise a schedule of items for each repair type. There is some flexibility in repair method afforded to the contractor. Payment is per item completed and may include some lump sum items that combine cyclic and routine works items. A greater level of risk and responsibility is passed to the contractor than in input driven contracts. Contractors can usually carry out output driven contracts without the need to hire in new technical skills. Conventional routine maintenance contracts fall into this category. Page 4

5 End product specifications, fall somewhere between output and outcome driven. These specifications are performance-based with the time frame being end of construction with a 12-month liability period. E.g. Transit s P17 Resurfacing contracts Outcome driven contracts; focus on the delivery of the outcome desired by the customers and endeavour to align the contract objectives with the higher level needs of the RA. They specify only the desired outcomes and allow flexibility in methodology. Payment is by a single lump sum, with an element of the payment at risk against measured performance. Performance contracts are outcome driven contracts. Examples include: Transit s PSMCs 01,02 for Auckland Harbour Bridge and 409km of predominantly rural state highway respectively Transit s hybrid contracts fall somewhere between an outcome and an output-based contract. Outcome driven contracts and performance contracts are synonymous. They have developed generally as an evolution of existing contract arrangement with the intent of providing better value than the current contracts and a service more closely aligned with the outcomes desired. Page 5

6 3 TERMINOLOGY The definition of what constitutes a performance contract or specification varies significantly between RAs and also from country to country. Defining a common terminology for use by the industry is a key output from the study. 3.1 DEFINITIONS The following definitions were proposed as means of fostering a common understanding of what a performance contract is and were adopted for the study: Performance Specification: A specification that describes how the end product should perform over time. Example: The average roughness of the road shall always be below 75 NAASRA counts A Performance Contract: defines obligations and outcomes in terms of performance indicators for the product or service and is of sufficient duration to enable measurement of the contractor s performance over time. Examples of current performance contracts are: Design, Construct and Maintain Contracts (DCM) Performance Specified Maintenance Contracts (PSMC) Build, Own, Operate and Transfer (BOOT) Design, Build, Finance and Operate (DBFO) 3.2 KEY ELEMENTS OF A PERFORMANCE CONTRACT The key elements of a performance contract are: A definition of the performance required (as opposed to the definition of the method to be used or simply the end product at the completion of construction) A requirement that a defined performance shall prevail over a suitable period of time Page 6

7 The definitions are required as much to exclude what isn t a performance contract as to identify what is. Terms such as performance based and performance related have been specifically excluded. 4 THE TIME ELEMENT 4.1 PERFORMANCE OVER TIME The definition of a performance contract requires the inclusion of a time element. Many performance contracts endeavour to measure performance using performance indicators that predict the expected performance, i.e. measurements taken at the end of a maintenance period are used to infer the expected life of the product. Design and construct contracts are examples of this approach as are the performance based resurfacing contracts being used by Transit New Zealand (P17) which use measures such as texture depth at the end of a maintenance period to predict the life of the new surface. 4.2 CONTRACT DURATION The definition of a performance contract includes the time element, however it is deliberately silent on what the duration of the contract should be. Ideally, a performance contract would have a duration that covers a significant proportion of the expected life of the product. In practice this is difficult to define, e.g. what is the expected life of a road network? Elements of it may have a life cycle of 10 years or less; but the network as whole needs to endure well beyond the 10 years and needs to be managed accordingly. 4.3 CHOICE OF DURATION The choice of duration for performance contract is a key consideration. A 10- year duration has been adopted for most current PSMCs. 10 years has been chosen to generate the economic incentives that are the trade-off for the obligation to meet performance objectives. It is long enough to allow amortisation of risks and investments by the contractor allows: Investment, in physical resources & an 'asset ownership' culture The flexibility to design appropriate treatments, Investment up-front to reduce ongoing costs, 10 years recognises the planning horizon of most RAs. It also limits the potential changes in traffic volume, axle loading and weather events and the consequent changes in asset condition that could be expected during the contract period as a result of such changes Page 7

8 The definitions given above are academic. The driver behind the adoption of this form of contract is a desire to create efficiency gains and therefore obtain better value for money. A performance contract is merely means to an end. Debate over whether it is possible to measure performance is largely an esoteric argument. Page 8

9 5 POTENTIAL BENEFITS 5.1 WHAT IS A BENEFIT? For any contracting strategy to be considered to have provided a benefit it must result in the customer receiving: The same level of service at a reduced cost or A better level of service at the same cost or A better level of service at a reduced cost If one of these overall outcomes is not achieved there is no benefit. By definition, the customer must receive the benefit, i.e. an improvement that provides a benefit for one party in the supply chain but does not provide a benefit to the customer is not a benefit. This is key point, as a number of the claimed benefits of performance contracts are not directly beneficial to the customer. 5.2 ARE THE BENEFITS UNIQUE TO PERFORMANCE CONTRACTS? Incremental Benefits? B e n e f i t Own Forces? Performance Contract Conventional contracts Input Driven Output Driven Outcome Driven The scale of benefits attributed to a performance contract has to be established with reference to the contract arrangements (if any) prior to the establishment of the contract. A benefit of a performance contract is the incremental benefit that has accrued as the result of moving to a performance model over and above benefits that could have been achieved through other contracting methods. An array of benefits has been attributed to the exposure of services to competition. These have most often been achieved by the use of competitive tendering. These benefits have to be discounted before an assessment of the benefit of the performance contract can be attempted. Page 9

10 5.3 EXTENT OF EXPERIENCE The majority of performance contracts have durations of 10 years. The two longest running contracts have been in existence for 5 years, the remaining contracts are all less than 3 years old. In the context of the term (duration) of the contracts, experience is limited and consequently so is the evidence to support the benefits claimed. Contract NSW RTA North Sydney Virginia USA ( yrs) Tasmania Southern Road Network PSMC01 (Auckland Harbour Bridge) PSCM02 (SH3 etc) PSMC03 (Northland) Main Roads Western Australia (6 contracts) Table 1: Extent of Experience: Current Performance Specified Maintenance Contracts 5.4 INDUSTRY OPINION As part of the study 3 workshops were run and were attended by 54 people representing a range of interests within the industry including contractors, consultants, road authorities and funding agencies. In addition a questionnaire was sent out to a wide industry group. 19 replies were received. Whilst this is statistically a small sample the respondents almost all had significant experience with performance contracts. Their views are consequently worthy of comment. In the questionnaire we posed the question in relation to the potential benefits, Are the claimed benefits achievable? The responses are summarised in Figure 3. Page 10

11 Potential Benefits: Can they be achieved? Percentage Agree 100.0% 90.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Industry Road Authority Both Better Value for Money Reduced Administration Reduced Agency Risk Budgetary Certainty Increased Innovation Improved Utilisation of Industry Skills Better Customer Focus Better Definition of Better Service Required Better Undestanding of Performance by Road Managers Clearer Accountability between Stakeholders Increased Ownership Figure 3: Industry Questionnaire Response: Are Potential Benefits Achievable? There was strong agreement amongst the respondents that the benefits claimed could be achieved. The questionnaire went on to ask are these benefits quantifiable? The responses received are summarised in figure 4. Potential Benefits: Are they quantifiable? 100.0% 90.0% 80.0% Percentage Agree 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% 0.0% Industry Road Authority Both Better Value for Money Reduced Administration Reduced Agency Risk Budgetary Certainty Increased Innovation Improved Utilisation of Industry Skills Better Customer Focus Better Definition of Better Service Required Better Undestanding of Performance by Road Managers Clearer Accountability between Stakeholders Increased Ownership Figure 4: Potential Benefits: Can They Be Quantified? Page 11

12 Clearly there is less confidence that the benefits can be quantified than there is that they can be achieved. However it is worth noting that the greatest agreement on this question is with the benefits of better value for money and better definition of the level of service required. Most road authorities would be happy to achieve these two benefits alone and would consider other potential benefits to be subsidiary to them. There was discussion within the workshops are to whether these benefits could only be achieved by the use of performance contacts. This resulted in the production of the following table. A indicates general agreement. A? indicates a mixture of opinion between the workshop attendees. Potential Benefit Achieved only through a Performance Contract? Easier through a Performance Contract? Aligned with Road User Requirements Ownership by Contractor (?) Better Value? Better Knowledge of Asset? Risk transfer to those who can manage it best Encouraging move to Pavement deterioration modelling Intervene at optimal time Longer term planning Encourages innovation Price certainty for level of service Up-skilling staff Greater uniformity of measures Better programming / flexibility Table 2: Workshop Output: Comparative Ease of Achieving Benefits Interestingly the workshop attendees were divided on whether the two key benefits (better value and better knowledge of the asset) could be more easily achieved using a performance contract compared to a traditional contract. This I belief reflects a generally mixed opinion amongst the industry as to the credibility of the benefits claimed for performance contracts. The following section comments upon the specific benefits that have been claimed by various parties as attributable to the adoption of performance contracts and in particular relates to the use of performance specified maintenance contracts (PSMC). Page 12

13 6 SPECIFIC POTENTIAL BENEFITS 6.1 VALUE FOR MONEY Performance contracts are purported to provide better value for money by providing the same, or better, level of service at reduced price. Better value for money is ostensibly easy to quantify. Every contract let to date in Australia and New Zealand has resulted in a tendered price that has been assessed as a significant saving to the RA letting the contract. Figures for savings compared with traditional contracts range from approx. 38% quoted for the latest TRANSIT PSMC to 15% in Virginia in the USA as shown in Table 2 below. The context of the contract arrangements preceding a change to a performance contract is important. The process of contracting out and the exposure of services to competition have led in most cases to significant cost reductions. When the contracting out process is combined with a move to the use of a performance contract model it can be reasonably assumed that some of the economic benefit has been achieved through the process of competition. The maturity of the contracting environment is another important consideration. Where contracting out has been repeated over a sustained period there has generally been successive cost reductions as contractors discover more cost effective methods of delivering the services required. Where performance contracts have been preceded by a short, 3 years or less pilot contracting initiative, it could be argued that part of the saving could have been achieved by simply re-tendering on the basis of a conventional contracting arrangement. This is not the case with the New Zealand contracts listed in Table 1, where the preceding contract arrangement was a succession of conventional contracts over a period of over 10 years. In terms of initial reduction of cost the evidence at present would appear to be compelling. Page 13

14 NSW RTA Contract: (Award Date) Northern Sydney (1996) Virginia USA (1997) Tasmania (July 1998) Western Australia ( ) New Zealand: PSMC01, 02 & 03 ( ) Quoted Saving (Source of information) 35% (Improving Quality and Cutting Cost through performance contracts M Frost 1996) 15% (Review of VDOT s Administration of the Interstate Asset Management Contract Dec. 2000) NB this reports questions the validity of these savings 20% ($20m) (MRWA Position Paper Ten Year Contracting Strategy Road Maintenance - Aug 1998) Contracts range of savings 15 to 35 % (Outsourcing Road Design, Construction and Maintenance in WA, - G Martin, 2000) 15% to 38% (TRANSIT press release Transit to let 4 new 10 year maintenance contracts following success of the first May 2001) Preceding Contract Arrangement 2-year pilot trial contracts split between private contractor and in house resources. In house resources. NB this contract resulted from an unsolicited offer by the contractor. 1 no. 3 year conventional maintenance contract Mixture of 3 year conventional contracts and in house resources PSMC01, 02 Conventional maintenance contracts for the last 10 years re-tendered every 3 years. PSMC03 Traditional maintenance contracts, followed by 18month hybrid contract leading into the PSMC Table 2: Quoted Savings of PSMCs It is too early to judge whether these contracts are providing better value for money, it is clear that they almost always lead to tendered prices, which are less than the estimated costs of using other procurement methods. The acid test will be to monitor long-term performance and determine whether: The level of service provided meet long term expectations The tendered price remains intact over the contract period Page 14

15 Most of the current contracts are for 10 years and only 2 of them are older than 3 years. It is therefore early days for these contracts. These apparent savings will only be able to be confirmed once there has been time to ratify that the specified performance measures deliver the level of service expected over the contract period. In general terms, experience is mixed although clearly positive from a Transit point of view in New Zealand. There is concern held by some that over the period of the contract the asset will be consumed, i.e. the condition of the asset at the end of the contract will not be of equal or better value than it was at the start of the contract. The fact that it may take 10 years or more to draw definitive conclusions regarding the cost savings that might be derived from performance contracts is significant. The contracts deal with assets that may have life spans of 20 to 40 years on which changes in condition happen slowly. Currently, there is consequently little objective data from which to assess the whole of life cost benefits of these contracts. As a result, there is considerable debate within the industry over how real these cost savings are. In particular there is the question of the duration of the contract in comparison to the deterioration life cycle of the pavement, i.e. will the deterioration of the network within the contract period be masked by the short contract period. In other words will the contracts effectively mine the condition of the asset over the contract duration creating a backlog to be addressed by the following contract? The key question is whether the same or better value is being delivered, not simply is the cost reduced. The definition of a level of service for maintenance of a road network is complex. How sure can an authority be that the key performance measures given in the contract adequately represent the service required by the road users? Even if the measures are correct can they be accurately measured? The successful contractors have long-term revenue streams. This provides them with the potential to make long term investment decisions for both research and development (R&D) and training. This is a clear benefit to them in comparison to shorter contracts, but it prompts the question of whether the potential economic benefit is a result of the longer duration, or the form of contract. There is to date insufficient substantive evidence to state categorically that the initial savings are a true reflection of increased value for money. It is, however, similarly impossible to state that this is not the case. Page 15

16 6.2 BETTER CUSTOMER FOCUS Supporters of performance contracts assert that the process of defining performance measures has led to a greater understanding of customer needs. This is feasible and could be quantified by simply asking the customers. A customer satisfaction measure is, however, conspicuous by its absence from current performance contracts and it is not clear whether RAs in establishing their performance measures have involved their customers in determining the target levels. It is true that customer satisfaction is dependent upon an array of issues; many of which are external to the contract scope e.g. progress with desirable improvements. As the customer is the ultimate arbiter of the quality of service provided, this is an important consideration. The technically oriented will look to correlate the cost with the technical interpretation of the customer s needs but this may miss the point in terms of customer satisfaction. RAs are increasingly focusing on the needs of their Customers. The translation of these needs into robust performance measures (KPIs), which match the performance of the asset being created or maintained, is a considerable challenge. Historically, many of these needs have been implicit with little documentary evidence of their existence and, more importantly there has been no common understanding of customer needs amongst the parties delivering them. Who determines the level of service/performance required is a crucial consideration. The adoption of performance contracts has led to attempts to define perceived customer needs in term of measures that can be used in a contract. It does not necessarily follow, however, that these measures accurately reflect customer s needs. This can only be determined by reference to the customers and current contracts do not explicitly address this. Performance contracts by their nature impose a discipline on all involved, which facilitates greater communication and discussion of customer needs. A performance contract is not required for this to happen but has in many instances provided the catalyst for a greater consideration than ever before. Page 16

17 6.3 IMPROVED RISK RECOGNITION, ALLOCATION AND MANAGEMENT Performance contracts transfer significant risks to the contractor that have been traditionally been held by the RA. In this regard the most significant additional risk transferred is that of the network condition. At the same time, the RA takes on the risk that their performance measures may not reflect their requirements. Risk transfer does not necessarily mean better risk management. The transfer of risk from the RA to the contractor only provides a benefit to the customer if the contractor is better able to manage the risk Current performance contracts tabulate the risks associated with the contract and either allocates them to the parties or provides a framework for risk sharing on a negotiated basis. There is thus a much more explicit recognition of risk than in traditional contract arrangements. The benefit of this is that risk may be managed better as a result of this greater focus. Assessing whether a risk was better managed is, however, difficult and, debatably, could only be quantified by a subjective assessment carried out if the risk eventuated. Performance contracts offer the RA the opportunity of shedding or sharing a variety of risks previously borne solely by the RA. Most current contract offered options to the contractor in terms of how risks are allocated and managed. For example the MRWA PSMCs invited contractors to propose the costs associated with transfer of a table of identified risks from the RA to the contractor. These figures then formed part of the contract negotiation with the successful contractor. This method has the advantage of allowing the RA to evaluate the cost effectiveness of reducing their risk exposure. Other contracts have placed a cap on certain risks. For example` Transit New Zealand s PSMC01 transferred some weather risks to the contractor but, placed a limit upon the extent of these i.e. land slips up to a specified size were allocated to the contractor and had to be allowed for in the lump sum price, but the cost of remedying larger slips remained with Transit. There is an inherent difference in the manner in which contractors and RAs manage risks. RAs are required to be careful if not necessarily conservative in how they handle risk. In contrast, contractors are generally amenable to taking on additional risks, provided they are accompanied by a commensurate opportunity. The notion that performance contracts in themselves force a better management of risk is in my opinion at best unproven. Page 17

18 6.4 REDUCED ADMINISTRATION Customers are not interested in administration. A reduction in administration is only a benefit if it assists in providing a better level of service or a reduction in cost. Traditional measure and value contracts can require double handling of information between the parties involved (RA, consultant and contractor). Performance contracts are generally single supplier arrangements that negate the need for a portion of this work. In addition, performance contracts advocate a hands off approach to contract administration. The input required from supervisory staff and contract administration staff is reduced due to the change of role from day to day surveillance to the measurement of the specified performance outcomes. Little direct evidence is available to quantify this except for the staff reduction in some RAs following the change in contract arrangements. Some of this administration is, however, passed onto the contractor. In instances where the previous contracting arrangement included 3 parties, (the RA, consultant and contractor), the consultant s role gets absorbed into the contractor s. There is at least one less contract to administer and it is logical to assume that whilst the contractor will take on some of the functions previously undertaken by the consultant, there will be an efficiency gain and thus some reduction in the administration. Anecdotal evidence suggests that although performance contracts lead to a reduction in the number of supervisory staff required to administer the contract, there is a need for a higher level of skill and experience in the staff involved. For some RA staff the change in role is challenging as it creates a feeling of loss of control. For example the decision making on treatment selection transfers to the contractor and the RA no longer controls directly what happens on the road. Reduced administration is an internal benefit. It only provides a benefit to the customer if it is significant enough to provide better value for money. The scale of savings quoted for these contracts are significantly greater than could be achieved simply by reducing administration. Reduced administration is not an outcome and should not be a major consideration in evaluation of the benefits. Page 18

19 6.5 CERTAINTY OF EXPENDITURE Most performance contracts are tendered on a single lump sum basis. The lump sum is then subject to price adjustments for performance achieved as measured by KPIs, changes to the asset etc. The potential benefit is that this approach reduces the risk of cost over-runs and budget blow- outs. Budgetary certainty is an issue that is largely internal to the supply chain. It may not in fact be desirable to the RA as it could lead to a global inflexibility of expenditure. The customer is interested in value for money, rather than certainty of expenditure. It is therefore debatable whether this is a benefit at all. Greater certainty of expenditure is feasible and is relatively easy to measure through a simple comparison of tendered cost against out-turn cost. In many respects a measurement of this may be useful to demonstrate whether the contract has delivered the savings indicated at the time of tender. If the price increases during the contract through variations careful consideration will need to be given as to whether these have eaten into the savings declared at the commencement of the contract The downside of being committed to lump sum payment for 10 years is covered in the limitation section that follows. Many authorities, particularly local authorities that may be managing other assets as well as roads, prefer the ability to manage their budget globally. They may, for example, wish to reduce road expenditure in one year to allow funds to be allocated to utility upgrades and then catch up the deferred road maintenance in the subsequent years. Fixed lump sum performance contracts reduce this flexibility. Certainty of expenditure is only a benefit if it is something that the road authority desires. Even then it only benefits the road authority rather than necessarily the customer. International experience includes examples in South America where the prime motivation for moving to a long term contract was to secure future funding by making it contractually difficult for funds to be diverted to other causes. Page 19

20 6.6 PROMOTE INNOVATION There are two key considerations in determining if the customer benefits from increased innovation through the adoption of a performance contract Does a performance contract provide greater incentive to a contractor to innovate? If so, does the benefit get to the customer? As previously described, the guaranteed long-term revenue streams provided by PSMCs might assist contractors fund the development of innovations that improve effectiveness and hence reduce the cost of their operations. It is highly likely that in tendering contractors will anticipate some efficiency gains during the contract and reduce their price accordingly. The current speed of technological advancement means that it is likely that during the life of the contract improved techniques will be available to the contractor. The longer term means that the contractor has a much greater incentive to invest in the development of new products and techniques. The negative aspect of this is that innovations may be carried out on a commercial-in-confidence basis that may lead to duplication of effort and loss of industry wide benefits. The cost savings from innovation may not be passed on to the road user. Some contracts have endeavoured to address the potential loss of innovation, due to contractors retaining the benefits for their own commercial gain, by requiring compliance with their existing technical specifications as a starting point for the contract. The contract then allows negotiation of changes to these if they are seen as an improvement. This allows the RA the opportunity to share in the benefit of innovations developed and implemented under the contract. Quantifying innovation is difficult in any context performance contracts are no exception. We should no confuse true innovation from efficiency gains. True innovation is generated by the forward thinkers in the industry and often need the support of RAs to come to fruition. I do not believe that performance contracts significantly increase the ability of the industry to innovate. Page 20

21 6.7 IMPROVED INDUSTRY SKILL BASE If the result of the implementation of performance contracts is an overall increase in the skill level in the industry, there will ultimately be a benefit to the customer through more effective and efficient services. It is debatable, however, whether there is an overall increase is skills, or simply redistribution within the industry? I.e. have technical staff who previously worked for the RA or consultants, moved to a contracting organisation? The shift of some RAs to more asset management focus has resulted in increased specialist technical knowledge in the contracting industry. There is clear evidence of this where some large contracting firms have recruited technical expertise and are actively targeting a greater scope of works i.e. many are looking to offer a comprehensive service that incorporates both design and construction. Whilst this trend is easy to observe and could be quantified, it would not give any true indication of whether there had been an overall increase in the skill levels in the industry. Whilst it is clear that some skills have simply transferred from one party to another, performance contracts have created an increased focus on performance measurement, risk management and deterioration modelling/prediction. Enhanced skills in these areas have almost certainly been created as a result of being involved in the tendering and running of PSMCs. Page 21

22 7 THE DOWNSIDE: RISKS AND CONSTRAINTS To obtain a balanced view of the potential benefits the potential risks and constraint associated with the adoption of a performance contract must also be evaluated. There are some significant constraints limiting the wide-scale adoption of performance contracts 7.1 INAPPROPRIAT E PERFORMANCE MEASURES The measurement of performance is a complex and challenging area and whilst the benefits noted above are possible without robust performance measures which truly reflect the performance required these benefits may either not be realised or be overstated i.e. the desired outcome may not be achieved even if the KPIs are met. If the base asset data is inaccurate, or not repeatable, or there is a lack of historic data this will have a big impact on the ability of the tenderers to produce maintenance programs that will be correct in the future years. Hence the risks of asset consumption or future contractual dispute over the performance measures are increased. The development of key performance indicators is a complex and challenging task. In many respects this concept is in its infancy and it is likely that considerable knowledge will be gained over the next 5 to 10 years. This knowledge may allow this risk to be reduced significantly. Even if appropriate measures can be determined is it possible to measure these to sufficient accuracy and repeatability? This is particularly pertinent to the expected life of a pavement and hence the inability to measure asset value and remaining life. 7.2 REDUCED COMPETITION The majority of performance contracts let to date have been large contracts in excess of $100m. This is to ensure that there is sufficient economy of scale, to provide financial incentive to contractors to offset the high initial tendering costs and to counteract the potential downside of taking on additional risk (in particular the network condition risk). The downside to this is that the scale of the contracts and the high tendering cost is such that it effectively precludes the smaller contractors from tendering and it will become increasingly difficult for them to stay in the market. In addition, the length of the contracts means the size of the market is reduced for the duration of the contract, thus placing greater pressure on the small and medium sized contractors. Competition is a key driver of efficiency and needs to be retained in any longterm procurement strategy. The size of the market and the ability to retain a Page 22

23 competitive market place are key considerations in deciding whether to take the performance contract path. There will undoubtedly be instances whereby the adoption of a single large contract would significantly reduce future competition by locking up the majority of locally available work with one contractor. This is particularly the case in networks linking small rural communities. 7.3 THE COST OF TENDERING Tendering is an involved and costly process requiring legal and financial advice to support the business decision in addition to the detailed technical analysis required to enable a price to be determined. This limits the parties able to tender for the contracts and raises the question of who should bear these costs. The preparation and tendering of the contract is also a complex and costly process for the RA. It generally involves not only producing a set of a typical contract documents but also compiling and verifying asset inventory and condition data and calculating programmes and estimates to be used in the tender evaluation. 7.4 INCREASED SIGNIFICANCE OF POOR CONTRACTOR S PERFORMANCE The possibility of poor contractor performance exists in all contracts. As with other types of contract remedies exist in performance contracts to address poor performance. The consequential effects of prematurely terminating a performance contract are, however, potentially more difficult to handle than for a traditional contract. E.g. the lead in time and cost of re-tendering a performance contact are particularly significant. A similar situation would exist if a contractor were to go into liquidation. It could be argued that the transfer of significantly greater risk onto the contractor increases the possibility of this occurring, especially if the contractor is not able to quantify the potential costs of these risks and include adequate provision for them in their bid price. All contracts contain the risk that a contractor may not perform to the standard required. With PSMCs the net effect of poor contractor performance is potentially greater, especially if the extent of the inadequacy is sufficient for the RA to contemplate terminating the contract. Termination of such a large contract would always be a last resort, but it is consequently particularly important that the contracts contain appropriate provisions to deal with poor performance. 7.5 REDUCED ABILITY TO DEAL WITH CHANGE During the life of a performance contract many factors affecting the contract could change. These could be physical, political or environmental. The lump sum nature of performance contracts means that the ability to deal with such changes is potentially reduced by being locked in to outdated contract Page 23

24 provisions. It is always possible deal with variations but they invariably result in increased costs to the RA and the lack of contract rates may make negotiation of the variation more difficult. 7.6 REDUCED TECHNICAL CAPABILITY IN RAS The transfer of responsibility for design and technical specification means that RAs will require a reduced level of technical expertise. There is a risk that if this downsizing in key technology areas is taken to an extreme level, then that RA could loose the ability to be an informed purchaser. In addition, if RAs do not retain sufficient technical skills to keep pace with developing technologies they risk being unable to take advantage of emerging technologies in future contracts. This is more of an item to be aware of than a significant risk. The developing role of RAs as procurement specialists still requires technical skills and in many respects requires a higher level of technical skills focused on asset management rather than day-to-day design and supervision. 7.7 LOSS OF CONTROL A common concern amongst RA staff about performance contracts is the loss of control of the network. Ownership passes from the RA to the contractor who has the greatest say in what gets done on the network. The perceived risk is that this loss of control will lead to a reduction of the standard of service provided. The risk that is reflected by these concerns is really the risk that performance measures are inadequately defined. It is immaterial who controls or owns the network as long as an adequate level of service is provided. 7.8 LOSS OF INNOVATION TO THE PUBLIC DOMAIN Whilst one of the purported potential benefit is to encourage innovation, the availability of innovation to the wider market place will be restricted if they are locked in to one supplier. This is highly dependent upon how this aspect is dealt with in each contract. The risk clearly exists, but the real questions are how significant a risk is it and is it any different to what happens under normal contract arrangements? The risk is predicated on the assumption that contractor developed innovation in some way replaces RA funded research and development. If RAs retain R&D then any innovations coming out of performance contracts can be considered a bonus. Comparison to RA instigated R&D is not valid if RA R&D continues. It is likely that groundbreaking innovations will continue to come from a variety of sources. Whilst the performance contracts may provide additional incentive to investigate new methods and products the risk of these being lost to the public domain is no greater under a performance model arrangement that under a conventional contract arrangement. Page 24

25 7.9 LOSS OF FINANCIAL FLEXIBILITY (RA). As described above lump sum contracts can provide greater certainty of expenditure, but this assumes that this is desirable. Not all authorities wish to be locked in to a level of expenditure for a period as long as 10 years. For example, many local authorities manage their funds more actively than this and wish to retain the ability to defer expenditure from year to year in order to balance the books and seek community input into levels of expenditure and service. Whilst performance contracts do not preclude varying the specified level of service and re-negotiation of the total expenditure it is more difficult than under a traditional contract model. The ability to vary budgets on a year-by-year basis is restricted by PSMCs. Whether this perceived increase in price certainty is desirable or not will depend upon the wishes of the particular RA and may be a significant consideration is deciding whether or not to pursue the performance contract route THE ABILITY TO JUSTIFY THE BENEFITS The potential benefits but also comments upon the difficulty of quantifying these. Currently there appears to be minimal objective data available for use in documenting the perceived benefits. Whilst this doubt exists it will always present an obstacle to the wide scale adoption of performance contracts LACK OF EXPERIENCE OR PREPAREDNESS (IN BOTH THE INDUSTRY AND RAS). Performance contracts demand different skills and a different approach to that taken traditionally by contractors. If there were to be wide-scale adoption of performance contracts contractors would require sufficient warning to allow them to up-skill in some key areas particularly asset management. The RAs require a similar shift in skills with the supervision role undertaken by the RAs representative changing to one of observation/auditing requiring the acquisition of new skills. The limitation of the industry in terms of size and ability can thus be an obstacle to the wide-scale adoption of performance contracts. The contracts themselves are large, generally over $10m for PSMCs and over $100m for DCMs. The scale and complexity of the contracts means that in order to provide a suitable team to attack the contracts contractors may wish to form joint ventures or associations with other contractors or consultants. Experience to date shows a mixture of large companies and joint ventures has been successful to date in acquiring these contracts LACK OF ROBUST ASSET DATA Performance contracts rely heavily upon the use of complete, accurate and up to date asset data. Whilst most RAs will have asset inventory and condition Page 25

26 databases, the robustness of this data may never have been tested in earnest. If asset data is incomplete, or insufficient to allow the contractor to make reasonable pricing assumptions then significant risk to the contract is introduced ABILITY TO FORECAST FUTURE CONDITION PSMC contracts use forecasts of future condition to determine the works required to maintain asset condition. For the contractor this means using a forecast as a means of determining a tender price. For the RA the forecast will be used to determine a cost estimate and to assist with the evaluation of tenders. The ability to forecast future condition is a crucial item in the success of the contract. A range of views exists within the industry over the accuracy and reliability of the tools used currently to predict future conditions. This is particularly the case with the residual life of the pavements. Without a good estimate of the effect on residual life the long-term (whole of life) benefits are difficult to assess. Confidence levels in deterioration models therefore represent a constraint to the wide scale adoption of performance contracts REGIONAL DEVELOPMENT AND EMPLOYMENT In many rural areas road maintenance activities provide vital employment that assists in sustaining the viability of small communities. The efficiency gains that large region wide performance contracts create place pressures on this employment. That is contractors may not retain staff in all the communities that currently employ a small road maintenance work force. There is consequently a potential social cost to rural communities of implementing a performance contract, which may override the economic arguments. Organisational politics within the RA may provide another constraint. The threat of job losses in the RA and the erosion of traditionally held roles and responsibilities may produce a resistance to change that makes it difficult to make the changes required to implement a performance contract. Page 26

A REVIEW OF ACHIEVABLE EFFICIENCIES AND ASSOCIATED ISSUES UNDER OUTPUT AND PERFORMANCE BASED CONTRACTS

A REVIEW OF ACHIEVABLE EFFICIENCIES AND ASSOCIATED ISSUES UNDER OUTPUT AND PERFORMANCE BASED CONTRACTS A REVIEW OF ACHIEVABLE EFFICIENCIES AND ASSOCIATED ISSUES UNDER OUTPUT AND PERFORMANCE BASED CONTRACTS Authors: Ewan Hunter NZCE, BE (Civil), MIPENZ and Rowan Kyle BE (Civil), B. Ag.Sc MIPENZ Page 1 1.

More information

Risk Management Update ISO Overview and Implications for Managers

Risk Management Update ISO Overview and Implications for Managers Contents - ISO 31000 highlights 1 - Changes to key terms and definitions 2 - Aligning key components of the risk management framework 3 - The risk management process 4 - The principles of risk management

More information

Contract Management Part One Making the Business Case for Investment

Contract Management Part One Making the Business Case for Investment Contract Management Part One Making the Business Case for Investment Executive Summary This paper is the first in a short series of three which will look at the business case for organisations to invest

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

CAPITAL INVESTMENT SYSTEMS MAKING THE RIGHT INVESTMENT DECISIONS

CAPITAL INVESTMENT SYSTEMS MAKING THE RIGHT INVESTMENT DECISIONS INTRODUCTION CAPITAL INVESTMENT SYSTEMS MAKING THE RIGHT INVESTMENT DECISIONS Neil Cusworth Managing Director Enthalpy Pty Ltd Investment decisions to develop or acquire new capital assets should be made

More information

Five Global Pty Ltd ABN (0) (0)

Five Global Pty Ltd ABN (0) (0) Five Global Pty Ltd ABN 78 158 704 226 +61 (0) 468 999 561 +61 (0) 427 119 234 Introduction What is the optimum project management model that an Owner should employ to deliver a successful project? It

More information

ISO whitepaper, January Inspiring Business Confidence.

ISO whitepaper, January Inspiring Business Confidence. Inspiring Business Confidence. ISO 31000 whitepaper, January 2015 Author: Graeme Parker enquiries@parkersolutionsgroup.co.uk www.parkersolutionsgroup.co.uk ISO 31000 is an International Standard for Risk

More information

CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: INCENTIVISATION

CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: INCENTIVISATION CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: INCENTIVISATION INTRODUCTION The CIPS' practice documents are written as a statement in time. They are a collection of views on good practice

More information

Quick Guide: Meeting ISO Requirements for Asset Management

Quick Guide: Meeting ISO Requirements for Asset Management Please visit the NAMS.org.nz website for downloading the digital version of this quick guide. Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International

More information

STRATEGIC CASE STUDY FEBRUARY 2018 EXAM ANSWERS. Variant 5. The February 2018 exam can be viewed at

STRATEGIC CASE STUDY FEBRUARY 2018 EXAM ANSWERS. Variant 5. The February 2018 exam can be viewed at STRATEGIC CASE STUDY FEBRUARY 2018 EXAM ANSWERS Variant 5 The February 2018 exam can be viewed at These answers have been provided by CIMA for information purposes only. The answers created are indicative

More information

Central Procurement Directorate. removing the barriers to SMEs

Central Procurement Directorate. removing the barriers to SMEs Central Procurement Directorate removing the barriers to SMEs A GUIDE TO PURCHASERS FOREWORD Public procurement policy recognises the importance of SMEs both for the vital contribution they make to the

More information

MANAGEMENT CASE STUDY FEBRUARY 2018 EXAM ANSWERS. Variant 1. The February 2018 exam can be viewed at

MANAGEMENT CASE STUDY FEBRUARY 2018 EXAM ANSWERS. Variant 1. The February 2018 exam can be viewed at MANAGEMENT CASE STUDY FEBRUARY 2018 EXAM ANSWERS Variant 1 The February 2018 exam can be viewed at These answers have been provided by CIMA for information purposes only. The answers created are indicative

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

Public Private Partnerships: Airwave

Public Private Partnerships: Airwave Public Private Partnerships: Airwave REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 730 Session 2001-2002: 11 April 2002 LONDON: The Stationery Office 0.00 Ordered by the House of Commons to be printed

More information

OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS. Variant 2. The August 2016 exam can be viewed at

OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS. Variant 2. The August 2016 exam can be viewed at OPERATIONAL CASE STUDY AUGUST 2016 EXAM ANSWERS Variant 2 The August 2016 exam can be viewed at https://connect.cimaglobal.com/resources/operational-case-study-exam/august-2016- operational-case-study-exam---variant-2

More information

Procurement Guide Part 1

Procurement Guide Part 1 Procurement Guide Part 1 [Draft7_Part1_revB_Introduction_Aug12] P a g e 1 Draft7_Part1_revB_Introduction_Aug12 Procurement Guide Part 1 1.1 Introduction All projects consume goods and services as part

More information

New Zealand Transport Agency: Maintaining and renewing the state highway network follow-up report

New Zealand Transport Agency: Maintaining and renewing the state highway network follow-up report New Zealand Transport Agency: Maintaining and renewing the state highway network follow-up report Published under section 21 of the Public Audit Act 2001 October 2014 ISBN 978-0-478-41095-2 (online) Contents

More information

AUSTROADS HARMONISING ASSET DATA STANDARDS

AUSTROADS HARMONISING ASSET DATA STANDARDS Austroads Harmonising Asset Data Standards Tim Cross Page 1 AUSTROADS HARMONISING ASSET DATA STANDARDS Author and Presenter: Tim Cross B.Tech(Hons), GIPENZ, Cert. Foundation Business Analysis, ISACA Silver

More information

Cymdeithas Tai AELWYD Housing Association AELWYD HOUSING ASSOCIATION CONTINUOUS IMPROVEMENT PLAN

Cymdeithas Tai AELWYD Housing Association AELWYD HOUSING ASSOCIATION CONTINUOUS IMPROVEMENT PLAN Cymdeithas Tai AELWYD Housing Association AELWYD HOUSING ASSOCIATION CONTINUOUS IMPROVEMENT PLAN 2017 1. AELWYD'S STRATEGIC AIMS AND OBJECTIVES is a charitable housing association, which is formed for

More information

Procurement Models for Road Maintenance

Procurement Models for Road Maintenance Procurement Models for Road Maintenance Tony M Porter BE (Hons), FIPENZ Opus International Consultants Limited Napier New Zealand Paper Prepared for Presentation at the Best Practices in Contracting Routine

More information

Single or multi-sourcing model?

Single or multi-sourcing model? Outsourcing 2007/08 Single and multi-sourcing models Anthony Nagle and Alistair Maughan, Morrison & Foerster www.practicallaw.com/8-380-6567 Once an organisation decides to outsource, one of its biggest

More information

Responding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs.

Responding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs. Slide 2 In this module Companies today are spending more time planning and conducting a comprehensive screening process

More information

TRUST & RELATIONAL CONTRACTING

TRUST & RELATIONAL CONTRACTING TRUST & RELATIONAL CONTRACTING EXTRACT FROM MDL PAPER ON RELATIONAL CONTRACTING 1.0 THE RELEVANCE OF TRUST IN CONTRACTING 1.1 The role of trust in building relationships is fast gaining ground in the theory

More information

Impact of Agile on Change Management

Impact of Agile on Change Management Impact of Agile on Change Management Author Melanie Franklin Director Agile Change Management Limited Introduction Agile approaches and techniques are having significant impact on the volume, frequency

More information

APPENDIX A. This is the current form of relationship the Council has with its repairs and voids contractors, and is familiar with its operation.

APPENDIX A. This is the current form of relationship the Council has with its repairs and voids contractors, and is familiar with its operation. APPENDIX A 1. Options Appraisal A. Traditional contracting The key points in a traditional contract are: Can potentially obtain the best prices available in the market at tender stage, although care has

More information

Information sheet: STRATEGIC CASE: DEFINING PROBLEMS AND BENEFITS WELL

Information sheet: STRATEGIC CASE: DEFINING PROBLEMS AND BENEFITS WELL NZ TRANSPORT AGENCY Business Case Approach information sheet Strategic case: defining problems and benefits well June 2017 Information sheet: STRATEGIC CASE: DEFINING PROBLEMS AND BENEFITS WELL This information

More information

Procurement Options for NZ Construction Contracts

Procurement Options for NZ Construction Contracts 1 P a g e Tool Box Resource Procurement Options for NZ Construction Contracts A wide variety of contract arrangements have evolved in NZ for use on construction contracts. The following describes the most

More information

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2)

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) CARDIFF COUNCIL CYNGOR CAERDYDD CABINET MEETING: 27 JULY 2017 RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) REPORT OF CORPORATE DIRECTOR

More information

Enterprise Asset Management. Enterprise Asset Management 1

Enterprise Asset Management. Enterprise Asset Management 1 Enterprise Asset Management 1 Introduction Managing assets effectively is critical to the success of organisations that depend on complex physical assets to deliver services. Increasingly, operators and

More information

45. Feedlot construction delivery

45. Feedlot construction delivery Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction

More information

COUNTYWIDE RISK ASSESSMENT AND AUDIT PLAN SUMMIT COUNTY, OHIO

COUNTYWIDE RISK ASSESSMENT AND AUDIT PLAN SUMMIT COUNTY, OHIO COUNTYWIDE RISK ASSESSMENT AND AUDIT PLAN CONTENTS Page Independent Accountants Report on Applying Agreed-Upon Procedures 1 I. Introduction 2 II. Principles for the Risk Assessment and Audit Plan Development

More information

The Welsh Assembly Government is grateful for the report. We welcome the findings and offer the following response to the recommendations within it.

The Welsh Assembly Government is grateful for the report. We welcome the findings and offer the following response to the recommendations within it. The Welsh Assembly Government s response to the report of the National Assembly Audit Committee's report on NHS Energy Management: Committee Report (2)07-06 The Welsh Assembly Government is grateful for

More information

Sample Social Clauses to Encourage Community Benefits from Waste

Sample Social Clauses to Encourage Community Benefits from Waste Sample Social Clauses to Encourage Community Benefits from Waste What are social clauses and community benefits? 1 The UK Sustainable Development Strategy has set the challenge of making the UK an EU leader

More information

How do we measure up? An Introduction to Performance Measurement of the Procurement Profession

How do we measure up? An Introduction to Performance Measurement of the Procurement Profession How do we measure up? An Introduction to Performance Measurement of the Procurement Profession Introduction Stakeholder buy-in is definitely one of the biggest problems facing procurement in Australia

More information

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006 Assessing Extensions of Time Tony Farrow Trett Consulting March 2006 Contracts require the Works to be completed by a set date, subject to the Contractor s entitlement of extensions of time under the Conditions

More information

4 The balanced scorecard

4 The balanced scorecard SUPPLEMENT TO THE APRIL 2009 EDITION Three topics that appeared in the 2007 syllabus have been removed from the revised syllabus examinable from November 2009. If you have the April 2009 edition of the

More information

Geoff Cross, Vice President, Transportation Planning and Policy. Custom Transit Service Delivery Review: Outcomes and Recommendations

Geoff Cross, Vice President, Transportation Planning and Policy. Custom Transit Service Delivery Review: Outcomes and Recommendations TO: FROM: Board of Directors Geoff Cross, Vice President, Transportation Planning and Policy DATE: SUBJECT: Custom Transit Service Delivery Review: Outcomes and Recommendations PROPOSED RESOLUTIONS That

More information

Asset Management Policy

Asset Management Policy Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset

More information

CASH FLOW IS KING WHITE PAPER

CASH FLOW IS KING WHITE PAPER Cash Flow is King White Paper Executive summary Like a King is revered by his loyal subjects, so should cash flow be respected by the business owner(s) and staff alike, as it is the life blood of the business,

More information

Choosing Delivery Method

Choosing Delivery Method Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing

More information

ALTERNATE FORMS OF PROJECT DELIVERY

ALTERNATE FORMS OF PROJECT DELIVERY ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors

More information

INTRODUCTION. P a g e 1 20

INTRODUCTION. P a g e 1 20 INTRODUCTION LET ME START BY MAKING THE OBSERVATION THAT, ON THE EVE OF THE 2016 DEFENCE WHITE PAPER S RELEASE, INDIGENOUS DEFENCE INDUSTRY HAS ARRIVED AS A KEY COMPONENT OF AUSTRALIA S NATIONAL DEFENCE

More information

Key Points How to create an effective business plan

Key Points How to create an effective business plan Key Points What s in a business plan? 1. An executive summary 2. The business profile 3. The market analysis for your products or services 4. The marketing plan 5. The operating plan 6. The management

More information

CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: MONITORING THE PERFORMANCE OF SUPPLIERS

CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: MONITORING THE PERFORMANCE OF SUPPLIERS CIPS POSITIONS ON PRACTICE PURCHASING & SUPPLY MANAGEMENT: MONITORING THE PERFORMANCE OF SUPPLIERS INTRODUCTION The CIPS' practice documents are written as a statement in time. They are a collection of

More information

PRIVATE FINANCE INITIATIVE & PUBLIC PRIVATE PARTNERSHIPS

PRIVATE FINANCE INITIATIVE & PUBLIC PRIVATE PARTNERSHIPS INTO 33 PRIVATE FINANCE INITIATIVE & PUBLIC PRIVATE PARTNERSHIPS What is the Private Finance Initiative? The Government is promoting the Private Finance Initiative (PFI) and Public Private Partnerships

More information

Conception Design Construction Operation.

Conception Design Construction Operation. 4 Development Process and Procurement 4.1 The development process by which the project moves from the earliest ideas to the final completion of the facilities and their use can be considered as having

More information

Report to INFRASTRUCTURE SERVICES Committee for decision

Report to INFRASTRUCTURE SERVICES Committee for decision 15/247 Subject: Prepared by: Network Outcomes Contracts Dave Hadfield (General Manager - Tairāwhiti Roads) Meeting Date: 6 August 2015 Report to INFRASTRUCTURE SERVICES Committee for decision SUMMARY The

More information

Short Breaks and Self-directed Support: Opportunities and Challenges Introduction

Short Breaks and Self-directed Support: Opportunities and Challenges Introduction Short Breaks and Self-directed Support: Opportunities and Challenges Introduction Shared Care Scotland held a debate in Perth on November 2015 on This house believes that Self Directed Support is a threat

More information

Integrated Performance and Incentive Framework: Achieving the Best Health Care Performance for New Zealand

Integrated Performance and Incentive Framework: Achieving the Best Health Care Performance for New Zealand Integrated Performance and Incentive Framework: Achieving the Best Health Care Performance for New Zealand The health sector needs a new performance framework because: There is widespread support for a

More information

RELATIONSHIP CONTRACTING FOR CIVIL CONSTRUCTION BY STANDING OFFER PANEL ARRANGEMENTS

RELATIONSHIP CONTRACTING FOR CIVIL CONSTRUCTION BY STANDING OFFER PANEL ARRANGEMENTS RELATIONSHIP CONTRACTING FOR CIVIL CONSTRUCTION BY STANDING OFFER PANEL ARRANGEMENTS Simon Malouf : simonmalouf@logan.qld.gov.au Road Delivery Management Program Leader, Logan City Council, Queensland,

More information

Getting ready for AMP6 Delivering Capex Programmes in the Water Sector

Getting ready for AMP6 Delivering Capex Programmes in the Water Sector www.pwc.co.uk/water Getting ready for AMP6 Delivering Capex Programmes in the Water Sector January 2013 PwC has worked with capital programme delivery organisations in many of the UK s water and sewerage

More information

Office of the Auditor General. Follow-up to the 2011 Audit of Procurement Practices General. Tabled at Audit Committee October 8, 2015

Office of the Auditor General. Follow-up to the 2011 Audit of Procurement Practices General. Tabled at Audit Committee October 8, 2015 Office of the Auditor General Follow-up to the 2011 Audit of Procurement Practices General Tabled at Audit Committee October 8, 2015 Table of Contents Executive Summary... 1 Introduction... 1 Summary

More information

Impact of Agile on Change Management

Impact of Agile on Change Management Impact of Agile on Change Management Author Melanie Franklin Director Agile Change Management Limited Introduction Agile approaches and techniques are having significant impact on the volume, frequency

More information

Quality of Advice Process in Firms Offering Financial Advice

Quality of Advice Process in Firms Offering Financial Advice Quality of Advice Process in Firms Offering Financial Advice Considerations for Treating Customers Fairly 1 Contents Introduction TCF considerations for quality of advice Our findings Conclusions 2 Introduction

More information

Template for ToR for Transaction Advisory Services

Template for ToR for Transaction Advisory Services Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services

More information

Medical Category Tower Providers Contract Awards. Questions and Answers

Medical Category Tower Providers Contract Awards. Questions and Answers Medical Category Tower Providers Contract Awards Questions and Answers 1. What is the Future Operating Model (FOM)? The National Health Service (NHS) has the potential, through greater collaboration, to

More information

Measuring Performance Systems and Structures to drive improvement

Measuring Performance Systems and Structures to drive improvement Measuring Performance Systems and Structures to drive improvement 2 Workshop Objectives Understand the principles of performance management Learn how to develop performance measures Understand the tools

More information

Contract Change Management

Contract Change Management Slide 1 Change Control Management Welcome to this module on Change Control Management. Slide 2 This module addresses the factors of change and will help you to understand how to control project changes

More information

Information and Guidance relating to the Review of Unit Standards Registered on the NQF of Namibia

Information and Guidance relating to the Review of Unit Standards Registered on the NQF of Namibia Information and Guidance relating to the Review of Unit Standards Registered on the NQF of Namibia NQA Council Resolution: 2010/03/25/7 Table of Contents Introduction... 3 Key terms... 4 Review of Unit

More information

INTERNAL AUDIT PLAN AND CHARTER 2018/19

INTERNAL AUDIT PLAN AND CHARTER 2018/19 INTERNAL AUDIT PLAN AND CHARTER 208/9 PURPOSE OF REPORT. To present the proposed 208/9 audit plan and charter to the Audit Committee for consideration and approval..2 The Internal Audit Plan for 208/9

More information

Programme & Project Planning and Execution

Programme & Project Planning and Execution Portfolio, LEADING THE WAY IN PROJECTS Programme & Project Planning and Execution Caravel Group - Project Management with a total focus on value THE SPECIALIST FOR LARGE COMPLEX MULTI-DISCIPLINED PROJECTS

More information

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS 1) THE LIFE CYCLE OF A CONSTR. PROJECT: 1.1:CONCEPT AND FEASIBILITY STUDIES: THE START Recognition of a need for a new facility conceptual analyses Technical

More information

Auckland Transport HS08-01 Safety In Design

Auckland Transport HS08-01 Safety In Design Auckland Transport HS08-01 Safety In Design (Procedure uncontrolled when printing) Relating to Standard: HS08 Safety In Design December 2016 Health and Safety-Procedure-HS08-01 Safety In Design Contents

More information

RE: State Infrastructure Plan

RE: State Infrastructure Plan 3 July 2015 Att: Darren Crombie Department of Infrastructure, Local Government and Planning Via email: infrastructurepolicy@dilgp.qld.gov.au Dear Darren, RE: State Infrastructure Plan Consult Australia

More information

Procurement Strategy

Procurement Strategy Procurement Strategy Contents Introduction... 2 Objectives... 2 Our Key Procurement Principles... 3 The Procurement Process... 4 Sustainable Procurement... 5 1 P a g e Introduction Procurement is defined

More information

that these standards can only be delivered effectively by devolution of responsibility to the frontline;

that these standards can only be delivered effectively by devolution of responsibility to the frontline; UK GOVERNMENT RESPONSE TO THE EUROPEAN COMMISSION S GREEN PAPER ON PUBLIC-PRIVATE PARTNERSHIPS AND COMMUNITY LAW ON PUBLIC CONTRACTS AND CONCESSIONS, MAY 2004 The UK Government welcomes the debate on the

More information

APSE s Competitiveness Continuum and Efficiency

APSE s Competitiveness Continuum and Efficiency Briefing 10/55 October 2010 APSE s Competitiveness Continuum and Efficiency To: All Chief Executives, Main Contacts and APSE Contacts This briefing is one of a series of papers being issued by APSE around

More information

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

Level 5 NVQ Diploma in Management and Leadership Complete

Level 5 NVQ Diploma in Management and Leadership Complete Learner Achievement Portfolio Level 5 NVQ Diploma in Management and Leadership Complete Qualification Accreditation Number: 601/3550/5 Version AIQ004461 Active IQ wishes to emphasise that whilst every

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification

Level 7 NVQ Diploma in Construction Senior Management. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support for candidates 6 Links to National Standards / NOS

More information

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification

Level 7 NVQ Diploma in Construction Site Management. Qualification Specification Level 7 NVQ Diploma in Construction Site Management Qualification Specification ProQual 2016 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 6 Support

More information

25th March The Secretary Senate Standing Committee on Economics PO Box 6100 Parliament House CANBERRA ACT

25th March The Secretary Senate Standing Committee on Economics PO Box 6100 Parliament House CANBERRA ACT 25th March 2009 The Secretary Senate Standing Committee on Economics PO Box 6100 Parliament House CANBERRA ACT 2600 Email: economics.sen@aph.gov.au Australian Aluminium Council submission to Senate Standing

More information

DHL E-Business White Paper 2000

DHL E-Business White Paper 2000 DHL White Paper 2000/ 1 DHL E-Business White Paper 2000 Author: Colum Joyce DHL Electronic Commerce Strategy Manager Introduction The Internet and its associated technologies are transforming many businesses

More information

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Canadian Energy Law Foundation March 1, 2013 11:00 a.m. 12:00 p.m. Introduction

More information

Sportnz.org.nz/facilityguide. Sport & Recreation Facility Development Guide

Sportnz.org.nz/facilityguide. Sport & Recreation Facility Development Guide Sportnz.org.nz/facilityguide Sport & Recreation Facility Development Guide INTRODUCTION Background Sport New Zealand s Strategic Plan 2015-20 has a vision for New Zealand to be the world s most successful

More information

TOOL #47. EVALUATION CRITERIA AND QUESTIONS

TOOL #47. EVALUATION CRITERIA AND QUESTIONS TOOL #47. EVALUATION CRITERIA AND QUESTIONS 1. INTRODUCTION All evaluations and fitness checks should assess the evaluation criteria of effectiveness, efficiency, coherence, relevance and EU added value

More information

INSTITUTION OF CIVIL ENGINEERS (ICE) SCOTLAND WRITTEN SUBMISSION

INSTITUTION OF CIVIL ENGINEERS (ICE) SCOTLAND WRITTEN SUBMISSION INSTITUTION OF CIVIL ENGINEERS (ICE) SCOTLAND WRITTEN SUBMISSION Introduction and background The Institution of Civil Engineers is a global membership organisation which qualifies civil engineers, exchanges

More information

The Radiocommunications Agency s joint venture with CMG

The Radiocommunications Agency s joint venture with CMG The Radiocommunications Agency s joint venture with CMG REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 21 Session 2000-2001: 8 December 2000 LONDON: The Stationery Office 0.00 Ordered by the House of

More information

Branch guide: Best Value update (England and Wales)

Branch guide: Best Value update (England and Wales) Supporting members Defending services Branch guide: Best Value update (England and Wales) Branch guide: Best Value update (England and Wales) Introduction Best Value was a key policy for local government

More information

Working Capital Management 2017 a survey of small and medium-sized Norwegian companies

Working Capital Management 2017 a survey of small and medium-sized Norwegian companies Report Working Capital Management 2017 a survey of small and medium-sized Norwegian companies Prepared by Norsk Arbeidskapital Acknowledgements We gratefully acknowledge the efforts of our survey respondents

More information

Personalised Support for MD and CEO. How SME s can breakthrough and achieve consistent growth for creating sustainable value

Personalised Support for MD and CEO. How SME s can breakthrough and achieve consistent growth for creating sustainable value Independent Services for Directors of SME s Personalised Support for MD and CEO OPINION PAPER How SME s can breakthrough and achieve consistent growth for creating sustainable value Contents: Introduction:

More information

Queen Alia International Airport Expansion

Queen Alia International Airport Expansion JORDAN Queen Alia International Airport Expansion Image: Aerial view of the terminal after completion by KRISTIN HOOVER, courtesy of Foster and Partners- Photographer Nigel Young / CC BY-NC-ND 3.0 OVERVIEW

More information

FINANCE COMMITTEE CALL FOR EVIDENCE PROCUREMENT REFORM (SCOTLAND) BILL: FINANCIAL MEMORANDUM

FINANCE COMMITTEE CALL FOR EVIDENCE PROCUREMENT REFORM (SCOTLAND) BILL: FINANCIAL MEMORANDUM FINANCE COMMITTEE CALL FOR EVIDENCE PROCUREMENT REFORM (SCOTLAND) BILL: FINANCIAL MEMORANDUM SUBMISSION FROM SCOTTISH FEDERATION OF HOUSING ASSOCIATIONS Introduction 1. As the national representative body

More information

Developing Mechanisms for Promoting DSM and Energy Efficiency in Changing Electricity Businesses

Developing Mechanisms for Promoting DSM and Energy Efficiency in Changing Electricity Businesses Published in: Proceedings of the 38th Annual Conference of the Australian & New Zealand Solar Energy Society: Solar 2000. Brisbane, Australia, ANZSES, pp 1-12. ABSTRACT Developing Mechanisms for Promoting

More information

IMPROVEMENT SKILLS CONSULTING LTD. Simply, improvement. You don t need a Culture Change Programme

IMPROVEMENT SKILLS CONSULTING LTD. Simply, improvement. You don t need a Culture Change Programme IMPROVEMENT SKILLS CONSULTING LTD. Simply, improvement You don t need a Culture Change Programme You don t need a Culture Change Programme Is it just me? How many times have we heard politicians, commentators

More information

THE QUADRO 2017 MANUAL PART 1 ECONOMIC CONCEPTS IN QUADRO. Contents. Chapter. 1. The QUADRO Method. 2. Defining the Options for Appraisal

THE QUADRO 2017 MANUAL PART 1 ECONOMIC CONCEPTS IN QUADRO. Contents. Chapter. 1. The QUADRO Method. 2. Defining the Options for Appraisal THE QUADRO 2017 MANUAL PART 1 ECONOMIC CONCEPTS IN QUADRO Contents Chapter 1. The QUADRO Method 2. Defining the Options for Appraisal 3. Discounting, the Price Basis and Treatment of Taxation 4. Single

More information

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-2020 Glasgow West Housing Association Limited Registered with The Scottish Housing Regulator HEP126 Registered under the Co-operative and Community

More information

Regulatory Approach to Maintaining Local Security of Supply in Electricity

Regulatory Approach to Maintaining Local Security of Supply in Electricity An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Regulatory Approach to Maintaining Local Security of Supply in Electricity Information Paper Reference: CRU17346 Date Published: 18/12/2017

More information

Assessing the ROI of training

Assessing the ROI of training Page 1 of 7 Assessing the ROI of training by Clive Shepherd If people really are your greatest asset, isn't it time to look at your training programmes as investments in your organisation's human capital

More information

The Contribution of NSW Community Service Organisations

The Contribution of NSW Community Service Organisations The Contribution of NSW Community Service Organisations December 2015 Contents 1. Context... 1 2. Research Approach... 2 3. Research Findings... 3 4. Recommendations... 5 5. Case study 1: Local Multiplier

More information

PROJECT MANAGEMENT - BUSINESS CASES AND GATEWAYS BY KEN GARRETT

PROJECT MANAGEMENT - BUSINESS CASES AND GATEWAYS BY KEN GARRETT PROJECT MANAGEMENT - BUSINESS CASES AND GATEWAYS BY KEN GARRETT It can be assumed that whenever an organisation embarks on a project to improve its performance and results, the project is expected to bring

More information

David Lucas: Cost Management in a Complex Contracting Environment

David Lucas: Cost Management in a Complex Contracting Environment David Lucas: Cost Management in a Complex Contracting Environment Contracting is a primary method that both Owners and Contractors utilize to allocate identified risks associated with a project. In today

More information

A structured approach for highlighting design weaknesses in all types of plant and equipment before the design leaves the drawing board

A structured approach for highlighting design weaknesses in all types of plant and equipment before the design leaves the drawing board SDS0902 A structured approach for highlighting design weaknesses in all types of plant and equipment before the design leaves the drawing board Overview of Structured Design Scrutiny (SDS) Definition Structured

More information

SNAP Review Findings & Recommendations Paper for HACT

SNAP Review Findings & Recommendations Paper for HACT EXECUTIVE SUMMARY SNAP Review Findings & Recommendations Paper for HACT Background The SNAP Consortium is a group of six organisations, set up to jointly run Floating Support and gateway services across

More information

Internal self assessment

Internal self assessment Internal self assessment Understanding your internal capability for collaboration is a crucial part of developing the right platform for building effective relationships. About PSL PSL (Partnership Sourcing

More information

EUROPEAN LOCATION SERVICES VISION AND STRATEGY. Securing the long-term future of authoritative geospatial information and services

EUROPEAN LOCATION SERVICES VISION AND STRATEGY. Securing the long-term future of authoritative geospatial information and services EUROPEAN LOCATION SERVICES VISION AND STRATEGY Securing the long-term future of authoritative geospatial information and services EUROPEAN LOCATION SERVICES VISION AND STRATEGY CONTENTS INTRODUCTION...

More information

Chartered Institute of Internal Auditors. The above areas are addressed by the sections identified below:

Chartered Institute of Internal Auditors. The above areas are addressed by the sections identified below: 22 March 2018 Projects Chartered Institute of Internal Auditors Internal audit can play a significant role in helping an organisation achieve its strategic objectives in relation to project management.

More information

LIES, DAMNED LIES and KPIs A White Paper on Key Performance Indicators By Mark Sykes Principal Consultant Fox IT

LIES, DAMNED LIES and KPIs A White Paper on Key Performance Indicators By Mark Sykes Principal Consultant Fox IT LIES, DAMNED LIES and KPIs A White Paper on Key Performance Indicators By Mark Sykes Principal Consultant Fox IT Fox IT SM Resourcing Ltd 2013 Page 1 of 8 Lies, Damned Lies and KPIs Benjamin Disraeli is

More information

Application of the Actual Costs Saved and Avoided Costs Saved Standards

Application of the Actual Costs Saved and Avoided Costs Saved Standards 12 April 2005 374895 FINAL THE COMMISSION S VIEW ON THE ACTUAL COSTS SAVED AND AVOIDED COSTS SAVED STANDARDS: APPLICATION OF THE FINAL PRICING PRINCIPLE FOR RESALE OF TELECOM RETAIL SERVICES Executive

More information